Category:E-Mail
MONTHYEARML23320A1122024-01-18018 January 2024 NRC to Fws, Concurrence with Endangered Species Act Determinations for North Anna Power Station, Units 1 and 2, Subsequent License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment ML23355A2722023-12-21021 December 2023 NRR E-mail Capture - Schedule Revision for Emergency Preparedness Staff Augmentation Times License Amendment Request ML23318A1172023-11-13013 November 2023 NRR E-mail Capture - Formal Issuance of RAIs for North Anna Technical Support Center (TSC) License Amendment Request (LAR) (L-2023-LLA-0006) ML23257A2092023-09-14014 September 2023 NRR E-mail Capture - Formal Issuance of 2nd Round RAIs for Surry Units 1&2 and North Anna Units 1&2 Emergency Plans LAR ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23219A1602023-08-0707 August 2023 003 Radiation Safety Baseline Inspection Information Request ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23075A0232023-03-15015 March 2023 NRR E-mail Capture - RAI - License Amend Req (LAR) to Revise Tech Spec (Ts) 3.6.8 Limiting Condition for Operation to Remove Refueling Water Chemical Addition Tank and Replace the Containment Sump Buffer North Anna, 1 and 2 (L-2022-LLA-0162 ML23067A2162023-03-0707 March 2023 NRR E-mail Capture - RAI for North Anna, 1 & 2, Surry 1 & 2, Millstone, 2 & 3, Request for Approval of App. F Fleet Report DOM-NAF-2-P, Qual of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion VIPRE-D Computer Code ML23060A0932023-03-0101 March 2023 NRR E-mail Capture - Formal Issuance of RAIs for Surry/North Anna Emergency Plans LAR ML23059A2282023-02-28028 February 2023 NRR E-mail Capture - Draft RAIs for Containment Buffer Change to Natb (L-2022-LLA-0162) ML23039A1712023-02-0808 February 2023 NRR E-mail Capture - Acceptance Review for Technical Support Center (TSC) Relocation (L-2023-LLA-0006) ML23018A0352023-01-17017 January 2023 NRR E-mail Capture - Acceptance Review for Fleet Report Re Appendix F of DOM-NAF-2-P (L-2022-LLT-0003) ML22342B1472022-12-0808 December 2022 NRR E-mail Capture - Acceptance Review for LAR Re NAPS Post LOCA Buffer Change (L-2022-LLA-0162) ML22335A4842022-12-0101 December 2022 NRR E-mail Capture - Acceptance Review for LAR North Anna Power Station - Units 1 and 2 and Surry Power Station - Units 1 and 2 Emergency Plan Staff Augmentation Times (L-2022-LLA-0166) ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22174A3552022-06-23023 June 2022 NRR E-mail Capture - Acceptance Review for Dominion Fleet LAR to Implement TSTF-554 (L-2022-LLA-0078) ML22104A0252022-04-14014 April 2022 NRR E-mail Capture - Dominion Presentation Slides for April 21, 2022 Public Meeting on Emergency Preparedness Submittal for the North Anna Power Station and the Surry Power Station ML22083A2102022-03-24024 March 2022 NRR E-mail Capture - Draft RAI - Relief Request N2-14-LMT-003 Fourth Ten Year Inservice Inspection Interval ML22032A0962022-02-0101 February 2022 002 Radiation Safety Baseline Inspection Information Request ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML22007A2672022-01-0707 January 2022 NRR E-mail Capture - North Anna, Unit 2, ASME Section XI Inservice Inspection Program Relief Request N2-14-LMT-003 Fourth Interval Third Period Limited Examinations (L-2021-LLR-0088) ML21335A0812021-12-0101 December 2021 NRR E-mail Capture - Acceptance Review for OMN-28 Request Alternative to ISTC-3700, Position Verification Testing (L-2021-LLR-0086) ML21334A1922021-11-30030 November 2021 NRR E-mail Capture - Audit Plan for Reactor Core Thermal-Hydraulics Using the VIPRE-D Appendix E Review ML21327A3652021-11-23023 November 2021 NRR E-mail Capture - Draft RAI for TSTF-577 LAR ML21326A1502021-11-22022 November 2021 NRR E-mail Capture - Acceptance Review for Relocation of Unit Staff Requirements to the QAPD LAR (L-2021-LLA-0195) ML21322A0962021-11-18018 November 2021 Final Request for Additional Information Set 5 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21312A0082021-11-0404 November 2021 Enclosure 2 - NAPS Draft SER Table A.1-1 Markup ML21312A0112021-11-0404 November 2021 Enclosure 3 - NAPS Draft SER Section 3 Comments ML21312A0012021-11-0404 November 2021 Comments on North Anna Draft SER ML21306A3302021-11-0202 November 2021 NRR E-mail Capture - Acceptance Review for TSTF-569 LAR ML21286A7372021-10-13013 October 2021 Additional Element Included in the Implementation Plan for the Surry Fuel Melt Safety Limit (SL) LAR ML21274A0022021-09-30030 September 2021 NRR E-mail Capture - Acceptance Review for TSTF-577 LAR (L-2021-LLA-0158) ML21312A0022021-09-21021 September 2021 Enclosure 1 - E-mail - NAPS SLR SER Appendix a for Dominion Review ML21312A0072021-09-21021 September 2021 Enclosure 1 - E-mail - Enclosure B - NAPS SER App a - Dominion Comments 9-21-2021 ML21312A0032021-09-21021 September 2021 Enclosure 1 - E-mail - Enclosure a - Dominion Table A4.4-1 Clean Version ML21256A0672021-09-13013 September 2021 Final Request for Confirmation of Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21152A1722021-09-0707 September 2021 NRC to Fws, NRC Issuance of Draft Environmental Impact Statement for North Anna Subsequent License Renewal, Opportunity for Public Comment, and Endangered Species Act Determinations ML21238A0942021-08-25025 August 2021 Draft Request for Additional Information Set Z - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21225A5512021-08-13013 August 2021 Discussion Point for Public Meeting Regarding Fire Protection Piping Cyclic Loading - Transmittal E-mail ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21188A1632021-07-0707 July 2021 Final Request for Additional Information Set 4 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21154A0152021-06-0101 June 2021 NRR E-mail Capture - Acceptance Review for Primary Grade Water LAR (L-2021-LLA-0082) ML21140A3682021-05-20020 May 2021 Response to North Anna Hardship (Temporary Staff Guidance Additional Guidance for FOF Inspections During the PHE) ML21140A3712021-05-19019 May 2021 FOF Discussion ML21123A2972021-05-0303 May 2021 Final Request for Additional Information Set 3 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - E-mail ML21091A0022021-04-0101 April 2021 Final Request for Additional Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21076A4622021-03-17017 March 2021 NRR E-mail Capture - Draft RAI for Versatile Internals and Component Program for Reactors Vipre Code Review (L-2021-LLT-0000) ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 ML21069A3522021-03-10010 March 2021 NRR E-mail Capture - Acceptance Review for Topical Report DOM-NAF-2 VIPRE-D 2024-01-18
[Table view] |
Text
Dennig, Robert From: Khanna, Meena i (
Sent: Sunday, September 18, 2011 11:59 AM To: Martin, Robert; Li, Yong; Farzam, Farhad; Tsirigotis, Alexander; Thomas, George; Ulses, Anthony; Casto, Greg; Bailey, Stewart; Dennig, Robert; Evans, Michele; Lubinski, John; Taylor, Robert; Murphy, Emmett; McGinty, Tim; Pham, Bo; Murphy, Martin; Lupold, Timothy; Mitchell, Matthew; McMurtray, Anthony; Wilson, George; Mathew, Roy; Cheok, Michael; Tate, Travis; Harrison, Donnie; Circle, Jeff; Klein, Alex; Holian, Brian; Galloway, Melanie; Auluck, Rajender; Pelton, David; Rosenberg, Stacey; Thompson, Jon Cc: Bahadur, Sher; Weerakkody, Sunil
Subject:
Re: NORTH ANNA SEISMIC REPORT - Summary Report of August 23/ 2011 Earthquake Response and Restart Readiness Determination Plan North Anna Power Station Units 1 and 2 and ISFSI Thanks, Bob. All, pls note that we will schedule a meeting to discuss path forward and acceptance criteria for staff review.
Thanks for the continued support.
From: Martin, Robert ( 0(.!
To: Li, Yong; Farzam, Farhad; Tsirigotis, Alexander; Thomas, George; Ulses, Anthony; Casto, Greg; Bailey, Stewart; Dennig, Robert; Evans, Michele; Lubinski, John; Taylor, Robert; Murphy, Emmett; McGinty, Tim; Pham, Bo; Murphy, Martin; Lupold, Timothy; Mitchell, Matthew; McMurtray, Anthony; Wilson, George; Mathew, Roy; Cheok, Michael; Tate, Travis; Harrison, Donnie; Circle, Jeff; Klein, Alex; Holian, Brian; Galloway, Melanie; Auluck, Rajender; Pelton, David; Rosenberg, Stacey; McGinty, Tim; Thompson, Jon; Boger, Bruce; Leeds, Eric; Khanna, Meena; Kulesa, Gloria; Howe, Allen; Boyle, Patrick Cc: Bahadur, Sher; Weerakkody, Sunil Sent: Sun Sep 18 09:17:51 2011
Subject:
NORTH ANNA SEISMIC REPORT - Summary Report of August 23/ 2011 Earthquake Response and Restart Readiness Determination Plan North Anna Power Station Units I and 2 and ISFSI From: Ginger LRutherfor (b)(6)
Sent: Saturday, September-17, 2011 1:50 PMR 6 To: Cotton, Karen; Davis (NMSS), Jennifer; Hiland, Patrick; Khanna, Meena; Manoly, Kamal,_y( 1.
Mendiola, Anthony; Howe, Allen; Martin, Robert; McCoy, Gerald; Boyle, Patrick; Karwoski, Kenneth; Giitter, Joseph
Subject:
11-520 - Summary Report of August 23/ 2011 Earthquake Response and Restart Readiness Determination Plan North Anna Power Station Units 1 and 2 and ISFSI CONFID NTIALITY >OTICE: T electroni*cessage conta' information ch may be legal confid tial and/or prJ eged and es not in case represe a firm ENER COMMODIT id or offer relat' g thereto w~ih binds th ender with an additiona xpress writte onfirmation to t effect. The in rmation is' ended sole for the idi *ual or entity amed above access by any e else is authorize .If you are t the intend recipient, an disclosure, co ing, distributio , or use of the co nts of this in rmation is ohibited and ay be unlaw . If you have ceived this ele ronic transmissio in error, pleas eply imme itely to the der that you ve received t message in e r, and delete it. nk you.
information in this record was deleted in accordance with be Freedom of Information Act, exemptions e s711, 55 Fn1el Z /JAZ