Letter Sequence Request |
---|
|
|
MONTHYEARML1025101862010-08-30030 August 2010 Relief Request Serial #10-MN-001 Project stage: Request ML1105507702011-03-0303 March 2011 Relief 10-MN-001 for a Proposed Alternative to to Delay the Update to the Code of Record During the Fourth 10-Year Inservice Inspection (ISI) Interval Project stage: Other 2010-08-30
[Table View] |
|
---|
Category:Inservice/Preservice Inspection and Test Report
MONTHYEARRA-22-0303, End of Cycle 28 (M1 R28) Steam Generator Tube Inspection Report2022-10-25025 October 2022 End of Cycle 28 (M1 R28) Steam Generator Tube Inspection Report RA-22-0178, End of Cycle 28 (M1R28) Inservice Inspection Summary Report2022-08-0808 August 2022 End of Cycle 28 (M1R28) Inservice Inspection Summary Report RA-19-0400, End of Cycle 27 (M1R27) Inservice Inspection Summary Report2021-01-19019 January 2021 End of Cycle 27 (M1R27) Inservice Inspection Summary Report RA-20-0031, Revision to Request for Alternative in Accordance with 10 CFR 50.55a (z)(1) to Delay the Update of the ASME Code of Record for the First Inspection Period2020-01-23023 January 2020 Revision to Request for Alternative in Accordance with 10 CFR 50.55a (z)(1) to Delay the Update of the ASME Code of Record for the First Inspection Period RA-19-0341, Request for Alternative in Accordance with 10 CFR 50.55a (z)(1) to Delay the Update of the ASME Code of Record for the First Inspection Period2019-12-19019 December 2019 Request for Alternative in Accordance with 10 CFR 50.55a (z)(1) to Delay the Update of the ASME Code of Record for the First Inspection Period RA-19-0268, End of Cycle 26 (M1 R26) Inservice Inspection Summary Report2019-07-10010 July 2019 End of Cycle 26 (M1 R26) Inservice Inspection Summary Report MNS-18-003, End of Cycle 25 In-service and Steam Generator In-service Inspection Summary Reports2018-01-11011 January 2018 End of Cycle 25 In-service and Steam Generator In-service Inspection Summary Reports MNS-17-033, Snubber Program Plan for the Fourth Ten-Year Lnservice Testing (IST) Interval2017-08-0202 August 2017 Snubber Program Plan for the Fourth Ten-Year Lnservice Testing (IST) Interval ML16208A0582016-07-14014 July 2016 End of Cycle 24 Inservice Inspection Report MNS-15-010, Inservice Inspection Report, End of Cycle 23 Refueling Outage2015-02-12012 February 2015 Inservice Inspection Report, End of Cycle 23 Refueling Outage ML14197A2872014-06-26026 June 2014 MISI-1462.10-0040, Revision 0, Fourth Inspection Interval Inservice Inspection Plan, Enclosure 1 MNS-14-053, MISI-1462.20-0040, Revision 0, Fourth Inspection Interval Inservice Inspection Pressure Test Plan2014-06-24024 June 2014 MISI-1462.20-0040, Revision 0, Fourth Inspection Interval Inservice Inspection Pressure Test Plan MNS-14-026, Risk-Informed Inservice Inspection Program Response to Request for Additional Information2014-03-0303 March 2014 Risk-Informed Inservice Inspection Program Response to Request for Additional Information ML13234A0692013-08-13013 August 2013 Relief Request Serial #13-MN-002, Risk-Informed Inservice Inspection Program Fourth Inservice Inspection Interval ML13212A0672013-07-22022 July 2013 Inservice Inspection Report End of Cycle 22 Refueling Outage ML13205A1692013-07-11011 July 2013 Steam Generator In-Service Inspection Summary Report Unit 1, End of Cycle (EOC)22 ML13078A0092013-02-27027 February 2013 Fourth Ten-Year Inservice Testing Interval Inservice Testing Program, Revision 28 ML12321A0502012-11-0101 November 2012 Steam Generator Inservice Inspection Report ML12025A1392012-01-12012 January 2012 Inservice Inspection Report End of Cycle 21 Refueling Outage ML11362A0792011-12-15015 December 2011 Fourth Inspection Interval Inservice Inspection Pressure Test Plan ML1025101862010-08-30030 August 2010 Relief Request Serial #10-MN-001 ML1020405152010-07-15015 July 2010 Inservice Inspection Report Unit 1, End of Cycle 20 Refueling Outage ML0918804232009-06-29029 June 2009 Relief Request Serial #09-MN-003 ML0918804242009-06-29029 June 2009 Relief Request Serial #09-MN-004 ML0905106612009-02-0909 February 2009 In-Service Inspection Report, Unit 1, End of Cycle (EOC) 19 ML0904908362009-02-0202 February 2009 Steam Generator In-Service Inspection Report, End of Cycle (EOC) 19 ML0805805772008-03-26026 March 2008 Relief, Third 10-Year Interval Inservice Inspection Program Plan Repair of Chemical Volume and Control System Valve 1NV-240, MD6274 ML0726204622007-08-23023 August 2007 Inservice Inspection Report, End of Cycle 18 Refueling Outage ML0704500202007-02-0808 February 2007 Notification of Inspection and Request for Information ML0617801652006-06-0909 June 2006 Inservice Testing Program, Request for Additional Information, Relief Request Nos. MC-GRP-01 ML0513003642005-05-0303 May 2005 Units 1 & 2, Inservice Testing Program Relief Request MC-SRP-NS-01 Supplement ML0508105992005-03-11011 March 2005 Duke Requests NRC Approval of an Alternative to the Requirements of the 1998 Edition Through the 2000 Addenda of the Pressure Vessel Code, Section XI for the Listed Inservice Inspection Intervals ML0423305882004-08-12012 August 2004 Third Ten-Year Inservice Testing Interval Inservice Testing Program, Revision 27 ML0421602882004-07-26026 July 2004 Relief Request (RR) 03-001 ML0419401702004-06-30030 June 2004 Inservice Inspection Report End of Cycle 16 Refueling Outage ML0407607472004-03-0808 March 2004 Inservice Inspection Plan Relief Requests ML0401505112004-01-0505 January 2004 Inservice Inspection (ISI) Pressure Test Plan, Third Ten-Year Interval Plan ML0400200412003-12-0909 December 2003 to Third Interval Inservice Inspection Plan, McGuire Nuclear Station, Units 1 and 2, Unit 1, Section 1 Through Unit 2, Section 2 ML0400200402003-12-0909 December 2003 to Third Interval Inservice Inspection Plan, McGuire Nuclear Station, Units 1 and 2, General Requirements Through Unit 1, Section 2 2022-08-08
[Table view] Category:Letter
MONTHYEARIR 05000369/20230042024-01-31031 January 2024 Integrated Inspection Report 05000369/2023004 and 05000370/2023004 ML24019A1392024-01-25025 January 2024 TSTF 505 and 50.69 Audit Summary ML24019A2002024-01-24024 January 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000369/20234022023-12-14014 December 2023 Material Control and Accounting Program Inspection Report 05000369/2023402 and 05000370/2023402 ML23317A2272023-11-17017 November 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Transmittal of Dam Inspection Report - Non-Proprietary ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230032023-10-24024 October 2023 Integrated Inspection Report 05000369/2023003 and 05000370/2023003; and Inspection Report 07200038/2023001 IR 05000369/20240102023-10-13013 October 2023 Notification of McGuire Nuclear Station Comprehensive Engineering Team Inspection U.S. Nuclear Regulatory Commission Inspection Report 05000369, 370/2024010 IR 05000369/20230102023-10-13013 October 2023 Age Related Degradation Inspection Report 05000369/2023010 and 05000370/2023010 ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds IR 05000369/20233012023-09-20020 September 2023 William B. McGuire Nuclear Station - NRC Examination Report 05000369/2023301 and 05000370/2023301 ML23230A0652023-08-31031 August 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Relief Request Use of Later Edition of ASME Code ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230052023-08-25025 August 2023 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 (Report 05000369/2023005 and 05000370/2023005) IR 05000369/20230022023-07-28028 July 2023 Integrated Inspection Report 05000369/2023002 and 05000370/2023002 IR 05000369/20234202023-07-24024 July 2023 Security Baseline Inspection Report 050003692023420 and 050003702023420 ML23206A0092023-07-24024 July 2023 William B. McGuire Nuclear Station Operator Licensing Written Examination Approval 05000369/2023301 and 05000370/2023301 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23159A2712023-06-20020 June 2023 William B. McGuire Nuclear Station, Unit 1 - Relief Request Impractical Reactor System Welds ML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23115A2122023-05-0101 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000369/20230012023-05-0101 May 2023 Integrated Inspection Report 05000369/2023001 and 05000370/2023001 ML23094A1832023-04-18018 April 2023 Audit Plan TSTF-505, Rev. 2, RITSTF Initiative 4B & 10 CFR 50.69, Risk-Informed Categorization & Treatment of Structures, Systems & Components for Nuclear Power Reactors (EPIDs L-2023-LLA-0021 & L-2023-LLA-0022) ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000369/20220062023-03-0101 March 2023 Annual Assessment Letter for McGuire Nuclear Station Units 1 and 2 (NRC Inspection Report 05000369/2022006 and 05000370 2022006) IR 05000369/20220042023-01-30030 January 2023 Mcguire Nuclear Station - Integrated Inspection Report 05000369/2022004 and 05000370/2022004 IR 05000369/20224202023-01-11011 January 2023 Security Baseline Inspection Report 05000369/2022420 and 05000370/2022420 ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl ML22347A1512022-12-13013 December 2022 William B. Mcguire Nuclear Station Notification of Licensed Operator Initial Examination 05000369/2023301 and 05000370/2023301 ML22340A6662022-12-0808 December 2022 Summary of November 30, 2022, Public Meeting with Duke Energy Carolinas, LLC for McGuire Nuclear Station, Units 1 & 2 Proposed LAR to Adopt TSTF-505, Rev. 2 and 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems ML22290A1012022-11-29029 November 2022 Issuance of Amendment Nos. 326 and 305, Regarding Changes to Technical Specification 3.4.3, Reactor Coolant System Pressure Temperature Limits ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000369/20220032022-10-27027 October 2022 Integrated Inspection Report 05000369/2022003 and 05000370/2022003 IR 05000369/20220112022-09-29029 September 2022 Biennial Problem Identification and Resolution Inspection Report 05000369/2022011 and 05000370/2022011 ML22266A0782022-09-26026 September 2022 William B. Mcguire Nuclear Station, Unit 2 Pressurizer Power Operated Relief Valve Relief Request ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports ML22242A0022022-09-12012 September 2022 Issuance of Amendments to Adopt TSTF 569, Revision 2, Revise Response Time Testing Definition IR 07200038/20220012022-09-12012 September 2022 Operation of an Independent Spent Fuel Storage Installation Report 07200038/2022001 ML22230B6132022-09-0101 September 2022 Review of the Draft Environmental Assessment and Finding of No Significant Impact for Brunswick Steam Electric Plant and McGuire Nuclear Station Independent Spent Fuel Storage Installations Decommissioning Funding Plans IR 05000369/20220052022-08-29029 August 2022 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 NRC Inspection Report 05000369/2022005 and 05000370/2022005 IR 05000369/20220022022-07-26026 July 2022 Integrated Inspection Report 05000369/2022002 and 05000370/2022002 ML22215A2502022-07-25025 July 2022 EN 55960 - Update - Curtiss Wright ML22164A0362022-07-19019 July 2022 Mcguire Nuclear Station, Units 1 and 2; Issuance of Amendments to Revise the Conditional Exemption of the End-Of-Cycle Moderator Temperature Coefficient Measurement Methodology (EPID L-2021-LLA-0198) Public ML22175A0162022-06-24024 June 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML22111A3112022-05-16016 May 2022 Letter Issuing Exemption to McGuire IR 05000369/20224012022-05-12012 May 2022 Cyber Security Inspection Report 05000369/2022401 and 05000370/2022401 2024-01-31
[Table view] |
Text
REGIS T. REPKO
.p Duke Vice President McGuire Nuclear Station O Energy Duke Energy MGO1 VP /12 700 Hagers Ferry Rd.
Huntersville, NC 28078 980-875-4111 980-875-4809 fax regis.repko@duke-energy,corn August 30, 2010 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Duke Energy Carolinas, LLC (Duke Energy)
McGuire Nuclear Station, Unit 1 Docket No. 50-369 Relief Request Serial #10-MN-001 Pursuant to 10 CFR 50.55a(a)(3)(i), Duke Energy hereby submits Relief Request 10-MN-001 to delay updating the ASME Section XI Code of Record for the McGuire Unit 1 Fourth Inservice Inspection Interval.
The enclosure to this letter contains this relief request. If you have any questions or require additional information, please contact P.T. Vu at (980) 875-4302.
Sincerely, Regis T. Repko Enclosure AN-1 www.duke-energy.com PM,
U. S. Nuclear Regulatory Commission August 30, 2010 Page 2 xc:
L. A. Reyes, Region II Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 J. H. Thompson, Project Manager U. S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop O-8G9A Rockville, MD 20852-2738 J. B. Brady NRC Senior Resident Inspector McGuire Nuclear Station
Enclosure Duke Energy Carolinas, LLC McGuire Nuclear Station, Unit 1 Relief Request Serial #10-MN-001 Request for Alternative in Accordance with 10 CFR 50.55a(a)(3)(i) to Delay the Update of the ASME Code of Record for the Fourth Inservice Inspection Interval
.Duke Energy Carolinas, LLC Relief Request #1 0-MN-001 Page 2 of 4
- 1. ASME Code Component(s) Affected ASME Class 1, 2, and 3 components and component supports.
Note: This request specifically excludes ASME Class MC components at McGuire Unit 1.
A separate inservice inspection (ISI) program has been established for Class MC components that uses the ASME Code, Section Xl, 1998 Edition through the 2000 Addenda, and the Code of Record for this program will be updated to a later Code Edition and Addenda when the Class MC interval expires in 2014.
- 2. Applicable Requirements 2.1. 10 CFR 50.55a(g)(4)(ii) states that "Inservice examination of components and system pressure tests conducted during successive 120-month inspection intervals must comply with the requirements of the latest edition and addenda of the Code incorporated by reference in paragraph (b) of this section 12 months before the start of the 120-month inspection interval (or the optional ASME Code cases listed in NRC Regulatory Guide 1.147, Revision 15, that are incorporated by reference in paragraph (b) of this section), subject to the limitations and modifications listed in paragraph (b) of this section."
2.2. 10 CFR 50.55a(b)(2) states that "As used in this section, references to Section XI of the ASME Boiler and Pressure Vessel Code refer to Section XI, and include the 1970 Edition through the 1976 Winter Addenda, and the 1977 Edition (Division 1) through the 2004 Edition (Division 1), subject to the following limitations and modifications:"
Note: Unless 10 CFR 50.55a(b)(2) is amended to incorporate by reference a later Edition and Addenda of Section Xl prior to December 1, 2010 (12 months before the start date of the McGuire Unit 1 fourth ISI interval), the ISI program for the fourth interval must be updated to comply with the 2004 Edition.
- 3. Proposed Alternative Pursuant to 10 CFR 50.55a(a)(3)(i), Duke Energy proposes the following alternative to the above requirements.
3.1. Duke Energy proposes to use the ASME Code,Section XI, 1998 Edition through the 2000 Addenda during the first period of the Unit 1 fourth ISI interval.
3.2. The ASME Section XI Code of Record for McGuire Unit 1 shall be updated by the end of the first period of the fourth ISI interval to the same Edition and Addenda required for the McGuire Unit 2 fourth ISI interval, which is currently scheduled to start on July 15, 2014. The updated Code of Record shall be used during the second and third periods of the Unit 1 fourth ISI interval, and shall comply with all applicable limitations and modifications specified in 10 CFR 50.55a(b)(2).
3.3. The proposed alternative also includes continued use of relief requests during the first period of the Unit 1 fourth ISI interval that were submitted pursuant to 10 CFR 50.55a(a)(3) and approved during the McGuire Unit 1 third ISI interval.
3.4. When implementing this alternative, the following requirements shall apply when using the ASME Code,Section XI, 1998 Edition with the 2000 Addenda:
3.4.1. Duke Energy shall comply with all NRC limitations and modifications specified in 10 CFR 50.55a applicable to the 1998 Edition through the 2000 Addenda.
°*
Duke Energy Carolinas, LLC Relief Request #10-MN-001 Page 3 of 4 3.4.2. Code Cases, if used, shall comply with the requirements specified in Regulatory Guide 1.147.
3.4.3. The provisions of IWA-4340, Mitigation of Defects by Modification, shall not be Used, except when specifically authorized by the NRC in accordance with 10 CFR 50.55a(a)(3). This limitation is consistent with that specified in 10 CFR 50.55a(b)(2)(xxv).
3.4.4. The repair and replacement activity provisions in IWA-4540(c) of the 1998 Edition of Section Xl for pressure testing Class 1, 2, and 3 mechanical joints shall be met when using the 1998 Edition through the 2000 Addenda. This limitation is
.consistent with that specified in 10 CFR 50.55a(b)(2)(xxvi).
- 4. Basis for Use of Alternative 4.1. ASME Section Xl activities [e.g., ISI, repair/replacement, pressure testing, and Non-Destructive Examination (NDE)] at McGuire Units 1 and 2, Catawba Units 1 and 2, and Oconee Units 1, 2, and 3 are standardized and administered by a centralized organization at Duke Energy. Since 2005, Duke Energy's ASME Section XI Program has used a common Code of Record for our plants (1998 Edition through the 2000 Addenda), which simplifies program administration, requiring fewer programs and procedures than would otherwise be needed to implement requirements of different Code Editions and Addenda. Standardizing these programs using a common Code of Record also minimizes the risk.tat errors will occur during program development and implementation.
4.2. Because the 2004 Edition of the ASME Code,Section XI has been incorporated by reference in 10 CFR 50.55a, Duke Energy is required to update the McGuire Unit 1 ISI program to this edition of the Code, unless 10 CFR 50.55a is amended to incorporate by reference a later edition and addenda, prior to December 1, 2010. Consequently, the regulation will require Duke Energy to maintain ISI programs using an ASME Section XI Code for Unit 1 that is different from that in use at Unit 2 and the remaining plants within the Duke Energy fleet.
4.3. Duke Energy has reviewed the changes published in the 2004 Edition and believes that there are no new requirements that, in addition to the requirements of the proposed alternative, need to be -implemented to maintain an acceptable level of quality and safety. This is supported by the fact that when 10 CFR 50.55a was revised to incorporate by reference the 2004 Edition, the regulation did not impose any new limitations or modifications applicable to the 2004 Edition on plants using the 1998 Edition with the 2000 Addenda.
4.4. All other ASME Code,Section XI requirements for which relief was not specifically requested and approved in this relief request remain applicable, including third-party review by the Authorized Nuclear Inservice Inspector.
4.5. For the reasons stated above, Duke Energy believes that the proposed alternative provides an acceptable level of quality and safety.
- 5. Duration of Proposed Alternative Use of the proposed alternative is requested for the duration of the first period of the McGuire Unit 1 fourth ISI interval (currently scheduled to start on December 1, 2011).
Duke Energy Carolinas, LLC Relief Request #10-MN-001 Page 4 of 4
- 6. Related Industry Relief Requests 6.1. Entergy Operations, Inc., Arkansas Nuclear One Unit 2 Request for Relief No. ANO2-ISI-003, submitted June 8, 2009 (ML091600248), approved April 26, 2010 (ML100970659).
6.2. Luminant Generation Company LLC, Comanche Peak Nuclear Power Plant Unit 1 Request to Delay the Update of the Code of Record for Inservice Inspection Program, submitted July 14, 2009 (ML092030380), approved April 28, 2010 (ML100850122).