MONTHYEARML1107503812011-03-10010 March 2011 Entergy'S Response to New England Coalition'S Motion for Stay and Request for Further Opportunity for Hearings ML1036300302010-12-23023 December 2010 Entergy'S Response to the Supplement to New England Coalition'S Petition for Commission Review of LBP-10-19 ML1033403292010-11-22022 November 2010 Entergy'S Answer Opposing New England Coalition'S Petition for Commission Review of LBP-10-19 ML1028002492010-09-30030 September 2010 New England Coalition'S Answer & Opposition to Entergy'S Motion to Strike Declaration of Paul Blanch ML1027204022010-09-20020 September 2010 New England Coalition'S Reply to NRC Staff and Entergy Nuclear Vermont Yankee Opposition to New England Coalition'S Motion to Reopen the Hearing & Reply to NRC Staff'S Answer to Proposed New Contention ML1026003772010-09-14014 September 2010 Entergy'S Answer Opposing New England Coalition'S Motion to Reopen ML1007403702010-03-12012 March 2010 Entergy'S Response in Opposition to New England Coalition'S Stay Request ML0922400652009-08-0303 August 2009 Entergy'S Response in Opposition to New England Coalition'S Petition for Review of LBP-09-09 ML0921202202009-07-23023 July 2009 New England Coalition'S Petition for Review of the Licensing Board'S Full Initial Decision, LBP-09-09 ML0916702632009-06-0808 June 2009 New England Coalition'S Opposition to Entergy'S Motion to Strike New England Coalition'S Reply to NRC Staff and Entergy Oppositions to Nec'S Motion to File a Timely New Contention ML0915404042009-05-26026 May 2009 Nec'S Reply to NRC Staff and Entergy Oppositions to Nec'S Motion to File a Timely New Contention ML0914203732009-05-18018 May 2009 Entergy'S Opposition to Nec'S Motion to File a Timely New Contention ML0913400192009-05-0707 May 2009 New England Coalition'S Reply to Nrc'S Staff and Entergy Answers to New England Coalition'S Motion to Hold in Abeyance Action on It'S Proposed Contention Until Issuance of NRC Staff Supplemental Safety Evaluation Report ML0912708592009-05-0101 May 2009 Entergy'S Opposition to New England Coalition'S Motion to Hold Action on Proposed Contention in Abeyance Until Issuance of NRC Staff Supplemental Safety Evaluation Report ML0908404222009-03-10010 March 2009 Final Calculations of Record for the Confirmatory Environmentally Assisted Fatigue (Cufen) Analyses on the Reactor Pressure Vessel Core Spray (CS) and Recirculation Outlet (RO) Nozzles at Vermont Yankee ML0912101052009-03-0909 March 2009 New England Coalition'S Petition for Leave Reply to Entergy Responses to New England Coalition'S Motion to Alter or Amend the Schedule in the Above Captioned Proceeding ML0907711422009-03-0909 March 2009 Entergy'S Opposition to New England Coalition'S Motion to Alter or Amend the Schedule ML0901400782009-01-0707 January 2009 Entergy'S Opposition to New England Coalition'S Motion for Reconsideration of the Licensing Board'S Partial Initial Decision ML0901400792008-12-29029 December 2008 Entergy'S Answer Opposing Motion by New York Et Al. for Leave to Submit Brief Amici Curiae ML0901602092008-12-19019 December 2008 New England Coalition'S Response to NRC Staff'S Petition for Review of the Licensing Board'S Partial Initial Decision, LBP-08-25 ML0900606092008-12-19019 December 2008 Entergy'S Answer in Support of NRC Staff'S Petition for Review of the Licensing Board'S Partial Initial Decision ML0836600342008-12-19019 December 2008 Vermont Department of Public Service Opposition to Petition for Review of Partial Initial Decision LBP-08-25 ML0836401982008-12-11011 December 2008 Entergy'S Answer to Commonwealth of Massachusetts Petition for Review of LBP-08-25 and Request for Consolidated Ruling ML0835205232008-12-10010 December 2008 Entergy'S Response in Opposition to New England Coalition'S Motion to Extend Time to File Petition for Review ML0835004492008-12-0404 December 2008 Entergy'S Motion for Clarification ML0835100872008-12-0404 December 2008 Entergy'S Opposition to New England Coalition'S Motion to Extend Time to File Motion for Reconsideration ML0824018252008-08-25025 August 2008 Vermont Yankee - NRC Staff'S Proposed Findings of Fact and Conclusion of Law and Order in the Form of an Initial Decision ML0819905482008-07-15015 July 2008 Vermont Yankee - NRC Staff Letter to Board Regarding Evidentiary Hearing Attendees ML0820501022008-07-15015 July 2008 Entergy'S Response to July 11, 2008 Board Order ML0820501012008-07-15015 July 2008 Entergy'S Reply to Responses to Licensing Board'S Questions ML0820406152008-07-15015 July 2008 Vermont Department of Public Service Response to Entergy and NRC Staff Brief on Pre-Trial Legal Issues ML0819806542008-07-15015 July 2008 Vermont Yankee - NRC Staff'S Reply Brief ML0819704842008-07-0909 July 2008 Entergy'S Answers to Licensing Board Questions ML0819202482008-07-0909 July 2008 Vermont Yankee - Nrc'S Brief in Response to Board Order ML0819805252008-07-0808 July 2008 Joint Stipulation ML0819704802008-07-0707 July 2008 Entergy'S Response to Vermont Department of Public Service Motion for Modification of the Scheduling Order to Facilitate Full Compliance with 10 C.F.R. 2.323(b) ML0818504242008-07-0202 July 2008 Vermont Yankee - NRC Staff'S Response to Vermont Department of Public Service'S Motion to Modify the Schedule ML0819100872008-06-30030 June 2008 New England Coalition, Inc'S Opposition to Entergy'S and the NRC Staff'S Motions in Limine to Exclude Rebuttal Testimony of Ulrich Witte ML0819200412008-06-30030 June 2008 Entergy'S Response in Support of Staff'S Motion in Limine to Exclude Witte Rebuttal Testimony ML0818304142008-06-23023 June 2008 Entergy'S Response in Opposition to NEC Motion to File Untimely Rebuttal Testimony by Ulrich Witte ML0817807432008-06-20020 June 2008 Filing Discussing Proprietary Documents in the Matter of Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc ML0817107262008-06-19019 June 2008 Vermont Yankee - NRC Staff'S Response to Nec'S Motion to Strike NRC Staff'S Rebuttal Testimony Concerning NEC Contention 4 ML0817800972008-06-19019 June 2008 Entergy'S Response in Support of Staff'S Motion in Limine ML0816305762008-06-0505 June 2008 2008/06/05-Vermont Yankee License Renewal Proceeding: June 24 Call ML0814905522008-05-20020 May 2008 Certificate of Disclosure of Sarah Hofmann, for the Vermont Department of Public Service Certifying Current with Disclosures Pursuant to 10 C.F.R. 2.336 That Are Relevant and Not Privileged to the Contentions Now Being Considered ML0814306502008-05-15015 May 2008 Supplemental Petition by Nuclear Information and Resource Service: Jersey Shore Nuclear Watch, Inc.; Grandmothers, Mothers and More for Energy Safety: New Jersey Public Interest Research Group: New Jersey Sierra Club.. ML0814906102008-05-15015 May 2008 2008/05/15-Supplemental Petition by Collective Petitioners for Additional Investigation and Correction of Deficiencies Regarding License Renewal Reviews for Oyster Creek, Indian Point, Pilgrim, and Vermont Yankee Nuclear Power Plants ML0814306512008-05-15015 May 2008 Supplemental Petition by Nuclear Information and Resource Service: Jersey Shore Nuclear Watch, Inc.: Grandmothers, Mothers and More for Energy Safety: New Jersey Public Interest Research Group: New Jersey Sierra Club: New Jersey.. ML0816402452008-05-15015 May 2008 2008/05/15-Supplemental Petition by Listed Companies for Additional Investigation and Correction of Deficiencies Regarding License Renewal Reviews, for Oyster Creek, Indian Point, Pilgrim, and Vermont Yankee Nuclear Power Plants ML0813501902008-05-0606 May 2008 Commonwealth of Massachusetts' Notice of Intent to Participate as an Interested State 2011-03-10
[Table view] Category:Responses and Contentions
MONTHYEARML1107503812011-03-10010 March 2011 Entergy'S Response to New England Coalition'S Motion for Stay and Request for Further Opportunity for Hearings ML1036300302010-12-23023 December 2010 Entergy'S Response to the Supplement to New England Coalition'S Petition for Commission Review of LBP-10-19 ML1033403292010-11-22022 November 2010 Entergy'S Answer Opposing New England Coalition'S Petition for Commission Review of LBP-10-19 ML1028002492010-09-30030 September 2010 New England Coalition'S Answer & Opposition to Entergy'S Motion to Strike Declaration of Paul Blanch ML1027204022010-09-20020 September 2010 New England Coalition'S Reply to NRC Staff and Entergy Nuclear Vermont Yankee Opposition to New England Coalition'S Motion to Reopen the Hearing & Reply to NRC Staff'S Answer to Proposed New Contention ML1026003772010-09-14014 September 2010 Entergy'S Answer Opposing New England Coalition'S Motion to Reopen ML1007403702010-03-12012 March 2010 Entergy'S Response in Opposition to New England Coalition'S Stay Request ML0922400652009-08-0303 August 2009 Entergy'S Response in Opposition to New England Coalition'S Petition for Review of LBP-09-09 ML0921202202009-07-23023 July 2009 New England Coalition'S Petition for Review of the Licensing Board'S Full Initial Decision, LBP-09-09 ML0916702632009-06-0808 June 2009 New England Coalition'S Opposition to Entergy'S Motion to Strike New England Coalition'S Reply to NRC Staff and Entergy Oppositions to Nec'S Motion to File a Timely New Contention ML0915404042009-05-26026 May 2009 Nec'S Reply to NRC Staff and Entergy Oppositions to Nec'S Motion to File a Timely New Contention ML0914203732009-05-18018 May 2009 Entergy'S Opposition to Nec'S Motion to File a Timely New Contention ML0913400192009-05-0707 May 2009 New England Coalition'S Reply to Nrc'S Staff and Entergy Answers to New England Coalition'S Motion to Hold in Abeyance Action on It'S Proposed Contention Until Issuance of NRC Staff Supplemental Safety Evaluation Report ML0912708592009-05-0101 May 2009 Entergy'S Opposition to New England Coalition'S Motion to Hold Action on Proposed Contention in Abeyance Until Issuance of NRC Staff Supplemental Safety Evaluation Report ML0908404222009-03-10010 March 2009 Final Calculations of Record for the Confirmatory Environmentally Assisted Fatigue (Cufen) Analyses on the Reactor Pressure Vessel Core Spray (CS) and Recirculation Outlet (RO) Nozzles at Vermont Yankee ML0912101052009-03-0909 March 2009 New England Coalition'S Petition for Leave Reply to Entergy Responses to New England Coalition'S Motion to Alter or Amend the Schedule in the Above Captioned Proceeding ML0907711422009-03-0909 March 2009 Entergy'S Opposition to New England Coalition'S Motion to Alter or Amend the Schedule ML0901400782009-01-0707 January 2009 Entergy'S Opposition to New England Coalition'S Motion for Reconsideration of the Licensing Board'S Partial Initial Decision ML0901400792008-12-29029 December 2008 Entergy'S Answer Opposing Motion by New York Et Al. for Leave to Submit Brief Amici Curiae ML0901602092008-12-19019 December 2008 New England Coalition'S Response to NRC Staff'S Petition for Review of the Licensing Board'S Partial Initial Decision, LBP-08-25 ML0900606092008-12-19019 December 2008 Entergy'S Answer in Support of NRC Staff'S Petition for Review of the Licensing Board'S Partial Initial Decision ML0836600342008-12-19019 December 2008 Vermont Department of Public Service Opposition to Petition for Review of Partial Initial Decision LBP-08-25 ML0836401982008-12-11011 December 2008 Entergy'S Answer to Commonwealth of Massachusetts Petition for Review of LBP-08-25 and Request for Consolidated Ruling ML0835205232008-12-10010 December 2008 Entergy'S Response in Opposition to New England Coalition'S Motion to Extend Time to File Petition for Review ML0835004492008-12-0404 December 2008 Entergy'S Motion for Clarification ML0835100872008-12-0404 December 2008 Entergy'S Opposition to New England Coalition'S Motion to Extend Time to File Motion for Reconsideration ML0824018252008-08-25025 August 2008 Vermont Yankee - NRC Staff'S Proposed Findings of Fact and Conclusion of Law and Order in the Form of an Initial Decision ML0819905482008-07-15015 July 2008 Vermont Yankee - NRC Staff Letter to Board Regarding Evidentiary Hearing Attendees ML0820501022008-07-15015 July 2008 Entergy'S Response to July 11, 2008 Board Order ML0820501012008-07-15015 July 2008 Entergy'S Reply to Responses to Licensing Board'S Questions ML0820406152008-07-15015 July 2008 Vermont Department of Public Service Response to Entergy and NRC Staff Brief on Pre-Trial Legal Issues ML0819806542008-07-15015 July 2008 Vermont Yankee - NRC Staff'S Reply Brief ML0819704842008-07-0909 July 2008 Entergy'S Answers to Licensing Board Questions ML0819202482008-07-0909 July 2008 Vermont Yankee - Nrc'S Brief in Response to Board Order ML0819805252008-07-0808 July 2008 Joint Stipulation ML0819704802008-07-0707 July 2008 Entergy'S Response to Vermont Department of Public Service Motion for Modification of the Scheduling Order to Facilitate Full Compliance with 10 C.F.R. 2.323(b) ML0818504242008-07-0202 July 2008 Vermont Yankee - NRC Staff'S Response to Vermont Department of Public Service'S Motion to Modify the Schedule ML0819100872008-06-30030 June 2008 New England Coalition, Inc'S Opposition to Entergy'S and the NRC Staff'S Motions in Limine to Exclude Rebuttal Testimony of Ulrich Witte ML0819200412008-06-30030 June 2008 Entergy'S Response in Support of Staff'S Motion in Limine to Exclude Witte Rebuttal Testimony ML0818304142008-06-23023 June 2008 Entergy'S Response in Opposition to NEC Motion to File Untimely Rebuttal Testimony by Ulrich Witte ML0817807432008-06-20020 June 2008 Filing Discussing Proprietary Documents in the Matter of Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc ML0817107262008-06-19019 June 2008 Vermont Yankee - NRC Staff'S Response to Nec'S Motion to Strike NRC Staff'S Rebuttal Testimony Concerning NEC Contention 4 ML0817800972008-06-19019 June 2008 Entergy'S Response in Support of Staff'S Motion in Limine ML0816305762008-06-0505 June 2008 2008/06/05-Vermont Yankee License Renewal Proceeding: June 24 Call ML0814905522008-05-20020 May 2008 Certificate of Disclosure of Sarah Hofmann, for the Vermont Department of Public Service Certifying Current with Disclosures Pursuant to 10 C.F.R. 2.336 That Are Relevant and Not Privileged to the Contentions Now Being Considered ML0814306502008-05-15015 May 2008 Supplemental Petition by Nuclear Information and Resource Service: Jersey Shore Nuclear Watch, Inc.; Grandmothers, Mothers and More for Energy Safety: New Jersey Public Interest Research Group: New Jersey Sierra Club.. ML0814906102008-05-15015 May 2008 2008/05/15-Supplemental Petition by Collective Petitioners for Additional Investigation and Correction of Deficiencies Regarding License Renewal Reviews for Oyster Creek, Indian Point, Pilgrim, and Vermont Yankee Nuclear Power Plants ML0814306512008-05-15015 May 2008 Supplemental Petition by Nuclear Information and Resource Service: Jersey Shore Nuclear Watch, Inc.: Grandmothers, Mothers and More for Energy Safety: New Jersey Public Interest Research Group: New Jersey Sierra Club: New Jersey.. ML0816402452008-05-15015 May 2008 2008/05/15-Supplemental Petition by Listed Companies for Additional Investigation and Correction of Deficiencies Regarding License Renewal Reviews, for Oyster Creek, Indian Point, Pilgrim, and Vermont Yankee Nuclear Power Plants ML0813501902008-05-0606 May 2008 Commonwealth of Massachusetts' Notice of Intent to Participate as an Interested State 2011-03-10
[Table view] |
Text
DOCKETED USNRC June 30, 2008 (1:15pm)
OFFICE OF SECRETARY June 30, 2008 RULEMAKINGS AND ADJUDICATIONS STAFF UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of )
)
Entergy Nuclear Vermont Yankee, LLC ) Docket No. 50-271-LR and Entergy Nuclear Operations, Inc. ) ASLBP No. 06-849-03-LR
)
(Vermont Yankee Nuclear Power Station) )
ENTERGY'S RESPONSE IN SUPPORT OF STAFF'S MOTION IN LIMINE TO EXCLUDE WITTE REBUTTAL TESTIMONY Pursuant to 10 C.F.R. § 2.323(c) and paragraph 10.E of the Atomic Safety and Licensing Board ("Board")'s Initial Scheduling Order dated November 17, 2006, Applicants Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. (collectively "Entergy")
hereby file their response in support of the NRC Staff s "Motion in Limine to Strike Late-Filed Rebuttal Testimony and Exhibits of NEC Witness Ulrich Witte" (June 23, 2008) ("Staff Motion in Limine"). The Staff s Motion in Limine seeks to exclude the late-filed rebuttal testimony submitted by Mr. Ulrich Witte ("Witte Rebuttal") on behalf of intervenor New England Coalition, Inc. ("NEC") on the grounds that Mr. Witte lacks adequate qualifications to testify on NEC Contentions 2A, 2B and 4, which are the subject of the Witte Rebuttal. The Staff also asserts that the rebuttal testimony of Mr. Witte on Contentions 2A and 2B "is unsupported, unreliable, irrelevant, and not useful to the trier of fact" (Staff Motion in Limine at 4), and that his testimony on NEC Contention 4 is likewise "unsupported, unreliable, irrelevant, and not useful to the trier of fact." Id. at 7.
Entergy fully supports the Staff Motion in Limine. Entergy has filed its own Motion in Limine to exclude the entirety of the rebuttal testimony and exhibits proffered by Mr. Witte on similar grounds to those raised by the Staff. Entergy's Motion in Limine to Exclude Rebuttal Testimony of Ulrich Witte (June 23, 2008) ("Entergy's Motion to Exclude Witte's Rebuttal").
Rebuttal Testimony and Exhibits on NEC Contentions 2A and 2B Mr. Witte is clearly unqualified to testify as an expert on environmentally assisted fatigue, the subject of NEC Contentions 2A and 2B. See Entergy's Motion to Exclude Witte's Rebuttal at 2-4.1 Also, his testimony contains many statements that are speculative (see, e.g.,
Staff Motion in Limine at 5-6; Entergy's Motion to Exclude Witte's Rebuttal at 4); irrelevant (see, e.g*, Staff Motion in Limine at 5; Entergy's Motion to Exclude Witte's Rebuttal at 6); and lacking any factual support, (see, e.g*, Staff Motion in Limine at 5-6; Entergy's Motion to Exclude Witte's Rebuttal at 5-6). Likewise, the exhibits included with Mr. Witte's rebuttal testimony are unidentified and lack any probative value. For all these reasons, Mr. Witte's testimony and exhibits are inadmissible.
Rebuttal Testimony and Exhibits on NEC Contention 4 Both Entergy and the NRC Staff have already moved to exclude Mr. Witte's direct testimony on NEC Contention 4 because Mr. Witte does not qualify as an expert on the issues raised by NEC Contention 4 by "knowledge, skill, experience, training, or education." Entergy's Motion in Limine (June 12, 2008) at 22; NRC Staff s Motion in Limine to Strike Testimony and Exhibits Filed by New England Coalition, Inc. (June 12, 2008) at 5-9. Mr. Witte acknowledges in his rebuttal testimony that he has no expertise on the use of CHECWORKS, which is the main issue in controversy on NEC Contention 4. See Witte Rebuttal at A8. For that reason and the As the Staff points out (Staff Motion at 4, n.6) Mr. Witte was not even identified by NEC in its final list of witnesses as a witness on NEC Contentions 2A and 2B. This suggests that Mr. Witte's rebuttal testimony is an afterthought and that NEC implicitly recognized that he was not qualified to testify on those contentions.
2
others discussed in Entergy's and the Staff s previous and current motions in limine, Mr. Witte's testimony should be stricken. See Staff Motion in Limine at 7-9; Entergy's Motion to Exclude Witte's Rebuttal at 7.
In addition, Mr. Witte's rebuttal testimony on NEC Contention 4 suffers from the same deficiencies that rendered his direct testimony inadmissible: it is outside the scope of the admitted contention, is speculative, is without factual support, and is inaccurate. See Staff Motion in Limine at 9-12; Entergy's Motion to Exclude Witte's Rebuttal at 8-9.
If further proof were needed that Mr. Witte's direct and rebuttal testimony on NEC Contention 4 warrant exclusion, such proof has been provided by the motion just filed by NEC to withdraw portions of both pieces of testimony as erroneous, to correct countless other errors in both, and to substitute exhibits determined to be "incomplete" and "corrupted." New England Coalition, Inc's Motion to File Corrections to Exhibits and to Withdraw Certain Testimony of Ulrich Witte (June 27, 2008). Such flaws in the testimony of an alleged expert evidence a lack of care that renders Mr. Witte's entire direct and rebuttal testimony unreliable.
For the above stated reasons, the Staff Motion in Limine should be granted and the entire Witte Rebuttal and exhibits thereto should be stricken.
Respectfully Submitted, David R. Lewis Matias F. Travieso-Diaz Blake J. Nelson PILLSBURY WINTHROP SHAW PITTMAN LLP 2300 N Street, NW Washington, DC 20037-1122 Tel. (202) 663-8000 Counsel for Entergy Dated: June 30, 2008 3
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safetv and.Licensin2 Board In the Matter of )
Entergy Nuclear Vermont Yankee, LLC ) Docket No. 50-271-LR and Entergy Nuclear Operations, Inc. ) ASLBP No. 06-849-03-LR
)
(Vermont Yankee Nuclear Power Station) )
CERTIFICATE OF SERVICE I hereby certify that copies of"Entergy's Response in Support of Staff s Motion in Limine to Exclude Witte Rebuttal Testimony" were served on the persons listed below by deposit in the U.S.
Mail, first class, postage prepaid, and where indicated by an asterisk by electronic mail, this 3 0th day of June, 2008.
- Administrative Judge *Administrative Judge Alex S. Karlin, Esq., Chairman Dr. Richard.E. Wardwell Atomic Safety and Licensing Board Atomic Safety and Licensing Board Mail Stop T-3 F23 Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Washington, D.C. 20555-0001 ask2(d)nrc.gov rew(Onrc. gov
- Administrative Judge *Secretary William H. Reed Att'n: Rulemakings and Adjudications Staff 1819 Edgewood Lane Mail Stop 0-16 C1 Charlottesville, VA 22902 U.S. Nuclear Regulatory Commission whrcville@(embarqmail.comn Washington, D.C. 20555-0001 secy@nrc.gov, hearingdocket()nrc. gov
- Office of Commission Appellate Adjudication Atomic Safety and Licensing Board Mail Stop O-16.,C Mail Stop, T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Washington, D.C. 20555-0001 OCAAmail(anrc.gov
- Lloyd.Subin,,Esq. *.Sarah:Hofrnann,-Esq.
- M Baty, E q. Director of Public Advocacy
- Jessica A. Bielecki, Esq. Department of Public Service
- Susan L. Uttal, Esq. 112 State Street- Drawer 20 Office of the General. Counsel Montpelier, VT 05620-2601 Mail.Stop O-715-D21 Sarah.hofmann(@state.vt.us U.S. Nuclear.Regulatory Commission Washington, D.C. 20555-0001 LB$S3anrc. nov; mcb l.(1nrc.gov; iessica.bielecki(&nrc, gov; susan.uttal(inrc.gov
- Anthony Z. Roisman, Esq. *Ronald A. Shems, Esq.
National Legal Scholars Law Firm *Karen Tyler, Esq.
84 East Thetford Road Shems, Dunkiel, Kassel & Saunders, PLLC Lyme, NH 03768 9 COllege Street aroismant(nationallegalscholars.com Burlington, VT 05401 rshems~sdkslaw.com ktyler(osdkslaw.com
- Peter L. Roth, Esq. *Marcia Carpenter, Esq.
Office of the New Hampshire Attorney General Atomic Safety and Licensing Board Panel 33 Capitol Street Mail Stop T-3 F23 Concord, NH 03301 U.S. Nuclear Regulatory Commission Peter.roth(tdoj.nh. gov Washington, D.C. 20555-0001 mxc7P@nrc.gov
- Lauren Bregman, Law Clerk *Diane Curran, Esq.
Atomic Safety and Licensing Board Harmon, Curran, Spielberg, & Eisenberg, U.S. Nuclear Regulatory Commission L.L.P.
Mail Stop: T-3 F23 - 1726 M Street N.W., Suite 600 Washington, D.C. 20555-0001 Washington, D.C. 20036 Lauren.BreamanO.1nrc. gov dcurran(aharmoncurran.com
- Matthew Brock Assistant Attorney General Office of the Attorney General One Ashburton Place, 18'h Floor Boston, MA 02108 Matthew.Brock state.ma.us Matias F. Travieso-Diaz 2