Letter Sequence Approval |
---|
|
|
MONTHYEARML1011708402010-04-27027 April 2010 Acceptance Review of LAR - Revision to Containment Spray System Nozzle Surveillance Frequency Project stage: Acceptance Review ML1106500032011-03-16016 March 2011 Issuance of Amendment No. 208 Revision to Containment Spray System Nozzle Surveillance Frequency Project stage: Approval 2010-04-27
[Table View] |
|
---|
Category:Letter
MONTHYEARML24268A3382024-10-16016 October 2024 Issuance of Amendment No. 253 Regarding the Modification of TS Surveillance Requirement 4.3.6.a Related to Adoption of TSTF-425, Revision 3 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP2L2890, Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6)2024-10-0404 October 2024 Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6) ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing IR 05000220/20243022024-10-0303 October 2024 Initial Operator Licensing Examination Report 05000220/2024302 ML24190A0012024-09-26026 September 2024 Issuance of Amendment Nos. 252 and 197 Regarding the Revision to Technical Specification Design Features Section to Remove Nine Mile Point Unit 3 Project Designation NMP1L3608, Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-09-20020 September 2024 Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000220/20240052024-08-29029 August 2024 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2024005 and 05000410/2024005) IR 05000220/20240102024-08-22022 August 2024 Age-Related Degradation Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3603, Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan2024-08-20020 August 2024 Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000220/20240022024-08-0505 August 2024 Integrated Inspection Report 05000220/2024002 and 05000410/2024002 ML24215A3002024-08-0202 August 2024 Operator Licensing Examination Approval NMP1L3601, Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-07-31031 July 2024 Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML24213A1412024-07-31031 July 2024 Requalification Program Inspection NMP2L2883, Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations2024-07-24024 July 2024 Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations ML24198A0852024-07-16016 July 2024 Senior Reactor and Reactor Operator Initial License Examinations RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3584, License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2024-06-13013 June 2024 License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling IR 05000220/20244012024-05-30030 May 2024 Security Baseline Inspection Report 05000220/2024401 and 05000410/2024401(Cover Letter Only) ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 NMP1L3591, Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request2024-05-18018 May 2024 Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request NMP1L3589, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-05-16016 May 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable ML24158A2052024-05-15015 May 2024 Annual Radioactive Environmental Operating Report NMP1L3582, 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 22024-05-15015 May 2024 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 2 IR 05000220/20240012024-05-10010 May 2024 Integrated Inspection Report 05000220/2024001 and 05000410/2024001 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds 05000410/LER-2024-001, Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum2024-05-0101 May 2024 Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP1L3581, Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report2024-04-30030 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report NMP2L2877, 2023 Annual Environmental Operating Report2024-04-19019 April 2024 2023 Annual Environmental Operating Report NMP2L2878, Core Operating Limits Report2024-04-16016 April 2024 Core Operating Limits Report ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24092A3352024-04-0101 April 2024 NRC Office of Investigations Case No. 1-2023-002 ML24074A2812024-03-14014 March 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3577, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-03-13013 March 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable IR 05000220/20230062024-02-28028 February 2024 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2, (Reports 05000220/2023006 and 05000410/2023006) IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 NMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation 05000410/LER-2023-001, Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater2024-01-30030 January 2024 Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000220/LER-2023-002, Average Power Range Monitors Declared Inoperable Due to Trip of Reactor Recirculation Pump 122023-12-15015 December 2023 Average Power Range Monitors Declared Inoperable Due to Trip of Reactor Recirculation Pump 12 NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station 2024-09-04
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML24190A0012024-09-26026 September 2024 Issuance of Amendment Nos. 252 and 197 Regarding the Revision to Technical Specification Design Features Section to Remove Nine Mile Point Unit 3 Project Designation NMP1L3584, License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2024-06-13013 June 2024 License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration NMP1L3534, License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2023-08-18018 August 2023 License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling NMP1L3484, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Reatment of Structures, Systems and Components for Nuclear Power Reactors2022-12-15015 December 2022 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Reatment of Structures, Systems and Components for Nuclear Power Reactors NMP1L3482, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-12-15015 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML22298A0112022-10-25025 October 2022 License Amendment Request to Adopt Technical Specification Task Force TSTF-295-A, Modify Note 2 to Actions of (Post-Accident Monitoring) PAM Table To. RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration NMP1L3477, License Amendment Request - Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, to Revise.2022-08-12012 August 2022 License Amendment Request - Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, to Revise. NMP1L3467, License Amendment Request - Revision to Alternative Source Term Calculation for Main Steam Isolation Valve (MSIV) Leakage and Non-MSIV Leakage2022-06-29029 June 2022 License Amendment Request - Revision to Alternative Source Term Calculation for Main Steam Isolation Valve (MSIV) Leakage and Non-MSIV Leakage NMP2L2799, License Amendment Request - Revise Surveillance Requirements to Reduce Excessive Fast Starting of Emergency Diesel Generators2022-05-24024 May 2022 License Amendment Request - Revise Surveillance Requirements to Reduce Excessive Fast Starting of Emergency Diesel Generators RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21277A1932021-11-16016 November 2021 Enclosure 2, Draft Conforming License Amendments NMP2L2780, Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2021-09-30030 September 2021 Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position NMP2L2762, License Amendment Request Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control2021-05-26026 May 2021 License Amendment Request Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments ML21057A2732021-02-25025 February 2021 Application for Order Approving License Transfers and Proposed Conforming License Amendments NMP1L3369, Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0 Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-12-18018 December 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0 Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements RS-20-031, License Amendment Request - Application to Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2 .5 and TS 3.6 .3.2, Using the Consolidated Line Item Improvement Process2020-04-30030 April 2020 License Amendment Request - Application to Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2 .5 and TS 3.6 .3.2, Using the Consolidated Line Item Improvement Process NMP2L2716, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2019-12-26026 December 2019 Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors NMP2L2706, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b.2019-10-31031 October 2019 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. RS-19-044, License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions2019-08-28028 August 2019 License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability NMP1L3278, License Amendment Request - Administrative Changes to the Technical Specifications2019-06-26026 June 2019 License Amendment Request - Administrative Changes to the Technical Specifications RS-19-040, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-06-25025 June 2019 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program NMP2L2699, License Amendment Request to Revise Technical Specifications Main Steam Isolation Valve Leak Rate2019-05-31031 May 2019 License Amendment Request to Revise Technical Specifications Main Steam Isolation Valve Leak Rate RS-19-003, Application to Adopt TSTF-564, Safety Limit Mcpr.2019-02-0101 February 2019 Application to Adopt TSTF-564, Safety Limit Mcpr. NMP2L2694, Emergency License Amendment Request: One Time Extension to the High Pressure Core Spray Completion Time and Associated Surveillances2018-12-0606 December 2018 Emergency License Amendment Request: One Time Extension to the High Pressure Core Spray Completion Time and Associated Surveillances NMP1L3192, License Amendment Request - Revise Technical Specification 3.3.1 for Primary Containment Oxygen Concentration2018-06-26026 June 2018 License Amendment Request - Revise Technical Specification 3.3.1 for Primary Containment Oxygen Concentration RS-18-020, Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement2018-06-15015 June 2018 Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement RS-17-161, Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR)2018-03-0101 March 2018 Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR) NMP1L3188, License Amendment Request - Proposed Change to Remove Boraflex Credit from Spent Fuel Racks2018-02-0909 February 2018 License Amendment Request - Proposed Change to Remove Boraflex Credit from Spent Fuel Racks NMP1L3142, License Amendment Request - Revise Technical Specifications to Apply TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 22017-12-15015 December 2017 License Amendment Request - Revise Technical Specifications to Apply TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 RS-17-137, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2017-11-0808 November 2017 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NMP2L2660, License Amendment Request - Safety Limit Minimum Critical Power Ratio Change2017-11-0303 November 2017 License Amendment Request - Safety Limit Minimum Critical Power Ratio Change NMP2L2652, License Amendment Request - Revise Surveillance Requirement 3.5.1.2 to Remove Note2017-08-22022 August 2017 License Amendment Request - Revise Surveillance Requirement 3.5.1.2 to Remove Note ML17164A1542017-05-31031 May 2017 Enclosure 4C - EAL Basis Document for Nine Mile Point Nuclear Station, Unit 1 ML17164A1552017-05-31031 May 2017 Enclosure 4D - EAL Front Matter for Nine Mile Point Nuclear Station, Unit 1 NMP2L2641, License Amendment Request - Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Revision 02017-05-31031 May 2017 License Amendment Request - Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Revision 0 ML17164A1532017-05-31031 May 2017 Enclosure 4B - EAL Red-Line Basis Document for Nine Mile Point Nuclear Station, Unit 1 NMP1L3158, Enclosure 4E - Procedure Matrix for Nine Mile Point Nuclear Station, Unit 12017-05-31031 May 2017 Enclosure 4E - Procedure Matrix for Nine Mile Point Nuclear Station, Unit 1 JAFP-17-0050, Exigent License Amendment Request to Revise Emergency Action Level HU1.52017-05-19019 May 2017 Exigent License Amendment Request to Revise Emergency Action Level HU1.5 ML17037C4192017-05-11011 May 2017 Amendment to Operating License/Change to Appendix a of Technical Specification Concerning Certain Repairs at Facility and Concomitantly to Allow a Continuation of a Slightly Lower Water Level in the Reactor... NMP2L2643, License Amendment Request-Adoption of TSTF-283-A, Revision 3, Modify Section 3.8 Mode Restriction Notes2017-04-0505 April 2017 License Amendment Request-Adoption of TSTF-283-A, Revision 3, Modify Section 3.8 Mode Restriction Notes RS-17-049, Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process2017-03-28028 March 2017 Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process NMP2L2640, License Amendment Request - Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 22017-02-28028 February 2017 License Amendment Request - Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 NMP2L2639, Supplement to License Amendment Request - Proposed Revision to Technical Specification in Response to GE Energy- Nuclear 10 CFR Part 21 Safety Communication SC05-032017-02-17017 February 2017 Supplement to License Amendment Request - Proposed Revision to Technical Specification in Response to GE Energy- Nuclear 10 CFR Part 21 Safety Communication SC05-03 2024-09-26
[Table view] Category:Safety Evaluation
MONTHYEARML24268A3382024-10-16016 October 2024 Issuance of Amendment No. 253 Regarding the Modification of TS Surveillance Requirement 4.3.6.a Related to Adoption of TSTF-425, Revision 3 ML24190A0012024-09-26026 September 2024 Issuance of Amendment Nos. 252 and 197 Regarding the Revision to Technical Specification Design Features Section to Remove Nine Mile Point Unit 3 Project Designation ML24145A1862024-05-30030 May 2024 Authorization and Safety Evaluation of Alternative Relief Request I5R-12 Concerning the Installation of a Full Structural Weld Overlay on RPV Recirculation Inlet Nozzle N2E ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23291A4642023-12-0707 December 2023 Issuance of Amendment No. 251 Regarding the Adoption of Title 10 the Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of SSC for Nuclear Power Plants ML23289A0122023-12-0606 December 2023 Issuance of Amendment No. 250 Regarding the Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration ML23131A4242023-06-23023 June 2023 Issuance of Amendment No. 249 Regarding the Revision to Technical Specification 3.3.1 to Adopt Technical Specifications Task Force Traveler TSTF-568 ML23156A6832023-06-22022 June 2023 Authorization and Safety Evaluation of Alternative Relief Request I5R-14 ML23156A6822023-06-22022 June 2023 Authorization and Safety Evaluation of Alternative Relief Request I5R-11 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration ML23103A1912023-04-20020 April 2023 Request for Threshold Determination Under 10 CFR 50.80 ML23082A3502023-04-17017 April 2023 Issuance of Amendment No. 192, Revision of Surveillance Requirements Associated with Emergency Diesel Generator Testing ML23094A1422023-04-0505 April 2023 Approval of Alternative Request I5R-13 to Utilize Specific Provisions of Code Case N-716-3 ML23025A4122023-02-28028 February 2023 Issuance of Amendment No. 248 to Revise Alternative Source Term Calculation for Main Steam Isolation Valve Leakage and Non-MSIV Leakage ML22339A0582022-12-21021 December 2022 Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps ML22293B8052022-11-30030 November 2022 Constellation Energy Generation, Llc_Fleet - Request to Authorize Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML22094A0012022-04-15015 April 2022 Constellation Energy Generation, LLC - Proposed Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles (Epids L-2021-LLR-0057 and L-2021-LLR-0058) ML22061A0402022-03-11011 March 2022 Relief Request Associated with Excess Flow Check Valves ML22033A3102022-03-0404 March 2022 Issuance of Amendment No. 190, Changes to Reactor Pressure Vessel Water Inventory Control Technical Specification Requirements ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21277A2482021-11-16016 November 2021 Letter with Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (Public Version) ML21295A7342021-11-15015 November 2021 Issuance of Amendment No. 187 Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML21256A1792021-11-0202 November 2021 Issuance of Amendment No. 246 Changes to Reactor Pressure Vessel Water Inventory Control Technical Specification Requirements ML21280A0782021-10-27027 October 2021 Proposed Alternative to Use of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-893 (Epids L-2020-LLR-0147 and L-2020-LLR-0148) ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML21166A1682021-06-25025 June 2021 ML21140A1532021-06-0303 June 2021 Correction to April 22, 2021 Safety Evaluation for Requests for Alternative to the Inservice Testing Requirements of the ASME OM Code for the Fifth 10-Year Program Interval ML21082A2212021-04-29029 April 2021 Issuance of Amendment No. 186, Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML21109A2162021-04-22022 April 2021 Proposed Alternative to Inservice Testing Requirements of the ASME OM Code for the Fifth 10-Year Interval ML21105A3382021-04-22022 April 2021 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Concerning Examination Coverage of Certain Class 1 and 2 Component Welds ML21033A5302021-04-0101 April 2021 Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML21049A0062021-03-16016 March 2021 Issuance of Amendment No. 245 for Relaxation of Surveillance Frequency for Instrument-Line Flow Check Valve ML21049A0242021-02-23023 February 2021 Alternative Request to the Requirements of the ASME OM Code for the Testing Intervals for the Instrument-Line Flow Check Valves ML21013A0052021-02-0404 February 2021 Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML21028A6732021-02-0303 February 2021 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L-2020-LLR-011 ML20332A1152021-01-29029 January 2021 Issuance of Amendment No. 183 Regarding Risk-Informed Categorization and Treatment of Structures, Systems, and Components ML21005A0612021-01-14014 January 2021 Proposed Alternatives to Extend the Safety Relief Valve Testing Interval (EPID L-2020-LLR-0014 Through L-2020-LLR-0018) ML20287A1302020-11-0505 November 2020 Review of Quality Assurance Program Changes ML20241A1902020-10-20020 October 2020 Issuance of Amendment No. 182 to Change Allowable Main Steam Isolation Valve Leak Rates ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20232A1712020-09-0101 September 2020 Request to Use Alternative Code Case OMN-26 ML20141L6362020-07-10010 July 2020 Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20141L0532020-06-0202 June 2020 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code ML20113F0412020-04-30030 April 2020 Proposed Alternative to the Submittal Schedule for Certain Reports (COVID-19) ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts 2024-09-26
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 16, 2011 Mr. Samuel L. Belcher Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093
SUBJECT:
NINE MILE POINT NUCLEAR STATION, UNIT NO.1 - ISSUANCE OF AMENDMENT RE: REVISION TO CONTAINMENT SPRAY SYSTEM NOZZLE SURVEILLANCE FREQUENCY (TAC NO. ME3737)
Dear Mr. Belcher:
The Nuclear Regulatory Commission (NRC) has issued the enclosed Amendment No. 208 to Renewed Facility Operating License No. DPR-63 for the Nine Mile Point Nuclear Station, Unit No.1 (NMP1), in response to your application dated March 22,2010, (Agencywide Documents and Management System (ADAMS) Accession No. ML100890422).
This amendment revises the NMP1 Technical Specifications (TSs) Surveillance Requirement (SR) 4.3.7.b. by modifying the frequency of this SR from "at least once per operating cycle" to "following maintenance that could result in nozzle blockage." Additionally, the SR is revised to be more reflective of the Standard TS SR by deleting references to the type of test (e.g., air) performed and deleting references to the spray headers.
A copy of the related Safety Evaluation is enclosed. A Notice of Issuance will be included in the Commission's next regular biweekly Federal Register notice.
Sincerely, Richard V. Guzman, Senior Project Manager Plant Licensing Branch 1-1 Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-220
Enclosures:
- 1. Amendment No. 208 to DPR-63
- 2. Safety Evaluation cc w/encls: Distribution via Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 NINE MILE POINT NUCLEAR STATION, LLC (NMPNS)
DOCKET NO. 50-220 NINE MILE POINT NUCLEAR STATION, UNIT NO.1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 208 Renewed License No. DPR-63
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Nine Mile Point Nuclear Station, LLC (the licensee) dated March 22, 2010, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-63 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, which is attached hereto, as revised through Amendment No. 208, is hereby incorporated into this license.
Nine Mile Point Nuclear Station, LLC shall operate the facility in accordance with the Technical Specifications.
-2
- 3. This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Nancy L. Salgado, Chief Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the License and Technical Specifications Date of Issuance: March 16, 2011
ATTACHMENT TO LICENSE AMENDMENT NO. 208 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-63 DOCKET NO. 50-220 Replace the following page of the Renewed Facility Operating License with the attached revised page. The revised page is identified by amendment number and contains marginal lines indicating the areas of change.
Remove Page Insert Page 3 3 Replace the following page of Appendix A, Technical Specifications, with the attached revised page. The revised page is identified by amendment number and contains marginal lines indicating the areas of change.
Remove Page Insert Page 159 159
-3 (3) Pursuant to the Act and 10 CFR Parts 30, 40, and 70 to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument and equipment calibration or associated with radioactive apparatus or components.
(5) Pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I:
Part 20, Section 30.34 of Part 30; Section 40.41 of Part 40; Section 50.54 and 50.59 of Part 50; and Section 70.32 of Part 70. This renewed license is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect and is also subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 1850 megawatts (thermal).
(2) Technical Specifications The Technical Specifications contained in Appendix A, which is attached hereto, as revised through Amendment No. 208, is hereby incorporated into this license. Nine Mile Point Nuclear Station, LLC shall operate the facility in accordance with the Technical Specifications.
(3) Deleted Renewed License ~o. DPR 63 Amendment No. 191 to 207, 208
LIMITING CONDITION FOR OPERAliON SURVEILLANCE REQUIREMENT 3.3.7 CONTAINMENT SPRAY SYSTEM 4.3.7 CONTAINMENT SPRAY SYSTEM Applicability: Applicability:
Applies to the operating status of the containment Applies to the testing of the containment spray spray system. system.
Objective: Qbjective:
To assure the capability of the containment spray To verify the operability of the containment spray system to limit containment pressure and temperature system.
in the event of a loss*of-coolant accident.
Specification:
Specification:
The containment spray system surveillance shall be
- a. During all reactor operating conditions whenever performed as indicated below:
reactor coolant temperature is greater than 215°F and fuel is in the reactor vessel and a. Containment Spray Pumps primary containment integrity is required; each of the two containment spray systems and the (1) At least once per operating cycle, automatic associated raw water cooling systems shall be startup of the containment spray pump shall operable except as specified in 3.3.7.b. be demonstrated.
- b. If a redundant component of a containment spray (2) At least once per quarter, pump operability system becomes inoperable, Specification shall be checked.
3.3.7.a shall be considered fulfilled, provided that the component is returned to an operable b. Nozzles condition within 15 days and that the additional surveillance required is performed. Following maintenance that could result in nozzle blockage, a test shall be performed on the spray nozzles.
AMENDMENT NO. 142. 170, 208 159
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 208 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-63 NINE MILE POINT NUCLEAR STATION, LLC NINE MILE POINT NUCLEAR STATION, UNIT NO.1 DOCKET NO. 50-220
1.0 INTRODUCTION
By letter dated March 22,2010, Nine Mile Point Nuclear Station, LLC, requested a license amendment to revise Nine Mile Point, Unit 1 (NMP1) Technical Specification (TS) Surveillance Requirement (SR) 4.3.7.b. Specifically, the proposed license amendment would revise the frequency of this SR from "at least once per operating cycle" to "following maintenance that could result in nozzle blockage." Additionally, the SR is being revised to be more reflective of the Standard TS SR by deleting references to the type of test (e.g., air) performed and deleting references to the spray headers.
The containment spray system (CSS) is an engineered safeguards system which reduces containment pressure and temperature following a loss-of-coolant-accident (LOCA). The system is designed to prevent containment pressure and temperature from exceeding design values for reactor coolant system leaks up to and including the design-basis accident (DBA), the double-ended break of a reactor coolant recirculation line. The CSS provides long-term cooling of the pressure suppression chamber (torus) after a LOCA. As a result, the system is a means of decay heat removal available following a DBA LOCA. The CSS is also capable of providing an unlimited supply of lake water for both core and containment cooling. This capability is provided by the containment spray raw water subsystem. This subsystem may be aligned to provide lake water directly to the reactor vessel via the core spray spargers and to containment via the containment spray headers. These alignments allow the CSS to be used to flood the reactor vessel above the top of the core. The CSS may also be used under normal operating conditions to cool the torus water and lower the torus water level. In addition, the CSS may be used under off-normal conditions to add lake water directly to the torus.
2.0 REGULATORY EVALUATION
The Nuclear Regulatory Commission (NRC) staff finds that the licensee in its March 22, 2010, submittal, identified the applicable regulatory requirements. The regulatory requirements and guidance which the NRC staff considered in assessing the proposed TS change are as follows:
- 2 Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix A, General Design Criteria (GDC) 38, Containment heat removal, requires a system to remove heat from the reactor containment shall be provided. The system safety function is to rapidly reduce containment pressure and temperature. The drywell spray is one mode of operation of the residual heat removal system which performs this function.
GDC 39, Inspection of containment heat removal system, requires that the containment heat removal system be designed to permit periodic inspection. The NMP1 containment spray system permits verification that the spray nozzles are unobstructed. However, the licensee states that the proposed surveillance, which would require a flow test only in special circumstances, would reduce outage dose and improve personnel safety.
GDC 40, Testing of containment heat removal system, requires that the containment heat removal system be designed for periodic functional testing. The NMP1 TS require periodic testing of the drywell spray system nozzles to demonstrate that they are unobstructed once per operating cycle.
3.0 TECHNICAL EVALUATION
The NMP1 CSS is designed with two redundant loops. The "primary" loop (Loop 11) provides water to the primary or "inner" drywell header and to the torus header. The "secondary" loop (Loop 12) provides water to the secondary or "outer" drywell header and to the torus header.
The torus header is common to both loops. Each loop includes two redundant trains, each of which can provide water to the drywell header associated with the loop and to the one common torus header.
The NMP1 containment spray pipes that feed the drywell headers are 12" schedule #40, A333, GR6 carbon steel and schedule #80 galvanized carbon steel. These 12" pipes feed the seven ring headers consisting of 2" through 6" galvanized carbon steel. The nozzles are Grinnell Corporation Protectospray angle spray models made of corrosion resistant stainless steel. The majority of the piping in the drywell is galvanized and, therefore, will not produce corrosion products even if wet. There are twenty of the Model D3, 28-0.275" (3/8") nozzles on header rings "F" and "G." There are one hundred eighty-four of the Model D3, 34-0.500" (1/2") nozzles on the remaining 5 header rings. All of the nozzles point downward except for those on the lowest header ring, which is ring header "A" on elevation 245 feet. These nozzles are pointed Slightly above horizontal. The containment spray pipes that feed the torus header are 12" schedule #40, A333, GR6 carbon steel. These two pipes feed one common ring header of mostly 4" and some 3" carbon steel pipe. The torus header is attached to the top of the torus and runs in a full circle around the torus. The 40 spray nozzles on this header are Spraying Systems Company Model 11 H4.2, FullJet 1" nozzles with a 15/64" orifice. All of the nozzles in the torus point downward.
Air flow testing and visual inspections of the NMP1 drywell and torus spray nozzles from 1990 through 2009 (last ten tests) were reviewed. There was no nozzle blockage identified in these tests. In order to evaluate the vulnerability of having a CSS spray nozzle obstruction, condition reports (CR) related to the spray nozzles were reviewed. The licensee references five CRs that were relevant to this request. From the review of these CRs, the licensee concluded that events
- 3 that could affect nozzle flow have been infrequent and of minor impact. The one exception to this was the obstruction of a single nozzle due to the Foreign Material Exclusion (FME):
CR-2000-003458 (10/4/2000): During a work order to replace a bent nozzle, other nozzles were closely inspected visually. A small piece of cloth was found protruding from one of the other nozzles on the "A" header. Some nozzles on the "A" header were removed in order to inspect the header using a video probe.
A %" layer of material was found behind the cloth. CR-2000-003477 was written to document the condition. The material was sampled and found to have small particles of corrosion products in it. The %" layer was determined to be built up due to the cloth obstruction, but the origin of the material was not determined.
The header pipe is made of galvanized steel and would not normally rust.
The material was removed and the rest of the header was inspected and found to be clean. The apparent cause of the cloth being in the pipe was inappropriate Foreign Material Exclusion (FME) control. Since this incident, a more robust FME program was instituted.
NRC staff review of industry experience indicates that spray systems of similar design are highly reliable (I.e., not susceptible to plugging). The staff reviewed industry experience and found that, in general, once tested after construction, containment spray nozzles have not been subject to blockage. In the case of one pressurized-water reactor, debris was discovered in this piping. The debris was identified as construction material. The fraction of blockage was not significant and the sprays remained functional. The debris was found by visual observation, not by an air flow test.
Introduction of foreign material from exterior to the spray nozzles is unlikely, as many of the nozzles are located high in the drywell and torus. The spray nozzles in the drywell and torus are pointed downward except for those on the lowest drywell header ring, which is ring header "A" on elevation 245 feet. These nozzles are pointed slightly above horizontal. The nozzles, though open at the end, have a flared spray piece over the nozzle orifice. Any debris coming down from above would be expected to be deflected away from the orifice unless it was sufficiently small to fall past the spray piece. Any material that was large enough to clog an orifice would not be expected to enter the nozzle. It would sit on top until it was removed by the spray. Since maintenance that could introduce foreign material is the most likely cause for obstruction, flow testing or inspection following maintenance or testing in which a breakdown of the FME program occurs would suffice to verify the absence of nozzle blockage and the system's capability to perform its safety function.
The licensee's March 22, 2010, letter describes the NMP1 FME program. The licensee's program is based on industry guidance and operating experience. The licensee states that:
If any material is unaccounted for in an FME area or a general FME concern is observed, a condition report is initiated. The corrective action program would then provide for a determination of the scope of the issue, the actions necessary to return the area to the required level of cleanliness, and whether testing is necessary.
For these reasons, the NRC staff considers the potential for nozzle obstruction very low and, therefore, the "once per operating cycle" test frequency is unnecessary. Testing at the
-4 proposed frequency would reduce outage dose and improve personnel safety. Verifying that the nozzles are not obstructed following maintenance or inadvertent system flow that could introduce foreign materials internal to the spray ring headers is a more appropriate surveillance.
The NRC staff concludes that the licensee's proposal to revise TS SR 4.3.7.b frequency from "once per operating cycle" to "following maintenance that could result in nozzle blockage" is acceptable, since the licensee maintains an effective FME program and has taken steps to maintain the system dry in order to eliminate corrosion of the metal piping. This surveillance maintains the drywell spray system's capability to satisfy GDC 38, 39, and 40.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the New York State official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20 and changes SRs.
The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding (75 FR 39980, July 13, 2010). In addition, the NRC staff has determined that some of the changes are administrative in nature. Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9) and (c)(10). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above that (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributors: R. Guzman B. Lee Date: March 16, 2011
March 16, 2011 Mr. Samuel L. Belcher Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093
SUBJECT:
NINE MILE POINT NUCLEAR STATION, UNIT NO.1 - ISSUANCE OF AMENDMENT RE: REVISION TO CONTAINMENT SPRAY SYSTEM NOZZLE SURVEILLANCE FREQUENCY (TAC NO. ME3737)
Dear Mr. Belcher:
The Nuclear Regulatory Commission (NRC) has issued the enclosed Amendment No. 208 to Renewed Facility Operating License No. DPR-63 for the Nine Mile Point Nuclear Station, Unit No.1 (NMP1), in response to your application dated March 22, 2010, (Agencywide Documents and Management System (ADAMS) Accession No. ML100890422).
This amendment revises the NMP1 Technical Specifications (TSs) Surveillance Requirement (SR) 4.3.7.b. by modifying the frequency of this SR from "at least once per operating cycle" to "following maintenance that could result in nozzle blockage." Additionally, the SR is revised to be more reflective of the Standard TS SR by deleting references to the type of test (e.g., air) performed and deleting references to the spray headers.
A copy of the related Safety Evaluation is enclosed. A Notice of Issuance will be included in the Commission's next regular biweekly Federal Register notice.
Sincerely, Ira!
Richard V. Guzman, Senior Project Manager Plant Licensing Branch 1-1 Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-220
Enclosures:
- 1. Amendment No. 208 to DPR-63
- 2. Safety Evaluation cc w/encls: Distribution via Listserv Distribution:
PUBLIC RidsOgcRp RidsOGCMailCenter RidsRgn 1MailCenter LPL1-1 R/F RidsNrrDorlLPL 1-1 RidsNrrLASLittie RidsNrrPMNineMilePoint R. Grover, NRR RidsNrrDirsltsb RidsNrrDorlDpr RidsAcrsAcnw_MailCenter G. Bedi, NRR RidsNrrDciCptb NRR-106 DIRSIITSB/BC OGC LPL1-1/BC SLittie RDennig REliiott STurk NSalgado (DPickett for) 3/9/11 2/24'11 3/10/11 3/14/2011 3/16/11 OFFICIAL RECORD COPY