Letter Sequence Approval |
---|
EPID:L-2023-LLR-0017, Presentation Slides for Information Call on 4/13/23 N2E Recirc Discharge Nozzle Weld Repair 2nd Request for Alternative (Approved, Closed) |
|
|
|
---|
Category:Code Relief or Alternative
MONTHYEARML23354A0032024-01-19019 January 2024 Authorization and Safety Evaluation for Alternative Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines ML23104A3472023-04-14014 April 2023 Verbal Authorization for Relief Request I5R-14, Proposed Alternative Associated with N2E Dissimilar Metal Weld Overlay Repair with Laminar Indication ML22339A0582022-12-21021 December 2022 Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps ML21280A0782021-10-27027 October 2021 Proposed Alternative to Use of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-893 (Epids L-2020-LLR-0147 and L-2020-LLR-0148) NMP2L2777, Relief Request Associated with Excess Flow Check Valves2021-09-0808 September 2021 Relief Request Associated with Excess Flow Check Valves ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML21140A1532021-06-0303 June 2021 Correction to April 22, 2021 Safety Evaluation for Requests for Alternative to the Inservice Testing Requirements of the ASME OM Code for the Fifth 10-Year Program Interval ML21109A2162021-04-22022 April 2021 Proposed Alternative to Inservice Testing Requirements of the ASME OM Code for the Fifth 10-Year Interval ML21105A3382021-04-22022 April 2021 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Concerning Examination Coverage of Certain Class 1 and 2 Component Welds ML21049A0242021-02-23023 February 2021 Alternative Request to the Requirements of the ASME OM Code for the Testing Intervals for the Instrument-Line Flow Check Valves ML20294A4242020-10-20020 October 2020 Acceptance of Requested Licensing Action Relief Requests CTNSP-PR-01 and CS-PR-01 (EPIDs L-2020-LLR-0136 and L-2020-LLR-0137) ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20188A2642020-07-0606 July 2020 Clinton Power Station, R.E. Ginna Station, Limerick Station, Nine Mile Point Station & Peach Bottom Station - Proposed Alternative to Utilize Code Case OMN-26 - Response to Request for Additional Information ML20113F0412020-04-30030 April 2020 Proposed Alternative to the Submittal Schedule for Certain Reports (COVID-19) ML20099D9552020-04-17017 April 2020 Request to Use Provisions in the 2013 Edition of the ASME Boiler and Pressure Vessel Code for Performing Non-Destructive Examinations RS-20-020, Relief Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)(3)(xi)2020-02-28028 February 2020 Relief Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)(3)(xi) ML20036D9622020-02-0404 February 2020 Dresden Nuclear Power Station, Nine Mile Point Nuclear Station, Peach Bottom Atomic Power Station, & Quad Cities Nuclear Power Station - Proposed Alternative to Extend Reactor Pressure Vessel Safety Relief Valve Testing Frequency ML19269C5342019-09-27027 September 2019 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19161A2572019-06-0404 June 2019 BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19046A1142019-02-25025 February 2019 Issuance of Relief Requests 154-04 and 14R-04 Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography JAFP-19-0023, Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds2019-02-15015 February 2019 Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds ML18334A2362018-12-21021 December 2018 Alternative to the Requirements of the ASME Code ML18332A0422018-12-12012 December 2018 Issuance of Relief Requests I5R-04 and I4R-04 Use of ASME Code Case N-513-4 in Lieu of Specific ASME Code Requirements ML18318A4222018-12-10010 December 2018 Issuance of Relief Request Use of ASME Code Case OMN-13 in Lieu of Specific ASME Code Requirements ML18275A1392018-11-13013 November 2018 Relief from the Requirements of the ASME Code (EPID L-2017-LLR-0145 Through EPID L-2017-LLR-0152) NMP1L3226, Submittal of Relief Requests Associated with the Fifth and Fourth Lnservice Inspection Intervals2018-06-0808 June 2018 Submittal of Relief Requests Associated with the Fifth and Fourth Lnservice Inspection Intervals JAFP-18-0052, Proposed Alternative to Utilize Code Case N-8792018-05-30030 May 2018 Proposed Alternative to Utilize Code Case N-879 JAFP-18-0053, Proposed Alternative to Utilize Code Cases N-878 and N-8802018-05-30030 May 2018 Proposed Alternative to Utilize Code Cases N-878 and N-880 ML17331A1812017-12-0505 December 2017 Alternative to the Requirements of the American Society of Mechanical Engineers Code (CAC Nos. MF9381 and MF9382; EPID L-2017-LLR-0015) ML17297A5242017-11-0606 November 2017 R. E. Ginna - Request for Use of a Portion of a Later Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (CAC Nos. MG0079-MG0083; EPID L-2017-LLR-0061) ML17170A0132017-06-26026 June 2017 Proposed Alternative to Eliminate Examination of Threads in Reactor Pressure Vessel Flange (CAC Nos. MF8712-MF8729 and MF9548) ML17136A1122017-05-30030 May 2017 Alternative to the Requirements of the American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants NMP1L3146, Response to Request for Additional Information to Relief to Perform Pressure Isolation Valve Leakage Testing at Frequencies Consistent with 10 CFR 50, Appendix J2017-04-0606 April 2017 Response to Request for Additional Information to Relief to Perform Pressure Isolation Valve Leakage Testing at Frequencies Consistent with 10 CFR 50, Appendix J ML16230A2372016-09-0606 September 2016 Fleet Request for Proposed Alternative to Use ASME Code Case N-513-4 (CAC Nos. MF7301-MF7322) ML16138A0212016-05-19019 May 2016 Proposed Alternative to Use Code Case N-789 (CAC Nos. MF7018-MF7022) ML16071A2332016-04-29029 April 2016 Relief Request Alternative Use of Boiling Water Reactor Vessel and Internals Project Guidelines in Lieu of Specific ASME Code Requirements ML13290A1722013-10-24024 October 2013 Relief from the Requirements of the ASME Code Request Number 2lSl-011, Rev. 00, Request to Utilize an Alternative to the Requirements of 10 CFR 50.55a(g) for Implementation of a Risk-Informed, Safety-Base ML13052A3732013-03-15015 March 2013 ME5789-Authorization of Relief Request 1ISI-004, Revision 1 (NMP1 Relief Request) ML13084A2442013-03-14014 March 2013 Response to Request for Review of Draft NRC Safety Evaluation, Relief from Requirements of ASME Code, Section XI, Request No. 1ISI-004, Revision 1, Repair of Control Rod Drive Housing Penetrations ML12166A2692012-06-22022 June 2012 ME8534-Authorization of Relief Request No. RR-PTRR-02, Revision 1,Recirc Pump Seals Replacement ML1109503072011-03-25025 March 2011 Request to Utilize an Alternative to the Requirements of 10 CFR 50.55a(g) for the Repair of Control Rod Drive Housing Penetrations for the Remainder of the License Renewal Period of Extended Operation ML1007000342010-03-15015 March 2010 Request for Alternative 1ISI-003, Request to Use ASME Code Case N-716 Associated with the Fourth 10-year Inservice Inspection Interval ML0926300072009-09-23023 September 2009 Request for Alternative No. MSS-VR-02 Main Steam Safety Relief Valve Test Interval Extension ML0919804542009-08-0303 August 2009 Request to Utilize Alternative of Applying ASME Code Case 730 for Repair and ISI of Control Rod Drive Bottom Head Penetrations for the License Renewal Period of Extended Operation ML0831904942008-12-0101 December 2008 Relief Request 2ISI-007 and 2ISI-009 for Third 10-Year ISI Interval ML0633204612006-11-16016 November 2006 Request for Permanent Relief from Inservice Inspection Requirements of 10 CFR 50.55a(g) for the Volumetric Examination of Circumferential Reactor Pressure Vessel Welds ML0332400602003-11-21021 November 2003 Relief, Approval of Alternative Regarding Dissimilar Metal Welds ML0312200272003-05-0606 May 2003 Authorization of Alternative, Inservice Inspection (ISI) Relief Request ISI-23B, TAC MB5732 2024-01-19
[Table view] Category:E-Mail
MONTHYEARML24008A0592024-01-0808 January 2024 E-mail Dated 1-8-2024 from R. Guzman to R. Reynolds Correct TS Page 204 for License Amendment No. 250 Adoption of TSTF-505 ML24008A2622024-01-0808 January 2024 Acceptance Review Determination for Relief Request I5R-12, Concerning Installation of a FSWOL on RPV Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld ML23268A0022023-09-22022 September 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-264-A, Revision 0 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23255A2872023-09-12012 September 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative to Use the Successive Inspection Requirements of BWRVIP-75-A ML23237B3972023-08-24024 August 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative Request to Use Updated BWRVIP Guidelines ML23205A2432023-07-19019 July 2023 NRC Staff Follow-up Question on Audit Question 18 TSTF-505 and 50.69 Regulatory Audit (E-mail Dated 7/19/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23205A2412023-07-11011 July 2023 NRC Staff Follow-up Comments on Audit Questions 6a, 6b, and 6c TSTF-505 and 50.69 Regulatory Audit (E-mail Dated 7/11/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23205A2422023-07-11011 July 2023 NRC Staff Follow-up Comments on Audit Questions 17 and 19 TSTF-505 and 50.69 Regulatory Audit (E-mail Dated 7/11/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23209A7692023-06-14014 June 2023 Draft Audit Results File TSTF-505 and 50.69 (E-mail Dated 6/14/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23209A7672023-06-13013 June 2023 Share File Observations on Response to Question 06 and 22 TSTF-505 and 50.69 (E-mail Dated 6/13/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23163A2292023-06-12012 June 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-580, Revision 1 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23149A0012023-05-29029 May 2023 Audit Agenda TSTF-505 and 50.69 (E-mail Dated 5/29/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23142A0222023-05-22022 May 2023 Regulatory Audit Questions (PRA) TSTF-505 and 50.69 (E-mail Dated 5/22/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23118A3882023-04-28028 April 2023 Regulatory Audit Questions TSTF-505 and 50.69 (E-mail Dated 4/28/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23104A3472023-04-14014 April 2023 Verbal Authorization for Relief Request I5R-14, Proposed Alternative Associated with N2E Dissimilar Metal Weld Overlay Repair with Laminar Indication ML23093A1782023-04-0303 April 2023 E-mail from T. Loomis to R. Guzman Proposed Alternative to Utilize Specific Provisions of Code Case N-716-3 ML23090A1302023-03-31031 March 2023 Verbal Authorization for Relief Request I5R-11, Proposed Alternative Repair of Recirculation Inlet Nozzle N2E Dissimilar Metal Weld ML23087A2912023-03-28028 March 2023 Request for Additional Information (3/28/2023 E-mail) - Proposed Emergent I5R-11 Alternative Associated with a Weld Overlay on RPV Recirculation Nozzle N2E DM Weld ML23061A0522023-03-0202 March 2023 Request for Additional Information (3/2/2023 E-mail) - Proposed Alternative Associated with a Weld Overlay Repair to the Torus ML23047A3832023-02-15015 February 2023 (2-15-2023 Email from J. Nelson to R. Guzman) Long Island Power Authority and Long Island Lighting Company Request for Threshold Determination ML23033A0142023-02-0202 February 2023 E-mail Dated 2-2-2023 from R.Guzman to R.Reynolds Correction to Error in NMP1 TSTF-505 and 50.69 Audit Plan ML23019A3092023-01-19019 January 2023 Acceptance Review Determination License Amendment Request to Adopt 10 CFR 50.69 Categorization Process ML23019A3032023-01-19019 January 2023 Acceptance Review Determination License Amendment Requets to Adopt TSTF-505 ML23013A3332023-01-13013 January 2023 Acceptance Review Determination Proposed Alternative for Weld Overlay Repair to the Torus ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22342B1462022-11-21021 November 2022 NRR E-mail Capture - Acceptance Review for TSTF 295A ML22314A2262022-11-10010 November 2022 E-mail Dated 11/10/2022 Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps ML22301A0902022-10-28028 October 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-301, Revision 2 ML22252A1522022-09-0909 September 2022 Acceptance Review Determination Partial Adoption of TSTF-568 to Revise TS 3.3.1 for Primary Containment Oxygen Concentration ML22207A0192022-07-26026 July 2022 (E-mail Dated 7/26/2022) Setup of Online Reference Portal for Revision to Alternative Source Term Calculation for MSIV and Non-MSIV Leakage ML22207A0122022-07-26026 July 2022 Acceptance Review Determination Revision to Alternative Source Term Analysis for Containment Leakage ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22194A9412022-07-13013 July 2022 Request for Additional Information Relief Request CS-PR-02 (7/13/2022 e-mail) ML22173A0802022-06-22022 June 2022 E-mail Dated 6/22/2022, Acceptance of Requested License Amendment Request to Revise Surveillance Requirements to Reduce Number of Fast Starts of EDGs ML22075A0362022-03-16016 March 2022 Acceptance Review Determination - Relief Request CS-PR-02 Associated with Pump Periodic Verification Test of Core Spray System Pumps, E-mail Dated 3/16/2022 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21320A3472021-11-16016 November 2021 Request for Additional Information LAR to Revise TSs to Adopt TSTF-582, Revision 0 ML21306A3312021-11-0202 November 2021 Request for Additional Information Alternative Request GV-RR-10 (11/2/2021 e-mail) ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21298A0912021-10-25025 October 2021 E-mail Dated 10/25/2021, Acceptance of Requested License Amendment Request to Adopt Technical Specification Task Force Traveler 582 ML21292A2122021-10-19019 October 2021 NRR E-mail Capture - NRC Notification to the State of New York Regarding a Nine Mile Point Nuclear Station, Unit 2 Amendment - Adopt TSTF-501, Rev. 1 ML21278A6872021-10-0505 October 2021 Acceptance Review Determination - Relief Request GV-RR-10 ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0482021-09-0707 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21168A3462021-06-17017 June 2021 Acceptance of Requested Licensing Action License Amendment Request - Adoption of TSTF-501, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (EPID L-2021-LLA-0096) (Email) 2024-01-08
[Table view] |
Text
From: Richard Guzman To: Loomis, Thomas R:(Constellation Nuclear)
Cc: Reynolds, Ronnie J:(Constellation Nuclear); Hipo Gonzalez
Subject:
Verbal Authorization for NMP1 Relief Request I5R-14 Proposed Alternative Associated with N2E Safe-End-to-Nozzle DM Weld Repair with a Laminar Indication (EPID L-2023-LLR-0017)
Date: Friday, April 14, 2023 1:41:34 PM Attachments: image001.png Mr. Loomis, In accordance with NRR Office Instruction LIC-102, Review of Relief Requests, Proposed Alternatives, and Requests to Use Later Code Editions and Addenda, (ADAMS Accession No. ML18351A218) the NRR staff has provided verbal authorization for Nine Mile Point Nuclear Station, Unit 1 (NMP1) Relief Request I5R-14 as described in Constellation Energy Generation, LLC (CEG, the licensee) letter dated April 13, 2023 (ML23103A404). The proposed alternative, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(z)(1), requested to use the flaw acceptance criteria of American Society of Mechanical Engineers (ASME), Section XI, Rules for Inservice Inspection of Nuclear Power Plants, 2013 Edition, Non-Mandatory Appendix Q, Section Q-4100, Weld Overlay Repair of Classes 1, 2, and 3 Austenitic Stainless Steel Piping Weldments, and permit a laminar flaw to remain in place for the upcoming operating cycle at NMP1.
Below is the script for the verbal authorization of Relief Request I5R-14 that was provided at approximately 1:00pm EDT on April 14, 2023, by Matthew Mitchell and Hipolito Gonzalez and a list of attendees on the call. As was communicated, the NRC staff finds that the licensees proposed alternative I5R-14 will provide an acceptable level of quality and safety in accordance with 10 CFR 50.55a(z)(1). Accordingly, the NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(z)(1). Therefore, as of April 14, 2023, the NRC authorizes the use of Relief Request I5R-14 at NMP1 until the end of the next refueling outage (N1R28).
This e-mail communication will be added to ADAMS as a publicly available official agency record, documenting the staffs approval. The NRC staffs formal safety evaluation will be transmitted via separate correspondence within approximately 150 days.
Please contact me if you have any questions regarding this licensing action.
Richard V. Guzman Senior Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Docket No. 50-220
Enclosure:
Verbal Authorization Script and List of Attendees
========================================================
VERBAL AUTHORIZATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELIEF REQUEST I5R-14 PROPOSED ALTERNATIVE ASSOCIATED WITH N2E SAFE END-TO-NOZZLE DISSIMILAR METAL WELD REPAIR WITH A LAMINAR INDICATION NINE MILE POINT NUCLEAR STATION, UNIT 1 CONSTELLATION ENERGY GENERATION, LLC DOCKET NO. 50-220 Technical Evaluation read by Matthew Mitchell, Chief of the Piping and Head Penetrations Branch, Division of New and Renewed Licenses, NRR By letter dated April 13, 2023, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML23103A404), Constellation Energy Generation, LLC (CEG, the licensee) requested an alternative to specific requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code), Section XI, Rules for Inservice Inspection of Nuclear Power Plants, and ASME Code Case N-740-2 Full Structural Dissimilar Metal Weld Overlay for Repair or Mitigation of Class 1, 2, and 3 Items Section XI, Division 1, the use of which was verbally approved under licensee Relief Request I5R-11 by the U.S. Nuclear Regulatory Commission (NRC) staff on March 31, 2023 (ADAMS Accession No. ML23090A130), for Nine Mile Point Nuclear Station, Unit 1 (NMP1). The licensee submitted Relief Request I5R-14 for NRC review and approval to support the examination and acceptance of a weld overlay that has been installed to act as a leakage barrier on the recirculation inlet nozzle N2E safe end-to-nozzle dissimilar metal weld, in lieu of repairing as required by ASME Code, Section XI. Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(z)(1), the licensee submitted Relief Request I5R-14 on the basis that it will provide an acceptable level of quality and safety for NMP1s next cycle of operation. The licensee requested approval of Relief Request I5R-14 until the end of the next refueling outage (N1R28).
During the acceptance examination of the weld overlay installed under Relief Request I5R-11, a laminar indication with a length exceeding 10% of the pipe circumference (91.3 inches) was identified, which does not meet the acceptance criteria of Code Case N-740-2.
The laminar indication was measured at 13.4 percent of the pipe circumference with an area of 3.66 square inches. As an alternative, the licensee seeks to use the acceptance criteria of ASME Code Section XI, 2013 Edition, Nonmandatory Appendix Q, Weld Overlay Repair of Classes 1, 2, and 3 Austenitic Stainless Steel Piping Weldments, which permits laminar flaws with an area of up to 7.5 square inches.
The axial indication that was mitigated by the application of the weld overlay under Relief Request I5R-11 is located 14 inches clockwise from top dead center and is confined to the
original weld material. The laminar flaw in question is 0.3 inches wide and 12.2 inches long and located sufficiently far from the original flaw to not impact the ability to examine the required NDE volume including the susceptible material. The licensee performed a bounding analysis of the laminar flaw by assuming a 0.3-inch wide laminar flaw 360 degrees around the pipe, taking into account internal pressure and a bending moment. The analysis shows an insignificant difference in the applied stress with and without the laminar flaw. Hence, the laminar flaw has no impact on the material performance of the weld overlay.
Therefore, the NRC staff has determined that the proposed alternative will provide an acceptable level of quality and safety in accordance with 10 CFR 50.55a(z)(1) because the axial flaw is not near the laminar flaw, the licensees analysis shows that the laminar flaw does not significantly increase applied stresses, and Appendix Q provides appropriate acceptance criteria for laminar flaws for the one operating cycle duration requested under Relief Request I5R-14.
Authorization read by Hipolito Gonzalez, Chief of Plant Licensing Branch I, Division of Operating Reactor Licensing, NRR As chief of the Plant Licensing Branch I, Office of Nuclear Reactor Regulation, I concur with the conclusions of the Piping and Head Penetrations Branch.
As set forth above, the NRC staff determines that the proposed alternative provides acceptable level of quality and safety. Accordingly, the NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(z)(1). Therefore, as of April 14, 2023, the NRC authorizes the use of Relief Request I5R-14 at Nine Mile Nuclear Station Unit 1 until the end of the next refueling outage (N1R28).
All other requirements in ASME Code, Section XI for which relief was not specifically requested and approved in this relief request remain applicable, including third-party review by the Authorized Nuclear Inservice Inspector.
This verbal authorization does not preclude the NRC staff from asking additional clarification question(s) regarding the proposed alternative while preparing the subsequent written safety evaluation.
========================================================
NRC Participants Hipo Gonzalez Matthew Mitchell Richard Guzman Constellation Energy Group Participants Thomas Loomis Mathew Rice Jason Pulliam Michael Salley Mark Weis
David Barton David Gudger Robert Beaumont Jacky Shoulders Matthew Rossi Sailaja Mokkapati Dick Mattson Jody Morgan Vasilios Peter Zeppos Heather Malikowski Michael Briggs Jonathan Shaver Hayne Gersbach Jennifer Bianculli Paul Touvannas Peter Orphanos Angel Reyes-Cruz Alan Raush