RA-22-0178, End of Cycle 28 (M1R28) Inservice Inspection Summary Report

From kanterella
Jump to navigation Jump to search
End of Cycle 28 (M1R28) Inservice Inspection Summary Report
ML22220A255
Person / Time
Site: McGuire Duke energy icon.png
Issue date: 08/08/2022
From: Bare B
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RA-22-0178
Download: ML22220A255 (7)


Text

Brent Bare Plant Manager McGuire Nuclear Station Duke Energy MG01OP l 12700 Hagers Ferry Road Huntersville, NC 28078 o: 980.875.4111 Brent.Bare@duke-energy.com Serial: RA-22-0178 10 CFR 50.55a August 8,2022 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 MCGUIRE NUCLEAR STATION, UNIT NO.1 DOCKET NO. 50-369 / RENEWED LICENSE NUMBER NPF-9

SUBJECT:

McGuire Nuclear Station Unit 1, End of Cycle 28 (M1 R28) lnservice Inspection Summary Report Pursuant to the reporting requirements of American Society of Mechanical Engineers (ASME)

Section XI, as amended by ASME Code Case N-532-5, Duke Energy Carolinas, LLC (Duke Energy) hereby submits the lnservice Inspection Summary Report for the McGuire Unit 1 outage M1R28.

This submittal contains no regulatory commitments.

Should you have any questions concerning this letter,or require additional information, please contact Ryan Treadway - Director, Fleet Licensing, at (980) 373-5873.

Sincerely, Brent Bare Plant Manager McGuire Nuclear Station

Enclosure:

1. lnservice Inspection Summary Report Unit 1 McGuire Spring 2022 Refueling Outage M1R28

U.S. Nuclear Regulatory Commission Page 2 Serial: RA-22-0178 cc: (with enclosure)

J. Klos, NRC Project Manager, NRR L. Dudes, NRC Regional Administrator, Region II A. Hutto, NRC Senior Resident Inspector

U.S. Nuclear Regulatory Commission Serial: RA-22-0178 RA-22-0178 Enclosure 1 Inservice Inspection Summary Report Unit 1 McGuire Spring 2022 Refueling Outage M1R28 (5 pages including cover)

CASE N-532-5 FORM OAR-1 OWNERS ACTIVITY REPORT Report Number Owners Activity Report for Refueling Outage M1R28 Plant McGuire Nuclear Station, 12700 Hagers Ferry Rd, Huntersville, NC 28078-9340 Unit No. 1 Commercial service date 12/01/1981 Refueling outage no. M1R28 (if applicable)

Current inspection interval ISI - 5th, Containment - 3rd (1st, 2nd, 3rd, 4th, other)

Current inspection period ISI - 1st, Containment - 3rd (1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the inspection plans 2007 edition with 2008 addenda 2017 edition (see attachment)

Date and revision of inspection plans See attachment Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans Same as inspection plans Code Cases used The following Code Cases are permitted by the ISI Plan: N-513-4, N-526, N-532-5, N-586-1, N-600, N-613-2, for inspection and N-639, N-643-2, N-648-2, N-651, N-705, N-706-1, N-711-1, N-712, N-716-1, N-722-1, N-729-6, N-735, N-747, evaluation: N-765, N-770-5, N-771, N-776, N-778, N-786-1, N-798, N-800, N-823-1, N-825, and N-845.

(if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of M1R28 conform to the requirements of Section XI.

(refueling outage number)

Digitally signed by JMB9947 (107526)

Date: 2022.07.12 15:13:49 -04'00' Signed Date Jim Boughman, ISI Program Owner CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Bureau Veritas Inspection and Insurance Company of Lynn, MA have inspected the items described in this Owners Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. JFSwan (245816)

Jerome F Swan 2022.07.13 11:16:01 ANIIS Bureau Veritas

-04'00' Commissions NB 11473, I, N, NS, NSI, R Inspectors Signature National Board, State, Province, and Endorsements Date 7-13-2022 Page 2 of 5

CASE N-532-5 ATTACHMENT McGuire Unit 1 End of Cycle 28 Inservice Inspection Report The McGuire Nuclear Station Unit 1 Fifth Ten Year Inservice Inspection (ISI) Plan complies with 10CFR50.55a(g), which implements, by reference, the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, 2007 Edition with 2008 Addenda.

Per RIS 2004-12, Letter RA-21-0152, NRC Accession Number ML21182A028 and approval NRC Accession Number ML21306A159, the NRC staff concluded that the use of paragraphs IWA-2318, IWA-4340, IWA-4540(b), IWA-5120, IWA-5213, IWA-5241, IWA-5242, and IWA-5250 of the 2017 Edition of the ASME B&PV Code,Section XI, is acceptable for McGuire Unit 1.

This summary report is being submitted pursuant to the reporting requirements of ASME Section XI, IWA-6000 as amended by ASME Code Case N-532-5, Repair/Replacement Activity Documentation Requirements and Inservice Inspection Summary Report Preparation and Submission Section XI, Division 1.

Contained within this summary report are the form OAR-1 (Owners Activity Report) and Tables 1 and 2 of Code Case N-532-5 for McGuire Nuclear Station Unit 1 during cycle 28 and Refueling Outage 28 (M1R28). M1R28 is the first refueling outage of the first ISI period in the fifth inspection interval. M1R28 is the first refueling outage of the third Containment period in the third inspection interval. This report includes all ISI activities from October 20, 2020 through May 9, 2022, cycle 28.

During M1R28, Visual Examinations VT-1 and VT-3 were successfully conducted on valve 1NI-175 to fulfill the scope expansion requirements in ASME Section XI, IWB-2430 for the fourth 10-year interval. Reference NCR 2275082.

Date and Revision of Inservice Inspection Plans used during M1R28:

Fourth Interval Inservice Inspection Plan The following document comprises the McGuire Nuclear Station 4th Interval Inservice Inspection Plan for Unit 1 (Class 1, 2, and 3 Components):

Fourth Interval Inservice Inspection Plan - McGuire Nuclear Station Units 1 and Unit 2, Document MISI-1462.10-0040-ISIPLAN, Rev 2, dated 03/10/2022.

Fourth Ten-Year Interval Inservice Inspection Schedule McGuire Nuclear Station Unit 1, Document MISI-1462.10-0040-Unit 1 Schedule, Rev. 2, dated 03/10/2022.

Fifth Interval Inservice Inspection Plan The following document comprises the McGuire Nuclear Station 5th Interval Inservice Inspection Plan for Unit 1 (Class 1, 2, and 3 Components):

Fifth Interval Inservice Inspection Plan - McGuire Nuclear Station Unit 1, Document MISI-1462.10-0050-ISIPLAN, Rev 1, approval date of 11/8/2021.

Fifth Ten-Year Interval Inservice Inspection Schedule McGuire Nuclear Station Unit 1, Document MISI-1462.10-0050-Unit 1 Schedule, Rev. 0, dated 09/03/2021.

Page 3 of 5

CASE N-532-5 Fifth Interval Pressure Test Plan The following document comprises the McGuire Nuclear Station 5th Interval Pressure Test Plan for Unit 1:

McGuire Nuclear Station Fifth Inspection Interval Inservice Inspection Pressure Test Plan, Document MISI-1462.20-0050-PTPLAN, Rev 0, dated 09/14/2021.

Containment Inservice Inspection Plan The following document comprises the McGuire Nuclear Station 3rd Interval Containment Inservice Inspection Plan for Unit 1 (Class MC):

McGuire Nuclear Station - Third Interval Containment Inservice Inspection Plan -

Containment - Units 1 & 2, Document #MC-ISIC3-1042-0001, Rev. 9, dated 10/19/2021.

Augmented ISI Plan The following document comprises the McGuire Nuclear Station 5th Interval Augmented Inservice Inspection Plan and Schedule for Unit 1:

McGuire Nuclear Station - Fifth Interval Augmented Inservice Inspection Plan and Schedule, Document MISI-1462.10-0050-AUGISI, Rev. 0, dated 10/12/2021.

Page 4 of 5

CASE N-532-5 McGuire Nuclear Unit 1 Form OAR-1 Owners Activity Report Table 1 Items with Flaws or Relevant Conditions that Required Evaluation for Continued Service Examination Category and Item Item Description Evaluation Description Number Relevant Condition evaluated for Corrective Relevant Conditions discovered on valves 1ND-99, C-H / C7.10 Action per IWA-5251 and Accepted by IWB-1ND-102, and 1FW-27A 3142.3, Corrective Measures. NCR 2422405 Missing washers on 1-PENE-E252 (M1-00607) and 1- Relevant Condition evaluated and Accepted by E-G / E8.10 PENE-E310 (M1-00631) Engineering per IWE-3122.3 - NCR 2423911 Bent rod on spring can support 1MCR-NV-1292 (Sum # Relevant Condition evaluated and Accepted by F-A / F1.10 M1-05710) Engineering per IWF-3122.3 - NCR 2423256 Table 2 Abstract of Repair/Replacement Activities Required for Continued Service Code Repair / Replacement Item Description Description of Work Date Completed Class Plan Number Plugged (2) tubes via rolled 1NCSG0006 - 1B Steam Work Order #

1 plug and full-length wire rope 4/18/2022 Generator 20476905-15 stabilizer Page 5 of 5