Letter Sequence Request |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
Results
Other: CNL-14-201, Response to Questions Regarding the Unit 1/Unit 2 As-Constructed Fire Protection Report, CNL-15-174, Submittal of Updated Pages for Unit 1/Unit 2 As-Constructed Fire Protection Report & License Condition 2.C(9) Addition Request, CNL-15-214, Updated Pages for As-Constructed Fire Protection Report, ML113500239, ML12207A080, ML13051A045, ML13081A002, ML13081A003, ML14265A449, ML15175A508
|
MONTHYEARML1000800082010-01-11011 January 2010 Notice of Forthcoming Conference Call with Tennessee Valley Authority Sequoyah Nuclear Plant, Units 1 & 2; Watts Bar Unit 1 Project stage: Request ML1001914212010-01-11011 January 2010 Final Safety Analysis Report, Amendment 97 Project stage: Request ML1013701862010-05-14014 May 2010 OL - FW: Call Summary - TVA Clarification Call Project stage: Request ML1015401332010-06-10010 June 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Accident Dose Project stage: RAI ML1019402362010-06-18018 June 2010 Instrumentation and Controls Staff Information Requests Project stage: Request ML1018201562010-06-18018 June 2010 OL - Updated Open Items List Project stage: Request ML1015402502010-06-24024 June 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Nuclear Performance and Code Review, Plant Systems, and Testing (Tac Nos. ME2731 and ME3091) Project stage: RAI ML1016002782010-07-12012 July 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Accident Dose Project stage: RAI ML1019506102010-07-30030 July 2010 Request for Additional Information, Licensees Final Safety Analysis Report Amendment Related to Chapters 3.9.1, 3.9.2, and 3.9.3 Project stage: RAI ML1019404742010-07-30030 July 2010 Request for Additional Information, Licensees Final Safety Analysis Report Amendment Related to Chapter 10.4.7 Project stage: RAI ML1026305982010-09-28028 September 2010 Request for Additional Information, Regarding Final Safety Analysis Report Related to Sections 3.2 and 5.2 Project stage: RAI ML1029901502010-10-26026 October 2010 Cancelled - Notice of Meeting with (Tva), to Discuss Responses to the NRC Requests for Additional Information (Rals) for Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Project stage: RAI ML1035401772010-12-20020 December 2010 Notice of Meeting with Tennessee Valley Authority to Discuss Watts Bar Nuclear Plant, Unit 2, Final Safety Analysis Report Related to Section 7 Instrumentation and Control Project stage: Request ML1036101142010-12-21021 December 2010 Submittal of Pre-op Test Instruction Project stage: Request ML1101401972011-01-14014 January 2011 Notice of Meeting with Tennessee Valley Authority to Discuss Watts Bar Nuclear Plant, Unit 2, Final Safety Analysis Report Related to Section 7 Instrumentation and Control Project stage: Request ML1102801282011-02-0909 February 2011 Request for Additional Information, Regarding Final Safety Analysis Report Amendment Related to Section 9.5.1 Fire Protection System Project stage: RAI ML1106107452011-03-10010 March 2011 Request for Additional Information, Regarding Final Safety Analysis Report Related to Section 9.5.1 Fire Protection Report - Round 2 Project stage: RAI ML1107705372011-03-16016 March 2011 Instrumentation and Controls Staff Information Requests Project stage: Request ML1109104642011-04-13013 April 2011 Summary of Meeting with Tennessee Valley Authority to Discuss Watts Bar Nuclear Plant, Unit 2, Final Safety Analysis Report Related to Section 9.5.1 Fire Protection Project stage: Meeting ML1109607652011-04-25025 April 2011 Request for Additional Information Regarding Final Safety Analysis Report Related to Section 9.5.1 Fire Protection Round 3 Project stage: RAI ML11129A1582011-05-0606 May 2011 Request for Additional Information Regarding Fire Protection Report, Project stage: Request ML11165A1452011-05-18018 May 2011 OL - Commitments and Sser Open Items Project stage: Request ML1112404832011-05-23023 May 2011 Request for Additional Information Regarding Final Safety Analysis Report Related to Section 9.5.1 Fire Protection Round 4 Project stage: RAI ML1115201192011-05-26026 May 2011 Response to Request for Additional Information Regarding Fire Protection Report Project stage: Response to RAI ML1114506732011-05-26026 May 2011 July 14, 2011 Notice of Forthcoming Meeting with Tennessee Valley Authority (TVA) to Discuss Bellefonte Nuclear Plant, Unit 1, Digital Instrumentation and Control and Human Factors Project stage: Request ML11161A1282011-06-0707 June 2011 Safety Evaluation Report Supplement 22 (Sser 22) - Second Response to NRC Required Action Items Project stage: Request ML1115109792011-06-0808 June 2011 Request for Additional Information Regarding Final Safety Analysis Report Related to Section 9.5.1 Fire Protection Round 5 Project stage: RAI ML11186A8642011-07-0101 July 2011 Submittal of Report in Accordance with 10 CFR 26.719(c)(1) for Drug and Alcohol Testing Errors Project stage: Request ML11200A1092011-07-14014 July 2011 Meeting Slides - TVA Phase 0 Meeting Bln/Nrc Bellefonte Digital I & C Upgrades Project stage: Request ML11200A1152011-07-14014 July 2011 Meeting Slides - TVA Phase 0 Meeting with NRC Bellefonte Units 1 & 2 Main Control Room Modernization Project stage: Request ML1118235802011-07-21021 July 2011 Request for Additional Information Regarding Final Safety Analysis Report Related to Section 9.5.1 Fire Protection Group 6 Project stage: RAI ML1120000992011-07-22022 July 2011 July 14, 2011 Summary of Pre-Application Meeting with Tennessee Valley Authority Regarding Digital Instrumentation and Control and Human Factors for the Potential, Proposed Updated Operating License Application at Bellefonte Nuclear Plant, Project stage: Meeting ML1120303872011-07-27027 July 2011 Request for Additional Information Regarding Incore Instrumentation System Project stage: RAI ML11215A1322011-07-29029 July 2011 Response to Request for Additional Information Regarding June 28, 2011 NRC Audit- Steam Line Break (Slb) and Other Miscellaneous RAIs Project stage: Response to RAI ML11227A2572011-08-0505 August 2011 Request for Additional Information (RAI) Group 6 Regarding Fire Protection Report Project stage: Request ML11230A3852011-08-15015 August 2011 Transmittal of Revised Unit 1 / Unit 2 As-Designed Fire Protection Report Project stage: Request ML1124904742011-09-14014 September 2011 Request for Additional Information Regarding Final Safety Analysis Report Related to Section 9.5.1 Fire Protection Group 7 Project stage: RAI ML11286A0352011-09-30030 September 2011 OL - Additional Draft RAI on Fire Protection - Group 8 Project stage: Request ML11286A0382011-09-30030 September 2011 OL - Draft RAIs on Fire Protection - Group 8 Project stage: Request ML13060A2252011-09-30030 September 2011 Response to Request for Additional Information Group 7 Regarding Fire Protection Report, (TAC No. ME3091) (Public Version) Project stage: Response to RAI ML11306A0902011-10-28028 October 2011 Response to Request for Additional Information Group 8 Regarding Fire Protection Report Project stage: Response to RAI ML11322A1032011-11-30030 November 2011 WCAP-17529-NP, Rev. 0, System Requirements Specification for the Common Q Post Accident Monitoring System Project stage: Request ML1135002392011-12-20020 December 2011 Audit Report of Fire Protection Relating to Final Safety Analysis Report Accident Analyses Project stage: Other ML12054A0622012-03-13013 March 2012 Summary of Public Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2, Final Safety Analysis Report Related to Fire Protection Project stage: Request ML1207905812012-03-23023 March 2012 Request for Additional Information Regarding Final Safety Analysis Report Related to Section 9.5.1, Fire Protection Group 8 Project stage: RAI ML12142A0262012-05-17017 May 2012 OL - Request for Additional Information Regarding Fire Protection Review Group 10 Project stage: RAI ML12153A3742012-05-30030 May 2012 Watts, Unit 2, Response to Request for Additional Information Project stage: Response to RAI ML12181A5312012-06-27027 June 2012 Resolution of Concerns with Fire Protection Report (FPR) Operator Manual Action (OMA) 732 and Response to Requests for Additional Information Project stage: Response to RAI ML12207A0802012-07-19019 July 2012 Resolution of Concerns with Fire Protection Report Operator Manual Action 732 - Commitment Schedule Update Project stage: Other ML13051A0452013-02-14014 February 2013 Updated Response to NRC Bulletin 2011-01, Mitigation Strategies Project stage: Other 2011-05-23
[Table View] |
Text
1 WBN2Public Resource From:
Beissel, Dennis Sent:
Friday, May 14, 2010 10:21 AM To:
WBN2HearingFile Resource
Subject:
FW: Call summary - TVA clarification call Attachments:
Call Record WBN_call summary March 12 2010.doc From: Stegen, Amanda [1]
Sent: Thursday, May 13, 2010 7:44 PM To: Beissel, Dennis; Logan, Dennis; Wiebe, Joel; Imboden, Andy
Subject:
Call summary - TVA clarification call AttachedisthePNNLcallsummaryforthecallNRC/PNNLhadwithTVAonMay12,2010.Pleaseletmeknowifyouhaveany questions.PleasenotethatTVAhadseveralactionitemsthatcameoutofthecall.
- Thanks,
Amanda
Hearing Identifier:
Watts_Bar_2_Operating_LA_Public Email Number:
18 Mail Envelope Properties (87B1F1BDFE5A554CA9DC5EAA75EB6D0D1CF90711A4)
Subject:
FW: Call summary - TVA clarification call Sent Date:
5/14/2010 10:20:33 AM Received Date:
5/14/2010 10:20:36 AM From:
Beissel, Dennis Created By:
Dennis.Beissel@nrc.gov Recipients:
"WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov>
Tracking Status: None Post Office:
HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 466 5/14/2010 10:20:36 AM Call Record WBN_call summary March 12 2010.doc 101442 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:
Phone/Conference Call Record Project/Plant: Watts Bar Nuclear Unit 2 Call title/subject: TVA RAI Clarification Call Purpose of call: To clarify several of the TVA RAI responses from February 25 and April 9 2010 Submittals Date: 5/12/10 Attendees:
PNNL Bob Bryce Eva Hickey Rick Traub Amanda Stegen Van Ramsdell NRC Dennis Logan Dennis Beissel TVA Jerri Phillips Gordon Arent Eddie Woods Dennis Baxter Bo Baxter Call notes:
Land Use - Amanda Stegen PNNL requested clarification on total acreage for WBN site - there are inconsistencies with data provided in the February 25, 2010 RAI responses (1055 acres) and the value in the ER (1700 acres).
TVA response (Gordon Arent): The 1055 acres is specifically related to Watts Bar Nuclear and just a portion of the Watts bar reservation. He explained that the
1700 acres encompasses the Watts Bar Dam and Hydro-Electric Plant, the Watts Bar Steam Plant, the TVA Central Maintenance Facility, and the Watts Bar Resort Area.
This issue is considered resolved.
Aquatic Ecology - Becky Krieg/Dennis Logan We need to be able to access the entire report on Preoperational Assessment - 1986.
As we discussed previously on the phone, TVA only provided the document through page 302, and the appendices in Volume II. We are missing from page 302-484-plus from Volume 1.
o TVA 1986. Preoperational Assessment of Water Quality and Biological Resources of Chickamauga Reservoir, Watts Bar Nuclear Plant 1973-1985.
Office of Natural Resources and Economic Development - Division of Air and Water Resources.
TVA Response (Dennis Baxter): TVA is scanning the entire 1986 document and submitting to NRC. - TVA Action Item Clarification on AE specifically when we are talking monitoring sites is that the same as beds. If it is then does the TRM 526-527 site really extend further upstream or is that just a small grouping of mussels at 592.2 R? And are these the ones you relocated across the river? Which ones were relocated to the boulder study area described in AE-7?
TVA Response (Dennis Baxter): There is a 1994 report that has the mussel sampling stations AND the mussel beds in a figure.
The mussels from 529.2 (SCCW discharge location) were not considered part of the bed that is downstream of the SCCW discharge. These mussels were moved across the river to the mussel bed by the boat launch. Although the freshwater mussels do tend to congregate in beds, there are a few that are distributed between the beds and these were the types of mussels that were relocated.
The mussels that were placed in the boulder field as an experiment to see if cutting the flow of water would improve their survival, were randomly selected from mussel beds downstream. They are located near the 528 RM marker and almost directly across from the 528.9 boat ramp, mid-channel. They have not been checked since placement but they are being checked June 2010 during a mussel survey.
TVA will submit the figure with the sampling locations and mussel bed locations to NRC. - TVA Action Item
Please clarify why did TVA did not provide an update of TVA 1998 Aquatic Environmental Conditions in the Vicinity of Watts Bar nuclear plant, specifically sections on the entrainment sampling that we discussed in a phone call in late January.
TVA response: TVA is still reviewing the changes to TVA 1998 (Aquatic Environmental Conditions in the Vicinity of Watts Bar Nuclear Plant During Two Years of Operation, 1996-1997) and will send it to NRC, once it has been approved. The changes to the report have been completed and the entrainment numbers recalculated based on the original data. The numbers show low levels of entrainment for the IPS. - TVA Action Item Hydrology - Bob Bryce/Dennis Beissel TVA Response to H-10. Clarification of the Surface Water Chemical Analysis.
TVA response (Jerry Phillips/Bo Baxter/Dennis Baxter/Gordon Arent): TVA will be providing clarification on the analytical results for the surface water sample that was performed September 2009. Was the sample analyzed for trace metals and were they not reported because they were below detection - TVA Action Item TVA Response to H-6. Verification of the withdrawal rate from the French Drain TVA response (Eddie Woods): Eddie explained that the approximately 70 gpm reported by Arcadis is flowing specifically from the French Drain and the 500 gpm reported by TVA is pumped from the sump and includes the water from the French Drain. The water from the sump is pumped into the yard holding pond.
This issue is resolved.
TVA Response to H-11. Clarification of information regarding through screen velocity for the intake TVA response (Dennis Baxter/Gordon Arent): TVA will be providing verification of the flow through velocities provided in the response. - TVA Action Item Design Basin Accidents - Van Ramsdell TVA personnel that can provide information on the status of the accident analysis (it appears some accident scenarios were not analyzed) as well as the assumptions that went into the analysis.
TVA response (Frank Coonz?/Gordon Arent): TVA will be providing status of the accidents analysis. - TVA Action Item RAD-Eva Hickey/Rick Traub TVA personnel that have an understanding of the TVA RAIs responses (related to Rad).
TVA personnel that can clarify information related to the dilution factor for the release from the plant to the river for the liquid effluents TVA response (Eddie Woods): The dilution factors were calculated by dividing the cooling tower blowdown (20,000 gpm-44.6 cfs)) (see Fig 3-7 of the submittal) by the effluent flow rate (can vary from less than 100 gpm to 290 gpm - 13.4 cfs to 38.8 cfs).
All fishing is assumed to be sport fishing.
There is only one terrain adjustment factor for each sector.
This issue is considered resolved.