Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML24008A262 | 8 January 2024 | Acceptance Review Determination for Relief Request I5R-12, Concerning Installation of a FSWOL on RPV Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld | Weld Overlay Dissimilar Metal Weld |
ML23019A309 | 19 January 2023 | Acceptance Review Determination License Amendment Request to Adopt 10 CFR 50.69 Categorization Process | |
ML23019A303 | 19 January 2023 | Acceptance Review Determination License Amendment Requets to Adopt TSTF-505 | |
ML22252A152 | 9 September 2022 | Acceptance Review Determination Partial Adoption of TSTF-568 to Revise TS 3.3.1 for Primary Containment Oxygen Concentration | |
ML22207A012 | 26 July 2022 | Acceptance Review Determination Revision to Alternative Source Term Analysis for Containment Leakage | |
ML22173A080 | 22 June 2022 | E-mail Dated 6/22/2022, Acceptance of Requested License Amendment Request to Revise Surveillance Requirements to Reduce Number of Fast Starts of EDGs | |
ML22075A036 | 16 March 2022 | Acceptance Review Determination - Relief Request CS-PR-02 Associated with Pump Periodic Verification Test of Core Spray System Pumps, E-mail Dated 3/16/2022 | |
ML21278A687 | 5 October 2021 | Acceptance Review Determination - Relief Request GV-RR-10 | |
ML21077A177 | 8 April 2021 | Withdrawal of Requested Exemption from Certain Requirement in 10 CFR 50.55a (Epids L-2021-LLE-0014, 0015, & 0016) | Incorporated by reference Exemption Request |
ML21033A943 | 2 February 2021 | Correction to Acceptance of Requested License Amendment to Adopt Technical Specification Task Force Traveler 582 | Water Inventory Control |
ML20294A424 | 20 October 2020 | Acceptance of Requested Licensing Action Relief Requests CTNSP-PR-01 and CS-PR-01 (EPIDs L-2020-LLR-0136 and L-2020-LLR-0137) | |
ML20262H032 | 18 September 2020 | Acceptance Email of Requested Licensing Actions Concerning Surveillance Frequency for Excess Flow Check Valve Testing Frequency (EPIDs L-2020-LLA-0188 and L-2020-LLR-0114) | |
ML20262G937 | 17 September 2020 | Acceptance of Requested Licensing Action End of Interval Relief Request Associated with the Fourth Ten-Year Inservice Inspection (ISI) Interval | |
ML19339E854 | 5 December 2019 | Supplemental Information Needed for Acceptance of Requested Licensing Action Adoption of Risk-Informed Completion Times | |
ML19301C316 | 28 October 2019 | Acceptance of Requested Licensing Action Relief Request 2ISI - 014 | |
ML18206A717 | 25 July 2018 | Acceptance of Requested Licensing Action Revision to Technical Specification for Primary Containment Oxygen Concentration | |
ML18190A140 | 9 July 2018 | Acceptance of Requested Licensing Action Relief Requests I5R-05 and I4R-05 Threads in Flange | |
ML18190A092 | 6 July 2018 | Acceptance of Requested Licensing Action Relief Requests I5R-06 and I4R-06 - Use of Encoded Phased Array | |
ML18192B858 | 6 July 2018 | L-2018-LLR-0085 - Acceptance Email for RR BWRVIP Requirements 2018-07-06 | |
ML18186A535 | 5 July 2018 | Acceptance of Requested Licensing Action Relief Requests I5R-04 and I4R-04 - N-513-4 | |
ML18107A025 | 16 April 2018 | Acceptance of License Amendment Request Relocation of Surveillance Requirement Frequencies to Inservice Testing Program | |
ML18071A158 | 12 March 2018 | Acceptance of License Amendment Request Concerning Proposed Changes to Remove Boraflex Credit | |
ML17340A954 | 5 December 2017 | Acceptance of License Amendment Request Concerning Changes to Safety Limit Minimum Critical Power Ratios for Cycle 17 | Minimum Critical Power Ratio |
ML17192A175 | 11 July 2017 | Plants, Units 1 and 2; Calvert Cliffs Independent Spent Fuel Storage Installation; Nine Mile Point Nuclear Station, Units 1 and 2; R. E. Ginna - Acceptance of License Amendment Request to Revise Emergency Action Level Schemes | |
ML17167A219 | 21 June 2017 | Acceptance of Requested Licensing Action Amendment to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-522 | |
ML17143A041 | 23 May 2017 | Acceptance of Requested Licensing Action Amendments to Revise Emergency Action Level | |
ML17143A264 | 23 May 2017 | Acceptance of Requested Licensing Action Amendment to Revise Emergency Action Level | |
ML17117A362 | 2 May 2017 | Acceptance of Requested Licensing Action Amendment to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-283A, Revision 3 | |
ML17083A365 | 31 March 2017 | Acceptance of Requested Licensing Action Relief Request to Utilize Code Case N-702 | |
ML17058A434 | 2 March 2017 | Acceptance of Requested Licensing Action Reduce Steam Dome Pressure in Reactor Core Safety Limits | |
ML17019A053 | 31 January 2017 | Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment to Reduce Steam Dome Pressure in Reactor Core Safety Limits | |
ML17017A109 | 24 January 2017 | Acceptance of Requested Licensing Action Partial Length Fuel Rod Burnup | |
ML13022A325 | 22 January 2013 | MF0345 - Acceptance of Requested Licensing Action License Amendment Request- Relocation of PT Limit Curves to PTLR | Pressure and Temperature Limits Report |
ML12222A029 | 9 August 2012 | Correction to Acceptance Letter - Nine Mile Point Nuclear Station, Unit No. 1 - License Amendment Request Pursuant to 10CFR 50.90: Adoption of NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generat | Fire Protection Program |
ML121300491 | 9 May 2012 | ME8534, E-mail to Licensee for Acceptance of Relief Request RR-PTRR-02 | |
ML111590552 | 7 June 2011 | E-mail from R.Guzman to J.Dosa - Acceptance Review Determination for Request to Revise Emergency Action Levels in Accordance with NEI-99-01 | |
ML110950292 | 5 April 2011 | Acceptance Review Determination Relief Request for Repair of CRD Housing Penetrations | |
ML103610334 | 5 January 2011 | Acceptance Review Determination of License Amendment Request Revisions to Average Power Range Monitor Instrumentation Operability Requirements TS 3.6.2 | |
ML101260166 | 6 May 2010 | E-mail from R. Guzman to J. Dosa Acceptance Review Revised Questions for License Amendment Requesting 14 Day Completion Time Extension for Inoperable EDG | |
ML101180379 | 28 April 2010 | Unit No.2 - E-mail from R. Guzman to J. Dosa Acceptance Review for LAR - Inoperable DG 14-Day Completion Time Extension | |
ML101120987 | 22 April 2010 | E-mail from R. Guzman to J. Dosa Acceptance Review Determination for LAR to Modify Technical Specifications for Inoperable Snubbers and Add LCO 3.0.8 | |
ML091890666 | 8 July 2009 | E-mail from R. Guzman to J. Dosa Acceptance Review Results of NMP2 Extended Power Uprate Application | |
ML090570315 | 26 February 2009 | Acceptance Review Constellation and Edf Development - Application for Approval of License Transfers and Conforming License Amendment Request-Calvert Cliffs Nuclear Power Plant 1 and 2, Nine Mile Point Nuclear Station 1 and 2, and R.E. Ginna |