ML21168A346

From kanterella
Jump to navigation Jump to search

Acceptance of Requested Licensing Action License Amendment Request - Adoption of TSTF-501, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (EPID L-2021-LLA-0096) (Email)
ML21168A346
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 06/17/2021
From: Ballard B
Plant Licensing Branch 1
To: Reynolds R
Exelon Nuclear, Exelon Generation Co
Ballard, B., NRR/DORL/LPL
References
EPID L-2021-LLA-0096
Download: ML21168A346 (2)


Text

1 Ballard, Brent From:

Ballard, Brent Sent:

Thursday, June 17, 2021 3:25 PM To:

[Licensee] Ron Reynolds (Exelon)

Cc:

Marshall, Michael; Danna, James

Subject:

NINE MILE POINT NUCLEAR STATION, UNIT 2 - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: LICENSE AMENDMENT REQUEST - ADOPTION OF TSTF-501, RELOCATE STORED FUEL OIL AND LUBE OIL VOLUME VALUES TO LICENSEE CONTROL. (EPID L-2021-LLA-0096)

GoodafternoonRon,



ByletterdatedMay26,2021(AgencywideDocumentsAccessandManagementSystem(ADAMS)AccessionNo.

ML21146A045),ExelonGenerationCompany,LLC(thelicensee)submittedalicenseamendmentrequest(LAR)forNine

MilePointNuclearStation,Unit2.ThepurposeofthisemailistoprovidetheresultsoftheU.S.NuclearRegulatory

Commission(NRC)staffsacceptancereviewofthisamendmentrequest.Theacceptancereviewwasperformedto

determineifthereissufficienttechnicalinformationinscopeanddepthtoallowtheNRCstafftocompleteitsdetailed

technicalreview.Theacceptancereviewisalsointendedtoidentifywhethertheapplicationhasanyreadilyapparent

informationinsufficienciesinitscharacterizationoftheregulatoryrequirementsorthelicensingbasisoftheplant.



TheproposedLARwouldreviseTechnicalSpecification(TS)3.8.3,DieselFuelOil,LubeOil,andStartingAir,

SurveillanceRequirement(SR)3.8.3.1,andSR3.8.3.2.TheproposedchangesreviseTS3.8.3byrelocatingthecurrent

storeddieselfueloilnumericalrequirementsfromtheTStotheTSBasessothatitmaybemodifiedunderlicensee

control.TheproposedchangesarebasedonTechnicalSpecificationTaskForce(TSTF)TravelerTSTF501,Revision1,

RelocateStoredFuelOilandLubeOilVolumeValuestoLicenseeControl.



ConsistentwithSection50.90ofTitle10oftheCodeofFederalRegulations(10CFR),anamendmenttothelicense

(includingthetechnicalspecifications)mustfullydescribethechangesrequested,andfollowingasfarasapplicable,the

formprescribedfororiginalapplications.Section50.34of10CFRaddressesthecontentoftechnicalinformation

required.Thissectionstipulatesthatthesubmittaladdressthedesignandoperatingcharacteristics,unusualornovel

designfeatures,andprincipalsafetyconsiderations.



TheNRCstaffhasreviewedyourapplicationandconcludedthatitdoesprovidetechnicalinformationinsufficientdetail

toenabletheNRCstafftocompleteitsdetailedtechnicalreviewandmakeanindependentassessmentregardingthe

acceptabilityoftheproposedamendmentrequestintermsofregulatoryrequirementsandtheprotectionofpublic

healthandsafetyandtheenvironment.Giventhelesserscopeanddepthoftheacceptancereviewascomparedtothe

detailedtechnicalreview,theremaybeinstancesinwhichissuesthatimpacttheNRCstaffsabilitytocompletethe

detailedtechnicalreviewareidentifieddespitecompletionofanadequateacceptancereview.Youwillbeadvisedofany

furtherinformationneededtosupporttheNRCstaffsdetailedtechnicalreviewbyseparatecorrespondence.



Basedontheinformationprovidedinyoursubmittal,theNRCstaffhasestimatedthatthislicensingrequestwilltake

approximately120hourstocomplete.TheNRCstaffexpectstocompletethisreviewbyJune17,2022.Ifthereare

emergentcomplexitiesorchallengesinourreviewthatwouldcausechangestotheinitialforecastedcompletiondateor

significantchangesintheforecastedhours,thereasonsforthechanges,alongwiththenewestimates,willbe

communicatedduringtheroutineinteractionswiththeassignedprojectmanager.



TheseestimatesarebasedontheNRCstaffsinitialreviewoftheapplicationandtheycouldchange,duetoseveral

factorsincludingrequestsforadditionalinformation,unanticipatedadditionofscopetothereview,andreviewbyNRC

advisorycommitteesorhearingrelatedactivities.AdditionaldelaymayoccurifthesubmittalisprovidedtotheNRCin

advanceorinparallelwithindustryprograminitiativesorpilotapplications.

2



Ifyouhaveanyquestions,pleasecontactmeat3014150680orbyemail.



BrentBallard

ProjectManager

PlantLicensingBranch1

DivisionofOperatingReactorLicensing

OfficeofNuclearReactorRegulation

U.S.NuclearRegulatoryCommission

3014150680