Closeout of Generic Letter 2008-01 Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.
ML110840205
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 04/07/2011
From: Mahesh Chawla
Plant Licensing Branch III
To: Jennifer Davis
Detroit Edison
chawla M
References
TAC MD7827, GL-08-001
Download: ML110840205 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555"()001 April 7, 2011 Mr. Jack M. Davis Senior Vice President and Chief Nuclear Officer Detroit Edison Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166

SUBJECT:

FERMI 2 - CLOSEOUT OF GENERIC LETTER 2008-01 "MANAGING GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS" (TAC NO. MD7827)

Dear Mr. Davis:

On January 11, 2008, the U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems" (Agencywide Documents Access and Management System (ADAMS) Accession No. ML072910759). The purpose of GL 2008-01 was (a) to request addressees to submit information to demonstrate that the subject systems are in compliance with the current licensing and design bases and applicable regulatory requirements, and that suitable design, operational, and testing control measures are in place for maintaining this compliance; and, (b) to collect the requested information to determine if additional regulatory action is required.

GL 2008-01 requested that licensees provide the following information within 9 months of the date of the GL:

a) A description of the results of evaluations that were performed pursuant to requested actions specified in the GL. This description should provide sufficient information to demonstrate that you are or will be in compliance with the quality assurance criteria in Sections III, V, XI, XVI, and XVII of Appendix B to 10 CFR Part 50 and the licensing basis and operating license as those requirements apply to the subject systems; b) A description of all corrective actions, including plant, programmatic, procedure, and licensing basis modifications that you determined were necessary to assure compliance with these regulations; and, c) A statement regarding which corrective actions were completed, the schedule for completing the remaining corrective actions, and the basis for that schedule.

In your letters dated October 14, 2008, July 29,2009, and January 22, 2010 (ADAMS Accession Nos. ML082970220, ML092160404, and ML100250012, respectively), you provided information in response to the GL. The NRC staff has reviewed the submitted information and

Davis, J. M. -2 has concluded that for Fermi 2, your response to the GL is acceptable. Consequently, your GL response is considered closed and no further information or action is requested of you.

Notwithstanding, the NRC's Region III staff may decide to perform (and would contact you to schedule) an inspection using Temporary Instruction (TI) 2515/177, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems (NRC Generic Letter 2008-01)" (ADAMS Accession No. ML082950666). TI2515/177 is confirmatory in nature in that it directs NRC inspectors to selectively verify that the licensee has implemented or is in the process of acceptably implementing the commitments, modifications, and programmatically controlled actions described in the licensee's response to GL 2008-01 and the plant-specific information supports a conclusion that subject systems operability is reasonably ensured.

If you have any questions regarding this letter, please feel free to contact me at (301) 415-8371 or mahesh.chawla@nrc.gov.

Sincerely, Mahesh Chawla, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-341 cc: Distribution via Listserv

ML082950666). TI 2515/177 is confirmatory in nature in that it directs NRC inspectors to selectively verify that the licensee has implemented or is in the process of acceptably implementing the commitments, modifications, and programmatically controlled actions described in the licensee's response to GL 2008-01 and the plant-specific information supports a conclusion that subject systems operability is reasonably ensured.

If you have any questions regarding this letter, please feel free to contact me at (301) 415-8371 or Mahesh.chawla@nrc.gov.

Sincerely, IRAt Mahesh Chawla, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-341 cc: Distribution via Listserv DISTRIBUTION:

PUBLIC LPL3-1 R/F RidsAcrsAcnw_MailCTR Resource DCunanan, NRR RidsNrrDssSrxb Resource RidsNrrDorlLpl3-1 Resource RidsNrrLABTu"y Resource*

RidsNrrPMFermi2 Resource RidsOgcRp Resource RidsRgn3MailCenter Resource ADAMS Accession No' ML110840204

  • Memo from AUlses to RPascarelli , dated 3/2/2011 OFFICE DORLlLPL3-1/PM DORLlLPL3-1/LA SRXB/BC(A)* DORLlLPL3-1/BC NAME MChawla BTuily IRSola for SMiranda RPascarelli DATE 04/06/11 04/06/11 03/02/11 04/07/11