ML093631140

From kanterella
Jump to navigation Jump to search
Submittal of Steam Generator In-Service Inspection Report, End of Cycle 19
ML093631140
Person / Time
Site: Mcguire
Issue date: 12/16/2009
From: Brandi Hamilton
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML093631140 (19)


Text

BRUCE H. HAMILTON PDuke Vice President 0Energy McGuire Nuclear Station Duke Energy MG01VP / 12700 Hagers Ferry Road Huntersville, NC 28078 980-875-5333 980-875-4809 fax bruce.hamilton@duke-energy.com December 16, 2009 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001

SUBJECT:

Duke Energy Carolinas, LLC McGuire Nuclear Station Docket No. 50-370 Steam Generator In-Service Inspection Report Unit 2, End of Cycle (EOC) 19 Pursuant to ASME Section XI and McGuire Technical Specification 5.6.8, Duke Energy hereby submits the attached Steam Generator In-Service Inspection Summary Report for the McGuire Unit 2 EOC-19 refueling outage.

Questions regarding the attached report should be directed to Mitch Hatley at (980) 875-5456 or Kay Crane at (980) 875-4306.

Sincerely, Bruce Hamilton Attachment 4ocg7 www, duke-energy.com

U. S. Nuclear Regulatory Commission December 16, 2009 Page 2 xc:

Mr. L. A. Reyes, Regional Administrator U.S. Nuclear Regulatory Commission, Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 Mr. Jon H. Thompson NRC Project Manager U. S. Nuclear Regulatory Commission Mail Stop 8G9A 11555 Rockville Pike Rockville, MD 20852-27238 Joe Brady NRC Senior Resident Inspector McGuire Nuclear Station

Steam Generator In-service Inspection Summary Report McGuire Nuclear Station Unit 2 EOC 19 Fall Outage 2009 Location: McG uire Nuclear-Station, 12700 Hagers Ferry Road Huntersville, N.C. 28078-9340 NRC Docket No. 50-370 National Board No. 84 Commercial Service Date: March 1, 1984 Owner: Duke Energy Carolinas, LLC 526 South Church St.

Charlotte, N.C. 28202 Revision 0 Prepared By: Date:  ; '-/o,'

Checked By: Date: AA41lJzO.

Approved By: ~1. Date: _______

/2 7 /9/a S' Document Completion Date:

Copy No Assigned To:

Controlled Controlled ~~Uncontrolled.

ControlledDistribution Copy No. Assigned To-Original McGuire Nuclear Station Document Control Master File MC 1201.35 1 NRC Document Control UncontrolledDistribution 2 Hartford Steam Boiler Inspection and Insurance Corporation (AlA) 3 State of North Carolina Department of Labor C/o J. M. Givens, II

FORM NIS-1 OWNER'S DATA REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules

1. Owner: Duke Energy Corporation, 526 S. Church St.. Charlotte, NC 28201-1006 (Name and Address of Owner)
2. Plant: McGuire Nuclear Station, 12700 Hagers Ferry Rd, Huntersville, NC 28078-9340 (Name and Address of Plant)
3. Plant Unit: 2
4. Owner Certificate of Authorization (if required) N/A
5. Commercial Service Date: March 1, 1984
6. National Board Number for Unit 84
7. Components Inspected:

Manufacturer State or National Component Manufacturer Serial No. Province No. Board No.

Steam Generator 2A BWI 7700-02 NC-302674 159 Steam Generator 2B BWI 7700-04 NC-302675 161 Steam Generator 2C BWI 7700-01 NC-302676 158 Steam Generator 2D BWI 7700-03 NC-302677 160 Note: Supplemental sheets in form of lists, sketches, or drawings may be used provided (1) size is 81/2 in. x 11 in., (2) information in items I through 6 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

FORM NIS-1 (Back)

8. Examination Dates 4/14/2008 to 10/10/2009
9. Inspection Period Identification: Second Period
10. Inspection Interval Identification: Third Interval
11. Applicable Edition of Section XI 1998 Addenda 2000
12. Date/Revision of Inspection Plan: March 26n, 2008 Revision 1
13. Abstract of Examinations and Test. Reference attached response to technical specification 5.6.8 Steam Generator Tube Inspection Report.
14. Abstract of Results of Examination and Tests. Reference attached response to technical specification 5.6.8 Steam Generator Tube Inspection Report.
15. Abstract of Corrective Measures. Reference attached response to technical specification 5.6.8 Steam Generator Tube Inspection Report.

We certify that a) the statements made in this report are correct b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI, and c) corrective measures taken conform to the rules of the ASME Code,Section XI.

Certificate of Authorization No. (if applicable) NAý Expiration Date NA Date ,4 v <-V4'* 20 Z> ý Signed Duke Energy Corp.

Owner CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of NC employed by *The Hartford Steam Boiler Inspection & Insurance Company of Connecticut have inspected the componenrA described in this Owner's Report during the period q - - 0 to /2- /49 - ZQ- *7 , and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in the Owner's Report in accordance with the Inspection Plan and as required by the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, test, and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or operty damage or a loss any kind arising from or connected with this inspection 1I

=: . gnature Inspettoes

ý 1.ýMissions Ak§ , /1 2 A). W National Board, State, Ptovince, and Endorsements 6 Date _ _ _ _ _ _ 20'

  • The Hartford Steam Boiler Inspection & Insurance Company of Connecticut 200 Ashford Center North Suite 205 Atlanta, GA. 30338

Attachment to Form NIS-1 McGuire 2 EOC 19 Steam Generator Tube Inspection Report Pursuant to ASME Section XI and McGuire Technical Specification 5.6.8 the following information is provided:

a. The scope of inspections performed on each SG Baseline inspection scope includedfull length data acquisitionand bobbin coil data analysis on allfour (4) steam generatorsasfollows:
1) 100% of all tubes in each SG.

Special interest inspection scope included data acquisition and arraydata analysis asfollows:

1) Special interest based on new bobbin calls (new wear indications,all bobbin "I" codes, and some miscellaneous codes)
2) Peripherytubes 5 rows deep (TSH and TSC tofirst support) in allfour (4) steam generators (Outerperimeterand open lane)
3) New dent indications
4) Bounding inspections one tube aroundall PLP indicationsconfirmed with Array
5) All tubes with previous possible loose part (PLP)indications.

Plug inspection scope asfollows:

1) Visual inspection of all plugs
b. Active degradation mechanisms found Degradationfound in allfour (4) steam generators include wear at support structures and wearfrom loose parts.
c. Non-destructive examination techniques utilized for each degradation mechanism Bobbin was used to detect wear at supportstructures.Bobbin and array were used to detect wearfrom loose objects.
d. Location, orientation (if linear), and measured sizes (if available) of service induced indications The complete listingfor service induced indicationsis referenced in attachment #1.
e. Number of tubes plugged during the inspection outage for each active degradation mechanism In the 2C SGfour tubes were plugged due to aforeign object that could not be removed. In the 2D SG one tube was plugged due to wear believed to be associated with aforeign object.
f. The total number and percentage of tubes plugged to date Tubes Plugged Steam Generator A B C D Total Prior to 2EOC 19 20 3 1 4 28 2E0C 19 0 0 4 1 5 Total 20 3 5 5 33

% Plugged 0.30% 0.05% 0.08% 0.08% 0.12%

g. The results of condition monitoring, including the results of tube pulls and in-situ pressure testing An NDE maximum depth call of 53% TW or less is sufficient to demonstrate a minimum degraded tube burstpressure of 3AP at 0.95 probabilitywith 50%

confidencefor wear at supportstructures. The worst case supportstructure wear call observed during the McGuire 2EOC19 inspectionfor wear at structures was 27% TW. Therefore, condition monitoringstructuralintegrity has been demonstratedfor supportstructure wear. Since the burstpressure equation treats though-wall tearingas coincident with burst, demonstration of structuralintegrity also demonstrates leakage integrity at the lower differential pressure of a postulatedsteam line break accident.

Other additionalvolumetric indications were detected and are believed to be due to loose parts wear. All but one of these had maximum depths of 18 %TW or less and with these, condition monitoringstructuralintegrity has been demonstrated. One of these indicationshad a depth of 54 %TW and was sized with +Pteddy currentprobe,profiled, and evaluated using the applicable regression sizing equation. The calculated condition monitoring burstpressure for that worst case loose part wear indication is 531 7psi, which provides a comfortable margin when compared to the limiting structuralintegrity performance criteriaof 3900 psi; thus, condition monitoringrequirements have been demonstratedfor wear due to loose parts as well.

No in-situ testing was requiredor performed. No tube pulls were performed.

h. The effective plugging percentage for all plugging in each SG The effective pluggingpercentagefor each of the McGuire Unit 2 Steam Generators is identical to those shown in section (9 above.

Attachment #1 Location, orientation, and measured sizes of service induced indications AREVA NP Inc 11/19/09 10:27:24 Customer Name: McGuire - Unit 2 Replacement Component: S/G A Page 1 o.f 3 QUERY: QueryMl[l]

ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 PROBE SCOPE 17 42 0.63 75 94 VOL 05H -1.64 05H 05H WAR 560XP Array Special Inter 0.16 88 P2 TWD 8 05H -1.65 09C TEN WAR 560UL Bobbin Exam 17 116 0.22 90 P2 TWO 6 07C -1.48 TEC TEN WAR 560UL Bobbin Exam 17 140 0.25 113 138 VOL FB4 +1.29 FB4 FB4 WAR 560XP Array Special Inter 0.08 102 P2 TWO 4 FB4 +1.20 TEC TEH WAR 560UL Bobbin Exam 47 90 NDF FB5 +0.76 FB5 FB5 560XP Array Special Inter 0.11 73 P2 TWD 6 FB5 +0.76 TEC TEN WAR 56OUL Bobbin Exam 48 83 0.13 85 P2 TWD 5 FB4 +1.26 TEC TEN WAR 56OUL Bobbin Exam 49 32 0.11 80 P2 TWD 5 FB5 -0.86 TEC TEN WAR 560UL Bobbin Exam 0.35 107 134 VOL FB5 -0.70 FB5 FB5 WAR 560XP Array Special Inter 54 65 NDF FB5 +1.51 FB5 FB5 560XP Array Special Inter 0.18 19112 P2 TWD 7 FB5 +1.51 TEC TEN WAR 560UL Bobbin Exam' 56 97 0.46 r 98 VOL FB5 +1.77 FB5 FB5 WAR 560XP Array Special Inter 0.15 63 P2 TWD 8 FB5 +1.72 TEC TEN WAR 560UL Bobbin Exam 61 66 0.36 105 Q6 VOL FB6 +1.87 09C TEN WAR 560XP Array Special Inter 0.20 91 P2 TWO 7 FB6 +1.88 TEC TEN WAR 560UL Bobbin Exam 61 70 0.24 100 P2 TWD 8 FB5 +1.51 TEC TEN WAR 560UL Bobbin Exam 62 57 0.40 105 134 VOL FB4 +1.34 FB4 FB4 WAR 560XP Array Special Inter 0.21 111 P2 TWO 7 FB4 +1.43 TEC TEN WAR 560UL Bobbin Exam 62 63 0.16 103 186 VOL FB5 +1.51 FB5 FB5 WAR 560XP Array Special Inter 0.21 78 P2 TWO 8 FB5 +1.51 TEC TEH WAR 56OUL Bobbin Exam 62 71 0.37 108 106 VOL FB4 -1.01 FB4 FB4 WAR 560XP Array Special Inter 0.08 124 P2 TWD 3 FB4 -1.01 TEC TEN WAR 560UL Bobbin Exam 64 51 0.17 103 P2 TWD 8 FB5 +0.76 TEC TEN WAR 560UL Bobbin Exam 65 60 0.31 93 P2 TWD 14 FB5 +1.62 TEC TEH WAR 560UL Bobbin Exam 0.91 105 98 VOL FB5 +1.56 FB5 FB5 WAR 560XP Array Special Inter 66 63 0.13 111 P2 TWD 6 FB4 -1.64 TEC TEN WAR 560UL Bobbin Exam 0.35 85 74 VOL FB4 -1.74 FB4 FB4 WAR 560XP Array Special Inter 69 80 0.22 115 P2 TWD 11 FB5 +1.13 TEC TEN WAR 560UL Bobbin Exam 70 77 0.24 80 P2 TWD 11 FB4 -0.73 TEC TEN WAR 560UL Bobbin Exam 71 76 0.58 98 126 VOL F£4 -0.87 FB4 FB4 WAR 560XP Array Special Inter 0.24 86 P2 TWD 8 FB5 +1.00 TEC TEN WAR 560UL Bobbin Exam 0.39 103 P2 TWD 13 FB4 -0.87 TEC TEN WAR 560UL Bobbin Exam 72 79 0.32 121 P2 TWD 11 FB4 +1.34 TEC TEN WAR 560UL Bobbin Exam 73 62 0.13 87 P2 TWO 6 FB7 -2.00 TEC TEH. WAR 5600L Bobbin Exam NDF FB7 -2.00 FB7 FB7 560XP Array Special Inter 75 82 0.15 74 P2 TWD 8 FB4 -1.29 TEC TEN WAR 560UL Bobbin Exam 76 65 0.21 73 Q15 VOL FB5 +0.76 FB5 FB5 WAR 560XP Array Special Inter 0.27 112 P2 TWD 8 FB5 +0.64 TEC TEN WAR 560UL Bobbin Exam 79 70 0.39 101 Q7 VOL FB5 +0.71 FB5 FB5 WAR 560XP Array Special Inter 0.26 93 P2 TWD 8 FB5 +0.58 TEC TEN WAR 560UL Bobbin Exam 80 63 0.24 79 P2 TWD 7 FB4 +0.81 TEC TEN WAR 560UL Bobbin Exam 80 69 0.32 90 P2 TWD 10 FB4 +1.44 TEC TEN WAR 560UL Bobbin Exam 80 75 0.30 109 P2 TWD 10 FB4 +1.52 TEC TEN WAR 560UL Bobbin Exam 80 81 0.23 86 P2 TWD 8 FB4 -1.58 TEC TEN WAR 560UL Bobbin Exam 82 51 0.12 74 P2 TWD 6 F£4 -1.31 TEC TEH WAR 560UL Bobbin Exam 0.70 104 98 VOL FB4 -1.41 FB4 FB4 WAR 560XP Array Special Inter 83 82 0.22 72 P2 TWO 11 FB5 -0.68 TEC TE- WAR 560UL Bobbin Exam 83 86 0.44 93 P2 TWO 19 FB4 +0.97 TEC TEH WAR 560UL Bobbin Exam 84 75 0.90 95 Q7 TWD 15 08H +0.55 08H 0811 0.42 0.30 560XP Array Special Inter 0.96 81 150 voL 08H +0.55 08H 08H WAR 560XP Array Special Inter 0.34 107 P1 NQI 08H +0.50 TEC TEH 560UL Bobbin Exam 85 74 0.96 99 114 VOL 07H +0.45 TEN 09H WAR 560XP Array PLP Bounding 0.24 81 P2 TWD 12 07H +0.50 TEC TEH WAR 560UL Bobbin Exam 85 90 0.43 65 98 VOL FB4 -0.77 F£4 FB4 WAR 560XP Array Special Inter 0.19 102 P2 TWD 9 FB4 -0.77 TEC TEH WAR 56OUL Bobbin Exam 86 73 0.12 71 P2 TWD 6 FB5 -1.06 TEC TEH WAR 560UL Bobbin Exam 0.52 98 166 VOL FB5 -1.06 FB5 FB5 WAR 560XP Array Special Inter 86 77 0.35 76 P2 TWD 16 FB4 -1.18 TEC TEl WAR 56OUL Bobbin Exam

AREVA NP Inc 11/19/09 10:27:24 Customer Name: McGuire - Unit 2 Replacement Component: S/G A page 2 of 3 QUERY: QueryMl[l]

ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 PROBE SCOPE 88 63 0.32 105 P2 TWD 10 FB5 +0.94 TEC TEH WAR 560UL Bobbin Exam 88 69 0.37 93 P2 TWD 11 FB5 -1.76 TEC TEH WAR 560UL Bobbin Exam 91 68 0.20 93 P2 TWD 6 FB3 +0.60 TEC TEH WAR 560UL Bobbin Exam 92 69 0.38 81 Q7 VOL FB5 -1.51 FB5 FB5 WAR 560XP Array Special Inter 0.24 105 P2 TWD 7 FB5 -1.73 TEC TEH WAR 560UL Bobbin Exam 95 78 0.32 119 P2 TWD 11 FB5 -1.21 TEC TEH WAR 560UL Bobbin Exam 95 86 0.09 80 P2 TWD 5 FB4 +1.22 TEC TEH WAR 560UL Bobbin Exam 0.28 75 166 VOL FB4 +1.22 FB4 FB4 WAR 560XP Array Special Inter 96 75 0.16 94 P2 TWD 6 FB6 +0.55 TEC TEH WAR 560UL Bobbin Exam 96 83 0.36 101 P2 TWD 12 FB5 +0.63 TEC TEH WAR 560UL Bobbin Exam 97 66 0.11 78 P2 TWD 7 FB4 +1.30 TEC TEH WAR 560UL Bobbin Exam 97 68 0.25 78 P2 TWD 12 FB5 -0.57 TEC TEH WAR 560UL Bobbin Exam 99 64 0.35 114 Q6 VOL FB5 +1.84 FB5 FB5 WAR 560XP Array Special Inter 0.17 93 P2 TWO 5 FB5 +1.68 TEC TEH WAR 560UL Bobbin Exam 99 84 0.42 91 P2 TWO 18 FB4 -1.10 TEC TEH WAR 560UL Bobbin Exam 100 77 0.23 98 P2 TWO 8 FB5 -0.89 TEC TEH WAR 560UL Bobbin Exam 101 62 0.25 97 P2 TWO 7 FB4 +1.57 TEC TEH WAR 560UL Bobbin Exam 0.38 88 126 VOL FB4 +1.48 FB4 FB4 WAR 560XP Array Special Inter 101 76 0.21 73 P2 TWO 10 FB6 +0.63 TEC TEH WAR 560UL Bobbin Exam 101 78 0.30 96 P2 TWD 14 FB3 +1.60 TEC TEH WAR 560UL Bobbin Exam 102 85 0.66 124 150 VOL FB4 +1.30 FB4 FB4 WAR 560XP Array Special Inter 0.30 107 P2 TWD 14 FB4 +1.30 TEC TEH WAR 560UL Bobbin Exam 104 '59 0.19 89 P2 TWD 7 FB4 +1.13 TEC TEH WAR 560UL Bobbin Exam 105 64 0.16 83 P2 TWD 8 FB4 +0.57 TEC TEH WAR 560UL Bobbin Exam 0.33 79 Q6 VOL FB4 +0.48 FB4 FB4 WAR 560XP Array Special Inter 105 70 0.28 106 P2 TWD 13 FB5 +0.60 TEC TEH WAR 56OUL Bobbin Exam 106 77 0.33 86 P2 TWD 15 FB4 +1.41 TEC TEH WAR 560UL Bobbin Exam 107 76 0.40 118 98 VOL FB4 -0.76 FB4 FB4 WAR 560XP Array Special Inter 0.24 121 P2 TWD 8 FB4 -0.76 TEC TEH WAR 560UL Bobbin Exam 107 78 0.41 91 P2 TWD 13 FB3 +1.79 TEC TEH WAR 560UL Bobbin Exam 108 83 0.56 96 P2 TWD 17 FB5 +0.66 TEC TEH WAR 560UL Bobbin Exam 110 77 0.27 91 P2 TWD 13 FB7 +0.57 TEC TEH WAR 56OUL Bobbin Exam 0.39 85- P2 TWD 17 FB5 -1.17 TEC TEH WAR 560UL Bobbin Exam 0.44 80 P2 TWD 19 FB4 -1.07 TEC TEH WAR 560UL Bobbin Exam 110 83 0.15 87 P2 TWD 8 FB4 -0.52 TEC TEH WAR 560UL Bobbin Exam 110 85 0.90 140 150 VOL FB5 +1.01 FB5 FB5 WAR 560XP Array Special Inter 0.37 123 150 VOL FB3 +1.27 FB3 FB3 WAR 560XP Array Special Inter 0.32 114 P2 TWD 15 FB5 +1.01 TEC TEH WAR 56OUL Bobbin Exam 0.31 102 P2 TWD 14 FB3 +1.27 TEC TEH WAR 560UL Bobbin Exam Ill 70 0.79 80 P2 TWD 21 FB5 +0.71 TEC TEH WAR 560UL Bobbin Exam 0.36 65 P2 TWD 11 FB6 +1.92 TEC TEH WAR 560UL Bobbin Exam Ill 74 0.32 94 P2 TWD 11 FB4 +1.46 TEC TEH WAR 560UL Bobbin Exam 115 78 1.02 114 150 VOL FB4 -0.53 FB4 FB4 WAR 560XP Array Special Inter 0.38 103 P2 TWD 13 FB4 -0.53 TEC TEH WAR 560UL Bobbin Exam 0.66 98 P2 TWD 20 FB6 -1.34 TEC TEH WAR 560UL Bobbin Exam 115 82 0.29 71 P2 TWD 14 FB4 +1.11 TEC TEH WAR 560UL Bobbin Exam 0.27 99 P2 TWD 13 FB3 -0.65 TEC TEH WAR 560UL Bobbin Exam 0.38 134 150 VOL FB3 -0.65 FB3 FB3 WAR 560XP Array Special Inter 0.18 110 134 VOL FB4 +1.11 FB4 FB4 WAR 560XP Array Special Inter 115 84 0.59 139 150 VOL FB4 +0.65 FB4 FB4 WAR. 560XP Array Special Inter 0.46 264 Q7 VOL FB4 -1.24 FB4 FB4 WAR 560XP Array Special Inter 0.25 88 P2 TWD 12 FB4 +0.65 TEC TEH WAR 560UL Bobbin Exam 0.22 71 P2 TWD 11 FB4 -1.06 TEC TEH WAR 560UL Bobbin Exam 116 67 0.27 78 P2 TWD 12 FB4 +1.04 TEC TEH WAR 560UL Bobbin Exam 117 76 0.70 91 P2 TWD 26 FB5 -1.77 TEC TEH WAR 560UL Bobbin Exam 0.57 94 P2 TWO 23 FB3 +1.36 TEC TEH WAR 560UL Bobbin Exam 0.16 79 P2 TWD 8 FB4 +0.89 TEC TEH WAR 560UL Bobbin Exam

AREVA NP Inc 11/19/09 10:27:24 Customer Name: McGuire - Unit 2 Replacement Component: S/G A Page 3 of 3 QUERY: QueryMl[l]

ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 PROBE SCOPE Total Tubes  : 70 Total Records: 116

AREVA NP Inc 11/19/09 10:30:04 Customer Name: McGuire - Unit 2 Replacement Component: S/G B Page 1 of 2 QUERY: QueryMl(l]

ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL I UTIL 2 PROBE SCOPE 40 97 0.42 97 P2 TWD 17 04H +0.65 TEC TEN WAR 560UL Bobbin Exam 42 95 0.10 75 P2 TWD 5 05H -1.80 TEC TEH WAR LAR 560UL Bobbin Exam 54 63 0.09 62 P2 TWD 4 FB5 +1.17 TEC TEH WAR 560UL Bobbin Exam 0.41 87 58 VOL FB5 +1.10 FB5 F£5 WAR 560XP Array Special Inter 62 93 0.11 30 P2 TWD 5 FB5 +1.54 TEC TEH WAR 560UL Bobbin Exam 64 87 0.17 79 P2 TWD 8 FB2 -2.14 TEC TEH WAR 560UL Bobbin Exam 0.43 277 Q5 VOL FB2 -2.14 FB2 FB2 WAR 560XP Array Special Inter 65 78 0.-09 88 P2 TWD 4 FB4 -0.97 TEC TEH WAR 560UL Bobbin Exam 0.31 91 42 VOL FB4 -0.80 FB4 FB4 WAR 560XP Array Special Inter 68 71 0.17 71 P2 TWD 7 FBI +0.73 TEC TEH WAR LAR 560UL Bobbin Exam 69 76 0.11 67 P2 TWD 5 FB4 -1.18 TEC TEH WAR 560UL Bobbin Exam 0.45 92 42 VOL FB4 -1.00 FB4 FB4 WAR 560XP Array Special Inter 70 67 0.26 97 P2 TWD 11 FB5 +0.68 TEC TEH WAR 560UL Bobbin Exam.

72 89 0.12 83 P2 TWD 6 FB8 +0.89 TEC TEH WAR 560UL Bobbin Exam 73 66 0.21 112 P2 TWD 8 FB4 +0.68 TEC TEH WAR 560UL Bobbin Exam 73 86 0.24 85 P2 TWD 11 FB5 +0.76 TEC TEH WAR 560UL Bobbin Exam 0.27 108 Q3 VOL FB5 +0.76 FB5 FB5 WAR 560xP Array Special Inter 77 66 0.20 89 P2 TWD 8 FB4 +0.60 TEC TEH WAR 560UL Bobbin Exam 78 61 0.29 97 P2 TWD 12 FB5 -1.61 TECTEH WAR 560UL Bobbin Exam 78 77 0.20 76 P2 TWD 9 FB2 +0.79 TEC TEH WAR 560UL Bobbin Exam 79 66 0.18 53 P2 TWD 8 FB4 +0.58 TEC TEH WAR 560UL Bobbin Exam 80 67 0.18 83 P2 TWO 8 FB3 -1.76 TEC TEH WAR 560UL Bobbin Exam 81 78 0.22 70 P2 TWD 9 FB5 +0.95 TEC TEH WAR 560UL Bobbin Exam 81 88 1.33 60 138 VOL 09H +0.69 09H 09H WAR 560XP Array Special Inter 0.17 91 P2 TWD 7 09H +0.71 TEC TEH WAR 560UL Bobbin Exam 82 65 0.14 72 P2 TWO 6 FB4 -0.49 TEC TEH WAR 560UL Bobbin Exam 0.56 85 Q10 VOL FB4 -0.71 FB4 FB4 WAR 560XP Array Special Inter 84 67 0.32 72 P2 TWD 13 FB4 +1.65 TEC TEH WAR 560UL Bobbin Exam 85 64 0.28 70 P2 TWD 11 FB7 +0.63 TEC TEH WAR 560UL Bobbin.Exam 87 66 0.25 79 P2 TWD 10 FB3 +0.66 TEC TEH WAR 5600L Bobbin Exam 88 75 0.20 105 P2 TWD 9 FB6 +1.73 TEC TEH WAR 560UL Bobbin Exam 0.28 262 QII VOL FB6 +1.73 FB6 FB6 WAR 560XP Array Special Inter 89 56 0.20 73 P2 TWD 9 FB4 +1.50 TEC TEH WAR 560UL Bobbin Exam 0.51 66 QI0 VOL FB4 +1.25 FB4 FB4 WAR 560XP Array Special Inter 90 67 0.57 100 P2 TWD 21 FB4 -1.01 TEC TEH WAR 560UL Bobbin Exam 0.52 113 P2 TWD 20 FB5 -1.11 TEC TEH WAR 5600L Bobbin Exam 91 60 0.32 71 P2 TWD 13 FB3 -0.60 TEC TEH WAR 5600L Bobbin Exam 0.39 106 P2 TWD 15 FB5 -1.23 TEC TEH WAR 560UL Bobbin Exam 0.36 95 P2 TWD 14 FB4 -1.02 TEC TEH WAR 5600L Bobbin Exam 91 66 0.23 69 P2 TWD 10 FB3 +0.58 TEC TEH WAR 5600L Bobbin Exam 91 68 0.13 92 P2 TWD 6 FB3 +0.58 TEC TEH WAR 5600L Bobbin Exam 95 66 0.19 75 P2 TWD 8 FB3 +0.65 TEC TEH WAR 560UL Bobbin Exam 0.40 89 QI1 VOL FB3 +0.53 FB3 FB3 WAR 560XP Array Special Inter 95 76 0.17 100 P2 TWO 8 FB6 +0.63 TEC TEH WAR 5600L Bobbin Exam 0.37 79 Q2 VOL FB6 +0.83 FB6 FB6 WAR 560XP Array Special Inter 96 75 0.24 113 P2 TWO 10 FB6 +1.73 TEC TEH WAR 560UL Bobbin Exam 0.39 101 Q10 VOL FB6 +1.91 FB6 FB6 WAR 560XP Array Special Inter 97 76 0.17 104 P2 TWD 8 FB3 +1.79 TEC TEH WAR 5600L Bobbin Exam 0.50 94 Q3 VOL FB3 +1.96 FB3 FB3 WAR 560XP Array Special Inter 98 67 0.23 104 P2 TWD 9 FB3 +1.78 TEC TEH WAR 5600L Bobbin Exam 98 75 0.27 66 P2 TWD 11 FB6 +1.63 TEC TEH WAR 560UL Bobbin Exam 99 74 0.19 46 P2 TWD 8 FB4 +1.13 TEC TEH WAR 560UL Bobbin Exam 101 66 0.28 103 P2 TWD 11 FB3 +0.50 TEC TEH WAR 560UL Bobbin Exam 102 61 0.60 89 P2 TWD 22 FB4 -1.45 TEC TEH WAR 560UL Bobbin Exam 103 66 0,10 59 P2 TWO 5 FB4 +1.29 TEC TEH WAR 5600L Bobbin Exam 103 76 0.09 147 P2 TWO 4 FB3 +1.79 TEC TEH WAR 56OUL Bobbin Exam 104 59 0.16 74 P2 TWD 7 FB4 -1.34 TEC TEH WAR 560UL Bobbin Exam 0.28 78 Q10 VOL FB4 -1.53 FB4 FB4 WAR 560XP Array Special Inter 105 66 0.38 100 P2 TWO 15 FB3 +0.58 TEC TEH WAR 560UL Bobbin Exam

AREVA NP Inc 11/19/09 10:30:04 Customer Name: McGuire - Unit 2 Replacement Component: S/G B Page 2 of 2 QUERY: QueryMl[l]

ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 PROBE SCOPE 106 59 0.21 118 P2 TWD 8 FB4 +1.36 TEC TEH WAR 560UL Bobbin Exam 106 75 0.05 137 P2 TWD 3 FB6 +1.58 TEC TEH WAR 560UL Bobbin Exam 107 56 NDD 01C TEC 560XP Array Exam 0.18 72 P2 TWD 8 F54 -0.55 TEC TEH WAR 560UL Bobbin Exam 0.37 98 Q3 VOL FB4 -1.30 FB4 FB4 WAR 560XP Array Special Inter NDD 01H TEH 560XP Array Exam 107 66 0.16 82 P2 TWD 7 FB3 +0.63 TEC TEH WAR 560UL Bobbin Exam 108 61 0,30 93 P2 TWD 1i2 FB7 +1.79 TEC TEH WAR 560UL Bobbin Exam 0.46 85 P2 TWD 1l7 FB4 +0.68 TEC TEH WAR 560UL Bobbin Exam 0.49 74 Q2 VOL FB7 +1.91 FB7 FB7 WAR 560XP Array Special Inter 108 65 0.22 117 P2 TWD 9 FB4 +0.63 TEC TEH WAR 560UL Bobbin Exam 0.39 94 Q3 VOL FB4 +1.05 FB4 FB4 WAR 56oX'P Array Special Inter Total Tubes  : 48 Total Records: 71

AREVA NP Inc 11/19/09 10:15:28 Customer Name: McGuire - Unit 2 Replacement Component: S/G C Page 1 of ý QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 PROBE SCOPE 41 14 0.34 92 122 VOL FB5 -1.47 FB5 FB5 WAR 560Xp Array Special Inter 0.14 110 P2 TWD 5 FB5 -1.61 TEC TEH WAR 5 60UL Bobbin Exam 47 50 0.27 74 P2 TWD 12 FB4 +0.55 TEC TEH WAR 560UL Bobbin Exam 48 77 0.16 61 P2 TWD 7 FB5 +1.52 TEC TEH WAR 560UL Bobbin Exam 50 55 0.33 91 Q6 VOL FB4 +0.82 FB4 FB4 WAR 560XP Array Special Inter 0.08 82 P2 TWD 3 FB4 +0.84 TEC TEH WAR 560UL Bobbin Exam 51 86 0.10 75 P2 TWD 5 FB4 -1.61 TEC TEH WAR 560UL Bobbin Exam 52 45 0.29 123 122 VOL FB4 +0.73 FB4 FB4 WAR 560XP Array Special Inter 0.14 111 P2 TWO 6 FB4 +0.73 TEC TEH WAR 560UL Bobbin Exam 53 94 0.27 118 P2 TWD 11 FB5 +1.56 TEC TEH WAR 560UL Bobbin Exam 54 67 0.18 87 P2 TWO 7 FB4 -1.65 TEC TEH WAR 560UL Bobbin Exam 54 75 0.10 69 P2 TWO 5 FB4 +1.02 TEC TEH WAR 560UL Bobbin Exam 56 61 0.21 110 P2 TWD 9 FB5 +1.43 TEC TEH WAR 560UL Bobbin Exam 57 66 0.09 52 P2 TWD 4 FB4 +1.36 TEC TEH WAR 560UL Bobbin Exam 57 82 0.05 81 P2 TWD 2 FB3 -1.46 TEC TEH WAR 560UL Bobbin Exam 58 51 0.32 100 138 VOL FB4 -1.04 FB4 FB4 WAR 560XP Array Special Inter 0.08 65 P2 TWD 4 FB4 -1.04 TEC TEH WAR 560UL Bobbin Exam 58 .69 0.24 121 126 VOL FB3 +1.14 FB3 FB3 WAR 560XP Array Special Inter 0.06 106 P2 TWD 2 FB3 +1.28 TEC TEH WAR 560UL Bobbin Exam 58 73 0.16 74 Q14 VOL FB4 +0.35 FB4 FB4 WAR 560XP Array Special Inter 0.20 112 P2 TWO 8 FB4 -0.65 TEC TEH WAR 560UL Bobbin Exam 58 .79 0.16 98 P2 TWO 7 FB5 +1.60 TEC TEH WAR 560UL Bobbin Exam 61 64 0.15 82 P2 TWO 6 FB4 -1.75 TEC TEH WAR 560UL Bobbin Exam 61 80 0.19 91 P2 TWO 9 FB5 -1.00 TEC TEH WAR 560UL Bobbin Exam 62 71 0.57 80 Q15 VOL FB4 -0.95 FB4 FB4 WAR 560XP Array Special Inter 0.12 112 P2 TWD 6 FB4 -0.97 TEC TEH WAR 560UL Bobbin Exam 63 52 0.21 93 Q8 VOL FB5 -0.80 FB5 FB5 WAR 560XP Array Special Inter 0.15 90 P2 TWD 7 FB5 -0.78 TEC TEH WAR 560UL Bobbin Exam 63 60 0.18 88 P2 TWD 8 FB5 +0.73 TEC TEH WAR 560UL Bobbin Exam 65 54 0.13 73 P2 TWD 6 FB5 +0.77 TEC TEH WAR 560UL Bobbin Exam 67 44 0.34 105 138 VOL FB4 +1.50 FB4 FB4 WAR 560XP Array Special Inter 0.11 94 P2 TWO 5 FB4 +1.49 TEC TEH WAR 560UL Bobbin Exam 67 90 0.23 123 P2 TWD 10 FB4 +1.37 TEC TEH WAR 560UL Bobbin Exam 68 49 0.27 88 P2 TWD 10 FB5 -0.60 TEC TEH WAR 560UL Bobbin Exam 68 53 0.08 55 P2 TWO 3 FB4 +1.21 TEC TEH WAR 560UL Bobbin Exam 68 63 0.14 86 P2 TWD 6 FB5 -1.62 TEC TEH WAR 560UL Bobbin Exam 68 85 0.22 64 P2 TWO 9 FB5 +1.03 TEC TEH WAR 560UL Bobbin Exam 71 64 0.12 68 P2 TWO 5 FB5 +1.31 TEC TEH WAR 560UL Bobbin Exam 71 88 0.39 83 P2 TWO 15 FB5 +1.45 TEC TEH WAR 560UL Bobbin Exam 72 73 0.32 92 P2 TWD 12 FB4 -0.80 TEC TEH WAR 560UL Bobbin Exam 73 84 0.33 132 P2 TWO 12 FB5 +1.09 TEC TEH WAR 560UL Bobbin Exam 75 66 0.11 64 P2 TWO 4 FB4 -1.13 TEC TEH WAR 560UL Bobbin Exam 75 68 0.38 105 122 VOL FB5 -0.88 FB5 FB5 WAR 560XP Array Special Inter 0.12 118 P2 TWD 5 FB5 -0.84 TEC TEH WAR 560UL Bobbin Exam 76 81 1.23 101 154 VOL FB4 -1.28 FB4 FB4 WAR 560XP Array Special Inter 0.37 122 P2 TWD 14 F54 -1'.45 TEC TEH WAR 560UL Bobbin Exam 78 67 0.19 130 P2 TWD 7 FB5 -0.81 *TEC TEH WAR 560UL Bobbin Exam 78 85 0.99 99 142 VOL FB5 +1.33 FB5 FB5 WAR 560XP Array Special Inter 0.19 73 P2 TWD 8 FB5 +1.42 TEC TEH WAR 560UL Bobbin Exam 79 78 0.14 81 P2 TWD 6 FB5 +1.32 TEC TEH WAR 560UL Bobbin Exam 0.62 104 154 VOL FB5 +1.20 FB5 FB5 WAR 560XP Array Special Inter 80 67 0.64 78 P2 TWD 23. FB5 +1.33 TEC TEH WAR 560UL Bobbin Exam 80 79 0.22 120 P2 TWD 10 FB4 -1.70 TEC TEH WAR 560UL Bobbin Exam 81 64 0.27 83 P2 TWO 11 FB4 +1.31 TEC TEH WAR 560UL Bobbin Exam 82 61 0.15 118 P2 TWO 6 FB5 -1.54 TEC TEH WAR 560UL Bobbin Exam 0.14 91 P2 TWO 6 FB4 -1.51 TEC TEH WAR' 560UL Bobbin Exam 82 79 0.30 119 P2 TWD 11 FB4 -1.67 TEC TEH WAR 560UL Bobbin Exam 82 85 0.12 79 P2 TWO 6 FB5 -0.71 TEC TEH WAR 560UL Bobbin Exam 84 83 0.51 251 QI5 VOL FB5 +1.26 FB5 FB5 WAR 560XP Array Special Inter

AREVA NP Inc 11/19/09 10:15:28 Customer Name: McGuire - Unit 2 Replacement Component: S/G C Page 2 of 3 "

QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 PROBE SCOPE 0.33 78 P2 TWD 12 FB5 +0.58 TEC TEN WAR 560UL Bobbin Exam 86 65 0.10 100 P2 TWD 4 FB5 -0.60 TEC TEN WAR 560UL Bobbin Exam 86 79 0.33 113 P2 TWD 12 FB4 -1.67 TEC TEN WAR 560UL Bobbin Exam 86 89 0.24 83 P2 TWD 10 FB4 +1.41 TEC TEN WAR 560UL Bobbin Exam 87 76 0.43 96 150 VOL FB4 +1.37 FB4 FB4 WAR 560XP Array Special Inter 0.18 137 P2 TWD 7 FB4 +1.30 TEC TEN WAR 560UL Bobbin Exam 88 85 0.37 111 P2 TWD 13 FB4 -1. 11 TEC TEN WAR 560UL Bobbin Exam 89 76 0.18 107 P2 TWD .8 FB4 +1.70 TEC TEN WAR 560UL Bobbin Exam 89 80 0.13 122 P2 TWD 6 FB4 +1.47 TEC TEN WAR 560UL Bobbin Exam 90 61 0.29 89 P2 TWD 12 FB4 -0.99 TEC TEN WAR 560UL Bobbin Exam 91 84 0.14 74 P2 TWD 7 FB6 +0.52 TEC TEN WAR 56OUL Bobbin Exam 92 73 0.35 79 P2 TWD 10 FB5 -1.17 TEC TEN WAR 560UL Bobbin Exam 92 79 1.91 92 154 VOL F84 -1.20 FB4 F34 WAR 560XP Array Special Inter 0.48 70 P2 TWD 19 FB4 -1.20 TEC TEN WAR 560UL Bobbin Exam 93 (58 0.34 94 110 VOL FB4 +1.51 FB4 FB4 WAR 560XP Array Special Inter 0.10 108 P2 TWD 4 FB4 +1.29 TEC TEN WAR 560UL Bobbin Exam 93 80 0.25 95 P2 TWD 11 FB7 +1.86 TEC TEN WAR 560UL Bobbin Exam 94 87 0.31 93 P2 TWD 13 FB5 +1.63 TEC TEN WAR 560UL Bobbin Exam 95 76 0.21 61 P2 TWD 9 FP4 -0.85 TEC TEN WAR 560UL Bobbin Exam 96 83 0.31 141 P2 TWD 12 FB5 -1.59 TEC TEN WAR 560UL Bobbin Exam 98 85 0.39 95 P2 TWD 16 FB5 -1.76 TEC TEN WAR 560UL Bobbin Exam 99 86 0.33 84 P2 TWD 14 FB4 +0.50 TEC TEN WAR 56OUL Bobbin Exam 99 100 0.40 79 P2 TWD 14 FB4 +0.77 TEC TEN WAR 560UL Bobbin Exam 101 78 0.15 93 P2 TWD 7 FB6 +0.63 TEC TEN WAR 560UL Bobbin Exam 0.20 63 Q7 VOL FB6 +0.76 FB6 FB6 WAR 560XP Array Special Inter 101 80 0.41 93 P2 TWD 16 FB4 +1.04 TEC TEN WAR 560UL Bobbin Exam 102 73 0.42 272 Q7 VOL FB5 -1. 15 FB5 FB5 WAR 560XP Array Special Inter 0.47 55 Q7 VOL F84 -1.28 FB4 FB4 WAR 560XP Array Special Inter 0.26 103 P2 TWD 10 FB5 -1.11 TEC TEN WAR 560UL Bobbin Exam 0.25 86 P2 TWD 10 FB4" -1.14 TEC TEN WAR 560UL Bobbin Exam 102 77 0.35 95 P2 TWD 14 FB3 +0.45 TEC TEN WAR 560UL Bobbin Exam 104 69 0.24 83 154 VOL FB4 +1.53 FB4 FP4 WAR 560XP Array Special Inter 0.19 98 P2 TWO 7 FB4 +1.31 TEC TEN WAR 560UL Bobbin Exam 105 78 0.24 89 P2 TWO 10 FB4 +1.44 TEC TEN WAR 56OUL Bobbin Exam 105 84 0.36 104 P2 TWD 13 FB4 +1.16 TEC TEN WAR 560UL Bobbin Exam 106 47 0.49 75 7 PLP TSH +1. 11 TEC TEN LAR 56OUL Bobbin Exam 20.65 132 40 PLP TSH +0.81 01H TEN LAR 560XP Array Exam 1.13 114 46 TWD 18 TSH +0.59 01H TEN LPI 560XP Array Exam 106 69 0.24 108 110 VOL FB4 -1.45 FB4 FB4 WAR 560XP Array Special Inter 0.14 76 P2 TWD 7 FB4 -1.62 TEC TEN WAR 560UL Bobbin Exam 5.43 107 104 PLP TSH +10.78 01H TEN LAR 560XP Array PLP Bounding 23.95 134 144 PLP TSH +1.92

+0.67 01H TEN LAR 560XP Array PLP Boundingj QYKos 107 46 7.67 101 56 PLP TSH 01H TEN LAR 560XP Array Exam 0.15 81 7 PLP TSH +1.05 TEC TEN LAR 560UL Bobbin Exam 107 48 22.59 107 44 PLP TSH +0.64 01H TEN LAR 560XP Array Exam 0.43 251 7 PLP TSH +0.82 TEC TEN LAR 5 6OUL Bobbin Exam 107 78 0.24 126 P2 TWO 10 FB3 +1.77 TEC TEN WAR 560UL Bobbin Exam 107 .80 0.25 126 P2 TWD 10 FB7 +1.82 TEC TEN WAR 560UL Bobbin Exam 107 82 0.30 69 Q15 VOL FB4 -0.54 FB4 FB4 WAR 560XP Array Special Inter 0.17 86 P2 TWO 8 FB4 -0.44 TEC TEN WAR 560UL Bobbin Exam 108 47 25.23 114 24 PLP TSH +0.90 01H TEN LAR 560XP Array Exam 0.62 108 6 TWD 9 TSH +0.71 01H TEN LPI 560XP Array Exam 0.49 78 7 PLP TSH +1.13 TEC TEN LAR 560OUL Bobbin Exam 108 75 0.18 126 P2 TWO 8 FB4 -1.69 TEC TEN WAR 560UL Bobbin Exam 110 77 0.20 74 P2 TWD 9 FB3 +0.71 TEC TEN WAR 560L Bobbin Exam 110 79 0.16 96 P2 TWD 7 FB7 +0.39 TEC TEN WAR 56OUL Bobbin Exam 0.59 155 138 VOL FB7 +0.27 FB7 FB7 WAR 560XP Array Special Inter 110 91 0.44 77 P2 TWD 17 FB4 +1.36 TEC TEN WAR 560TUL Bobbin Exam ill 80 0.18 94 Q14 VOL FB4 -1.01 FB4 FB4 WAR 560XP Array Special Inter

AREVA NP Inc 11/19/09 10:15:28 Customer Name: McGuire - unit 2 Replacement Component: S/G C Page 3 of 3 QUERY: QueryM1 ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 PROBE SCOPE 0.21 138 P2 TWD 8 FB4 +1.35 TEC TEN WAR 560UL Bobbin Exam 0.20 52 P2 TWD 8 FB4 -1. 11 TEC TEN WAR 560UL Bobbin Exam 112 73 0.36 83 Q13 TWD 8 TSH +13.46 01HN TEN LPI 560XP Array Exam 0.22 71 Q2 TWD 5 TSH +13.51 01HN TEN LPI 560XP Array Exam 0.26 106 3 NQI TSH +13.90 TEC TEN LPI 560UL Bobbin Exam 113 72 0.42 104 3 NQI TSH +13.97 TEC TEN LPI 560UL Bobbin Exam 0.66 89 142 TWD 11 TSH +13.90 0iN TEN LPI 560XP Array Exam 114 83 0.15 108 P2 TWD 7 FB4 -1.52 TEC TEN WAR 560UL Bobbin Exam 115 76 0.29 78 Q7 VOL FB4 +0.68 FE 4 FB4 WAR 560XP Array Special Inter 0.33 124 P2 TWD 13 FB3 +1.77 TEC TEN WAR 560UL Bobbin Exam 0.33 ill P2 TWD 13 FB4 +0.53 TEC TEN WAR 560UL Bobbin Exam 115 78 0.34 131 P2 TWD 13 FB5 +1.66 TEC TEN WAR 560UL Bobbin Exam Total Tubes  : 89 Total Records: 130

AREVA NP Inc 11/19/09 10:21:52 Customer Name: McGuire - Unit 2 Replacement Component: S/G D Page 1 of?

QUERY: QueryMl[l]

ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL I UTIL 2, PROBE SCOPE 33 68 0.41 103 174 VOL FB5 -1.00 FB5 FB5 WAR 560XP Array Special Inter 0.14 99 P2 TWD 6 FB5 -0.86 TEC TEH WAR 560UL Bobbin Exam 36 77 1.06 105 P1 NQI 02H +0.49 TEC TEH 560UL Bobbin Exam 4.67 62 Q16 SVI 02H +0.37 02H TEH 560XP Array Special Inter 0.08 0 2 TWD 17 02H +0.56 01H 02H 560PP Plus Point Exam 0.18 0 2 TWD 24 02H +0.58 01H 02H 560PP Plus Point Exam 0.30 0 2 TWD 31 02H +0.61 01H 02H 560PP Plus Point Exam 0.46 0 2 TWD 39 02H +0.63 01H 02H 56OPP Plus Point Exam 0.66 0 2 TWD 48 02H +0.65 01H 02H 560PP Plus Point Exam 0.79 0 2 TWD 52 02H +0.68 01H 02H 56OPP Plus Point Exam 0.79 0 2 TWD 53 02H +0.70 01H 02H 56OPP Plus Point Exam 0.67 0 2 TWD 48 02H +0.72 01H 02H 560PP Plus Point Exam 0,59 0 2 TWD 45 02H +0.75 01H 02H 56OPP Plus Point Exam 0.63 0 2 TWD 47 02H +0.77 01H 02H 560PP Plus Point Exam 0.79 0 2 TWD 52 02H +0.79 01H 02H 560PP Plus Point Exam 0.84 0 2 TWD 54 02H +0.81 01H 02H 560PP Plus Point Exam 0.73 0 2 TWD 50 02H +0.84 01H 02H 560PP Plus Point Exam 0.54 0 2 TWD 43 02H +0.86 01H 02H 560PP Plus Point Exam 0.38 0 2 TWD 35 02H +0.88 01H 02H 560PP Plus Point Exam 0.84 0 2 TWD 54 02H +0.77 01H 02H 27901.1 560PP Plus Point Exam 0.53 89 P4 ARC 02H +0.77 01H 02H 560PP Plus Point Exam 0.35 0 P4 LEN 02H +0.77 01H 02H 560PP Plus Point Exam 0.00 0 2' TWD 0 02H +0.54 01H 02H 560PP Plus Point Exam 0.28 0 2 TWD 30 02H +0.91 01H 02H 560PP Plus Point Exam 0.00 0 2 TWD 0 02H +0.93 01H 02H 560PP Plus Point Exam 45 90 0.19 103 P2 TWD 8 FB5 -1.69 TEC TEH WAR 560UL Bobbin Exam 50 23 0.15 73 P2 TWD 6 CBC +0.63 TEC TEH WAR 56OUL Bobbin Exam 50 99 0.21 110 P2 TWD 9 FB4 +1.59 TEC TEH WAR 560UL Bobbin Exam 53 70 0.32 93 174 VOL FB4 -0.98 FB4 FB4 WAR 560XP Array Special Inter 0.08 149 P2 TWD 4 FB4 -0.96 TEC TEH WAR 560UL Bobbin Exam 55 88 0.46 85 162 VOL FB4 +1.24 FB4 FB4 WAR 560XP Array Special Inter 0.15 70 P2 TWD 8 FB4 +1.22 TEC TEH WAR 560UL Bobbin Exam 57 92 0.08 108 P2 TWD 4 FB5 -1.09 TEC TEH WAR 560UL Bobbin Exam 61 58 0.39 91 174 VOL FB4 -0.98 FB4 FB4 WAR 56OXP Array Special Inter 0.11 52 P2 TWD 5 FB4 -1.18 TEC TEN WAR 560UL Bobbin Exam 61 84 0.33 100 P2 TWD 13 FB4 -0.60 TEC TEH WAR 560UL Bobbin Exam 62 75 0.17 95 P2 TWD 7 FB3 -1.95 TEC TEH WAR 560UL Bobbin Exam 66 81 0.15 116 P2 TWD 8 FB4 -0.83 TEC TEH WAR 560UL Bobbin Exam 67 88 0.20 91 P2 TWD 8 FB5 +0.65 TEC TEH WAR 560UL Bobbin Exam 70 57 0.25 107 P2 TWD 12 FB5 +0.60 TEC TEH WAR 560UL Bobbin Exam 71 88 0.26 102 P2 TWD 11 FB5 +0.73 TEC TEH WAR 560UL Bobbin Exam 71 90 0.23 101 P2 TWD 10 FB5 +0.63 TEC TEH WAR 560UL Bobbin Exam 72 87 0.21 78 P2 TWD 9 FB5 +1.70 TEC TEH WAR 560UL Bobbin Exam 73 78 0.28 98 P2 TWD 13 FB5 +0.50 TEC TEH WAR 560UL Bobbin Exam 75 62 0.29 90 P2 TWD 14 FB4 -1.83 TEC TEH WAR 560UL Bobbin Exam 76 67 0.39 78 P2 TWD 15 FB5 -1.11 TEC TEN WAR 560UL Bobbin Exam 80 83 0.16- 70 P2 TWD 7 FB4 -1.64 TEC TEH WAR 560UL Bobbin Exam 82 83 0.24 109 P2 TWD 12 FB4 -1.70 TEC TEH WAR 560UL Bobbin Exam 83 72 0.51 84 P2 TWD 18 FB5 -0.57 TEC TEH WAR 560UL Bobbin Exam 83 82 0.32 97 P2 TWD 14 FB3 +1.72 TEC TEH WAR 560UL Bobbin Exam 84 73 0.27 82 P2 TWD 13 FB5 +1.26 TEC TEH WAR 560UL Bobbin Exam 0.43 75 Q15 VOL FB5 +1.40 FB5 FB5 WAR 560XP Array Special Inter 85 30 0.15 0 P2 TWD 3 FB1 +0.79 TEC TEH WAR 560UL Bobbin Exam 85 72 0.70 98 P2 TWD 27 FB5 -0.03 TEC TEH WAR 560UL Bobbin Exam 0.37 ill P2 TWD 17 FB6 +0.34 TEC TEH WAR 560UL Bobbin Exam 0.43 110 Q15 VOL FB6 +0.13 FB6 FB6 WAR 560XP Array Special Inter 89 37 0.13 110 P2 TWD 6 FB5 +0.68 TEC TEH WAR 560UL Bobbin Exam 0.28 113 122 VOL FB5 +0.76 FB5 FB5 WAR 560XP Array Special Inter 90 61 0.40 105 P2 TWD 18 FB4 +1.22 TEC TEH WAR 560UL Bobbin Exam

AREVA NP Inc 11/19/09 10:21:52 Customer Name: McGuire - Unit 2 Replacement Component: S/G D Page 2 of 2 QUERY: QueryMl[l]

ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 PROBE SCOPE 90 75 0.42 80 QI5 VOL FB5 +1.38 FB5 FB5 WAR 560XP Array Special Inter 0.18 87 P2 TWD 9 FB5 +0.47 TEC TEH WAR 560UL Bobbin Exam 90 77 0.13 77 P2 TWD 7 FB4 -1.23 TEC TEH WAR 560UL Bobbin Exam 90 87 0.48 126 138 VOL FB4 +1.62 FB4 FB4 WAR 560XP Array Special Inter 0.26 84 P2 TWD 12 FB4 +1.65 *TEC TEH WAR 56OUL Bobbin Exam 92 61 0.24 102 P2 TWD 10 FB7 -1.87 TEC TEH WAR 560UL Bobbin Exam 0.40 78 P2 TWO 15 FB4 +1.22 TEC TEH- WAR 560UL Bobbin Exam 93 66 0.43 93 P2 TWD 19 FB5 -0.68 TEC TEH WAR 560UL Bobbin Exam 94 55 0.51 83 Q7 VOL FB4 +1.08 FB4 FB4 WAR 560XP Array Special Inter 0.34 114 P2 TWD 15 FB4 +1.26 TEC TEH WAR 560UL Bobbin Exam 95 68 0.31 91 P2 TWD 12 FB5 +1.56 TEC TEH WAR 560UL Bobbin Exam 96 73 0.16 93 P2 TWD 8 FB5 -1.66 TEC TEH WAR 560UL Bobbin Exam NDF FB5 -1.66 FB5 FB5 560XP Array Special Inter 97 54 0.32 99 P2 TWD 15 FB3 -1.23 TEC TEH WAR 560UL Bobbin Exam 97 64 0.51 80 QI5 VOL FB5 +1.24 FB5 FB5 WAR 560XP Array Special Inter 0.37 94 P2 TWD 17 FB5 +1.02 TEC TEH WAR 560UL Bobbin Exam 97 74 0.41 97 154 VOL FB5 +1.08 FB5 FB5 WAR 560XP Array Special Inter 0.11 100 P2 TWD 5 FB5 +0.94 TEC TEH WAR 560UL Bobbin Exam 97 80 0.31 93 178 VOL FB4 +1.44 FB4 FB4 WAR 560XP Array Special Inter 0.15 129 P2 TWD 7 FB4 +1.57 TEC TEH WAR 560UL Bobbin Exam 98 61 0.19 81 P2 TWD 9 FB7 +1.85 TEC TEH WAR 560UL Bobbin Exam 99 62 0.72 94 P2 TWD 27 FB5 -1.20 TEC TEH WAR 560UL Bobbin Exam 0.34 93 P2 TWD 16 FB4 -0.73 TEC TEH WAR 560UL Bobbin Exam 100 61 0.43 95 P2 TWD 16 FB5 +1.64 TEC TEH WAR 560UL Bobbin Exam 0.31 79 P2 TWD 12 FB7 +1.77 TEC TEH WAR 560UL Bobbin Exam 100 69 0.44 81 P2 TWD 16 FB6 +0.68 TEC TEH WAR 560UL Bobbin Exam 101 76 0.28 83 P2 TWD 13 FB2 -0.75 TEC TEH WAR 560UL Bobbin Exam 103 48 0.19 101 P2 TWO 10 FB4 +0.74 TEC TEH WAR 560UL Bobbin Exam 105 62 0.54 78 P2 TWD 19 FB5 -1.14 TEC TEH WAR 560UL Bobbin Exam 106 53 0.75 86 Q7 VOL FB4 +1.08 FB4 FB4 WAR 560XP Array Special Inter 0.41 97 P2 TWO 18 FB4 +1.23 TEC TEH WAR 560UL *Bobbin Exam 106 61 0.17 68 P2 TWD 9 FB6 -1.89 TEC TEH WAR 560UL Bobbin Exam 106 69 0.22 107 P2 TWD 11 FB3 +1.78 TEC TE9 WAR 560UL Bobbin Exam 107 74 0.24 71 P2 TWD 11 FB4 -0.94 TEC TEH WAR 560UL Bobbin Exam 108 69 0.81 98 154 VOL FB4 +1.33 FB4 FB4 WAR 560XP Array Special Inter 0.25 68 P2 TWD 10 FB4 +1.38 TEC TEH WAR 560UL Bobbin Exam Total Tubes  : 53 Total Records: 95