Letter Sequence RAI |
---|
|
Results
Other: CNL-15-039, Severe Accident Management Alternatives for Reactor Coolant Pump Seals, ML090360589, ML093630039, ML100120107, ML100210350, ML100630115, ML100630139, ML100630140, ML100630146, ML100630155, ML100630167, ML100630169, ML100630170, ML100630171, ML100630173, ML100630174, ML100630175, ML100630176, ML100630177, ML100630178, ML100630192, ML100630193, ML100630194, ML100630234, ML100630235, ML100630263, ML100630264, ML101130395, ML101130397, ML101130398, ML101130399, ML101130401, ML101130403, ML101130404, ML101130405, ML101130407, ML101130408, ML101130409, ML101170096, ML101390048, ML103080030, ML110871475, ML110890472, ML11264A052, ML11294A461, ML11329A001, ML12166A068, ML12296A227, ML13150A376, ML13150A379
|
MONTHYEARML1011304092004-05-15015 May 2004 Drawing, Distribution of Tritium Concentration in Groundwater at Power Block, March 2004, Attachment K Project stage: Other ML1011304082004-05-15015 May 2004 Drawing, Distribution of Tritium Concentrations in Groundwater, March 2004, Attachment J Project stage: Other ML1011304072004-05-15015 May 2004 Drawing, Water Table at Power Block, March 2004, Attachment I Project stage: Other ML1011304052004-05-15015 May 2004 Drawing, Water Table, Attachment H Project stage: Other ML1011304042004-05-15015 May 2004 Drawing, Hydrogeologic Cross-Section D-D, Attachment G Project stage: Other ML1011304032004-05-15015 May 2004 Drawing, Hydrogeologic Cross-Section C-C, Attachment F Project stage: Other ML1011304012004-05-15015 May 2004 Drawing, Hydrogeologic Cross-Section B-B, Attachment E Project stage: Other ML1011303992004-05-15015 May 2004 Drawing, Hydrogeologic Cross-Section A-A, Attachment D Project stage: Other ML1011303982004-08-10010 August 2004 Map, Bedrock Contours, Attachment C Project stage: Other ML1011700962004-08-12012 August 2004 Groundwater Investigation Report Project stage: Other ML1011303972004-08-12012 August 2004 Block Site Map, Plate B Project stage: Other ML1011303952004-08-12012 August 2004 Site Map. Attachment a Project stage: Other ML0814300282008-05-14014 May 2008 Transmittal of Annual Radiological Environmental Operating Report of 2007 Project stage: Request ML0812102702008-06-0303 June 2008 Request for Supplemental Information to Support Acceptance Review of Final Supplemental Environmental Impact Statement Project stage: Acceptance Review ML0818504602008-07-0202 July 2008 Final Supplemental Environmental Impact Statement - Request for Additional Information Project stage: Supplement ML1006301392008-12-12012 December 2008 WB-DC-20-20, Revision 0009, Traveling Water Screens and Trashracks, Project stage: Other ML0903605892009-01-21021 January 2009 Enclosure 1 - Watts Bar, Unit 2 Severe Accident Management Alternatives Analysis Project stage: Other ML0903605882009-01-27027 January 2009 Final Supplemental Environmental Impact Statement - Severe Accident Management Alternatives Project stage: Supplement ML1006302632009-11-0707 November 2009 Map - Final Map of the Watts Bar Nuclear Plant Project stage: Other ML1006302642009-11-0707 November 2009 Map of the Wetlands Streams Project stage: Other ML0922300242009-11-30030 November 2009 Watts, Unit 2, RAI, Regarding Severe Accident Management Alternatives Project stage: RAI ML0932900732009-12-0303 December 2009 Environmental RAI Enclosure Project stage: RAI ML0930301482009-12-0303 December 2009 RAI, Regarding Environmental Review Project stage: RAI ML1001201072009-12-14014 December 2009 December 14, 2009, TVA Letter Additional Information Regarding Environmental Review - Cultural Resources Project stage: Other ML0936300392009-12-22022 December 2009 Severe Accident Management Alternatives Additional Information Project stage: Other ML1002103502009-12-23023 December 2009 Submittal of Additional Information Regarding Environmental Review Project stage: Other ML1006301672010-01-15015 January 2010 Intact Containment Loss of Coolant Accident (LOCA) Analysis Project stage: Other ML1006302332010-01-26026 January 2010 Response to Tennessee Valley Authority Request for Plant Water Flow Information Project stage: Request ML1006302342010-02-25025 February 2010 Annual Estimates 2008 - Average Net Megawatts = 1180 Mwe, Non-Outage O&M Project stage: Other ML1006301702010-02-25025 February 2010 Drawing, Plot: 5047CL Sequoyah-Watts Bar HP Project stage: Other ML1006301692010-02-25025 February 2010 Drawing, Plot: 6059KX Bull Run Project stage: Other ML1006301462010-02-25025 February 2010 Plant Withdrawals Impacts, Water Supplied by Sccw Intake/Average Velocity for Expect No. of Bays in Service Project stage: Other ML1006301152010-02-25025 February 2010 Additional Information Regarding Environmental Review Project stage: Other ML1006301732010-02-25025 February 2010 Drawing, Plot: 5127CL Watts Bar HP-Watts Bar 1 Project stage: Other ML1006301402010-02-25025 February 2010 Plant Withdrawal Impacts, Water Supplied by Intake Pumping Station (Ips)/Average Velocity for All Openings Project stage: Other ML1006302352010-02-25025 February 2010 Yard Holding Pond Wsel Graph Overflow for 2001 Project stage: Other ML1006301712010-02-25025 February 2010 Drawing, Plot: 5173KX Watts Bar HP-Great Falls Project stage: Other ML1006301942010-02-25025 February 2010 Drawing, Plot: 5167GF Winchester-Watts Bar FP Project stage: Other ML1006301932010-02-25025 February 2010 Drawing, Plot: 6092KX Watts Bar-Volunteer Project stage: Other ML1006301922010-02-25025 February 2010 Drawing, Plot: 6084KX Watts Bar NP-Roane Project stage: Other ML1006301782010-02-25025 February 2010 Drawing, Plot: 5645 Cl Watts Bar-Athens Project stage: Other ML1006301552010-02-25025 February 2010 Operating Conditions for Intake Pumping Station, Table 1 Project stage: Other ML1006301772010-02-25025 February 2010 Plot: 608 1CL Watts Bar NP-Sequoyah Np 2 Project stage: Other ML1006301762010-02-25025 February 2010 Plot: 6080CL Watts Bar HP-Sequoyah 1 Project stage: Other ML1006301752010-02-25025 February 2010 Drawing, Plot: 5733KX Watts Bar HP-Spring City Project stage: Other ML1006301742010-02-25025 February 2010 Drawing, Plot: 5791KX Watts Bar HP-Rockwood Project stage: Other ML1011303932010-04-0909 April 2010 Response to U.S. Nuclear Regulatory Commission (NRC) Request for Additional Information Regarding Environmental Review Project stage: Request ML1013900482010-04-22022 April 2010 Additional Information Regarding Environmental Review- Cultural Resources (Tac No. MD8203) Project stage: Other ML1013405892010-05-12012 May 2010 Response to Request for Additional Information Regarding Environmental Review Project stage: Response to RAI ML1013701862010-05-14014 May 2010 OL - FW: Call Summary - TVA Clarification Call Project stage: Request 2009-11-07
[Table View] |
|
---|
Category:Request for Additional Information (RAI)
MONTHYEARML23166A1142023-06-15015 June 2023 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2023-03 ML23067A2372023-03-0808 March 2023 WB_2023-02_RP_inspection_doc_request ML23030A3512023-01-25025 January 2023 Notification of Watts Bar Nuclear Plant - Design Bases Assurance Inspection (Programs) and Initial Information Request ML22343A0692022-12-0808 December 2022 NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML22227A0272022-08-11011 August 2022 NRR E-mail Capture - Request for Additional Information Related to Alternative Requests RP-11 for Sequoyah Nuclear Plant, Units 1 and 2, and IST-RR-9 for Watts Bar Nuclear Plant, Units 1 and 2 ML22144A1002022-05-12012 May 2022 NRR E-mail Capture - Request for Additional Information Related to Tva'S Request to Revised the TVA Plants' Radiological Emergency Plans ML22115A1402022-04-25025 April 2022 NRR E-mail Capture - Requests for Confirmation of Information and Additional Information Regarding Watts Bar Nuclear Plant, Unit 2 Exemption Request Re 10 CFR Part 26 (L-2022-LLE-0017) ML22083A2372022-03-24024 March 2022 NRR E-mail Capture - Request for Additional Information and Confirmation of Information Related to Tva'S Request for Changes to Watts Bar Nuclear Plant, Units 1 and 2, Technical Specification 3.7.8 ML22056A3802022-02-25025 February 2022 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2022-02 ML21267A1392021-09-23023 September 2021 Document Request for Upcoming RP Inspection at Watts Bar ML21221A2602021-08-0909 August 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise Watts Bar, Unit 1 Tech Specs Related to Continuous Opening of the Auxiliary Building Secondary Containment Enclosure Boundary ML21102A1312021-04-19019 April 2021 Request for Withholding Information from Public Disclosure for Watts Bar Nuclear Plant, Unit 1 ML21095A0422021-04-0202 April 2021 NRR E-mail Capture - Added Clarification to RAI 2 for Thot LAR ML21095A0402021-04-0202 April 2021 NRR E-mail Capture - Request for Additional Information Re Generic Letter 95-05 90-Day Report and LAR to Adjust Growth Rate for Thot (EPIDs L-2021-LRO-0003 and L-2021-LLA-0026) ML21095A0412021-04-0101 April 2021 NRR E-mail Capture - Revised Draft RAI - Combined RAI Set for Watts Bar Unit 2 90-Day Report and Thot LAR (EPIDs L-2021-LRO-0003 and L-2021-LLA-0026) ML21095A0442021-04-0101 April 2021 NRR E-mail Capture - Revised Draft RAI - Combined RAI Set for Watts Bar Unit 2 90-Day Report and Thot LAR (EPIDs L-2021-LRO-0003 and L-2021-LLA-0026) ML21091A0772021-04-0101 April 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise Technical Specification 5.7.2.19, Containment Leakage Rate Testing Program ML21095A0462021-03-22022 March 2021 NRR E-mail Capture - Draft Request for Additional Information Regarding Tva'S Generic Letter 95-05 90-Day Report for Watts Bar Unit 2 ML21039A6402021-02-0808 February 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise the Watts Bar Nuclear Plant, Unit 1 Technical Specifications Related to Steam Generator Tube Inspection Frequency ML21012A2032021-01-11011 January 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise the Watts Bar UFSAR to Use Alternate Probability of Detection ML20350B5592020-12-15015 December 2020 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Adopt Traveler TSTF-490 Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec ML20338A3202020-12-0303 December 2020 Notification of an NRC Fire Protection Team Inspection (NRC Inspection Report 05000390/2021011 and 05000391/2021011) and Request for Information ML20322A4412020-11-17017 November 2020 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise TS 3.7.11 Related to the MCR Chiller Replacement ML20322A4392020-11-0505 November 2020 NRR E-mail Capture - Draft Request for Additional Information Regarding Tva'S Request to Revise TS 3.7.11 Related to the MCR Chiller Replacement ML20308A3512020-11-0202 November 2020 Request for Additional Information on WBN Request for Exemption from 10 CFR Part 73, Appendix B, Section VI for the Conduct of an Annual Force-on-Force Exercise (EPID L-2020-LLE-0165 (COVID-19)) ML20253A1782020-09-0909 September 2020 Emergency Preparedness Program Inspection Request for Information ML20266G4592020-08-14014 August 2020 Notification of Inspection and Request for Information ML20196L8622020-07-14014 July 2020 NRR E-mail Capture - Watts Bar Nuclear Plant, Units 1 and 2 - Request for Additional Information Regarding Request to Implement the Full Spectrum LOCA Methodology ML20086G4802020-03-26026 March 2020 NRR E-mail Capture - Request for Additional Information for WBN2 Request Measurement Uncertainty Recapture Power Uprate (L-2019-LLS-0000) - Part 2 ML20085G3572020-03-25025 March 2020 NRR E-mail Capture - Request for Additional Information for WBN2 Request Measurement Uncertainty Recapture Power Uprate (L-2019-LLS-0000) ML20084M1942020-03-24024 March 2020 NRR E-mail Capture - Request for Additional Information for WBN2 Request Measurement Uncertainty Recapture Power Uprate (L-2019-LLS-0000) ML20083J3952020-03-12012 March 2020 NRR E-mail Capture - Draft Request for Additional Information for WBN2 Request Measurement Uncertainty Recapture Power Uprate (L-2019-LLS-0000) ML19340A6842019-12-0505 December 2019 NRR E-mail Capture - Request for Additional Information for WBN2 Request for One-Time Extension of Completion Time for TS 3.7.8 (L-2019-LLA-0020) ML19218A0302019-08-0505 August 2019 NRR E-mail Capture - Watts Bar Nuclear Plant - Second-Round Request for Additional Information Related to Application to Revise Technical Specifications Regarding DC Electrical Systems, TSTF-500, Revision 2 ML19218A0282019-07-25025 July 2019 NRR E-mail Capture - Watts Bar Nuclear Plant - Draft Second-Round Request for Additional Information Related to Application to Revise Technical Specifications Regarding DC Electrical Systems, TSTF-500, Revision 2 ML19186A4352019-07-0505 July 2019 NRR E-mail Capture - Watts Bar Nuclear Plant - Correction to Final Request for Additional Information Related to Application to Adopt 10 CFR 50.69 ML19169A3592019-06-18018 June 2019 NRR E-mail Capture - Watts Bar Nuclear Plant - Final Request for Additional Information Related to Application to Adopt 10 CFR 50.69 ML19148A7912019-05-28028 May 2019 NRR E-mail Capture - Sequoyah Nuclear Plant and Watts Bar Nuclear Plant - Final Request for Additional Information Related to Request for Alternative to OM Code Requirements ML19106A0462019-04-15015 April 2019 NRR E-mail Capture - Watts BAR, Units 1 and 2 Request for Additional Informatin (RAI) Regarding Changes to Technical Specifications Sections 3.8.1, 3.8.7, 3.8.8, and 3.8.9 ML19071A3542019-03-0808 March 2019 NRR E-mail Capture - Watts Bar Nuclear Plant - Final Request for Additional Information Related to Request to Adopt TSTF-425 to Relocate Specific Surveillance Frequency Requirements to Licensee-Controlled Program ML18313A2202018-11-0707 November 2018 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML18282A6372018-10-0909 October 2018 NRR E-mail Capture - RAIs (Final) - LAR to Revise the Steam Generator Technical Specifications for Watts Bar Nuclear Plant, Unit 2 ML18270A2362018-09-26026 September 2018 NRR E-mail Capture - Watts Bar Units 1 and 2 RAIs - Modify TS 3.8.9 Completion Time for Inoperable 120V AC Vital Buses (L-2018-LLA-0050) ML18240A0702018-08-27027 August 2018 NRR E-mail Capture - RAI for Watts Bar Unit 2 Tpbars LAR and Watts Bar Units 1 and 2 LAR Related to Fuel Storage ML18199A1822018-07-17017 July 2018 NRR E-mail Capture - Request for Additional Information Regarding Watts Bar Unit 1 Extension of Surveillance Requirement Intervals ML18123A3942018-05-0303 May 2018 NRR E-mail Capture - Request for Additional Information Unit 2 Cycle 1 Steam Generator Tube Inspection Report ML18057A6372018-02-23023 February 2018 NRR E-mail Capture - Request for Additional Information Related to TVA Fleet Topical Report TVA-NPG-AWA16 - EPIC: L-2016-TOP-0011) ML18031A6592018-02-0606 February 2018 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment to Revise Technical Specification 4.2.1 and Technical Specifications Related to Fuel Storage ML18016A0112018-01-12012 January 2018 Draft Request for Additional Information Exigent Amendment Request for Inoperable Reactor Coolant Temperature Indication ML17226A0032017-08-11011 August 2017 NRR E-mail Capture - Watts Bar, Unit 1 - Final Request for Additional Information Concerning Request to Amend Turbine Trip Low Fluid Oil Pressure Reactor Protection System Trip Setpoint 2023-06-15
[Table view] Category:Letter
MONTHYEARML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML24008A2462024-01-18018 January 2024 Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability2024-01-0909 January 2024 Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)2024-01-0808 January 2024 Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) ML23346A1382024-01-0303 January 2024 Regulatory Audit Summary Related to Request to Increase the Number of Tritium Producing Burnable Absorber Rods CNL-23-069, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000390/20234412023-12-21021 December 2023 Plantfinal Significance Determination for a Security-Related Greater than Green Finding, Nov, and Assessment Follow-up, 05000390-2023441 and 05000391-2023441-Public CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) IR 05000390/20234042023-12-14014 December 2023 Security Baseline Inspection Report 05000390/2023404 and 05000391/2023404 CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)2023-12-13013 December 2023 Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) ML23293A0572023-12-0606 December 2023 Issuance of Amendment Nos. 163 and 70 Regarding Adoption of TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control IR 05000390/20230102023-11-30030 November 2023 RE-Issue Watts Bar Nuclear Plant - Biennial Problem Identification and Resolution Inspection Report 050000390/2023010 and 05000391/2023010 and Apparent Violation CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20230032023-11-13013 November 2023 Integrated Inspection Report 05000390/2023003 and 05000391/2023003 and Apparent Violation ML23312A1432023-11-0808 November 2023 Submittal of Dual Unit Updated Final Safety Analysis Report (UFSAR) Amendment 5 CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23251A2002023-09-11011 September 2023 Request for Withholding Information from Public Disclosure for Watts Bar Nuclear Plant, Units 1 and 2 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000390/20230052023-08-30030 August 2023 Updated Inspection Plan for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2023005 and 05000391/2023005 ML23233A0042023-08-28028 August 2023 Proposed Alternative to the Requirements of the ASME Boiler and Pressure Vessel Code for Upper Head Injection Dissimilar Metal Butt Welds IR 05000390/20230022023-08-16016 August 2023 Reissue - Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2023002 and 05000391/2023002 ML23220A1582023-08-0909 August 2023 Integrated Inspection Report 05000390/2023002 and 05000391/2023002 CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)2023-08-0707 August 2023 License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills IR 05000390/20230112023-07-24024 July 2023 Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000390 2023011 and 05000391 2023011 CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . ML23122A2322023-06-0707 June 2023 Issuance of Amendment Nos. 162 and 69 Regarding Change to Date in Footnotes for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System (Creatcs) CNL-23-044, Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out2023-06-0101 June 2023 Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out IR 05000390/20234032023-05-30030 May 2023 Cyber Security Inspection Report 05000390/2023403 and 05000391/2023403 ML23131A1812023-05-23023 May 2023 Correction to Amendment No. 161 to Facility Operating License No. NPF-90 CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20220032023-05-0909 May 2023 Reissue Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2022003 and 05000391/2022003 ML23125A2202023-05-0505 May 2023 Issuance of Amendment No. 161 Regarding a Change to Footnotes for Technical Specification Table 1.1-1 Modes (Emergency Circumstances) IR 05000390/20230012023-05-0404 May 2023 Integrated Inspection Report 05000390/2023001 and 05000391/2023001 CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)2023-05-0404 May 2023 Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23072A0652023-04-0505 April 2023 Units 1 and 2 Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12 ML23073A2762023-04-0303 April 2023 Individual Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing (EPID L-2023-LLA-0029) (Letter) CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report 2024-01-09
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 30, 2011 Mr. Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
WATTS BAR NUCLEAR PLANT, UNIT 2 - SUPPLEMENTAL REQUEST FOR ADDITIONAL INFORMATION REGARDING SEVERE ACCIDENT MANAGEMENT DESIGN ALTERNATIVES REVIEW (TAC NO. MD8203)
Dear Mr. Bhatnagar:
By letter dated October 14,2010 (Agencywide Documents Access and Management System Accession No. ML102910629), the Tennessee Valley Authority (TVA) submitted an updated severe accident management design alternatives (SAMDA) analysis for Watts Bar Nuclear Plant, Unit 2. In response to a request for additional information (RAI) from the Nuclear Regulatory Commission (NRC) staff, TVA responded in a letter dated January 31,2011 (Accession No. ML110340347) to questions regarding this analysis.
In an effort to complete the NRC staff review, enclosed is an RAI regarding the SAMDA analysis.
A response is required 14 days from the date of this letter.
If you should have any questions, please contact me at 301-415-2048.
Sincerely,
~Q).~---
Patrick D. Milano, Sr. Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391
Enclosure:
Request for Additional Information cc w/encl: Distribution via Listserv
SUPPLEMENTAL REQUEST FOR ADDITIONAL INFROMATION WATIS BAR NUCLEAR PLANT. UNIT 2 SEVERE ACCIDENT MITIGATION DESIGN ALTERNATIVES TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-391 By letter dated January 31,2011, the Tennessee Valley Authority (TVA) provided a response to the Nuclear Regulatory Commission (NRC) staff regarding questions related to TVA's Updated Analysis of Severe Accident Mitigation Design Alternatives (SAMDAs) for Watts Bar Nuclear Plant (WBN), Unit 2. In its review of this information, the NRC staff requires further information and clarification on TVA's response. The information listed in the following request for additional information (RAI) refers to the RAI responses in the January 31, 2011, letter.
- 1. RA11.a
- a. Provide the core damage frequency (CDF) and the large early release frequency (LERF) for the WBN Unit 2 model reviewed in November 2009 by the Westinghouse Owners Group &:1.0G).
- b. The only difference between the model reviewed by the WOG and the independent plant examination (lPE) model appears to be changes made to resolve findings and observations. Describe the most significant changes made in the peer-reviewed model to obtain the I PE model.
- 2. RA11.f The response did not address the assumptions concerning the availability of WBN Unit 1 components/systems for both dual-unit and Unit 2 initiating events. Discuss how the availability of Unit 1 systems during Unit 1 outages is accounted for in evaluating WBN Unit 2 CDF and LERF.
- 3. RA11.h
- a. The response to the RAI states "The following peer cert findings remain open and are considered documentation related (i.e., are judged to not have the potential for significant change to model results or risk ranking): ... " Among the findings listed, the following, from the description in the IPE, do not appear to be limited to just documentation:
(1) 1-4 (DG [diesel generator] load sequencer) - states certain failures are missing from the logic model, (2) 2-11 (T-H [thermal-hydraulic] timing for HRA [human reliability analysis] cues, no simulator runs) - does this mean the runs were not performed, or that they were performed but not documented, and (3) 5-1 (Optimistic room heatup times used).
Enclosure
-2 Provide further justification that each of these items is only a documentation issue and that final resolution is unlikely to impact the SAMDA evaluation.
- b. TVA stated (p. E1-13), with reference to internal flooding, that "the current model is judged to be adequately bounding for this application," which is based on conservatisms in the flooding model described in the response. While this may be true, there are a large number of open internal flood findings from the peer review and an updated flooding analysis is to be included in the next model update. Section 3.7 (p. 70) of the WBN Unit 2 IPE submittal states that two sets of sensitivity studies were performed on the internal flooding analysis, with one set focused on evaluating alternative design/procedural changes that would significantly impact (I.e., reduce) the flood related CDF and LERF while the other was designed to address epistemic uncertainties identified in the WBN internal flooding probabilistic risk assessment (PRA). Provide a description of these studies, their results and conclusions, and how the results and conclusions support the conclusion that the current flooding model is bounding for the SAMDA application.
- 4. RAI 2.a.ii and iii The response to these RAls discussing mapping the containment event tree (CET) end states to release categories states (p. E 1-37) that "Single linked-fault tree Level 2 End State gates are defined for each of the major contributors to each of the 4 Release Categories."
Describe what is meant by "major," what is left out of the quantification of release categories, and the significance of contributors not accounted for in the release categories.
- 5. RAI 2.a.iv
- a. The discussion of the determination of release category characteristics (I.e. source terms) indicates that the SEQSOR methodology was used. This methodology does not calculate release fractions from first principles but uses input from other calculations and has been used in the past for Sequoyah. The WBN Unit 2 IPE submittal discusses the use of Modular Accident Analysis Program (MAAP) 4.0.7 for the LERF analysis. Clarify the origin of the source terms used for the SAMOA analysis. Note that in the July 23,2010, TVA response to RAI 2.f, TVA took the position that results from MAAP analysis were more valid than those from SEQSOR Clarify this apparent change in TVA's position.
- b. The discussion of the source terms states that the, The source terms for each set of accident characteristics are weighted in accordance with the % contribution for each release type in Table 2.a.iv-3." This process is valid only if the consequences of the releases are linear with respect to the source terms. This is not necessarily true.
Provide support that this process provides a valid estimate of consequences.
- c. The discussion of release category definitions and contributors in response to RAI 2.a.ii and iii indicates that early steam generator tube ruptures (SGTRs) are assigned to the BYPASS release category under the contributor LERF-SGTR (SLERF) corresponding to the SLERF CET end state. The WBN Unit 2 IPE indicates that thermally induced SGTRs make up 32 percent of the WBN Unit 2 LERF. The SLERF end state is not
- 3 included in the RAI revised model dominant CET end states listed in Table 2.a.iv-2. It is noted that plant damage state (PDS) bin 481, which, according to Table 2.a.i-2, is made up of large SGTR sequences, is not represented in the dominant CET end states.
Clarify the reason for this and describe the SGTR contribution to W8N Unit 2 consequences.
- d. The development of the RAI revised source term characteristics given in Table 2.a.iv-3 includes four contributors to the late release category, whereas Table 2.a.iv-2 identifies six dominant CET end states from three different PDS bins. Explain the development of the four late release category contributors and their weighting.
- e. Table 2.a.iv-6 gives the October 2010 RAI offsite population dose for release category III as 8.19E06 person-rem. This is a signi'ficant increase over the original October 2010 result of 1.13E06 person-rem, and when multiplied by the release category frequency of 1.3E-05 per year gives an annual population dose of 107 person-rem. This is a factor of 10 higher than that given in Table 5.c-1. Confirm that the value in Table 2.a.iv-6 should be 8.19E05 person-rem.
- f. Provide the revised Off-Site Exposure Cost and Off-Site Economic Cost used to develop the maximum averted cost risk (MACR) as given in Section 5.1 and 5.2 of the October 14, 2010, RAI response submittal (and On-Site Exposure Cost in Section 5.3 and On-Site Cleanup and Decontamination Cost and Replacement Power Cost in Section 5.4 if these have changed for any reason) of the October 14, 2010, submittal.
- 6. RA12.c The response to RAI 1.a (p. E 1-4) gives the W8N Unit 2 LERF as 1.70E-06 per year while the sum of release categories 1 and 2 frequencies is 1.61 E-06. Discuss the reasons for this difference.
- 7. RAI4.a.i
- a. The last paragraph on page E1-80 indicates that all basic events with a risk reduction worth (RRW) of 1.007 or higher were reviewed for all types of SAMDAs - hardware and operator error improvement. Confirm that the reference to an RRW of 1.007 in this paragraph is an error and should be an RRW of 1.026, since the following paragraph states that the review is "further extended" down to an RRWof 1.007.
- b. In Table 4ai-1, no SAMDAs are identified for SEQFD2A-A and SEQFD28-8. The justification appears to be the citation of the entry for diesel generator failure, which is addressed by a number of SAMDAs ranging from a new 2 MW DG to bypassing DG trips. None of these directly address the sequencer failure such as the possibility of manual loading of the DG following sequencer failure. Sequencer failures contribute a total of about 2.3 percent to the CDF, which would correspond to a benefit of approximately $200,000 at the 95th percentile. Discuss this possibility.
-4
- 8. RAI 4.a.ii The response to this RAI develops a lower RRW cutoff, apparently based on only RC2 on the stated basis that reducing the LERF frequency had the greatest impact for bypass sequences (i.e., RC2). RC2, however, due to its low frequency, contributes only a small amount (-1 percent) to the overall MACR and consequently eliminating the risk completely would only have a very small benefit (approximately $120,000). How the lower RRW cutoff values given were determined is not clear. Also, the basis (RC2 or both RC1 and RC2) for the event ranking and the associated RRW values in Table 4.a.ii-1 is not clear. The importance of the events in Table 4.a.ii-1 appear to be essentially the same (after converting RRWto F-V) as in Table 15.h of the October 14, 2010, submittal. Provide additional clarification on these issues.
- 9. RA14.d The response to this RAI provides a good review of fire risk contributors and potential actions that might be taken to reduce these risks. In Table 4.d-1, newly identified SAMOA 314, "Enhance training for local control of AFW [auxiliary feedwater] given station blackout, loss of control air, or fires affecting AFW LCVs [level control valves]," is indicated to have already been implemented, citing previous commit to SAMOAs 285 and 299. While these SAMOAs cite enhancements to training in a general sense, neither appears to specifically address the training enhancement needed for SAMOA 314. Provide a specific citation that incorporates the requirements of SAMOA 314.
- 10. RAI 4.e.ii The response to this RAI indicates that one reason that SAMOA 29 is not feasible is that the use of a diesel-driven fire pump for injection would require AC power to provide OC power after battery depletion to allow the power-operated relief valves (PORVs) to remain open. It would appear that a much smaller AC power source would suffice to allow the PORVs to remain open than that which would be required to operate the residual heat removal and other pumps to provide cooling. Further it is stated that depressurization to the point of allowing the fire pump would be challenging for the operator. Such actions are, however, proceduralized in TVA procedure SAG-2 (7/23/10 response to original SAMOA RAls,
- p. E1-41). While a recirculation path may ultimately be needed, it is conceivable that containment flooding would not be an issue until very late in the scenario. Provide additional discussion of this SAMOA to support its screening.
- 11. RAI4.e.v The response to this RAI indicates that the significant room cooling failures are the centrifugal charging pump (CCP) area, the turbine-driven auxiliary feedwater pump room and the OG switchgear rooms. Provide the status of procedures and/or availability of necessary portable equipment (such as fans and ducting) that would reduce the likelihood of equipment failures due to room cooling failures for each of these areas. If not included in procedures or portable equipment is not available, discuss the feasibility and cost benefit of such SAMOAs addressing these failures. While as is stated for SAMOA 337, that for the CCP area there are no direct alarms or indications in the control room concerning the room
-5 cooling failure, it is possible that the room cooling failures would be discovered by other means such that having portable fans available would provide a benefit.
- 12. RA15.e The response to this RAI concerning SAMOA 70 discusses changing the cognitive portion of the human error for events HAFR1 and HAAF1. It is noted that the former event is incorporated in several dependent human error events including HRAOEP-POST-221 and 180. Clarify whether these dependent human errors changed when the benefit of this SAMOA was determined. If not, discuss the impact of these changes on the result, noting that this SAMOA has a benefiUcost ratio of 0.99 considering uncertainty. Note also that if the 95th percentile to point estimate ratio of 2.78 is used in the uncertainty analysis instead of the 2.70, which is the ratio of the 95th percentile value to the mean, this SAMOA becomes slightly cost beneficial. Provide a revised evaluation of this SAMOA that accounts for these issues and the stated conservatism in the benefit calculation.
- 13. RAI 5.f It is noted that there is no reduction in COF for SAMOA 93. The usual purpose of containment venting is to prevent core damage for loss of containment heat removal sequences where the functioning core injection systems would fail upon containment over pressure failure. The importance of these sequences for WBN Unit 2 is not known. Oiscuss the reason why there is no COF reduction for this SAMOA.
- 14. RA15.g The response to this RAI discusses a number of different sensitivity studies for the assumptions used to evaluate SAMOA 110. Several results are provided, none of which correspond with that given in Table 2.a.iv-8 for this SAMOA. Clarify this and indicate the external events multiplier used in the response to this RAI.
- 15. RAI6 This RAI requested an assessment of the impact of uncertainty on the Phase I screening of SAMOAs due to either excessive cost or very low benefit similar to that given in response to the original RAI 7.a. The response to this new RAI does not provide this assessment.
While Table 19 of the October 14,2010, SAMOA submittal is cited, this table addresses the impact of uncertainty on the Phase II cost benefit analYSis not the Phase 1 screening. The current marginal MACR is a factor of 2.6 times that on which the original screening was performed, while the risk profile of the current PRA is considerably different from that used in the original screening. These changes could impact the judgments made in the Phase I screening without requiring a Phase II cost evaluation. Provide the requested assessment.
- 16. Cover Letter With respect to SAMA 58, TVA has committed to follow the progress and experience with the new Westinghouse seal package design, and if proven reliable during operation, to install the new package at WBN Unit 2. While it is true that SAMOAs 215 and 226 are mutually exclusive and installation of the new seal would preclude the necessity for other
- 6 means of reducing reactor coolant pump seal failures such as SAMDA 215 or 226, there is no commitment to implement either SAMDA 215 or 226 (which are cost beneficial considering uncertainty) should the new seal design not be implemented at WBN Unit 2.
Describe the process TVA would use to evaluate SAMDAs 215 and 226 in the eventuality that SAMA 58 is not implemented.
t1arch 30, 2011 Mr. Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
WATIS BAR NUCLEAR PLANT, UNIT 2 - SUPPLEMENTAL REQUEST FOR ADDITIONAL INFORMATION REGARDING SEVERE ACCIDENT MANAGEMENT DESIGN ALTERNATIVES REVIEW (TAC NO. MD8203)
Dear Mr. Bhatnagar:
By letter dated October 14, 2010 (Agencywide Documents Access and Management System Accession No. ML102910629), the Tennessee Valley Authority (TVA) submitted an updated severe accident management design alternatives (SAMDA) analysis for Watts Bar Nuclear Plant, Unit 2. In response to a request for additional information (RAI) from the Nuclear Regulatory Commission (NRC) staff, TVA responded in a letter dated January 31, 2011 (Accession No. ML110340347) to questions regarding this analysis.
In an effort to complete the NRC staff review, enclosed is an RAI regarding the SAMDA analysis.
A response is required 14 days from the date of this letter.
If you should have any questions, please contact me at 301-415-2048.
Sincerely, IRAJ Patrick D. Milano, Sr. Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391
Enclosure:
Request for Additional Information cc w/encl: Distribution via Listserv DISTRIBUTION: RidsOgcRp Resource RidsRgn2MailCenter Resource PUBLIC RidsNrrDorlLpwb Resource RidsNrrDraApla Resource LPWB Reading File RidsNrrLABClayton Resource RidsNrrPMWattsBar2 Resource RidsAcrsAcnw_MailCTR Resource RidsNrrDorlDpr RGallucci, NRR ADAMS Accession No ML110820858 OFFICE LPWB/PM LPWB/LA APLAlBC OGC LPWB/BC NAME PMilano BClayton DHarrison DRoth SCampbeil DATE 03/24/11 03/24/11 03/25/11 03/28/11 03/30/11 OFFICIAL AGENCY RECORD