Fourth Inspection Interval Inservice Inspection Pressure Test Plan
ML11362A079
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 12/15/2011
From: Repko R
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML11362A079 (34)


Text

REGIS T. REPKO kDuke Vice President OEnergy McGuire Nuclear Station Duke Energy MG01VP / 12700 Hagers Ferry Rd.

Huntersville, NC 28078 980-875-4111 980-875-4809 fax regis.repko@duke-energy.com December 15, 2011 10 CFR 50.55a U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Duke Energy Carolinas, LLC (Duke Energy)

McGuire Nuclear Station, Units 1 and 2 Docket Number 50-369 and 50-370 Fourth Inspection Interval Inservice Inspection Pressure Test Plan Pursuant to 10 CFR 50.55a(g)(4)(ii), attached is Revision 0 of the Fourth Inspection Interval Inservice Inspection Pressure Test Plan for McGuire Nuclear Station Units 1 and 2. Section 2 of this plan lists the pressure test requirements for McGuire Unit 1. Section 3 of this plan will be updated by the start of the fourth interval for Unit 2 to include the pressure test requirements for McGuire Unit 2.

If you have any questions or require additional information, please contact P. T. Vu at (980) 875-4302.

Sincerely, Regis T. Repko Attachment 46c4r(

www. duke-energy.corn

U. S. Nuclear Regulatory Commission December 15, 2011 Page 2 xc:

V. M. McCree, Region II Administrator U. S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 J. H. Thompson, Project Manager U. S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8G9A Rockville, MD 20852-2738 J. Zeiler NRC Senior Resident Inspector McGuire Nuclear Station

ATTACHMENT Duke Energy McGuire Nuclear Station FOURTH INSPECTION INTERVAL INSERVICE INSPECTION PRESSURE TEST PLAN Revision 0 Owner: Duke Energy Corporation 526 South Church St.

Mail Code EC05ZB Charlotte, N. C. 28201-1006 Plant Location: 12700 Hagers Ferry Road Huntersville, North Carolina 28078-9340 Document Index Number: MISI-1462.20-0040 - PTPLAN Prepared By: Date lo/5/I Reviewed By: Date , '

Approved By:

Aý424' C-,

Date Duke Energy Corporation McGuire Nuclear Station J.M. Boughman Fourth Interval Inservice Inspection Pressure Test Plan (704) 382-5112 Document Index Number: MISI-1462.20-0040 - PTPLAN Jim.Boughman@duke-energy.com

APPLICABILITY For the 3 rd 10-year interval, McGuire Unit 1 and McGuire Unit 2 were separate Pressure Test Plans. Starting with the 4 th 10-year interval, both Unit 1 and Unit 2 will be included in the same Pressure Test Plan but as separate sections withing the plan.

Because Unit I and Unit 2 have different Commercial Start Dates, Revision 0 of this plan only applies to the 4"h 10-Year Pressure Test Plan for McGuire Unit 1. The 4"h 10-Year Pressure Test Plan for McGuire Unit 2 will be included in a future revision of this document in close proximity to 30 years after the Unit 2 Commercial Start Date. Section 3.0 in this plan is currently a place holder for the 4 di 10-year interval for Unit 2 and the details will be added during a future revision of this plan.

The current Pressure Test Plan for McGuire Unit 2 (3rd 10-Year Pressure Test Plan - Document Index Number MISI-1462.20-0030 - U2PTPLAN) is located in NEDL and contains the curent Pressure Test requirements for McGuire Unit 2.

Duke Energy Corporation McGuire Nuclear Station Revision 0 Fourth Interval Inservice Inspection Pressure Test Plan Applicability Document Index Number: MISI-1462.20-0040 - PTPLAN Page 1 of 30

SUMMARY

OF CHANGES SECTION DESCRIPTION N/A Original Issue of the 4th Interval Plan for McGuire Unit I.

Duke Energy Corporation McGuire Nuclear Station Revision 0 Fourth Interval Inservice Inspection Pressure Test Plan Summary of Changes Document Index Number: MISI- 1462.20:-0040 - PTPLAN Page 2 of 30

TABLE OF CONTENTS SECTION TITLE 1.0 General Requirements 1.1 Applicable Codes, Standards, and Regulatory Guides used for Inservice Inspection Pressure Testing 1.2 Inspection Methods and Procedures Used for Inservice Inspection Pressure Testing 1.3 Description of Inservice Inspection Pressure Testing Plan for ISI Class A Items 1.4 Description of Inservice Inspection Pressure Testing Plan for ISI Class B Items 1.5 Description of Inservice Inspection Pressure Testing Plan for ISI Class C Items 1.6 System Boundaries Subject to Examination 1.7 Components Exempt / Excluded From Pressure Test Examination 1.8 Description of Examination Schedules 1.9 Requests for Relief from ASME Code Requirements (RR) and Requests to use Regulatory Issue Summaries (RIS) 1.10 Buried Components 1.11 Flow Chart for Determining Hold Times for ISI Classes 1, 2, & 3 Pressure Testing 2.0 Pressure Test Requirements Specific to McGuire Unit 1 2.1 McGuire Unit I - Examination Zone Discription 2.2 McGuire Unit 1 - System, Boundary Drawing, and ISI Classification Listing 2.3 McGuire Unit I - 4th 10-Year Interval Pressure Testing Examination Zone Listing 3.0 Pressure Test Requirements Specific to McGuire Unit 2 3.1 McGuire Unit 2 - Examination Zone Discription 3.2 McGuire Unit 2 - System, Boundary Drawing, and ISI Classification Listing 3.3 McGuire Unit 2 - 4" 10-Year Interval Pressure Testing Examination Zone Listing Duke Energy Corporation McGuire Nuclear Station Revision 0 Fourth Interval Inservice Inspection Pressure Test Plan Table of Contents Document Index Number: MISI-1462.20-0040 - PTPLAN Page 3 of 30

1.0 General Requirements 1.1 Applicable Codes, Standards, and Regulatory Guides used for Inservice Inspection Pressure Testing The purpose of system pressure testing is to assure leakage integrity of systems and components that support a nuclear safety related function.

This document provides the Pressure Testing requirements per the American Society of Mechanical Engineers (ASME), Boiler and Pressure Vessel Code,Section XI, as mandated by Title 10, Code of Federal Regulations, Part 50 (10CFR50), Article 55a, "Codes and Standards" for the Inservice Inspection (ISI) of systems and components that are classified as ASME Code Class 1, 2, and 3.

Every 120 months, the Pressure Test plan must be updated to comply with the requirements of the latest edition and addenda of the Section XI Code endorsed by the Nuclear Regulatory Commission (NRC) 12 months before the start of the 120-month inspection interval.

This document constitutes the inservice inspection pressure testing plan and schedules for the fourth inspection interval for McGuire Units 1 & 2. All pressure retaining components classified as Class A, B, and C have been reviewed to determine the inservice inspection pressure test examination requirements. Unless otherwise noted, systems designated as Class A are equivalent to ASME Class 1, those designated as Class B are equivalent to ASME Class 2, and those designated as Class C are equivalent to ASME Class 3.

All Inservice Inspection pressure testing activities for McGuire Unit I - 10t Period shall be performed in accordance with Program B of the 1998 Edition of ASME Section XI with the 2000 Addenda. Reference Relief Request I0-MN-001, Section 3.2 regarding Code Edition applicability for Periods 2 and 3.

McGuire Unit 2 will be added to the fourth inspection interval plan at a later date. See Applicability on page 1.

1.1.1 Title 10, Code of Federal Regulations, Part 50.55a (I0CFR50.55a)

(10CFR50.55a)(b)(2)(xx)(A) System Leakage Tests - When performing system leakage tests in accordance with IWA-5213(a), 1997 through 2002 Addenda, the licensee shall maintain a 10-minute hold time after test pressure has been reached for Class 2 and Class 3 components that are not in use during normal operating conditions. No hold time is required for the remaining Class 2 and Class 3 components provided that the system has been in operation for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for insulated components or 10 minutes for uninsulated components".

(10CFR50.55a)(b)(2)(xxvii) Removal of insulation - When performing visual examination in accordance with IWA-5242 of Section XI of the ASME B&PV Code, 2003 Addenda through the 2006 Addenda, or IWA-5241 of the 2007 Edition through the latest edition and addenda incorporated in paragraph (b)(2) of this section, insulation must be removed from 17-4 PH or 410 stainless steel studs or bolts aged at a temperature below 1100 'F or having a Rockwell Method C hardness value above 30, and from A-286 stainless steel studs or bolts preloaded to 100,000 pounds per square inch or higher.

(10CFR50.55a)(b)(5) In-service Inspection Code cases - Licensees may apply the ASME Boiler and Pressure Vessel Code cases listed in the latest NRC endorsed Regulatory Guide 1.147 without prior NRC approval, subject to the following:

(10CFR50.55a)(b)(5)(i) When a licensee initially applies a listed Code case, the licensee shall apply the most recent version of that Code case incorporated by reference in this paragraph.

(10CFR50.55a)(b)(5)(ii) If a licensee has previously applied a Code case and a later version of the Code case is incorporated by reference in this paragraph, the licensee may continue to apply, to the end of the current 120-month interval, the previous version of the Code case as authorized or may apply the later version of the Code case, including any NRC-specified conditions placed on its use.

(IOCFR50.55a)(b)(5)(iii) Application of an annulled Code case is prohibited unless a licensee previously applied the listed Code case prior to it being listed as annulled in Regulatory Guide Duke Energy Corporation McGuire Nuclear Station Section 1 Fourth Interval Inservice Inspection Pressure Test Plan Revision 0 Document Index Number: MISI-1462.20-0040 - PTPLAN Page 4 of 30

1.147. Any Code case listed as annulled in any Revision of Regulatory Guide 1.147 which a licensee has applied prior to it being listed as annulled, may continue to be applied by that licensee to the end of the 120-month interval in which the Code case was implemented.

1.1.2 If leakage is detected in the Regenerative Heat Exchangers or in either of the Residual Heat Removal Heat Exchanger (Shells 1, 2, or 3) during Pressure Testing and VT-2 examinations, the McGuire ISI -

NDE Plan manager shall be notified of the leakage so that an evaluation can be performed to determine the continued use of Code Case N-706.

1.1.3 Table 1 shows the Code Case numbers that may be used as alternatives to the Section XI Pressure Testing requirements for McGuire's 4h Interval.

Table 1 - Code Cases Aooroved For Use Case Case Title Applicability NRC Conditions for Use of Code Case No. (as stated in Regulatory Guide 1.147 revision 16)

N-533-1 Alternative From the 1989 Edition Prior to conducting the VT-2 examination of Requirements for VT- up to and including the Class 2 and Class 3 components not required 2 Visual Examination 1998 Edition with the to operate during normal plant operation, a 10 of Class 1, 2, and 3 2000 Addenda minute holding time is required after attaining Insulated Pressure- test pressure. Prior to conducting the VT-2 Retaining Bolted examination of Class 2 and Class 3 Connections components required to operate during normal plant operation, no holding time is required, provided the system has been in operation for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for insulated components or 10 minutes for non-insulated components.

N-566-2 Corrective Action for From the 1983 Edition Unconditional Leakage Identified at with the Winter 1984 Bolted Connections Addenda up to and including the 2004 Edition with the 2006 Addenda N-616 Alternative From the 1983 Edition (1) Insulation must be removed for VT-2 Requirements for VT- with the Winter 1984 examination during the system pressure test 2 Visual Examination Addenda up to and for any 17-4 PH stainless steel of 410 of Classes 1, 2, 3 including the 2001 stainless steel stud or bolt aged at a Insulated Pressure Edition with the 2002 temperature below II 00°F or with hardness Retaining Bolted Addenda above Rc 30.

Connections (2) For A-286 stainless steel studs or bolts, the preload must be verified to be below 100 Ksi or the thermal insulation must be removed and the joint visually examined.

(3) Prior to conducting the VT-2 examination of Class 2 and Class 3 components not required to operate during normal plant operation, a 10 minute holding time is required after attaining test pressure. Prior to conducting the VT-2 examination of Class 2 and Class 3 components required to operate during normal plant operation, no holding time is required, provided the system has been in operation for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for insulated components or 10 minutes for non-insulated components N-686-1 Alternative From the 1989 Edition Unconditional Requirements for with the 1990 Addenda Visual Examinations, up to and including the VT-I, VT-2, and VT-3 2004 Edition Duke Energy Corporation McGuire Nuclear Station Section 1 Fourth Interval Inservice Inspection Pressure Test Plan Revision 0 Document Index Number: MISI-1462.20-0040 - PTPLAN Page 5 of 30

N-731 Alternative Class I From the 1989 Edition Unconditional System Leakage Test up to and including the Pressure Requirements 2007 Edition with the 2008 Addenda When the alternatives listed in a Code Case are used for a pressure testing zone, the Code Case number shall be documented in the Pressure Test Database Management System.

1.2 Inspection Methods and Procedures to be Used for Inservice Inspection Pressure Testing VT-2 visual examinations shall be conducted to locate evidence of leakage from pressure retaining components during the conduct of a system pressure test, except for buried components. Section 1.10 contains additional information for pressure testing buried components.

Pressure testing and associated VT-2 visual examinations shall be performed using the latest revision of procedure NDE-68 "Inservice Inspection (ISI) Visual Examination, VT-2, Pressure Test".

Buried portions of the Nuclear Service Water (RN) system shall receive an unimpaired flow test to satisfy the IWA-5244 requirements. Refer to Section 1.10 for additional information.

The following Duke Energy procedures and directives shall be used to control pressure testing inservice inspection activities, Inservice Inspection Pressure Testing Plans, Pressure Test Database Management System, and Inservice Inspection Pressure Test Reports:

Procedure No:

Title:

MP/O/A/7650/076 Controlling Procedure For System Pressure Testing Of ASME Piping Systems PT/ 1(2)/A/4403/007(8) RN Flow Balance Tests PT/1 (2)/A/4350/017A(B) D/G Fuel Oil Transfer Pump Performance Test NDE-68 NDE Procedures Manual - Volume 1 - VT-2, Visual Examination for Leakage and Boric Acid Corrosion Control NDE-94 NDE Program Manual - Volume 1 - NDE-94 Evaluation of Indications and Relevant Conditions Detected by Nondestructive Examination and System Pressure Testing NSD-300 ASME Section XI Program NSD-701 Records Management NSD-702 Document Control NSD-800 Software and Data Quality Assurance (SDQA) Program ASME FAM, Appendix E Control of Preservice and Inservice Inspection Activities ASME FAM, Appendix G Preparation and Distribution of Inservice Inspection Reports ASME FAM, Appendix H Preparation and Implementation of the Inservice Inspection Pressure Testing Plans ASME FAM, Appendix J ISI Pressure Testing Process Duke Energy Corporation McGuire Nuclear Station Section 1 Fourth Interval Inservice Inspection Pressure Test Plan Revision 0 Document Index Number: MISI-1462.20-0040 - PTPLAN Page 6 of 30

1.3 Description of Inservice Inspection Pressure Testing Plan for ISI Class A Items Pressure testing ISI Class A systems shall be performed in accordance with the requirements of Articles IWA-5000, lWB-2000, and IWB-5000 of Section XI. ISI Class A systems that are required to be pressure tested shall be divided into isolable areas (to the extent practical). These isolated areas represent specific pressure test examination zones' Examination Catezories and Requirements:

The examination categories and item numbers shall be those listed in Table IWB-2500-1 of Section XI. Each examination zone may include variousSection XI categories and item numbers.

Category B-P, All Pressure Retaining Components The Class A System Leakage Test (IWB-5220) is conducted at a pressure not less than the pressure corresponding to 100% rated reactor power. The test pressure and temperature shall be attained at a rate in accordance with the heat-up limitations specified for the system. The Class A system leakage test is required prior to plant startup following each reactor refueling outage.

The pressure-retaining boundary for the Class A system leakage test conducted each refueling outage [IWB-5222(a)] shall be performed with all valves in the position required for normal reactor operation startup. The VT-2 examination shall, however, extend to and include the second closed valve at the boundary extemity (non-pressurized area). At or near the end of each inspection interval, the Class A pressure-retaining boundary which is not pressurized when the system valves are in the position required for normal reactor startup [IWB-5222(b)]

shall be pressurized and VT-2 examined. The IWB-5222(b) test is required only once during a ten-year interval.

Table 2 shows the ASME Class A, Category B-P, Item Numbers and Parts To Be Examined (applicable to Unit I - 1st Period only).

Table 2 - ASME Class A Items To Be Examined IWB-2500-1 Item Parts To Be Examined Comments B 15.10 Reactor Vessel - Pressure Retaining Boundary B 15.20 Pressurizer - Pressure Retaining Boundary B 15.30 Steam Generators - Pressure Retaining Boundary B 15.40 Heat Exchangers - Pressure Retaining Boundary B15.50 Piping - Pressure Retaining Boundary B 15.60 Pumps - Pressure Retaining Boundary B 15.70 Valves - Pressure Retaining Boundary Duke Energy Corporation McGuire Nuclear Station Section I Fourth Interval Inservice Inspection Pressure Test Plan Revision 0 Document Index Number: MISI-1462.20-0040 - PTPLAN - Page 7 of 30

Table 3 shows the ASME Class A, Category B-P, Item Numbers and Parts To Be Examined (applicable to Unit I - Periods 2 and 3).

Table 3 - ASME Class A Items To Be Examined IWB-2500-1 Item Parts To Be Examined Comments B 15.10 Pressure Retaining Components [IWB-5222(a)]

B 15.20 Pressure Retaining Components [IWB-5222(b)]

1.4 Description of Inservice Inspection Pressure Testing Plan for ISI Class B Items Pressure testing ISI Class B systems shall be performed in accordance with the requirements of Articles IWA-5000, IWC-2000, and IWC-5000 of Section XI. ISI Class B systems that are required to be pressure tested shall be divided into isolable areas (to the extent practical). These isolated areas represent specific pressure test examination zones.

Examination Categoriesand Requirements:

The examination categories and item numbers shall be those listed in Table IWC-2500-1 of Section XI. Each examination zone may include variousSection XI categories and item numbers.

Category C-B, Pressure Retaining Nozzle Welds In Vessels When nozzle-to-shell (or head) welds (to be examined by NDE methods) are inaccessible due to reinforcing plates on exterior of vessel, the telltale hole in the reinforcing plates shall receive a VT-2 visual examination for evidence of leakage while the vessel is undergoing the System Leakage Test as required by Category C-H.

Table 4 shows the Class B, Category C-B, Item Numbers and Parts To Be Examined. The information shown in Table 4 is the same for Periods 1, 2, and 3 of Units 1 and 2.

Table 4 - ASME Class B Items To Be Examined IWC-2500-1 Item Parts To Be Examined Comments C2.30 Nozzles With Reinforcing Plate in Vessels > 1/2 in. Nominal Thickness C2.33 Nozzle-to-Shell (Nozzle to Head or The VT-2 may be conducted without the Nozzle to Nozzle) Welds When Inside removal of insulation.

of Vessel is Inaccessible Duke Energy Corporation McGuire Nuclear Station Section I Fourth Interval Inservice Inspection Pressure Test Plan Revision 0 Document Index Number: MISI-1462.20-0040 - PTPLAN Page 8 of 30

Category C-H, All Pressure Retaining Components The Class B System Leakage Test (IWC-5220) is conducted at the system pressure obtained while the system, or portion of the system, is in service performing its normal operating function or at the system pressure developed during a test conducted to verify system operability. The Class B leakage test is required once in each inspection period. Table 5 shows the ASME Class B, Category C-H, Item Number and Parts To Be Examined.

Table 5 - ASME Class B Items To Be Examined IWC-2500-1 Item Parts To Be Examined Comments C7.10 Pressure Retaining Components Item Number is the same for Periods 1, 2, and 3 1.5 Description of Inservice Inspection Pressure Testing Plan for ISl Class C Items Pressure testing ISI Class C systems shall be performed in accordance with the requirements of Articles IWA-5000, IWD-2000, and IWD-5000 of Section XI. iSI Class C systems that are required to be pressure tested shall be divided into isolable areas (to the extent practical). These isolated areas represent specific pressure test examination zones.

Examination Categoriesand Requirements:

The examination categories and item numbers shall be those listed in Table IWD-2500-1 of Section XI. Each examination zone may include variousSection XI categories and item numbers.

Category D-B, All Pressure Retaining Components The Class C System Leakage Test (IWD-5220) is conducted at the system pressure obtained while the system, or portion of the system, is in service performing its normal operating function or at the system pressure developed during a test conducted to verify system operability. The Class C leakage test is required once in each inspection period. Table 6 shows the ASME Class C, Category D-B, Item Numbers and Parts To Be Examined (applicable to Unit 1 - Is"Period only).

Table 6 - ASME Class C Items To Be Examined IWD-2500-1 Item Parts To Be Examined Comments D2.10 Pressure Retaining Components D2.20 Pressure Retaining Components This Item Number is for a hydrostatic test although no hydrostatic test is required. See Relief Request 0 1-002.

Duke Energy Corporation McGuire Nuclear Station Section 1 Fourth Interval Inservice Inspection Pressure Test Plan Revision 0 Document Index Number: MISI1462.20=0040 - PTPLAN Page 9 of 30

Table 7 shows the ASME Class C, Category D-B, Item Numbers and Parts To Be Examined (applicable to Periods 2 and 3).

Table 7 - ASME Class C Items To Be Examined IWD-2500-1 Item Parts To Be Examined Comments D2. 10 Pressure Retaining Components 1.6 System Boundaries Subject to Examination Unless otherwise noted, systems designated as ISI Class A are equivalent to ASME Class 1, those designated as ISI Class B are equivalent to ASME Class 2, and those designated as ISI Class C are equivalent to ASME Class 3.

The following color codes, shown on electronic pressure testing boundary drawings, are used to represent pressure test examination boundaries:

Red = ISI Class A Yellow = ISI Class B Green = ISI Class C Blue = Components exempt from pressure testing requirements Magenta = Boundary line showing the extremities of pressure testing examination zones Black = Non ISI Class components Instrumentation tubing is subject to the requirements of pressure testing. Instrumentation details are shown on typical detail drawings and the tap locations are shown on flow diagrams. All instrumentation taps within the examination boundary shall be examined up to the first isolation valve off the process pipe although not explicitly shown as a color-coded component on the boundary drawing.

Pressure test examination boundaries are defined on drawings located in Nuclear Electronic Document Library (NEDL). Section 2.2 of this plan contains a listing of the McGuire Unit 1 Pressure Testing Boundary drawings required for the 4th 10-year interval. A later revision of Section 3.2 of this plan will contain a listing of the McGuire Unit 2 Pressure Testing Boundary drawings required for the 4tb I 0-year interval.

1.7 Components Exempt / Excluded From Pressure Test Examination Exemptions and exclusions with supporting references are shown on individual boundary drawings. Additional exemption/exclusion information can be found in the McGuire Pressure Testing Basis Document.

1.8 Description of Examination Schedules All system pressure testing is completed in accordance with the schedule shown in the ASME Section XI Tables for each examination category. The examination periods are derived from "Program B" of the Section XI Code.

ASME Section XI requires the Class A Leakage Test zones to be completed each refueling outage before the unit is returned to service.

ISI Class B and ISI Class C Leakage Test zones are required each Inspection Period. These zones will not be scheduled for specific refueling outages and may be performed at any time during each Inspection Period.

Duke Energy Corporation McGuire Nuclear Station Section I Fourth Interval Inservice Inspection Pressure Test Plan Revision 0 Document Index Number: MISI-1462-.20-0040 - PTPLAN Page 10 of 30

1.9 Requests for Relief from ASME Code Requirements (RR) and Requests to use Regulatory Issue Summaries (RIS)

Relief Requests regarding requirements of the Section XI Code specified in this Plan shall be administered per the ASME FAM.

Table 8 is a listing of the Relief Requests for use at McGuire. Unless specified differently in the comments, the Relief Request applies to both units.

Table 8 - Relief Requests Serial Date RFR Date SER Number Description Submitted Approved Comments01-002 Request to use corrected ASME Code 7/23/01 12/10/01 For McGuire Unit 1, 1' Period Only Revision I requirement for Class 3 pressure tests.

09-GO-001 Request to use alternative test for 2/24/09 2/18/10 For McGuire Unit 1, 1*'Period Only buried components.

10-MN-001 Delay updating the ASME Section XI 8/30/10 3/3/11 For McGuire Unit 1, 1*'Period Only Code of Record for the McGuire Unit I Fourth Inservice Inspection Interval 1.10 Buried Components Unless otherwise specified (i.e., deviation cited in a Relief Request), pressure testing for ISI classified buried components will be performed in accordance with ASME Section XI, IWA-5244.

McGuire submitted Relief Request, serial number 09-GO-00 1, to use an alternative to the IWA-5244 requirements for buried components associated with the RN system. The Relief Request states that an unimpaired flow test and a VT-2 examination of the ground surface (above the components buried in soil) will be performed each Inspection Period. Because of the common header between the units, the examination zones are part of the Unit 1 plan.

Nuclear Service Water (RN) - An acceptable RN Flow Balance Test conducted per procedures PT/l(2)/A/4403/007(8) is adequate for the unimpaired flow test cited in Relief Request 09-GO-001 and cited in Section XI, IWA-5244(b)(2).

Diesel Generator Fuel Oil (FD) - An acceptable D/G Fuel Oil Transfer Pump Performance Test conducted per procedures PT/1(2)/A/4350/017A(B) is adequate for the unimpaired flow test cited in Section XI, IWA-5244(b)(2).

Duke Energy Corporation McGuire Nuclear Station Section 1 Fourth Interval Inservice Inspection Pressure Test Plan Revision 0 Document Index Number: MISI-1462.20-0040 - PTPLAN Page 11 of 30

1.11 Flow Chart for Determining Hold Times for ISI Classes 1, 2, & 3 Pressure Testing Duke Energy Corporation McGuire Nuclear Station Section 1 Fourth Interval Inservice Inspection Pressure Test Plan Revision 0 Document Index Number: MISI- 1462.20-0040 - PTPLAN Page 12 of 30

1 2.0 Pressure Test Requirements Specific to McGuire Unit 1 Unit 1 Commercial Service Date: December 1, 1981 Unit 1 Fourth Interval Start Date: December 1,2011 Start Date End Date 12/01/2011 12/01/2014 12/01/2018 12/01/2021 1st Period 2nd Period 3rd Period Refueling Outage I Refueling Outage 3 Refueling Outage 5 (EOC 22) (EOC 24) (EOC 26)

Refueling Outage 2 Refueling Outage 4 Refueling Outage 6 (EOC 23) (EOC 25) (EOC 27)

Duke Energy Corporation McGuire Nuclear Station Section 2 Fourth Interval Inservice Inspection Pressure Test Plan Revision 0 Document Index Number: MISI-1462.20-0030 - PTPLAN Page 13 of 30

2.1 McGuire Unit 1 - Examination Zone Discription The Examination Zone number for each pressure test represents an area of a system that shall receive a VT-2 visual examination. An Examination Zone terminates at boundary valves, building interfaces, component interfaces, or class breaks and may include several "subtests" based on conditional valve alignements, pump test configurations, or surveillance test configurations. The Examination Zone includes all pressure retaining components required to receive a VT-2 visual examination while the system is under pressure. Only the Red, Yellow, or Green color-coded portion of a zone shown on pressure test boundary drawings require a VT-2 visual examination. See Section 1.6 for additional information regarding boundary drawing color-coding.

All McGuire Unit I Examination Zone numbers have the same format. The following example is for an ISI Class A Leakage Test zone:

1NC-070L-A

-Class A, B, or C

- (L) = Leakage Test Sequential Number 001-9, 99 System Being Examined (1) = Unit 1 Duke Energy Corporation McGuire Nuclear Station Section 2 Fourth Interval Inservice Inspection Pressure Test Plan Revision 0 Document Index Number. MISI-1462.20.0030 - PTPLAN Page 14 of 30

2.2 McGuire Unit 1 - System, Boundary Drawing, and ISI Classification Listing The pressure testing examination boundaries (zones) are identified on color coded drawings (modified system flow diagrams) and stored in the Nuclear Electronic Document Library (NEDL). NIS-2 forms and "As Built" system flow diagram revisions are reviewed to see if any changes are needed to the pressure testing boundary drawings. The "As Built" flow diagram revisions are incorporated into the Inservice Inspection pressure testing boundary drawings as necessary. Some flow diagram revisions do not affect the pressure testing boundaries; therefore, the pressure testing boundary drawings are not required to be revised. For this reason, there may be a difference between the numeric revision level listed on the flow diagram versus the revision level of the flow diagram referenced on the pressure testing boundary drawing. "As Built" flow diagram revisions are published subsequent to modifications that are made to a system. The timeliness of these "As Built" flow diagram revisions are not on a regulated schedule; therefore, subsequent boundary drawing revisions cannot be performed on a regulated schedule. The latest revision of the pressure testing boundary drawing can be retrieved from NEDL.

Table 9 is a listing of ISI Pressure Testing Boundary Drawings that contain ASME Class A, B, or C components. Each drawing has been reviewed for applicable pressure testing requirements, exemptions, and exclusions for McGuire Unit 1. See notes on individual boundary drawings for specific exemptions/exclusions and the justification for the exemption/exclusion. The ISI Class A, B, & C columns in Table 7 contain an "X" if the listed drawing contains those specific ISI components.

Table 9 - System Name, Boundary Drawing, and ISI Classification System Boundary Drawing ISI Class ISI Class ISI Class A B C Nuclear Service Water (RN) MC-ISIL4-1030-01.00 X Nuclear Service Water (RN) MC-ISIL4-1030-02.00 X Nuclear Service Water (RN) MC-ISIL4-1030-03.00 X Nuclear Service Water (RN) MC-ISIL4-1030-04.00 X Reactor Coolant (NC) MC-ISILA-t553-01.00 X X Reactor Coolant (NC) MC-ISIL4-1553-02.00 X X Reactor Coolant (NC) MC-ISIL4-1553-02.01 X X X Reactor Coolant (NC) MC-ISIL4-1553-04.00 X Chemical & Volume Control (NV) MC-ISIL4-1554-01.00 X X Chemical & Volume Control (NV) MC-ISIL4-1554-01.01 X X Chemical & Volume Control (NV) MC-ISIL4-1554-01.02 X X Chemical & Volume Control (NV) MC-ISIL4-1554-01.03 X Chemical & Volume Control (NV) MC-ISIIA-1554-02.00 X X Duke Energy Corporation McGuire Nuclear Station Section 2 Fourth Interval Inservice Inspection Pressure Test Plan Revision 0 Document Index Number: MISI-1462.20-0030 - PTPLAN Page 15 of 30

Table 9 - System Name, Boundary Drawing, and ISI Classification System Boundary Drawing ISI Class ISI Class ISI Class A B C Chemical & Volume Control (NV) MC-ISIL4-1554-02.01 X Chemical & Volume Control (NV) MC-ISIL4-1554-03.00 X X Chemical & Volume Control (NV) MC-ISIL4-1554-03.0! X X Chemical & Volume Control (NV) MC-ISIL4-1554-04.00 X X Chemical & Volume Control (NV) MC-ISIL4-1554-05.00 X X Boron Thermal Regeneration (NR) MC-ISIL4-1555-01.00 X Boron Thermal Regeneration (NR) MC-ISIL4-1555-02.00 XX Boron Recycle (NB) MC-ISIL4-1556-01.00 X Boron Recycle (NB) MC-ISIL4-1556-0i.01 X X Boron Recycle (NB) MC-ISIL4-1556-02.00 X Boron Recycle (NB) MC-ISIL4-1556-02.01 X Boron Recycle (NB) MC-ISIL4-1556-03.00 X Cont Air Return Ex & Hydrgn Skmer (VX) MC-ISIL4-1557-01.00 X Ice Condenser Refrigeration (NF) MC-ISIL4-1558-01.01 X Ice Condenser Refrigeration (NF) MC-ISIL4-1558-04.00 X Residual Heat Removal (ND) MC-ISIL4-1561-01.00 X X Safety Injection (NI) MC-ISIL4-1562-01.00 X X Safety Injection (NI) MC-ISILA-1562-02.00 X X Safety Injection (NI) MC-ISIL4-1562-02.01 X X Safety Injection (NI) MC-ISIL4-1562-03.00 X X Safety Injection (NI) MC-ISILA-1562-03.01 X X Safety Injection (NI) MC-ISILA-1562-04.00 X Containment Spray (NS) MC-ISIL4-1563-01.00 X Annulus Ventilation (VE) MC-ISIL4-1 564-01.00 X Duke Energy Corporation McGuire Nuclear Station Section 2 Fourth Interval Inservice Inspection Pressure Test Plan Revision 0 Document Index Number: MISI-1462.20-0030 - PTPLAN Page 16 of 30

Table 9 - System Name, Boundary Drawing, and ISI Classification System Boundary Drawing ISI Class ISI Class ISI Class A B C Liquid Waste Recycle (WL) MC-ISIL4-1565-01.00 X Liquid Waste Recycle (WL) MC-ISIL4-1565-01.01 X Liquid Waste Recycle (WL) MC-ISIL4-1565-02.00 X Liquid Waste Recycle (WL) MC-ISIL4-1565-02.01 X Liquid Waste Recycle (WL) MC-ISIL4-1565-06.00 X Liquid Waste Recycle (WL) MC-ISIL4-1565-07.00 X Nuclear Solid Waste Disposal (WS) MC-ISIL4-1566-01.00 X Waste Gas (WG) MC-ISIL4-1567-01.00 X X Waste Gas (WG) MC-ISIL4-1567-02.00 X Waste Gas (WG) MC-ISIL4-1567-02.01 X X Waste Gas (WG) MC-ISIL4-1567-03.00 X Waste Gas (WG) MC-ISIL4-1567-03.01 X Waste Gas (WG) MC-ISIL4-1567-04.00 X Spent Fuel Cooling (KF) MC-ISIL4-1570-01.00 X Spent Fuel Cooling (KF) MC-ISIL4-1570-01.01 X Refueling Water (FW) MC-ISIL4-1571-01.00 X X Nuclear Sampling (NM) MC-ISIL4-1572-01.00 X Nuclear Sampling (NM) MC-ISIL4-1572-01.01 X X Nuclear Sampling (NM) MC-ISIL4-1572-02.00 X Nuclear Sampling (NM) MC-ISIL4-1572-03.00 X Component Cooling (KC) MC-ISIL4-1573-01.00 X Component Cooling (KC) MC-ISILA-1573-01.01 X Component Cooling (KC) MC-ISILA- 1573-02.00 X Component Cooling (KC) MC-ISIL4- 1573-02.01 X Duke Energy Corporation McGuire Nuclear Station Section 2 Fourth Interval Inservice Inspection Pressure Test Plan Revision 0 Document Index Number- MISI-1462.20:0030 - PTPLAN Page 17of30 -

Table 9 - System Name, Boundary Drawing, and ISI Classification System Boundary Drawing ISI Class ISI Class ISI Class A B C Component Cooling (KC) MC-ISILA-1573-02.02 X Component Cooling (KC) MC-ISIL4-1573-03.00 X X Component Cooling (KC) MC-ISIL4-1573-03.01 X X Component Cooling (KC) MC-ISIL4-l 573-04.00 X X Nuclear Service Water (RN) MC-ISIL4-1574-01.00 X Nuclear Service Water (RN) MC-ISIL4-1574-01.01 X Nuclear Service Water (RN) MC-ISIL4-1574-02.00 X Nuclear Service Water (RN) MC-ISIL4-1574-02.01 X Nuclear Service Water (RN) MC-ISIL4-1574-03.00 X Nuclear Service Water (RN) MC-ISIL4-1574-03.01 X Nuclear Service Water (RN) MC-ISIL4-1574-04.00 X X Containment Purge Ventilation (VP) MC-ISIL4-1576-01.00 X Steam Generator Blowdown Recycle (BB) MC-ISIL4-1580-01.00 X Groundwater Drainage (WZ) MC-ISIL4-1581-01.00 X Steam Generator Wet Layup Recirc (BW) MC-ISIL4-1584-01.00 X Containment Air Release and Additn (VQ) MC-ISIL4-1585-01.00 X Feedwater (CF) MC-ISIL4-1591-01.01 X Auxiliary Feedwater (CA) MC-ISIL4-1592-01.00 X X Auxiliary Feedwater (CA) MC-ISIL4-1592-01.01 X Main Stm (SM) & Vent To Atmsph (SV) MC-ISIL4-1593-01.00 X Main Stm To Aux Eq (SA) & Turb Ex (TE) MC-ISIL4-1593-01.02 X X Main Stm (SM) & Vent To Atmsph (SV) MC-ISIL4-1593-01.03 X Fire Protection (RF) MC-ISIL4-1599-02.02 X Makeup Demineralized Water (YM) MC-ISIL4-1601-02.04 X Nitrogen (GN) MC-ISIL4-1602-01.02 X Duke Energy Corporation McGuire Nuclear Station Section 2 Fourth Interval Inservice Inspection Pressure Test Plan Revision 0 Document Index Number: MISI-1462.20-0030 - PTPLAN Page 18 of 30

Table 9 - System Name, Boundary Drawing, and ISI Classification System Boundary Drawing ISI Class ISI Class ISI Class A B C Containment Ventilatn Cooling Water (RV) MC-ISIL4-1604-03.00 X X Instrument Air (VI) MC-ISIL4-1605-01.02 X Instrument Air (VI) MC-ISILA-1605-01.03 X Instrument Air (VI) MC-ISIL4- 1605-01.13 X X Instrument Air (VI) MC-ISILA-1605-01.14 X Instrument Air (VI) MC-ISILA-1605-0l. 17 X Instrument Air (VI) MC-ISIL4-1605-01.24 X Instrument Air (VI) MC-ISILA-1605-01.25 X Station Air (VS) MC-ISIL4-1605-02.02 X Breathing Air (VB) MC-ISILA-1605-03.01 X Diesel Gen Engine Cooling Water (KD) MC-ISIL4-1609-01.00 X Diesel Gen Engine Cooling Water (KD) MC-ISIL4-1609-01.01 X Diesel Gen Engine Lube Oil (LD) MC-ISIL4-1609-02.00 X Diesel Gen Engine Lube Oil (LD) MC-ISIIA-1609-02.01 X Diesel Gen Engine Fuel Oil (FD) MC-ISIL4-1609-03.00 X Diesel Gen Engine Fuel Oil (FD) MC-ISIL4-1609-03.01 X Diesel Gen Starting Air (VG) MC-ISIL4-1609-04.00 X Diesel Generator Room Sump Pump (WN) MC-ISIL4-1609-07.00 X Conventional Chemical Addition (YA) MC-ISIL4-1617-01.00 X Control Area Chilled Water (YC) MC-ISIL4-1618-01.00 X Control Area Chilled Water (YC) MC-ISIL4-1618-02.00 X Control Area Chilled Water (YC) MC-ISIL4-1618-04.00 X Duke Energy Corporation McGuire Nuclear Station Section 2 Fourth Interval Inservice Inspection Pressure Test Plan Revision 0 Document Index Number: MISI-1462.20-0030 - PTPLAN Page 19 of 30

2.3 McGuire Unit 1 - 4 th 10-Year Interval Pressure Testing Examination Zone Listing Table 10 is a listing of the McGuire Unit 1 Pressure Testing Zones required to receive a Section XI Leakage Test and VT-2 Visual Examination during the 4th 10-year interval.

Duke Energy Corporation McGuire Nuclear Station Section 2 Fourth Interval Inservice Inspection Pressure Test Plan Revision 0 Document Index Number: MISI-1462.20-0030 - PTPLAN Page 20 of 30

Table 10 - Pressure Testing Zones Required for McGuire Unit I - 4 th Interval Zone Boundary Drawings ISI ISI System Test Required Req Req Proc ASME Number Class Cat Freq Test Exam Item No IBB-096L-B MC-ISIL4-1580-01.00 Class B C-H BB - Steam Periodic Leakage VT-2 NDE-68 C7.10 Generator Test NDE-94 Blowdown MP/O/A/7650/076 Recycle IBB-098L-B MC-ISIL4-1572-03.00 Class B C-H BB - Steam Periodic Leakage VT-2 NDE-68 C7.10 Generator Test NDE-94 MC-ISIL4-1580-01.00 Blowdown MP/0/A/7650/076 Recycle MC-ISIL4-1584-01.00 1CA-006L-B MC-ISIL4-1592-01.00 Class B C-H CA - Periodic Leakage VT-2 NDE-68 C7.10 Auxiliary Test NDE-94 Feedwater MP/0/A/7650/076 1CA-030L-C MC-ISIL4-1574-02.00 Class C D-B CA - Periodic Leakage VT-2 NDE-68 D2.10 Auxiliary Test NDE-94 MC-ISIL4-1592-O1.01 Feedwater MP/0/A/7650/076 1CA-032L-B MC-ISIL4-1584-01.00 Class B C-H CA - Periodic Leakage V--2 NDE-68 C7.10 Auxiliary Test NDE-94 MC-ISIL4-1591-01.01 Feedwater MP/O/A/7650/076 MC-ISIL4-1592-01.00 MC-ISIL4-1617-01.00 JCA-033L-C MC-ISIL4-1592-01.01 Class C D-B CA - Periodic Leakage VT-2 NDE-68 D2.10 Auxiliary Test NDE-94 Feedwater MP/0/A/7650/076 1CA-034L-C MC-ISIL4-1592-01.01 Class C D-B CA - Periodic Leakage Vl-2 NDE-68 D2.10 Auxiliary Test NDE-94 Feedwater MP/0/A/7650/076 1CA-038L-C MC-ISIL4-1574-03.00 Class C D-B CA - Periodic Leakage VT-2 NDE-68 D2.10 Auxiliary Test NDE-94 MC-ISIL4-1592-01.01 Feedwater MP/O/A/7650/076 lCA-054L-C MC-ISIL4-1592-01.00 Class C D-B CA - Periodic Leakage VT-2 NDE-68 D2.10 Auxiliary Test NDE-94 MC-ISIL4-1592-01.01 Feedwater MP/0/A/7650/076 Duke Energy Corporation McGuire Nuclear Station Section 2 Fourth Interval Inservice Inspection Pressure Test Plan Revision 0 Document Index Number- MISI- 1462.20-0030 - PTPLAN Page 21 of 30

Table 10 - Pressure Testing Zones Required for McGuire Unit 1 - 4th Interval Zone Boundary Drawings ISI ISI System Test Required Req Req Proc ASME Number Class Cat Freq Test Exam Item No 1CA-055L-C MC-ISIL4-1592-01.00 Class C D-B CA - Periodic Leakage VT-2 NDE-68 D2.10 Auxiliary Test NDE-94 MC-ISIL4-1592-01.01 Feedwater MP/0/A/7650/076 ICA-056L-C MC-ISIL4-1592-01.00 Class C D-B CA - Periodic Leakage VT-2 NDE-68 D2.10 Auxiliary Test NDE-94 MC-ISIL4-1592-01.01 Feedwater MP/O/A/7650/076 ICA-057L-C MC-ISIL4-1592-01.00 Class C D-B CA - Periodic Leakage VT-2 NDE-68 D2.10 Auxiliary Test NDE-94 Feedwater MP/0/A/7650/076 1CA-058L-C MC-ISIL4-1592-01.00 Class C D-B CA - Periodic Leakage VT-2 NDE-68 D2.10 Auxiliary Test NDE-94 Feedwater MP/O/A/7650/076 1CA-059L-C MC-ISIL4-1592-01.00 Class C D-B CA - Periodic Leakage VT-2 NDE-68 D2.10 Auxiliary Test NDE-94 Feedwater MP/O/A/7650/076 1FW-OO1L-B MC-ISIL4-1571-01.00 Class B C-H FW - Periodic Leakage VT-2 NDE-68 C7.10 Refueling Test NDE-94 Water MP/O/A/7650/076 1FW-027L-B MC-ISIL4-1554-03.00 Class B C-H FW - Periodic Leakage VT-2 NDE-68 C7.10 Refueling Test NDE-94 MC-ISIL4-1554-03.01 Water MP/O/A/7650/076 MC-ISIL4-1561-01.00 MC-ISIL4-1562-03.00 MC-ISIL4-1563-01.00 MC-ISIL4-1571-01.00 1GN-001L-B MC-ISIL4-1602-01.02 Class B C-H GN - Periodic Leakage V--2 NDE-68 C7.10 Nitrogen Test NDE-94 MP/O/A/7650/076 lKC-001L-B MC-ISIL4-1573-03.01 Class B C-H KC - Periodic Leakage VT-2 NDE-68 C7.10 Component Test NDE-94 Cooling MP/0/A/7650/076 1KC-028L-C MC-ISIL4-1573-01.00 Class C D-B KC - Periodic Leakage VT-2 NDE-68 D2.10 Component Test NDE-94 MC-ISIL4-1573-01.01 Cooling MP/O/A/7650/076 MC-ISIL4-1573-02.00 1KC-029L-C MC-ISIL4-1573-01.00 Class C D-B KC - Periodic Leakage VT-2 NDE-68 D2.10 Component Test NDE-94 MC-ISIL4-1573-01.01 Cooling MP/O/A/7650/076 Duke Energy Corporation McGuire Nuclear Station Section 2 Fourth Interval Inservice Inspection Pressure Test Plan Revision 0 Document Index Number: MISI-1462.20-0030 - PTPLAN Page 22 of 30

Table 10 - Pressure Testing Zones Required for McGuire Unit 1 - 4th Interval Zone Boundary Drawings ISI ISI System Test Required Req Req Proc ASME Number Class Cat Freq Test Exam Item No 1KF-025L-C MC-ISIL4-1570-01.00 Class C D-B KF - Spent Periodic Leakage VT-2 NDE768 D2.10 Fuel Cooling Test NDE-94 MC-ISIL4-1570-01.01 MP/O/A/7650/076 1KF-052L-C MC-ISIL4-1570-01.00 Class C D-B KF - Spent Periodic Leakage VT-2 NDE-68 D2.10 Fuel Cooling Test NDE-94 MC-ISIL4-1570-01.01 MP/0/A/7650/076 1NC-001L-B MC-ISIL4-1553-02.01 Class B C-H NC - Reactor Periodic Leakage VT-2 NDE-68 C7.10 Coolant Test NDE-94 MC-ISIL4-1554-03.01 MP/O/A/7650/076 MC-ISIL4-1561-01.00 MC-ISIL4-1562-03.00 MC-ISIL4-1562-03.01 MC-ISIL4-1563-01.00 1NC-002L-B MC-ISIL4-1553-02.01 Class B C-H NC - Reactor Periodic Leakage VT-2 NDE-68 C7.10 Coolant Test NDE-94 MP/O/A/7650/076 1NC-070L-A MC-ISIL4-1553-01.00 Class A B-P NC -Reactor Outage Leakage VT-2 NDE-68 B15.10 Class B C-H Coolant Test NDE-94 B15.20 MC-ISIL4-1553-02.00 MP/O/A/7650/076 B15.30 B15.50 MC-ISIL4-1553-02.01 B15.60 B15.70 MC-ISIL4-1554-01.00 C7.10 MC-ISIL4-1554-01.01 MC-ISIL4-1554-01.02 MC-ISIL4-1561-01.00 MC-ISIL4-1562-01.00 MC-ISIL4-1562-02.00 MC-ISIL4-1562-02.01 MC-ISIL4-1562-03.00 MC-ISIL4-1562-03.01 Duke Energy Corporation McGuire Nuclear Station Section 2 Fourth Interval Inservice Inspection Pressure Test Plan Revision 0 Document Index Number: MISI- 1462.20ý0030 - PTPLAN Page 23 of 30

Table 10 - Pressure Testing Zones Required for McGuire Unit 1 - 4th Interval Zone Boundary Drawings ISI ISI System Test Required Req Req Proc ASME Number Class Cat Freq Test Exam Item No 1ND-019L-B MC-ISIL4-1554-01.02 Class B C-H ND- Periodic Leakage VT-2 NDE-68 C7.10 Residual Test NDE-94 MC-ISIL4-1561-01.00 Heat MP/O/A/7650/076 Removal MC-ISIL4-1562-03.00 MC-ISIL4-1562-03.01 MC-ISIL4-1563-01.00 MC-ISIL4-1571-01.00 MC-ISIL4-:1572-01.00 1ND-OSOL-B MC-ISIL4-1561-01.00 Class B C-H ND- Periodic Leakage VT-2 NDE-68 C7.10 Residual Test NDE-94 MC-ISIL4-1562-03.01 Heat MP/0/A/7650/076 Removal MC-ISIL4-1563-01.00 1NI-021L-B MC-ISIL4-1562-02.00 Class B C-H NI - Safety Periodic Leakage VT-2 NDE-68 C7.10 Injection Test NDE-94 MC-ISIL4-1562-02.01 MP/O/A/7650/076 MC-ISIL4-1572-01.01 1NI-022L-B MC-ISIL4-1562-03.00 Class B C-H NI - Safety Periodic Leakage VT-2 NDE-68 C7.10 Injection Test NDE-94 MC-ISIL4-1562-03.01 MP/0/A/7650/076 1NI-039L-B MC-ISIL4-1562-03.01 Class B C-H NI - Safety Periodic Leakage VT-2 NDE-68 C7.10 Injection Test NDE-94 I _ MP/O/A/7650/076 1NI-053L-B MC-ISIL4-1562-03.00 Class B C-H NI - Safety Periodic Leakage VT-2 NDE-68 C7.10 Injection Test NDE-94 MP/0/A/7650/076 1NI-060L-B MC-ISIL4-1562-02.01 Class B C-H NI - Safety Periodic Leakage VT-2 NDE-68 C7.10 Injection Test NDE-94 MC-ISIL4-1562-03.00 MP/O/A/7650/076 1NI-071L-B MC-ISIL4-1562-01.00 Class B C-H NI - Safety Periodic Leakage VT-2 NDE-68 C7.10 Injection Test NDE-94 MP/OA/17650/076 1NI-074L-B MC-ISIL4-1562-03.00 Class B C-H NI - Safety Periodic Leakage VT-2 NDE-68 C7.10 Injection Test NDE-94 MP/0/A/7650/076 Duke Energy Corporation McGuire Nuclear Station Section 2 Fourth Interval Inservice Inspection Pressure Test Plan Revision 0 Document Index Number: MISI-1462.20-0030 - PTPLAN Page 24 of 30

Table 10 - Pressure Testing Zones Required for McGuire Unit I - 4th Interval Zone Boundary Drawings ISI ISI System Test Required Req Req Proc ASME Number Class Cat Freq Test Exam Item No 1NM-044L-B MC-ISIL4-1553-02.00 Class B C-H NM - Nuclear Periodic Leakage VT-2 NDE-68 C7.10 Sampling Test NDE-94 MC-ISIL4-1572-01.00 MP/0/A/7650/076 1NM-045L-B MC-ISIL4-1553-01.00 Class B C-H NM - Nuclear Periodic Leakage VT-2 NDE-68 C7.10 Sampling Test NDE-94 MC-ISIL4-1572-01.00 MP/O/A/7650/076 1NM-046L-B MC-ISIL4-1572-01.01 Class B C-H NM - Nuclear Periodic Leakage VT-2 NDE-68 C7.10 Sampling Test NDE-94 MP/O/A/7650/076 1NS-023L-B MC-ISIL4-1563-01.00 Class B C-H NS - Periodic Leakage VT-2 NDE-68 C7.10 Containment Test NDE-94 Spray I MP/O/A/7650/076 1NS-024L-B MC-ISIL4-1563-01.00 Class B C-H NS - Periodic Leakage VT-2 NDE-68 C7.10 Containment Test NDE-94 Spray MP/O/A/7650/076 1NV-001L-B MC-ISIL4-1554-01.00 Class B C-H NV - Periodic Leakage VT-2 NDE-68 C7.10 Chemical & Test NDE-94 MC-ISIL4-1554-01.01 Volume MP/0/A/7650/076 Control MC-ISIL4-1554-01.02 MC-ISIL4-1554-02.01 1NV-002L-B MC-ISIL4-1554-01.02 Class B C-H NV - Periodic Leakage VT-2 NDE-68 C7.10 Chemical & Test NDE-94 MC-ISIL4-1554-02.00 Volume MP/O/A/7650/076 Control MC-ISIL4-1554-02.01 MC-ISIL4-1554-03.00 MC-ISIL4-1554-03.01 MC-ISIL4-1554-04.00 MC-ISIL4-1555-02.00 MC-ISIL4-1567-01.00 MC-ISIL4-1567-02.01 MC-ISIL4-1572-02.00 INV-003L-B MC-ISIL4-1554-02.00 Class B C-H NV - Periodic Leakage VT-2 NDE-68 C7.10 Chemical & Test NDE-94 MC-ISIL4-1554-02.01 Volume MP/0/A/7650/076 Control MC-ISIL4-1556-01.01 Duke Energy Corporation McGuire Nuclear Station Section 2 Fourth Interval Inservice Inspection Pressure Test Plan Revision 0 Document Index Number: MISI-1462.20-0030 - PTPLAN Page 25 of 30

Table 10 - Pressure Testing Zones Required for McGuire Unit 1 - 4th Interval Zone Boundary Drawings ISI ISI System Test Required Req Req Proc ASME Number Class Cat Freq Test Exam Item No 1NV-016L-B MC-ISIL4-1554-01.00 Class B C-H NV - Periodic Leakage VT-2 NDE-68 C7.10 Chemical & Test NDE-94 MC-ISIL4-1554-01.01 Volume MP/O/A/7650/076 Control MC-ISIL4-1554-01.02 MC-ISIL4-1554-02.00 MC-ISIL4-1554-02.01 MC-ISIL4-1554-03.00 MC-ISIL4-1554-03.01 MC-ISIL4-1554-O5.00 MC-ISIL4-1561-01.00 MC-ISIL4-1562-O1.00 MC-ISIL4-1562-03.00 1NV-016L-C MC-ISIL4-1554-02.00 Class C D-B NV - Periodic Leakage VT-2 NDE-68 D2.10 Chemical & Test NDE-94 MC-ISIL4-1554-03.01 Volume MP/O/A/7650/076 Control MC-ISIL4-1554-05.00 1NV-017L-B MC-ISIL4-1554-01.00 Class B C-H NV - Periodic Leakage VlT-2 NDE-68 C7.10 Chemical & Test NDE-94 MC-ISIL4-1554-01.01 Volume MP/O/A/7650/076 Control MC-ISIL4-1554-01.02 MC-ISIL4-1554-01.03 INV-018L-B MC-ISIL4-1554-01.02 Class B C-H NV - Periodic Leakage VT-2 NDE-68 C7.10 Chemical & Test NDE-94 Volume MP/O/A/7650/076 Control 1NV-020L-B MC-ISIL4-1554-01.02 Class B C-H NV - Periodic Leakage VT-2 NDE-68 C7.10 Chemical & Test NDE-94 Volume MP/O/A/7650/076 Control 1NV-045L-B MC-ISIL4-1554-03.00 Class B C-H NV - Periodic Leakage VT-2 NDE-68 C7.10 Chemical & Test NDE-94 Volume MP/O/A/7650/076 Control Duke Energy Corporation McGuire Nuclear Station Section 2 Fourth Interval Inservice Inspection Pressure Test Plan Revision 0 Document Index Number: MISI-1462.20-0030 - PTPLAN Page 26 of 30

Table 10 - Pressure Testing Zones Required for McGuire Unit 1 - 4th Interval Zone Boundary Drawings ISI ISI System Test Required Req Req Proc ASME Number Class Cat Freq Test Exam Item No 1NV-051L-B MC-ISIL4-1554-03.01 Class B C-H NV - Periodic Leakage Vl-2 NDE-68 C7.10 Chemical & Test NDE-94 Volume MP/O/A/7650/076 Control 1RN-003L-B MC-ISIL4-1574-04.00 Class B C-H RN - Nuclear Periodic Leakage VT-2 NDE-68 C7.10 Service Test NDE-94 Water MP/O/A/7650/076 1RN-004L-B MC-ISIL4-1574-04.00 Class B C-H RN - Nuclear Periodic Leakage VT-2 NDE-68 C7.10 Service Test NDE-94 Water MP/0/A/7650/076 1RN-005L-C MC-ISIL4-1030-01.00 Class C D-B RN - Nuclear Periodic Leakage VT-2 NDE-68 D2.10 Service Test NDE-94 Water MP/0/A/7650/076 1RN-006L-C MC-ISIL4-1030-01.00 Class C D-B RN - Nuclear Periodic Leakage VT-2 NDE-68 D2.10 Service Test NDE-94 MC-ISIL4-1030-02.00 Water MP/0/A/7650/076 1RN-007L-C MC-ISIL4-1030-01.00 Class C D-B RN - Nuclear Periodic Leakage VT-2 NDE-68 D2.10 Service Test NDE-94 MC-ISIL4-1030-02.00 Water MP/0/A/7650/076 1RN-008L-C MC-ISIL4-1030-02.00 Class C D-B RN - Nuclear Periodic Leakage VT-2 NDE-68 D2.10 Service Test NDE-94 Water MP/0/A/7650/076 1RN-009L-C MC-ISIL4-1030-02.00 Class C D-B RN - Nuclear Periodic Leakage VT-2 NDE-68 D2.10 Service Test NDE-94 MC-ISIL4-1030-03.00 Water MPlO/A/76501076 1RN-01OL-C MC-ISIL4-1030-03.00 Class C D-B RN - Nuclear Periodic Leakage VT-2 NDE-68 D2.10 Service Test NDE-94 MC-ISIL4-1030-04.00 Water MP/0/A/7650/076 1RN-011L-C MC-ISIL4-1030-04.00 Class C D-B RN - Nuclear Periodic Leakage VT-2 NDE-68 D2.10 Service Test NDE-94 Water MP/0/A/7650/076 1RN-030L-C MC-ISIL4-1574-01.00 Class C D-B RN - Nuclear Periodic Leakage VT-2 NDE-68 D2.10 Service Test NDE-94 MC-ISIL4-1574-01.01 Water MP/0/A/7650/076 MC-ISIL4-1574-02.00 MC-ISIL4-1574-02.01 MC-ISIL4-1574-04.00 MC-ISIL4-1604-03.00 MC-ISIL4-1609-01.00 Duke Energy Corporation McGuire Nuclear Station Section 2 Fourth Interval Inservice Inspection Pressure Test Plan Revision 0 Document Index Number: MISI- 1462:20-0030 - PTPLAN Page 27 of 30

Table 10 - Pressure Testing Zones Required for McGuire Unit 1 - 4th Interval Zone Boundary Drawings ISI ISI System Test Required Req Req Proc ASME Number Class Cat Freq Test Exam Item No IRN-031L-C MC-ISIL4-1574-01.00 Class C D-B RN - Nuclear Periodic Leakage VT-2 NDE-68 D2.10 Service Test NDE-94 MC-ISIL4-1574-01.01 Water MP/O/A/7650/076 MC-ISIL4-1574-03.00 MC-ISIL4-1574-03.01 MC-ISIL4-1609-01.01 1RN-032L-C MC-ISIL4-1574-01.00 Class C D-B RN - Nuclear Periodic Leakage VT-2 NDE-68 D2.10 Service Test NDE-94 Water MP/O/A/7650/076 1RN-061L-C MC-ISIL4-1574-03.01 Class C D-B RN - Nuclear Periodic Leakage VT-2 NDE-68 D2.10 Service Test NDE-94 Water I MP/0/A/7650/076 1RV-002L-B MC-ISIL4-1604-03.00 Class B C-H RV - Periodic Leakage VT-2 NDE-68 C7.10 Containment Test NDE-94 Ventilation MP/0/A/7650/076 Cooling Water 1SA-035L-B MC-ISIL4-1593-01.02 Class B C-H SA - Main Periodic Leakage V-T-2 NDE-68 C7.10 Stm To Aux Test NDE-94 Equip I MP/0/A/7650/076 1SA-035L-C MC-ISIL4-1593-01.02 Class C D-B SA - Main Periodic Leakage VT-2 NDE-68 D2.10 Stm To Aux Test NDE-94 Equip MP/0/A/7650/076 1SM-006L-B MC-ISIL4-1572-03.00 Class B C-H SM - Main Periodic Leakage VT-2 NDE-68 C7.10 Steam Test NDE-94 MC-ISIL4-1584-01.00 MP/O/A/7650/076 MC-ISIL4-1591-01.01 MC-ISIL4-1593-01.00 MC-ISIL4-1593-01.03 1SM-036L-B MC-ISIL4-1593-01.00 Class B C-H SM - Main Periodic Leakage VT-2 NDE-68 C7.10 Steam Test NDE-94 MC-ISIL4-1593-01.02 MP/O/A/7650/076 MC-ISIL4-1593-01.03 Duke Energy Corporation McGuire Nuclear Station Section 2 Fourth Interval Inservice Inspection Pressure Test Plan Revision 0 Document Indek Number: MISI- 1462.20-0030 - PTPLAN Page 28 of 30

Table 10 - Pressure Testing Zones Required for McGuire Unit 1 - 4t Interval Zone Boundary Drawings ISI ISI System Test Required Req Req Proc ASME Number Class Cat Freq Test Exam Item No 1SM-037L-B MC-ISIL4-1593-01.00 Class B C-H SM - Main Periodic Leakage VT-2 NDE-68 C7.10 Steam Test NDE-94 MC-ISIL4-1593-01.03 MP/0/A/7650/076 1VI-001L-B MC-ISIL4-1602-01.02 Class B C-H VI - Periodic Leakage VT-2 NDE-68 C7. 10 Instrument Test NDE-94 MC-ISIL4-1605-01.13 Air MP/0/A/7650/076 1YC-066L-C MC-ISIL4-1618-01.00 Class C D-B YC - Control Periodic Leakage VT-2 NDE-68 D2.10 Area Chilled Test NDE-94 MC-ISIL4-1618-02.00 Water MP/0/A/7650/076 MC-ISIL4-1618-04.00 1YC-067L-C MC-ISIL4-1618-01.00 Class C D-B YC - Control Periodic Leakage VT-2 NDE-68 D2.10 Area Chilled Test NDE-94 MC-ISIL4-1618-02.00 Water MP/0/A/7650/076 MC-ISIL4-1618-04.00 Duke Energy Corporation McGuire Nuclear Station Section 2 Fourth Interval Inservice Inspection Pressure Test Plan Revision 0 Document Index Number: MISI-1462.20-0030 - PTPLAN Page 29 of 30

3.0 1 Pressure Test Requirements Specific to McGuire Unit 2 This Section of the pressure test plan is for the McGuire Unit 2, 4th 10-Year pressure test requirements. This section is currently a place holder for the 4th 10-year interval and the details will be added during a future revision of this plan.

Reference the 3rd 10-Year Pressure Test Plan (Document Index Number MISI-1462.20-0030 - U2PTPLAN located in NEDL) for the curent Pressure Test requirements for McGuire Unit 2. See Applicability on page 1.

Unit 2 Commercial Service Date: March 1, 1984 Unit 2 Fourth Interval Start Date: March 1, 2014 Start Date End Date 03/01/2014 03/01/2017 03/01/2021 03/01/2024 I st Period 2nd Period 3rd Period 1--

Refueling Outage I Refueling Outage 3 Refueling Outage 6 (EOC 22) (EOC 24) (EOC 27)

Refueling Outage 2 Refueling Outage 4 Refueling Outage 7 (EOC 23) (EOC 25) (EOC 28)

Refueling Outage 5 (EOC 26) 3.1 McGuire Unit 2 - Examination Zone Discription 4'1 10-Year Interval Requirements to be added at a later date. See Applicability on page 1.

3.2 McGuire Unit 2 - System, Boundary Drawing, and ISI Classification Listing 4 th 10-Year Interval Requirements to be added at a later date. See Applicability on page 1.

3.3 McGuire Unit 2 - 4th 10-Year Interval Pressure Testing Examination Zone Listing 40' 10-Year Interval Requirements to be added at a later date. See Applicability on page 1.

Duke Energy Corporation McGuire Nuclear Station Section 3 Fourth Interval Inservice Inspection Pressure Test Plan Revision 0 Document Index Number: MISI1462.20-0040 - PTPLAN Page 30 of 30