MONTHYEARML1107503812011-03-10010 March 2011 Entergy'S Response to New England Coalition'S Motion for Stay and Request for Further Opportunity for Hearings ML1036300302010-12-23023 December 2010 Entergy'S Response to the Supplement to New England Coalition'S Petition for Commission Review of LBP-10-19 ML1033403292010-11-22022 November 2010 Entergy'S Answer Opposing New England Coalition'S Petition for Commission Review of LBP-10-19 ML1028002492010-09-30030 September 2010 New England Coalition'S Answer & Opposition to Entergy'S Motion to Strike Declaration of Paul Blanch ML1027204022010-09-20020 September 2010 New England Coalition'S Reply to NRC Staff and Entergy Nuclear Vermont Yankee Opposition to New England Coalition'S Motion to Reopen the Hearing & Reply to NRC Staff'S Answer to Proposed New Contention ML1026003772010-09-14014 September 2010 Entergy'S Answer Opposing New England Coalition'S Motion to Reopen ML1007403702010-03-12012 March 2010 Entergy'S Response in Opposition to New England Coalition'S Stay Request ML0922400652009-08-0303 August 2009 Entergy'S Response in Opposition to New England Coalition'S Petition for Review of LBP-09-09 ML0921202202009-07-23023 July 2009 New England Coalition'S Petition for Review of the Licensing Board'S Full Initial Decision, LBP-09-09 ML0916702632009-06-0808 June 2009 New England Coalition'S Opposition to Entergy'S Motion to Strike New England Coalition'S Reply to NRC Staff and Entergy Oppositions to Nec'S Motion to File a Timely New Contention ML0915404042009-05-26026 May 2009 Nec'S Reply to NRC Staff and Entergy Oppositions to Nec'S Motion to File a Timely New Contention ML0914203732009-05-18018 May 2009 Entergy'S Opposition to Nec'S Motion to File a Timely New Contention ML0913400192009-05-0707 May 2009 New England Coalition'S Reply to Nrc'S Staff and Entergy Answers to New England Coalition'S Motion to Hold in Abeyance Action on It'S Proposed Contention Until Issuance of NRC Staff Supplemental Safety Evaluation Report ML0912708592009-05-0101 May 2009 Entergy'S Opposition to New England Coalition'S Motion to Hold Action on Proposed Contention in Abeyance Until Issuance of NRC Staff Supplemental Safety Evaluation Report ML0908404222009-03-10010 March 2009 Final Calculations of Record for the Confirmatory Environmentally Assisted Fatigue (Cufen) Analyses on the Reactor Pressure Vessel Core Spray (CS) and Recirculation Outlet (RO) Nozzles at Vermont Yankee ML0912101052009-03-0909 March 2009 New England Coalition'S Petition for Leave Reply to Entergy Responses to New England Coalition'S Motion to Alter or Amend the Schedule in the Above Captioned Proceeding ML0907711422009-03-0909 March 2009 Entergy'S Opposition to New England Coalition'S Motion to Alter or Amend the Schedule ML0901400782009-01-0707 January 2009 Entergy'S Opposition to New England Coalition'S Motion for Reconsideration of the Licensing Board'S Partial Initial Decision ML0901400792008-12-29029 December 2008 Entergy'S Answer Opposing Motion by New York Et Al. for Leave to Submit Brief Amici Curiae ML0901602092008-12-19019 December 2008 New England Coalition'S Response to NRC Staff'S Petition for Review of the Licensing Board'S Partial Initial Decision, LBP-08-25 ML0900606092008-12-19019 December 2008 Entergy'S Answer in Support of NRC Staff'S Petition for Review of the Licensing Board'S Partial Initial Decision ML0836600342008-12-19019 December 2008 Vermont Department of Public Service Opposition to Petition for Review of Partial Initial Decision LBP-08-25 ML0836401982008-12-11011 December 2008 Entergy'S Answer to Commonwealth of Massachusetts Petition for Review of LBP-08-25 and Request for Consolidated Ruling ML0835205232008-12-10010 December 2008 Entergy'S Response in Opposition to New England Coalition'S Motion to Extend Time to File Petition for Review ML0835004492008-12-0404 December 2008 Entergy'S Motion for Clarification ML0835100872008-12-0404 December 2008 Entergy'S Opposition to New England Coalition'S Motion to Extend Time to File Motion for Reconsideration ML0824018252008-08-25025 August 2008 Vermont Yankee - NRC Staff'S Proposed Findings of Fact and Conclusion of Law and Order in the Form of an Initial Decision ML0819905482008-07-15015 July 2008 Vermont Yankee - NRC Staff Letter to Board Regarding Evidentiary Hearing Attendees ML0820501022008-07-15015 July 2008 Entergy'S Response to July 11, 2008 Board Order ML0820501012008-07-15015 July 2008 Entergy'S Reply to Responses to Licensing Board'S Questions ML0820406152008-07-15015 July 2008 Vermont Department of Public Service Response to Entergy and NRC Staff Brief on Pre-Trial Legal Issues ML0819806542008-07-15015 July 2008 Vermont Yankee - NRC Staff'S Reply Brief ML0819704842008-07-0909 July 2008 Entergy'S Answers to Licensing Board Questions ML0819202482008-07-0909 July 2008 Vermont Yankee - Nrc'S Brief in Response to Board Order ML0819805252008-07-0808 July 2008 Joint Stipulation ML0819704802008-07-0707 July 2008 Entergy'S Response to Vermont Department of Public Service Motion for Modification of the Scheduling Order to Facilitate Full Compliance with 10 C.F.R. 2.323(b) ML0818504242008-07-0202 July 2008 Vermont Yankee - NRC Staff'S Response to Vermont Department of Public Service'S Motion to Modify the Schedule ML0819100872008-06-30030 June 2008 New England Coalition, Inc'S Opposition to Entergy'S and the NRC Staff'S Motions in Limine to Exclude Rebuttal Testimony of Ulrich Witte ML0819200412008-06-30030 June 2008 Entergy'S Response in Support of Staff'S Motion in Limine to Exclude Witte Rebuttal Testimony ML0818304142008-06-23023 June 2008 Entergy'S Response in Opposition to NEC Motion to File Untimely Rebuttal Testimony by Ulrich Witte ML0817807432008-06-20020 June 2008 Filing Discussing Proprietary Documents in the Matter of Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc ML0817107262008-06-19019 June 2008 Vermont Yankee - NRC Staff'S Response to Nec'S Motion to Strike NRC Staff'S Rebuttal Testimony Concerning NEC Contention 4 ML0817800972008-06-19019 June 2008 Entergy'S Response in Support of Staff'S Motion in Limine ML0816305762008-06-0505 June 2008 2008/06/05-Vermont Yankee License Renewal Proceeding: June 24 Call ML0814905522008-05-20020 May 2008 Certificate of Disclosure of Sarah Hofmann, for the Vermont Department of Public Service Certifying Current with Disclosures Pursuant to 10 C.F.R. 2.336 That Are Relevant and Not Privileged to the Contentions Now Being Considered ML0814306502008-05-15015 May 2008 Supplemental Petition by Nuclear Information and Resource Service: Jersey Shore Nuclear Watch, Inc.; Grandmothers, Mothers and More for Energy Safety: New Jersey Public Interest Research Group: New Jersey Sierra Club.. ML0814906102008-05-15015 May 2008 2008/05/15-Supplemental Petition by Collective Petitioners for Additional Investigation and Correction of Deficiencies Regarding License Renewal Reviews for Oyster Creek, Indian Point, Pilgrim, and Vermont Yankee Nuclear Power Plants ML0814306512008-05-15015 May 2008 Supplemental Petition by Nuclear Information and Resource Service: Jersey Shore Nuclear Watch, Inc.: Grandmothers, Mothers and More for Energy Safety: New Jersey Public Interest Research Group: New Jersey Sierra Club: New Jersey.. ML0816402452008-05-15015 May 2008 2008/05/15-Supplemental Petition by Listed Companies for Additional Investigation and Correction of Deficiencies Regarding License Renewal Reviews, for Oyster Creek, Indian Point, Pilgrim, and Vermont Yankee Nuclear Power Plants ML0813501902008-05-0606 May 2008 Commonwealth of Massachusetts' Notice of Intent to Participate as an Interested State 2011-03-10
[Table view] Category:Responses and Contentions
MONTHYEARML1107503812011-03-10010 March 2011 Entergy'S Response to New England Coalition'S Motion for Stay and Request for Further Opportunity for Hearings ML1036300302010-12-23023 December 2010 Entergy'S Response to the Supplement to New England Coalition'S Petition for Commission Review of LBP-10-19 ML1033403292010-11-22022 November 2010 Entergy'S Answer Opposing New England Coalition'S Petition for Commission Review of LBP-10-19 ML1028002492010-09-30030 September 2010 New England Coalition'S Answer & Opposition to Entergy'S Motion to Strike Declaration of Paul Blanch ML1027204022010-09-20020 September 2010 New England Coalition'S Reply to NRC Staff and Entergy Nuclear Vermont Yankee Opposition to New England Coalition'S Motion to Reopen the Hearing & Reply to NRC Staff'S Answer to Proposed New Contention ML1026003772010-09-14014 September 2010 Entergy'S Answer Opposing New England Coalition'S Motion to Reopen ML1007403702010-03-12012 March 2010 Entergy'S Response in Opposition to New England Coalition'S Stay Request ML0922400652009-08-0303 August 2009 Entergy'S Response in Opposition to New England Coalition'S Petition for Review of LBP-09-09 ML0921202202009-07-23023 July 2009 New England Coalition'S Petition for Review of the Licensing Board'S Full Initial Decision, LBP-09-09 ML0916702632009-06-0808 June 2009 New England Coalition'S Opposition to Entergy'S Motion to Strike New England Coalition'S Reply to NRC Staff and Entergy Oppositions to Nec'S Motion to File a Timely New Contention ML0915404042009-05-26026 May 2009 Nec'S Reply to NRC Staff and Entergy Oppositions to Nec'S Motion to File a Timely New Contention ML0914203732009-05-18018 May 2009 Entergy'S Opposition to Nec'S Motion to File a Timely New Contention ML0913400192009-05-0707 May 2009 New England Coalition'S Reply to Nrc'S Staff and Entergy Answers to New England Coalition'S Motion to Hold in Abeyance Action on It'S Proposed Contention Until Issuance of NRC Staff Supplemental Safety Evaluation Report ML0912708592009-05-0101 May 2009 Entergy'S Opposition to New England Coalition'S Motion to Hold Action on Proposed Contention in Abeyance Until Issuance of NRC Staff Supplemental Safety Evaluation Report ML0908404222009-03-10010 March 2009 Final Calculations of Record for the Confirmatory Environmentally Assisted Fatigue (Cufen) Analyses on the Reactor Pressure Vessel Core Spray (CS) and Recirculation Outlet (RO) Nozzles at Vermont Yankee ML0912101052009-03-0909 March 2009 New England Coalition'S Petition for Leave Reply to Entergy Responses to New England Coalition'S Motion to Alter or Amend the Schedule in the Above Captioned Proceeding ML0907711422009-03-0909 March 2009 Entergy'S Opposition to New England Coalition'S Motion to Alter or Amend the Schedule ML0901400782009-01-0707 January 2009 Entergy'S Opposition to New England Coalition'S Motion for Reconsideration of the Licensing Board'S Partial Initial Decision ML0901400792008-12-29029 December 2008 Entergy'S Answer Opposing Motion by New York Et Al. for Leave to Submit Brief Amici Curiae ML0901602092008-12-19019 December 2008 New England Coalition'S Response to NRC Staff'S Petition for Review of the Licensing Board'S Partial Initial Decision, LBP-08-25 ML0900606092008-12-19019 December 2008 Entergy'S Answer in Support of NRC Staff'S Petition for Review of the Licensing Board'S Partial Initial Decision ML0836600342008-12-19019 December 2008 Vermont Department of Public Service Opposition to Petition for Review of Partial Initial Decision LBP-08-25 ML0836401982008-12-11011 December 2008 Entergy'S Answer to Commonwealth of Massachusetts Petition for Review of LBP-08-25 and Request for Consolidated Ruling ML0835205232008-12-10010 December 2008 Entergy'S Response in Opposition to New England Coalition'S Motion to Extend Time to File Petition for Review ML0835004492008-12-0404 December 2008 Entergy'S Motion for Clarification ML0835100872008-12-0404 December 2008 Entergy'S Opposition to New England Coalition'S Motion to Extend Time to File Motion for Reconsideration ML0824018252008-08-25025 August 2008 Vermont Yankee - NRC Staff'S Proposed Findings of Fact and Conclusion of Law and Order in the Form of an Initial Decision ML0819905482008-07-15015 July 2008 Vermont Yankee - NRC Staff Letter to Board Regarding Evidentiary Hearing Attendees ML0820501022008-07-15015 July 2008 Entergy'S Response to July 11, 2008 Board Order ML0820501012008-07-15015 July 2008 Entergy'S Reply to Responses to Licensing Board'S Questions ML0820406152008-07-15015 July 2008 Vermont Department of Public Service Response to Entergy and NRC Staff Brief on Pre-Trial Legal Issues ML0819806542008-07-15015 July 2008 Vermont Yankee - NRC Staff'S Reply Brief ML0819704842008-07-0909 July 2008 Entergy'S Answers to Licensing Board Questions ML0819202482008-07-0909 July 2008 Vermont Yankee - Nrc'S Brief in Response to Board Order ML0819805252008-07-0808 July 2008 Joint Stipulation ML0819704802008-07-0707 July 2008 Entergy'S Response to Vermont Department of Public Service Motion for Modification of the Scheduling Order to Facilitate Full Compliance with 10 C.F.R. 2.323(b) ML0818504242008-07-0202 July 2008 Vermont Yankee - NRC Staff'S Response to Vermont Department of Public Service'S Motion to Modify the Schedule ML0819100872008-06-30030 June 2008 New England Coalition, Inc'S Opposition to Entergy'S and the NRC Staff'S Motions in Limine to Exclude Rebuttal Testimony of Ulrich Witte ML0819200412008-06-30030 June 2008 Entergy'S Response in Support of Staff'S Motion in Limine to Exclude Witte Rebuttal Testimony ML0818304142008-06-23023 June 2008 Entergy'S Response in Opposition to NEC Motion to File Untimely Rebuttal Testimony by Ulrich Witte ML0817807432008-06-20020 June 2008 Filing Discussing Proprietary Documents in the Matter of Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc ML0817107262008-06-19019 June 2008 Vermont Yankee - NRC Staff'S Response to Nec'S Motion to Strike NRC Staff'S Rebuttal Testimony Concerning NEC Contention 4 ML0817800972008-06-19019 June 2008 Entergy'S Response in Support of Staff'S Motion in Limine ML0816305762008-06-0505 June 2008 2008/06/05-Vermont Yankee License Renewal Proceeding: June 24 Call ML0814905522008-05-20020 May 2008 Certificate of Disclosure of Sarah Hofmann, for the Vermont Department of Public Service Certifying Current with Disclosures Pursuant to 10 C.F.R. 2.336 That Are Relevant and Not Privileged to the Contentions Now Being Considered ML0814306502008-05-15015 May 2008 Supplemental Petition by Nuclear Information and Resource Service: Jersey Shore Nuclear Watch, Inc.; Grandmothers, Mothers and More for Energy Safety: New Jersey Public Interest Research Group: New Jersey Sierra Club.. ML0814906102008-05-15015 May 2008 2008/05/15-Supplemental Petition by Collective Petitioners for Additional Investigation and Correction of Deficiencies Regarding License Renewal Reviews for Oyster Creek, Indian Point, Pilgrim, and Vermont Yankee Nuclear Power Plants ML0814306512008-05-15015 May 2008 Supplemental Petition by Nuclear Information and Resource Service: Jersey Shore Nuclear Watch, Inc.: Grandmothers, Mothers and More for Energy Safety: New Jersey Public Interest Research Group: New Jersey Sierra Club: New Jersey.. ML0816402452008-05-15015 May 2008 2008/05/15-Supplemental Petition by Listed Companies for Additional Investigation and Correction of Deficiencies Regarding License Renewal Reviews, for Oyster Creek, Indian Point, Pilgrim, and Vermont Yankee Nuclear Power Plants ML0813501902008-05-0606 May 2008 Commonwealth of Massachusetts' Notice of Intent to Participate as an Interested State 2011-03-10
[Table view] |
Text
DOCKETED USNRC May 1, 2009 (12:57pm) May 1, 2009 OFFICE OF SECRETARY UNITED STATES OF AMERICA RULEMAKINGS AND ADJUDICATIONS STAFF NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of )
)
Entergy Nuclear Vermont Yankee, LLC ) Docket No. 50-271-LR and Entergy Nuclear Operations, Inc. ) ASLBP No. 06-849-03-LR
)
(Vermont Yankee Nuclear Power Station) )
ENTERGY'S OPPOSITION TO NEW ENGLAND COALITION'S MOTION TO HOLD ACTION ON PROPOSED CONTENTION IN ABEYANCE UNTIL ISSUANCE OF NRC STAFF SUPPLEMENTAL SAFETY EVALUATION REPORT Pursuant to 10 C.F.R. § 2.323(c), Applicants Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. (collectively "Entergy") oppose the New England Coalition, Inc.'s ("NEC") "Motion to Hold in Abeyance Action on this Proposed Contention Until Issuance of NRC Staff Supplemental Safety Evaluation Report" ("NEC Motion to Hold Action in Abeyance"). The NEC Motion to Hold Action in Abeyance is part of NEC's filing dated April 24, 2009 entitled "New England Coalition, Inc.'s Motion for Leave to File a Timely New Contention and Motion to Hold in Abeyance Action on this Proposed Contention Until Issuance of NRC Staff Supplemental Safety Evaluation Report" ("NEC Motion"), which moves for the admission of a new contention challenging the "reanalysis of environmentally assisted metal fatigue for Recirculation Outlet (RO) and Core Spray (CS) nozzles" performed by Entergy in accordance with the Board's instructions. NEC Motion at 1; Partial Initial Decision (Ruling on
Contentions 2A, 2B, 3 and 4), LBP-08-25, 68 NRC _ (Nov. 24, 2008) ("LBP-08-25"), slip op.
at 66-67.'
In support of its Motion to Hold Action in Abeyance, NEC argues that the Audit Summary and Supplemental Safety Evaluation Report ("SSER") to be issued by the NRC Staff regarding the Staff's review of Entergy's confirmatory analyses of the RO and CS nozzles "will be helpful in both building a record in this docket and helpful to the Board and the Parties in evaluating the merits of NEC's proposed contention." NEC Motion at 7. NEC further argues that the Commission depends, and the Board relies on, the Staff "to assist in informing decisions regarding what should or should not go to hearing." Id. at 8.
On April 30, 2009 the NRC Staff filed its "Answer in Opposition to NEC Motion to Hold in Abeyance Action on Proposed Contention until Issuance of NRC Staff Supplemental Safety Evaluation Report" ("Staff's Answer"), which provides a cogent explanation of the reasons why the NEC Motion to Hold Action in Abeyance should be denied. Entergy wholly agrees with and supports the Staff's Answer.
NEC filed a very similar motion only a few weeks ago seeking an extension of time to file new contentions until fifteen days after the Staff issued its SSER and Audit Summary regarding the confirmatory analyses of the CS and RO nozzles. New England Coalition, Inc.
(NEC) Motion to Alter or Amend the Schedule in the Above Captioned Proceeding (March 6, 2009). That motion was denied by the Board. March 9, 2009 Order at.4. As that decision and others by the Board have made clear, the reviews by the Staff of Entergy' s license renewal Entergy will file a separate response opposing admission of the new contention propounded in the NEC Motion because the contention fails to meet the general admissibility requirements in 10 C.F.R. §2.309(f)(1), the additional requirements set forth in 10 C.F.R. § 2.309(f)(2) for the admission of contentions submitted after the initiation of a proceeding, the provisions of 10 C.F.R. § 2.309(c) governing untimely filings, and the very specific requirements for the admissibility of contentions challenging the new RO and CS calculations set -by the Board in LBP-08-25 and in its March 9, 2009 Order (Clarifying Deadline for Filing New or Amended Contentions).
2
application are independent of the adjudicatory proceedings on the application and, after the issuance of the initial SER, the two proceed on separate schedules. LBP-08-25 at 67; Order (Granting Entergy's Motion for Clarification) (December 22, 2008) (time for NEC and other intervenors to file new contentions based on Entergy's new calculations begins when they are provided to the other parties, not when the Staff's SSER addressing the calculations is issued).
The Board's rulings are consistent with repeated Commission decisions emphasizing the separation between the Staff's review of a license application and the adjudicatory proceedings on the application. See, AmerGen Energy Co. LLC (Oyster Creek Nuclear Generating Station),
CLI-08-23, 68 N R.C. __ (Oct. 6, 2008), slip op. at 18; Dominion Nuclear Connecticut, Inc.
(Millstone Power Station, Unit 3), CLI-08-17, 68 N.R.C. __ (2008), slip op. at 8; Pa'ina Hawaii, LLC, CLI-08-3, 67 N.R.C. 151, 168 n.73 (2008). Accordingly, there is no basis for the Staff s SSER schedule to affect the Board's disposition of NEC's Motion.
Conclusion For the above stated reasons, the NEC Motion to Hold Action in Abeyance should be denied.
Respectfully Submitted, David R. Lewis Matias F. Travieso-Diaz Blake J. Nelson PILLSBURY WINTHROP SHAW PITTMAN LLP 2300 N Street, NW Washington, DC 20037-1122 Tel. (202) 663-8000 Counsel for Entergy Dated: May 1, 2009 3
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of )
)
Entergy Nuclear Vermont Yankee, LLC ) Docket No. 50-271-LR and Entergy Nuclear Operations, Inc. ) ASLBP No. 06-849-03-LR
)
(Vermont Yankee Nuclear Power Station) )
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing "Entergy's Opposition to New England Coalition's Motion to Hold Action on Proposed Contention in Abeyance Until Issuance of NRC Staff Supplemental Safety Evaluation Report" 'were served on the persons listed below by deposit in the U.S. Mail, first class, postage prepaid, and where indicated by an asterisk by electronic mail, this 1 st day of May, 2009.
- Administrative Judge *Administrative Judge Alex S. Karlin, Esq., Chairman Dr. Richard E. Wardwell Atomic Safety and Licensing Board Atomic Safety and Licensing Board Mail Stop T-3 F23 Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Washington, D.C. 20555-0001 ask2@nrc.gov rew@nrc.gov
- Administrative Judge *Secretary William H. Reed Att'n: Rulemakings and Adjudications Staff 1819 Edgewood Lane Mail Stop 0-16 C I Charlottesville, VA 22902 U.S. Nuclear Regulatory Commission whrcvillegembarqmail.com Washington, D.C. 20555-0001 hearingdocket(&nrc.gov
- Office of Commission Appellate Adjudication Atomic Safety and Licensing Board Mail Stop 0-16 C1 Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Washington, D.C. 20555-0001 OCAAmail@nrc. gov
- Lloyd Subin, Esq. *Sarah Hofmann, Esq.
- Susan L. Uttal, Esq. Director of Public Advocacy
- Maxwell C. Smith, Esq. Department of Public .Service Office of the General Counsel 112 State Street - Drawer 20 Mail Stop O-15-D21 Montpelier, VT 05620-2601 U.S. Nuclear Regulatory Commission Sarah.hofmann(astate.vt.us Washington, D.C. 20555-0001 LB S3 (@nrc.gov; susan.uttalanrc .gov; maxwell.smith(anrc.gov
- Matthew Brock National Legal Scholars Law Firm Assistant Attorney General 84 East Thetford Road Office of the Attorney General Lyme, NH 03768 One Ashburton Place, 18 th Floor aroismanlnationallegalscholars.com Boston, MA 01108 Matthew.Brock(&state.ma.us
- Zachary Kahn Office of the New Hampshire Attorney General Atomic Safety and Licensing Board Panel 33 Capitol Street Mail Stop T-3 F23 Concord, NH 03301 U.S. Nuclear Regulatory Commission Peter.roth(@doj.nh.gov Washington, D.C. 20555-0001 zachary.katmh(nrc.gov Raymond Shadis
- Lauren Bregman New England Coalition Pro Se Representative Atomic Safety and Licensing Board Panel Post Office Box 98 Mail Stop T-3 F23 Edgecomb, Maine 04556 U.S. Nuclear Regulatory Commission shadis@(prexar.com Washington, D.C. 20555-0001 lauren.bremnantnrc. aov
Matias F. Travieso-Diaz 2