TMI-2 POST DE-FUELING MONITORED STORAGE SAFETY ANALYSIS REPORT UPDATE 5 AUGUST 2003
TMI-2 POST-DEFUELING MONITORI1D STORAGE SAFETY ALNALYSIS REPORT AUGUST 1997
TMI-2 POST DE-FUELING MONITORED STORAGE SAFETY ANALYSIS REPORT UPDATE 5 August 2003
- I TMI-2 POST-DEFUELING MONITORED STORAGE SAFETY ANALYSIS REPORT UPDATE 5 AUGUST 2003
TMI-2 POST DE-FUELING MONITORED STORAGE SAFETY ANALYSIS REPORT UPDATE 5 August 2003
TABLE OF CONTENTS TABLE OF CONTENTS CHAPTER TITLE 1 INTRODUCTION AND GENERAL DESCRIPTION OF PLANT 2 SITE CHARACTERISTICS 3 DESIGN CRITERIA - STRUCTURES, SYSTEMS AND COMPONENTS 4 FUEL 5 PDMS RADIOLOGICAL CONDITIONS 6 DEACTIVATED SYSTEMS AND FACILITIES 7 OPERATIONAL SYSTEMS AND FACILITIES 8 ROUTINE AND UNANTICIPATED RELEASES 9 DELETED 10 ADMINISTRATIVE FUNCTIONS TC-1 UPDATE 4 - AUGUST 2001
TMI-2 POST-DEFUELING MONITORED STORAGE SAFETY ANALYSIS REPORT List of Effective Pages Page # Update # Date TC-1 4 8/01 1-i 4 8/01 I.I- l2 8/97 1.1-2 2 8/97 1.1-3 2 8/97 1.1-4 2 8/97 1.1-5 2 8/97 1.1-6 4 8/01 1.2-1 4 8/01 1.2-2 2 8/97 1.2-3 4 8/01 1.3-1 2 8/97 1.3-2 2 8/97 1.3-3 2 8/97 1.3-4 2 8/97 1.3-5 2 8/97 1.4-1 4 8/01 1.4-2 4 8/01 1.4-3 4 8/01 1.4-4 5 8/03 1.4-5 2 8/97 1.4-6 2 8/97 1.4-7 2 8/97 1.4-8 2 8/97 1.4-9 2 8/97 1.5-1 2 8/97 Update-5 8/03
TMI-2 POST-DEFUELING MONITORED STORAGE SAFETY ANALYSIS REPORT List of Effective Pages Page # Update # Date 2-i 2 8/97' 2-ii 2 8/97 2.1-1 4 8/01 2.1-2 2 8/97 2.1-3 2 8/97 2.1-4 4 8/01 2.2-1 2 8/97 2.3-1 2 8/97 2.4-1 2 8/97 2.4-2 3 8/99 2.4-3 2 8/97 2.4-4 2 8/97 2.4-5 2 8/97 2.4-6 2 8/97 2.5-1 2 8/97 3-i 2 8/97 3-ii 2 8/97 3-iii 2 8/97 3-iv 2 8/97 3-v 2 8/97 3-vi 2 8/97 3-vii 2 8/97 3-viii 2 8/97 3-ix 2 8/97 3-x 2 8/97 3-xi 2 8/97 Update-5 8/03
TMI-2 POST-DEFU.EIJNG MONITORED STORAGE SAFETY ANALYSIS REPORT List of Effective Pages Pge # Update # Date 3-xii 2 8/97 3-xiii 2 8/97 3.1-1 2 8/97 3.1-2 3 8/99 3.1-3 2 8/97 3.1-4 2 8/97 3.1-5 2 8/97 3.1-6 2 8/97 3.1-7 4 8/01 3.1-8 2 8/97 3.1-9 2 8/97 3.1-10 3 8/99 3.1-11 2 8/97 3.1-12 4 8/01 3.1-13 3 8/99 3.1-14 2 8/97 3.1-15 4 8/01 3.1-16 4 8/01 3.1-17 2 8/97 3.1-18 2 8/97 3.1-19 2 8/97 3.1-20 4 8/01 3.1-21 4 8/01 3.1-22 3 8/99 3.1-23 5 8/03 3.1-24 2 8/97 Update-5 8/03
TMI-2 POST-DEFUELING MONITORED STORAGE SAFETY ANALYSIS REPORT List of Effective Pages Pne # Update Date 3.1-25 2 8/97 3.1-26 2 8/97 3.1-27 2 8/97 3.1-28 2 8/97 3.1-29 2 8/97 3.1-30 2 8/97 3.1-31 2 8/97 3.1-32 2 8/97 3.1-33 2 8/97 3.1-34 2 8/97 3.1-35 2 8/97 3.1-36 2 8/97 3.1-37 2 8/97 3.1-38 2 8/97 3.1-39 2 8/97 3.1-40 2 8/97 3.1-41 2 8/97 3.1-42 2 8/97 3.1-43 4 8/01 3.2-1 2 8/97 3.2-2 2 8/97 3.2-3 2 8/97 3.2-4 2 8/97 3.3-1 2 8/97 3.3-2 2 8/97 3.4-1 2 8/97 Update-5 8/03
TMI-2 POST-DEFUJELING MONITORED STORAGE SAFETY ANALYSIS REPORT List of Effective Pages P # Update # Date 3.5-1 2 8/97 3.5-2 2 8/97 3.5-3 2 8/97 3.6-1 2 8/97 3.7-1 2 8/97 3.7-2 2 8/97 3.7-3 2 8/97 3.7-4 2 8/97 3.7-5 2 8/97 3.7-6 2 8/97 3.7-7 2 8/97 3.7-8 2 8/97 3.7-9 2 8/97 3.7-10 2 8/97 3.7-11 2 8/97 3.7-12 2 8/97 3.7-13 2 8/97 4-i 2 8/97 4-i 2 8/97 4-iii 2 8/97 4-iv 2 8/97 4.0-1 2 8/97 4.1-1 2 8/97 4.1-2 2 8/97 4.1-3 2 8/97 4.1-4 2 8/97 Update-5 8/03
TMI-2 POST-DEFUELING MONITORED STORAGE SAFETY ANALYSIS REPORT List of Effective Pages Pa # Update # Date 4.1-5 2 8/97 4.2-1 2 8/97 4.3-1 2 8/97 4.3-2 2 8/97 4.3-3 2 8/97 4.3-4 2 8/97 4.3-5 2 8/97 4.3-5a 2 8/97 4.3-5b 2 8/97 4.3-6 2 8/97 4.3-7 2 8/97 4.3-8 1 6/95 4.3-9 1 6/95 4.3-10 1 6/95 4.3-11 1 6/95 4.3-12 1 6/95 4.3-13 1 6/95 4.3-14 1 6/95 4.3-15 1 6/95 4.3-16 1 6/95 4.3-17 2 6/95 4A- 1 2 8/97 4A-2 2 8/97 4A-3 2 8/97 4A-4 2 8/97 4A-5 2 8/97 Update-5 8/03
TMI-2 POST-DEFUELING MONITORED STORAGE SAFETY ANALYSIS REPORT list of Effective Pages Page # Date 4A-6 2 8/97 4A-7 2 8/97 4A-8 2 8/97 5-i 2 8/97 5-ii 2 8/97 54-ii 2 8/97 5-iv 2 8/97 5-v 2 8/97 5-vi 2 8/97 5-vii 2 8/97 5.0-1 2 8/97 5.1-1 2 8/97 5.1-2 2 8/97 5.1-3 2 8/97 5.1-4 2 8/97 5.1-5 2 8/97 5.2-1 2 8/97 5.2-2 2 8/97 5.3-1 2 8/97 5.3-2 2 8/97 5.3-3 2 8/97 5.3-4 2 8/97 5.3-5 2 8/97 5.3-6 2 8/97 5.3-7 2 8/97 5.3-8 2 8/97 Update-5 8/03
TMI-2 POST-DEFUELING MONITORED STORAGE SAFETY ANALYSIS REPORT List of Effective Pages Page # Update # Date 5.3-9 2 8/97 5.3-10 2 8/97 5.3-11 2 8/97 5.3-12 2 8/97 5.3-13 2 8/97 5.3-14 2 8/97 5.3-15 2 8/97 5.3-16 2 8/97 5.3-17 2 8/97 5.3-18 2 8/97 5.3-19 2 8/97 5.3-20 2 8/97 5.3-21 2 8/97 5.3-22 2 8/97 5.3-23 2 8/97 5.3-24 2 8/97 5.A-1 2 8/97 5.A-2 2 8/97 5.A-3 2 8/97 5.A-4 2 8/97 5.A-5 2 8/97 5.A-6 2 8/97 5.A-7 2 8/97 5.A-8 2 8/97 5.A-9 2 8/97 5.A-10 2 8/97 Update-5 8/03
TMI-2 POST-DEFUELING MONUTORED STORAGE SAFETY ANALYSIS REPORT List of Effective Pages Pae # Update # Date 5.A-11 2 8/97 5.A-12 2 8/97 5.A-13 2 8/97 5.A-14 2 8/97 5.A-15 2 8/97 5.A-16 2 8/97 5.A-17 2 8/97 5.A-18 2 8/97 5.A-19 2 8/97 5.A-20 2 8/97 5.A-21 2 8/97 5.A-22 2 8/97 5.A-23 2 8/97 5.A-24 2 8/97 5.A-25 2 8/97 5.A-26 2 8/97 5.A-27 2 8/97 5.A-28 2 8/97 5.A-29 2 8/97 5.B-1 2 8/97 5.B-2 2 8/97 5.B-3 2 8/97 5.B-4 2 8/97 6-i 2 8/97 6-ii 2 8/97 6-iii 2 8/97 Updlate-5 8/03
TMI-2 POST-DEFUELING MONITORED STORAGE SAFETY ANALYSIS REPORT List of Effective Pages
- ag Update # Date 6-iv 2 8/97 6-v 2 8/97 6-vi 2 8/97 6-vii 2 8/97 6-viii 2 8/97 6-ix 2 8/97 6-x 2 8/97 6-xi 2 8/97 6-xii 2 8/97 6.0-1 5 8/03 6.1-1 3 8/99 6.1-2 2 8/97 6.1-3 3 8/99 6.1-4 3 8/99 6.1-5 2 8/97 6.2-1 3 8/99 6.2-2 2 8/97 6.2-3 2 8/97 6.2-4 2 8/97 6.2-5 2 8/97 6.2-6 2 8/97 6.2-7 3 8/99 6.2-8 2 8/97 6.2-9 2 8/97 6.2-10 2 8/97 6.2-11 2 8/97 Update-5 8/03
TMI-2 POST-DEFUELING MONITORED STORAGE SAFETY ANALYSIS REPORT p List of Effective Pages Page # Update # Date 6.2-12 2 8/97 6.2-13 2 8/97 6.2-14 2 8/97 6.2-15 2 8/97 6.2-16 2 8/97 6.2-17 2 8/97 6.2-18 2 8/97 6.2-19 3 8/99 6.2-20 2 8/97 6.2-21 3 8/99 6.2-22 3 8/99 P 6.2-23 2 8/97 6.3-1 2 8/97 6.3-2 2 8/97 6.3-3 2 8/97 6.3-4 2 8/97 6.3-5 2 8/97 6.3-6 2 8/97 6.3-7 2 8/97 6.4-1 2 8/97 6.5-1 2 8/97 6.5-2 2 8/97 6.5-3 3 8/99 6.5-4 3 8/99 6.5-5 2 8/97 6.5-6 2 8/97 Update-5 8/03
TNI-2 POST-DEFUELING MONITORED STORAGE SAFETY ANALYSIS REPORT List of Effective Pages g# Updte # Date 6.5-7 2 8/97 6.5-8 3 8/99 6.5-9 3 8/99 6.5-10 3 8/99 7-i 2 8/97 7-H 2 8/97 7-iii 2 8/97 7-iv 2 8/97 7-v 2 8/97 7-vi 2 8/97 7-vii 2 8/97 7-viii 2 8/97 7.0-1 2 8/97 7.1-1 2 8/97 7.1-2 2 8/97 7.1-3 2 8/97 7.1-4 4 8/01 7.1-5 4 8/01 7.1-6 2 8/97 7.1-7 2 8/97 7.1-8 2 8/97 7.1-9 2 8/97 7.2-1 2 8/97 7.2-2 2 8/97 7.2-3 2 8/97 7.2-4 2 8/97 Update-5 8/03
TMI-2 POST-DEFUELUNG MONITORED STORAGE SAFETY ANALYSIS REPORT List of Effective Pages P e# Date 7.2-5 2 8/97 7.2-6 2 8/97 7.2-7 2 8/97 7.2-8 4 8/01 7.2-9 4 8/01 7.2-10 2 8/97 7.2-11 2 8/97 7.2-12 2 8/97 7.2-13 2 8/97 7.2-14 4 8/01 7.2-15 2 8/97 7.2-16 2 8/97 7.2-17 2 8/97 7.2-18 4 8/01 7.2-19 2 8/97 7.2-20 4 8/01 7.2-21 2 8/97 7.2-22 5 8/03 7.2-23 5 8/03 7.2-24 5 8/03 7.2-25 4 8/01 7.2-26 5 8/03 7.2-27 2 8/97 7.2-28 4 8/01 7.2-29 2 8/97 7.2-30 2 8/97 Update-5 8/03
TMI-2 POST-DEFUELING MONITORED STORAGE SAFETY ANALYSIS REPORT List of Effective Pages Page# Update Date 7.2-31 2 8/97 7.2-32 2 8/97 7.2-33 2 8/97 7.2-34 2. 8/97 7.2-35 2 8/97 7.2-36 2 8/97 7.2-37 3 8/99 7.2-38 2 8/97 7.2-39 2 8/97 7.2-40 2 8/97 7.2-41 2 8/97 7.2-42 2 8/97 7.2-43 2 8/97 7.2-44 2 8/97 7.2-45 2 8/97 7.2-46 2 8/97 7.2-47 2 8/97 7.2-48 2 8/97 7.2-49 2 8/97 7.2-50 2 8/97 7.2-51 2 8/97 7.2-52 2 8/97 8-i 1 6/95 8-ii 1 6/95 8.1-1 2 8/97 8.1-2 2 8/97 Update-5 8/03
TMI-2 POST-DEFUELING MONITORED STORAGE SAFEIY ANALYSIS REPORT List of Effective Pages
- FUpdate # Date 8.1-3 2 8/97 8.1-4 2 8/97 8.1-5 2 8/97 8.1-6 2 8/97 8.1-7 2 8/97 8.1-8 2 8/97 8.1-9 2 8/97 8.1-10 2 8/97 8.1-11 2 8/97 8.1-12 2 8/97 8.1-13 2 8/97 8.2-1 2 8/97 8.2-2 2 8/97 8.2-3 2 8/97 8.2-4 2 8/97 8.2-5 2 8/97 8.2-6 2 8/97 8.2-7 2 8/97 8.2-8 2 8/97 8.2-9 2 8/97 8.2-10 2 8/97 8.2-11 2 8/97 8.2-12 2 8/97 Chapter 9 Deleted 10-i 5 8/03 Update-5 8/03
TMI-2 POST-DEFUELING MONITORED STORAGE SAFETY ANALYSIS REPORT List of Effective Pages Page # Update # Date 10-ii (Deleted) 4 8/01 10.0-1 1 2 8/97 10.1-1 2 8/97 10.2-1 4 8/01 10.3-1 4 8/01 10.4-1 5 8/03 10.5-1 4 8/01 10.5-2 5 8/03 10.5-3 4 8/01 10.5-4 5 8/03 Update-5 8/03
CHAPTER 1 INTRODUCTION AND GENERAL DESCRIPTION OF PLANT
CHAPTER 1 INTRODUCTION AND GENERAL DESCRIPTION OF PLANT TABLE OF CONTENTS SECTION TITLE PAGE
1.1 INTRODUCTION
1.1-1 S1.1.1 POST-DEFUELING MONITORED STORAGE 1.1-1 1.1.2 TRANSITION TO POST-DEFUELING MONITORED 1.1-2 STORAGE 1.1.2.1 Prerequisites for PDMS 1.1-2 1.1.2.2 Transition Activities 1.1-3 1.1.3 APPLICABLE REGULATIONS 1.1-5.
1.1.4 SAFETY-RELATED STRUCTURES, SYSTEMS, AND 1.1-5 COMPONENTS 1.1.5 DEVELOPMENT OF ACCEPTABLE OFF-SITE DOSE 1.1-6 1.1.6 RELATIONS OF THIS PDMS SAR TO EXISTING UNIT 1 1.1-6 UFSAR AND UNIT 2 FSAR 1.2 GENERAL PLANT DESCRIPTION 1.2-1 1.2.1 SITE CHARACTERISTICS 1.2-1 1.2.2 CONTAINMENT SYSTEMS 1.2-1 1.2.2.1 Containment 1.2-1 1.2.2.2 Containment Isolation Valves 1.2-1 1.2.2.3 Containment Atmospheric Breather 1.2-2 1.2.3 FIRE PROTECTION, SERVICE, AND SUPPRESSION 1.2-2 1.2.4 RADIOACTIVE WASTE MANAGEMENT 1.2-2 1.2.5 RADIATION MONITORING 1.2-2 1.2.6 ELECTRICAL SYSTEMS 1.2-3 1.2.7 PDMS SUPPORT SYSTEMS 1.2-3 1.2.8 FACILITIES AND SYSTEMS RELEASED FOR SITE USE 1.2-3 1.3 MATERIAL REFERENCED 1.3-1 1.4 PRESENTATION 1.4-1 1.4-1 DRAWINGS 1.4-1 1.4-2 ABBREVIATIONS AND ACRONYMS 1.4-1 LIST OF FIGURES SECTION TITLE PAGE
- 1. 1.2.2.4 Cork Seam Modifications 1.5-1 U-i UPDATE 4 - AUGUST 2001
CHAPTER 1 INTRODUCTION AND GENERAL DESCRIPTION OF PLANT
1.1 INTRODUCTION
This Post-Defueling Monitored Storage (PDMS) Safety Analysis Report (SAR) was submitted in support of the application of GPU Nuclear Corporation (GPU Nuclear) as agent for Metropolitan Edison Company (Met-Ed), Jersey Central Power & Light Company (JCP&L), and Pennsylvania Electric Company (Penelec) for revision of the existing Class 103 license to delineate the non-operating status of the nuclear electric generating station designated as Three Mile Island Nuclear Station Unit 2 (TMI-2). There are various sections of this SAR which reference either the Unit 1 UFSAR or Unit 2 FSAR for relevant information. These refer to information which has been previously reviewed and approved by the NRC, remains valid, and does not require further review. The TMI-1 UFSAR will continue to be updated in accordance with 10 CFR 50.71(e) whereas the TMI-2 FSAR update is no longer required.
The Three Mile Island Unit 2 operating license was issued on February 8, 1978, and commercial operation was declared on December 30, 1978. On March 28, 1979, the unit experienced an accident which resulted in severe damage to the reactor core. TMI-2 has been in a non-operating status since that time. GPU Nuclear conducted a substantial program to defuel the Reactor Vessel and decontaminate the facility. As a result, TMI-2 has been defueled and decontaminated to the extent that the plant is in a safe, inherently stable condition suitable for long-term management and any threat to the public health and safety has been eliminated. This long-term management condition is termed Post-Defueling Monitored Storage.
1.1.1 POST-DEFUELING MONITORED STORAGE Post-Defueling Monitored Storage has been established at this time based on three principal considerations:
- 1. The Reactor Vessel and the Reactor Coolant System have been defueled and the core material has been shipped off-site.
- 2. Decontamination has been completed to the extent that further major decontamination programs are not justified on the basis of worker dose.
- 3. A condition of stability and safety has been established such that there is no risk to public health and safety.
These three criteria are interrelated in that each has some degree of dependence on the other. A significant amount of decontamination had to be completed prior to the beginning of defueling. As defueling progressed and was completed, further decontamination tasks were undertaken which allowed for the completion of other cleanup activities. Extensive decontamination and the completion of defueling were required to establish the inherently stable and safe condition of the facility such that there was no risk to public health and safety.
1.1-1 UPDATE 2 - AUGUST 1997
Although it would be possible to continue decontamination of the facility, this effort would not appreciably enhance the overall stability and maintainability of the facility nor would it add to the overall margin of safety for the public. However, additional decontamination at this time would result in unnecessary additional occupational exposure to personnel who would be conducting the decontamination tasks. In addition, further decontamination might require some destructive decontamination techniques which would be best conducted when the plant is decommissioned. By placing TMI-2 in a long-term monitored storage condition at this time (i.e., until the time of decommissioning of TMI-1), it is possible to realize a significant savings in occupational exposure by deferring remaining decontamination activities for a number of years. For example, assuming all other factors to be equal, natural decay of the dominant radioactive isotopes (Sr-90, Cs-137) over a 30-year period would result in the occupational exposure being reduced by a factor of approximately two for any given task. It is possible that additional reductions in occupational exposure also could result from advances in decontamination technology and robotics. Although the exact reductions in occupational exposure are extremely difficult to quantify, it is clear that postponement of the remaining pre-decommissioning decontamination activities will result in a significant savings in occupational exposure (Reference Table 5A-10, Chapter 5). This estimate was based on information published by the NRC in Supplement 1 to the Programmatic Environmental Impact Statement (PEIS) and adjusted to account for variations in the scope of the work and actual exposure experience during the cleanup.
Based on this preliminary analysis and using revised data, GPU Nuclear, in 1985, more accurately quantified the potential savings in occupational exposure due to the deferral of the remaining decontamination tasks. The results of this extensive effort are presented in Chapter 5, Appendix 5A.
Given that occupational exposure remains the singular contributor to environmental impact, avoidance of unnecessary exposure where the public health and safety are not at risk is appropriate.
1.1.2 TRANSITION TO POST-DEFUELING MONITORED STORAGE The formal transition from the post-accident condition to PDMS required NRC approval. The establishment of PDMS occurred over a period of time preceding the formal implementation of PDMS and extending into PDMS. Not all activities leading to the final PDMS configuration were completed prior to the implementation of PDMS. However, during the transition period, all of the prerequisites to PDMS were satisfied. The following sections outline those conditions which were established prior to the implementation of PDMS and those activities which extended for some period of time subsequent to PDMS implementation.
1.1.2.1 Prerequisites for PDMS The following prerequisites were satisfied prior to the implementation of PDMS.
- 1. It has been demonstrated that there is no credible possibility of nuclear criticality. This condition has been assured by the removal of substantially all of the fuel from the Reactor Vessel and elimination of all potentially critical configurations. The elimination of any credible possibility of nuclear criticality was demonstrated as a requirement for transition to Mode 2 in accordance with the TMI-2 Recovery Technical Specifications. GPU Nuclear Letters 4410 L-0012 (Defueling Completion Report), C312-92-2080 (Reactor Vessel Criticality Safety Analyses) and C312-93-2004 (Reactor Vessel Post Defueling Survey Reports) have been submitted to support this conclusion.
1.1-2 UPDATE 2 - AUGUST 1997
- 2. All fuel and core debris which have been removed 'from the Reactor Vessel and associated systems have been shipped off-site.
- 3. Any potential for a significant release of radioactive material has been eliminated. Radioactive material has been removed and other sources of radioactivity have been isolated so that any potential radioactive release will be within: 10 CFR 50 Appendix I guidelines for off-site dose consequences.
- 4. As a precondition to implementing PDMS, water has been removed to the extent practical from the Reactor Coolant System and the Fuel Transfer Canal, and the fuel transfer tubes have been isolated. To the extent that the Spent Fuel Pools are needed to support Accident Generated Water disposal activities, water may remain in these pools subsequent to the implementation of PDMS. The treatment and processing of the Accident Generated Water has been completed.
- 5. All radioactive waste from the major cleanup activities has been shipped off-site or has been packaged and staged for shipment off-site.
- 6. Radiation within the facility has been reduced, as necessary, consistent with As-low-as-is-reasonably-achievable (ALARA) principles to levels which will allow necessary plant monitoring activities, the performance of required maintenance, and any necessary inspections.
1.1.2.2 Transition Activities Although the conditions described in Section 1.1.2.1 were established prior to the implementation of PDMS, there were some conditions described in this SAR which were not essential to the implementation of PDMS and the related activities were conducted subsequent to the implementation of PDMS. A general description of some of those activities and conditions follows.
- 1. Decontamination - During the initial stages of PDMS, removal or isolation of small sources of radioactivity or radioactive material will be ongoing.
- 2. Radioactive Waste - Small quantities of radioactive waste will continue to be generated, accumulated, and packaged during PDMS. Thus, radioactive waste shipments will continue during PDMS.
- 3. PDMS Electrical Modification - The TMI-2 PDMS Electrical Modification results in a safer, more reliable power system than the system existing during Facility Mode 3. Although many electrical loads were eliminated during PDMS preparation, this modification further consolidates loads to produce a simpler, easier to maintain electrical power system. The PDMS Electrical Modification was completed in July of 1994.
- 4. Cork Seam - The TMI-2 cork seam is a cork-filled construction joint located between the various major structures at TMI-2 (See Figure 1.4-1). During the TMN-2 accident, the cork seam located in the Auxiliary Building Seal Injection Valve Room (SIVR) was contaminated with radioactive water. Since the accident, radioactive material has spread along the joint in one direction into the Annulus, and in the other direction into the Auxiliary Building, Service Building and Control Building Area. The radioactive contamination is prevented from entering the ground water table by a PVC waterstop and thus represents no threat to the health and safety of the public.
1.1-3 UPDATE 2 - AUGUST 1997
Modifications have been made to the cork seam to allow periodic monitoring of the water levels in the joint, to permit periodic water removal, and to prevent water and contamination migration within the cork filled joint. Figure 1.4-1 shows the locations where the cork seam was penetrated and modifications performed. At locations S-2, S-6, S-7, S-8, and S-9, one inch diameter holes were drilled into the cork seam to a depth of about one inch above the PVC waterstop. A perforated tube was inserted into these monitoring holes and acts much like a conventional well point in providing a means of pumping accumulated water out of the seam i the vicinity. Also, the monitor pipes have been fitted with bubbler devices that allow measuring of the water level in the hole.
During the drilling for hole S-6, samples of water and cork were removed for analysis. From the data obtained, it was determined that the 40-year Total Integrated Dose to the PVC waterstop in this area would be 6.4E5 rads. This is less than 5% of the dose that would cause degradation of the material.
At locations S-1, S-3, S-4, S-5, and S-10, four inch diameter holes were core bored to penetrate the cork and the adjacent concrete slab on both sides of the seam. These holes extend down to the surface of the PVC waterstop. When these holes were drilled, the bottom was carefully probed with a blunt instrument to verify that the hole had actually reached the waterstop and to verify that the waterstop had not been breached and the material was still pliable. Where possible the waterstop was visually inspected. The hole was then filled with a moisture activated expandable polyurethane foam material that will bond well with both the concrete and the waterstop material. These locations serve as damns that will block water migration within the cork seam.
To prevent any additional spread of contamination from the cork seam in the future, work was completed to install a seal over the top of the cork filled joint. The work involved excavating about 3 inches of cork from the top of the joint along all accessible areas of the full length of the seam. The concrete edges were surface prepped and primed where required, an open cell polyurethane foam backer bar was packed into the joint, and the top one inch depth of the joint was filled with a pourable polysulfide sealant. The materials chosen for this modification are expected to provide a very tight bond with the concrete and provide a good pliable contamination barrier over the surface of the cork seam.
The monitoring holes remained intact after installation of the top seal described above. This will permit continued monitoring and sampling of the water that may enter the seam, and removal for processing as required. A program is in place for continued monitoring of the water level in the cork seam by the PDMS staff. If the water levels begin to increase, the water will be pumped out for processing as needed.
1.1-4 UPDATE 2 - AUGUST 1997
TMI-2 has been maintained in a safe, monitored condition throughout the transition period prior to PDMS, and will be maintained accordingly following implementation of PDMS even though some transition activities are ongoing. A commitment tracking process was established to verify the status and completion of all activities performed in preparation for PDMS and during the PDMS; transition period to ensure all required activities described in this SAR are completed.
1.1.3 APPLICABLE REGULATIONS GPU Nuclear received an amended facility license for TMI-2 in accordance with the provisions of Title 10 to the Code of Federal Regulations, Part 50 (10 CFR 50). The provisions of 10 CFR 50, as established, were intended to be applicable to an operable nuclear power plant. For this reason, many of the requirements originally imposed on TMI-2 no longer apply or can be substantially reduced in scope because of the status of TMI-2 during PDMS. Because nuclear criticality has been precluded with removal of substantially all of the fuel from TMI-2, and because radiation hazards have been substantially reduced due to the immobilization of essentially all of the radioactivity remaining in the plant, many systems, structures, and components are no longer required and the regulations governing these systems, structures, and components have a significantly reduced scope of applicability at TMI-2.
In order to assure compliance with the appropriate requirements of the regulations in 10 CFR 50, a thorough review of these regulations was undertaken. Chapter 3 of this SAR presents the results of that review and serves as the basis for determining which regulations have a controlling impact on TMI-2.
The determination of applicability does not suggest that some regulations can be ignored. Rather, the intent of some regulations can be met with no impact or additional requirements imposed due to the PDMS status of TMI-2.
1.1.4 SAFETY-RELATED STRUCTURES, SYSTEMS, AND COMPONENTS There are no structures, systems, or components classified as safety-related at TMI-2 during PDMS. GPU Nuclear procedures define safety-related structures, systems, and components as those which are necessary to ensure:
- a. The integrity of the reactor coolant pressure boundary,
- b. The capability to shutdown the reactor and to mainitain it in a safe shutdown condition, or
- c. The capability to prevent or mitigate the consequences of accidents which could result in potential off-site exposures comparable to the guidelines exposures of 10 CFR Part 100.
Criterion a requires maintenance of the reactor coolant pressure boundary. Due to the defueled condition of TMI-2, there is no reactor coolant or reactor coolant pressure boundary required.
Criterion b requires a capability to shutdown the reactor and maintain it in a safe shutdown condition. In its current defueled state, there are no structures, systems, or components required to maintain a safe shutdown condition.
Criterion c requires a capability to prevent or mitigate the consequences of accidents that could result in potential off-site exposures comparable to the 10 CFR Part 100 guidelines. Analysis demonstrates (see Chapters 4 and 8) that there are no postulated events that result in releases greater than 10 CFR 50 Appendix I guidelines. Since 10 CFR 50 Appendix I is more restrictive, there are no postulated events 1.1-5 UPDATE 2 - AUGUST 1997
which could result in exposures comparable to 10 CFR Part 100 guidelines.
Due to the non-operating and defueled status of TMI-2 during PDMS, there are no structures, systems, or components which are required to meet the safety-related criteria. Therefore, there are no structures, systems, or components classified as safety-related at TMvI-2 during PDMS.
1.1.5 DEVELOPMENT OF ACCEPTABLE OFF-SITE DOSE CRITERIA Various regulations establish permissible limits for off-site radiation exposures resulting from the operation of licensed nuclear reactors and other nuclear fuel cycle activities. These regulations include 10 CFR 20, 10 CFR 50 Appendix I, 10 CFR 100, 40 CFR 190, and the EPA Protective Action Guidelines. The licensing basis for off-site dose criteria for PDMS has been derived from these existing regulations and applicable precedents. Specifically, 10 CFR 50 Appendix I, which is recognized as demonstrably safe with respect to radiological implications, has been established as the PDMS standard. A small fraction (i.e., less than 10%) of the Appendix I off-site dose guidelines is expected to be maintained for normal conditions prevailing during PDMS. The potential off-site radiological doses resulting from postulated off-normal conditions will be within the 10 CFR 50 Appendix I guidelines.
Due to the non-operating and defueled status of TMI-2, a major radiological release approaching the guidelines of 10 CFR 100 is no longer credible. As noted above, Appendix I guidelines have been selected as the limiting criteria for the evaluation of unanticipated events as an unarguable, demonstrably, conservative basis. This ultra-conservative approach far exceeds the regulatory limits for unanticipated events in operating nuclear power plants.
1.1.6 RELATIONS OF THIS PDMS SAR TO THE EXISTING UNIT 1 UFSAR AND UNIT 2 FSAR This PDMS SAR makes reference to relevant portions of the Unit 1 UFSAR or the Unit 2 FSAR. The TMI- 1 UFSAR will continue to be updated as required, and the updated document will be applicable for those changing site-related conditions that have a bearing on TMI-2. The TMI-2 FSAR will not be updated but will continue to be applied as appropriate to TMI-2 in the PDMS condition. In particular, the bounding conditions in the TMI-2 FSAR as augmented by the PDMS SAR will be used to judge the acceptability of changes, tests, and experiments with regard to 10CFR50.59. The TMI-2 FSAR also applies for those areas not addressed by this PDMS SAR.
1.1-6 UPDATE 4- AUGUST 2001
1.2 GENERAL PLANT DESCRIPTION On March 28, 1979, Three Mile Island Unit 2 experienced an accident which severely damaged the reactor core. In the ensuing years, the reactor core has been removed and shipped to the Idaho National Engineering Laboratory for analysis and long-term storage. In addition, the facility has been substantially decontaminated and is in a stable and benign condition suitable for long-term management.
Three Mile Island Unit 2 was originally designed to comply with the seventy General Design Criteria of 10 CFR 50, Appendix A, dated July 11, 1967 and addressed plant design with respect to the Revised General Design Criteria dated July 15, 1971. Due to the defueled and non-operating status of TNI-2 during PDMS, many of these criteria no longer apply to the facility. A review of the General Design Criteria, revised as of January 1; 1987, is included in Section 3.1 of this SAR.
The general arrangement of major equipment and structures, including the Reactor, Auxiliary, and Turbine Buildings is shown on Drawings listed in Table 1.4-1.
1.2.1 SITE CHARACTERISTICS The site is located on the Susquehanna River about ten miles southeast of Harrisburg, Pennsylvania. It is characterized by a 2,000 foot minimum exclusion distance; a two mile radius low population zone; sound bedrock as a structural foundation; an ample supply of emergency off-site power and favorable conditions of hydrology, geology, seismology and meteorology. The land within a ten mile radius of the site is used primarily for farming.
There are two airports within ten miles of the site. Harrisburg International Airport (formerly Olmsted State Airport) is located approximately two and one-half miles northwest of the site, and the Capitol City Airport is located approximately eight miles west-northwest of the site.
1.2.2 CONTAINMENT SYSTEMS The Containment and associated systems are used during PDMS as the environmental barrier for the residual contamination which remains inside the Containment structure. The Containment encloses the areas and systems which contain essentially all of the contamination Which could potentially result in off-site exposures.
1.2.2.1 Containment The primary function of the Containment during PDMS is as a contamination barrier. The Containment will provide shielding of the environment from the radiation inside the Containment, and will also provide the means to assure that any effluents from the Containment will be controlled, filtered, and monitored.
The Containment is a reinforced concrete structure composed of cylindrical walls with a flat foundation mat and a dome roof lined with carbon steel. The structure provides biological shielding for normal and unanticipated conditions. The steel liner encloses the equipment and systems which remain inside the Containment and ensures that the upper limit of potential leakage of radioactive material will not be exceeded under the worst unanticipated event.
1.2.2.2 Containment Isolation Valves The Containment isolation valves were designed to provide a barrier on the system lines which penetrate 1.2-1 UPDATE 4 - AUGUST 2001
the Containment so that no event can result in loss of isolation or intolerable leakage. In most cases, the valves are installed both inside and outside the Reactor Building on each system line. Only one valve is required for isolation during PDMS. All valves used for containment isolation during PDMS ate normally closed and locked, closed and deactivated or closed and administratively maintained closed except for the breather isolation valve and RB pressure indication piping which are normally open.
1.2.2.3 Containment Atmospheric Breather The Containment Atmospheric Breather has been added to the Containment to provide passive pressure control of the Containment relative to ambient atmospheric pressure (via the AFHB) and to establish a "most probable pathway" through which the Containment will "breathe". The breather is a passive system consisting of a 6 in. diameter duct with a HEPA filter. Providing this filtered pathway will ensure insignificant leakage through any uncontrolled pathway. The Containment Atmospheric Breather is described in more detail in Section 7.2.1.2.
1.2.3 FIRE PROTECTION, SERVICE, AND SUPPRESSION Fire Protection is provided during PDMS to minimize the potential of a release of radioactive material
,due to a fire in a contaminated area, to protect those systems which are maintained operational during PDMS, and to minimize the liability and property risk from potential fires.
These objectives have been achieved through a combination of (1) minimizing the potential for a fire by minimizing combustible materials and ignition sources and (2) by providing a system of detection and suppression suitable to deal with any potential fire.
1.2.4 RADIOACTIVE WASTE MANAGEMENT The generation of radioactive waste during PDMS will be minimal. A small amount of radioactive waste will be generated from the processing of water inleakage to contaminated areas, small decontamination tasks, and surveillance and maintenance activities. Liquid radwaste will be collected in the various sumps and handled through the liquid radwaste disposal system. Other radwastes will be collected and disposed of as appropriate.
1.2.5 RADIATION MONITORING During PDMS, radiation monitors will be maintained operational to provide for evaluation of airborne radiological conditions. This requires monitoring the Reactor Building exhaust ventilation and the 1.2-2 UPDATE 2 - AUGUST 199
station vent during periods when a ventilation system is operating. The monitors will provide the necessary information to evaluate environmental releases and air quality conditions in the plant. This monitoring will provide a basis for determining the total integrated dose to the public.
Monitoring and survey data will provide a basis for a trend analysis to ensure that the plant is maintained in a stable condition and enables timely corrective actions, if necessary.
1.2.6 ELECTRICAL SYSTEMS During PDMS, portions of the TMI-2 AC and DC electrical systems will be maintained operational to provide reliable power to PDMS support systems, controls, and instrumentation. Electrical equipment not required for PDMS support is minimized to enhance overall plant safety, nearly all such items have been deactivated.
1.2.7 PDMS SUPPORT SYSTEMS Other systems necessary to support PDMS activities also have been provided. The ventilation systems for the Auxiliary, Fuel Handling, Control and Service Buildings will be maintained operational to provide ventilation capabilities in those areas. Compressed air, sewers, domestic water, and other systems have been provided for use, as necessary.
1.2.8 FACILITIES AND SYSTEMS RELEASED FOR SITE USE As a result of the accident, unique situations developed which could not be properly managed with the existing facilities or systems which were designed for normal operating power plant use. Several systems were designed and fabricated to process the radioactive wastes resulting from cleanup activities.
Upon completion of cleanup activities, several of these facilities were released to general site use (and included under the TNMI- 1 license). These systems and facilities include:
- 1. Auxiliary Building Emergency Liquid Cleanup (EPICOR II)
- 2. Waste Handling and Packaging Facility
- 3. Interim Solid Waste Storage Facility
- 4. Solid Waste Staging Facility
- 5. Respirator Cleaning and Laundry Maintenance Facility
- 6. Solid Waste Storage Building
- 7. Processed Water Storage Facility 1.2-3 UPDATE 4 - AUGUST 2001
1.3 MATERIAL REFERENCED The following documents are referenced as part of this application.
Referenced in Document SAR Section TMI-2 Final Safety Analysis Report 1.1, 1.1.6, 2.4.2, 2.4.5, 2.5, 3.1.1.17, 3.1.2, 3.2.1, 3.2.1.1, 3.2.2.1, 3.3.1.1, 3.4.2, 3.5.3.2, 3.6, 3.7, 3.7.2.1.1, 6.0 TMI-1 Updated Safety Analysis Report 1.1, 1.1.6, 2.1.3, 2.2, 2.3, 2.4.3, 3.1.1.17 NUREG-0683, Supplement No. 1, "Programmatic 1.1.1 Environmental Impact Statement ... October 1984 NUREG-0683, Supplement No. 3, "Programmatic 5A.1.2, 5A.8, 5A.10 Environmental Impact Statement...," August 1989 "Decontamination Task Force Report," by 5A.2.17 5A.8 P. R. Bengel, et al, December 18, 1985 Technical Bulletin 85-1, "Reactor Building 5A.4.1 General Area Radiation Survey Maps," Rev. 3, February 3, 1988 Technical Bulletin 86-10, ""B" Steam Generator 5A.4.1 TLD Characterization," Rev. 0, February 18, 1986 GPU Nuclear memorandum 9240-88-4372 from 5A.4.4 J. E. Tarpinian to D. W. Turner, "Comparison of TMI-2 with other B&W Plants," dated February 2, 1988 BBR GMBH Report Number 595-COIA (82), "Evaluation 5A.4.4 of the Dose Rate Data of Various Nuclear Power Plants with B&W Nuclear Steam Supply Systems" GPU Nuclear memorandum 6615-90-0188 from S. E. 5A.5, 5A. 11 Acker to E. D. Schrull, "PDMS SAR Ch 8 Dose Calculations," dated November 5, 1990 1.3- 1 UPDATE 2- AUGUST 1997
1.3 MATERIAL REFERENCED (Cont'd)
Referenced in Document SAR Section Technical Plan TPO/TMI-188, "TMI-2 Cleanup 5A.6.1.2 Program Post-Defuelmng Monitored Storage,"
Revision 0, January 1987 "Disposition of the Reactor Building Blockwall," 5A.7.1, Table 5A-5, by P. R. Bengel, et al, June 19, 1987 (Attachment Table 5A-9 to GPU Nuclear Memorandum 4440-87-048)
"Task Force Report - Reactor Building Basement 5A.7.1 Decontamination," November 1987 GPU Nuclear memorandum 9240-88-4521, from D. J. 5A.9.1 Merchant to J. E. Tarpinian, "Review of 1986 Collective Dose Goal," dated May 9, 1988 TPO)TMI-009, "Gross Decontamination Experiment 5A.2.1 Report," Bechtel National, Inc., September 1982 Letter, Travers, W. D. (NRC) to Standerfer, F. R. 3.1.1.20, 3.1.1.51 (GPUNC), "Approval of Exemption from 10 CFR 50.61,"
dated December 30, 1985 Letter, Snyder, B. J. (NRC) to Kanga, B. K. (GPUNC), 3.1.1.38 "10 CFR 50.49, 'Environmental Qualification of Electrical Equipment Important to Safety for Nuclear Power Plants'," dated July 22, 1983 Letter, Stolz, J. F. (NRC) to Standerfer, F. R. 3.1.1.43 (GPUNC), "Issuance of Amendment (TAC No. 65337),"
dated May 27, 1988 Letter, Snyder, B. J. (NRC) to Hovey, G. K. 3.1.1.43, 3.1.1.45 (Met-Ed), Re: Exemption from 10 CFR 50 Appendix J, dated September 2, 1981 Letter, Snyder, B. J. (NRC) to Hovey, G. K. 3.1.1.45 (Met-Ed), Re: Relief from the Inservice Inspection Program Requirements of 10 CFR 50.55a, dated April 27, 1981 1.3 -2 UPDATE 2-AUGUST 1997
1.3 MATERIAL REFERENCED (Cont'd)
Referenced in Document SAR Section GPU Nuclear letter, 4410-90-L-0044, 3.1.1.59 "Decommissioning Financial Assurance Certification Report for ... TMI-2,"
dated July 26, 1990 GPU Nuclear letter, 4410-90-L-0012, "Defueling 1.1.2.1, 3.1.2.52, 4.0, 4.3.1, Completion Report, Final Submittal," dated 4.3.5 February 22, 1990 ALAB-692 dated September 14, 1982 3.5.3.2 GPU Nuclear letter, LL2-81-0191, "Design 3.7.1.2, 7.2.1.1 Pressure for Containment and Future Mechanical and Electrical Penetration Modifications,"
dated December 4, 1981 Letter, W. D. Travers (NRC) to F. R. Standerfer 3.7.1.2 (GPUNC), "Seismic Design Criteria for Modified Containment Penetrations," dated April 3, 1987 Technical Bulletin 89-08, Revision 0, "Final 4.1.2 Core Material Estimates," October 19, 1989 DOE letter WWB-100-85, W. W. Bixby (DOE) to 4.3.2 H. M. Burton (EG&G), "Accountability for the TMI-2 Core," dated October 8, 1985 Letter, B. J. Snyder (NRC) to F. R. Standerfer 4.3.2, 4.3.6 (GPUNC), "Approval of Exemption from 10 CFR 30.51, 40.61, 70.5 1(d), and 70.53," dated October 17, 1985 NSAC 80-1, "Analysis of Three Mile Island - 4.3.3.1 Unit 2 Accident," Electrical Power Research Institute, March 1980 Rogovin M., et.al., "Three Mile Island, A Report 4.3.3. 1 to the Commissioners and the Public," US Nuclear Regulatory Commission, January 1980 GPU Nuclear Procedure 4000-PLN-4420.02, "SNM 4.3.3.2 Accountability Plan" TPOITMI-051, "Location and Characterization of 4.3.3.2 Fuel Debris in TMI-2," Revision 0, April 1984 1.3- 3 UPDATE 2- AUGUST 1997
1.3 MATERIAL REFERENCED (Cont'd)
Referenced m Document SAR Section TPO/TMI-124, "Ex-Vessel Fuel Characterization," 4.3.3.2 Revision 0, July 1984 TPO/TMI-1 87, "Instrument Selection for Residual 4.3.3.2 Fuel Measurements," Revision 0, January 1987 GPU Nuclear Procedure 4000-ADM-4420.03, "Review 4.3.3.2 and Qualification of Selected Preliminary Calculations and Characterization Measurements for SNM Documentation" Letter, Stolz, J. F. (NRC) to Roche, M. B. (GPUNC), 4.3.5 "Three Mile Island Unit No. 2 Mode Changes," dated April 26, 1990 GPU Nuclear memorandum, from D. W. Ballengee 8.1.3 to T. D. Murphy," Safety/Environmental Determination and Review of SEEDS," dated August 10, 1990 Letter, W. D. Travers (NRC) to F. R. Standerfer (GPUNC), "Seismic Design Criteria for Modified Containment Penetrations," dated April 3, 1987 GPU Nuclear letter, C312-91-2045, "SNM Accountability," 3.1.2.52, 4.0, 4.3.3.3 transmitting the Auxiliary and Fuel Handling Buildings PDSR, dated June 7, 1991 GPU Nuclear letter, C312-91-2052, "SNM Accountability," 3.1.2.52, 4.0, 4.3.3.3, transmitting the Reactor Building Miscellaneous Components PDSR, dated June 18, 1991 1.3- 4 UPDATE 2- AUGUST 1997
1.3 MATERIAL REFERENCED (Cont'd)
Referenced in Document SAR Section GPU Nuclear letter, C312-91-2055, "SNM Accountability," 3.1.2.52, 4.0, 4.3.3.3, transmitting the Reactor Coolant System PDSR, dated July 3, 1991 GPU Nuclear letter, C312-91-2064, "SNM Accountability," 3.1:2.52, 4.0, 4.3.3.3, transmitting the 'A' and 'B' Once-Through Steam Generators PDSR, Revision 1, dated July 3, 1991 GPU Nuclear letter, C3 12-93-2004, "SNM Accountability," 1.1.2.1, 3.1.2.52, 4.0, 4.3.3.3 transmitting the Reactor Vessel PDSR, dated February 1, 1993 GPU Nuclear letter, C312-92-2080, "TMI-2 Reactor Vessel 1.1.2.1, 3.1.2.52, 4.0, 4.3.1, Criticality Safety Analysis," dated December 18, 1992 4.3.5 TMI Radiological Controls Department Procedure, 3.1.1.20, 6610-PLN-4200.01, "Offsite Dose Calculation Manual (ODCM)"
TMI-2 Recovery Technical Specifications 1.1.2.1, GPU Nuclear memorandum 6615-92-0160, from S. Acker 5.A. 11, 8.2.5 to E. Schrull, "Dose Calculation Results per memo C312-92-1045, PDMS SAR Rev. 16," dated October 27, 1992 GPU Nuclear memorandum 6615-92-0162, from S. Acker 8.2.5 to E. Schrull, "Additional Dose Calculations per memo C312-92-1045, PDMS SAR Rev. 16," dated October 30, 1992 GPU Nuclear memorandum 6510-93-0077, from S. Acker 8.2.6 to E. Schrull, "Dose Calculation Results per memo C312-93-1019, PDMS SAR Rev. 17," dated May 21, 1993 1.3- 5 UPDATE 2 - AUGUST 1997
1.4 PRESENTATION 1.4.1 DRAWINGS Drawings listed in Table 1.4-1 are referenced throughout the text of the PDMS SAR. Copies of the curre~nt revision of each drawing are readily available at the Three Mile Island Nuclear Station.
Drawing 2001, P & ID Symbol Identification, provides explanation for symbols used in non-electrical drawings. Drawing 3001, Electrical Symbol List, provides explanation for symbols used in electrical drawings.
I 1.4.2 ABBREVIATIONS AND ACRONYMS Abbreviations and acronyms which are used in this document are listed in Table 1.4-2.
1.4-1 UPDATE 4 - AUGUST 2001
TABLE 1.4-1 DRAWINGS TITLE DWG. NO.
Site Plan 1E-120-01-001 Reactor Building Basement Floor 2060 Reactor Building Ground Floor 2061 Reactor Building Operating Floor 2062 Reactor Building Section A-A 2063 Reactor Building Sections 2064 B-B, C-C, D-D Auxiliary and Fuel Handling 2065 Building, Basement and Sub-Basement Floor Auxiliary and Fuel Handling 2066 Building, Ground Floor Auxiliary and Fuel Handling 2067 Building, First Floor Auxiliary and Fuel Handling 2068 Floor Building, Operating Auxiliary and Fuel Handling 2069 Building, Sections A-A and B-B Auxiliary and Fuel Handling 2070 Building, Section C-C Auxiliary and Fuel Handling 2071 Building, Section D-D Auxiliary and Fuel-Handling 2072 Building, Section E-E Control and Service Building, 2380 Lower Floor Plans Control and Service Building, 2381 Upper Floor Plans Control and Service 2382 Building, Sections River Water Pump House 2338 1.4-2 UPDATE 4 - AUGUST 2001
TABLE 1.4-1 (Cont'd)
DRAWING REFERENCES TITLE DWG. NO. I DELETED Turbine Building Basement Plan - East Side 2051 Turbine Building Basement Plan - West Side 2052 Turbine Building Ground Floor Plan - East Side 2053 Turbine Building Ground Floor Plan - West Side 2054 Turbine Building Operating Floor - East Side 2055 Turbine Building Operating Floor - West Side 2056 Turbine Building Section B-B 2057 Turbine Building Sections A-A and C-C 2058 Turbine Building Sections D-D and E-E 2059 P&ID Symbol Identification 2001 Electrical Symbol List 3001 Reactor Building Ventilation and Purge 302-2041 Fire Protection 302-231 Radwaste Disposal Miscellaneous Liquids 302-2045 Radwaste Pumps Seal Water 302-2492 Sump Pump Discharge and Miscellaneous Sumps 302-2496 Building Air Intake, Exhaust, and 302-2219 Radiation Monitoring 13.2 KV One Line Diagram 206201 480 Volt Unit Substation 206202 480 Volt Unit Substation 206203 480 Volt Unit Substation 206204 120V Regulated Voltage System 3009 1.4-3 UPDATE 4 AUGUST 2001
TABLE 1.4-1 (Cont'd)
DRAWING REFERENCES TITLE DWG. NO.
DC One Line Diagram 3010 480V USS 2-3 8, 2-48 One Line Diagram E0 13 Reactor Building Portable Power Distr. Center 2-E21-011 Reactor Building Portable Power Distr. Center 2-E21-012 Power Distribution Key Diagram 3015 Power Distribution Panel Schedules 3016 Miscellaneous Power Panel Schedules 3017 Sh. 1 Miscellaneous Power Panel Schedules 3017 Sh. 2 Miscellaneous Power Panel Schedules 3017 Sh. 3 Auxiliary Building Heating and Ventilation 302-2042 Fuel Handling Building Heating and Ventilation 302-2343 Instrument Air Supply 302-2012 Sht. 1 Compressed Air Supply 302-2012 Sht. 2 PDMS SAR FIGURES TITLE PDMS SAR FIG. NO.
General Area Map 2.1-1 Site Topography 5 Mile Radius 2.1-2 Extended Plot Plan 2.1-3 Flood Water Surface Profiles 2.4-1 Details of Effluent Discharge System 2.4-2 Reactor Building - General Layout 3.7-1 Reactor Building Personnel and Equipment 3.7-2 Access Openings Detail 1.4-4 UPDATE 5 - AUGUST 2003
TABLE 1.4-2 ABBREVIATIONS AND ACRONYMS ABST Auxiliary Building Sump Tank ACES Automated Cutting Equipment System AEC Atomic Energy Commission AFHB Auxiliary and Fuel Handling Buildings AGW Accident Generated Water AISC American Institute of Steel Construction AIT Air Intake Tunnel ALARA As Low As Is Reasonably Achievable ANS American Nuclear Society ANSI American National Standards Institute ASME American Society of Mechanical Engineers ASTM American Society of Testing Materials ATWS Anticipated Transients Without Scram AWS American Welding Society BBR Brown Boveri Reactor BWST Borated Water Storage Tank B&R Bums and Roe B&W Babcock and Wilcox CACE Containment Air Control Envelope CAS Compressed Air System CCW Closed Cooling Water CCTV Closed Circuit Television CFR Code of Federal Regulations cfs/cfm Cubic Feet Per Second/Cubic Feet Per Minute Ci Curie CRD Control Rod Drive CRDCS Control Rod Drive Control System 1.4-5 UPDATE 2 - AUGUST 1997
TABLE 1.4-2 (Cont'd)
ABBREVIATIONS AND ACRONYMS CRDM Control Rod Drive Motor CRDS Control Rod Drive System CS Cork Seam System CSA Core Support Assembly DCR Defuelmg Completion Report DHCCW Decay Heat Closed Cooling Water DH Decay Heat Removal DOE Department of Energy DOP Dioctyl Phthalate DTA Defueling Test Assembly DTFR Decontamination Task Force Report DWC Defueling Water Cleanup System EPA Environmental Protection Agency ESF Engineered Safety Features ETN Exposure Tracking Number FCN Field Change Notice FIB Fuel Handling Building FPPE Fire Protection Program Evaluation FSAR Final Safety Analysis Report FTC Fuel Transfer Canal GDC General Design Criteria GI Gastrointestinal gpm Gallons Per Minute GPU General Public Utilities GPLJN GPU Nuclear GPUNC GPU Nuclear Corporation GRC General Review Committee H&V Heating and Ventilation HEPA High Efficiency Particulate Air 1.4-6 UPDATE 2 - AUGUST 1997
TABLE 1.4-2 (Cont'd)
ABBREVIATIONS AND ACRONYMS HEU Highly Enriched Uranium HIC High Integrity Container HVAC Heating, Ventilating, and Air Conditioning IAEA International Atomic Energy Agency INEL Idaho National Engineering Laboratory IOSRG Independent Onsite Safety Review Group IWTS Industrial Waste Treatment System JCP&L Jersey Central Power and Light LCSA Lower Core Support Assembly LER Licensee Event Report LLD Lowest Level of Detection LOCA Loss of Coolant Accident MDH Mini-Decay Heat Removal MET-ED Metropolitan Edison Company MIDAS Meteorological Information and Dose Assessment System MPC Maximum Permissible Concentration mph Miles Pet Hour MS1V Main Steam Isolation Valve MSR Moisture Separator Reheater MU Makeup and Purification System MWHT Miscellaneous Waste Holdup Tank NFPA National Fire Protection Agency NLB National Liquid Blasting NPDES National Pollutant Discharge Elimination System NRC Nuclear Regulatory Commission NSAC Nuclear Safety Analysis Center NTU Nephelometric Turbidity Index ODCM Off-site Dose Calculation Manual 1.477 UPDATE 2 - AUGUST 1997
TABLE 1.4-2 (Cont'd)
ABBREVIATIONS AND ACRONYMS OMB Office of Management and Budget ORNL Oak Ridge National Laboratory OTSG Once Through Steam Generator PAF Personnel Access Facility PDMS Post-Defueling Monitored Storage PDSR Post-Defueling Survey Report PEIS Programmatic Environmental Impact Statement PENELEC Pennsylvania Electric Company PMF Probable Maximum Flood PORC Plant Operations Review Committee PORV Pilot Operated Relief Valve PSAR Preliminary Safety Analysis Report psi Pounds Per Square Inch P&ID Piping and Instrument Diagram QA Quality Assurance RAF Radiation Area Factor RB Reactor Building RC Reactor Coolant System RCBT Reactor Coolant Bleed Tank RCMM Remote Controlled Mobile Manipulator RCP Reactor Coolant Pump RCS Reactor Coolant System RCTV Remote Controlled Transport Vehicle RPS Reactor Protection System RRV Remote Reconnaissance Vehicle RV Reactor Vessel RWP Radiation Work Permit SAR Safety Analysis Report SCBA Self-Contained Breathing Apparatus 1.4-8 UPDATE 2 - AUGUST 1997
TABLE 1.4-2 (Cont'd)
ABBREVIATIONS AND ACRONYMS sccm Standard Cubic Centimeters per Minute scfm Standard Cubic Feet Per Minute SD System Description SDS Submerged Demineralizer System SEEDS Simplified Environmental Effluent Dosimetry System SER Safety Evaluation Report SFAS Safety Features Actuation System SFML Safe Fuel Mass Limit SFP Spent Fuel Pool SG Steam Generator SISI System In-Service Inspection SNM Special Nuclear Material SPC Standby Pressure Control SRP Standard Review Plan SSCCW Secondary Side Closed Cooling Water STP Sewage Treatment Plant TER Technical Evaluation Report TLD Thermoluminescent Dosimeter TMI Three Mile Island TM[NS Three Mile Island Nuclear Station TPAF Temporary Personnel Access Facility UFSAR Updated Safety Analysis Report USGS U. S. Geological Survey UTM Universal Transmeridian WDG Waste Disposal Gas WDL Waste Disposal Liquid WDS Waste Disposal Solid WHPF Waste Handling and Packaging Facility 1.4-9 UPDATE 2 - AUGUST 1997
TURBINE BUILDING 1 '--_VERTICAL SEAM LEGEND CORIN SEAM REMOVAL I" SAMPLIMG HOLE 4" DAM GENERAL ARRANGEMENT OF THE CORK SEAM AREA
CHAPTER 2 SITE CHARACTERISTICS
CHAPTER 2 SITE CHARACTERISTICS TABLE OF CONTENTS SECTION TITLE PAGE 2.1 GEOGRAPHY AND DEMOGRAPHY 2.1-1 2.1.1 SITE LOCATION 2.1-1 2.1.2 SITE DESCRIPTION 2.1-1 2.1.3 POPULATION AND POPULATION DISTRIBUTION 2.1-1 2.2 NEARBY INDUSTRIAL, TRANSPORTATION, AND 2.2-1 MILITARY FACILITIES 2.3 METEOROLOGY 2.3 -1 2.4 HYDROLOGIC ENGINEERING 2.4-1 2.4.1 HYDROLOGIC DESCRIPTION 2.4-1 2.4.1.1 Site and Facilities 2.4-1 2.4.2 FLOODS 2.4-1 2.4.3 FLOODING PROTECTION REQUIREMENTS 2.4-1 2.4.4 ENVIRONMENTAL ACCEPTANCE OF EFFLUENTS 2.4-2 2.4.5 GROUNDWATER 2.4-3
'2.4.6 EMERGENCY OPERATIONS REQUIREMENTS 2.4-4 2.4.6.1 Flood Protection 2.4-4 2.5 GEOLOGY AND SEISMOLOGY 2.5-1 i iUPDATE 2 - AUGUST 1997
CHAPTER 2 TABLE OF CONTENTS (Cont'd)
LIST OF FIGURES FIGURE NO. TITLE PAGE 2.1-1 GENERAL AREA MAP 2.1-2 2.1-2 SITE TOPOGRAPHY 5 MILE RADIUS 2.1-3 2.1-3 EXTENDED PLOT PLAN 2.1-4 2.4-1 FLOOD WATER SURFACE PROFILES 2.4-5 2.4-2 DETAILS OF EFFLUENT DISCHARGE SYSTEM 2.4-6 ii UPDATE 2 - AUGUST 1997
CHAPTER 2 SITE CHARACTERISTICS 2.1 GEOGRAPHY AND DEMOGRAPHY 2.1.1 SITE LOCATION Three Mile Island is located approximately 2-1/2 miles south of Middletown, Pennsylvania at longitude 760 43' 30" west and at latitude 400 9' 15" north. The Unit 2 reactor vessel coordinates are N300, 324.40; E2, 286, 366.04, based on the Pennsylvania State coordinate system (UTM coordinates, Zone 18, 4,446, 020 meters north, 353,070 meters east). It is one of the largest of a group of several islands in the Susquehanna River and is situated about 900 ft. from the east bank. It is elongated parallel to the flow of the river, withits 11,000 ft. in length and 1700 ft. in width. TMI-2 is located in the northern one-third of the island.
The southeasterly-flowing Susquehanna River makes a sharp change in direction, to nearly due south, in the vicinity of Middletown. After this directional change just north of Three Mile Island, the channel widens to approximately 1.5 miles.
The Three Mile Island Nuclear Station, Unit 2 is located adjacent to Unit 1 in Londonderry Township of Dauphin County, Pennsylvania, about 2-1/2 miles north of the southern tip of Dauphin County, where Dauphin is coterminal with York and Lancaster counties. Its location with respect to regional topographic and cultural features is shown on.Figure 2.1-1 and with respect to local features on Figure 2.1-2. The station is located on Three Mile Island situated in the Susquehanna River upstream from York Haven Dam.
2.1.2 SITE DESCRIPTION Figure 2.1-3 shows the site marked to indicate the Site and the minimum exclusion distance. For accident evaluations, the distance to the site boundary in each direction is used. Those distances may be derived from Figure 2.1-3.
I 2.1.3 POPULATION AND POPULATION DISTRIBUTION The population and population demographics are given in Section 2.2 of the TMI Unit 1 UFSAR. This information is updated as appropriate with the Unit 1 UFSAR updates.
2.1-1 UPDATE 4 - AUGUST 2001
/ 7-- --
.,0 . .
INEV CONT'IR L 2IFE ,* UPDATE. 2-_x AU3S 1.9 0ONTU 00ITERVL 2 FEET 2000. .IO-'- - .
SITE TOPOGRAPHY 5 MILE RADIUS
.UPDATE 2 - AUGU:ST 1997 FIGURE 2.1-2 PAGE 2.1-3
2.2 NEARBY INDUSTRIAL, TRANSPORTATION, AND MILITARY FACILITIES The nearby industrial, transportation, and military facilities are described in Chapter 2 of the TMI Unit 1 UFSAR 2.2- 1 UPDATE 2- AUGUST 1997
2.3 METEOROLOGY The meteorology for the Three Mile Island site is given in Section 2.5 of the TMI Unit 1 UFSAR. Since TMI-1 and TMI-2 are on the same site, the meteorological information for the two units is the same.
The TMI-1 UFSAR is updated periodically in accordance with NRC regulations and contains the currently applicable meteorological information for the TMI site.
2.3- 1 UPDATE 2 - AUGUST 1997
2.4 HYDROLOGIC ENGINEERING 2.4.1 HYDROLOGIC DESCRIPTION 2.4.1.1 Site and Facilities TMI Unit 2 is located on Three Mile Island in the Susquehanna River about ten muiles southeast of Harrisburg.
Existing grade elevation at the site is approximately 304.0 ft. based upon U.S.G.S. datum.
The site is protected from the design flood conditions of 1,100,000 cfs by a system of protective dikes surrounding Units 1 and 2. These dikes have a maximum crest elevation of 3 10. 0 ft. at the north end of the site and a maximum crest elevation of 304.0 ft. at the south end.
The site is engineered to sustain a river flow up to 1,100,000 cfs. During floods exceeding 1,100,000 cfs, all of the necessary features of the site are protected from flood and wave action associated with these floods-up to and including the Probable Maximum Flood.
2.4.2 FLOODS The description of flooding conditions which were considered in the design of the site and facilities on the site is given in Section 2.4 of the TMI-2 FSAR. These flooding conditions include the Probable Maximum Flood with coincident wind wave activity, the Probable Maximum Precipitation, potential dam failures, ice flooding, and channel diversions.
2.4.3 . FLOODING PROTECTION REQUIREMENTS Three Mile Island Nuclear Station is situated on a portion of the island that is, under natural conditions, above the level of an "Agnes" magnitude flood. Natural topography in the main station area is above elevation 300.5 ft., the crest of the Agnes flood at approximately one million cubic feet per second.
The design flood for the site was established at 1,100,000 cfs, based upon the provisional Probable Maximum Flood established by the Army Corps of Engineers prior to 1969. The hydraulic design of the plant protective dikes is based upon the design flood and includes an ample margin of freeboard. The dikes will be subjected to flood waters rather infrequently, since it would require a repeat of the 1964 flood of 485,000 cfs to reach the elevation of the bottom of the dikes. Even with the Agnes flood, the maximum crest was 3.5 ft: below the lowest south dike elevation of 304 ft., indicating conservatism in design.
In June of 1969 the Corps of Engineers issued a revised and provisional value of the Probable Maximum Flood for the Susquehanna River at Harrisburg, which was established as 1,600,000 cfs, as the result of upstream reservoir regulation. This flood at Three Mile Island was established at 1,625,000 cfs and the water surface profiles on Figure 2.4-1 were extended by computation to cover this flood magnitude. Unit backwater computations established a PMF elevation of 308.5 ft on the west side and 308 ft on the east side of the site.
Due to wave action, flood protection is designed to protect against a water level of at least four feet above the PMF water level or 312.5 ft on the west side and 312 ft on the east side as described in Section 3.4.4.
Various components which have been protected include, but are not limited to the following locations and type of flood protection:
2.4-1 2.4- 1UPDATE2 -AUGUST 1997
- a. Fuel Handling Building - There are no external openings in this building requiring flood protection. The Unit 1 railroad door, which serves as access to this building, is made watertight. (See the Unit I UFSAR, Section 2.6.5.)
- b. Control Building - Flood panels are provided for all ground level entrances.
- c. Auxiliary Building - A flood panel is provided for the ground level entrance.
- d. Control Building Area - Access to the tendon gallery is protected by watertight enclosures and flood panels at ground level.
- e. Air Intake - Located at an elevation above PMF level and a watertight hatch.
- f. General - Ground level doors and entrances to the Concrete Power Block Buildings are either water tight or are provided with flood panels. All openings that are potential leaks (e.g., ducts, pipes, conduits, cable trays) are configured to minimize water intrusion.
Unit flood protection will be achieved by instituting operational procedures and actions predicated upon continuous monitoring of upstream river stages and precipitation reports through the River Forecast Center at State College. Operational procedures to establish FLOOD ALERT and EMERGENCY CLOSURE actions are outlined in Section 2.4.6. Reference Section 7.1.4, Flood Protection.
Designs and criteria were established for the structures associated with flood protection facilities including earth dikes, channels, and pressure conduits. The criteria are conservative and based on sound civil engineering practices. The facilities were constructed and will be maintained and inspected consistent with their design as integral parts of a nuclear station. The design of the facilities has been reviewed and approved by the appropriate State and Federal agencies, including the Federal Power Commission, the Corps of Engineers, and the Water and Power Resources Board of the Commonvealth of Pennsylvania, where applicable.
2.4.4 ENVIRONMENTAL ACCEPTANCE OF EFFLUENTS Liquideffluents from TMI-1 and TMI-2 enter the middle channel of the Susquehanna River through the station discharge pipe located approximately 640 ft. downstream from the intake structures, as shown in Figure 2.4-2.
Processed liquid waste will be discharged on a batch basis. Prior to release, each batch will be sampled and analyzed to determine its radioactivity content. Based upon the activity analysis, the wastes will either be released under controlled conditions or recycled for further processing. The flowrate of waste discharge will be a function of the activity analysis and the flowrate of the discharge from the Unit 1 mechanical draft cooling towers. The ability of the Susquehanna River to disperse and dilute the station discharge stream is dependent upon the magnitude of river water flow.
.2.4-2 UPDATE 3 - AUGUST 1999
A section of the York Haven Dam blocks the east channel of the Susquehanna River at Three Mile Island approximately one mile downstream from TMI-2. The York Haven Dam forms a pool extending approximately 3-1/2 miles upstream containing a volume of about 10,000 acre-feet. As long as the river flow is 20,000 cfs or less, all the flow discharges through the York Haven Hydro Plant tailrace into the lower section of Conewago Falls. When the river flow is above 20,000 cfs, the excess flow spills over the portion of the main dam upstream of the headrace wall and flows down through the Conewago Falls joining the flow from the tailrace at the foot of the dam; the full river flow then continues through the lower section of the falls. The exact extent of the mixing of TMINS effluents with the river depends on such factors as station discharge flowrate and the river flowrate. In 1980, an experiment was conducted which tracked the dispersion and dilution of a dye from the TMINS discharge. This study showed that plant discharge water and Susquehanna River water are typically 99% or greater mixed before intake by downstream users.
TMINS effluent releases are diluted by the effluent of the mechanical draft cooling towers by factors typically ranging from 167 times to 7600 times, depending upon the water intake from the river. The diluted radiological waste is further diluted by the flow of the Susquehanna River. At low flow (1700 cfs), the river would dilute.
the effluent by a factor of 20. However, at normal river flow (34,000 cfs), the dilution from the river would be 403 times. For effluent releases a minimum flow rate of 5000 gpm is maintained from the Mechanical Draft Cooling Towers, however, 8,000 gpm MDCT flow is always maintained during IWTS and/or IWFS releases (continuous releases). Dilution credit up to 38,000 gpm is taken for Mechanical Draft Cooling Tower effluent rates in FSAR calculations.
All users of surface water downstream of Three Mile Island are also downstream of York Haven Dam.
Therefore, it is assured that mixing of station effluent and river water flow will occur prior to use.
2.4.5 GROUNDWATER Three Mile Island Nuclear Station is located in the Triassic lowland of Pennsylvania, a region often referred to as the Gettysburg Basin. The island was formed as a result of fluvial deposition by the Susquehanna River. It is composed of sub-rounded to rounded sand and gravel, containing varying amounts of silt and clay. Soil depths vary from approximately 6 feet at the south of the island to about 30 feet at the center of the island. The site is underlain by Gettysburg shale which is at approximately 277 feet elevation.
There are two different water-bearing zones at TMINS. One is comprised of the unconsolidated materials overlying the Gettysburg shale (bedrock), and the other is comprised of the bedrock. Permeabilities in geologic materials on TMINS vary; however, groundwater discharges into the Susquehanna River and does not communicate with off-site groundwater supplies.
2.4-3 UPDATE 2- AUGUST 1997
Hydrostatic pressure of the water table on the east and west shores of the river should prevent the island groundwater and the station discharge from communications with onshore groundwater. Therefore, b
groundwater effluents from TMINS cannot impact the quality of groundwater off-site. Additionally, the tritium concentrations in the TMINS groundwater are well below 10 CFR 20 regulatory limits and will not adversely affect the Susquehanna River.
A more thorough description of the groundwater characteristics and related features are given in Section 2.4.13 of the Unit 2 FSAR.
2.4.6 EMERGENCY OPERATIONS REQUIREMENTS 2.4.6.1 Flood Protection Although the flood protection design features of the station are based on the PMF, the emergency operational procedures are based on forecasts received from the Federal-State River Forecast Center, National Weather Service, State College, Pennsylvania. Communications are normally by phone or through civil defense radio as a backup.
The emergency procedure for the station will go into effect when the Federal-State River Forecast Center forecasts in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />, a river flow of 350,000 cfs. A flood ALERT will be initiated when a 36 hour4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> forecast of 640,000 cfs is received and a EMERGENCY CLOSURE when a 36-hour forecast of 940,000 cfs or greater is received. During the EMERGENCY CLOSURE, flood panels will be moved into place.
2.4-4 UPDATE 2 - AUGUST I
2.5 GEOLOGY AND SEISMOLOGY The geology and seismology for the Three Mile Island site has been reviewed and accepted by the NRC based on the information presented in Section 2.5 of the Unit 2 FSAR.
2.5-1 UPDATE 2- AUGUST 1997
CHAPTER 3 DESIGN CRITERIA - STRUCTURES, SYSTEMS, AND COMPONENTS
CHAPTER 3 DESIGN CRITERIA - STRUCTURES, SYSTEMS, AND COMPONENTS TABLE OF CONTENTS SECTION TITLE PAGE 3.1 REGULATORY CONFORMANCE 3.1-1 3.1.1 CONFORMANCE WITH 10 CFR PART 50 3.1-1 GENERAL PROVISIONS 3.1.1.1 10 CFR 50.1 - Basis, Purpose, & Procedures Applicable 3.1-1 3.1.1.2 10 CFR 50.2 - Definitions 3.1-1 3.1.1.3 10 CFR 50.3 - Interpretations 3.1-1 3.1.1.4 10 CFR 50.4 - Communications 3.1-1 3.1.1.4a 10 CFR 50.5 - Deliberate Misconduct 3.1-2 3.1.1.5 10 CFR 50.7 - Employee Protection 3.1-2 3.1.1.6 10 CFR 50.8 - Information Collection 3.1-2 Requirements: OMB Approval 3.1.1.6a 10 CFR 50.9 - Completeness & Accuracy of Information 3.1-2 REQUIREMENT OF LICENSE, EXCEPTIONS 3.1.1.7 10 CFR 50.10 - License Required 3.1-2 3.1.1.8 10 CFR 50.11 - Exceptions & Exemptions from 3.1-2 Licensing Requirements 3.1.1.9 10 CFR 50..12 - Specific Exemptions 3.1-2 3.1.1.10 10 CFR 50.13 - Attacks & Destructive Acts by Enemies 3.1-2 of the United States; and Defense Activities CLASSIFICATION AND DESCRIPTION OF LICENSES 3.1.1.11 10 CFR 50.20 - Two Classes of Licenses 3.1-2 3.1.1.12 10 CFR 50.21 - Class 104 Licenses; for Medical 3.1-3 Therapy and Research and Development Facilities i UPDATE 2 - AUGUST 1997
CHAPTER 3 TABLE OF CONTENTS (Contd)
SECTION 'TITLE PAGE 3.1.1.13 10 CFR 50.22 - Class 103 Licenses; for 3.1-3 Commercial & Industrial Facilities 3.1.1.14 10 CFR 50.23 - Construction Permits 3.1-3 APPLICATIONS FOR LICENSES, FORM, CONTENTS, INELIGIBILITY OF CERTAIN APPLICANTS 3.1.1.15 10 CFR 50.30 - Filing of Applications for 3.1-3 Licenses; Oath or Affirmation 3.1.1.16 10 CFR 50.31 - Combining Applications 3.1-3 3.1.1.17 10 CFR 50.32 - Elimination of Repetition 3.1-3 3.1.1.18 10 CFR 50.33 - Contents of Applications; 3.1-3 General Information 3.1.1.19 10 CFR 50.33a - Information Requested by the 3.1-3 Attorney General for Antitrust Review 3.1.1.20 10 CFR 50.34 - Contents of Applications; 3.1-4 Technical Information 3.1.1.21 10 CFR 50.34a -Design Objectives for Equipment to Control Releases 3.1-9 of Radioactive Material in Effluents- Nuclear Power Reactors 3.1.1.22 10 CFR 50.35 - Issuance of Construction Permits 3.1-9 3.1.1.23 10 CFR 50.36 - Technical Specifications 3.1-9 3.1.1.24 10 CFR 50.36a - Technical Specifications on 3.1-9 Effluents from Nuclear Power Reactors 3.1.1.25 10 CFR 50.36b - Environmental Conditions 3.1-10 3.1.1.26 10 CFR 50.37 - Agreement Limiting Access to 3.1-10 Restricted Data ii UPDATE 2 - AUGUST 1997
/
CHAPTER 3 TABLE OF CONTENTS (Cont'd)
SECTION TITLE PAGE 3.1.1.27 10 CFR 50.38 - Ineligibility of Certain Applications 3.1-10 3.1.1.28 10 CFR 50.39 - Public Inspection of Applications 3.1-11 STANDARDS FOR LICENSES AND CONSTRUCTION PERMITS 3.1.1.29 10 CFR 50.40 - Common Standards 3.1-11 3.1.1.30 10 CFR 50.41 - Additional Standards for Class 104 Licenses 3.1-10 3.1.1.31 10 CFR 50.42 - Additional Standards for Class 103 Licenses 3.1-11 3.1.1.32 10 CFR 50.43 - Additional Standards and Provisions Affecting 3.1-11 Class 103 Licenses for Commercial Power 3.1.1.33 10 CFR 50.44 - Standards for Combustible Gas Control System 3.1-11 in Light-Water-Cooled Power Reactors 3.1.1.34 10 CFR 50.45 - Standards for Construction Permits 3.1-11 3.1.1.35 10 CFR 50.46 - Acceptance Criteria for Emergency 3.1-12 Core Cooling Systems for Light Water Nuclear Power Reactors 3.1.1.36 10 CFR 50.47 - Emergency Plans 3.1-12 3.1.1.37 10 CFR 50.48 - Fire Protection 3.1-12 3.1.1.38 10 CFR 50.49 - Environmental Qualification of 3.1-12 Electric Equipment Important to Safety for Nuclear Power Plants ISSUANCE, LIMITATIONS, & CONDITIONS OF LICENSES & CONSTRUCTION PERMITS 3.1.1.39 10 CFR 50.50 - Issuance of Licenses and Construction Permits 3.1-13 3.1.1.40 10 CFR 50.51 - Duration of License, Renewal 3.1-13 iii UPDATE 2 - AUGUST 1997
CHAPTER 3 TABLE OF CONTENTS (Cont'd)
SECTION TITLE PAGE 3.1.1.41 10 CFR 50.52 - Combining Licenses 3.1-13 3.1.1.42 10 CFR 50.53 - Jurisdictional Limitations 3.1-13 3.1.1.43 10 CFR 50.54 - Conditions of Licenses 3.1-13 3.1.1.44 10 CFR 50.55 - Conditions of Construction Permits 3.1-17 3.1.1.45 10 CFR 50.55a - Codes and Standards' 3.1-17 3.1.1.46 10 CFR 50.56 - Conversion of Construction Permit to License, 3.1-18 or Amendment of License 3.1.1.47 10 CFR 50.57 - Issuance of Operating License 3.1-18 3.1.1.48 10 CFR 50.58 - Hearings and Report of the Advisory 3.1-18 Committee on Reactor Safeguards 3.1.1.49 10 CFR 50.59 - Changes, Tests and Experiments 3.1-19 3.1.1.50 10 CFR 50.60 - Acceptance Criteria for Fracture 3.1-19 Prevention Measures for Light-Water Nuclear Power Reactors for Normal Operation 3.1.1.51 10 CFR 50.61 - Fracture Toughness Requirements 3.1-20 for Protection Against Pressurized Thermal ShockEvents 3.1.1.52 10 CFR 50.62 - Requirements for Reduction of Risk 3.1-19 from Anticipated Transients without Scram (ATWS) Events for Light-Water Cooled Nuclear Power Plants 3.1.1.53 10 CFR 50.63 - Loss of Alternating Current Power 3.1-20 3.1.1.54 10 CFR 50.64 - Limitations on the Use of Highly Enriched 3.1-20 Uranium (HLEU) in Domestic Non- Power Reactors 3.1.1 .54a 10 CFR 50.65 - Requirements for Monitoring the Effectiveness 3.1-20 of Maintenance at Nuclear Power Plants" INSPECTION, RECORDS, REPORTS, NOTIFICATIONS 3.1.1.55 10 CFR 50.70 - Inspections 3.1-20 iv UPDATE 2 - AUGUST 1997
CHAPTER 3 TABLE OF CONTENTS (Cont'd)
SECTION TITLE PAGE 13.1.1.56 10 CFR 50.71 - Maintenance of Records, Making of Reports 3.1-21 3.1.1.57 10 CFR 50.72 - Immediate Notification Requirements for Operating 3.1-21 Nuclear Power Reactors 3.1.1.58 10 CFR 50.73 - Licensee Event Report System 3.1-21 3.1.1.58a 10 CFR 50.74 - Notifications of Change in Operator or 3.1-21 Senior Operator Status" 3.1.1.59 10 CFR 50.75 - Reporting and Recordkeeping for 3.1-22 Decommissioning Planning US/IAEA SAFEGUARDS AGREEMENT 3.1.1.60 10 CFR 50.78 - Installation Information and Verification 3.1-22 TRANSFERS OF LICENSES-CREDITORS RIGHTS-SURRENDER OF LICENSES 3.1.1.61 10 CFR 50.80 -Transfer of Licenses 3.1-22 3.1.1.62 10 CFR 50.81 - Creditor Regulations 3.1-22 3.1.1.63 10 CFR 50.82 - Applications for Termination of Licenses 3.1-22 AMENDMENT OF LICENSE OR CONSTRUCTION PERMIT AT REQUEST OF HOLDER 3.1.1.64 10 CFR 50.90 - Application for Amendment of 3.1-22 License or Construction Permit 3.1.1.65 10 CFR 50.91 - Notice for Public Comment;' 3.1-22 State Consultation 3.1.1.66 10 CFR 50.92 - Issuance of Amendment 3.1-22 V UPDATE 2 - AUGUST 1997
CHAPTER 3 TABLE OF CONTENTS (Cont'd)
REVOCATION, SUSPENSION, MODIFICATION, AMENDMENT OF LICENSES AND CONSTRUCTION PERMITS, EMERGENCY OPERATIONS BY THE COMMISSION SECTION TITLE PAGE 3.1.1.67 10 CFR 50. 100 - Revocation, Suspension, Modification of 3.1-23 Licenses and Construction Permits for Cause 3.1.1.68 10 CFR 50.101 -Retaking Possession of Special Nuclear Material 3.1-23 3.1.1.69 10 CFR 50.102 - Commission Order for Operation After 3.1-23 Revocation 3.1.1.70 10 CFR 50.103 - Suspension and Operation in War 3.1-23 or National Emergency BACKFITING 3.1.1.71 10 CFR 50.109 - Baclfitting 3.1-23 ENFORCEMENT 3.1.1.72 10 CFR 50.110 - Violations 3.1-23 3.1.1.73 10 CFR 50.111 - Criminal Penalties" 3.1-23 3.1.1.74 10 CFR 50.120 - Training and Qualifications of Nuclear Power 3.1-23 Plant Personnel 3.1.2 GENERAL DESIGN CRITERIA 3.1-24 3.1.2.1 Criterion 1 - Quality Standards and Records 3.1-24 3.1.2.2 Criterion 2 - Design Bases for Protection Against Natural Phenomena 3.1-24 3.1.2.3 Criterion 3 - Fire Protection 3.1-25 3.1.2.4 Criterion 4 - Environmental and Missile Design Bases 3.1-25 3.1.2.5 Criterion 5 - Sharing of Siructures, Systems, and Components 3.1-26 vi UPDATE 2 - AUGUST 1997
CHAPTER 3 TABLE OF CONTENTS (Contd)
SECTION TITLE PAGE 3.1.2.6 Criterion 10 -Reactor Design 3.1-26 3.1.2.7 Criterion 11 - Reactor Inherent Protection 3.1-26 3.1.2.8 Criterion 12 - Suppression of Reactor Power Oscillations 3.1-26 3.1.2.9 Criterion 13 - Instrumentation and Control 3.1-27 3.1.2.10 Criterion 14 - Reactor Coolant Pressure Boundary 3.1-27 3.1.2.11 Criterion 15 - Reactor Coolant System Design 3.1-27 3.1.2.12 Criterion 16 - Containment Design 3.1-27 3.1.2.13 Criterion 17 - Electric Power Systems 3.1-28 3.1.2.14 Criterion 18 - Inspection and Testing of Electric Power Systems 3.1-29 3.1.2.15 Criterion 19 - Control Room 3.1-29 3.1.2.16 Criterion 20 - Protection System Functions 3.1-29 3.1.2.17 Criterion 21 - Protection System Reliability and Testability 3.1-30 3.1.2.18 Criterion 22 - Protection System Independence 3.1-30 3.1.2.19 Criterion 23 - Protection System Failure Modes 3.1-30 3.1.2.20 Criterion 24 - Separation of Protection and Control Systems 3.1-30 3.1.2.21 Criterion 25 - Protection System Requirements 3.1-31 for Reactivity Control Malfunctions 3.1.2.22 Criterion 26 - Reactivity Control System Redundancy and Capability 3.1-31 3.1.2.23 Criterion 27 - Combined Reactivity Control Systems Capability 3.1-31 3.1.2.24 Criterion 28 - Reactivity Limits 3.1-31 vii UPDATE 2 - AUGUST 1997
CHAPTER 3 TABLE OF CONTENTS (Cont'd)
SECTION TITLE PAGE 3.1.2.25 Criterion 29 - Protection Against Anticipated 3.1-32 Operational Occurrences 3.1.2.26 Criterion 30 - Quality of Reactor Coolant 3.1-32 Pressure Boundary 3.1.2.27 Criterion 31 - Fracture Prevention of Reactor 3.1-32 Coolant Pressure Boundary 3.1.2.28 Criterion 32 - Inspection of Reactor Coolant 3.1-33 Pressure Boundary 3.1.2.29 Criterion 33 - Reactor Coolant Makeup 3.1-33 3.1.2.30 Criterion 34 - Residual Heat Removal 3.1-33 3.1.2.31 Criterion 35 - Emergency Core Cooling 3.1-33 3.1.2.32 Criterion 36 - Inspection of Emergency Core Cooling System 3.1-34 3.1.2.33 Criterion 37 - Testing of Emergency Core Cooling System 3.1-34 3.1.2.34 Criterion 38 - Containment Heat Removal 3.1-34 3.1.2.35 Criterion 39 - Inspection of Containment Heat Removal System 3.1-35 3.1.2.36 Criterion 40 - Testing of Containment Heat Removal System 3.1-35 3.1.2.37 Criterion 41 - Containment Atmosphere Cleanup 3.1-35 3.1.2.38 Criterion 42 - Inspection of Containment Atmosphere 3.1-36 Cleanup Systems 3.1.2.39 Criterion 43 - Testing of Containment Atmosphere Cleanup Systems 3.1-36 3.1.2.40 Criterion 44 - Cooling Water 3.1-36 Viil UPDATE 2 - AUGUST 1997
CHAPTER 3 TABLE OF CONTENTS (Contd)
SECTION ITITLE PAGE 3.1.2.41 Criterion 45 - Inspection of Cooling Water System 3.1-37 3.1.2.42 Criterion 46 - Testing of Cooling Water System 3.1-37 3.1.2.43 Criterion 50 - Containment Design Basis 3.1-37 3.1.2.44 Criterion 51 -Fracture Prevention of 3.1-38 Containment Pressure Boundary 3.1.2.45 Criterion 52 - Capability for Containment 3.1-38 Leakage Rate Testing 3.1.2.46 Criterion 53 - Provisions for Containment Testing and Inspection 3.1-38 3.1.2.47 Criterion 54 - Piping Systems Penetrating Containment 3.1-39 3.1.2.48 Criterion 55 -Reactor Coolant Pressure Boundary 3.1-39 Penetrating Containment 3.1.2.49 Criterion 56 - Primary Containment Isolation 3.1-40 3.1.2.50 Criterion 57 - Closed System Isolation Valves 3.1-40 3.1.2.51 Criterion 60 - Control of Releases of 3.1-41 Radioactive Materials to the Environment 3.1.2.52 Criterion 61 - Fuel Storage and Handling and Radioactivity Control 3.1-41 3.1.2.53 Criterion 62 - Prevention of Criticality in Fuel Storage and Handling 3.1-41 3.1.2.54 Criterion 63 - Monitoring Fuel and Waste Storage 3.1-42 3.1.2.55 Criterion 64 - Monitoring Radioactivity Releases 3.1-42 3.2 CLASSIFICATION OF STRUCTURES, SYSTEMS, AND 3.2-1
!COMPONENTS 3.2.1 SEISMIC CLASSIFICATION 3.2-1 ix UPDATE 2 - AUGUST 1997 ix
CHAPTER 3 TABLE OF CONTENTS (Cont'd)
SECTION TITLE PAGE 3.2.1.1 Seismic Category I 3.2-1 3.2.1.2 PDMS Category HI 3.2-2 3.2.1.2.1 Design Basis 3.2-2 3.2.1.2.2 PDMS Category II Structures 3.2-2 3.2.1.2.3 PDMS Category II Systems 3.2-2 3.2.2 SYSTEM QUALITY GROUP CLASSIFICATION 3.2-3 3.2.2.1 Identification of Safety Related Systems and Components 3.2-3 3.3 WIND AND TORNADO LOADINGS 3.3-1 3.3.1 WIND LOADINGS 3.3-1 3.3.1.1 Design Wind Velocity 3.3-1 3.3.2 TORNADO LOADINGS 3.3-1 3.3.2.1 Applicable Design Parameters 3.3-1 3.3.2.2 Tornado Missiles 3.3-1 3.4 WATER LEVEL (FLOOD) DESIGN 3.4-1 3.4.1 FLOOD ELEVATION 3.4-1 3.4.2 PHENOMENA CONSIDERED IN DESIGN LOAD 3.4-1 CALCULATIONS 3.4.3 FLOOD FORCE APPLICATION 3.4-1 3.4.4 FLOOD PROTECTION 3.4-1 3.5 MISSILE PROTECTION CRITERIA 3.5-1 3.5.1 MISSILE LOADINGS AND BARRIERS 3.5-1 3.5.2 MISSILE SELECTION 3.5-1 X UPDATE 2 - AUGUST 1997
CHAPTER 3 TABLE OF CONTENTS (Cont'd)
SECTION TITLE PAGE 3.5.3 SELECTED MISSILES 3.5-1 3.5,3.1 Tornado Generated Missiles 3.5-1 3.5,3.2 Aircraft Impact 3.5-1 3.5.4 BARRIER DESIGN PROCEDURES 3.5-2 3.5.4.1 Overall Structural Effect 3.5-2 3.5.4.2 Missile Penetration (Localized Effect) 3.5-2 3.5.5 MISSILE BARRIER FEATURES 3.5-2 3.6 SEISMIC DESIGN 3.6-1 3.7 DESIGN OF PRINCIPAL BUILDING STRUCTURES 3.7-1 3.7.1 CONTAINMENT BUILDING 3.7-1 3.7.1.1 Structure Description 3.7-1 3.7.1.2 Liner Plate and Penetrations 3.7-1 3.7.2 OTHER PRINCIPAL STRUCTURES 3.7-3 3.7.2.1 Description of Structures 3.7-3 3.7.2.1.1 Auxiliary Building 3.7-3 3.7.2.1.2 Fuel Handling Building 3.7-3 3.7.2.1.3 Control and Services Buildings 3.7-3 3.7.2.1.4 Control Building Area 3.7-4 3.7.2.1.5 Air Intake Tunnel 3.7-4 xi UPDATE 2 - AUGUST 1997
CHAPTER 3 TABLE OF CONTENTS (Cont'd)
LIST OF TABLES TABLE NO. TITLE PAGE 3.2-1 PDMS CATEGORY H SYSTEMS 3.2-4 3.3-1 TORNADO GENERATED MISSILES 3.3-2 3.7-1 MODIFIED CONTAINMENT PENETRATIONS 3.7-6 xii UPDATE 2 - AUGUST 1997
CHAPTER 3 TABLE OF CONTENTS (Cont'd)
LIST OF FIGURES FIGURE NO. TITLE PAGE 3.7-1 REACTOR BUILDING GENERAL LAYOUT 3.7-4 3.7-2 REACTOR BUILDING PERSONNEL AND 3.7-5 EQUIPMENT ACCESS OPENINGS DETAIL 3.7-3 CONTAINMENT WALL PENETRATION DETAILS 3.7-6 3.7-4 SECTION THROUGH THE PLANT 3.7-7 STRUCTURES - "A-A" 3.7.5 SECTION THROUGH THE PLANT 3.7-8 STRUCTURES - "B-B" 3.7-6 SECTION THROUGH THE PLANT 3.7-9 STRUCTURES "C-C" & "D-D" xiii UPDATE 2 - AUGUST 1997
CHAPTER 3 DESIGN CRITERIA - STRUCTURES, SYSTEMS, AND COMPONENTS 3.1 REGULATORY CONFORMANCE 3.1.1 CONFORMANCE WITH 10 CFR Part 50 Three Mile Island Nuclear Station Unit 2 was originally designed to conform to the Regulations of 10 CFR Part 50, including the General Design Criteria of Appendix A. On March 28, 1979, the unit experienced an accident which severely damaged the reactor core. Subsequently, the core was removed and shipped off-site. The removal of the reactor core and the revision of the license to a non-operating license have changed the function of the facility from an operating nuclear power plant to one of management and maintenance. These characteristics substantially alter the applicability and the requirement for Three Mile Island Unit 2 conformance with the regulations of 10 CFR Part 50. The degree and manner of addressing those regulations which are applicable to Three Mile Island Unit 2 during Post Defueling Monitored Storage are described in the following sections. In addition, based on this evaluation, a request for relief from the inservice inspection requirements of 10 CFR 50.55a and an exemption from the requirements of 10 CFR 50.60 are also provided. The regulations which have been reviewed are those which were revised as of January 1, 1995.
3.1.1.1 10 CFR 50.1 - Basis, purpose, and procedures applicable.
Article 50.1 describes the basis, purpose, and procedures of 10 CFR Part 50 and gives notice that persons may be individually subject to NRC Enforcement Actions for violations of Article 10 CFR 50.5 "Deliberate Misconduct." No exceptions are taken to the provisions of this article.
3.1.1.2 10 CFR 50.2 - Definitions Article 50.2 provides definitions of terms used throughout 10 CFR 50. No exceptions are taken to the provisions of this article.
3.1.1.3 10 CFR 50.3 - Interpretations.
Article 50.3 delegates the responsibility for interpretations of 10 CFR 50 to the General Counsel. No exceptions are taken to the provisions of this article.
3.1.1.4 10 CFR 50.4 - Communications.
Article 50.4 describes communications requirements for nuclear power plants. No exceptions are taken to the provisions of this article.
3.1-1 UPDATE 2 - AUGUST 1997
3.1.1.4a 10 CFR 50.5 - Deliberate Misconduct Article 50.5 prohibits deliberate misconduct as defined in this article by Licensees, applicants for a license, contractors, sub-contractors, and their respective employees and provides for appropriate enforcement action. No exceptions are taken to the provisions of this article.
3.1.1.5 10 CFR 50.7 - Employee Protection Article 50.7 describes provisions relating to the protection of employees at nuclear facilities. No exceptions are taken to the provisions of this article.
3.1.1.6 10 CFR 50.8 - Information Collection Requirements: OMB Approval Article 50.8 states that the OMB has approved NRC information requirements. No exceptions are taken to the provisions of this article.
I 3.1.1.6a "IOCFR50.9 - Completeness and Accuracy of Information" Article 50.9 providcs requirements for licensees to maintain and to provide the NRC complete and accurate information. No exceptions are taken to the provisions of this article.
3.1.1.7 10 CFR 50.10 - License Required Article 50.10 describes the requirements and restrictions of a license obtained pursuant to 10 CFR Part
- 50. No exceptions are taken to the provisions of this article.
3.1.1.8 10 CFR 50.11 - Exceptions and Exemptions from Licensing Requirements Article 50.11 describes certain agencies of the Federal Government not required to obtain a license pursuant to 10 CFR 50. No exceptions are taken to the provisions of this article.
3.1.1.9 10 CFR 50.12 - Specific Exemptions Paragraph 50.12 allows the Commission to grant exemptions from the requirements of regulations. No exceptions are taken to the provisions of this article.
3.1.1.10 10 CFR 50.13- Attacks and Destructive Acts by Enemies of the United States; and Defense Activities Article 50.13 exempts Licensees from having to provide design features to protect a facility from sabotage and other destructive acts. No exceptions are taken to the provisions of this article.
3.1.1.11 10 CFR 50.20 - Two Classes of Licenses Article 50.20 provides for two classes of licenses; class 103 and 104. TMI-2 currently possesses a class 103 license.
3.1-2 UPDATE 3 - AUGUST 1999
3.1.1.12 10 CFR 50.21 - Class 104 Licenses; for Medical Therapy and Research and Development Facilities The class of license described in Article 50.21 does not apply to TMI-2.
3.1.1.13 10 CFR 50.22 - Class 103 Licenses; for Commercial and Industrial Facilities The class of license described in Article 50.22 is applicable to TMI-2 and is the class of license under which the facility is currently licensed. TMI-2 will continue to be licensed as a Class 103 facility but the license has been modified to recognize the unique PDMS condition of the plant.
3.1.1.14 10 CFR 50.23 - Construction Permits Article 50.23 describes to whom and when a construction permit will be issued. No exceptions are taken to the provisions of this article.
3.1.1.15 10 CFR 50.30 - Filing of Applications for Licenses; Oath or Affiration Article 50.30 describes requirements for filing for amendments to a facility license. No exceptions are taken to the provisions of this article.
3.1.1.16 10 CFR 50.31 - Combining Applications Article 50.31 states that applications for licenses may be combined. No exceptions are taken to the provisions of this article.
3.1.1.17 10 CFR 50.32 - Elimination of Repetition Article 50.32 states that applications may reference information in other applications. No exceptions are taken to the provisions of this article. In fact, the TMI-2 FSAR and the TMI-1 USAR are referenced in the application.
3.1.1.18 10 CFR 50.33 - Contents of Applications; General Information Article 50.33 specifies general requirements for applications. No exceptions are taken to the provisions of this article.
3,1.1.19 10 CFR 50.33a - Information Requested by the Attorney General for Antitrust Review Article 50.33a specifies information required to be filed by applicants who are filing construction permit applications for nuclear power reactors, uranium enrichment or fuel reprocessing plants. No exceptions are taken to the provisions of this article.
3.1-3 UPDATE 2- AUGUST 1997
3.1.1.20 10 CFR 50.34 - Contents of Applications; Technical Information Paragraph 50.34(a) describes requirements for a Preliminary Safety Analysis Report (PSAR) to be filed with an application for a construction permit. Since TMI-2 has completed the construction permit process and received a license, the requirements of this paragraph are no longer applicable to TMI-2.
Paragraph 50.34(b) requires that each application for a license to operate a facility shall include a Final Safety Analysis Report (FSAR) and describes the required contents of that FSAR. This paragraph requires the FSAR to include information that describes the facility, presents the design basis and presents a safety analysis of the structures, systems and components of the facility as a whole. The original TMI-2 license application included the required FSAR which addressed the requirements of paragraph 50.34(b). Although TMI-2 has addressed the requirements of paragraph 50.34(b) in the FSAR, it is useful to review each of the FSAR requirements in the context of Post-Defueling Monitored Storage. A paragraph by paragraph review of the content requirements of the FSAR, considering the circumstances which exist during Post-Defueling Monitored Storage, follows:
50.34(b)(I)
Paragraph 50.34(b)(1) requires the FSAR to include all current information, such as the results of environmental and meteorological monitoring programs, which has been developed since issuance of the construction permit, relating to site evaluation factors identified in Part 100 ofthis chapter. This information was included in the FSAR and is bounding for Post-Defueling Monitored Storage. 10 CFR Part 100 evaluation factors generally include such assumptions as a substantial meltdown of the reactor core with subsequent release of appreciable quantities of fission products for site evaluation. While these kinds of assumptions were used in the initial siting evaluation of TMI-2, they do not apply during Post-Defueling Monitored Storage. Due to the non-operating and defueled status of TMI-2, a major nuclear event can no longer occur at TMI-2. In order to assure that TMI-2 does not present any significant risk to the public during PDMS, 10 CFR 50 Appendix I release guidelines (see SAR Table 8.1-4) have been selected as the limiting criteria for the evaluation of routine and unanticipated releases. Therefore, although the evaluation criteria of paragraph 50.34(b)(1) are no longer directly applicable during PDMS, comparable evaluations have been reviewed using the limiting criteria specified above. In addition, TMI-I has in place an extensive Radiological and Environmental Monitoring Program for the TMI site. Since TMI-2 is on the same site and will utilize relevant site information (i.e., the ODCM), TMI-2 will utilize the latest applicable site-related environmental and meteorological information.
50.34(b)(2)
Paragraph 50.34(b)(2) requires descriptions and analysis of structures, systems and components. Although the specific requirements of this paragraph cannot be complied with as written due to the unique condition of TMI-2 during PDMS, the intent of this paragraph has been addressed by providing descriptions of the structures, systems and 3.1 -4 UPDATE 2 - AUGUST 1997
components that provide necessary protective functions during PDMS. The primary protective function of structures, systems, and components during PDMS is the isolation from the environment of the contamination which remains at TMI-2.
50.34(b)(2)(i)
Paragraph 50.34(b)(2)(i) requires the discussion of several items (e.g., reactor core, reactor coolant system, emergency systems) for nuclear reactors. Due to the non-operating and defueled status of TMI-2 during PDMS, the facility is no longer a "nuclear reactor."
Although many of the items referenced in this paragraph will not exist or have no function during PDMS, the intent of this paragraph has been addressed by providing descriptions of those items which are required during PDMS. See the discussion of paragraph 50.34(b)(2)(ii).
50.34(b)(2)(ii)
Paragraph 50.34(b)(2)(ii) requires the discussion of a number of items (e.g., ventilation systems, control systems, waste handling) for facilities other than nuclear reactors. Although TMI-2 was originally licensed as a nuclear reactor, during PDMS the facility will not function as a nuclear reactor. Due to the unique condition of TMI-2 during PDMS, the provisions described in this paragraph more accurately portray requirements for TMI-2 than does paragraph 50.34(b)(2)(i). The intent of the provisions of this paragraph, as they relate to TMJ-2 has been addressed in this document with the additional consideration that TMI-2 was originally licensed as a nuclear power reactor.
50.34(b)(3)
Paragraph 50.34(b)(3) requires that the kinds of radioactive materials produced and the means for controlling and limiting effluents and exposures be described. Although there will be no radioactive materials produced during PDMS as would normally occur at an operating power reactor, there will be some radioactive waste generated as well as the residual contamination that remains within the facility. Although the specific requirements of this paragraph cannot be complied with as written due to the unique condition of TMI-2 during PDMS, the intent of the provisions of this paragraph has been addressed by providing descriptions of the kinds of radioactive materials which remain at the facility and the means for controlling and limiting effluents and exposures to these materials to within the limits of 10 CFR 20.
50.34(b)(4)
Paragraph 50.34(b)(4) requires a final analysis and evaluation of the structures, systems and components which relate to the protection of the public from the consequences of normal operation, transients, and accidents. Although the specifics of these requirements as given in paragraph 50.34(b)(4) do not apply for PDMS, the intent of these requirements has been addressed for the limited number of postulated events and the insignificant risk to public health and safety has been demonstrated.
3.1 -5 UPDATE 2 - AUGUST 1997
Paragraph 50.34(b)(4) also requires an analysis and evaluation of ECCS cooling performance following postulated loss-of-coolant accidents in accordance with the requirements of 10 CFR 50.46. As 10 CFR 50.46 does not apply to TMI-2 in its current defueled condition, an analysis of ECCS cooling performance is not provided.
50.34(b)(5)
Paragraph 50.34(b)(5) requires the description and evaluation of programs to resolve safety questions identified at the construction permit stage. These requirements were addressed in the FSAR and do not apply to TMI-2 during PDMS.
50.34(b)(6)(i)
Paragraph 50.34(b)(6)(i) requires information concerning the applicant's organizational structure, allocations of responsibilities and authorities, and personnel qualifications requirements. Although the actual organization and responsibilities will be substantially different than that of a normally operating power plant, the requirements of this paragraph as they apply to TMI-2 during PDMS have been addressed in Section 10.5.
50.34(b)(6)(ii)
Paragraph 50.34(b)(6)(ii) requires a description of the managerial and administrative controls used to satisfy applicable requirements of 10 CFR Part 50 Appendix B. Appendix B establishes quality assurance requirements for activities affecting the safety-related functions of those structures, systems and components that prevent or mitigate the consequences of postulated accidents that could cause undue risk to the health and safety of the public.
During PDMS, TMI-2 has no structures, systems or components classified as safety-related and, therefore, the requirements of paragraph 50.34(b)(6)(ii) and Appendix B do not apply to TMI-2 during PDMS. Due to the unique condition of TMI-2 during PDMS, the specific requirements of this paragraph are not directly applicable; however, TMI-2 has addressed the intent of this paragraph by establishing a quality assurance program similar to that described in Appendix B for activities such as radioactive waste shipping and conformance with 10 CFR 20 requirements as well as for all activities which are judged to be within the intent of this paragraph.
50.34(b)(6)(iii)
Paragraph 50.34(b)(6)(iii) requires information concerning plans for preoperational testing and initial operations. These requirements do not apply to TMI-2 during PDMS.
50.34(b)(6)(iv)
Paragraph 50.34(b)(6)(iv) requires information concerning plans for conduct of normal operations, including maintenance, surveillance and periodic testing of structures, systems and components. During PDMS, operations are limited to those activities 3.1 -6 UPDATE 2 - AUGUST 1997
related to monitoring and maintaining the facility in a stable condition. Although the specific requirements of this paragraph do not apply due to the unique condition of TMII-2 during PDMS, the intent of these provisions has been addressed by providing information concerning activities appropriate during PDMS.
50.34(b)(6)(v)
Paragraph 50.34(b)(6)(v) requires information concerning plans for coping with emergencies, which shall include the items specified in Appendix E. Emergency planning requirements are based on the assumption of the potential necessity to notify the public of the existence of, or potential for significant off-site releases. Appendix E recognizes that emergency planning needs are different for facilities that present less risk to the public.
Due to the non-operating and defueled status of TMI-2 during PDMS, there is no potential for any significant off-site radioactive release. Further, due to the existence of TNII-1 on the same site, emergency planning requirements for the site are dominated by TMI- 1.
Therefore, the limited emergency planning necessary to accommodate the existence of TMI-2 on the same site as TMJ-1 has been incorporated in one integrated emergency plan. There exists only one Emergency Preparedness Plan for the TMA station. The Plan encompasses both TMJ-1 and TMJ-2 and is under the authority of AmerGen, the TMI-1 License holder.
50.34(b)(6)(vi)
Paragraph 50.34(b)(6)(vi) requires information concerning proposed technical specifications prepared in accordance with the requirements of Article 50.36. Due to the unique condition of TMI-2 during PDMS, the specific requirements of Article 50.36 are not applicable; however, the intent of this article has been addressed. Rev. 0 of the PDMS SAR provided draft Technical Specifications (Tech. Specs.). The NRC subsequently, issued TMI-2 Technical Specifications as Appendix A to the Possession-Only License for PDMS.
The draft Tech. Specs. in Chapter 9 have been deleted from the PDMS SAR to prevent confusion between the draft and the actual Tech. Specs.
50.34(b)(6)(vii)
Paragraph 50.34(b)(6)(vii) requires information concerning the construction of multiunit power plant sites. These requirements are not applicable to TMf-2 during PDMS.
50.34(b)(7)
Paragraph 50.34(b)(7) requires the SAR to include the technical qualifications of the applicant to engage in the proposed activities in accordance with the regulations in this chapter. The technical qualifications of GPU Nuclear, which are applicable to activities related to the unique PDMS conditions, are provided in Section 10.5.
3.1-7 UPDATE 4 - AUGUST 2001
50.34(b)(8)
Paragraph 50.34(b)(8) requires the SAR to include a description and plans for implementation of an operator requalification program. The operator requalification program shall, as a minimum, meet the requirements for those programs contained in Appendix A of Part 55 of this chapter. Due to the nonoperating and defueled status of TMI-2 during PDMS, the requirements for licensed reactor operators do not apply and consequently the requirements for operator requalification also do not apply.
50.34(b)(9)
Paragraph 50.34(b)(9) requires a description of protection provided against pressurized thermal shock events. Due to the non-operating and defueled status of TMI-2 during PDMS, the requirements of paragraph 50.34(b)(9) do not apply. In addition, TMI-2 was granted an exemption to 10 CFR 50.61 (Reference 3.1-1) which acknowledged that TMI-2 need take no measures to protect against pressurized thermal shock.
50.34(c)
Paragraph 50.34(c) requires each application for a license to operate a production or utilization facility to include a physical security plan. Due to the unique condition of TMI-2 during PDMS, the specific requirements of this paragraph are not applicable; however,'the intent of the requirements has been addressed in this SAR. The security provisions necessary for TMI-2 have been provided by locating the unit inside the same protected area as TMIf Unit 1 and the provisions incorporated in the TMI site security plan referenced in Section 10.2.
50.34(d)
Paragraph 50.34(d) requires that each application for a license to operate a production or utilization facility that is subject to Article 73.50, Article 73.55, or Article 73.60 shall include a licensee safeguards contingency plan in accordance with the criteria set forth in Appendix C to 10 CFR Part 73. The safeguards contingency provisions necessary for TMI-2 are provided by being located inside the same protected area as TMI- I and are incorporated in the safeguards contingency plan for the TMI site. See Section 10.2.
50.34(e)
Paragraph 50.34(e) requires that each applicant for a license to operate a production or SC.
utilization facility who prepared a physical security plan, a safeguards contingency plan, or a guard qualification and training plan shall protect the plans and other related Safeguards Information against unauthorized disclosure in accordance with the requirements of 10 CFR 73.21 as appropriate. Due to the non-operating and defueled 3.1-8 UPDATE 2 - AUGUST 1997
status of TMI-2 during PDMS and the location of TMI-I on the same site, overall security will be controlled by the site security plan. All security activities established in accordance with the regulations in 10 CFR Part 50 will be protected against unauthorized disclosure in accordance with 10 CFR 73.2 1.
50.34(f)
Paragraph'50.34(f) establishes TMI-related requirements for a specific group of plants.
TMI-2 is not included in this group of plants; therefore, this paragraph does not apply to TMI-2.
50.34(g)
Paragraph 50.34(g) requires applicants for operating licenses docketed after May 17, 1982, to include SRP evaluations with their license applications. As this application is not requesting an operating license for TMI-2, this paragraph does not apply to TMI-2.
3.1.1.21 10 CFR 50.34a - Design objectives for equipment to control releases of radioactive material in effluents-nuclear power reactors.
Article 50.34a establishes requirements for radioactive effluent control descriptions in construction permit and operating license applications. Due to the unique condition of TMI-2 during PDMS, the specific requirements of this article are not applicable; however, there will be limited radioactive effluents to the environment during PDMS. Descriptions of the equipment to monitor and control those releases are provided consistent with the intent of this article.
3.1.1.22 10 CFR 50.35 - Issuance of construction permits.
Article 50.35 establishes requirements for the Commission with respect to the issuance of construction permits and defines the limitations of the construction permit. No exceptions are taken to the provisions of this article.
3.1.1.23 10 CFR 50.36 - Technical specifications Article 50.36 establishes requirements for Technical Specifications. No exceptions are taken to the provisions of this article.
3.1.1.24 10 CFR 50.36a - Technical specifications on effluents from nuclear power reactors.
3.1 -9 UPDATE 2 - AUGUST 1997
50.36a(a)
Paragraph 50.36a(a) establishes requirements for effluents for operating reactors. Although TMI-2 is not an operating reactor and the requirements of this paragraph cannot be complied with as written, the effluents during PDMS will be controlled and limited to very low values.
The-intent of the provisions of this paragraph is addressed by providing effluent limits and the description of how these-limits will be met in Chapters 7 and 8.
50.36a(a)(1)
Paragraph 50.36a(a)(l) requires that procedures be developed for the control of effluents and that equipment installed in radioactive waste systems pursuant to 50.34(a) be maintained and used. Procedures in use will be in place for the control of effluents during PDMS. The TMI-2 equipment that will be used to process radioactive wastes during PDMS will be maintained and is described in Section 7.2.3.
50.36a(a)()
Paragraph 50.36a(a)(2) requires that each licensee submit annual reports on effluents and prepare estimated public dose from those effluents. These requirements are applicable to TMI-2 during PDMS.
50.36a(b)
Paragraph 50.36a(b) establishes guidelines for limiting radioactive effluents and references 10 CFR 20.106 and 10 CFR 50 Appendix I as applicable in limiting effluents. These requirements are applicable to TMI-2 during PDMS.
3.1.1.25 10 CFR 50.36b - Environmental Conditions Article 50.36b establishes that the NRC may specify conditions as part of the license to protect the environment. No exceptions are taken to the provisions of this article.
3.1.1.26 10 CFR 50.37 - Agreement Limiting Access to Restricted Data Article 50.37 establishes requirements for access to Restricted Data and classified National Security Information. No exceptions are taken to the provisions of this article.
3.1.1.27 10 CFR 50.38 - Ineligibility of Certain Applicants Article 50.38 establishes that certain persons are not eligible to apply for or obtain a license. No exceptions are taken to the provisions of this article.
3.1-10 UPDATE 3 - AUGUST 1999
3.1,.1.28 10 CFR 50.39 -Public Inspection of Applications Article 50.39 states that applications and documents submitted to the Commission may be made available for public inspection. No exceptions are taken to the provisions of this article.
3.1.1.29 10 CFR 50.40 - Common Standards Article 50.40 establishes guidelines for the Commission in determining if a License will be issued to an applicant. No exceptions are taken to the provisions of this article.
3.1.1.30 10 CFR 50.41 - Additional Standards for Class 104 Licenses Article 50.41 establishes additional standards for class 104 licenses for the Commission to use in determining if a license will be issued to an applicant. The class of license described in this article does not apply to TMI-2.
3.1.1.31 10 CFR 50.42 - Additional Standards for Class 103 Licenses Article 50.42 establishes additional standards for class 103 licenses for the Commission to use in determining if a license will be issued to an applicant. No exceptions are taken to the provisions of this article.
3.1.1.32 10 CFR 50.43 - Additional Standards and Provisions Affecting Class 103 Licenses for Commercial Power Article 50.43 establishes additional standards and provisions for class 103 licenses. No exceptions are taken to the provisions of this article.
3.1.1.33 10 CFR 50.44 - Standards for Combustible Gas Control System in Light-Water-Cooled Power Reactors Article 50.44 specifically exempts plants that have permanently ceased operations from the requirement to establish a combustible gas control system to be used in the event of a LOCA. This exemption reapplies to TMI-2 during PDMS. Thus, no exceptions to the provisions of this article are necessary.
3.1.1.34 10 CFR 50.45 - Standards for Construction Permits Article 50.45 establishes standards for the issuance of a construction permit. No exceptions are taken to the provisions of this article.
3.1-11 UPDATE 2 - AUGUST 1999
3.1.1.35 10 CFR 50.46 - Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors Article 50.46 specifically exempts plants that have permanently ceased operations from the@
requirement for emergency core cooling systems for light water nuclear power reactors..
This exemption applies to TMI-2 during PDMS. Thus, no exceptions to the provisions of this article are necessary.
3.1.1.36 10 CFR 50.47- Emergency Plans Article 50.47 establishes.requirements for the content and criteria for acceptance of emergency plans. Emergency planning requirements are based on the assumption of the potential necessity to notify the public of the existence of, or potential for significant off-site releases.
Appendix E recognizes that emergency planning needs are different for facilities that present less risk to the public. Due to the non-operating and defueled status of TMI-2 during PDMS, there is no potential for any significant off-site radioactive release. Due to the existence of TNvI-1 on the same site, emergency planning requirements for the site are dominated by TM- 1. Therefore, the limited emergency planning necessary to accommodate the existence of TMII-2 on the same site as TMI- 1 has been incorporated into one integrated emergency plan. The Plan encompasses both TII-1 and TMI-2 and is under the authority of AmerGen, the TMI-1 License holder. See the discussion of paragraph 50.34(b)(6)(v).
3.1.1.37 10 CFR 50.48 - Fire Protection Article 50.48 establishes fire protection requirements for plants that have permanently ceased operation. These requirements are applicable to TMI-2 during PDMS.
3.1.1.38 10 CFR 50.49 - Environmental Qualification of Electric Equipment Important to Safety for Nuclear Power Plants Article 50.49 specifically exempts plants that have permanently ceased operations from the requirements to establish a program for the qualification of electrical equipment important to safety. This exemption applies to TMI-2 during PDMS. Thus, no exceptions are taken to the provisions of this article.
3.1-12 UPDATE 4 - AUGUST 2001
3.1.1.39 10 CFR 50.50- Issuance of Licenses and Construction Permits Article 50.50 states that the Commission will issue a license or construction permit with such conditions and limitations as it deems appropriate. No exceptions are taken to the provisions of this article.
3.1.1.40 10 CFR 50.51 - Continuation of License.
Article 50.51 establishes the duration of licenses issued by the Commission. No exceptions are taken to the provisions of this article.
3.1.1.41 10 CFR 50.52 - Combining Licenses Article 50.52 establishes that the Commission may combine licensed activities in a single license. No exceptions are taken to the provisions of this article.-
3.1.1.42 10 CFR 50.53 - Jurisdictional Limitations Article 50.53 establishes jurisdictional limitations on licenses. No exceptions are taken to the provisions of this article.
3.1.1.43 10 CFR 50.54 - Conditions of Licenses Article 50.54 establishes a series of conditions applicable to holders of a license. Due to the non-operating and defueled status of TMI-2 during PDMS, many of these requirements do not apply.
The applicability of each paragraph of Article 50.54 has been addressed in the following review.
50.54(a)
Paragraph 50.54(a) requires that each nuclear power plant or fuel reprocessing plant licensee subject to the criteria of 10 CFR Part 50 Appendix B implement a quality assurance program pursuant to paragraph 50.34(b)(6)(ii). Appendix B establishes quality assurance requirements for the safety-related functions of those structures, systems and components that prevent or mitigate the consequences of postulated accidents that could cause undue risk to the health and safety of tle public. During PDMS, TMI-2 will not have any structures, systems or components classified as safety-related and, therefore, 3.1-13 UPDATE 3 - AUGUST 1999
the requirements of paragraphs 50.54(a)(1), 50.34(b)(6)(ii) and Appendix B do not apply to TMI-2. However, the intent ofthis article has been addressed by establishing and maintaining a quality assurance program similar to that described in Appendix B for TMI-2 activities.
50.54(b) through 50.54(h)
Paragraphs 50.54(b) through 50.54(h) establish general limitations on licenses. No exceptions are taken to the provisions of these paragraphs.
50.54i) through 50.54(m)
Paragraphs 50.54(i) through 50.54(m) establish requirements related to reactor operators and senior reactor operators. As discussed in License Amendment No. 30 (Reference 3.1-3),
these requirements are specified for fueled reactors. As the TMI-2 reactor has been defueled, the requirements of these paragraphs do not apply to TMI-2 during PDMS. Also see Section 3.1.1.20 regarding paragraph 50.34(b)(8).
50.54(n)
Paragraph 50.54(n) states that "The licensee shall not, except as authorized pursuant to a construction permit, make any alteration in the facility constituting a change from the technical specifications previously incorporated in a license or construction permit pursuant to Article 50.36 of this part." No exceptions are taken to the provisions of the article.
50.54(o)
Paragraph 50.54(o) specifically exempts the primary reactor containments of plants that have permanently ceased operation from the requirements of 10 CFR 50 Appendix J.
This exemption applies to TMI-2 during PDMS. Thus, no exceptions to the provisions of this article are necessary.
50.54(R)
Paragraph 50. 5 4(p) requires that a licensee prepare and maintain safeguard contingency plan procedures and provides for revisions to those procedures. The safeguards contingency provisions necessary for TMI-2 are provided by being located inside the same protected area as TMI-1 and are incorporated in the safeguards contingency plan for the TMI site. See Section 10.2.
3.1 -14 UPDATE 2 - AUGUST 1997
5o.54(g)
Paragraph 50.54(q) requires that a licensee shall follow and maintain emergency plans which meet the requirements of paragraph 50.47(b). This paragraph also defines requirements for revising those emergency plans. Due to the existence-of TMI- I on the same site as TMI-2, emergency planning requirements for the site are dominated by TMI-1. Therefore, the limited emergency planning necessary to accommodate the existence of TMI-2 on the same site as TMI-1 has been incorporated into one integrated emergency plan. The Plan encompasses both TMI-1 and TMI-2 and is under the authority of AmerGen, the T1I-1 License holder.
50.54(r)
Paragraph 50.54(r) establishes requirements for test reactors. These requirements do not apply to TMI-2.
50.54(s)
Paragraph 50.54(s) requires each licensee who is authorized to possess and/or operate a nuclear power reactor to submit radiological emergency plans of state and local governmental entities to the NRC. All radiological emergency planning provisions necessary for TMI-2 have been incorporated in the TMI site emergency planning process, including the provisions of paragraph 50.54(s).
50.54(t)
Paragraph 50.54(t) establishes requirements for the development, revision, implementation and maintenance of the emergency preparedness program for nuclear power reactors. Emergency preparedness requirements applicable to TMI-2 are incorporated in the emergency preparedness program established for the TMI site. See Section 10.3.
50.54(u)
Paragraph 50.54(u) requires each licensee to submit emergency plans in accordance with 10 CFR 50.47(b) and Appendix E. Article 50.47 establishes requirements for the content and criteria for acceptance of emergency plans. Emergency planning requirements are based on the assumption of the potential necessity to notify the public of the existence of, or potential for significant off-site releases. Appendix E recognizes that emergency planning needs are different for facilities that present less risk to the public. Due to the non-operating and defueled status of TMI-2 during PDMS there is no potential for any significant off-site radioactive release and due to the existence of TMI- 1 on the same site, emergency planning requirements for the site will be dominated by TMI-1. Therefore, the limited emergency planning necessary to accommodate the existence of TMI-2 on the same site as TMI-1I has been incorporated into one integrated emergency plan. The Plan encompasses both TMI-1 and TMI-2 and is under the authority of AmerGen, the TMI-1 License holder. See Section 3.1.1.20 regarding paragraph 50.34(b)(6)(v).
50.54(v)
Paragraph 50.54(v) requires that each licensee shall ensure that physical security, safeguards contingency and guard qualification and training plans and other related safeguards information are protected against unauthorized disclosure in accordance with the requirements of 10 CFR 73.21 as appropriate. To the extent that TMI-2 possesses the above information during PDMS, it will be protected from unauthorized disclosure in accordance with 10 CFR 73.21. See paragraphs 50.34(c), 50.34(d) and 50.34(e).
3.1-15 UPDATE 4 - AUGUST 2001
50.54(w)
Paragraph 50.54(w) requires that each electric utility licensed under this part for a production or utilization facility of the type described in paragraph 50.2 1(b) or paragraph 50.22 shall by June 29, 1982 take reasonable steps to obtain on-site property damage 6
insurance available at reasonable costs and at reasonable terms from private sources.
Reference 3.1-16 exempted TMI-2 from certain requirements of this paragraph.
Based on this exemption the appropriate insurance has been acquired and will be maintained for TMI-2.
I 50.54(x) and 50.54(y)
Paragraph 50.54(x) allows a licensee to take action which departs- from a license condition or technical specification in an emergency when this action is immediately needed to protect the health and safety of the public. Paragraph 50.54(y) requires that for plants that have permanently ceased operation, any action taken pursuant to paragraph 50.54(x) be approved, as a minimum, by a licensed senior operator or a certified fuel handler prior to taking the action. The provisions of this article have limited applicability to TMI-2 during PDMS. Due to the non-operating and defueled status of TMI-2 during PDMS, there are no postulated events which could affect public health and safety in such a manner. In addition, the technical specifications will be of limited scope and it is not anticipated that a condition will exist such that it could become necessary to take action that departs from either a license condition or a technical specification to protect public health and safety. Since TMI-2 will not have licensed senior reactor operators or certified fuel handlers during PDMS, if an extremely unlikely event were to occur necessitating deviation from the technical specifications the action would have to be approved by senior management.
50.54(z)
Paragraph 50.54(z) requires each licensee to notify the NRC Operations Center of the occurrence of any event specified in 10 CFR 50.72. Due to the non-operating and defueled status of TMI-2 during PDMS, there are very few potential events which would require reporting under 10 CFR 50.72. However, to the extent that reporting is required under 10 CFR 50.72, the requirements of this paragraph are applicable. See Section 3.1.1.57 regarding paragraph 10 CFR 50.72.
50.54(aa)
Paragraph 50.54(aa) establishes that the licensee must meet Sections 401 (a)(2) and 401(d) of the Federal Water Pollution Control Act. No exceptions are taken to the provisions of this article.
50.54(bb)
Paragraph 50.54(bb) requires licensees of operating nuclear power reactors to acquire NRC approval of the program to fund, manage, and transfer irradiated fuel upon expiration of the reactor operating license. It further requires that Licensees that ceased operation prior to April 4, 1994 to submit their spent fuel management funding plan by April 4, 1996. As the irradiated fuel which comprised the TMI-2 reactor core has been transferred to the possession of the Department of Energy no funding plan is required for TMI-2. A letter documenting this position was submitted to the NRC on May 31, 1994 (C311-94-2077).
3.1-16 UPDATE 4 - AUGUST 2001
50.54(cc.
Paragraph 50.54(cc) requires licensee written notifications of the appropriate NRC Regional Administrator of certain bankruptcy filings. No exceptions are taken to the provisions of this article.
50.54(dd)
Paragraph 50.54(dd) allows licensees to take reasonable actions that depart from a license condition or a Technical Specification under certain conditions during a National Security Emergency. No exceptions are taken to the provisions of this article.
50.54(ee)
Paragraph 50.54(ee) allows licensees, authorized to possess by product and special nuclear material to receive back low level waste (LLW) separated at the plant and shipped off-site for processing. No exceptions are taken to the provisions of this article.
50.54(fl)
Paragraph 50.54(fl) establishes requirements for plant shutdown and subsequent restart if vibratory ground motion exceeds that for an operating basis earthquake for future nuclear power stations. As TMI-2 is currently licensed (i.e. permanently shutdown) the requirements of this paragraph do not apply to TMT-2.
3.1.1.44 10 CFR 50.55 - Conditions of Construction Permits Article 50.55 establishes terms and conditions of construction permits. No exceptions are taken to the provisions of this article.
3.1.1.45 10 CFR 50.55a - Codes and Standards Article 50.55a requires each operating license for a nuclear power facility be subject to the inservice testing and inspection requirements of paragraphs (f) and (g) to Article 50.55a and that each construction permit be subject to the remaining paragraphs of the article. As this application is not for a construction permit, paragraphs (f) and (g) of Article 50.55a are the only portions of the article potentially applicable to TMI-2 in PDMS.
Paragraphs (f) (1) and (g) (1) are the paragraphs which apply to TM[-2. These paragraphs require that safety related pumps, valves and components (including supports) meet the requirements of paragraphs (f) (4) and (5) or (g) (4) and (5). These paragraphs define the inservice testing and inspection requirements and provide a mechanism for relief from impractical requirements based on a satisfactory demonstration of this action to the Nuclear Regulatory Commission. Relief from these requirements was sought and for the most part granted early in the TM[-2 Cleanup Program. The NRC granted the following relief for TMI-2 (Reference 3.1-5):
I. The provisions of IWA-2400 of Section Xl of the ASME Boiler and Pressure Vessel Code (code) 1974 edition, Summer 1975 Addenda for extending the inspection interval for a period of time equivalent to the shutdown period of TMI-2 was applicable.
- 2. Testing of pumps in accordance with Section IWP-3400 of the code was only required for' those pumps specified in the Recovery Technical Specifications.
3.1 -17 UPDATE 2 - AUGUST 1997
- 3. Category A valves were defined to be containment isolation valves. The NRC agreed that these valves should not be exercised. However, 10 CFR Part 50 Appendix J Type "C" testing was required for any containment isolation valve that was opened and subsequently closed in order to verify its containment isolation function.
- 4. Category B and C valves in systems out-of-service need not be tested, however, Category B and C valves in safety related systems in service should be exercised at least once per 92 days.
- 5. The Mini Decay Heat Removal System was to be handled as a separate action.
During PDMS, the relief granted by the NRC still applies. In addition, based on the following justification, no further inservice inspection is required.
- 1. The PDMS Technical Specifications require no pumps to be operable. Therefore, based on the existing relief, testing of pumps in accordance with IWP-3400 would not be required during PDMS.
- 2. Performance of Type "C" testing of containment isolation valves (Category A valves) in accordance with 10 CFR Part 50 Appendix J is not required at TMI-2. The NRC granted TMI-2 an exemption from Type "C" testing (Reference 3.1-4).
- 3. During PDMS, there will be no safety related systems at TMI-2. Therefore, performance of testing of Category B and C valves is not required based on the relief granted by the NRC.
- 4. No testing is required for the MDHR System as it will be deactivated for PDMS (see Section 6.25). Article 50.55a further requires in paragraph 50.55a (g) (6) (EE) (A) an augmented examination of the reactor vessel to look for degradation of reactor vessel materials in accordance with Section XI Division 1 of the ASME Code. As the TMI-2 Reactor Vessel is no longer a pressure retaining component this examination is not applicable to the TMI-2 as described in paragraph IWB-1200 "Components Subject to Examinations" of Section XI Division I of the ASME Code.
Therefore, as discussed above, complete relief from the inservice testing and inspection requirements of 10 CFR 50.55a during PDMS is appropriate.
3.1.1.46 10 CFR 50.56 - Conversion of Construction Permit to License; or Amendment of License Article 50.56 establishes that the Commission will, in the absence of good cause shown to the contrary, issue a license or amendment of a license as the case may be. No exceptions are taken to the provisions of this article.
3.1.1.47 10 CFR 50.57 - Issuance of Operating License Article 50.57 establishes the standards the Commission shall use in determining the issuance of an operating license. No exceptions are taken to the provisions of this article.
3.1.1.48 10 CFR 50.58- Hearings and Report of the Advisory Committee on Reactor Safeguards 3.1 -18 UPDATE 2 - AUGUST 1997
50.58(a)
Paragraph 50.58(a) establishes that each application for a construction permit, an operating license, or an amendment to the construction permit or operating license may be referred to the Advisory Committee on Reactor Safeguards. The report from the Advisory Committee on Reactor Safeguards will be made part of the public record. No exceptions are taken to the provisions of this article.
50.58(b)
Paragraph 50.58(b) establishes that the Commission may hold hearings on each application for a construction permit or an operating license for a production or utilization fcility of the type described in 10CFR 50.21(b) or 10 CFR 50.22. No exceptions are taken to the provisions of this paragraph.
3.1.1.49 10 CFR 50.59 - Changes, Tests and Experiments Article 50.59 establishes the requirements for changes, tests or experiments that affect the facility. No exceptions are taken to the provisions of this article.
3.1.1.50 10 CFR 50.60 - Acceptance Criteria for Fracture Prevention Measures for Lightwater Nuclear Power Reactors for Normal Operation 10 CFR 50.60 specifically exempts plants that have permanently ceased operation from the requirement that all light water nuclear power reactors meet the fracture toughness and material surveillance program requirements for the reactor coolant pressure boundary as set forth in Appendices G and H to 10 CFR 50. This exemption applies to TMI-2 during PDMS. Thus, no exceptions are taken to the provisions of this article.
3.1-19 UPDATE 2 - AUGUST 1997
3.1.1.51 10 CFR 50.61 - Fracture toughness requirements for protection against pressurized thermal shock events.
Article 50.61 specifically exempts plants that have permanently ceased operations from the requirements for protection against pressurized thermal shock in pressurized water nuclear power reactors. This exemption applies to TMI-2 during PDMS. Thus, no exceptions to the provisions of this article are necessary.
3.1.1.52 10 CFR 50.62 - Requirements for reduction of risk from anticipated transients without scram (ATWS) events for light-water-cooled nuclear,power reactors.
Article 50.62 specifically exempts plants that have permanently ceased operations from the requirements to have equipment to address ATWS events. This exemption applies to TMI-2 during PDMS. Thus, no exceptions to the provisions of this article are necessary.
3.1.1.53 10 CFR 50.63 - Loss of alternating current power.
Article 50.63 requires that each light-water-cooled nuclear power plant licensed to operate be able to withstand and recover from a station blackout event. Since this application eliminates the legal authority to operate the TMI-2 facility from the license, a subsequent license application would be necessary to resume operation.
Therefore, during PDMS the requirements of this article are not applicable to TMf-2.
3.1.1.54 10 CFR 50.64 - Limitations on the use of highly enriched uranium (HEU) in domestic non-power reactors.
Article 50.64 establishes requirements for the issuance of licenses to use highly enriched uranium fuel in non-power reactors. No exceptions are taken to the provisions of this article.
3.1.1.54a IOCFRSO.65 - Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants" Article 50.65 specifically exempts plants that have permanently ceased operations from the requirement that each holder of a license to operate and monitor the performance or conditions of structures, systems and components against licensed established goals with the exception of structures, systems and components associated with storage, control, and maintenance of spent fuel in a safe condition. TMI-2's fuel has been shipped off site; thus the requirements of this article do not apply to TMI-2.
3.1.1.54b 10 CFR 50.66 - Requirements for Thermal Annealing of the Reactor Pressure Vessel Article 50.66 provides a consistent set of requirements for the use of thermal annealing to mitigate the effects of neutron irradiation. Due to the defueled non-operating status of TMI-2 in PDMS, the TMI-2 Reactor Vessel will not be thermally annealed. Thus the requirements of this article do not apply.
3.1.1.54c 10CFR50.67 - Accident Source Term This article allows holders of operating licenses to replace the traditional source terms used in design basis accident analysis with alternative source terms. As TMI-2 has permanently ceased operation, this rule is not applicable to TMI-2 in PDMS.
3.1.1 .54d 10CFR 50.68 - Criticality accident requirements Article 50.68 provides an alternative method that licensees can use to meet the requirements of 10 CFR 70.24.
The NRC granted TMI-2 an exemption to 10 CFR 70.24 (Reference 3.1-14). This exemption applies to TMI-2 during PDMS, thus, no exceptions to the provision of this article are necessary.
3.1-20
- .JJ*
A-
.I*."X J, X.s -- r -
ATiTT A
,t'-kt.J*..ll..)t_] JL L.*Vq.P J.
0
3.1.1.55 10 CFR 50.70- Inspections.
Article 50.70 establishes requirements to permit NRC inspectors to maintain activities at each nuclear power plant site. During PDMS, TMI-2 will be required to support NRC inspection activities to the extent determined necessary by the NRC. No exceptions are taken to the provisions of this article.
3.1.1.56 10 CFR 50.71 - Maintenance of records, making of reports.
Article 50.71 establishes requirements for facility records and updating the Safety Analysis Reports.
The requirements of these paragraphs apply to TMI-2 during PDMS.
3.1.1.57 10 CFR 50.72 - Immediate notification requirements for operating nuclear power reactors.
With the exception of paragraphs 50.72(b)(2)(xi) and 50.72(b)(3)(xii), the requirements for notification address events or situations which are related to the operation of the power plant and conditions which do, or may compromise the safe operation of the plant or cask storage of spent fuel on-site. Since TMI-2 will be specifically precluded from the operation of the plant during PDMS, the requirements of those paragraphs which relate to power plant operation will not apply. Similarly, since TMI-2's fuel has been shipped off-site, and there is no cask storage on-site, the requirements of the paragraph related to cask storage does not apply.
Paragraphs 50.72(b)(2)(xi) and 50.72(b)(3)(xii) require the-reporting of any event or situation related to the health and safety of the public or onsite personnel, or protection of the environment, for which a news release is planned or notification to other government agencies has been or will be made, and any event requiring the transport of a radioactively contaminated person to an off-site medical facility for treatment. These requirements are also applicable to TMvf-2 during PDMS. With the exception of subparagraph 50.72(a)(4) which is not applicable to TMI-2, required notifications will be made in accordance with paragraph 50.72(a).
3.1.1.58 10 CFR 50.73 - Licensee Event Report System Article 50.73 requires that the holder of an operating license for nuclear power plant (licensee) shall submit a Licensee Event Report (LER) for any event of the type described in this paragraph within 60 days after the discovery of the event. The requirements of this article are applicable to TMI-2 during PDMS.
3.1.1.58a "Article 50.74 - Notification of Change in Operator or Senior Operator Status" Article 50.74 requires each Licensee to notify the commission of a change in status of any licensed operator or senior operator. As the TMI-2 reactor has been defueled and the requirement to maintain licensed operators and senior operators at TMI-2 has been eliminated (Reference 3.1-3) this requirement is not applicable to TMI-2 in PDMS.
3.1-21 UPDATE 4 AUGUST 2001
31.1.59 10 CFR 50.75 - Reporting and recordkeeping for decommissioning planning.
Article 50.75 establishes requirements for providing reasonable assurance to the NRC that funds will be available for decommissioning and periodically reporting the status of these funds to the NRC.. No exceptions-are taken to the provisions of this article. Additionally, Reference 3.1-6 provided the decommissioning funding plan for TMI-2 required by 50.75(b) and Reference 3.1-15 provided the initial decommissioning fund status required by 50.75 (0).
3.1.1.60 10CFR 50.78 -Installation Information and Verification Article 50.78 requires that, "Each holder of a construction permit shall, if requested by the Commission, submit installation information on Form N-7 1, permit verification thereof by the International Atomic Energy Agency, and take such other action as may be necessary to implement the US/IAEA Safeguards Agreement, in the manner set forth in Articles 75.6 and 75.11 through 75.14 of this chapter." No exceptions are taken to the provisions of this article.
3.1.1.61 10 CFR 50.80 - Transfer of Licenses Article 50.80 specifies requirements for transferring a license from one entity to another. No exceptions are taken to the provisions of this article.
3.1.1.62 10 CFR 50.81 - Creditor Regulations Article 50.81 defines the rights and restrictions applying to any creditor relative to any license issued by the Commission. No exceptions are taken to the provisions of this article.
3.1.1.63 10 CFR 50.82 - Termination of Licenses Article 50.82 defines the requirements for terminating a license. No exceptions are taken to the provisions of this article.
3.1.1.64 10 CFR 50.90 - Application for Amendment of License or Construction Permit Article 50.90 establishes that a holder of a license must file an application for an amendment, describing the changes desired, if the license holder wishes to amend the license. No exceptions are taken to the provisions of this article.
3.1.1.65 10 CFR 50.91 - Notice for Public Comment; State Consultation Article 50.91 establishes requirements applying to the Commission and TMI-2 regarding the application for an amendment to a 10 CFR Part 50 license following permanent removal of the fuel. The requirements of this article apply to TMJ-2.
3.1.1.66 10 CFR 50.92 - Issuance of Amendment Article 50.92 establishes the standards by which the Commission determines if no significant hazards exist for a license amendment. The licensee must file a no significant hazards analysis with each amendment application using the standards set forth in Article 50.92 as required by Article 50.91. The requirements of this article apply to TMI-2.
3.1-22 UPDATE 3 - AUGUST 1999
3.1.1.67 10 CFR 50.100 - Revocation, Suspension, Modification, of Licenses and Construction Permits for Cause Article 50.100 provides that the Commission may revoke, suspend, or modify a license or construction permit for any material false statement or for other reasons specified in Article 50.100. No exceptions are taken to the provisions of this article.
3.1.1.68 10 CFR 50.101 - Retaking Possession of Special Nuclear Material Article 50.101 establishes that the Commission may cause the retaking or possession of special nuclear material upon revocation of a license. No exceptions are taken to the provisions of this article.
3.1.1.69 10 CFR 50.102 - Commission Order for Operation after Revocation Article 50.102 establishes that the Commission may, by following the requirements of Article 50.102, order operation of a facility whose license has been revoked. No exceptions are taken to the provisions of this article.
3.1.1.70 10 CFR 50.103 - Suspension and Operation in War or National Emergency Article 50.103 establishes that the Commission has, upon declaration of war by the Congress, certain rights regarding the suspension and/or operation of nuclear power plants licensed by the Commission. No exceptions are taken to the provisions of this article.
3.1.1.71 10CFR50.109-Backfitting Article 50.109 defines backfitting and defines requirements the Commission must meet regarding backfitting. No exceptions are taken to the provisions of this article.
3.1.1.72 10CFR50.110 -Violations Article 50.110 establishes actions the NRC may take regarding violations of any provision of the Atomic Energy Act of 1954, as amended, or Title II of the Energy Reorganization Act of 1974, or any regulation or order issued thereunder. No exceptions are taken to the provisions of this article.
3.1.1.73 "Article 50.111 - Criminal Penalties" Article 50.111 defines which articles of 10CFR Part 50 are subject to criminal sanction as defined in the Atomic Energy Act of 1954. No exceptions are taken to the provisions of this article.
3.1.1.74 "Article 50.120 - Training and Qualifications of Nuclear Power Plant Personnel" As described in TSCR No. 79 Revision 2, TMI-2 complies with the systems approach to training as defined by 10 CFR 50.120 for non-licensed personnel.
3.1-23 UPDATE 5 - AUGUST 2003
3.1.2 GENERAL DESIGN CRITERIA The Three Mile Island Nuclear Station Unit 2 was designed and constructed in accordance with the 70 general design criteria as listed in Appendix A of 10 CFR 50 dated July 11, 1967. A discussion of each criterion, demonstrating how the principal design features or design bases meet these criteria, is presented in Section 3.1.1 of the TMI-2 FSAR.
The general design criteria in Appendix A were revised by the AEC on July 15, 1971. The design and purchase of many Three Mile Island Unit 2 components were completed prior to the issuance of these revised general design criteria. These revised criteria, as they applied to the original design of the plant, are addressed in Section 3.1.2 of the TMI-2 FSAR.
During the PDMS period, fulfillment of many of the general design criteria in Appendix A of 10 CFR 50 are not necessary or appropriate; departure from the criteria are identified and justified herein. Other of the criteria are applicable only to a very limited degree. Criteria which address such requirements as containment, quality standards, and natural phenomena are examples of hose criteria which apply only to a limited degree during PDMS. Since the plant was originally 3.1-2 1.UPDATE 2 - AUGUST 1997 designed and constructed in accordance with these criteria and since neither the accident nor activities during the recovery period significantly degraded the plant with respect to the capabilities required during PDMS, the facility, as it exists, is designed and constructed to standards which far exceed the requirements for PDMS. Each of the general design criteria in Appendix A of 10 CFR 50, as revised on January 1, 1987, and the necessary and appropriate degree of applicability during PDMS is discussed in the following sections.
3.1.2.1 Criterion 1 - Quality Standards and Records Structures, systems, and components important to safety shall be designed, fabricated, erected, and tested to quality standards commensurate with the importance of the safety function to be performed. Where generally recognized codes and standards are used, they shall be identified and evaluated to determine their applicability, adequacy, and sufficiency and shall be supplemented or modified as necessary to assure a quality product in keeping with the required safety function. A quality assurance program shall be established and implemented in order to provide adequate assurance that these structures, systems, and components will satisfactorily perform their safety functions. Appropriate records of the design, fabrication, erection, and testing of structures, systems, and components important to safety shall be maintained by or under the control of the nuclear power unit licensee throughout the life of the unit.
Discussion Due to the unique condition of TMI-2 during PDMS, the specific requirements of Criterion I are not applicable; however, the intent of Criterion 1 has been addressed recognizing that the degree of quality assurance necessary to assure that the required capabilities are maintained during PDMS is far less extensive than that which was originally required for TMI-2. A quality assurance program has been established and will be maintained commensurate with the functional requirements of PDMS. The Quality Assurance Plan for PDMS is referenced in Section 10.1.
3.1.2.2 Criterion 2 - Design Bases for Protection against Natural Phenomena Structures, systems, and components important to safety shall be designed to withstand the effect of natural phenomena, such as earthquakes, tornadoes, hurricanes, floods, tsunami, and seiches without loss of capability to perform their safety functions. The design bases for these structures, systems, and components shall reflect:
(1) Appropriate consideration of the most severe of the natural phenomena that have been historically reported for the site and surrounding area, with 3.1-24 UPDATE 2 - AUGUST 1997
sufficient margin for the limited accuracy, quantity, and period of time in which the historical data have been accumulated, (2) appropriate combinations of the effects of normal and accident conditions with the effects of the natural phenomena and (3) the importance of the safety functions to be performed.
Discussion Due to the unique condition of TMI-2 during PDMS, the specific requirements of Criterion 2 are not applicable; however, the intent of Criterion 2 has been addressed by recognizing that the level of protection from natural phenomena required during PDMS is that which is required to maintain the isolation of the contamination which remains at the facility. There are no active functions required to be performed by any system to provide the protection from natural phenomena during PDMS. For example, all that is required during a seismic event is that the structure or system remain intact. Those structures, systems, and components necessary for the level of protection required for PDMS were originally designed and constructed to criteria which exceed the requirements for PDMS. This level of protection is more than adequate to meet the functional requirements for protection from natural phenomena during PDMS.
3.1.2.3 Criterion 3 - Fire Protection Structures, systems, and components important to safety shall be designed and located to minirize, consistent with other safety requirements, the probability and effect of fires and explosions.
Noncombustible and heat resistant materials shall be used whenever practical throughout the unit, particularly in locations such as the containment and control room. Fire detection and fighting systems of appropriate capacity and capability shall be provided and designed to minimize the adverse effects of fires on structures, systems, and components important to safety. Fire fighting systems shall be designed to assure that their rupture or inadvertent operation does not significantly impair the safety capability of these structures, systems, and components.
Discussion Due to the unique condition of TMI-2 during PDMS, the specific requirements of Criterion 3 are not applicable; however, the intent of Criterion 3 has been addressed by recognizing that the requirements for fire protection during PDMS are based on industrial safety and insurance requirements. A fire protection program has been established and will be maintained commensurate with the industrial safety and insurance requirements and to protect those systems important to PDMS. The Fire Protection System is described in Section 7.2.2.
3.1.2.4 Criterion 4 - Environmental and Missile Design Bases Structures, systems, and components important to safety shall be designed to accommodate the effects of and be compatible with the environmental conditions associated with normal operation, maintenance, testing, and postulated accidents, including loss-of-coolant accidents. These structures, systems, and components shall be appropriately protected against dynamic effect, including the effects of missiles, pipe whipping, and discharging fluids, that may result from equipment failures and from events and conditions outside the nuclear power unit. However, the dynamic effects associated with postulated pipe ruptures of primary coolant loop piping in pressurized water reactors may be excluded from the design basis when analyses demonstrate the probability of rupturing such piping is extremely low under design basis conditions.
3.1 -25 UPDATE 2 - AUGUST 1997
Discussion Due to the non-operating and defueled condition of TMI-2, the requirements of Criterion 4 associated with the dynamic effect, including the effects of missiles, pipe whipping, and discharging fluids, that may result from equipment failures and from events and conditions outside the nuclear power unit do not apply. Structures, systems and components relied upon to provide protection from the effects of and required to be compatible with environmental conditions associated with PDMS operations, maintenance, testing, and postulated unanticipated events are appropriately designed to accommodate effects associated with these activities.
3.1.2.5 Criterion 5 - Sharing of Structures, Systems, and Components Structures, systems, and components important to safety shall not be shared among nuclear power units unless it can be shown that such sharing will not significantly impair their ability to perform their safety function, including, in the event of an accident in one unit, an orderly shutdown and cool down of the remaining units.
Discussion Due to the non-operating and defueled condition of TMI-2, there are no important to safety functions associated with any TlvI-2 structure, system, or component. The required TMI-l safety functions associated with the few structures and systems shared by TMI-1 and TMI-2 are independent of any TMI-2 function for the respective structure or system.
3.1.2.6 Criterion 10 - Reactor Design The reactor core and associated coolant, control, and protection systems shall be designed with appropriate margin to assure that specified acceptable fuel design limits are not exceeded during any condition of normal operation, including the effects of anticipated operational occurrences.
Discussion Due to the non-operating and defueled condition of TMI-2, the requirements of Criterion 10 are not applicable.
3.1.2.7 Criterion 11 - Reactor Inherent Protection The reactor core and associated coolant systems shall be designed so that in the power operating range the net effect to the prompt inherent nuclear feedback characteristics tends to compensate for a rapid increase in reactivity.
Discussion Due to the non-operating and defueled condition of TMI-2, the requirements of Criterion 11 are not applicable.
3.1.2.8 Criterion 12 - Suppression of Reactor Power Oscillations The reactor core and associated coolant, control, and protection systems shall be designed to assure that power oscillations which can result in conditions exceeding specified acceptable fuel design limits are not possible or can be reliably and readily detected and suppressed.
3.1 -26 UPDATE 2 - AUGUST 1997
Discussion Due to the non-operating and defueled condition of TMI-2, the requirements of Criterion 12 are not applicable.
3.1.2.9 Criterion 13 - Instrumentation and Control Instrumentation shall be provided to monitor variables and systems over their anticipated ranges for normal operation, for anticipated operational occurrences, and for accident conditions as appropriate to assure adequate safety, including those variables and systems that can affect the fission process, the integrity of the reactor core, the reactor coolant pressure boundary, and the containment and its associated systems. Appropriate controls shall be provided to maintain these variables and systems within prescribed operation ranges.
Discussion Due to the non-operating and defueled condition of TMI-2, the requirements of Criterion 13 are not applicable.
3.1.2.10 Criterion 14 - Reactor Coolant Pressure Boundary The reactor coolant pressure boundary shall be designed, fabricated, erected, and tested so as to have an extremely low probability of abnormal leakage, of rapidly propagating failure, and of gross rupture.
Discussion Due to the non-operating and defueled condition of TMI-2, the requirements of Criterion 14 are not applicable.
3.1.2.11 Criterion 15 - Reactor Coolant System Design The reactor coolant system and associated auxiliary, control, and protection systems shall be designed with sufficient margin to assure that the design conditions of the reactor coolant pressure boundary are not exceeded during any condition of normal operation, including anticipated operational occurrences.
Discussion Due to the non-operating and defueled condition of TMI-2, the requirements of Criterion 15 are not applicable.
3.1.2.12 Criterion 16 - Containment Design Reactor containment and associated systems shall be provided to establish an essentially leak-tight barrier against the uncontrolled release of radioactivity to the environment and to assure that the containment design conditions important to safety are not exceeded for as long as postulated accident conditions require.
3.1 -27 UPDATE 2 - AUGUST 1997
Discussion The Containment and associated systems are maintained during PDMS to prevent the uncontrolled release of the contamination which remains inside the Containment. In addition, the Containment serves as the primary environmental barrier for the radioactive materials inside the Containment. Although the Containment will not be maintained during PDMS to the same degree of leaktightness as during power operation, there will be essentially no uncontrolled or unmonitored leakage. Normally, all effluents to the environment will be through the Containment Atmospheric Breather System via the Auxiliary Building or the Containment Purge System, both of which have HEPA-filtered systems. Leakage to the environment from other pathways has been demonstrated, by analysis (see Section 7.2.1.2) and by periodic testing, to be a very small portion of the overall leakage from the Containment. The Containment Atmospheric Breather System controls the Containment effluents during passive storage periods consistent with the "most probable pathway" concept referred to in Regulatory Guide 1.86 "Termination of Operating License for Nuclear Reactors."
3.1.2.13 Criterion 17 - Electric Power Systems An onsite electric power system and an off-site electric power system shall be provided to permit functioning of structures, systems, and components important to safety. The safety function for each system (assuming the other system is not functioning) shall be to provide sufficient capacity and capability to assure that (1) specified acceptable fuel design limits and design conditions of the reactor coolant pressure boundary are not exceeded as a result of anticipated operational occurrences and (2) the core is cooled and containment integrity and other vital functions are maintained in the event of postulated accidents.
The onsite electric power supplies, including the batteries, and the onsite electric distribution system, shall have sufficient independence, redundancy, and testability to perform their safety functions assuming a single failure.
Electric power from the transmission network to the onsite electric distribution system shall be supplied by two physically independent circuits (not necessarily on separate rights of way) designed and located so as to minimize to the extent practical the likelihood of their simultaneous failure under operating and postulated accident and environmental conditions. A switchyard common to both circuits is acceptable.
Each of these circuits shall be designed to be available in sufficient time following a loss of all onsite alternating current power supplies and the other off-site electric power circuit, to assure that specified acceptable fuel design limits and design conditions of the reactor coolant pressure boundary are not exceeded. One of these circuits shall be designed to be available within a few seconds following a loss-of-coolant accident to assure that core cooling, containment integrity, and other vital safety functions are maintained.
Provisions shall be included to minimize the probability of losing electric power from any of the remaining supplies as a result of or coincident with, the loss of power generated by the nuclear power unit, the loss of power from the transmission network, or the loss of power from the onsite electric power supplies.
Discussion Due to the non-operating and defueled condition of TMI-2, the requirements of Criterion 17 are not applicable. However, capabilities for electric power are maintained during PDMS commensurate with the electric power requirements necessary for PDMS activities.
3.1 -28 UPDATE 2 - AUGUST 1997
3.1.2.14 Criterion 18 - Inspection and Testing of Electric Power Systems Electric power systems important to safety shall be designed to permit appropriate periodic inspection and testing of important areas and features, such as wiring, insulation, connections, and switchboards, to assess the continuity of the systems and the condition of their components. The systems shall be designed with a capability to test periodically (1) the operability and functional performance of the components of the systems, such as onsite power sources, relays, switches, and buses, and (2) the operability of the systems as a whole and, under conditions as close to design as practical, the full operation sequence that brings the systems into operation, including operation of applicable portions of the protection system, and the transfer of power among the nuclear power unit, the off-site power system, and the onsite power system.
Discussion Due to the non-operating and defueled condition of TMI-2, the requirements of Criterion 18 are not applicable.
3.1.2.15 Criterion 19 - Control Room A control room shall be provided from which actions can be taken to operate the nuclear power unit safely under normal conditions and to maintain it in a safe condition under accident conditions, including loss-of-coolant accidents. Adequate radiation protection shall be provided to permit access and occupancy of the control room under accident conditions without personnel receiving radiation exposures in excess of 5 rem whole body, or its equivalent to any part of the body, for the duration of the accident.
Equipment at appropriate locations outside the control room shall be provided (1) with a design capability for prompt hot shutdown of the reactor, including necessary instrumentation and controls to maintain the unit in a safe condition during hot shutdown, and (2) with a potential capability for subsequent cold shutdown of the reactor through the use of suitable procedures.
Discussion Due to the non-operating and defueled condition of TMI-2, the requirements of Criterion 19 are not applicable.
3.1.2.16 Criterion 20 - Protection System Functions The protection system shall be designed (1) to initiate automatically the operation of appropriate systems including the reactivity control systems, to assure that specified acceptable fuel design limits are not exceeded as a result of anticipated operation occurrences and (2) to sense accident conditions and to initiate the operation of systems and components important to safety.
Discussion Due to the non-operating and defueled condition of TMI-2, the requirements of Criterion 20 are not applicable.
3.1 -29 UPDATE 2 - AUGUST 1997
3.1.2.17 Criterion 21 - Protection System Reliability and Testability The protection system shall be designed for high functional reliability and inservice testability commensurate with the safety functions to be performed. Redundancy and independence designed into the protection system shall be sufficient to assure that (1) no single failure results in loss of the protection function and (2) removal from service of any component or channel does not result in loss of the required minimum redundancy unless the acceptable reliability of operation of the protection system can be otherwise demonstrated. The protection system shall be designed to permit periodic testing of its functioning when the reactor is in operation, including a capability to test channels independently to determine failures and losses of redundancy that may have occurred.
Discussion Due to the non-operating and defueled condition of TMI-2, the requirements of Criterion 21 are not applicable.
3.1.2.18 Criterion 22 - Protection System Independence The protection system shall be designed to assure that the effects of natural phenomena, and of normal operating, maintenance, testing, and postulated accident conditions on redundant channels do not result in loss of the protection function, or shall be demonstrated to be acceptable on some other defined basis.
Design techniques, such as functional diversity or diversity in component design and principles of operation, shall be used to the extent practical to prevent loss of the protection function.
Discussion Due to the non-operating and defueled condition of TMI-2, the requirements of Criterion 22 are not applicable.
3.1.2.19 Criterion 23 - Protection System Failure Modes The protection system shall be designed to fail into a safe state or into a state demonstrated to be acceptable on some other defined basis if conditions such as disconnection of the system, loss of energy (e.g., electric power, instrument air), or postulated adverse environments (e.g., extreme heat or cold, fire, pressure, steam, water, and radiation) are experienced.
Discussion Due to the non-operating and defueled condition of TMI-2, the requirements of Criterion 23 are not applicable.
3.1.2.20 Criterion 24 - Separation of Protection and Control Systems The protection system shall be separated from control systems to the extent that failure of any single control system component or channel, or failure or removal from service of any single protection system component or channel which is common to the control and protection systems leaves intact a system satisfying all reliability, redundancy, and independence requirements of the protection system.
Interconnection of the protection and control systems shall be limited so as to assure that safety is not significantly impaired.
3.1 -30 UPDATE 2 - AUGUST 1997
Discussion Due to the non-operating and defueled condition of TMI-2, the requirements of Criterion 24 are not applicable.
3.1.2.21 Criterion 25 - Protection System Requirements for Reactivity Control Malfunctions The protection system shall be designed to assure that specified acceptable fuel design limits are not exceeded for any single malfunction of the reactivity control systems, such as accidental withdrawal (not ejection or dropout) of control rods.
Discussion Due to the non-operating and defueled condition of TMI-2, the requirements of Criterion 25 are not applicable.
3.1.2.22 Criterion 26 - Reactivity Control System Redundancy and Capability Two independent reactivity control systems of different design principles shall be provided. One of the systems shall use control rods, preferably including a positive means for inserting the rods, and shall be capable of reliably controlling reactivity changes to assure that under conditions of normal operation, including anticipated operational occurrences, and with appropriate margin for malfunctions such as stuck rods, specified acceptable fuel design limits are not exceeded. The second reactivity control system shall be capable of reliably controlling the rate of reactivity changes resulting from planned, normal power changes (including xenon burnout) to assure acceptable fuel design limits are not exceeded. One of the systems shall be capable of holding the reactor core subcritical under cold conditions.
Discussion Due to the non-operating and defueled condition of TMI-2, the requirements of Criterion 26 are not applicable.
3.1.2.23 Criterion 27 - Combined Reactivity Control Systems Capability The reactivity control systems shall be designed to have a combined capability, in conjunction with poison addition by the emergency core cooling system, of reliably controlling reactivity changes to assure that under postulated accident conditions and with appropriate margin for stuck rods the capability to cool the core is maintained.
Discussion Due to the non-operating and defueled condition of TMI-2, the requirements of Criterion 27 are not applicable.
3.1.2.24 Criterion 28 - Reactivity Limits The reactivity control systems shall be designed with appropriate limits on the potential amount and rate of reactivity increase to assure that the effects of postulated reactivity accidents can 3.1 -31 UPDATE 2 - AUGUST 1997
neither (1).result in damage to the reactor coolant pressure boundary greater than limited local yielding nor (2) sufficiently disturb the core, its support structures of other reactor pressure vessel internals to impair significantly the capability to cool the core. These postulated reactivity accidents shall include consideration of rod ejection (unless prevented by positive means), rod dropout, steam line rupture, changes in reactor coolant temperature and pressure, and cold water addition.
Discussion Due to the non-operating and defueled condition of TMI-2, the requirements of Criterion 28 are not applicable.
3.1.2.25 Criterion 29 - Protection Against Anticipated Operational Occurrences The protection and reactivity control systems shall be designed to assure an extremely high probability of accomplishing their safety functions in the event of anticipated operational occurrences.
Discussion Due to the non-operating and defueled condition of TMI-2, the requirements of Criterion 29 are not applicable.
3.1.2.26 Criterion 30 - Quality of Reactor Coolant Pressure Boundary Components which are part of the reactor coolant pressure boundary shall be designed, fabricated, erected, and tested to the highest quality standards practical. Means shall be provided for detecting and, to the extent practical, identifying the location of the source of reactor coolant leakage.
Discussion Due to the non-operating and defueled condition of TMI-2, the requirements of Criterion 30 are not applicable.
3.1.2.27 Criterion 31 - Fracture Prevention of Reactor Coolant Pressure Boundary The reactor coolant pressure boundary shall be designed with sufficient margin to assure that when stressed under operating, maintenance, testing, and postulated accident conditions (1) the boundary behaves in a nonbrittle manner and (2) the probability of rapidly propagating fracture is minimized.
The design shall reflect consideration of service temperatures and other conditions of the boundary material under operating, maintenance, testing, and postulated accident conditions and the uncertainties in determining (1) material properties, (2) the effects of irradiation of material properties, (3) residual, steady state and transient stresses, and (4) size of flaws.
Discussion Due to the non-operating and defueled condition of TMI-2, the requirements of Criterion 31 are not applicable.
3.1 -32 UPDATE 2 - AUGUST 1997
3.1.2.28 Criterion 32 - Inspection of Reactor Coolant Pressure Boundary Components which are part of the reactor coolant pressure boundary shall be designed to permit (1) periodic inspection and testing of important areas and features to assess their structural and leaktight integrity, and (2) an appropriate material surveillance program for the reactor pressure vessel.
Discussion Due to the non-operating and defueled condition of TMI-2, the requirements of Criterion 32 are not applicable.
3.1.2.29 Criterion 33 - Reactor Coolant Makeup A system to supply reactor coolant makeup for protection against small breaks in the reactor coolant pressure boundary shall be provided. The system safety function shall be to assure that specified acceptable fuel design limits are not exceeded as a result of reactor coolant loss due to leakage from the reactor coolant pressure boundary and rupture of small piping or other small components which are part of the boundary. The system shall be designed to assure that for onsite electric power system operation (assuming off-site power is not available) and for off-site electric power system operation (assuming onsite power is not available) the system safety function can be accomplished using the piping, pumps, and valves used to maintain coolant inventory during normal reactor operation.
Discussion Due to the non-operating and defueled condition of TMI-2, the requirements of Criterion 33 are not applicable.
3.1.2.30 Criterion 34 - Residual Heat Removal A system to remove residual heat shall be provided. The system safety function shall be to transfer fission product decay heat and other residual heat from the reactor core at a rate such that specified acceptable fuel design limits and the design conditions of the reactor coolant pressure boundary are not exceeded.
Suitable redundancy in components and features, and suitable interconnections, leak detection, and isolation capabilities shall be provided to assure that for onsite electric power system operation (assuming off-site power is not available) and for off-site electric powersystem operation (assuming onsite power is not available) the system safety function can be accomplished, assuming a single failure.
Discussion Due to the non-operating and defueled condition of TMI-2, the requirements of Criterion 34 are not applicable.
3.1.2.31 Criterion 35 - Emergency Core Cooling A system to provide abundant emergency core cooling shall be provided. The system safety function shall be to transfer heat from the reactor core following any loss of reactor coolant at a rate such that (1) fuel and clad damage that could interfere with continued effective core cooling is prevented and (2) clad metal-water reaction is limited to negligible amounts.
3.1 -33 UPDATE 2 - AUGUST 1997
Suitable redundancy in components and features, and suitable interconnections, leak detection, isolation, and containment capabilities shall be provided to assure that for onsite electric power system operation (assuming off-site power is not available) and for off-site electric power system operation (assuming onsite power is not available) the system safety function can be accomplished, assuming a single failure.
Discussion Due to the non-operating and defueled condition of TMI-2, the requirements of Criterion 35 are not applicable.
3.1.2.32 - Criterion 36 - Inspection of Emergency Core Cooling System The emergency core cooling system shall be designed to permit appropriate periodic inspection of important components, such as spray rings in the reactor pressure vessel, water injection nozzles, and piping, to assure the integrity and capability of the system.
Discussion Due to the non-operating and defueled condition of TMI-2, the requirements of Criterion 36 are not applicable.
3.1.2.33 Criterion 37 - Testing of Emergency Core Cooling System The emergency core cooling system shall be designed to permit appropriate periodic pressure and functional testing to assure (1) the structural and leaktight integrity of its components, ,(2) the operability and performance of the active components of the system, and (3) the operability of the system as a whole and, under conditions as close to design as practical, the performance of the full operational sequence that brings the system into operation, including operation of applicable portions of the protection system, the transfer between normal and emergency power sources, and the operation of the associated cooling water system.
Discussion Due to the non-operating and defueled condition of TMI-2, the requirements of Criterion 37 are not applicable.
3.1.2.34 Criterion 38 - Containment Heat Removal A system to remove heat from the reactor containment shall be provided. The system safety function shall be to reduce rapidly, consistent with the functioning of other associated systems, the containment pressure and temperature following any loss-of-coolant accident and maintain them at acceptably low levels. Suitable redundancy in components and features, and suitable interconnections, leak detection, isolation, and containment capabilities shall be provided to assure that for onsite electric power system operation (assuming off-site power is not available) and for off-site electric power system operation (assuming onsite power is not available) the system safety function can be accomplished, assuming a single failure.
Discussion Due to the non-operating and defueled condition of TMI-2, the requirements of Criterion 38 are not applicable.
3.1 - 34 UPDATE 2 - AUGUST 1997
3.1.2.35 Criterion 39 - Inspection of Containment Heat Removal System The containment heat removal system shall be designed to permit appropriate periodic inspection of important components, such as the torus, sumps, spray nozzles, and piping to assure the integrity and capability of the system.
Discussion Due to the non-operating and defueled condition of TMI-2, the requirements of Criterion 39 are not applicable.
3.1.2.36 Criterion 40 - Testing of Containment Heat Removal System The containment heat removal system shall be designed to permit appropriate periodic pressure and functional testing to assure (1) the structural and leaktight integrity of its components, (2) the operability and performance of the active components of the system, and (3) the operability of the system as a whole, and under conditions as close to the design as practical the performance of the full operational sequence that brings the system into operation, including operation of applicable portions of the protection system, the transfer between normal and emergency power sources and the operation of the associated cooling water system.
Discussion Due to the non-operating and defueled condition of TMI-2, the requirements of Criterion 40 are not applicable.
3.1.2.37 Criterion 41 - Containment Atmosphere Cleanup Systems to control fission product, hydrogen, oxygen, and other substances which may be released in the reactor containment shall be provided as necessary to reduce, consistent with the functioning of other associated systems, the concentration and quality of fission products released to the environment following postulated accidents, and to control the concentration of hydrogen or oxygen and other substances in the containment atmosphere following postulated accidents to assure that containment integrity is maintained.
Each system shall have suitable redundancy in components and features, and suitable interconnections, leak detection, isolation, and containment capabilities to assure that for onsite electric power system operation (assuming off-site power is not available) and for off-site electric power system operation (assuming onsite power is not available) its safety function can be accomplished, assuming a single failure.
Discussion Due to the non-operating and defueled condition of TMI-2, there are no postulated accidents during PDMS which could result in the generation of fission products, hydrogen, oxygen or other substances which would require Containment atmosphere cleanup systems as described in Criterion 41. Therefore, design of the Containment atmosphere cleanup system for TMI-2 during PDMS in accordance with Criterion 41 is not applicable. See the analysis in Section 8.2.
3.1 -35 UPDATE 2 - AUGUST 1997
3.1.2.38 .Criterion 42 - Inspection of Containment Atmosphere Cleanup Systems The containment atmosphere cleanup systems shall be designed to permit appropriate periodic inspection of important components, such as filter frames, ducts, and piping to assure the integrity and capability of the systems.
Discussion Due to the non-operating and defueled condition of TMI-2, there are no postulated accidents during PDMS which could result in the generation of fission products, hydrogen, oxygen or other substances which would require containment atmosphere cleanup systems as described in Criterion 41. Therefore, design of the Containment atmosphere cleanup system in accordance with Criterion 42 is not applicable to TMI-2 during PDMS.
3,1.2.39 Criterion 43 - Testing of Containment Atmosphere Cleanup Systems The containment atmosphere cleanup systems shall be designed to permit appropriate periodic pressure and functional testing to assure (1) the structural and leaktight integrity of its components, (2) the operability and performance of the active components of the systems such as fans, filters, dampers, pumps, and valves and (3) the operability of the systems as a whole and, under conditions as close to design as practical, the performance of the full operational sequence that brings the systems into operation, including operation of applicable portions of the protection system, the transfer between normal and emergency power sources, and the operation of associated systems.
Discussion Due to the non-operating and defueled condition of TMI-2, there are no postulated accidents during PDMS which could result in the generation of fission products, hydrogen, oxygen or other substances which would require containment atmosphere cleanup systems as described in Criterion 41. Therefore, design of the Containment atmosphere cleanup system in accordance with Criterion 43 is not applicable to TMI-2 during PDMS.
3.1.2.40 Criterion 44 - Cooling Water A system to transfer heat from structures, systems, and components important to safety, to an ultimate heat sink shall be provided. The system safety function shall be to transfer the combined heat load of these structures, systems, and components under normal operation and accident conditions.
Suitable redundancy in components and features, and suitable interconnections, leak detection, and isolation capabilities shall be provided to assure that for onsite electric power system operation (assuming off-site power is not available) and for off-site electric power system operation (assuming onsite power is not available) the system safety function can be accomplished, assuming a single failure.
Discussion Due to the non-operating and defueled condition of TMI-2, the requirements of Criterion 44 are not applicable.
3.1 - 36 UPDATE 2 - AUGUST 1997
3.1.2.41 Criterion 45 - Inspection of Cooling Water System The cooling water system shall be designed to permit appropriate periodic inspection of important components, such as heat exchangers and piping, to assure the integrity and capability of the system.
Discussion Due to the non-operating and defueled condition of TMI-2, the requirements of Criterion 45 are not applicable.
3.1.2.42 Criterion 46 - Testing of Cooling Water System The cooling water system shall be designed to permit appropriate periodic pressure and functional testing to assure (1) the structural and leaktight integrity of its components, (2) the operability and the performance of the active components of the system, and (3) the operability of the system as a whole and, under conditions as close to design as practical, the performance of the full operational sequence that brings the system into operation for reactor shutdown and for loss-of-coolant accidents, including operation of applicable portions of the protection system and the transfer between normal and emergency power sources.
Discussion Due to the non-operating and defueled condition of TM1-2, the requirements of Criterion 46 are not applicable.
3.1.2.43 Criterion 50 - Containment Design Basis The reactor containment structure, including access openings, penetrations, and the containment heat removal system shall be designed so that the containment structure and its internal compartments can accommodate, without exceeding the design leakage rate and with sufficient margin, the calculated pressure and temperature conditions resulting from any loss-of-coolant accident. This margin shall reflect consideration of (1) the effects of potential energy sources which have not been included in the determination of the peak conditions, such as energy in steam generators and as required by article 50.44 energy from metal-water and other chemical reactions that may result from degradation but not total failure of emergency core cooling functioning, (2) the limited experience and experimental data available for defining accident phenomena and containment responses, and (3) the conservatism of the calculational model and input parameters.
Discussion Due to the non-operating and defueled condition of TMI-2, the requirements of Criterion 50 are not applicable. However, the intent of Criterion 50 has been addressed by considering that there are functional requirements required to be provided by the Containment during the PDMS period which are different, and substantially less than those described in Criterion 50.
The Containment, during PDMS, is required to function as the primary barrier between the radioactive contamination inside the Containment and the environment. It provides this function in three ways: 1) it mininiizes the uncontrolled migration of contamination from inside the Containment to the environment, 2) it functions as an envelope to control the release of Containment atmosphere effluents to the environment, and 3) it functions as primary shielding for the radioactive materials inside the Containment.
3.1 -37 UPDATE 2 - AUGUST 1997
The Containment was originally designed and constructed to the criteria described in Criterion 50. Since the design basis requirements for the Containment during PDMS are substantially less than that required by Criterion 50, the Containment isolation capabilities were not degraded by either the accident or the recovery activities, the Containment is-capable of meeting the requirements of PDMS. (See Section 7.1.2) 3.1.2.44 Criterion 51 - Fracture Prevention of Containment Pressure Boundary The reactor containment boundary shall be designed with sufficient margin to assure that under operation, maintenance, testing, and postulated accident conditions (1) its ferritic materials behave in a nonbrittle manner and (2) the probability of rapidly propagating fracture is minimized. The design shall reflect consideration of service temperatures and other conditions of the containment boundary material during operation, maintenance, testing, and postulated accident conditions, and the uncertainties in determining (1) material properties, (2) residual, steady state, and transient stresses, and (3) size of flaws.
Discussion Due to the non-operating and defueled condition of TMI-2, the requirements of Criterion 51 are not applicable..
3.1.2.45 Criterion 52- Capability for Containment Leakage Rate Testing The reactor containment and other equipment which may be subjected to containment test conditions shall be designed so that periodic integrated leakage rate testing can be conducted at containment design pressure.
Discussion The requirements for leakage rate testing capability as established in Criterion 52 assume the possibility of pressurization events and the consequent potential for leakage of fission products. Due to the non-operating and defueled condition of TMI-2, there are no events which can result in significant pressurization of the Containment and threaten its isolation capabilities (See Criterion 50). During passive pressure control, the Containment will be continually vented to the AFHB through a passive breather system. During operation of the Containment Purge System, a filtered, monitored exhaust path is provided via the station vent to the atmosphere. Therefore, no significant pressurization of the Containment could occur during this mode of operation. Based on the above conditions, no leak rate testing at containment design pressure is required during PDMS.
3.1.2.46 Criterion 53 - Provisions for Containment Testing and Inspection The reactor containment shall be designed to permit (1) appropriate periodic inspection of all important areas, such as penetrations, (2) an appropriate surveillance program, and (3) periodic testing at containment design pressure of the leaktightness of penetrations which have resilient seals and expansion bellows.
Discussion The Containment has been designed and constructed in accordance with Criterion 53. Due to the unique condition of TMI-2 during PDMS, the specific requirements of Criterion 53 are not applicable; however, the intent of Criterion 53 has been addressed by providing the appropriate surveillance activities based on the Containment isolation requirements for PDMS as described in Section 7.2.1.
3.1 -38 UPDATE 2 - AUGUST 1997
3.1.2.47 Criterion 54 - Piping Systems Penetrating Containment Piping systems penetrating primary reactor containment shall be provided with leak detection, isolation, and containment capabilities having redundancy, reliability, and performance capabilities which reflect the importance to safety of isolating these piping systems. Such piping systems shall be designed with a capability to test periodically the operability of the isolation valves and associated apparatus and to determine if valve leakage is within acceptable limits.
Discussion Due to the non-operating and defueled condition of TMI-2 during PDMS, the specific requirements of Criterion 54 regarding leak detection, isolation, and containment capabilities are not applicable.
However, piping systems penetrating Containment have been isolated and will be maintained isolated during PDMS as described in Section 7.2.1.
3.1.2.48 Criterion 55 - Reactor Coolant Pressure Boundary Penetrating Containment Each line that is part of the reactor coolant pressure boundary and that penetrates primary reactor containment shall be provided with containment isolation valves as follows, unless it can be demonstrated that the containment isolation provisions for a specific class of lines, such as instrument lines, are acceptable on some other defined basis:
- 1. One locked closed isolation valve inside and one locked closed isolation valve outside containment; or
- 2. One automatic isolation valve inside and one locked closed isolation valve outside containment; or
- 3. One locked closed isolation valve inside and one automatic isolation valve outside containment. A simple check valve may not be used as the automatic isolation valve outside containment; or
- 4. One automatic isolation valve inside and one automatic isolation valve outside containment. A simple check valve may not be used as the automatic isolation valve outside containment.
Isolation valves outside containment shall be located as close to containment as practical and upon loss of actuating power, automatic isolation valves shall be designed to take the position that provides greater safety.
Other appropriate requirements to nmimize the probability of consequences of an accidental rupture of these lines or of lines connected to them shall be provided as necessary to assure adequate safety.
Determination of the appropriateness of these requirements, such as higher quality in design, fabrication, and testing, additional provisions for inservice inspection, protection against more severe natural phenomena, and additional isolation valves and containment, shall include consideration of the population density, use characteristics, and physical characteristics of the site environs.
3.1 - 39 UPDATE 2 - AUGUST 1997
Discussion Due to the non-operating and defueled condition of TMI-2 there is no reactor coolant pressure boundary, therefore, the specific requirements of Criterion 55 are not applicable. However, the intent of Criterion 55 has been addressed for PDMS. All piping which penetrates the Containment has been isolated as described in Section 7.2.1.
3.1.2.49 Criterion 56 - Primary Containment Isolation Each line that connects directly the containment atmosphere and penetrates primary reactor containment shall be provided with containment isolation valves as follows, unless it can be demonstrated that the containment isolation provisions for a specific class of lines, such as instrument lines, are acceptable on some other defined basis:
- 1. One locked closed isolation valve inside and one locked closed isolation valve outside containment; or
- 2. One automatic isolation valve inside and one locked closed isolation valve outside containment; or
- 3. One locked closed isolation valve inside and one automatic isolation valve outside containment. A simple check valve may not be used as the automatic isolation valve outside containment; or
- 4. One automatic isolation valve inside and one automatic isolation valve outside containment. A simple check valve may not be used as the automatic isolation valve outside containment.
Isolation valves outside containment shall be located as close to containment as practical and upon loss of actuating power, automatic isolation valves shall be designed to take the position that provides greater safety.
Discussion Due to the unique condition of TMI-2 during PDMS, the specific requirements of Criterion 56 are not applicable; however, the intent of Criterion 56 has been addressed for PDMS. Piping systems penetrating Containment have been isolated outside Containment and will be maintained isolated. Due to the non-operating and defiteled condition of TMI-2, one closed isolation valve outside Containment on each piping penetration provides suitable Containment isolation during PDMS. See Section 7.2. 1.
3.1.2.50 Criterion 57 - Closed System Isolation Valves Each line that penetrates primary reactor containment and is either part of the reactor coolant pressure boundary or connected directly to the containment atmosphere shall have at least one containment isolation valve which shall be either automatic, or locked closed, or capable of remote manual operation.
This valve shall be outside containment and located as close to the containment as practical. A simple check valve may not be used as the automatic isolation valve.
3.1 -40 UPDATE 2 - AUGUST 1997
Discussion Due to the unique condition of TMI-2 during PDMS, the specific requirements of Criterion 57 are not applicable; however, the intent of Criterion 57 has been addressed for PDMS. All piping systems penetrating Containment have been isolated as described in Section 7.2.1.
3.1.2.51 Criterion 60 - Control of Releases of Radioactive Materials to the Environment The nuclear power unit design shall include means to control suitably the release of radioactive materials in gaseous and liquid effluents and to handle radioactive solid wastes produced during normal reactor operation, including anticipated operational occurrences. Sufficient holdup capacity shall be provided for retention of gaseous and liquid effluents containing radioactive materials, particularly where unfavorable site environmental conditions can be expected to impose unusual operational limitations upon the release of such effluents to the environment.
Discussion Due to the unique condition of TMI-2 during PDMS, the specific requirements for Criterion 60 are not -
applicable; however, the intent of Criterion 60 has been addressed by providing means to suitably control releases of radioactive materials to the environment during PDMS.
3.1.2.52 Criterion 61 - Fuel Storage and Handling and Radioactivity Control The fuel storage and handling, radioactive waste, and other systems which may contain radioactivity shall be designed to assure adequate safety under normal and postulated accident conditions. These systems shall be designed (1) with a capability to permit appropriate periodic inspection and testing of components important to safety, (2) with suitable shielding for radiation protection, (3) with appropriate containment, confinement, and filtering systems, (4) with a residual heat removal capability having reliability and testability that reflects the importance to safety of decay heat and other residual heat removal, and (5) to prevent significant reduction in fuel storage coolant inventory under accident conditions.
Discussion Due to the non-operating and defueled condition of TMI-2, the requirements of Criterion 61 with regards to fuel handling and storage are not applicable. However, small quantities of residual fuel remain in various locations within the Reactor Coolant System and in other areas of the Reactor Building; the Post-Defueling Survey Reports (References 3.1-8 through 12) identified the quantity of residual fuel in each defined location and addressed the potential for fuel relocation. As discussed in Section 4.3.4, the criticality analyses provided in the Defueling Completion Report (DCR) (Reference 3.1-7) and in GPU Nuclear letter, C312-92-2080, dated December 18, 1992 (Reference 3.1-13) demonstrated that criticality has been precluded at TMI-2. Finally, personnel accessibility, potential exposure, and other protective features for the residual fuel and other radioactive material are provided consistent with the requirements of Criterion 61.
3.1.2.53 Criterion 62 - Prevention of Criticality in Fuel Storage and Handling Criticality in the fuel storage and handling system shall be prevented by physical systems or processes, preferably by use of geometrically safe configurations.
.3.1 -41 UPDATE 2 - AUGUST 1997
Discussion Due to the non-operating and defueled condition of TMI-2, the requirements of Criterion 62 are not applicable. See Section 4.3.
3.1.2.54 Criterion 63 - Monitoring Fuel and Waste Storage Appropriate systems shall be provided in fuel storage and radioactive waste systems and associated handling areas (1) to detect conditions that may result in loss of residual heat removal capability and excessive radiation levels and (2) to initiate appropriate safety actions.
Discussion Due to the non-operating and defueled condition of TMI-2 there will not be any materials which can generate sufficient decay heat to require residual heat removal capabilities. Therefore, the requirements of Criterion 63 are not applicable.
3.1.2.55 Criterion 64 - Monitoring Radioactivity Releases Means shall be provided for monitoring the reactor containment atmosphere, spaces containing components for recirculation of loss-of-coolant accident fluids, effluent discharge paths, and the plant environs for radioactivity that may be released from normal operation, including anticipated operational occurrences, and from postulated accidents.
Discussion Due to the unique condition of TMI-2 during PDMS, the specific requirements of Criterion 64 are not applicable; however, the intent of Criterion 64 has been addressed by providing means to monitor radioactivity releases, as described in Sections 7.2.1.2 and 7.2.4, commensurate with the plant condition during PDMS.
3.1 -42 UPDATE 2 - AUGUST 1997
REFERENCES 3.1-1 Letter, Travers, W. D. (NRC) to Standerfer, F. R. (GPUNC), "Approval of Exemption from 10 CFR 50.61," dated December 30, 1985.
3.1-2 Letter, Snyder, B. J. (NRC) to Kanga, B. K. (GPUNC), "10 CFR 50.49, 'Environmental Qualification of Electrical Equipment Important to Safety for Nuclear Power Plants'," dated July 22, 1983.
3.1-3 Letter, Stolz, J. F. (NRC) to Standerfer, F. R. (GPUNC), "Issuance of Amendment (TAC No.
65337)," dated May 27, 1988.
3.1-4 Letter, Snyder, B. J. (NRC) to Hovey, G. K. (Met-Ed), Re: Exemption from 10 CFR 50 Appendix J, dated September 2, 1981.
3.1-5 Letter, Snyder, B. J. (NRC) to Hovey, G. K. (Met-Ed), Re: Relief from the Inservice Inspection Program Requirements of 10 CFR 50.55a, dated April 27, 1981.
3.1-6 GPU Nuclear letter, 4410-90-L-0044, "Decommissioning Financial Assurance Certification Report for ... TMI-2," dated July 26, 1990.
3.1-7 GPU Nuclear letter, 4410-90-L-00 12, "Defueling Completion Report, Final Submittal," dated February 22, 1990.
3.1-8 GPU Nuclear letter, C312-91-2045, "SNM Accountability," transmitting the Auxiliary and Fuel Handling Buildings PDSR, dated June 7, 1991.
3.1-9 GPU Nuclear letter, C312-91-2052, "SNM Accountability," transmitting the Reactor Building Miscellaneous Components PDSR, dated June 18, 1991.
3.1-10 GPU Nuclear letter, C312-91-2055, "SNM Accountability," transmitting the Reactor Coolant System PDSR, dated July 3, 1991.
3.1-11 GPU Nuclear letter, C312-91-2064, "SNM Accountability," transmitting the 'A' and 'B' Once-Through Steam Generators PDSR, Revision 1, dated July 3, 1991.
3.1-12 GPU Nuclear letter, C3 12-93-2004, "SNM Accountability, transmitting the Reactor Vessel PDSR, dated February 1, 1993.
3.1-13 GPU Nuclear letter, C312-92-2080, "TMI-2 Reactor Vessel Criticality Safety Analysis, " dated December 18, 1992.
3.1-14 Letter, Masnik, M. T. (NRC) to Standerfer, F: R. (GPUNC) "Three Mile Island Nuclear Station Unit 2 Approval of Exemptions from 10 CFR 70.24 'Criticality Accident Requirements'," dated May 27, 1988.
3.1-15 GPU Nuclear, letter, 1920-99-20112, "Decommissioning Funding Status," dated March 31, 1999.
3.1-16 Letter, Thonus, L. H. (NRC) to Langenbach, J. W. (GPUNC) "Exemption from Insurance Coverage Limit of 10 CFR 50.54(w)," dated July 21, 1999.
3.1-43 UPDATE 4 - AUGUST 2001
3.2 CLASSIFICATION OF STRUCTURES, SYSTEMS, AND COMPONENTS 3.2.1 SEISMIC CLASSIFICATION The unit structures, systems, and components have been classified according to their function and the degree of integrity required to protect the public. Structures, components, and systems are classified for seismic design purposes as either Category I or Category IU. The original seismic design criteria for structures, components, and systems utilized during PDMS is given in Section 3.2 of the TMI-2 FSAR.
3.2.1.1 Seismic Category I Seismic Category I structures, systems, and components, including instruments and controls, are those which are necessary to ensure:
- a. The integrity of the reactor coolant pressure boundary,
- b. The capability to shutdown the reactor and to maintain it in a safe shutdown condition, or
- c. The capability to prevent or mitigate the consequences of accidents which could result in potential off-site exposures comparable to the guideline exposures of 10 CFR Part 100.
The first criterion requires the reactor coolant pressure boundary to be ensured. Due to the non-operating and defueled condition of TMI-2, there is no reactor coolant pressure boundary.
The second criterion requires the capability to shutdown the reactor and maintain it in a safe shutdown condition. Due to the non-operating and defueled condition of TMI-2, there is no reactor to shutdown and maintain in a safe shutdown condition. In addition, the criticality analysis discussed in Section 4.3.4 demonstrates that criticality has been precluded at TMI-2.
The third criterion requires the capability to prevent or mitigate the consequences of accidents that could result in potential off-site exposures comparable to the 10 CFR Part 100 guidelines. Analysis demonstrates (see Chapters 7 and 8) that there are no postulated events that could result in releases greater than 10 CFR 50 Appendix I limits, therefore there are no postulated events which could result in exposures comparable to 10 CFR Part 100 guidelines.
Due to the non-operating and defueled status of TMI-2 during PDMS, there are no structures, systems, or components which are required to meet the criteria of seismic Category I. Therefore, there are no structures, systems, or components classified as seismic Category I at TMI-2 during PDMS.
Those structures, systems, and components which were originally designed as seismic Category I and the applicable design criteria are described in Section 3.2.1 of the TMI-2 FSAR.
3.2- 1 UPDATE 2 - AUGUST 1997
3.2.1.2 PDMS Category H Those structures, components and systems which are relied upon for the isolation of residual contamination from the environment and for the prevention of an uncontrolled release of radioactivity during a seismic event have been designated as PDMS Category HI.
3.2.1.2.1 Design Basis All structures, components, and systems which were designed to seismic Category I or seismic Category II are in conformance with the seismic loading requirements of the Uniform Building Code for Zone 1.
Those structures, systems, and components that were originally designed and fabricated to seismic Category I or seismic Category I1requirements have not had their original structural design capability significantly degraded and will meet the seismic loading requirements of the Uniform Building Code for Zone 1.
3.2.1.2.2 PDMS Category H Structures Structures designated as PDMS Category II are the Reactor Building, the Control and Service Buildings, the Auxiliary Building, and the Fuel Handling Building. These five structures were originally designed to seismic Category I requirements.
3.2.1.2.3 PDMS Category HISystems As a result of the accident on March 28, 1979, various original plant systems were contaminated with radioactive materials from the reactor core. These systems have been decontaminated to the extent practical. However, a number of these systems still contain some degree of residual contamination and provide an initial barrier for control of the contamination which remains within the respective system.
The Containment provides a second barrier for those systems or partial systems located within that structure. The structural capabilities of the systems as originally designed to seismic Category I and seismic Category II criteria have not been degraded significantly and these capabilities provide the necessary degree of contamination control. These PDMS Category II systems and their original seismic design criteria are listed in Table 3.2-1.
Other piping systems designated as PDMS Category II which were not designed to seismic Category I or seismic Category H criteria also provide an initial barrier for control of internal contamination during the PDMS period. Since these systems were designed to function under equal or higher pressure and temperature conditions, they will maintain structural integrity under the conditions which exist during PDMS. In addition, deactivated systems have been drained to the extent practical, thus, minimizing contaminated leakage from these systems. A breach in system piping which has been deactivated would expose only a very small portion of the piping systems internal surface contamination and as deactivated systems are not pressurized, there is no motive force to expel contamination. Therefore, no further design, analysis, testing, or surveillance is required to assure the structural integrity of those systems relied upon during PDMS. These PDMS Category II systems are listed on Table 3.2-1 and are identified as not being designed to seismic criteria (N/S).
3.2- 2 UPDATE 2 - AUGUST 1997
3.2.2 SYSTEM QUALITY GROUP CLASSIFICATION 3.2.2.1 Identification of Safety Related Systems and Components Due to the non-operating and defueled status of TMI-2 during PDMS there are no safety related systems or components. The original quality group classifications and other design criteria for the original plant systems listed in Table 3.2-1 are given in Section 3.2 of the TMI-2 FSAR.
TABLE 3.2-1 PDMS CATEGORY II SYSTEMS FSAR IN OPERATIONAL/
SYSTEM SEISMIC CLASS CONTAINMENT DEACTIVATED Core Flood 1() PART.(2) DEACT.
RB Spray I PART. DEACT.
Decay Heat Removal I PART. DEACT.
Steam Generator Recirculation N/S NO- DEACT.
Spent Fuel I PART. DEACT.
1(3) PART. DEACT.
Main Steam Decon Process Water N/S PART. DEACT.
Dewatering Station N/S NO DEACT.
Fuel Transfer Canal N/S PART. DEACT.
Fill and Drain Makeup & Purification I PART. DEACT.
Nuclear Plant Nitrogen II PART. DEACT.
1(4)
Nuclear Sampling PART. DEACT.
Temporary Nuclear Sampling N/S(5) NO DEACT.
Steam Generator Secondary Vent I & II YES DEACT.
and Drain Inside Containment Waste Disposal Gas 1(6) PART. DEACT.
Defueling Water Cleanup N/S PART. DEACT.
Reactor Coolant I YES DEACT.
Waste Disposal Solid I PART. DEACT.
Fuel Handling I PART. DEACT.
Submerged Demineralizer N/S NO DEACT.
Reactor Building Sumnp N/S PART. OPER.ý (Level Measurement) 3.2 -3. UPDATE 2 - AUGUST 1997
TABLE 3.2-1 (Cont'd)
PDMS CATEGORY II SYSTEMS FSAR IN OPERATIONAL/
SYSTEM SEISMIC CLASS CONTAINMENT DEACTIVATED Sump Water Sucker N/S PART. DEACT.
Processed Water Storage N/S NO DEACT.
and Distribution Canister Loading Decon N/S NO DEACT.
Defueling(7) N/S YES DEACT.
Decant Filter Skid N/S NO DEACT.
Sludge Transfer N/S PART. DEACT.
Reactor Building Purge II NO OPER.
Exhaust Upstream of HEPA Filter Waste Disposal - Liquid I & II PART. OPER.
Key: N/S - Non-seismic PART. - Partially DEACT. - Deactivated OPER. - Operational NOTES:
(1) Except for N2 supply lines from NM-U-26 and 27 to CF-V- 114 and 115.
(2) All of system is in containment except for 1 inch fill and drain lines.
(3) Seismic I up to MSIVs and EF-P-2. All else is Seismic II. Portions of Seismic II piping are contaminated.
(4) Majority of system is Seismic I. Seismic II portion is very small and contains a small pump and associated 1/2 inch tubing.
(5) System consists of mainly 1/2 inch and 3/8 inch diameters.
(6) System was designed and constructed Seismic I except for 2 flexible connections to the secondary vent and drain system. A few non-seismic modifications were made during the course of the cleanup effort; however, the majority of the system remains seismically qualified.
(7) System consists of the defueling equipment that remains in the RV.
3.2- 4 UPDATE 2 - AUGUST 1997
3.3 WIND AND TORNADO LOADINGS 3.3.1 WIND LOADINGS 3.3.1.1 Design Wind Velocity Recurrence intervals, data sources and the history of occurrence of high winds, hurricanes and tornadoes in the vicinity of the site are discussed in Sections 2.3.1 and 2.3.2 of the TMI-2 FSAR.
Based on studies by the Weather Bureau, wind speeds 30 feet above the site grade are expected to exceed 78 mph once in 100 years. Hence, all structures were designed for forces associated with a wind of 80 mph and, with limited exceptions .as described in SAR Section 3.7.2.1.1, exist as originally designed. Additional design information is given in Section 3.3 of the TMI-2 FSAR.
3.3.2 TORNADO LOADINGS 3.3.2.1 Applicable Design Parameters The forces due to tornado loading .have been assumed as the forces associated with a wind having a velocity of 360 mph. The 360 mph velocity is considered as the resultant of a 300 mph tangential and 60 mph translational velocity of the storm.
- A differential pressure of 3 psi between inside and outside has been considered in the design of the Reactor Building. All other structures designed for tornado loadings are provided either with adequate areas of openings to relieve the differential pressure of 3 psi in 3 seconds or are designed to withstand an external pressure of 3 psi.
3.3.2.2 Tornado Missiles The missiles assumed to have been generated by the tornado event are listed in Table 3.3-1. They include items such as siding panel, pipe, and steel plate which could be detached from structures under tornado-associated loadings. All these missiles have been investigated for their ability to penetrate exterior concrete walls and slabs. The maximum penetration of a concrete barrier was found to be 30 in. The minimum thickness of structures designed to withstand tornado generated missiles is 36 in.
Their effects on the buildings designed for tornado loadings were considered together with the effects of loadings described in Section 3.3.2.1. Thus, with limited exceptions as described in SAR Section 3.7.2.1.1, the capability of buildings designed for tornado loadings will not be jeopardized as a result of flying objects from other structures under a tornado event.
3.3 - I UPDATE 2 - AUGUST 1997
TABLE 3.3-1 TORNADO GENERATED MISSILES Impact Impact Elevation Impact Weight Area Above Grade Velocity (mpnh)
- 1. Utility pole 1200 1.0 25 200
- 2. Passenger Auto 2000 25 25 100
- 3. Passenger Auto 4000 30 3 100
- 4. Concrete Fragment 4500 30 5 60 10' dia. x 3' x 4"
- 5. Steel plate 1000 1.0 10 200
- 6. Crated motor 1000 15 10 200
- 7. Pipe, 4" dia. x 250 0.15 25 200 12'-0"
- 8. Wood plank 110 0.33 any 360 4" x 12" x 12'-0" height
- 9. Street light fixture 25 0.5 any 360 height
- 10. Crushed rock, 1-1/2" .25 0.01 any 360 height
- 11. Siding Panels 400 0.04 any .360 1.5'x 50' height
- 12. Tools 125 0.1 any 360 height
- 13. Ductwork 150 0.3 any 360 height
- 14. 8'Handrail 50 0.05 any 360 Section height 3.3 -2 UPDATE 2 - AUGUST 1997
3.4 WATER LEVEL (FLOOD) DESIGN Flood history, flood design consideration, design of hydraulic facilities and emergency operation requirements for the unit facilities are discussed in Section 2.4.
3.4.1 FLOOD ELEVATION The foundation mats, exposed walls and flood panels of those structures designed to withstand floods are designed to withstand the hydrostatic pressures associated with a water level of 31 FI-0".
3.4.2 PHENOMENA CONSIDERED IN DESIGN LOAD CALCULATIONS Due to wave 'action, the maximum water level considered is 4'-0" higher than the PMF elevation
,expected around the station facilities. See Section 2.4.3 of the TMI-2 FSAR. No other phenomena have been considered in the design load calculations.
3.4.3 FLOOD FORCE APPLICATION Static forces on the flood panels and vertical walls are calculated considering hydrostatic pressures.
Dynamic forces on the flood panels and vertical walls are calculated considering wave action. The buoyancy forces on the mats are calculated considering the uplift due to the height of water above the bottom of the mats.
3.4.4 FLOOD PROTECTION Unit design is based on a water elevation of 308'-6" on the west side and 308'-0" on the east side under, flood conditions. Structures which originally contained Engineered Safety Feature equipment are sealed against entry of flood water to an elevation of 312'-6" on the west side and 312'-0" on the east side.
Complete protection has been provided at the exterior faces of these structures. The waterstops between adjacent building walls and mats are capable of withstanding a maximum water head of 45 feet which is in excess of maximum associated head for the flood level. The exterior sliding doors and flood panels are provided with watertight seals.
3.4- 1 UPDATE 2 - AUGUST 1997
3.5 MISSILE PROTECTION CRITERIA The missile protection criterion (i.e., GDC 4; see Section 3.1.2.4) is based on precluding damage to structures, systems, and components important to safety. During PDMS, there is no equipment that is important to safety; therefore, the consequences of a missile impact are limited to physical damage.
With limited exceptions as described in Section 3.7.2.1.1, all contamination isolation structures are protected from a loss of function due to damage from potential external missiles as described below.
Due to the non-operating and defueled status of TMI-2 during PDMS, there are no postulated internally generated missiles which would have any effect on the capability of structures to provide their required contamination isolation function.
3.5.1 MISSILE LOADINGS AND BARRIERS The exterior walls of the Reactor Building, Auxiliary and Fuel Handling Buildings and the Control &
Service Buildings were designed to withstand the effects of external missiles.
3.5.2 MISSILE SELECTION The potential sources of external missiles have been investigated for those buildings designed for missile protection. Missiles generated by environmental conditions and a postulated aircraft impact have been considered. The critical possible missiles have been selected and analyzed. They are described in the following paragraphs.
3.5.3 SELECTED MISSILES 3.5.3.1 Tornado Generated Missiles The residual contamination which remains at TMI-2 is contained within buildings that have been designed to withstand tornado generated missiles as discussed in Section 3.3.2.2.'
3.5.3.2 Aircraft Impact The probability of aircraft impact on the station has been studied. The results of evaluations show that the probability of an aircraft impact on the unit is very low (see Section 2.2.3.1.2 of the TMI-2 FSAR and Reference 3.5-1). In addition, all contamination isolation structures' were designed to withstand a hypothetical aircraft incident. The impact loadings on these structures are assumed to come from:
- 1. An aircraft of 200,000 lbs. traveling at 200 knots impacting on an effective area of 19 ft.
diameter
- 2. An aircraft of 300,000 lbs. traveling at 200 knots impacting on an area of 16 ft. diameter
- 3. An object of 6000 lbs. traveling at 200 knots impacting on an effective area of 5 ft. diameter
- 4. An object of 4000 lbs. traveling at 200 knots impacting on an effective area of 3 ft. diameter.
The results of these analyses provide assurance that with limited exceptions as described in SAR Section 3.7.2.1.1 the hypothetical objects would not perforate or cause collapse of any of these structures.
The "Other Buildings" from Table 5.3-6 that contain less than 140Ci residual contamination are excluded from this discussion.
3.5- 1 UPDATE 2 - AUGUST 1997
3.5.4 BARRIER DESIGN PROCEDURES With limited exceptions as described in SAR Section 3.7.2.1.1, structures are protected against the effects of all possible missiles, described above, by concrete barriers. The effects depend on the missile features such as weight, shape and velocity, as well'as on the barrier features such as material properties and geometry of the barrier. These effects can be classified as follows:
3.5.4.1 Overall Structural Effect The overall structural effect of a missile impacting on a structure is evaluated by the equivalent static load produced by the missiles. This is done by determining the deflection resulting from dissipation of the kinetic energy and finding the equivalent static load or directly from the kinetic energy of the missile and the magnitude of the missile penetration.
3.5.4.2 Missile Penetration (Localized Effect)
The following empirical formulas have been used to determine the missile penetration into the concrete barrier.
- a. Modified Petry Formula
- b. Army Corps of Engineers
- c. Ballistic Research Laboratory.
Computations have been made for all missiles described previously using these formulas. The results show the Petry formula as least conservative, and the Ballistic Research Laboratories formulas as most conservative.
Based on these considerations, it has been ascertained that with limited exceptions as described in SAR Section 3.7.2.1. 1, a potential missile would not jeopardize the function of the structures analyzed.
3.5.5 MISSILE BARRIER FEATURES As shown in Figures 3.7-1, 3.7-2 and 3.7-3, the exterior concrete walls and slabs of structures were designed to act as barriers against external missiles.
3.5 -2 UPDATE 2 - AUGUST 1997
REFERENCES 3.5-1 ALAB-692 dated September 14, 1982.
3.5 -3 UPDATE 2 - AUGUST 1997
3.6 SEISMIC DESIGN The Reactor Building, the Auxiliary and Fuel Handling Buildings, Control and Service Buildings, and other buildings were originally designed to Category I criteria for seismic design. These criteria may be found in Section 3.7 of the TMI-2 FSAR. Due to the non-operating and defueled status of TMI-2 during PDMS, it is not required that these buildings meet the seismic Category I criteria. The seismic criteria in the Uniform Building Code for Zone 1 is suitable for the PDMS period. It is assumed that the structural capability of the buildings as originally designed has not been significantly degraded and would fully comply with the criteria in the Uniform Building Code.
There are no systems which are required to meet the seismic Category I criteria. It is assumed that the systems which were designed to the seismic Category I criteria and contain residual contamination will retain their structural capability through the PDMS period and continue to isolate internal contamination from the external environment.
3.6- 1 UPDATE 2 - AUGUST 1997
3.7 DESIGN OF PRINCIPAL BUILDING STRUCTURES This section addresses the design of the principal buildings which serve protective functions during PDMS. These structures were originally designated as Category I structures and were designed to provide the protective functions associated with an operating nuclear power plant. During PDMS, the protective functions provided by these structures are very limited compared to those for which the building was originally designed. This section presents a summary of the criteria necessary to provide the protective finctions required during PDMS. The detailed design criteria for the Category I structures is given in Section 3.8 of the TMI-2 FSAR.
3.7.1 CONTAINMENT BUILDING 3.7.1.1 Structure Description The Containment Building is a reinforced concrete structure composed of a cylindrical wall with a flat foundation mat and a dome roof The foundation slab is reinforced with conventional mild steel reinforcing. The cylindrical wall is prestressed with a post tensioning system in the vertical and hoop directions. The dome roof is prestressed utilizing a three-way post tensioning system. The inside surface of the Containment Building is lined with a carbon steel liner to ensure a high degree of leak tightness. The nominal liner plate thickness is 3/8 in. for the cylinder, 1/2 in. for the dome and 1/4 in.
for the base.
The foundation mat is bearing on rock and is 11 ft. 6 in. thick with a 2 ft. thick concrete slab above the base liner plate. The cylinder has an inside diameter of 130 ft., a wall thickness of 4 ft. and a height of 157 ft. from the top of the foundation slab to the spring line. The roof is a shallow dome having a large radius of 110 ft., a transition radius of 20 ft. 6 in., and a thickness of 3 ft. 6 in. Typical Containment Building details are shown in Figure 3.7-1.
3.7.1.2 Liner Plate and Penetrations The liner plate has been designed to function as a leak-tight membrane. Nominal steel plate thicknesses for the plate are 1/2 in. for the dome and the ring girder, 3/8 in. for the cylindrical wall and 1/4 in. for the base. The thicknesses are locally increased at penetrations, polar crane supporting brackets and at equipment support locations.
The liner is anchored to the concrete shell by means of structural tees (ST 31) running vertically and meridionally along the cylinder and dome, respectively. The anchorage system is designed to prevent elastic instability of the liner. A continuous system of steel channel is welded over all liner weld seams on the face of the base line, and over all inaccessible liner weld seams (on the exposed face of the liner) of the wall.
The liner plate and the concrete shell are penetrated by the openings as described below:
- a. Equipment Access Hatch and Personnel Air Locks An equipment hatch with an inside diameter of 23 ft. has been provided to allow passage of large equipment and components into the Containment Building. The equipment hatch is an integral part of the Containment and is bolted to a flanged 3.7- 1 UPDATE 2 - AUGUST 1997
steel sleeve anchored in the concrete Containment wall and welded to the Containment liner so that the equipment hatch can be removed and. reinstalled from the outside of the Containment Building. One personnel air lock is a removable unit penetrating through the equipment hatch. The equipment hatch, consisting of the hatch cover, the attached air lock, and the flanged sleeve, is a complete gas-tight unit when field assembled.
A second personnel air lock is welded to the Containment liner, detailed layouts of these openings are shown in Figure 3.7-2.
- b. Piping and Electrical Penetrations The piping penetrations are normally anchored at the Containment Building shell.
Typical piping ducts and penetrations are shown in Figure 3.7-3. All penetrations are of the double barrier type. Where temperature considerations require, the second barrier of the piping penetration includes expansion bellows. The electrical penetrations are welded closures.
- c. Modified Penetrations Several penetrations were modified during the cleanup period. These penetrations were modified in accordance with criteria submitted to the NRC (Reference 3.7-1).
Piping and electrical penetrations were designed and modified to withstand at least 5 psig and tested to hold 1.2 to 1.5 times this pressure for not less than 10 minutes in accordance with ANSI B3 1.1. Fluid hard piped piping was designed, modified, and tested in accordance with ANSI B3 1.1.
The leakrate from modified penetrations, including flange and isolation valve leakage, was limited to 100 sccm.per 1 inch of pipe diameter.
A complete listing of all containment penetrations is provided in PDMS SAR Table 7.2-2 which includes the status of each for PDMS. The containment penetrations that are in a modified configuration for PDMS are listed in Table 3.7-1 which also provides details of the modifications. For this review, a modification to a containment penetration was included if the modification was made to the area from the inboard isolation valve through the penetration to and including the outboard isolation valve. Modifications to containment penetrations during the recovery period have been accomplished such that the combined modified cross sectional area does not exceed the NRC safety evaluation requirement of 40 square feet (Reference 3.7-2).
The Containment Atmnospheric Breather has been added to the Containment to provide passive pressure control of the Containment relative to ambient atmospheric pressure and to establish a "most probable pathway" through which the Containment will "breathe." This addition ensures that the Containment structure will not experience significant pressure differential to threaten the structural capability of the contamination boundaries provided by the Containment. Further discussion of the Breather is provided in PDMS SAR Section 7.2.1.2.
3.7-2 3.7-2UPDATE 2 - AUGUST 1997
3.7.2 OTHER PRINCIPAL STRUCTURES 3.7.2.1 Description of Structures The physical layout of other principal structures for the unit is shown in Figures 3.7-4 and 3.7-5.
Following is the physical description of these structures. All these structures are constructed of reinforced concrete.
3.7.2.1.1 Auxiliary Building The Auxiliary Building was designed to house.the components of auxiliarysystems required for reactor coolant purification, conditioning, reprocessing and cooling, radwaste processing, and engineered safety features. The Fuel Handling Building and this building are physically attached by means of a common structural wall. A vertical air intake shaft is also attached to the east wall of this building. The Auxiliary Building is rectangular in plan and has three main floors. At the east exterior wall, a large door opening is located at the grade level. This door opening is not protected from an aircraft impact loading or external missiles. In addition, concrete drilling operations in a small exterior wall section of the Auxiliary Building damaged six (6) reinforcing steel bars, two (2) of which impact the ability of the Auxiliary Building to meet TMI-2 FSAR design criteria for aircraft impact. Nonetheless, the wall presently meets normal non-operating load requirements. These two (2) areas comprise the limited exceptions to wind and tornado loadings and missile protection alluded to in SAR Sections 3.3 and 3.5.
To the south of this building is the Service Building and a portion of the Control Building Area. There is one foot separation between these structures. All floors of this building are slab-beam and flat slab construction.
3.7.2.1.2 Fuel Handling Building The Fuel Handling Building was designed to accommodate the storage of new and spent fuel. In addition, it provides an area to accommodate the storage of packaged waste prior to off-site disposal.
This building is physically connected to the Auxiliary Building on the east side by means of a common wall. The Fuel Handling Building of Unit 1 is located on the north side. The clear distance between these two buildings is 3 in. One bridge crane, common to both buildings, is used for fuel handling.
There is no wall separating these structures at the top floor (above elevation 347'-6"). The Containment structure is located on the south side of this building and is separated by a clear gap of 2 in. Two stainless steel lined, reinforced concrete fuel storage pools are located in the Fuel Handling Building.
3.7.2.1.3 Control and Service Buildings The Control Building and the Service Building are separated by a common wall. The Control Building houses a control room, a battery room, a cable room and a mechanical equipment room. The Service Building provides access to the Reactor Building, the Auxiliary Building and the control room. The Service Building serves as the Rad. Con. Control Point for Unit Two. The Control and Service Buildings are rectangular buildings with a common 3.7-3 UPDATE 2 - AUGUST 1997
foundation mat. Floors of the control building are supported by interior walls only and a peripheral gap of 4" between edges of the floors and the inside face of the exterior walls has been provided to create a structural separation between the exterior structure and the interior structure. The purpose of this separation is to protect vital and sensitive control room equipment from dynamic aircraft impact loading to which the exterior walls and the roof could be subjected. Door openings and other penetrations in exterior walls of the control building that are susceptible to aircraft loading have been shielded by reinforced concrete shield walls. The Control and Service Buildings are surrounded but physically separated from the Auxiliary Building, the Control Building Area and the Turbine Building.
3.7.2.1.4 Control Building Area The Control Building Area is located between the Reactor Building and the Turbine Building and accommodates the main steam relief and isolation valves and emergency steam generator feedwater pumps. This is a one story underground structure from the Turbine Building on the south end. At the north end, this structure follows the curvature of the outside face of the Containment Structure. On the west side, a metal frame structure called the CACE is situated at ground level. Protecting the RB equipment hatch.
3.7.2.1.5 Air Intake Tunnel The air intake tunnel provides a passage for air to be distributed into the following structures: Reactor Building, Auxiliary Building, Fuel Handling Building, Control Building, Service Building and Control Building Area. The air intake tower at an end of the tunnel extends above the grade level. The bottom of the air intake extends 12' -0" below the bottom of the tunnel providing a large well for the accumulation of rain water inleakage. Access to the tunnel is provided from the Service Building and from the air intake tower. One manhole from the grade level to the tunnel floor has been provided for emergency egress. Near the Auxiliary Building, the tunnel bends 90 degrees upward and changes into a rectangular concrete plenum. The plenum extends above the grade level and is closed off at the Auxiliary Building roof level. The supply air enters the Service Building and the Auxiliary Building through the openings in walls of the plenum.
3.7-4 UPDATE 2 - AUGUST 1997
REFERENCES 3.7-1 GPU Nuclear letter LL2-81-019 1, "Design Pressure for Containment and Future Mechanical and Electrical Penetration Modifications," dated December 4, 1981.
3.7-2 Letter, W. D. Travers (NRC) to F. R. Standeffer (GPUNC), "Seismic Design Criteria for Modified Containment Penetration," dated April 3, 1987.
3.7-5 UPDATE 2 - AUGUST 1997
TABLE 3.7-1 MODIFIED CONTAINMENT PENETRATIONS PENETRATION NUMBER MODIFICATION R-401 This penetration was modified in late summer 1979 to allow access to obtain samples of the Reactor Building (RB) sump water. Following successful completion of the sampling program, further changes were made to use the penetration for RB water level measurement by addition of a manometer system to the sampling tube. A further modification was made to provide a more permanent closure in consideration of future potential increase of RB water level to the extent of flooding the penetration. This final modification removed the 12 inch gate valve and special cover assembly outboard of the valve and welded a closure assembly to the penetration.
R-561 The penetration was modified to provide a flow path into the RB for a high pressure decontamination water supply and additional service air. This penetration modification consisted of replacing an existing 10 inch penetration with a 10 inch flange with three piping connections on the outboardside containing isolation valves and hose connections on the inboardside.
R-545 The spare penetration was modified to provide a flow path into and out of the RB for the DWCS. This penetration modification consisted of adding a double valve pressure boundary on the outboard side and providing piping for a hose connection on the inboard side.
R-536 This spare penetration was modified to provide a flow path into the RB for Plasma Arc Nitrogen as a quenching gas for PCI cutting operations. This penetration modification consisted of adding a two inch pipe through the penetration with isolation valves on the outboardside, including penetration test connections and hose adapter on the inboardside.
R-508 This electrical penetration was modified to provide an access for ROSA cables and CCTV coaxial cables. This penetration modification consisted of boring and tapping holes in the existing flange for cable routing, resealing and testing for leaks.
R-554 The penetration was modified to provide a source of clean compressed air for use with pneumatic controls and operators. This penetration modification consisted of replacing two (2) outboard containment isolation valves with three (3) valves and adding a flow limiter and quick disconnect on the inboard side.
3.7- 6 UPDATE 2 - AUGUST 1997
TABLE 3.7-1 (Cont'd)
MODIFIED CONTAINMENT PENETRATIONS PENETRATION NUMBER MODIFICATION R-555(c) The penetration was modified to provide access for a Plasma Arc Cutting machine ground cable. this penetration has had a blind flange installed.
R-562 The penetration was modified to provide a flow path for sludge transfer from the RB to the spent resin storage tank in the Auxiliary Building. This penetration modification consisted of adding a double valve pressure boundary on the outboard side and piping for a hose connection on the inboard side.
R-565 The penetration was modified to provide a means of transferring shield water to the containment sump. This penetration modification consisted of adding a piping spool assembly to the outboard side of the penetration.
R-626 The penetration was initially modified to insert an antenna and camera arrangement into Containment. These were subsequently removed and the penetration was modified to allow pumping out of the RB basement. This penetration modification consisted of installing a new spool piece and piping. For PDMS, a flange was bolted over the penetration with a single pipe centered in the flange. The pipe has an isolation valve with a cap installed on the end of the pipe.
- "Tying-in with the pipe" can be effected in one of two ways:
- 1. Cutting the existing pipe completely and adding a "T" fitting; or
- 2. Cutting a circular hole in the existing pipe and welding a new pipe to it.
In either case, the end result of two parallel flow paths where one previously existed.
3.7-7 UPDATE 2 - AUGUST 1997
CHAPTER 4 FUEL
CHAPTER 4 FUEL TABLE OF CONTENTS SECTION TITLE PAGE
4.0 INTRODUCTION
4.0-1
4.1 BACKGROUND
INFORMATION 4.1-1 4.
1.1 DESCRIPTION
OF THE MARCH 1979 ACCIDENT 4.1-1 4.1.2 POST-ACCIDENT CHARACTERIZATION 4.1-2 4.1.2.1 Core Inventory 4.1-2 4.1.2.2 Upper Core Region 4.1-2 4.1.2.3 Mid-Core Region 4.1-2 4.1.2.4 Lower Core Region 4.1-2 4.1.2.5 Lower CSA Region 4.1-3 4.1.2.6 Lower Head Region 4.1-3 4.1.2.7 Core Former Region 4.1-3 4.1.2.8 Ex-Vessel 4.1-3 4.2 FUEL RELATED ACTIVITIES 4.2-1 4.
2.1 DESCRIPTION
OF FUEL REMOVAL ACTIVITIES 4.2-1 4.2.1.1 Scope of Defueling 4.2-1 4.2.1.2 Defueling Equipment 4.2-1 4.3 SNM ACCOUNTABILITY AND CRITICALITY 4.3-1 SAFETY ANALYSIS 4.
3.1 INTRODUCTION
4.3-1 4.
3.2 BACKGROUND
4.3-1 i UPDATE 2 - AUGUST 1997
CHAPTER 4 TABLE OF CONTENTS (Cont'd)
SECTION TITLE PAGE 4.3.3 SNM ACCOUNTABILITY PROCESS 4.3-2 4.3.3.1 Classification of Plant Areas 4.3-2 4.3.3.2 SNM Accountability Methods 4.3-2 4.3.3.3 Documentation 4.3-3 4.3.4 FINAL SNM ACCOUNTABILITY 4.3-4 4.3.5 CRITICALITY ANALYSIS 4.3-4 4.3.6 CONTROL OF SNM DURING PDMS 4.3-5 APPENDIX 4A DEFUELING EQUIPMENT 4A-1 Shielded Rotatable Work Platform 4A-1 Defueling Canisters 4A-I Defueling Vacuum System - Airlift Systems 4A-3 Core Bore Equipment 4A-3 The Automated Cutting Equipment System (ACES) 4A-3 Long-Handled Tools 4A-4 ii UPDATE 2,- AUGUST 1997
CHAPTER 4 TABLE OF CONTENTS (Cont'd)
LIST OF TABLES TABLE NO. TITLE PAGE 4.1-1 CORE MATERIAL INVENTORY 4.1-5 4.3-1 FINAL SNM INVENTORY BY LOCATION - Reactor Building 4.3-6 4.3-2 FINAL SNM INVENTORY BY LOCATION - Auxiliary and Fuel 4.3-7 Handling Buildings iii UPDATE 2 - AUGUST 1997
CHAPTER 4 TABLE OF CONTENTS (Cont'd)
LIST OF FIGURES FIGURE NO. TITLE PAGE 4.3-1 SNM ACCOUNTABILITY LOCATIONS REACTOR BUILDING 4.3-8 282'-6" EL.
4.3-2 SNM ACCOUNTABILITY LOCATIONS REACTOR BUILDING 4.3-9 305'-0" EL.
4.3-3 SNM ACCOUNTABILITY LOCATIONS REACTOR BUILDING 4.3-10 347'-6" EL.
4.3-4 SNM ACCOUNTABILITY LOCATIONS AUXILIARY/FUEL 4.3-11 HANDLING BLDG.
4.3-4 SNM ACCOUNTABILITY LOCATIONS AUXILIARY/FUEL 4.3-12 HANDLING BLDG.
4.3-4 SNM ACCOUNTABILITY LOCATIONS AUXILIARY/FUEL 4.3-13 HANDLING BLDG.
4.3-5 SNM ACCOUNTABILITY LOCATIONS AUXILIARY/FUEL 4.3-14 HANDLING BLDG. 280'-6" EL.
4.3-6 SNM ACCOUNTABILITY LOCATIONS AUXILIARY/FUEL 4.3-15 HANDLING BLDG. 305'-0" EL.
4.3-7 SNM ACCOUNTABILITY LOCATIONS AUXILIARY/FUEL 4.3-16 HANDLING BLDG. 328'-0" EL.
4.3-8 SNM ACCOUNTABILITY LOCATIONS AUXILIARY/FUEL 4.3-17 HANDLING BLDG. 347'-6" EL.
APPENDIX 4A 4A-1 SHIELDED WORK PLATFORM ASSEMBLY 4A-5 4A-2 FUEL CANISTER 4A-6 4A-3 KNOCKOUT CANISTER 4A-7 4A-4 FILTER CANISTER 4A-8 iv UPDATE 2 - AUGUST 1997
CHAPTER 4 FUEL
4.0 INTRODUCTION
This chapter summarizes the conditions and activities associated with the TMI-2 core subsequent to the accident on March 28, 1979.
Section 4.1 provides a brief description of the accident and the post-accident core conditions as they became known through the defueling process. Section 4.2 provides summary descriptions of the major defueling activities, the background and understanding of the core conditions which prevailed after the accident, and the basis for the review and approval of the fuel-related conditions of TMI-2 during PDMS. This discussion is relevant because the core debris which remains during PDMS is directly dependent on the core conditions subsequent to the accident and the level of success achieved by the activities undertaken to remove the core debris. The residual fuel conditions are provided in the Post-Defueling Survey Reports (PDSRs); this information is summarized on Tables 4.3-1 and 4.3-2. The analysis demonstrating assured subcriticality during PDMS is provided in the Defueling Completion Report (DCR) and the criticality safety analyses presented in GPU Nuclear letter C312-92-2080, dated December 18, 1992 and summarized in Section 4.3.
4.0- 1 UPDATE 2 - AUGUST 1997
4.1 BACKGROUND
INFORMATION 4.
1.1 DESCRIPTION
OF THE MARCH 1979 ACCIDENT The March 1979 accident was initiated by cessation of secondary feedwater flow. The steam generator boiled dry, and the resultant reduction of primary-to- secondary heat exchange caused the primary coolant to heat up, surge into the pressurizer, and increase the primary system pressure. The Pilot Operated Relief Valve (PORV) opened to relieve pressure but failed to close when the pressure decreased. The first 100 minutes of the accident can be characterized as a small break loss-of-coolant accident with resultant loss of primary coolant and decreasing pressure. It differed from the scenario expected during a LOCA in that the pressurizer liquid level indication remained high. This was interpreted by the reactor operator as indicating that the Reactor Coolant System was full of water when, in fact, the RCS was continually voiding. Up to about 100 minutes into the accident, the core was still covered with sufficient water to be cooled.
The Reactor Coolant Pumps were turned off at 100 minutes and core heat-up began as the water level decreased to elevations below the top of the core. -By 150 minutes, a Zircaloy-steam exothermic reaction was occurring, which increased the core heat-up rate. Consequently, Zircaloy melting temperatures were exceeded, resulting in relocation of the molten Zircaloy and some liquefied fuel to the lower core regions, solidifying near the coolant interface. This condition prevailed until 174 minutes, at which time a large region of consolidated, degraded core material existed in the lower, central regions of the core. Coolant flow through this consolidated material was probably negligible. The intact fuel rod stubs in the lower core region indicate that only the lower portion of the core remained cool.
A Reactor Coolant Pump was turned on briefly at 174 minutes and coolant was pumped into the Reactor Vessel. The resultant thermal-mechanical forces generated from the rapid steam formation are believed to have shattered the oxidized fuel rod remnants in the upper regions of the core, forming a rubble bed on top of the consolidated core materials. The consolidated core materials continued to heatup during the next 50 minutes (174 to 224 miin.), even though coolant delivery to the Reactor Vessel from the pump transient and emergency core cooling injection is estimated to have covered the core by approximately 210 minutes. By 224 minutes, much of the non-cooled consolidated region had reached temperatures sufficient to melt the U-Zr-O ternary mixture.
On-line TMI-2 data recorded during the accident suggests that the crust surrounding the consolidated core failed between 224 and 226 minutes into the accident. Based on the end-state core and core support assembly configuration and supporting analysis of the degraded core heat-up, it is believed that as the crust failed, molten core material migrated to the lower internals. The majority of the molten material flowed down through the region of the southeastern assemblies and into the core bypass region.
A portion of the molten core material flowed around the bypass region and migrated down into the lower internals and lower head region. Limited damage to the CSA occurred as the core material flowed to the lower plenum. It is estimated that about 17-20 tons of material relocated to the lower internals and lower head region. Several incore instrument guide tubes were melted but overall vessel integrity was maintained throughout the accident.
4.1-1 UPDATE 2 - AUGUST 1997
4.1.2 4.1.2POST-ACCIDENT CHARACTERIZATION The post-accident conditions inside the TMI-2 Reactor Vessel, as currently understood, are sumimarized in the following sections. A detailed description of the conditions in the Reactor Vessel is given 'in Reference 4. 1-1.
4.1.2.1 Core Inventory The original core inventory included approximately 207,300 lb of fuel (i.e., U0 2 ) and 75,400 lb of structural and absorber material for a total of 282,700 lb. Including the material added as a result of damage to the Reactor Vessel internal components due to the dynamics of the accident and the material generated by defueling activities, the total post-accident core debris material was estimated to be 296,1001lb. This estimate does not include any portions of the CSA and grid structures beneath the core that may have partially melted and mixed with the core material. See Table 4.1-1. Due to the accident progression, some of this core material was relocated within and outside of the Reactor Vessel. Each of the relevant areas is discussed separately.
4.1.2.2 Upper Core Region This region covers approximately the top 8 ft. of the original core length (13.8 ft.). The bottom boundary of this region is the layer of resolidified material identified during debris bed probing and observed during the core bore activities.
The material in this region consisted of pa~rtial, standing peripheral assemblies, partial assemblies hanging from the underside of the plenum, loose debris, fuel assembly and control element structural components such as end fittings and spiders, fuel rods of various sizes, and loose debris consisting of resolidified material and fractured fuel rods and pellets.
4.1.2.3 Mid-Core Region This region includes the layer of resolidified material referenced above (Section 4.1.2.2). This region was surrounded by standing peripheral assemblies and supported by partial fuel assemblies.
This region consisted of a large resolidified mass that was relatively thin at the periphery and very thick near the center. The thickness vanied from about 13 in. at the periphery to about 60 in. at the center.
Composition of this damaged material included a monolithic resolidified mass wihpores, rubble that was fused together by once-molten material, buried end fittings, and other structural material.
4.1.2.4 Lower Core Region The geometrically intact partial assemblies at the bottom of the core varied in length from 9 in. near the center to full length at the periphery outboard of the resolidified material. Only two assemblies were full length and with better than 90% of the fuel rod cross-section. Most of the lower portions of these fuel assemblies were ductile while upper portions were brittle, indicating a higher degree of oxidation.
On the eastern side of the core near the major relocation path, a number of the partial assemblies were brittle near the bottom with ductile fuel rods on the upper portions of the stub assemblies. Several assemblies on the east,side were resolidified masses with no identifiable fuel rods.
4.1-2, 4.1 -2UPDATE2 - AUGUST 1997
4.1.2.5 -Lower CSA Region This region consists of the area between the bottom of the lower end fittings and the 2 inch-thick flow distributor. The majority of the region just beneath the core region contained only fine loose debris with no structural damage. The region outboard of the fuel region under the flow bypass region contained a large number of resolidified columns which were created by the downward flow of melted core material from the bypass region. The eastern part of the lower internals contained a large amount of resolidified material under several fuel assemblies and under the bypass region. This area was the major relocation path for the melted core material which flowed to the lower head region. There was some structural damage in this area with some melting of incore guide tubes and support posts.
4.1.2.6 Lower Head Region The lower head region encompassed the space between the flow distributor and the spherical lower head.
A large quantity of material was relocated to this region during the accident. The material appeared to be distributed nornunifortinly. Particle sizes in the loose portion ranged from fine dust to approximately 8 in. diameter nodules. There was much less loose material in the north quadrant of this region than in the other areas.
4.1.2.7 Core Former Region This region includes the area between the baffle plates and the thermal shield *inthe upper GSA.
Some damage (melting) to the baffle plates occurred on the eastern side. Inspections of this region revealed a large mass of material between the baffle plates and the core barrel. Material was observed on the various core former plates around the core circumference with most of the material accumulated in the east and the north. No physical damage of the thermal shield and core barrel was observed.
Resolidified material was seen at a number of locations just below and penetrating through flow holes below the core former plates.
4.1.2.8 Ex-Vessel This region consisted of any area outside the boundaries of the Reactor Vessel where core material had been transported. This included the Reactor Coolant System and associated components, and the Reactor Building and Auxiliary and Fuel Handling Building sumps. During the accident, small quantities of core debris were relocated throughout the RCS and support systems.
4.1-3 4.1 . 3UPDATE 2 - AUGUST 1997
REFERENCES 4.1-1 Technical Bulletin 89-08, Revision 0, "Final Core Material Estimates," October 19, 1989 4.1 -4 UPDATE 2 - AUGUST 1997
TABLE 4.1-1 CORE MATERIAL INVENTORY Oriminal Loading Wei~ht (Ib)
Total U0 2 (177 assemblies) 207,300 Total Zircaloy - 4 51,100 Absorber and Other 24,300 Structural Material Total Original Core Material 282,700 Post-Accident Weight (1b)
Original Mass 282,700 Material Melted from Plenum Upper Core 500 Tie Plate and Grid Pads Material Melted from Baffle Plates, 600 Core Former, and Incore Assemblies 02 Due to Zr Oxidation 7,700 Defueling-generated Material 4,600 Total Estimated Post-accident Core 296,100 Debris Material Inventory 4.1 -5 UPDATE 2 - AUGUST 1997
4.2 FUEL RELATED ACTIVITIES 4.
2.1 DESCRIPTION
OF FUEL REMOVAL ACTIVITIES This section provides a summary description of the activities associated with the removal of the damaged reactor core from the Reactor Vessel and the shipping of the core debris to the storage site in Idaho.
4.2.1.1 Scope of Defueling The activities associated with the defueling of the TMI-2 Reactor Vessel were primarily the removal of core material from the Reactor Vessel, encapsulation of these materials within specially-designed canisters, and placement of the canisters into the storage racks located in Spent Fuel Pool "A". The canisters were subsequently shipped to Idaho National Engineering Laboratory for analysis and storage.
The defueling process was divided into four major activities. These four activities are described below.
- 1. Initial defueling - This task involved the removal of loose debris which was readily accessible and small enough for easy handling and placement in canisters without sizing. This debris was located on the top of the core region and readily accessible once the Reactor Vessel head and plenum assembly were removed from the Reactor Vessel.
The loose debris was composed primarily of fuel element end fittings, small pieces of fuel rods, intact and broken fuel pellets, fuel fines, and other miscellaneous debris.
- 2. Core region defuelin - This task involved the removal of the debris remaining in the core region after completion of the initial defueling. This phase differed from the initial defueling in that significant sizing operations had to be performed on much of the remaining debris prior to placing the pieces in the canisters. This involved the boring and breaking up of the solid fused portion of the core and sizing any pieces too large to be placed in canisters. Once the large or fused portions of the core were sized and placed in canisters, the stubs of damaged fuel assemblies were also removed and placed in canisters. Finally, general cleaning of debris from the lower grid assembly completed the core region defueling.
- 3. Other vessel reeions defueling - This task involved the removal of core debris from the upper and lower core support assembly, the core formers, and the lower Reactor Vessel head. The core debris in these locations consisted of debris which relocated from the original core boundaries during defueling operations or flowed, as molten material, out of the core region during the accident. The defueling of these locations involved the disassembly and removal of reactor internals to provide access to the fuel. The core debris was sized, as required, for placement in canisters.
- 4. Ex-vessel defuelin - This task involved the removal of core debris from some locations within the Reactor Coolant System, outside the Reactor Vessel. Small quantities of fuel were located in the steam generators, pressurizer, other Reactor Coolant System components, and Reactor Coolant System piping.
4.2.1.2 Defueling Equipment The unique defueling operations required the design and fabrication of special equipment and tools.
Although not directly applicable to this SAR, the major equipment and tools are described in Appendix 4A for historical reference.
4.2- 1 UPDATE 2 - AUGUST 1997
4.3 SNM ACCOUNTABILITY AND CRITICALITY SAFETY ANALYSIS 4.
3.1 INTRODUCTION
The purpose of this section is to describe the TMI-2 SNM Accountability Program and summarize the criticality safety analyses presented in the DCR (Reference 4.3-10) and in GPU Nuclear letter, C312-92-2080, dated December 18, 1992 (Reference 4.3-11). This section identifies the methods and sequence of events for residual SNM accountability; the Quality Assurance program applied to the SNM measurements; the areas, systems and components that were assessed for residual quantities of SNM; and the areas, systems and components that did not require SNM assessment.
The quantity of fuel (i.e., U0 2) remaining at TMI-2 is a small fraction of the initial fuel load. As a result of TMI-2 defueling and decontamination activities, approximately 99% of the fuel was removed and transferred to DOE and/or licensed burial facilities.
The final results of the SNM Accountability Program are based on a comprehensive post-defueling survey of the TMI-2 facility. The post-defueling survey consisted of a review of the TMI-2 plant to identify areas that could contain SNM and areas unlikely to contain SNM. The quantity of SNM was determined in each area that was identified to have SNM present. This section describes the process by which the post-defueling survey was conducted and summarizes the results of the survey.
Finally, this section presents a summary of the criticality safety analyses presented in References 4.3-10 and 4.3-11 which demonstrated that a criticality event could not occur in TMI-2.
4.
3.2 BACKGROUND
The March 1979 accident resulted in significant damage to the reactor core with a subsequent release of fuel and fission products into the Reactor Coolant System and other connected systems. The core was reduced to fractured fuel pellets, resolidified fuel masses, structural metal components, loose rubble and partial fuel assemblies. The generic term used to refer to the post-accident core material is core debris.
The core debris removed from the TMI-2 facility was loaded into special canisters for shipment to the DOE INEL facility in Idaho. Each shipment was accompanied by a Nuclear Material Transaction Report (DOE/NRC Form 741) which recorded the net weight of the contents of each canister. Fuel accountability by the normal method, i.e., accounting for individual fuel assemblies, was not possible.
Since the canisters were filled with a mixture of SNM, other materials, and water, there was no practical or feasible method to determine the exact SNM content in each canister. A statement to that effect was included on each DOE/NRC Form 741.
In October 1985, GPU Nuclear, the U.S. Department of Energy and the U.S. Nuclear Regulatory Commission entered into an agreement (References 4.3-1 and 4.3-2) that final SNM accountability for TMI-2 would be performed after defueling was completed. The accountability would be based upon a thorough post-defueling survey of TMI-2 which would quantify the amount of residual SNM in plant systems and components. Implied in this agreement was an understanding that the post-defueling survey would involve all areas, structures, systems and components where SNM could reasonably be suspected to have been deposited as a result of the 1979 accident and subsequent cleanup activities.
4.3- 1 UPDATE 2 - AUGUST 1997
4.3.3 SNM ACCOUNTABILITY PROCESS 4.3.3.1 Classification of Plant Areas The entire TMI-2 plant was reviewed to determine where SNM could have been deposited as a result of the 1979 accident and subsequent cleanup activities. Each area was classified into one of three categories:
CATEGORY 1 - Locations where SNM was highly probable CATEGORY 2 - Locations where it was possible that SNM could be deposited CATEGORY 3 - Locations where it was unlikely that SNM was deposited Category 1 locations required that measurements or, in selected cases, analysis, be performed for SNM.
Category 2 areas were considered to have a lower probability for fuel deposits, but were assessed in the same manner as the Category 1 areas. Category 3 areas were determined not to require SNM assessment based on analyses of the TMI-2 accident (References 4.3-3 and 4.3-4) and review of cleanup activities.
4.3.3.2 SNM Accountability Methods SNM accountability for TMI-2 was completed in accordance with the SNM Accountability Plan (Reference 4.3-5). Several plant areas and components were characterized for SNM deposits prior to initiation of the formal SNM Accountability Program. In some cases, ALARA considerations, the quality ofthe previous measurements, and lack of actions potentially affecting SNM deposits warranted their use. These measurements were independently reviewed in accordance with Reference 4.3-9 to ensure sufficient data existed to meet SNM accountability QA standards. In all cases, the quantity of residual SNM was determined through measurements, sampling, inspection, or engineering analysis.
MEASUREMENTS In most cases, measurements were performed in individual locations after planned cleanup activities were completed within the area. In some areas, as stated above, it was determined that the cleanup activities did not materially affect the original SNM measurements which were then used for SNM accountability. The post-defueling survey required the application of several measurement techniques.
Technique selection for an individual measurement depended upon the geometry of the component/system or area to be assayed, physical access limitations, radiological conditions, personnel exposure considerations and the probable quantity of SNM in the area. Where required or desirable, the measurements also involved use of more than one measurement technique. Since the final SNM accountability activities were classified as "Important to Safety," measurements conducted for SNM accountability were performed using QA approved procedures.
Gamma scintillation spectrometry using sodium iodide detectors accounted for the majority of the early work. Later measurements involved the use of high purity germanium detectors, which allowed greater resolution for the tracer isotopes of interest. Other measurement techniques included alpha 4.3- 2 UPDATE 2 - AUGUST 1997
scans using proportional detectors and gross gamma measurement techniques using collimated Geiger-Mueller detectors. The endfitting and dry-vessel measurements were completed using neutron interrogation techniques. Detailed descriptions of the measurement techniques and selection criteria can be found in References 4.3-6 through 4.3-8.
SAMPLING To obtain additional isotopic and volumetric information for use with the other analysis techniques, sampling of suspected fuel locations was performed. Solid and liquid samples were obtained from various areas and components to obtain isotopic, composition, and ,density data for use with measurements and visual inspections. Scrape samples were taken of metal surfaces (i.e., manways, piping, filter housings) to determine film depositions. These samples were analyzed using either on-site or off-site facilities, applying QA-approved procedures.
VISUAL INSPECTION In areas where measurement was not practical, video camera probes were used to estimate the volume of material remaining in the subject area. Using the volumetric data generated through sampling, a fuel quantity was assigned.
ENGINEERING ANALYSIS In the latter part of the project, several areas that had not been measured were estimated using a flow-path analysis. The flow-path analysis was performed by examination of possible SNM introduction pathways into an area through plant systems during the accident or subsequent cleanup activities.
4.3.3.3 Documentation The quantity of residual SNM in each location was documented in a GPU Nuclear engineering calculation. The overall results are provided in References 4.3-13 through 4.3-17 and summarized in Tables 4.3-1 and 4.3-2. Figures 4.3-1 through 4.3-8 provide the locations of residual SNM in the Reactor, Auxiliary, and Fuel Handling Buildings. The engineering calculations were based on geometric configuration, analysis of the measurement data, instrument calibrations, capabilities and performance. Also included in the calculations were any specific assumptions made based on review of earlier measurements and the relevant history of that location during the accident and cleanup. All SNM engineering calculations were produced and approved in accordance with approved procedures.
The engineering calculations, in turn, provide the quantity of SNM for a specific area, system or component that is outlined in the PDSR. Each PDSR contains:
a detailed description of the area, system or component its role in the accident and/or cleanup activities the rationale supporting a conclusion as to whether contained residual SNM exists and, if so, a summary of the appropriate SNM engineering calculations 4.3- 3 UPDATE 2 - AUGUST 1997
applicable photographs and/or drawings of the area an assessment of residual fuel The PDSRs were forwarded to the NRC (e.g., References 4.3-13 through 4.3-17). The completed PDSRs formed the basis for the final TMI-2 SNM inventory detailed on Tables 4.3-1 and 4.3-2.
4.3.4 FINAL SNM ACCOUNTABILITY Final accountability was performed by summing the residual fuel quantities identified in the PDSRs and reporting the results as the remaining plant inventory of Special Nuclear Material. The amount of fuel shipped to the DOE INEL was determined by subtracting the sum of the final plant inventory and the amount of SNM shipped as radioactive waste from the pre-accident plant inventory of SNM, as corrected for decay in the most recent SNM Material Balance Report.
PRE-ACCIDENT REPORTED INVENTORY (corrected for decay)
- Final In-Plant Inventory
- SNM shipped as Samples/Radwaste
= SNM SHIPPED TO INEL (in canisters)
The resulting SNM inventory was reported on the PDMS SNM Material Balance Report (DOE/NRC Form 742).
4.3.5 CRITICALITY ANALYSIS The inherent criticality safety of the residual fuel during the PDMS period has been demonstrated by Reference 4.3-10 which was submitted to support the transition from Mode 1 to Mode 2 in accordance with the TMI-2 Recovery Technical Specifications and by Reference 4.3-11 which evaluated RV subcriticality based on an increased RV fuel estimate. The criticality analyses presented in References 4.3-10 and 4.3-11 addressed the quantity of residual fuel in each defined location and the potential for fuel relocation. The analyses estimated the quantity of fuel remaining, its location, its dispersion within the location, its physical form (i.e., film, finely fragmented, intact fuel pellets, resolidified), its mobility, the presence of any mechanism that would contribute to the mobility of the material, the presence of any moderating or reflecting material, and its potential for a critical event. Each issue was addressed to the extent appropriate for a given quantity of fuel. The NRC staff concurred with the criticality analyses presented in the DCR via their April 26, 1990 letter (Reference 4.3-12) stating "no objections" to the TMI-2 transition from Facility Mode 1 to Facility Mode 2.
A reanalysis of the RV steady state and accident criticality safety evaluations was necessitated by an increase in the estimated quantity of fuel remaining in the RV above that assumed for the DCRt A conservative criticality model was used to bound the most credible fuel configuration.
These analyses have demonstrated that criticality has been precluded as a result of the extensive TMI-2 defueling effort. This conclusion was based on three evaluations: the Safe Fuel Mass Limit determination, the bounding Reactor Vessel steady state criticality calculations, and the potential for 4.3- 4 UPDATE 2 -AUGUST 1997
criticality under accident conditions. In fact, it was demonstrated that no physically achievable quantity of residual core debris could result in a critical fuel configuration. Therefore, criticality is precluded for all credible conditions. Although not needed to assure reactivity control over the long-term, as an additional conservative measure, a stable and insoluble neutron poison, consisting of 1400 lbs of Boron Silicate glass shards, was added to the bottom head of the RV.
4.3.6 CONTROL OF SNM DURING PDMS Control of SNM at TMI-2 during PDMS relies upon isolation boundaries and control of access to components which contain SNM. Isolation boundaries will be maintained, as necessary, to prevent relocation of significant SNM quantities. The Reactor Coolant System, which contains the largest quantity of SNM, will be drained to the extent practical and isolated within the Containment Building.
There will be no physical inventory of SNM quantities at TMII-2 during PDMS because the remaining materials are of low enrichment, highly radioactive and relatively inaccessible. The NRC has granted TMI-2 an exemption from the 10 CFR 70.51(d) physical inventory requirements (Reference 4.3-2).
However, all shipments of accountable quantities of SNM from TMI-2 during PDMS will be reported as required on DOE/NRC 741 Nuclear Material Transaction Reports.
4.3 -5 UPDATE 2 - AUGUST 1997
REFERENCES 4.3-1 DOE letter WWB-100-85, Bixby, W. W. (DOE) to Burton, H. M. (EG&G),
"Accountability for the TMI-2 Core," dated October 8, 1985 4.3-2 Letter, Snyder, B. J. (NRC) to Standerfer, F. R. (GPUNC), "Approval of Exemption from 10 CFR 30.51, 40.61, 70.5 1(d) and 70.53," dated October 17, 1985 4.3-3 NSAC 80-1, "Analysis of Three Mile Island - Unit 2 Accident," Electrical Power Research Institute, March 1980 4.3-4 Rogovin M., et.al., "Three Mile Island, A Report to the Commissioners and the Public," US Nuclear Regulatory Commission, January 1980 4.3-5 GPU Nuclear Procedure 4000-PLN-4420.02, "SNM Accountability Plan" 4.3-6 TPO/TMI-051, "Location and Characterization of Fuel Debris in TMI-2," Revision 0, April 1984 4.3-7 TPO/TMI-124, "Ex-Vessel Fuel Characterization," Revision 0, July 1984 4.3-8 TPO/TMI-187, "Instrument Selection for Residual Fuel Measurements," Revision 0, January 1987 4.3-9 GPU Nuclear Procedure 4000-ADM-4420.03, "Review and Qualification of Selected Preliminary Calculations and Characterization Measurements for SNM Documentation" 4.3-10 GPU Nuclear letter, 4410-90-L-0012, "Defueling Completion Report, Final Submittal," dated February 22, 1990 4.3-11 GPU Nuclear letter, C312-92-2080, "TMI-2 Reactor Vessel Criticality Safety Analyses," dated December 18, 1992 4.3-12 Letter, Stolz, J. F. (NRC) to Roche, M. B. (GPUNC), "Three Mile Island Unit No. 2 Mode Changes," dated April 26, 1990 4.3-13 GPU Nuclear letter, C312-91-2045, "SNM Accountability," transmitting the Auxiliary and Fuel Handling Buildings PDSR, dated June 7, 1991 4.3 - 5a UPDATE 2 - AUGUST 1997 a
REFERENCES (Cont'd) 4.3-14 GPU Nuclear letter, C312-91-2052, "SNM Accountability," transmitting the Reactor Building Miscellaneous Components PDSR, dated June 18, 1991 4.3-15 GPU Nuclear letter, C312-91-2055, "SNM Accountability," transmitting the Reactor Coolant System PDSR, dated July 3, 1991 4.3-16 GPU Nuclear letter, C312-91-2064, "SNM Accountability," transmitting the 'A' and 'B' Once-Through Steam Generators PDSR, Revision 1, dated July 3, 1991 4.3-17 GPU Nuclear letter, C312-93-2004, "SNM Accountability," transmitting the Reactor Vessel PDSR, dated February 1, 1993 4.3 - 5b UPDATE 2- AUGUST 1997 b
Table 4.3-1, Final SNM Inventory by Location - Reactor Building is withheld, as it contains security-related information.
Table 4.3-2, Final SNM Inventory by Location - Auxiliary and Fuel Handling Buildings is withheld, as it contains security-related information.
APPENDIX 4A DEFUELING EQUIPMENT The major equipment and tools utilized during defueling are described below.
- 1. Shielded rotatable work platform/canister positioning system (cps)
- 2. Defueling canisters
- 3. Defueling vacuum system - airlift systems
- 4. Core bore equipment
- 5. The automated cutting equipment system (ACES)
- 6. Long-handled tools (1) - Shielded Rotatable Work Platform Once the Reactor Head and Plenum Assembly had been removed from the Reactor Vessel, the core was visible. In order to provide a working platform with the appropriate accommodations for the specialized defueling equipment and shielding for personnel performing the defueling operations, a rotatable and shielded work platform was designed, fabricated and installed on the top surface of the Reactor Vessel.
The Shielded Rotatable Work Platform is approximately 17 feet in diameter. The perimeter of the platform is a fabricated wide flange beam with roller assemblies mounted on the lower flange. The roller assemblies mate with the support rail mounted on the support structure. A cable drive system provides the rotational drive for the platform. This platform supports six inches of stainless steel shielding as well as some of the defueling tools and their reaction loads and the operators. Three transfer ports are provided to allow canisters to be installed and removed through the Shielded Work Platform. Two removable jib cranes are mounted on the Shielded Work Platform to aid the operators in the manipulation of the long-handled tools in the tool working slots. To avoid inadvertent movement of the Shielded Work Platform, a manual disc-type brake is attached to the service platform of the shielded support structure. The skirt on the Shielded Work Platform serves as the disc. A cutaway view of the Shielded Work Platform is shown in Figure 4A-I. The shielded work platform and canister positioning system were left "as-is" for PDMS.
(2) - Defueling Canisters Due to the post accident condition of the TMI-2 core, normal means of removal and shipment of the fuel were not possible. It was necessary to design and fabricate special canisters in which to contain and ship the core debris. Three types of canisters were required for the core debris; (1) filter, (2) knockout, and (3) fuel. The three types of canisters were required due to the various forms of debris, 4A- 1 UPDATE 2 -AUGUST 1997
which ranged from very small fuel fines to partial length fuel assemblies. Not only did these canisters serve as containers for removal and shipment of the core, they also serve as the long-term storage containers, and by design, ensure subcriticality of the contents.
A canister consists of a circular pressure vessel, housing one of three types of internals, depending on the function of the canister. Except for the top closures, the outer shell is the same for all three types of canister design. The upper closure head design varies according to the canister's function. The canister serves as a pressure vessel protecting against leakage of the canister contents as well as providing structural support for the neutron absorbing materials. It is designed to withstand the pressures associated with expected conditions during shipping and storage and accident loads associated with postulated events involving the handling or shipment of the canister.
The fuel canister is a receptacle for large pieces of core debris. The fuel canister consists of a cylindrical pressure vessel with a flat upper closure head. Within the outer shell, a full-length square shroud forms the internal cavity as shown in Figure 4A-2. This shroud is supported at the top by a bulkhead that mates with the upper closure head. Both the shroud and core debris rest on a support plate that is welded to the shell. The support plate has impact plates attached to absorb canister drop loads and payload drop loads.
The shroud assembly consists of a pair of concentric square stainless steel assemblies welded to completely enclose four sheets of Boral, a neutron absorbing material. The shroud internal dimensions are larger than the cross section of an undamaged fuel assembly. The shroud external dimensions are slightly smaller than the inner diameter of the canister, thus providing support at the shroud comers for lateral loads. The void area outside of the shroud is filled with a cement and glass bead mixture to the maximum extent practical to eliminate migration of the debris to an area outside of the shroud during a design basis accident.
The upper closure head is attached to the canister by eight equally spaced bolts. These bolts are designed to withstand the design pressure loads, handling loads, and postulated impact force due to shifting of the canister contents during in-plant load drop or a shipping accident.
The knockout canister, Figure 4A-3, was designed to be used as part of the vacuuming system with flow fittings which were capped or plugged after use. The internals module for the knockout canister is supported from a lower header welded to the outer shell. An array of four outer neutron absorber rods surround a central neutron absorber rod for criticality control. The four outer rods and the central absorber rod are filled with sintered B4C pellets. Lateral support for the neutron absorber rods and center assembly is provided by intermediate support plates.
The filter canisters were designed to function in conjunction with either the Defueling Water Cleanup System or the Westinghouse Vacuum System to remove small debris particles from the water. The filter assembly bundle that fits inside the canister shell was designed to remove particulates down to 0.5 microns. Flow into and out of the filter canister is through two quick disconnect fitting.
See Figure 4A-4.
The internal filter assembly bundle consists of a circular cluster of 17 filter elements, a drain line and a neutron absorber assembly. The influent enters the upper plenum region, flows down past the support plate, through the filter media and down the filter element drain tube to the lower sump. The 4A- 2 UPDATE 2 - AUGUST 1997
flow is from outside to inside with the particulate remaining around the outer perimeter of the filter element. The filtered water exists the canister through the drain line.
All fuel, filter and knockout canisters that were utilized during the recovery/defiueling period were shipped offsite for storage. However, one canister vessel (outer shell), without any internals, was used to store three fuel assembly end fittings. This canister was placed into the canister storage rack located on the south end of the fuel transfer canal, which is covered for PDMS. Three dummy canister test weight vessels are stored in the "A" spent fuel pool during PDMS.
(3) - Defueling Vacuum System - Airlift Systems The vacuum system was designed to remove small size fuel debris and fuel fines from the debris bed and discharge them into an appropriate canister. It also was designed to be adapted to permit vacuuming of debris in the lower vessel head region. The system was composed of a pump, piping, valving, and other miscellaneous components. It was located under, and supported from the Shielded Work Platform. It had a control console mounted on the auxiliary platform.
The vacuum pickup nozzle was connected to a defueling canister by a flexible hose and was manually manipulated by a long-handled tool supported from the Shielded Work Platform. The system was modular to permit remote installation and removal of the pump, load cell, valving and piping sections.
The airlift systems were devices designated to transfer small fuel debris from the debris bed to a fuel canister. These devices either discharged the debris directly to the canister or dumped the debris into a container which was then used to dump the debris into the canister. The airlift consists of a suction nozzle with air inlet, a separation chamber, and in some cases, a debris bucket. Depending on the unit, the debris bucket was removed from the airlift for dumping the debris into a fuel canister or the debris bucket was integral with the separation chamber. The integral bucket was equipped with a discharge chute having a sliding door for dumping the debris into a fuel canister. Hoses have been removed and the remaining hardware will remain "as-is" during PDMS.
(4) - Core Bore Equipment It was known that a large solidified mass existed below the loose core debris. Equipment was designed and fabricated which could drill into this mass and extract core stratification samples. The core bore equipment was subsequently modified to be fitted with a solid face bit to break up the solid material into smaller pieces. The core bore equipment also was used to cut some of the lower core support assembly structural elements. This equipment was mounted and supported from the rotatable platform. This equipment has been disassembled and is stored inside the R.B., on top of the "A&B" D-ring missile shields (367').
(5) - The Automated Cutting Equipment System (ACES)
The ACES was installed and operated to cut the lower core support assembly structural elements to provide access to remove fuel from the core support assembly and the Reactor Vessel lower head. The system consisted of the required framework and mechanical elements to position and control a plasma torch underwater during structure cutting. These parts were located in the Reactor Vessel and 4A - 3 UPDATE 2 - AUGUST 1997
were serviced with electrical power and other services delivered through umbilical cords from outside the vessel. The plasma torch was controlled and operated by a modified commercial power supply. The movement of the torch was powered and controlled by a special five-axis control system. This equipment was disassembled and is stored on the 347' elevation of the R.B., east of the "B" D-ring.
(6) - Long-Handled Tools The Rotatable Shielded Work Platform is located approximately 40 feet above the working area in the core region. This necessitates the use of long handled tools which can be operated from the Shielded Rotatable Platform., The tools are operated through slots in the rotatable platform. Most tools are supported by an overhead crane that provides vertical and lateral motion. Several cranes are available for use, including the two jib cranes on the platform, the Reactor Building service crane and the polar crane. Most of the long-handled tools are stored in various tool storage racks inside the R.B. during PDMS.
4A - 4 UPDATE 2 - AUGUST 1997
Shielded Work Platform Assembly UPDATE 2 - AUGUST 1997 SHIELDED WORK PLATFORM ASSEMBLY FIGURE 4A-1 NOTE: For PDMS the handrail@ have been removed and a moleturelcontamlnotlon barrler consisting of a lead brick PAGE 4A-5 chimney, was Installed on top of the platform. This chimney aleo provides access for a W to 200* F RTD suspended in the Reactor Vessel. The RTD has a remote digital readout on 2 SPC-PNL In the UnIt 2 Control Room.
Fuel Canister Drain -Bulkhead Upper Closure Head Lower Head w/Boie UPDATE 2 -AUGUST 1997 FUEL CANSITER FIGURE 4A-2 PAGE 4A-6
In Knockout Canister Recombiner Catalyst-(rotated +/-nto view)
Tube Inlet Poison Rods..
Scrsen*
sUpport Plate-0 Recoubiner Catalyst (typical) UPDATE 2 -AUGUST 1997 KNOCKOUT CANSITER FIGURE 4A-3 PAGE 4A-7
Filter Canister' Poison Rod Recombiner Catalyst (typicalI )
UPDATE 2 - AUGUST 1997 FILTER CANISTER FIGURE 4A-4 PAGE 4A-8
CHAPTER 5 PDMS RADIOLOGICAL CONDITIONS
CHAPTER 5 PDMS RADIOLOGICAL CONTROLS TABLE OF CONTENTS SECTION TITLE PAGE
5.0 INTRODUCTION
5.0-1 5.1 GENERAL DECONTAMINATION ACTIVITIES 5.1-1 5.1.1 GENERAL DECONTAMINATION OBJECTIVES 5.1-1 5.1.2 REACTOR BUILDING 5.1-2 5.1.2.1 Reactor Building Elevation 282'(Basement and Sump) 5.1-2 5.1.2.2 Reactor Building Elevations 305' and 347' 5.1-2 5.1.2.3 Reactor Building D-Rings 5.1-2 5.1.2.4 Refueling Canal 5.1-2 5.1.3 AUXILIARY AND FUEL HANDLING BUILDINGS 5.1-2 5.1.3.1 Auxiliary Building 5.1-2 5.1.3.2 Fuel Handling Building 5.1-2 5.1.4 OTHER BUILDINGS 5.1-3 5.1.4.1 Service Building (Elevation 281', 5.1-3 Tendon Access Gallery) 5.1.4.2 Service Building (Elevation 305') 5.1-3 5.1.4.3 Control Building Areas (East & West) 5.1-3 5.1.4.4 Turbine Building (Elevation 281') 5.1-3 5.1.4.5 CACE Building 5.1-3 5.1.5 SYSTEMS 5.1-3 5.1.5.1 Reactor Coolant System 5.1-3 5.1.5.2 Non-Reactor Coolant Systems 5.1-3 i UPDATE 2 - AUGUST 1997
CHAPTER 5 TABLE OF CONTENTS (Cont'd)
SECTION TITLE PAGE 5.2 SPECIFIC DECONTAMINATION ACTIVITIES 5.2-1 5.2.1 SPECIFIC DECONTAMINATION GOALS 5.2-1 5.2.2 GENERAL CHARACTERIZATION OF 5.2-1 CONTAMINATIONS 5.2.3 DECONTAMINATION TECHNIQUES 5.2-2 5.3 PDMS RADIOLOGICAL SURVEY 5.3-1 5.3.1 RADIOLOGICAL ASSESSMENT 5.3-1 5.3.1.1 Pre-PDMS Radiological Survey Methodology 5.3-1 5.3.1.2 Post-PDMS Radiological Survey Methodology 5.3-1 5.3.1.3 Remedial Decontamination Activities 5.3-1 5.3.2 RADIOLOGICAL CONDITIONS AT BEGINNING 5.3-1 OF PDMS 5.3.2.1 Surface Contamination at Beginning of PDMS 5.3-2 APPENDIX 5A - Potential Reductions in Occupational Exposure SECTION TITLE PAGE 5A. 1
SUMMARY
AND INTRODUCTION 5A-1 5A.1.1
SUMMARY
5A-1 5A.
1.2 INTRODUCTION
5A-1 5A.2 BACKGROUND INFORMATION 5A-2 5A.2.1 RECOVERY TASKS 5A-2 5A.2.1.1 Decontamination Task Force Report 5A-2 5A.2.2 FUTURE DECONTAMINATION TASKS 5A-3 5A.3 CRITERIA FOR PERFORMING THE EVALUATION 5A-3 ii UPDATE 2- AUGUST 1997
APPENDIX 5A - Potential Reductions in Occupational Exposure (Cont'd)
SECTION TITLE PAGE 5A.4 RADIOLOGICAL CONDITIONS 5A-4 5A.4.1 CONDITIONS AT THE END OF PHASE mI 5A-4 5A.4.2 CONDITIONS DURING PDMS 5A-4 5A.4.3 CONDITIONS AT THE END OF PDMS 5A-4 5A.4.4 BASE CASE PLANT CONDITIONS 5A-5 5A.4.5 ISOTOPIC CHARACTERIZATION 5A-5 5A.5 OFF-SITE DOSES DURING PDMS 5A-6 5A.6 DOSE RATE ESTIMATION 5A-6 5A.6.1 DECONTAMINATION TASKS 5A-6 5A.6.1.1 Tasks Performed Robotically 5A-7 5A.6.1.2 Example of Estimating Dose Rates 5A-7 5A.6.2 RADIOACTIVE WASTE PROCESSING 5A-7 5A.7 ACTIVITIES EVALUATED .5A-8 5A.7.1 FUTURE DECONTAMINATION TASKS 5A-8 5A.7.2 RADIOACTIVE WASTE MANAGEMENT TASKS 5A-8 5A.7.3 ACTIVITIES DURING PDMS 5A-8 5A.8 JOB-HOUR ESTIMATES 5A-8 5A.8.1 SCOPE MODIFICATIONS 5A-9 5A.8. 1.1 Immediate Additional Decontamination 5A-9 5A.8.1.2 Final Decontamination As A Part of Decommissioning 5A-10 5A.8.1.3 Example of Estimating Scope Modification 5A-10 5A.8.2 RADIATION AREA JOB-HOURS 5A-10 oii UPDATE 2 - AUGUST 1997
APPENDIX 5A - Potential Reductions in Occupational Exposure (Cont'd)
SECTION TITLE PAGE 5A.8.2.1 Example of Determining Radiation Area Job-hours 5A-11 5A.8.3 JOB-HOURS DURING PDMS 5A-11 5A.8.4 RADIOACTIVE WASTE MANAGEMENT 5A-1 I 5A.8.5 EXAMPLE OF JOB-HOUR ESTIMATION 5A-12 5A.9 PERSONNEL EXPOSURE 5A-12 5A.9.1 DECONTAMINATION TASKS 5A-13 5A.9.2 RADIOACTIVE WASTE MANAGEMENT 5A-13 5A.9.3 PDMS TASKS 5A-13 5A.9.4 TOTAL PERSON-REM 5A-14 5A.10 COMPARISON CASE YEAR PDMS 5A-14 5A.11 CONCLUSION 5A-14 5A.12 REFERENCES 5A-15 APPENDIX B -DECONTAMINATION ACTIVITIES 5B-1 Kelly Vacuumac 5B-I Concrete Scabbling 5B-1 Strippable Coatings 5B-1 High Pressure Spray and Flushing 5B-1 System Flushing 5B-1 Hands-on Decontamination 5B-2 ROBOTIC DEVICES 5B-2 System In-Service Inspection (SISI) 5B-2 Remote Controlled Mobile Manipulator (RCMM) 5B-2 iv UPDATE 2 - AUGUST 1997
APPENDIX 5B (Cont'd)
SECTION TITLE PAGE Remote Reconnaissance Vehicle (RRV) 5B-2 Remote Controlled Transport Vehicle (RCTV) 5B-3 Louie-2 5B-3 WATER PROCESSING 5B-3 Submerged Demineralizer System 5B-3 EPICOR II 5B-4 Defueling Water Cleanup System (Ion Exchanger-Portion) 5B-4 V UPDATE 2 - AUGUST 1997
CHAPTER 5 TABLE OF CONTENTS (Cont'd)
LIST OF TABLES TABLE NO. TITLE PAGE 5.1-1 BASELINE RADIOLOGICAL CRITERIA - REACTOR 5.1-4 BUILDING 5.1-2 BASELINE RADIOLOGICAL CRITERIA - AFHB 5.1-5 5.2-1 SPECIFIC DECONTAMINATION GOALS - REACTOR 5.2-3 BUILDING 5.3-1 PDMS RADIOLOGICAL CONDITIONS - REACTOR 5.3-3 BUILDING 5.3-2 PDMS RADIOLOGICAL CONDITIONS - AFHB 5.3-4 5.3-3 PDMS RADIOLOGICAL CONDITIONS - OTHER 5.3-13 BUILDINGS 5.3-4 SURFACE CONTAMINATION - REACTOR BUILDING 5.3-14 5.3-5 SURFACE CONTAMINATION - AFHB 5.3-15 5.3-6 SURFACE CONTAMINATION - OTHER BUILDINGS 5.3-24 5A-1 PHASE III ENDPOINT CRITERIA 5A-16 5A-2 END OF PHASE III AND BASE CASE DOSE RATES - 5A-17 REACTOR BUILDING 5A-3 END OF PHASE Ill AND BASE CASE DOSE RATES - 5A-18 AUXILIARY AND FUEL HANDLING BUILDINGS 5A-4 ESTIMATED Cs AND Sr ACTIVITIES IN THE 5A-19 REACTOR BUILDING 5A-5 DOSE RATES AND ADJUSTED JOB-HOURS 5A-20 5A-6 FINAL CLEANUP ACTIVITIES (TYPICAL) 5A-22 5A-7 RADIATION AREA JOB-HOURS 5A-24 5A-8 ETN AND RWP HOURS 5A-25 vi UPDATE 2 - AUGUST 1997
CHAPTER 5 TABLE OF CONTENTS (Cont'd)
LIST OF TABLES TABLE NO. TITLE PAGE 5A-9
SUMMARY
TABLE FOR PERSON-REM EVALUATION 5A-26 ANALYSIS 5A-10 ESTIMATED TOTAL PERSON-REM FOR FINAL 5A-29 DECONTAMINATION OPTIONS vii UPDATE 2 -AUGUST 1997
CHAPTER 5 PDMS - RADIOLOGICAL CONDITIONS
5.0 INTRODUCTION
One consequence of the March 1979 accident was wide spread radioactive contamination of the Reactor, Fuel Handling, and Auxiliary Buildings. Reactor Coolant System water was released to the Reactor Building and overflowed to the Auxiliary and Fuel Handling Buildings. These areas required extraordinary decontamination efforts to achieve the cleanup program objectives.
Contamination Of areas outside the RB and AFHB were minor and limited. These areas outside the RB and AFHB were decontaminated and either released for unrestricted use or configured such that the contamination is suitably contained.
The objectives of the decontamination program were to remove and/or stabilize the contamination to reduce occupational exposure to workers and to prevent release of contamination to the environment during recovery and cleanup activities. In addition, a final decontamination objective was to ensure that any remaining contamination was stable and suitably isolated for the PDMS period. The following discussion provides the major decontamination objectives and techniques utilized at TMI-2, as well as the contamination levels remaining in the various areas of the plant. Also included (Appendix 5A) are potential reductions in occupational exposure due to PDMS.
5.0- 1 UPDATE 2 - AUGUST 1997
5.1 GENERAL DECONTAMINATION ACTIITIES The decontamination of TMI-2 was accomplished in two phases. The initial phase improved the radiological conditions in the facility such that the dose rates were acceptably low to permit the necessary accident cleanup activities. The second phase was a decontamination program initiated for the purpose of systematically improving radiological conditions in the plant regardless of whether access was required for cleanup activities.
In order to establish goals for the TMI-2 decontamination program, decontamination criteria were established for the RB, AFHB, and specific portions of other buildings, where relevant. The primary consideration in establishing the criteria for the initial phase was the anticipated need for personnel access during the cleanup and post-cleanup timeframe. Table 5.1-1 presents the Baseline Radiological Criteria for the RB and Table 5.1-2 provides the Baseline Radiological Criteria for the AFHB.
The general decontamination criteria for piping systems, equipment, and components were based solely on their contribution to area dose rates. It should be emphasized that these criteria were intended as guidelines rather than absolute criteria. The guidelines were used in conjunction with common sense and good radiological practices.
5.1.1 GENERAL DECONTAMINATION OBJECTIVES The general decontamination program objectives were assigned primarily by area. The general objectives established for each area were based on initial contamination levels, the need for personnel access, and the possibility of release of radioactivity to the environment.
The faciity was categorized into the following areas:
- a. Reactor Building
- 1. Reactor Building elevation 282'
- 2. Reactor Building elevations 305' and 347'
- 3. Reactor Building D-Rings
- 4. Refueling Canal
- b. Auxiliary and Fuel Handling Buildings
- 1. Auxiliary Building Cubicles (total of 99)
- 2. Fuel Handling Building Cubicles (total of 37)
- c. Other Buildings
- 1. Service Building (elevation 281', Tendon Access Gallery)
- 2. Service Building (elevation 305')
- 3. Control Building Areas (East & West)
- 4. Turbine Building (elevation 281')
- 5. CACE Building
- d. Systems
- 2. Non-Reactor Coolant Systems The general decontamination objective for each area is outlined below.
5.1-1 UPDATE 2 - AUGUST 1997
5.1.2 REACTOR BUILDING 5.1.2.1 Reactor Building Elevation 282' (Basement and Sump)
The general decontamination objectives in the Reactor Building basement were to enhance the ability to characterize the basement with respect to residual fuel and to promote the long-term stability of contamination during the PDMS period. The specific program objectives included removing the sludge from all accessible areas in the Reactor Building basement and conduct a high pressure flush of walls, floors, and overheads.
5.1.2.2 Reactor Building Elevations 305' and 347' The original general decontamination objective on elevations 305' and 347' of the Reactor Building was.
to reduce dose rate levels low enough to support continued personnel occupation during defueling operations and other associated activities. These dose rate goals were achieved to allow for defueling operations. However, post-defueling draindown of CFT-lA has increased the dose rates for elevations 305' and 347' such that the PDMS general area dose rate goal had to be increased to 100 mR/hr.
5.1.2.3 Reactor Building D-Rings The general decontamination objectives within the upper portion of the D-rings were to support efforts to locate, characterize, and remove fuel from the pressurizer, steam generator, and reactor coolant piping and to evaluate the feasibility of RC pump removal.
5.1.2.4 Refueling Canal The original general decontamination objective in the refueling canal was to reduce dose rates sufficiently to support construction activities for defueling equipment installation. These dose rate goals were achieved for installation of defueling equipment and actual RV defueling. However, post-defueling pumpdown of the RV and the refueling canal has increased the dose rates in the refueling canal such that the PDMS general area dose rate goal had to be increased to 100 mR/hr.
5.1.3 AUXILIARY AND FUEL HANDLING BUILDINGS 5.1.3.1 Auxiliary Building The Auxiliary Building was categorized into 99 separate areas or cubicles, which accounted for essentially all of the walls, floors, and overhead areas in the building. The general decontamination objective for the contaminated cubicles was to support ongoing cleanup activities. The Baseline Radiological Criteria referenced in Table 5.1-2 were applied to each Auxiliary Building cubicle as a guideline for the decontamination efforts.
5.1.3.2 Fuel Handling Building The Fuel Handling Building was categorized into 37 separate areas or cubicles which accounted for essentially all of the walls, floors, and overhead areas in the building. The general 5.1 -2 UPDATE 2 - AUGUST 1997
decontamination objectives for the contaminated areas within the Fuel Handling Building were established to support ongoing cleanup activities and to stabilize localized contamination. As in the Auxiliary Building, the Baseline Radiological Criteria referenced in Table 5.1-2 were applied to each Fuel Handling Building cubicle for use as guideline for the programmatic decontamination effort.
5.1.4 OTHER BUJILDINGS 5.1.4.1 Service Building (Elevation 281', Tendon Access Gallery)
The general decontamination objective in the Service Building was to identify hot spots and remove or shield contamination. One objective was the partial removal and stabilization of the contaminated cork seal material from a building construction joint.
5.1.4.2 Service Building (Elevation 305')
The general decontamination objective in the Service Building (elevation 305') was to identify hot spots and remove or shield contamination.
5.1.4.3 Control Building Areas (East & West)
The general decontamination objective in this portion of the Control Building Arc-as was to identify hot spots and remove or shield contamination.
5.1.4.4 Turbine Building (Elevation 281l')
The general decontamination objective in this portion of the Turbine Building (elevation 281') was to identify hot spots and remove or shield contamination.
5.1.4.5 CACE Building The general decontamination objective in the CACE Building was to identify hot spots and remove or shield contamination.
5:1.5 SYSTEMS 5.1.5.1 Reactor Coolant System The general decontamination objective for the Reactor Coolant System was to remove residual fuel and other contamination to the maximium extent practical.
5.1.5.2 Non-Reactor Coolant Systems The general decontamination objective for the non-reactor coolant systems was to reduce radiation dose rates low enough to support general area dose rate goals. The systems decontamination program was integrated with the systematic cubicle and area decontamination programs.
5.1-3 UPDATE- 2 -AUGUST 1997
TABLE 5.1-1 BASELINE RADIOLOGICAL CRITERIA - REACTOR BUILDING GENERAL AREA SURFACE CONTAMINATION DOSE RATE (dpm/100 cm)_...
(mR/hr) BELOW 7' ABOVE 7' Infrequent (Quarterly)
Elevation 305' to 347' <100 <50,000 NOTE 3 Elevation 347' and Above < 30 <50,000 NOTE 3 Refueling Canal <600 <50,000 NOTE 3 Top of D-Rings <100 <50,000 NOTE 3 Access Not Required D-Ring Interior, El. 349' and Above "AS IS" "AS IS" NOTE 3 Basement (El. 282') "AS IS" "AS IS" NOTE 3 NOTES:
- 1. These criteria refer to general access areas and should not be used as maximum levels allowed (i.e.,
hot spots could have higher dose rates).
2- Areas of the Reactor Building not listed in this table are left "as is" for PDMS.
- 3. Since access is not required above 7', and the overheads are generally not the major contributors to the general area dose rate, these areas may be left without decontamination.
5.1 -4 UPDATE 2 - AUGUST 1997
TABLE 5.1-2 BASELINE RADIOLOGICAL CRITERIA - AFHB GENERAL AREA MAXIMUM SURFACE DOSE RATE HOT SPOT CONTAMINATION ACCESS FREQUENCY (mR/hr) (mR/hr) (dpm/100 cm 2)
Routine - 10 NOTE 1 (40 br/wk access)
Frequent - < 50 100 NOTE 1 (daily access)
Occasional - < 500 1000 NOTE I (weekly access)
Infrequent - < 1000 2000 NOTE 1 (monthly access or less)
NOTES:
- 1. Smearable contamination (dpr/100 cm 2) will be either:
- a. <1000 below 7'7<10,000 in overheads (generally applied to corridors and access ways) or
- b. <50,000 below 7'/<50,000 in overheads (generally applied to cubicles) 5.1-5. UPDATE 2 - AUGUST 1997
5.2 SPECIFIC DECONTAMINATION ACTIVITIES The primary decontamination activities at TMI-2 were in the AFIHB and the Reactor Building. Some decontamination tasks were also required in other areas such as the Turbine and Service Buildings.
However, the extent of work required in these areas was relatively minor compared to the AFHB and Reactor Building work scope.
5.2.1 SPECIFIC DECONTAMINATION GOALS Specific decontamination goals were developed by applying the baseline decontamination criteria introduced in Section 5.1 to specific areas within the facility. Note that these specific decontamination goals apply to general area access and do not represent the maximum levels allowed (i.e., hot spots could have higher dose rates and contamination levels). Categorization of the facility into specific areas was done within the context of the general decontamination program objectives as discussed in Section 5.1.1. In the case of the Reactor Building, the physical layout of the building and the anticipated personnel access requirements favored the use of the general criteria as specific goals. The Auxiliary and Fuel Handling Buildings and the specific portions of other buildings are configured in such a way as to favor applying the general criteria to much smaller areas, designated as cubicles, to derive the specific decontamination goals. The specific decontamination goals for the Reactor Building are presented in Table 5.3-1. Table 5.3-2 presents specific decontamination goals for the Auxiliary and Fuel Handling Buildings and Table 5.3-3 encompasses other buildings.
5.2.2 GENERAL CHARACTERIZATION OF CONTAMINATION There were various conditions of radiological contamination at TMI-2 after the accident. The majority of contamination can be characterized as a layer of loose particulate covering soluble contaminants that had been absorbed into the coatings and the surface layers of concrete and dried. Several areas, such as the Reactor Building basement, presented particularly difficult decontamination challenges.
Originally, it was anticipated that water flushing would remove the majority of surface contamination.
However, subsequent to the early decontamination efforts, decontaminated surfaces often became recontaminated to the earlier contamination levels.
In order to identify the sources of recontamination, survey techniques were developed to determine if the recontamination was from outside sources or from other mechanisms. It was determined that much of the recontamination resulted from soluble contaminants leaching from the surface materials into which they had been absorbed during and following the accident. Techniques were developed to physically remove coatings from floors or to remove a layer of concrete from both coated and non-coated surfaces.
After water flushing removed the loose surface contamination on areas where large open surfaces were contaminated, scabblers were used to reduce contamination levels to permit cleanup activities with as little personnel exposure as possible. The floor contamination levels in most areas of the AFHB were reduced to those typical of pre-accident conditions by this technique. In the Reactor Building, radiation levels in frequently accessed areas were reduced by 85% by scabbling accessible areas and shielding finite sources.
In the AFHB cubicles, it was necessary to flush piping in some areas to remove contained contaminants before scabbling was performed. The logic was to conduct a gross flush of an area using remote nozzles. A 5.2-1 UPDATE 2- AUGUST 1997
survey was then performed. If less exposure was required to perform a system flush of piping followed by scabbling, the piping flush was initially performed. Some exceptions to this logic were encountered because flow points through piping were totally blocked or a very localized area contained a large source of radioactive material. In these cases, the source of contamination was physically removed.
Approximately 17 Ci of contamination remains in the AFHB floor drains and approximately 600 Ci remains in the AFHB sumps with over 99% contained in the Auxiliary Building sunmp. The AFHB sumps are in service. Most floor drains in the AFIIB remain open and unaltered. Some drams were altered to have either a ball float valve installed or to be plugged. This was done for those drains that had become a source of contamination in their cubicle.
5.2.3 DECONTAMINATION TECHNIQUES The major decontamination techniques utilized during the cleanup period are described in Appendix 5B.
5.2- 2 UPDATE 2- AUGUST 1997
5.3 PDMS RADIOLOGICAL SURVEY This section describes the radiological conditions at the TMI-2 facility upon entering PDMS. These conditions are expressed in terms of general area dose rate, loose surface contamination, and general isotopic distribution.
5.3.1 RADIOLOGICAL ASSESSMENT Upon completion of cleanup activities (including decontamination) in a given area or cubicle, the area was isolated to prohibit uncontrolled access. Deactivated systems traversing the area or cubicle were drained, vented, and isolated. The subject area was, at that point, configured for long-term monitored storage and available for a final PDMS radiological assessment. This assessment was lierformed utilizing radiological surveys (in this case, radiation, contamination and air activity surveys performed by radiological controls technicians) as a basis for determining whether the established decontamination program endpoints were achieved as well as to document the radiological conditions which existed upon entering PDMS. If at the conclusion of the radiological assessment it was determined that satisfactory radiological conditions were not achieved, additional decontamination efforts were undertaken or exceptions to the goals were taken.
5.3.1.1 Pre-PDMS Radiological Survey Methodology Radiation contamination and air activity surveys were routinely performed during the course of the cleanup program in support of work activities. These surveys were performed in accordance with regulatory and industry standards and practices to verify and document radiation and contamination levels for use in controlling personnel exposure. These surveys were then evaluated as to whether or not they supported the conclusion that decontamination endpoints had been achieved., In those instances where existing surveys were judged unsuitable for substantiating decontamination endpoints, additional surveys were conducted.
5.3.1.2 Post-PDMS Radiological Survey Methodology During the PDMS period, radiological conditions within the facility will be monitored through sampling and periodic surveillance. Surveillance activities for the Reactor Building consist of radiation surveys in conjunction with planned Reactor Building inspections. The purpose for conducting these surveys is to provide assurance that conditions are stable or to provide early indication of any changing conditions which may require corrective action. The Radiological Survey Plan for PDMS is described in Section 7.2.4.2.
5.3.1.3 Remedial Decontamination Activities In the event that changing conditions are indicated, an evaluation will be performed as to the need for, and form of corrective action to be taken. In general, areas will be assessed on a case-by-case basis with the deciding factors being the area's impact on personnel exposure and the possibility of a release to the environment. The Unit 2 PDMS organization will be staffed to provide the capability to take corrective action or call upon additional resources necessary to take corrective action.
5.3.2 RADIOLOGICAL CONDITIONS AT BEGINNING OF PDMS Table 5.3-1 lists the specific radiological goals for the TMI-2 Reactor Building and the corresponding radiological conditions as of the most current radiological surveys existing in September 1992. The RB 5.3-1 UPDATE 2 - AUGUST 1997
radiological conditions listed in Table 5.3-1 reflect rounded-off, average PDMS survey data for the entire W cubicle/area in question. These data were compiled in the manner described in Section 5.3.1.1.
Table 5.3-2 lists the equivalent information for the AF-B as of November 1993.
Table 5.3-3 provides a summary of the radiological conditions for the balance-of-plant areas not covered by Tables 5.3-1 and 5.3-2.
5.3.2.1 Surface Contamination At Beginning Of PDMS To establish a baseline at the beginning of PDMS, the radioactivity present as surface contamination in various areas of the facility has been evaluated. This information serves as an initial reference for the evaluation of any future activities in the respective areas.
In order to appraise the radioactivity present as loose surface contamination upon entry into PDMS, an analytical model was constructed utilizing available loose surface contamination data, generalized waste stream isotopic distributions and estimates of surface area. This information is formatted in a manner similar to the general area dose rate and loose surface contamination data presented in Tables 5.3-1, 5.3-2, and 5.3-3. Only surface contamination was considered; fixed contamination or contamination internal to piping systems or equipment was omitted. The generalized waste streams or distribution of principal isotopes are referenced on each of the tables.
Table 5.3-4 lists the data obtained from the analytical model described above for the TMI-2 Reactor Building. Table 5.3-5 lists the equivalent data for the AF-B and Table 5.3-6 provides a similar summary for the balance-of-plant areas. All of the calculations of the quantities of curies listed are based on the specific decontamination goals given on Tables 5.3-2 and 5.3-3.
5.3-2 UPDATE 2- AUGUST 1997
TABLE 5.3-1 PDMS RADIOLOGICAL CONDITIONS - REACTOR BUILDING AREA DESCRIPTION SPECIFIC DECONTAMINATION GOALS PDMS RADIOLOGICAL CONDITIONS*
GENERAL AREA SURFACE GENERAL AREA SURFACE DOSE RATE CONTAMINATION DOSE RATE CONTAMINATION (mR/hr) (dpm/100 cm2 ) (mR/hr) (dpm/100 cm 21 Elevation 305' <100 <50,000 150 2,000,000 to 347' Elevation 347' <30 <50,000 50 710,000 and Above Refueling Canal <100 <50,000 120 670,000 D-Ring Interior, EL 349' and Above "A" D-Ring "AS IS" "AS IS" 300 280,000 "B" D-Ring "AS IS" "AS IS" 200 220,000 Top of D-Rings <100 <50,000 40 270,000
("A" D-ring) 50 190,000
("B" D-ring)
Basement, El. 282' "AS IS" "AS IS" 56,000** Note I
- The radiological conditions in this table reflect rounded-off, average PDMS survey data.
- This is the decay-corrected dose rate taken by ROVER (TPB 85-3 Rev. 0, February 1985.)
NOTES:
- 1. This area is inaccessible; no meaningful data exists.
5.3-3 UPDATE 2 - AUGUST 1997
TABLE 5.3-2 PDMS RADIOLOGICAL CONDITIONS - AFHB SPECIFIC DECONTAMINATION GOALS PDMS RADIOLOGICAL CONDITIONS*
GENERAL AREA SURFACE CONTAMINATION GE'NERAL AREA SURFACE CONTAMINATION CUBICLE DOSE RATE <7'/Overheads DOSE RATE <7'/OVERHEADS NUMBER AREA DESCRIPTION (mR/hr) (dpmll00 cm2) (mPRhr) (dpm/i100 cm 2)
AXOO RB Emerg. Cooling Booster <2.5 <1,000/<10,000 1.5 590/2,500 Pumps Area [WGP-I <2.5 <1,000/<10,000 2.4 81,000/6,500 Shielded Enclosure]
AX002 Access Corridor <2.5 <1,000/<10,000 1.5 110/1,300 AX002a N2 Piping System <2.5 <1,000/N/A 1.8 110/N/A AX003 Access Area <2.5 <1,000/<10,000 0.8 2,900/2,300 AX004 Seal Injection Valve Rin <1000 <50,000/<50,000 120 68,000/750,000 AX005 MUP Pump IC Rm <500 <50,0001<50,000 8 40,000/30,000 AX006 MUP Pump IB Rin <500 <50,000/<50,000 60 88,000/29,000 AX007 MUP Pump IA Rmn <500 <50,000/<50,000 40 9,200/21,000 AX008 Spent Resin Stor Tank 1B RPn "AS IS" "AS IS" 710 960,000/3,400,000 AX009 Spent Resin Stor Tank IA Rin "AS IS" "AS IS" 1,700 3,000,000/6,000,000 AX010 Spent Resin Transfer Pump Rin "AS IS" "AS IS" 180 1,400,000/5,100,000 AXOI1 AB Sump Tank Pump/Valve Pin <50 <5,000/<50,000 8 3,200/4,900 AX012 Aux Bldg Sump & Tank Rm <50 <5,000/<50,000 560 390,000/68,000 AX013 Evap Cond Tanks, Pumps <500 <1,000/<10,000 5 130/140 Demins PRn AXO14 RC Evaporator Rin <500 <50,000/<50,000 18 20,000/8,100 AX015a Cleanup Filters Pin <500 <50,000/<50,000 110 10,000/8,700
- TThe radiological conditions in this table reflect rounded-off, average PDMS survey data. N/A - Not Applicable 0 5.3-4 U - AUGUST 1997 0
TABM ' 2 (Cont'd)
PDMS RADIOLOGICAL CONDITIONS - AFHB SPECIFIC DECONTAMINATION GOALS PDMS RADIOLOGICAL CONDITIONS*
GENERAL AREA SURFACE CONTAMINATION GENERAL AREA SURFACE CONTAMINATION CUBICLE DOSE RATE <7'/Overheads DOSE RATE <7'/OVERHEADS NUMBER AREA DESCRIPTIO N (mR/hr) (dpm/100 cm2) (mR/hr) (dnm//100 cm2)
AX015b Cleanup After Filters Rm <500 <50,000/<50,000 38 21,000/13,000 AX016 Cleanup Demineralizer 2A Rin <500 <50,000/<50,000 38 21,000/13,000 AX017 Cleanup Demineralizer 2BI Rm <500 <50,0001<50,000 110 10,000/8,700 AX018 Waste Transfer Pumps RPn <500 <50,0001<50,000 10 17,000/14,000 AX019 Waste Disposal Liquid <500 <50,0001<50,000 19 7,800/5,700 Valve Rm AX020 RC Bleed Holdup Tanks <500 <50,000/<50,000 160 520,000/200,000 IB& ICRm AX021 RC Bleed Holdup Tank 1I Rin <500 <50,000/<50,000 18 1,800/12,000 AX022 North Stairwell <2.5 <1,000/N/A 0.3 440/N/A AX023 Elevator Pit and <10 <50,000/N/A 14 25,000/N/A AX024 Aux Bldg Sump Filters Ri n <500 <50,000/<50,000 15 156,400/11,000 AX025 Area Between Service, <500 <1,000/<10,000 3.5 1,000/310 Control, & RB AX026 Seal Injection Filters Rrn <500 <50,000/<50,000 12 9,000/1,100 AX027 South Stairwell <2.5 <1,000/N/A 0.2 480/N/A AXI01 Radwaste Disp. Cntrl Pan el Area <2.5 <1,000/<10,000 0.2 90/110 AX102 RB Sump Pumps Filters Ft1in <1000 <50,000/<50,000 47 9,300/4,200 AX103 Motor Control Center 2-1 IEB Rni <2.5 <1,000/< 10,000 0.2 470/480 5.3-5 UPDATE 2 - AUGUST 1997
TABLE 5.3-2 (Cont'd)
PDMS RADIOLOGICAL CONDITIONS - AFHB SPECIFIC DECONTAMINATION GOALS PDMS RADIOLOGICAL CONDITIONS*
GENERAL AREA SURFACE CONTAMINATION CUBICLE DOSE RATE <7/Overheads DOSE RATE OVERHEADS NUMBER AREA DESCRIPTICIN (ni/hr) (dpmll00 cm2) (mR/hr) (dpm//100 cm 2)
AX104 Motor Control Center 2-21IEB RPn <2.5 <1,000/<10,000 0.2 470/470 AX105 Substation 2-1 IE Rm <2.5 <1,000/<10,000 0.2 480/530 AX106 Substation 2-21E Rmn <2.5 <l1,000/<10,000 0.2 480/530 AX107 Motor Control Center 2-1 lEA Rm <2.5 <1,000/<10,000 0.2 460/530 AX108 Motor Control Center 2-2 lEA Rm <2.5 <l,000/<10,000 0.2 480/500 AX109 Nuclear Services Coolers <2.5 <1,000/<10,000 0.2 100/130
& Pumps Area AXI 10 Intermediate Coolers Area <2.5 <1,000/<10,000 0.2 100/130 AX111 Intermed Cooling Pumps <50 <1,000/<10,000 0.7 440/410
& Filters Room AX112 Seal Return Coolers & <1000 <50,000/<50,000 99 350,000/38,000 Filter Room AX113 Waste Gas Analyzer Rin <50 <50,000/<50,000 19 22,000/6,400 AXI 14 MUP Demineralizer 1A Rin "AS IS" "AS IS" 73,000 9,800/34,000 AXI 15 MUP Demineralizer IB I In "AS IS" "AS IS" 68,000 31,000/280,000 AXI 16 Makeup Tank Rin <500 <50,000/<50,000 60 3-10,000/23,000 AX117 MUP Filters RPn <1000 "AS IS" 940 330,000,000/2,400 AX118 Spent Fuel Coolers and Piumps Area <2.5 <1,000/<10,000 1.1 1,000/3,000 AXl 19 Spent Fuel Dernineralizer rRn <2.5 <1,000/<10,0000 .4 480/330 AX120 Spent Fuel Filters Rin <2.5 <1,000/<10,000 0.6 360/1,000 5.3-6 'E 2 - AUGUST 1997
TAD (Cont'd)
PDMS RADIOLOD. CONDITIONS - AFHB SPECIFIC DECONTAMINATION GOALS PDMS RADIOLOGICAL CONDITIONS*
GENERAL AREA SURFACE CONTAMINATION GENERAL AREA SURFACE CONTAMINATION CUBICLE DOSE RATE <7'/Overheads DOSE RATE <7'/OVERHEADS NUMBER AREA DESCRIPTION (mR/hr) (dpm/100 cm2) (mR/hr) (dpml/100 cmz)
AXI21 Inside Elevator Cab <2.5 <1,000/N/A 0.3 250/N/A AXI22 North Stairwell <2.5 <1,000/N/A 0.2 470/N/A AXI23 Access Area (includes AX-136) <2.5 <1,000/<10,000 0.2 160/140 AX124 Concent. Liq. Waste Pump Pan <500 <50,000/<50,000 3.3 3,300/1,800 AX125 Waste Gas Decay Tank IB Ran <500 <50,000/<50,000 0.2 1,000/1,000 AX126 Waste Gas Filter Rrn <500 <50,000/<50,000 0.2 100/160 AX127 Waste Gas Decay Tank IA Rmn <500 <50,000/<50,000 0.6 6,400/690 AX128 Valve & Instrument Rm <500 <50,0001<50,000 2.7 1,000/1,300 AX129 Deborating Detain. 1B Rmn <500 <50,000/<50,000 0.3 1,000/600 AX130 Deborating Detain. IA Rm <500 <50,000/<50,000 0.5. 540/520 AXI31 Misc. Waste Holdup Tank Rin <50 <5,000/<50,000 120 1,900/6,500 AX132 Unit I and Unit 2 Corridor <2.5 <1,000/<10,000 0.2 100/100 AX133 South Stairwell <2.5 <1,000/N/A 0.2 500/N/A AX134 Misc. Waste Tank Pumps Pin <50 <50,000/<50,000 13 13,000/45,000 AX135 Radwaste Disposal Control Pnls <2.5 <1,000/<10,000 0.2 130/120 AX201 North Stairwell <2.5 <1,000/N/A 0.2 450/N/A AX202 Elevator Shaft <2.5 <1,000/<10,000 0.2 480/480 AX203 4160V Switchgear 2-1E pin <2.5 <1,000/<10,000 0.2 480/460 5.3-7 UPDATE 2 - AUGUST 1997
TABLE 5.3-2 (Cont'd)
PDMS RADIOLOGICAL CONDITIONS - AFHB SPECIFIC DECONTAMINATION GOALS PDMS RADIOLOGICAL CONDITIONS*
GENERAL AREA SURFACE CONTAMINATION GENERAL AREA SURFACE CONTAMINATION CUBICLE DOSE RATE <7'/Overheads DOSE RATE <7'/OVERHEAD2 NUMBER AREA DESCRIPT ION (mR/hr), (dpnm/100 cm2) (mR/hr) (dpm//100 cm )
AX204 4160V Switchgear 2-2E Rin <2.5 <1,000/<10,000 0.2 480/480 AX205 RB Purge Air Sup. and Hy <2.5 <1,000/<10,000 0.7 100/130 Cntrl Exh Area AX206 RB Purge Air Exhaust Un it B <50 N/A 10 200,000/N/A AX207 RB Purge Air Exhaust Un it A <50 N/A 13 200,000/N/A AX208 Aux Bldg Exhaust Unit B <50 N/A 0.4 3,900/N/A AX209 Aux Bldg Exhaust Unit A <50 N/A 0.7 10,000/N/A AX210 Fuel Handling Bldg Exha ust Unit B <50 N/A 0.9 12,000/N/A AX211 Fuel Handling Bldg Exha ust Unit A <50 N/A 0.3 7,200/N/A AX212 Decay Ht Surge Tk & Subistation <2.5 < 1,000/<10,000 0.2 100/90 Area AX213 Unit Substations & Access Area <2.5 <1,000/<10,000 0.2 130/120 AX214 Decon Facility
[Internal Area of Decon <2.5 <1,000/<10,000 0.3 150/100 Facility Tanks) <2.5 <1,000/N/A 0.4 4,400/N/A AX215 Fuel Handling Bldg Supply <2.5 N/A 0.2 450/N/A AX216 Aux Bldg Supply Unit <2.5 N/A 0.2 450/N/A AX217 Access Area <2.5 <1,000/<10,000 0.2 120/370 5.3-8 1E 2 - AUGUST 1997
W TAWO , (Cont'd)
PDMS RADIOLOGICAL CONDITIONS - AFHB SPECIFI[C DECONTAMINATION GOALS PDMS RADIOLOGICAL CONDITIONS*
CUBICLE GENERAL AREA SURFACE CONTAMINATION GIENERAL AREA SURFACE CONTAMINATION DOSE RATE <7'/ Overheads DlOSE RATE <7'/OVERHEADS NUMBER AREA DESCRIPTION (mR/hr) (dpm/100 cm2) 2 (mR/hr) (dpm//100 cm')
AX218 Concentrated Waste Stor. Tank Fin <500 <50,000/<50,000 15 1,900/1,000 AX219 Inst. Racks & Atmospheric Monitor <2.5 <1,000/<10,000 0.3 390/5,900 Area AX220 Caustic Liquids Mixing Area <500 <1,000/<10,000 1.4 440/360 AX221 Caustic Liquids Mixing Area <500 <1,000/<10,000 0.8 450/880 Corridor AX222 South Stairwell <2.5 <1,000/N/A 0.2 100/N/A AX223 Air 1Handling Units General Area <2.5 <5,000/<10,000 0.8 490/450 AX301 Elevator Machine Rm <2.5 <1,000/<10,000 0.2 100/170 AX302 North Stairwell <2.5 <1,000/< 10,000 0.2 480/480 AX303 Elevator and Stairwell Access <2.5 <1,000/<10,000 0.2 510/510 AX304 Aux. Bldg. Exhaust Fan #8 <2.5 <1,000/<10,000 0.6 750/510 AX305 Fuel Handling Bldg. Exh. Fan #10 <2.5 <1,000/<10,000 0.2 650/390 AX401 Roof <2.5 <1,000/N/A 0.2 90/N/A AX402 Cooling Water Surge Tanks pin <500 <50,000/<50,000 0.2 110/230 AX403 Damper Rm <500 <50,000/<50,000 0.2 120/130 AX501 RB Spray Pump 1A RPm <25 <5,000/<50,000 17 370,000/2,100,000 AX502 RB Spray Pump 1B Pin <25 "AS IS" 31 110,000/540,000 5.3-9 UPDATE 2 - AUGUST 1997
TABLE 5.3-2 (Cont'd)
PDMS RADIOLOGICAL CONDITIONS - AFHB SPECIFIC DECONTAMINATION GOALS PDMS RADIOLOGICAL CONDITIONS*
GENERAL AREA SURFACE CONTAMINATION GENERAL AREA SURFACE CONTAMINATION CUBICLE DOSE RATE <7'/Overheads DOSE RATE <7'/OVERHEADS NUMBER AREA DESCRIPTION (mR/hr) (dpm/100 cm2) (mR/hr) (dpm//I00 cm 2)
AX503 Decay Heat Removal Cooler & <25 <50,000/<50,000 11 43,000/280,000 Pump IA Ran AX504 Decay Heat Removal Cooler & <2.5 <50,000/<50,000 6.1 15,000/89,000 Pump IB Rm FHOO I Makeup Suction Valve Rrn <500 "AS IS" 19 70,000/89,000 FH002 Access Corridor <2.5 <1,000/<10,000 1.5 1,000/1,500 FHO03a Makeup Discharge Valve Rin <1000 <50,000/<100,000 69 140,000/77,000 FHO03b Makeup Discharge Valve Rm <1000 <50,000/<100,000 220 510,000/180,000 FH004 Westinghouse Valve Ran <500 <50,000/<50,000 59 38,000/1,100,000 FH005 Mini Decay Heat Vault <500 <50,000/<50,000 2.4 2,700/1,500 FH006 Decay Heat Service Coolers Area <500 <1,000/<10,000 6.4 1,100/1,400 FH007 Neutrl and Recl Boric Acid <500 <1,000/<10,000 0.8 100/460 Access Area FH008 Neutralizer Tanks Pumps RPn <500 <50,000/<50,000 180 22,000/4,700 FH009 Neutralizer Tanks Rin <500 <50,000/<50,000 150 21,000/8,300 FH010 Reclaimed Boric Acid Tank Rmn <500 <50,000/<50,000 4.3 2,400/6,300 FHO 11 Reclaimed Boric Acid Pump PRm <500 <50,000/<50,000 9.1 14,000/20,000 FHO 12 Neutralizer Tanks Filters Ran <500 <50,000/<50,000 31 2,800/1,200 FHO13 Oil Drum Storage Area <500 <1,000/<10,000 0.2 100/100 5.3-10 5E 2 - AUGUST 1997
TA W* , (Cont'd) w PDMS RADIOLOGICAL CONDITIONS - AFHB SPECIFIC DECONTAMINATION GOALS PDMS RADIOLOGICAL CONDITIONS*
GENERAL AREA SURFACE CONTAMINATION GENERAL AREA SURFACE CONTAMINATION CUBICLE DOSE RATE <7'/Overheads DOSE RATE <7'/OVERHEADS NUMBER AREA DESCRIPTION (mR/hr) (dpm/100 cm2) (mR/hr) (dpm//100 cm 2)
FHO14 Annulus <500 <50,000/<50,000 110 35,000/7,500 FH101 MUP Valve Rn <500 <50,000/<50,000 200 850,000/14,000,000 FH102 East Corridor <2.5 <1,000/<10,000 1.1 200/31,000
[Chemistry Sample Shielded <2.5 <1,000/N/A 4 380,000/N/A Storage Cage]
FHI03 Sample Rm. <50 <50,000/<50,000 1.2 4,000/1,600 FHI04 West Corridor <2.5 <1,000/< 10,000 0.2 120/100 FH105 Model Room <2.5 <1,000/<10,000 0.2 100/100
[Boronometer Shielded <2.5 <1,000/N/A 21 22,000/N/A Enclosure]
FHI06 Monitor Tanks & Sample Sit k <2.5 <1,000/<10,000 0.7 330/110 Area FH107 Trash Compactor Area <2.5 <1,000/<10,000 0.2 100/130 FH108 Truck Bay <2.5 <1,000/<10,000 0.2 70/70 FH109 Spent Fuel Pool A "AS IS" "AS IS"/N/A 230 55,000,000/N/A (Under fuel pool cover)
FH1 10 SDS Spent Fuel Pool B <2.5 < 1,000/ N/A 6.9 180,000/N/A (Under Fuel Pool Cover)
FH111 Fuel Cask Storage <1000 <1,000/N/A 0.3 150,000/N/A (Under Fuel Pool Cover)
FH1 12 Annulus <100 <50,000/<50,000 19 3,500/840 FH201 East Corridor <2.5 <1,000/<10,000 1.0 420/9;400 5.3-11 UPDATE 2 - AUGUST 1997
TABLE 5.3-2 (Cont'd)
PDMS RADIOLOGICAL CONDITIONS - AFHB SPECIFIC DECONTAMINATION GOALS PDMS RADIOLOGICAL CONDITIONS*
GENERAL AREA SURFACE CONTAMINATION GENERAL AREA SURFACE CONTAMINATION CUBICLE DOSE RATE <7'/Overheads DOSE RATE <7'/OVERHEADS NUMBER AREA DESCRIPTION (mR/hr) (dalm/100 cm2) fmR/hr) (dvm//100 cm)2 FH202 West Corridor <2.5 <1,000/<10,000 0.2 480/490 FH203 Surge Tank Area <500 <50,000/<50,000 28 1,000/Inaccessible FH204 Standby Pressure Control <500 <1,000/<10,000 0.2 1,000/1,000 Area FH205 Annulus <100 <50,000/<50,000 8.7 700/8,500 FH301 Upper Spent Fuel Pool A <2.5 <1,000/<10,000 3.9 240/300 Area (Above Fuel Pool Cover)
FH302 SDS Operating Area <2.5 <1,000/<10,000 1.2 480/400 FH303 Upper Standby Pressure <2.5 <1,000/<10,000 0.2 300/160 Control Area FH304 Annulus <500 <50,000/<50,000 0.6 2,200/2,200 FH305 Spent Fuel Pool Access <2.5 <1,000/<10,000 1.3 390/900 Area 5.3-12 2 "E 2- AUGUST 1997
Raw TAnDLC 5.3-3 PDMS RADIOLOGICAL CONDITIONS - OTHER BUILDINGS SPECIFIC DECONTAMINATION GOALS PDMS RADIOLOGICAL CONDITIONS*
GENERAL AREA SURFACE CONTAMINATION GENERAL AREA SURFACE CONTAMINATION CUBICLE DOSE RATE <7'/Overheads DOSE RATE <7'/OVERHEADS NUMBER AREA DESCRIPTION (mR/hr) (dpm/100 cm2) (mR/hr) (dnml/100 cm2)
SB000 Service Building El. 281' <2.5 <1,000/<10,000 0.4 100(2)/330 SB002 M-20 Area <2.5 <1,000/<10,000 0.3 110/110 SB002 M-20 Area Sump <2.5 <1,000/N/A 0.4 1,000/N/A SB1100 Service Building El. 305' <2.5 <1,000/<10,000 0.2 110/380
[RB Containment Control <2.5 <1,000/<10,000 0.2 1,300/4,000 Cubicle Secondary Chemn Lab] <2.5 <1,000/<10,000 0.2 1,700/140 SB500 Tendon Access Gallery <2.5 <1,000/<10,000 0.4 110/110 TBOOO Turbine Building El. 281' <2.5 <1,000/<10,000 0.2 100/100 PA108 CACE Building <2.5 <1,000/<10,000 0.4 100/100 RAI01 PWST House <2.5 <1,000/<10,000 0.2 120/110
[PWST Sump] <2.5 <1,000/N/A 0.2 120/N/A RA104 BWST Area <2.5 <1,000/N/A 0.3 90/N/A (1) The radiological conditions in this table reflcct rounded-off, average PDMS survey data.
(2) Does not include surface contamination on the cork seam.
5.3-13 I UPDATE 2 - AUGUST 1997
TABLE 5.3-4 SURFACE CONTAMINATION - REACTOR BUILDING AREA DESCRIPTION PRINCIPLE ISOTOPES CURIES Elevations 305' to 347 Cs-137 9.7 E-1 Sr-90 1.9 E-1 Elevation 347' and Above Cs-137 6.7 E-1 Sr-90 3.3 E-1 Refueling Canal Cs-137 2.8 E-2 Sr-90 2.2 E-2 D-Ring Interior Cs-137 3.2 E-2 Elevation 349' and Above Sr-90 2.0 E-3 Basement, Elevation 282' Cs-137 6.5 E+2 Sr-90 5.9 E+2 5.3-14 UPDATE 2- AUGUST 1997
Table 5.3-5, Surface Contamination - AFHB is withheld, as it contains security-related information.
Table 5.3-6, Surface Contamination - Other Buildings is withheld, as it contains security-related information.
APPENDIX 5A OW POTENTIAL REDUCTIONS IN OCCUPATIONAL EXPOSURE DUE TO POST-DEFUELING MONITORED STORAGE
[NOTE: The following is a historical treatise that discusses the results of the Decontamination Task Force Report (DTFR) (Reference 2) conducted in 1985. The DTFR provides an evaluation of the reduction in occupational exposure attributed to PDMS. The actual radiological conditions existing in December 1993, i.e., at the time of entry into PDMS, as given in Section 5, have a negligible impact on the conclusions reached by this study. This Appendix will remain in its current condition to maintain that historical perspective. No further attempt will be made to be consistent with the rest of the SAR as it is revised.]
5A. 1
SUMMARY
AND INTRODUCTION 5A.l.1
SUMMARY
A comprehensive evaluation of the person-rem associated with additional required decontamination of the TMI-2 plant after completion of the "Cleanup Program" (i.e., Phase mI Endpoint) has determined that deferring this decontamination for a period of 30 years will result in a potential occupational exposure savings in the range of 4,500 to 9,800 person-rem. In calculating this savings, person-rem resulting from decontamination tasks, radioactive waste processing tasks, and exposures due to tasks performed during PDMS were estimated. Table 5A-10 contains a summary of the estimated range of person-rem for both immediate additional decontamination and final decontamination as a part of decommissioning, assuming a 30-year period of PDMS.
5A.
1.2 INTRODUCTION
Following the completion of the prerequisites identified in Section 1.1.2.1 of the PDMS SAR, the TMI-2 plant will enter PDMS. To enter this mode, the TMI-2 plant must be in a safe, stable condition so that it does not pose a risk to the health or safety of the public. GPU Nuclear has determined that by deferring any remaining decontamination until after PDMS, a significant savings in the occupational radiation. exposures will be realized. The difference in occupational exposure as a result of performing these tasks after a period of PDMS (final decontamination as a part of decommissioning) instead of at the end of Phase mI (immediate additional decontamination) is based on:
o Reduction in radiation dose rates due to the natural decay of radioactive materials remaining in the plant; o Advances in remote technology directly applicable to final cleanup activities; o Advances in chemical decontamination methods; and o A longer development period to plan, engineer and, in some cases, perform further decontamination activities.
This report quantifies the potential savings in occupational exposure which might be realized due to delaying the final decontamination until after the PDMS period. The evaluation performed considers two cases:
"immediate additional decontamination" (i.e., immediately after Phase I1) and "final decontamination as a part of decommissioning" after PDMS; the delay is assumed to be approximately 30 years. Neither case calculates person-rem exposures for normal decommissioning activities. This report describes the plant
- conditions assumed to exist both before and after decontamination activities. These conditions form the 5.A- I UPDATE 2 AUGUST 1997
basis for the dose rates used in the person-rem evaluation. The basis for the job-hour estimates used in the analysis are also provided in this report. This study is considered a reasonable estimate of the potential person-rem savings associated with PDMS based on available information.
In addition to the two cases listed above, person-rem are also evaluated assuming final decontamination as a part of decommissioning after a PDMS period of 20 years. This case is included to facilitate comparison with the person-rem stated in Supplement 3 of the Programmatic Environmental Impact Statement (Reference 1), which assumes a PDMS duration of 20 years followed by 4 years of final decontamination. It is not the plan of GPU Nuclear to have a PDMS period of 20 years nor has GPU Nuclear specified a duration for completing the decontamination activities, except that PDMS shall not continue beyond the time of decommissioning TMI-I.
This study should not be interpreted to imply a commitment by GPU Nuclear to employ specific decontamination techniques, nor to achieve specific endpoint radiological conditions during final decontamination.
.5A.2 BACKGROUND INFORMATION 5A.2.1 RECOVERY TASKS Decontamination and dose reduction activities have been conducted continuously during the TMI-2 cleanup period. Major tasks that have been performed are:
o Decontamination Task Force Report (Reference 2) o Gross Decontamination Experiment (Reference 12) o Dose Reduction Working Group Tasks o Auxiliary and Fuel Handling Buildings (AFHB) decontamination o Reactor Building (RB) decontamination In general, these tasks have been geared to ensuring that the recovery tasks, including stabilizing the plant and defueling, were performed in a radiological environment that ensured occupational exposures were ALARA. During the cleanup period, the priority tasks were those associated with removing the nuclear fuel from the plant. These tasks were important as they reduced the risk to public health and safety.
5A.2.1.1 Decontamination Task Force Report The Decontamination Task Force Report (DTFR) was prepared by a joint group of TMI-2 organization representatives. It is the most comprehensive, as well as the most current, review of the effort required to decontaminate TMI-2. The report was prepared by a task force formed in 1985 to evaluate the problems and activities associated with achieving Phase III radiological completion criteria by mid-1988. The objective of the Decontamination Task Force was to arrive at a consensus technical approach to each of the major areas of decontamination work identified by the Task Force. The ten major areas evaluated by the Task Force were:
o Remote equipment development o Sludge transfer and disposal o D-ring dose reduction and decontamination 5.A - 2 UPDATE 2 AUGUST 1997
o Reactor Building basement recovery o AFHB surface decontamination o Non-RCS systems decontamination o Reactor Building HVAC modifications o Reactor Building Phase IlI surface decontamination o Reactor Coolant System decontamination o Reactor Building Phase mI decontamination waste management The Task Force based its evaluations, technical approaches and schedules on available technical plans.
During the evaluation, several critical areas were identified including remote technology development and Reactor Building basement cleanup. These remain critical areas as the end of Phase IlI approaches.
5A.2.2 FUTURE DECONTAMINATION TASKS Tasks performed for immediate decontamination (Post-Phase m decontamination) or for final decontamination as a part of decommissioning (Post-PDMS decontamination) differ from cleanup tasks in that the priority will have changed from removing fuel in order to reduce the risk to the health and safety of the public, to removing radioactivity from the plant in order to provide a radiologically improved environment for future plant work. As the maximum annual off-site dose from routine releases during PDMS is projected to be 0.02 mrem/yr (PDMS SAR Table 8.1-5), the PDMS configuration presents negligible risk.to the health and safety of the public (see Section 5A.5). Future work, therefore, will be planned to maintain worker radiation exposures ALARA.
5A.3 CRITERIA FOR PERFORMING THE EVALUATION To perform the person-rem study in a thorough and efficient manner, the following criteria were established for the evaluation:
o Task evaluations should reflect GPU Nuclear's current plans.
o Person-rein estimates should be developed for the two cases such that the calculated difference (i.e.,
the savings) is representative.
5.A - 3 UPDATE 2 AUGUST 1997
o The expected plant conditions at the end of Phase mI should be projected, based on current progress and on-going cleanup activities.
o No time dependence is assumed to account for the actual schedule for performing the work.
o The decontamination techniques to be employed are assumed to be those envisioned by the DTFR.
o The job-hours spent in radiation areas should be estimated from historical data for total job-hours and time spent in radiation areas.
5A.4 RADIOLOGICAL CONDITIONS 5A.4.1 CONDITIONS AT THE END OF PHASE M Table 5A-1 summarizes the Phase EmI endpoint dose rate criteria. Some of these criteria have already been met or exceeded. Chapter 5 of the PDMS SAR describes the radiological conditions at the end of Phase III, which are the conditions that will be in effect at the beginning of PDMS. In general, the plant can be categorized into three areas:
o Auxiliary and Fuel Handling Buildings. Some cubicles are locked because of high radiation levels, however, general area dose rates throughout the buildings are relatively low and permit personnel access. Many areas, including hallways and access corridors, allow essentially unlimited access.
Surface contamination, particularly in the overhead areas, is relatively high in TMI-2. However, the surface contamination present does not normally impact the general area dose rate (see Table 5A-3 and Table 5.3-2 of the PDMS SAR);
o Reactor Building Entry and Operating Levels. General area dose rates allow access to most areas, and permit reasonably long stay times (see Table 5A-2 and Table 5.3-1 of the PDMS SAR). Based on available data, dose rates on the 305' elevation are generally less than 150 mrem/hr. On the 347' elevation dose rates are generally less than 50 mrem/hr; and o Reactor Building Basement and D-Rings. Radiological conditions in these areas severely limit accessibility and stay times. The average dose rates in the basement are in excess of 10 R/hr. The "B" D-ring dose rates average approximately I R/hr and those in the "A" D-ring approximately 500 mrem/hr.
These dose rates are based on surveys and other available documentation (e.g., References 3 & 4).
5A.4.2 CONDITIONS DURING PDMS It is planned that PDMS will go into effect at the completion of Phase Ell, therefore the radiological conditions in the plant at the beginning of PDMS will be the same as those at the end of Phase MI. During PDMS the dose rates in the plant will decrease due to natural decay of the radionuclides.
5A.4.3 CONDITIONS AT THE END OF PDMS The dose rates for final decontamination as part of decommissioning will be lower than those for immediate additional decontamination due to the decay of the radionuclides. After a 30-year period of PDMS, dose rates were assumed to be half of those existing at the end of Phase I11. This accounts for the decay of 5.A - 4 UPDATE 2 AUGUST 1997
dominant dose rate contributor (i.e., cesium-137), which has a half-life of 30 years.
5A.4.4 BASE CASE PLANT CONDITIONS The dose rate criteria assumed as endpoint goals for the final decontamination activities are the dose rates postulated for a typical pressurized water reactor during shutdown. This condition is referred to as the "base case" plant condition. Radiological data from six Babcock & Wilcox plants: Oconee Units 1, 2 and 3, Arkansas Nuclear One Unit- 1, Rancho Seco and TMI-Unit 1, were used to establish the base case plant condition (Reference 5). TMI-1 dose rates were obtained from TMI-1 surveys, and data for the other plants were obtained from the Brown Boveri Reactor (BBR) GMBH Report titled "Evaluation of the Dose Rate Data of Varous Nuclear Power Plants with B&W Nuclear Steam Supply Systems" (Reference 6). This report lists both the TMII-1 survey data and the common mean of the radiation levels at the six plants. The common mean from all six Babcock & Wilcox plants is used when it is available. However, for most areas in the AFHB the data in the BBR Report lacked sufficient detail, therefore, the TMI-1 survey data forms the base case criteria for these areas. Tables 5A-2 and 5A-3 list the base case dose rates for the Reactor Building and AFHB respectively, with the Phase Ill endpoint dose rates listed for comparison. It can be noted, from these tables, that:
o Dose rates in the AFHB, including corridors and cubicles, are, in general, comparable in both cases.
o Conditions in the TMI-2 Reactor Building are not comparable to the base case plant. Dose rates throughout the Reactor Building, especially in the D-rings and basement, are much higher at TMI-2.
Thus, it can be concluded that future decontamination tasks will be concentrated in the Reactor Building, with a smaller effort required in the AFHB.
5A.4.5 ISOTOPIC CHARACTERIZATION Radioactive source terms expected to remain at the TMI-2 plant are discussed in Chapter 8 of the PDMS SAR. The predominant dose contributors are the gamma emitters. This is due to the penetrating nature of gamma radiation, as compared to beta radiation which is non-penetrating and easily shielded.. Beta dose rates are normally not the controlling radiological concern for plant personnel. Radionuclides which decay by way of beta or alpha particle emissions are primarily a concern for internal uptake from inhalation of airborne radioactivity. Experience during the recovery period has shown that occupational internal exposures are small compared to the external 5.A - 5 UPDATE 2 AUGUST 1997
gamma exposures. Therefore the analysis to assess person-rem savings associated with PDMS has focused on direct gamma occupational exposures. The gamma emitter that will be the predominant dose contributor is Cs-137, which has a 30-year half-life. Thus, dose rates are expected to decrease to 50 percent of their original values during the 30-year period of PDMS assumed in this evaluation.
The areas of highest radioactivity are the basement and the D-rings. Tasks required to decontaminate these areas are expected to consume a significant number of person-rem. The major contributor in the basement is the block wall which has a current Cs-137 activity of approximately 19,000 curies. The total radioactivity in the D-rings is estimated to include approximately 17,000 curies of Cs-137. Table 5A.4 lists the cesium and strontium activities estimated for these areas.
5A.5 OFF-SITE DOSES DURING PDMS Table 8.1-5 of the PDMS SAR lists the estimated maximum off-site doses from both routine and accidental releases during PDMS. The annual doses from routine releases are based on airborne and liquid releases from the Reactor Building. The maximum doses, which are from the airborne source, are 2 x 10-2 mrem/yr to the bone and I x 10.2 nrem/yr total body. Annual doses from contamination in the AFHB are expected to be negligible, when compared to those from the Reactor Building, due to the lower radioactivity levels in the AFHB for both the liquid and airborne pathways. The estimated annual off-site doses from airborne radioactivity from the AFHB are I x 10-4 mrem/yr to the bone and 3 x 10" mrem/yr total body (Reference 7).
The routine release annual off-site doses are within the PDMS administrative limits listed in Table 8.1-4 of the PDMS SAR and, therefore, their reduction will not be the focus of future work.
5A.6 DOSE RATE ESTIMATION Dose rates estimated for immediate additional decontamination are based on current data and the dose rate criteria for the end of Phase III. The dose rates for performing the final decontamination as a part of decommissioning are assumed to be 50 percent of those for immediate additional decontamination. This results from the decay of Cs-137, the predominant dose contributor, over the assumed PDMS period of 30 years.
5A.6.1 DECONTAMINATION TASKS The dose rates used in the person-rein analysis, which are listed in Table 5A-5, are estimated considering the following:
o Phase III endpoints (see Table 5A-1);
o Average dose rates for 1987, from Exposure Tracking Numbers (Table 5A-8 lists the applicable ETNs);
o Planned Robotic use; o Decrease in dose rates as decontamination work proceeds; and o Time spent in radiation areas with lower dose rates than the area being decontaminated.
No dose rates are listed for health physics support as previous experience shows that 20 percent of the total 5.A - 6 UPDATE 2 AUGUST 1997
person-rem expended is attributable to health physics. The person-rem for health physics support in this evaluation will, therefore, be based on this criterion.
5A.6.1.1 Tasks Performed Robotically Due to the high general area radiation dose rates present in all areas of the Reactor Building basement and in some areas of the D-rings, it is assumed that many of the tasks in these areas will require remote or semi-remote operations. Remote tasks to be performed in the basement include removal of the block wall, general cleanup activities and cubicle cleanup. The use of robotics for cleanup of the D-rings will be limited by physical accessibility. It is assumed that all robotic operations will be remotely controlled from an operations center outside the Reactor Building. Although robotic operations will be performed remotely, personnel exposures will be incurred for robotic support tasks, including robot deployment and retrieval, robotic maintenance, repair and decontamination.
To estimate the personnel exposure associated with robotic tasks, radiation work permit (RWP) hours and person-rem data for previous robotic activities, which are tracked on an exposure tracking number (ETN) data base, were used. As a significant amount of work utilizing robotics was completed in 1987, data for this year were used to develop an average exposure estimate. Based on data obtained from the ETN data base, the average exposure rate associated with robotic activities was 64 mrem/hr.
Tasks that have been accomplished using robots include basement characterization, including video and radiological examinations; basement floor and wall concrete bore samples; basement wall and overhead gross flushing; and basement floor desludging.
5A.6.1.2 Example of Estimating Dose Rates As an example of how the dose rates used in this evaluation are estimated, the approach used for estimating the basement dose rates is considered representative. The estimated average dose rate for immediate additional decontamination of the basement, excluding the block wall, is 100 mrem/lr. This is based on:
o Current dose rates for placement and maintenance tasks associated with the use of robots - 64 mrem/hr (from ETN C91KO01);
o Limited personnel access into the basement after dose rates decrease to approximately 10 R/hr (Reference 8);
o Increased time spent in the basement as the dose rates approach the base case criteria of approximately 20 mrem/hr; and o Time spent in areas of lower dose rates.
It is assumed that most of the decontamination will be performed robotically until the dose rates have decreased sufficiently to allow fairly long personnel entries into the basement.
5A.6.2 RADIOACTIVE WASTE PROCESSING The dose rate for radioactive waste processing-is based on the dose per cubic foot of waste processed during 1987, adjusted toaccount for the fact that waste from highly radioactive areas, such as the Reactor Building basement, will be processed. This waste has higher activities than those in areas of the Reactor Building or AF-B from which waste is presently processed. The dose rate for final decontamination as a part of 5.A - 7 UPDATE 2 AUGUST 1997
decommissioning is assumed to be half the dose rate for immediate additional decontamination because of the 30-year half-life of Cs-137.
It is assumed that the volume of radioactive waste that will be processed is in the range of 120,000 - 183,000 cubic feet. This volume is within 20 percent of the total volume shipped through 1987.
5A.7 ACTIVITIES EVALUATED The activities that are considered in this person-rem analysis include final decontamination tasks, radioactive waste management tasks associated with the decontamination, and activities during PDMS.
5A.7.1 FUTURE DECONTAMINATION TASKS The "future decontamination tasks" are defined as those tasks which are required to improve radiological conditions from the Phase LI endpoint criteria to the base case level. The actual work required to accomplish the final cleanup, listed in Table 5A-6, was estimated based on the following sources:
o Decontamination Task Force Report o Decontamination Approaches o Decontamination Technical Specifications' o TMI-2 Reactor Building Blockwall Report and Task Force Report (References 9 and 10)
These future tasks will also include processing the radwaste produced by the decontamination.
5A.7.2 RADIOACTIVE WASTE MANAGEMENT TASKS Radioactive waste will be generated during the decontamination of TMI-2. Radwaste tasks will include removing this waste from the Reactor Building or AFHB; processing the waste (e.g., compacting); and shipping it to the appropriate disposal facility.
5A.7.3 ACTIVITIES DURING PDMS Work performed in radiation areas during PDMS includes maintenance in the Reactor Building and in the AFHB, surveys and inspections in these facilities and radioactive waste processing.
5A.8 JOB-HOUR ESTIMATES The most comprehensive study pertaining to the work scope and approach for decontamination activities is the DTFR which defines decontamination tasks necessary to achieve the Phase III endpoint criteria, along with the associated job-hours required to complete these tasks. The information presented in Reference 2, categorized by Reactor Building and AFHB activities, assumes 3 years to complete the decontamination tasks.
The DTFR is used as the basis for the job-hour estimates for this present evaluation as many of the tasks 1 The Decontamination Technical Specifications are not associated with the operating license. They are reports discussing decontamination techniques.
5.A - 8 UPDATE 2 AUGUST 1997
specified in the report will also be required for future decontamination. However, the total number of hours required to reach the base case criteria from current or Phase mI endpoint conditions will differ from those listed in the DTFR, and no time dependence is assumed for reducing the dose rates to the base case criteria.
In addition, the hours developed in the report were initially used for budget purposes and hence were billable hours (i.e., total hours committed) rather than an estimate of the actual hours spent in a radiation field.
Therefore, the job-hour estimates in the DTFR were modified for this evaluation. This modification considers:
o The difference in scope between the DTFR estimates and the Post-Phase Inl required additional decontamination; and o The fraction of the total job-hours that will be spent in radiation areas.
Table 5A-7 lists the estimated job-hours that will be spent in radiation fields, using the categories in the DTFP,, with the DTFR total job-hours included for comparison. The radiation area job-hours are given for three cases: 1) immediate additional decontamination following Phase II; 2) final decontamination as a part of decommissioning following 20 years of PDMS (the Reference 1 base case); and 3) final decontamination as a part of decommissioning following 30 years of PDMS (the base case assumed in this SAR). These categories were expanded for this evaluation, as shown in Table 5A-5. The job-hours assumed for each of these categories are also listed. Previous history has shown that person-rem attributable to health physics support is a percentage of total person-rem, therefore no job-hours are listed for this task.
5A.8.1 SCOPE MODIFICATIONS Identified modifications to the work scope are used to estimate the change in total job-hours based on a change in the desired endpoint of the tasks or a change in the decontamination program starting point.
5A.8.1.1 Immediate Additional Decontamination In all areas of the Reactor Building the Phase m1I endpoint dose rates are higher than the base case plant dose rates, therefore the scope is increased to account for the lower dose rate goals of the final decontamination activities. Modification is also made to tasks that require fewer job-hours because the task is partially completed or a reassessment of the job-hours required has been made.
In general, most areas of the AFHB are close to the base case criteria. Therefore, the original job-hour estimate is reduced to show that only a fraction of the work outlined by the Task Force will remain at the end of Phase Ill.
Generally, the modifications to job-hours are determined as follows:
o The job-hours increase if the base case is lower than the Phase mI endpoints assumed in the DTFR and decontamination has not reduced dose rates significantly. It also increases if the current Phase In endpoint is higher than the endpoint assumed in the DTFR and decontamination has notreduced it to below the endpoint. An example of an increase in scope is the D-rings where the general area dose rate criteria has been decreased, but, because access is difficult, little decontamination has been done in the lower sections of the "B" D-ring. In addition, the average dose rates in the "A" D-ring are also considerably above the dose rate criteria.
o The job-hours are unchanged if the work already done has reduced the present dose rate to a level where an equivalent amount of work is required to attain the base case criteria as that originally assumed to reach the Phase ImI endpoints. For example, it is assumed that the scope for desludging 5.A - 9 UPDATE 2 AUGUST 1997
previously unaccessed areas of the Reactor Building basement is the same as for the Phase ImI desludging tasks.
o The job-hours are decreased if decontamination has reduced the dose rates to close to the base case criteria, or to a point where less work is expected to obtain these criteria. A decrease in scope is seen primarily in the AFHB where most areas, except for some cubicles, are at or close to the base case dose rates. Every task in the AFHB is assumed to require fewer job-hours than listed in the DTFR.
In addition to these general assumptions for job-hour modifications the following should be noted:
o The DTFR included job-hours for possible modification to the RB HVAC systems to establish isolation zones to prevent re-contamination. It has been determined, based on work experience, that modification to the HVAC system will not be required.
o Robotics. The job-hours in the DTFR included robotic development. This task will not involve time in a radiation area, therefore the hours are not included in this evaluation 5A.8.1.2 Final Decontamination As A Part of Decommissioning The required job-hours for each task are generally assumed to be lower for decontamination deferred until after PDMS. This accounts for the decay that will occur during PDMS, thus reducing the job-hours required to meet the base case dose rates.
5A.8.1.3 Example of Estimating Scope Modification As for the previous dose rate example (Section 5A.6.1.2), Reactor Building basement recovery job-hours will be used to demonstrate the job-hour modifications, both in scope and time spent in radiation areas. For immediate additional decontamination, the job-hours required to complete this work are increased by a factor of three (3) as compared to the DTFR. This increase is based on:
o A decrease in the endpoint criteria. The interim radiological endpoint criteria for the DTFR were 1 R/hr general area in the basement, and 5 R/hr general area in the cubicles. These dose rate criteria have been reduced to 20 mr/hr general area and 1 R/hr general area in the cubicles, respectively, for the base case plant; o The assumption that no appreciable dose rate reduction has occurred in the basement since the DTFR was written.
For final decontamination as a part of decommissioning the job-hour requirement is also assumed to increase, based on these factors. This increase takes into account the decrease in dose rates in the basement during the 30 years assumed for PDMS, but also recognizes the fact that the dose rates will still be very high at the start of decontamination.
5A.8.2 RADIATION AREA JOB-HOURS The job-hours developed in the DTFR are total, billable hours (i.e., they include time spent on engineering tasks such as design; administrative tasks, such as record keeping; and planning and preparation that are spent away from radiation areas). The time spent by radiation workers for dressing out and other worker activities is also compensated for in the estimate of the time spent in radiation areas. Therefore, a factor 5.A- 10 UPDATE 2 AUGUST 1997
needs to be applied to the total hours developed in the DTFR to account for these tasks which are not performed in radiation areas. To determine the job-hours spent in radiation areas, the total job-hours listed in the DTFR were modified by factors based on actual billed hours and RWP hours (i.e., job-hours in radiation areas) for the decontamination group workers in 1987. These RWP hours include the hours spent on health physics support. Based on previous experience, it is assumed that the job-hours that apply to health physics support equal 20 percent of those expended on decontamination tasks. Table 5A-8 lists the ETNs, used for tracking RWPs, and the total RWP hours that were used in determining these modification factors. These factors were not developed for individual tasks but by type of task, as listed below:
RB AFHB Robotics 0.15 N/A Decon 0.20 0.50 Characterization 0.20 0.30 Systems 0.10 0.10 The Robotics radiation area factor (RAF) was used for tasks that are expected to require extensive use of robots. For tasks where limited robot use is expected, the RAF for decontamination is assumed. The RAF for systems work is assumed to be the same for both buildings. These assumed radiation area factors also assume that as dose rates decrease, allowing longer periods to be spent in radiation area, the percentage of total job-hours spent in radiation areas will increase.
5A.8.2.1 Example of Determining Radiation Area Job-hours Although both robotics and personnel access will be used in decontaminating the basement, the radiation area factor for robotic work is assumed for this task. The radiation area factor for robotic work is based on the following:
o Total job-hours for robotics tasks, in 1987, was 4990; o Total hours spent in radiation areas for robotic work in 1987 was 820 hours0.00949 days <br />0.228 hours <br />0.00136 weeks <br />3.1201e-4 months <br /> (ETN C91KOO 1);
o Radiation area hours that apply to Health Physics Support are 20%'of the hours for decontamination tasks.
Based on the above data a radiation area factor of 0.15 was derived for robotic tasks:
(820/1.2 rad areas hrs)/4990 total hours = 0.15) 5A.8.3 JOB-HOURS DURING PDMS It will be necessary for personnel to spend some time in the Reactor Building and AFHB for maintenance tasks and surveys. The job-hours for the period of PDMS are not estimated by task but, rather, are based on estimated annual job-hour requirements.
5A.8.4 RADIOACTIVE WASTE MANAGEMENT Job-hour estimates have not been made for radioactive waste management tasks. The person-rem for these tasks are based on the total volume of waste that it is estimated will be processed.
5.A- 11 UPDATE 2 AUGUST 1997
5A.8.5 EXAMPLE OF JOB-HOUR ESTIMATION The decontamination activities for which person-rem are estimated differ from task descriptions in the DTFR. For instance, the total job-hours for Reactor Building Recovery are assumed to include the hours spent on general decontamination in the basement, decontamination of the basement cubicles, and removal of the block wall. This example focuses on the hours spent in radiation areas during decontamination of the basement cubicles.
The total number of job-hours that are estimated for the basement recovery tasks is:
Radiation Areas Job-hours = DTFR job-hours
- scope modification
- radiation area factor 114610
- 3.00
- 0.15
= 51575 hours It is estimated that half of these hours will be spent on basement cubicle decontamination, therefore, this activity is estimated to require 25,788 job-hours in radiation areas.
5A.9 PERSONNEL EXPOSURE Personnel exposures were determined for two cases:
- 1. Immediate additional decontamination (i.e., at the end of Phase II); and
- 2. Final decontamination as a part of decommissioning (i.e., after PDMS)
The parameters described in the earlier sections were used in computing a range of estimated person-rem for final decontamination of the TMI-2 plant, radwaste management and tasks that will be performed during PDMS.
5.A - 12 UPDATE 2 AUGUST 1997
5A.9.1 DECONTAMINATION TASKS The person-rem estimated for the decontamination tasks listed in Table 5A-5 are the products of the dose rates and radiation area job-hours also listed in that table. As described in Section 5A.6.1, the dose rates for each task, for immediate additional decontamination, are based on the dose rate criteria for the start and finish of each task. The dose rates for final decontamination as a part of decommissioning are assumed to be half of the dose rates for immediate additional decontamination, to account for radionuclide decay.
In determining person-rem, the job-hours spent in radiation areas are required. In this evaluation these hours are developed from the total, billable job-hours developed in the DTFR for decontamination tasks required to meet Phase EIm criteria, as described in Section 5A.8. The radiation area job-hours are applied to several categories of tasks, such as Reactor Building cubicle cleanup, which are listed in Table 5A-5. The person-rem are estimated for each of these categories, as listed in Table 5A-9. However, there are many activities associated with each of these task categories. The array of activities considered in developing the total person-rem estimate for decontamination of TMI-2 are listed in Table 5A-6. Table 5A-6 gives a general idea of the extensive amount of work required to complete future decontamination activities.
Historical data from similar studies show that person-rem estimates for forecasted tasks tend to be a factor of 2 high when compared to the actual person-rem received in performing the tasks (Reference 11). To account for these uncertainties the person-rem for each task can be expressed as a range. The lower bound of the range is, therefore, assumed to be half of the calculated person-rem dose. In addition, to allow for uncertainty, the upper bound is assumed to be 10 percent higher than the calculated number. The person-rein for health physics support is 20% of the total person-rem for the other decontamination tasks.
5A.9.2 RADIOACTIVE WASTE MANAGEMENT The total person-rem estimated for radioactive waste management associated with the decontamination tasks is 360 - 550 person-rem if the decontamination is performed at the end of Phase III and 180 - 280 person-rem if additional required decontamination is deferred for a 30-year period of PDMS. This is based on the assumption that the volume of waste processed will be in the assumed range of 120,000 to 183,000 cubic feet, which is within 20% of the total radioactive waste processed to date. The estimated person-rem savings from radwaste processing is 180 - 280 person-rem, which accounts for less than 5 percent of the total savings.
5A.9.3 PDMS TASKS It is estimated that the occupational exposure during PDMS will be in the range of 230 - 490 person-rem.
This dose is less than 10% of the total estimated person-rem from final decontamination as a part of decommissioning. Tasks to be performed during PDMS, along with the estimated person-rem are:
Maintenance & Radwaste Processing 190-410 Surveys and Inspections 40- 80 Total 230-490 5.A- 13 UPDATE 2 AUGUST 1997
5A.9.4 TOTAL PERSON-REM The estimated person-rem for the two cases considered in this evaluation are listed by category in Table 5A-10. The total person-rem are:
Immediate Additional Decontamination 7,160 - 15,550 person-rem Final Decontamination as a part of of Decommissioning 2,710 - 5,770 person-rem The difference between these ranges (i.e., approximately 4,500 - 9,800 person-rem) is the estimated savings when further decontamination is deferred until after a 30-year period of PDMS.
5A.10 COMPARISON CASE YEAR PDMS The person-rem savings listed in the PEIS (Reference 1) is based on a PDMS duration of 20 years. The estimated person-rem savings, assuming 20 years of PDMS, has been determined for comparison with the PEIS numbers. The estimated total person-rem for this case are 4,100 - 8,800 person-rem, with a resultant savings in the range of 3,100 - 6,800 person-rem. This person-rem estimate for final decontamination following PDMS was determined using the methods described in this Appendix with a 20-year decay factor applied to the dose rates.
5A.11 CONCLUSION Table 5A-10 lists the estimated person-rem for immediate additional decontamination and for final decontamination as a part of decommissioning assuming a 30-year period for PDMS. The estimated occupational person-rem savings from deferring further decontamination of the TMI-2 plant until after a PDMS period of 30 years is in the range of 4500 - 9800 person-rem. Person-rem estimated for activities during PDMS. are small in comparison to the total savings. The range of estimated savings has been determined based on present knowledge of tasks that will be performed during the decontamination, and assuming that the decay of radionuclides during PDMS will be at least that of Cs-137, the predominant dose contributor. It should be noted that Cs-137, with a half-life of 30 years, is one of the longer-lived isotopes.
It is, therefore, conceivable that the dose rates at the end of PDMS will have decreased by more than 50%.
Robotic development during the period of PDMS could also decrease the person-rem from deferred decontamination due to increased efficiency and reliability of the robots, i.e., less job-hours required in radiation areas.
This person-rem evaluation demonstrates that deferring decontamination of TMI-2 beyond that required to achieve the postulated PDMS conditions for a period of 30 years will result in an occupational person-rem savings in the range of 4,500 - 9,800 person-rem; the shorter period of 20 years postulated in Reference 1 will provide estimated savings in the range of 3,100 - 6,800 person-rem. As has been shown, the risk to the general public is negligible during PDMS (References 7 and 13). Therefore, this large estimated person-rem savings clearly warrants deferral of further decontamination beyond that currently included in the TMI-2 Cleanup Program for the period of PDMS.
5.A - 14 UPDATE 2 AUGUST 1997
5A.12 REFERENCES
- 1. NUREG-0683, Supplement No. 3, "Programmatic Environmental Impact Statement...," August 1989
- 2. "Decontamination Task Force Report," by P. R. Bengel, et al,December 18, 1985
- 3. Technical Bulletin 85-1, "Reactor Building General Area Radiation Survey Maps,"
Rev. 3, February 3, 1988
- 4. Technical Bulletin 86-10, ""B" Steam Generator TLD Characterization," Rev. 0, February 18, 1986
- 5. GPU Nuclear memorandum 9240-88-4372 from J. E. Tarpmnian to D. W. Turner, "Comparison of TMI-2 with other B&W Plants," dated February 2, 1988
- 6. BBR GMBH Report Number 595-COlA (82), "Evaluation of the Dose Rate Data of Various Nuclear Power Plants with B&W Nuclear Steam Supply Systems"
- 7. GPU Nuclear memorandum 6615-90-0188, from S. E. Acker to E. D. Schrull, "PDMS SAR Ch 8 Dose Calculations," dated November 5, 1990
- 8. Technical Plan TPO/TMI-188, "TMI-2 Cleanup Program Post-Defueling Monitored Storage,"
Revision 0, January 1987
- 9. "Disposition of the Reactor Building Blockwall," by P. R. Bengel, et al, June 19, 1987 (Attachment to GPU Nuclear Memorandum 4440-87-048)
- 10. "Task Force Report - Reactor Building Basement Decontamination," November 1987
- 11. GPU Nuclear memorandum 9240-88-4521, from D. J. Merchant to J. E. Tarpinian, "Review of 1986 Collective Dose Goal," dated May 9, 1988
- 12. TPO/TMI-009, "Gross Decontamination Experiment Report," Bechtel National, Inc., September 1982
- 13. GPU Nuclear memorandum 6615-92-160, from S. Acker to E. Schrull, "Dose Calculation Results per memo C312-92-1045, PDMS SAR Rev. 16," dated October 27, 1992.
5.A - 15 UPDATE 2 AUGUST 1997
TABLE 5A-1 PHASE Mi END POINT CRITERIA GENERAL AREA DOSE RATE AREA DESCRIPTION R/hr REACTOR BUILDING' Refueling Canal <0.10 Elevation 347' and above (except D-Ring) <0.03 Elevation 305' to 347' <0.10 Basement (El. 282) "As Is" AUXILIARY BUILDING1 Corridors <0.0025 Other Areas <0.05 FUEL HANDLING BUILDING' Corridors <0.0025 Other Areas <0.05 OTHER BUILDINGS Turbine Building <0.0025 Chemical Cleanup Building <0.0025 (except EPICOR II pump area to be left operable)
Service Building Containment <0.0025 Tank Area NOTES:
- 1. Conditions pertain to general area.; excludes "hot spots" (e.g., basement block wall) and those that are locked high radiation areas (e.g., seal injection valve room).
5.A- 16 -UPDATE 2 AUGUST 1997 @
TABLE 5A-2
.END OF PHASE MIAND BASE CASE DOSE RATES REACTOR BUILDING DOSE RATES (mrem/hr)
LOCATION TMI-2 Base Case Top of Reactor Vessel 5 -60 55 Support structure Reactor Vessel Head 24-30 155 Stand Area Pressurizer Top. 400 - 600 25 -65 OTSG Sides 600 -3,000 10 - 35 OTSG Top 80 - 200 10 - 35 00 - >2,000 281' Reactor Building 10,000 - 50,000 <.2-18 D-Ring Walkways 25 - 80 8 Incore Table 120 - 150 4 Equipment Hatch Area 80 - 200 4 5.A - 17 UPDATE 2 AUGUST 1997
I~
TABLE 5A-3 END OF PHASE MIAND BASE CASE DOSE RATES AUXILIARY AND FUEL HANDLING BUILDINGS DOSE RATES (mrem/hr)
LOCATION TMI-2 Base Case General Areas Walkways (non-cubicle areas) 281'" <0.2-20 0.2-18 305' <0.2 <0.2 328' <0.2 <0.2 347' 0.5-30 0.2 Other Areas Make-up Pump Areas 20-80 (A) 26 (high pressure injection) <500 (B)
ND (C)
Concentrated Waste Storage Tank Area 10-22 90 Spent Resin Tank Area ND (B) 0.2-1 (A) 3800 Miscellaneous Waste Tank <50 65 Reactor Coolant Evaporator Room <50 2.2-6.0 Spent Fuel Pool Cooler 0.2-1.0 0.2-.5 Waste Transfer Pump Room <60 0.6-1.0 Reclaim Boric Acid Tank <0.6 15-26 Reclaim Boric Acid Pump <100 8-12 Neutralizer Pump Room 5-36 18-40 Decay Heat Vaults 5-50 3-18 (both)
Reactor Building Spray Pumps 4-15 (A) 0.2-2.5 (both) 50-150 (B)
Auxiliary Sump ND 10-25 Seal Injection Valve Room ND 5-20 Makeup Valve Areas 2-500 12-100 ND - no data 5.A- 18 UPDATE 2 AUGUST 1997
TABLE 5A-4 ESTIMATED Cs AND Sr ACTIVITIES IN THE REACTOR BUILDING Cs-137 Sr-90 SOURCE (Curies) (Cuwies)
D-Ring 'A' 1,660 80 D-Ring 'B' 15,000 750 Block wall 19,000 750 Previously Submerged 7,000 300 Floors and Walls Sediment 460 450
- NOTE: These activities are from Chapter 8 of the PDMS SAR 5.A - 19 UPDATE 2 AUGUST 1997
TABLE 5A-5 DOSE RATES AND ADJUSTED JOB-HOURS POST-PHASE mI POST-PDMS INDEX DECONTAMINATION DOSE RATES DOSE RATES NUMBER TASKS (mrem/hr) JOB-HOURS (mrem/hr) JOB-HOURS 1.0 Reactor Building 1.1 Preparations/Support Activities 1.1.1 Characterization 30 1,901 15 1,721 1.1.2 Ventilation Control - 0 0 and Area Isolation 1.1.3 Health Physics Support1 0 0 1.1.4 Engineering Support 30 3,810 15 3,810 1.2 Basement General Cleanup 100 26,740 50 21,009 1.3 Basement Cubicle Cleanup 100 25,788 50 17,192 1.4 Basement2 Block Wall Removal 8,596 5,731 1.5 D-Ring Dose Reduction 150 9,400 75 4,700 1.6 D-Ring Final Decontamination 100 14,848 50 11,136 1.7 Dome and Polar Crane Decon 50 762 25 381 1.8 El. 347'-0" Decon/Dose Reduction 30 4,700 15 2,350 1.9 El. 347'-0" Final Cleanup 20 37,303 10 18,651 1.10 El. 305'-0" Decon
/Dose Reduction 50 4,700 25 2,350 1.11 El. 305'-0" Final Cleanup 30 38,064 '15 19,032 1.12 Systems Decontamination 1.12.1 Reactor Coolant Sys. 50 267 25 267 1.12.2 Non-RCS Systems 50 2,392 25 2,392 Subtotal 179,268 110,720 5.A - 20 UPDATE 2 AUGUST 1997
TABLE 5A-5 (Cont'd)
DOSE RATES AND ADJUSTED JOB-HOURS POST-PHASE II POST-PDMS INDEX DECONTAMINATION DOSE RATES DOSE RATES NUMBER TASKS (mrem/hr) JOB-HOURS (mrem/hr) JOB-HOURS 2.0 Auxiliary and Fuel Handling Buildings Preparations/Support 2.1 Activities 2.1.1 Characterization 10 1,092 5 767 2.1.2 Health Physics Support - -
2.1.3 Engineering 10 139 5 28 Support 2.2 AFHB Decon/Dose Reduction 10 19,682 5 8.065 Subtotal 20,913 8,861 Total 200,181 119,581 NOTES:
- 1. No job-hours or dose rates are listed for health physics. Person-rem for health physics support is assumed to be 20%
of total person-rem for other tasks.
- 2. Person-rem for removal of the blockwall were developed in Reference 9, therefore, no dose rates were assumed in this evaluation.
5.A - 21 UPDATE 2 AUGUST 1997
TABLE 5A-6 FINAL CLEANUP ACTIVITIES (TYPICAL)
REACTOR BUILDING 1.1 Preparations/Support Activities 1.4 Basement Block Wall Removal Characterization Remove Hand Rail Ventilation Control and Area Isol. Remove Elevator Access Platform Health Physics Support Demolish Elevator Work Platform Engineering Support Core Bore Concrete Beneath Access Remove Structural Steel 1.2 Basement General Cleanup Remove Seismic Screen Core Drill Concrete Block Walls Desludge Floors Cut/Remove Steel Beams Gross Water Flush Remove Access Ladder High Pressure Water Flush Decontaminate Elevator Pit Remove Instrument Racks Fill Pit With Concrete Remove Pumps, Heat Exchangers Dismantle Stairs Concrete pad removal Piping, Cable, Conduit Removal 1.5 D-Ring Dose Reduction Scarify Concrete Wall Scarify Floors Low Pressure Flush All Surfaces Coating Removal From Steel Surfaces Limited Removal of Mirror Insul.
Coating Removal From Contrnnt. Liner Lower Pressure Flush Exposure Surf.
Remove Hoses, General Trash High and Ultrahigh Pressure Flush Remove Ventilation Ducts Limited Coatings Removal Clean Floor Drains Placement of Temporary Shielding Install Waste Handling System Flush/Move Basement Sludge 1.3 Basement Cubicle Cleanup 1.6 D-Ring Final Decon Remove Door, Cages to Cubicles Complete Insulation Removal Concrete Removal for Robot Access Low Pressure Flush All Surfaces Desludge Sump High and Ultrahigh Pressure Flush Flush, Scarify Sump Removal of Contaminated Coatings Chemical Clean Letdown Coolers Clean Platforms, Structural Steel Remove Letdown Coolers Decontaminate RC Pumps Gross Water Flush All Cubicles Scarify Inside D-Ring Walls High Pressure Flush All Cubicles Scarify All Bathtub Ring Areas Remove Piping, Cables, Conduit Paint Removal From Steel Surfaces Scarify Floors of All Cubicles Sandblast RCS Component Surfaces Scarify Walls in All Cubicles Decontaminate/Remove HVAC Ducts Miscellaneous Coatings Removal 5.A - 22 UPDATE 2 AUGUST 1997
TABLE 5A-6 (Cont'd)
FINAL CLEANUP ACTIVITIES REACTOR BUILDING 1.7 Dome and Polar Crane Decon 1.10 El. 305'-0" Decon/Dose Reduction Scarify Crane Rail Support Gross Flush of Overheads and Walls Remove Crane Motors/Equipment Limited Equipment Removal Remove Paint From Crane Placement of Temporary Shielding Remove Dome Coating Above LOCA Ducts Remove Dome Coating Other Areas 1.11 El. 305'-0" Final Cleanup 1.8 El. 347'-0" Decon/Dose Reduction Aggressive Decon Overheads, Walls Remove Concrete Pads Low Pressure Water Flush Decontaminate/Remove Equipment Limited Equipment Removal Clean Drains Placement of Temporary Shielding Decontaminate/Scarify Floors Remove Steel Coatings 1.9 El. 347'-0" Final Cleanup DeconlRemove Defueling Equipment Remove Air Cooler Motors and Fans Aggressive Decon Overheads, Walls Scarify Walls Around Open Stairwell Remove Concrete Pads Remove LCSA Pieces From CFT Decontamination/Remove Equipment Decon/Remove Core Flood Lines Clean Drains Remove Overheads Around Open Stair Decontaminate/Scarify Floors Remove Steel Coatings 1.12 Systems Decontamination Decon/Remove Defueling Equipment Remove LOCA Ducts Reactor Coolant System Scabble Missile Shields Non-RCS Systems Decontaminate Head Cut Up and Remove Plenum AUXILIARY AND FUEL HANDLING BUILDINGS 2.1 Preparations/Support Activities 2.2 AFHB Decon/Dose Reduction Characterization Decon Spent Resin Storage Tanks Health Physics Support Decon Makeup Demin Cubicle Engineering Support Decon Cleanup Demin Cubicle Decon Misc. Waste Holdup Tank Room Decon Seal Injection Valve Room Decon Other AFHB Areas Systems Decon 5.A - 23 AUPDATE 2 AUGUST 1997
TABLE 5A-7 RADIATION AREA JOB-HOURS 2
DTFR 1 TOTAL RADIATION AREA JOB-HOURS TASK DESCRIPTION JOB-HOURS Post-PDMS Post-Phase M 20-Year PDMS 30-Year PDMS 1 RB Characterization 6,400 1,280 1,280 1,280 2 RB Visual Survey 21,060 421 421 421 3 Sludge & Core Bore Visual 13,330 200 20 20 4 RB Decon/Dose Reduction 24,320 4,864 3,405 2,432 5 RB Decon Maintenance 69,680 13,936 9,755 6,968 6 Desludge RB Basement 63,650 9,548 9,548 9,548 7 Decon D Rings Above 282' 37,120 14,848 12,992 11,136 8 RB Basement Recovery 114,610 51,575 42,979 34,383 9 Establish HVAC Control 104,250 0 0 0 10 Decon 347' and above 190,320 38,064 26,645 19,032 11 Decon 305' and above 190,320 38,064 26,645 19,032 12 Robotics 22,880 0 0 0 13 Non RCS SystemsDecon 119,600 2,392 2,392 - 2,392 14 RCS System Decon 13,360 267 267 267 15 Site Engineering 76,190 3,810 3,810 3,810 SUBTOTAL 1,067,090 179,268 140,158 110,720 AFHB 1 AF-B Characterization 45,760 686 686. 686 2 Decon Maintenance 109,200 2,730 1,638 546 3 Tech Spec 106,080 0 0 0 Decontamination 4 AFHB Cubicle Decon 291,200 14,560 10,192 7,280 5 Systems Characterization 27,040 406 243 81 6 Non RCS Systems Decon 239,200 2,392 1,196 239 7 Site Engineering 55,640 139 28 28 SUBTOTAL 874,120 20,913 13,984 8,861 TOTAL 1,941,210 200,181 154,141 119,581 NOTES:
1 DTFR - Decontamination Task Force Report 2 Post-Phase Im - immediate additional decontamination Post-PDMS - Final Decontamination as a part of decommissioning 5.A- 24 UPDATE 2 AUGUST 1997
TABLE 5A-8 ETN AND RWP HOURS ETN RWP HOURS Reactor Building Robotics C91KO01 819.25 Characterization C90KO01 1,213.63 Decontamination C30CO01 0.0 C30DO01 10.80 C30EO01 0.0 C30D002 498.02 K20H015 170.07 D47H004* 1,322.93 Auxiliary & Fuel Handling Building Decontamination J30COll 397.12 J30C012 2,218.47 J30C013 1,491.62 J30C070 148.18 J30J103 3,353.57 J30C082 307.93 J30C083 18.78 J25H001 57,482.77 J30J040 538.65 Characterization Systems J90HOO1 664.32 E30CO01 1,664.37
- Not all the RWPs included in this ETN were for decontamination work. The hours listed are only for decontamination tasks.
5.A - 25 UPDATE 2 AUGUST 1997
TABLE 5A-9
SUMMARY
TABLE FOR PERSON-REM EVALUATION ANALYSIS POST-PHASE III INDEX DECONTAMINATION DOSE RATES P OST-PDMS NUMBER TASKS (mrem/hr) (.JOB-HOUIRS)I PERSON-REM' I OR-HOURS PERqON-REM
] ............ * $ ......... ............
1.0 Reactor Building 1.1 Preparations/Support Activities 1.1.1 Characterization 30 1,901 30-60 1,721 10-30 1,1.2 Ventilation Control & Area Iso. 0 0-0 0 0-0 2
1.1.3 Health Physics Support - 1,110 2,450 370-820 1.1.4 Engineering Support 30 3,810 60-130 3,810 30-60 1.2 Basement General Cleanup 100 26,740 1,340-2,940 21,009 530-1,160 1.3 Basement Cubicle Cleanup 100 25,788 1,290-2,840 17,192 430-950 1.4 Basement Block Wall Removal - 8,596 180-400 5,731 100-210 1.5 D-Ring Dose Reduction 150 9,400 710-1,550 4,700 180-390 1.6 D-Ring Final Decontamination 100 14,848 740-1,630 11,136 280-610 1.7 Dome and Polar Crane Decon 50 761 20-40 381 0-10 1.8 El. 347'-0" Decon/Dose Reduction 30 4,700 70-160 2,350 20-40 1.9 El. 347'-0" Final Cleanup 20 37,303 370-820 18,651 90-210 1.10 El. 305'-0" DeconfDose Reduction 50 4,700 120-260 2,350 30-60 5.A- 26 UPDATE 2 AUGUST 1997
TABLE 5A-9 (Cont'd)
SUMMARY
TABLE FOR PERSON-REM EVALUATION ANALYSIS POST-PHASE III INDEX DECONTAMINATION DOSE RATES POST-PDMS NUMBER TASKS (mrem/hr) (JOB-HOURS) PERSON-REMS JOB-HOURS PERSON-REM 1.11 El. 305'-0" Final Cleanup 30 38,064 570-1,260 19,032 140-310 1.12 Systems Decontamination 10-20 1.12.1 Reactor Coolant System 50 267 10-20 267 0-10 1.12.2 Non-RCS Systems 50 2,392 60-130 2,392 30-70 Subtotal 179,268 6,680 - 14,690 110,720 2,240 - 4,940 2.0 Auxiliary & Fuel Handling Buildings 2.1 Preparations/Support Activities 2.1.1 Characterization 10 1,092 10-10 767 Neg.
2 2.1.2 Health Physics Support 20-50 0-10 2.1.3 Engineering Support 10 139 Neg. 28 Neg.
2.2 AFHB Decon/Dose Reduction 19,682 100-220 8,065 20-40 Subtotal 20,913 130-280 8,861 20-50 Total 200,181 6,810-14,970 .119,581 2,260 5.A- 27 UPDATE 2 AUGUST 1997
TABLE 5A-9 (Cont'd) 4
SUMMARY
TABLE FOR PERSON-REM EVALUATION ANALYSIS NOTES:
- 1. Dose rates for Post-PDMS are 50% of those listed for Post-Phase m.
- 2. Person-rem for health physics support are assumed to be 20% of total person-rem.
- 3. Person-rem for block wall removal are from Reference 9.
- 4. The range of person-rem is assumed to be from 50% below to 10% above the product of dose rate and job-hours columns from Table 5A-9.
- 5. Neg. = Less than 5 person-rem.
5.A - 28 UPDATE 2 AUGUST 1997
TABLE 5A-10 ESTIMATED TOTAL PERSON-REM FOR FINAL DECONTAMINATION OPTIONS 2
POST-PHASE III' POST-PDMS TASK (Person-rem) (Person-rem)
During PDMS N/A 230- 490 Cleanup 6,800 - 15,000 2,300 - 5,000 Radwaste Handling 360- 550 180- 280 Total 7,160 - 15,550 2,710 - 5,770 PDMS Person rem Savings* 4,500 - 9,800
- The savings is defined to be the difference in total person rem required for deferred and immediate decontamination.
NOTES:
- 1. limmediate additional decontamination.
- 2. Final decontamination as a part of decommissioning (30-year PDMS).
5.A - 29 UPDATE 2 AUGUST 1997
APPENDIX 5B DECONTAMINATION ACTIVITIES The primary techniques used to decontaminate the TMI-2 facility are listed below and discussed as appropriate.
a.Kelly Vaccumac b.Scabbling c.Strippable Coatings d.High Pressure Spray e.System Flushing f.Hands-on Decontamination Kelly Vaccumac During the decontamination program, steam cleaning machines, called Kelly Vaccumac, were procured.
Contamination was removed from surfaces by a steam cleaning wand, then vacuumed much like conventional steam cleaning unit used on carpeting.
Concrete Scabbling A concrete scabbler was developed at TMI-2. This machine removed a layer of concrete surface from the floors of many contaminated areas of the plant and vacuumed the residue. Scabbled surfaces were then
-coated or painted to prevent recontamination.
I Strippable Coatings Strippable coatings made of carious polymer substances were applied to surfaces. When subsequently removed, gross particulate contamination adhered and also was removed.
High Pressure Spray and Flushing Several different types of high pressure spray and flush operations were used to decontaminate the plant areas. These techniques varied water temperature and pressure; however, in each case, water was the only medium used to remove loose contamination from walls and surfaces in the various areas of the plant.
Svstem Flushing Processed borated water was circulated through most contaminated systems to remove contaminants. All of the systems were then drained to the extent practical and isolated unless required for PDMS activities.
5.B - I UPDATE 2 - AUGUST 1997
Hands-On Decontamination Hands-on decontamination is a mechanical technique that was generally used on floors and walls to remove loosely held contamination. Typically, rags, absorbent cloths, brushes, and abrasive pads were utilized for this decontamination technique. In addition, mechanically driven hand brushes and floor brushes were utilized where required. Grit or abrasives were added, as necessary, to aid in surface cutting or removal of a portion of the surface if the contamination was more tightly fixed. Occasionally, approved chemical decontamination agents were used to enhance the effectiveness of hands-on techniques. However, no major chemical decontamination activities were conducted.
ROBOTIC DEVICES In several cases, the decontamination equipment was mounted on remotely controlled robots and used to treat surfaces that were inaccessible to personnel. These robots were used in the Reactor Building basement and AFIHB cubicles. Each robot is described below.
System In-Service Inspection (SISI)
In 1982 a device was developed to perform remote sampling and radiation surveys in the makeup purification demineralizer cubicles. This device was a small track, tethered vehicle that contained several CCTV cameras, a radiation detector, and a small manipulator arm for sample collection. Determination of the levels of smearable contamination of the floor surface was the extent of the sample collection intended.
Remote Controlled Mobile Manipulator (RCMM)
In December 1982 a RCMM device, designated "Fred" was purchased. This device was tethered, six-wheeled vehicle with a simple manipulator. The RCMM was used to remotely flush areas in the plant to minimize the requirement for personnel exposure in high radiation areas for extended periods of time. The acquisition of this device essentially was the first use of remote equipment to perform clean up tasks as a means of reducing occupational radiation exposure.
The first use of the RCMM was in the Auxiliary Building for flushing the "B" and "C" reactor coolant bleed tank cubicles and makeup pump 1B room. A high pressure water nozzle mounted on the end of the manipulator arm was used to flush the rooms. A support camera with pend and tile capabilities was used to provide additional viewing capability.
Remote Reconnaissance Vehicle (RRV)
During the first part of 1984 a Remote Reconnaissance Vehicle, designated "ROVER," was delivered to TMI. The RRV was a six-wheeled, tethered mobile vehicle. It contained CCTV cameras for viewing in the forward and rear directions. The tethered playout and takeup was controlled by the RRV operator. A space on the front of the RRV allowed attachment of devices to perform remote activities. During initial use of the RRV, a radiation detector on an x-y positioner allowed surveys and vertical radiation profiles to be performed. Later the RRV was equipped with flushing, core boring, concrete removal and sludge removal tools.
5.13 - 2 UPDATE 2 - AUGUST 1997
Remote Controlled Transport Vehicle (RCTV)
In 1984 a RCTV was loaned to GPU Nuclear Corporation by the Department of Energy. It contained a manipulator arm mounted to a telescoping column. Power and controls to the RCTV are transmitted through a tether that follows the movement of the transporter. Lessons learned during the implementation of the previously used remote vehicles helped make the first use of the RCTV a success.
The first effort with the RCTV was to perform a radiation survey and measure the radiation profile of the "A" and "B" makeup demmeralizer tanks.
Louie-2 GPU Nuclear designed and fabricated a six-wheeled, skid-steered remote vehicle named Louie-2, primarily to remove the highly contaminated grout pad from the floor of the seal injection valve room. The device was configured with a three-piston scabbler and a vacuum shroud to remove the scabbled debris.
The robots developed and used at TMI-2 performed a variety of recovery tasks including data acquisition, dose reduction, and waste management. Throughout the entire cleanup period, new equipment and techniques were developed as necessary to meet the challenges presented by the cleanup task.
In some cases, the most efficient and cost effective means of mitigating the contamination and minimizing exposure was to remove the contaminated equipment involved. It was then packaged and shipped to the appropriate commercial radioactive waste disposal facility.,
WASTE PROCESSING Several processing systems were developed for use in dispositioning both the accident water and the water necessary to accomplish the TMI-2 cleanup operations. Primarily, water use was restricted to the original accident generated water, which was cleaned and reused throughout the cleanup program. The primary water processing systems developed were the Submerged Demineralizer System, EPICOR IL and the Defueling Water Cleanup System.
Submered Demineralizer System The Submerged Demineralizer System (SDS) was a primary water processing system utilizing shielded, expendable vessels. The system was located in the Unit 2 Spent Fuel Pool 'B' and shielded by the pool water. The processing media were zeolites and it was most effective in removing soluble cesium and strontium. At the completion of TMI-2 waste management activities, the system was deactivated, the expendable vessels were disposed of ata commercial radioactive waste burial site or shipped to a DOE research facility, and the shielding water was disposed of as part of the accident generated water disposal program.
5.B - 3 UPDATE 2 - AUGUST 1997
EPICOR II EPICOR II was configured as a primary processing system utilizing three disposable demineralizer vessels (liners). The first position liner utilized zeolites as a processing media and served to remove soluble cesium and strontium. The second and third liners utilized organic resins as the process media, and served primarily as polishers.
Defueling Water Cleanup System (Ion-Exchanger Portion)
The Defueling Water Cleanup System (DWCS) was a primary processing system. It utilized a disposable High Integrity Container (HIC) with zeolites as a processing media. It was effective in removing soluble cesium and strontium. Like the SDS, it was deactivated at the conclusion of the TMI-2 waste management activities.
5.B - 4 UPDATE 2 - AUGUST 1997
CHAPTER 6 DEACTIVATED SYSTEMS AND FACILITIES CHAPTER 6
DEACTIVATED SYSTEMS AND FACIHTIES TABLE OF CONTENTS SECTION TITLE PAGE
6.0 INTRODUCTION
6.0-1 6.1 DEACTIVATED FACILITIES 6.1-1 6.1.1 DELETED 6.1-1 6.1.2 DELETED 6.1-1 6.1.3 CONTAINMENT AIR CONTROL ENVELOPE 6.1-1 6.1.4 CIRCULATING WATER PUMP HOUSE 6.1-1 6.1.5 CIRCULATING WATER CHLORINATOR HOUSE 6.1-1 6.1.6 NATURAL DRAFT COOLING TOWERS 6.1-2 6.1.7 MECHANICAL DRAFT COOLING TOWER 6.1-2 6.1.8 DELETED 6.1-2 6.1.9 TENDON ACCESS GALLERY 6.1-2 6.1.10 RIVER WATER AND FIRE PUMP HOUSE 6.1-2 6.1.11 BWST PIPE CHASE 6.1-3 6.1.12 CONTROL BUILDING (M-20) AREA EAST 6.1-3 6.1.13 CONTROL BUILDING (M-20) AREA WEST 6.1-3 6.1.14 DELETED 6.1-3 6.2 DEACTIVATED PASSIVE SYSTEMS 6.2-1 6.2.1 MAIN AND REHEAT STEAM SYSTEM 6.2-1 6.2.1.1 System Design 6.2-1 6.2.1.2 PDMS Function 6.2-1 i UPD'ATE 2 - AUGUST 1997
CHAPTER 6 TABLE OF CONTENTS (Cont'd)
SECTION TITLE PAGE 6.2.2 PRIMARY NUCLEAR PLANT HYDROGEN SUPPLY' 6.2-1 SYSTEM 6.2.2.1 System Design 6.2-1 6.2.2.2 PDMS Function 6.2-2 6.2.3 FUEL HANDLING AND STORAGE SYSTEM 6.2-2 6.2.3.1 System Design 6.2-2 6.2.3.2 PDMS Function 6.2-2 6.2.4 STANDBY REACTOR COOLANT PRESSURE 6.2-2 CONTROL SYSTEM 6.2.4.1 System Design 6.2-2 6.2.4.2 PDMS Function 6.2-2 6.2.5 MINI-DECAY HEAT REMOVAL SYSTEM 6.2-3 6.2.5.1 System Design 6.2-3 6.2.5.2 PDMS Function 6.2-3 6.2.6 SPENT FUEL COOLING SYSTEM 6.2-3 6.2.6.1 System Design 6.2-3 6.2.6.2 PDMS Function 6.2-3 6.2.7 REACTOR COOLANT MAKEUP AND PURIFICATION 6.2-4 SYSTEM 6.2.7.1 System Design 6.2-4 6.2.7.2 PDMS Function 6.2-4 6.2.8 DECAY HEAT REMOVAL SYSTEM 6.2-5 6.2.8.1 System Design 6.2-5 6.2.8.2 PDMS Function 6.2-5 ii UPDATE 2 - AUGUST 1997
CHAPTER 6 TABLE OF CONTENTS (Cont'd)
SECTION TITLE PAGE 6.2.9 REACTOR BUILDING LEAK RATE TEST SYSTEM 6.2-5 6.2.9.1 System Design 6.2-5 6.2.9.2 PDMS Function 6.2-6 6.2.10 SERVICE AIR SYSTEM 6.2-6 6.2.10.1 System Design 6.2-6 6.2.10.2 PDMS Function 6.2-6 6.2.11 CHEMICAL ADDITION SYSTEM 6.2-6 6.2.11.1 System design 6.2-6 6.2.11.2 PDMS Function 6.2-6 6.2.12 REACTOR BUILDING EMERGENCY SPRAY SYSTEM 6.2-6 6.2.12.1 System Design 6.2-6 6.2.12.2 PDMS Function 6.2-7 6.2.13 NUCLEAR SAMPLING SYSTEM 6.2-7 6.2.13.1 System Design 6.2-7 6.2.13.2 PDMS Function 6.2-7 6.2.14 NUC. PLANT AND RADWASTE NITROGEN SYSTEMS 6.2-7 6.2.14.1 System Design 6.2-7 6.2.14.2 PDMS Function 6.2-7 6.2.15 DECAY HEAT CLOSED COOLING WATER SYSTEM 6.2-8 6.2.15.1 System Design 6.2-8 6.2. 15.2 PDMS Function 6.2-8
°ii UPDATE 2 - AUGUST 1997
CHAPTER 6 TABLE OF CONTENTS (Cont'd)
SECTION TITLE PAGE 6.2.16 RADWASTE DISPOSAL, WASTE DISPOSAL GAS SYSTEM 6.2-8 6.2.16.1 System Design 6.2-8 6.2.16.2 PDMS Function 6.2-8 6.2.17 REACTOR BUILDING EMERGENCY COOLING WATER 6.2-8 SYSTEM 6.2.17.1 System Design 6.2-8 6.2.17.2 PDMS Function 6.2-9 6.2.18 INTERMEDIATE CLOSED COOLING WATER SYSTEM 6.2-9 6.2.18.1 System Design 6.2-9 6.2.18.2 PDMS Function 6.2-9 6.2.19 FUEL POOL WASTE STORAGE SYSTEM 6.2-9 6.2.19.1 System Design 6.2-9 6.2.19.2 PDMS Function 6.2-10 6.2.20 TEMPORARY NUCLEAR SAMPLING SYSTEM 6.2-10 6.2.20.1 System Design 6.2-10 6.2.20.2 PDMS Function 6.2-10 6.2.21 OTSG CHEMICAL CLEANING SYSTEM 6.2-10 6,2.21.1 System Design 6.2-10 6.2.21.2 PDMS Function 6.2-10 6.2.22 CORE FLOODING SYSTEM 6.2-11 iv UPDATE 2- Al.UGUST 1997
... 10-
CHAPTER 6 TABLE OF CONTENTS (Cont'd)
SECTION TITLE PAGE 6.2.22.1 System Design 6.2-11 6.2.22.2 PDMS Function 6.2-11 6.2.23 FEEDWATER SYSTEM 6.2-11 6.2.23.1 System Design 6.2-11 6.2.23.2 PDMS Function 6.2-11 6.2.24 NUC. SERVICES CLOSED COOLING WATER SYSTEM 6.2-11 6.2.24.1 System Design 6.2-11 6.2.24.2 PDMS Function 6.2-12 6.2.25 HYDROGEN RECOMBINER 6.2-12 6.2.25.1 System Design 6.2-12 6.2.25.2 PDMS Function 6.2-12 6.2.26 EMERGENCY FEEDWATER SYSTEM 6.2-12 6.2.26.1 System Design 6.2-12 6.2.26.2 PDMS Function 6.2-10 6.2.27 REACTOR COOLANT SYSTEM 6.2-12 6.2.27.1 System Design 6.2-12 6.2.27.2 PDMS Function 6.2-13 6.2.28 SOLID RADWASTE DISPOSAL SYSTEM 6-.2-13 6.2.28.1 System Design 6.2-13 6.2.28.2 PDMS Function 6.2-13 6.2.29 REACTOR FEEDWATER HEAT SYSTEM 6.2-13 V UPDATE: - AUGUST 1997
CHAPTER 6 TABLE OF CONTENTS (Cont'd)
SECTION TITLE PAGE 6.2.29.1 System Design 6.2-13 6.2.29.2 PDMS Function 6.2-13 6.2.30 STEAM GENERATOR SECONDARY VENTS & DRAINS 6.2-14 SYSTEM 6.2.30.1 System Design 6.2-14 6.2.30.2 PDMS Function 6.2-14 6.2.31 DEWATERING SYSTEM 6.2-14 6.2.31.1 System Design 6.2-14 6.2.31.2 PDMS Function 6.2-14 6.2.32 FUEL TRANSFER CANAL FILL AND DRAIN SYSTEM 6.2-14 6.2.32.1 System Design 6.2-14 6.2.32.2 PDMS Function 6.2-15 6.2.33 DELETED 6.2-15 6.2.33.1 DELETED 6.2-15 6.2.33.2 DELETED 6.2-15 6.2.34 DELETED 6.2-15 6.2.35 DELETED 6.2-15 6.2.35.1 DELETED 6.2-15 6.2.35.2 DELETED 6.2-15 vi UPDATE 2 - AUGUST 1997
CHAPTER 6 TABLE OF CONTENTS (Cont'd)
SECTION TITLE PAGE 6.2.36 SUBMERGED DEMINERALIZER SYSTEM 6.2-15 6.2.36.1 System Design 6.2-15 6.2.36.2 PDMS Function 6.2-15 6.2.37 DELETED 6.2-15 6.2.38 OTSG RECIRCULATING SYSTEM 6.2-15 6.2.38.1 System Design 6.2-15 6.2.38.2 PDMS Function 6.2-16 6.2.39 DECONTAMINATION SERVICE AIR SYSTEM 6.2-16 6.2.39.1 System Design 6.2-16 6.2.39.2 PDMS Function 6.2-16 6.2.40 DECON PROCESSED WATER SYSTEM 6.2-16 6.2.40.1 System Design 6.2-16 6.2.40.2 PDMS Function 6.2-16 6.2.41 SLUDGE TRANSFER AND PROCESSING SYSTEM 6.2-16 6.2.41.1 System Design 6.2-16 6.2.41.2 PDMS Function 6.2-17 6.2.42 DEFUELING WATER CLEANUP SYSTEM 6.2-17 6.2.42.1 System Design 6.2-17 6.2.42.2 PDMS Function 6.2-17 6.2.43 PLASMA ARC NITROGEN SYSTEM 6.2-17 vii UPDATE 2 - AUGUST 1997
CHAPTER 6 TABLE OF CONTENTS (Cont'd)
SECTION TITLE PAGE 6.2.43.1 System Design 6.2-17 6.2.43.2 PDMS Function 6.2-17 6.2.44 Reactor Building Sump Level System 6.2-17 6.2.44.1 System Design 6.2-17 6.2.44.2 PDMS Function 6.2-18 6.2.45 Reactor Building Air Sampling System 6.2-18 6.2.45.1 System Design 6.2-18 6.2.45.2 PDMS Function 6.2-18 6.2.46 Waste Disposal Liquid, Reactor Coolant System 6.2-18 6.2.46.1 System Design 6.2-18 6.2.46.2 PDMS Function 6.2-18 6.2.47 Secondary Plant Sampling System 6.2-18 6.2.47.1 System Design 6.2-18 6.2.47.2 PDMS Function 6.2-18 6.2.48 MakeUp Water Treatment and Condensate Polishing System 6.2-19 6.2.48.1 System Design 6.2-19 6.2.48.2 PDMS Function 6.2-19 6.3 DEACTIVATED SYSTEMS 6.3-1 6.3.1 AUXILIARY STEAM SYSTEM 6.3-1 6.3.2 DELETED 6.3-1 viii UPDATE 2 - AUGUST 1997
CHAPTER 6 TABLE OF CONTENTS (Cont'd)
SECTION TITLE PAGE 6.3.3 DELETED 6.3-1 6.3.4 DELETED 6.3-1 6.3.5 DELETED 6.3-1 6.3.6 DELETED 6.3-1 6.3.7 DELETED 6.3-1 6.3.8 INSTRUMENT AIR SYSTEM 6.3-1 6.3.9 DELETED 6.3-1 6.3.10 DELETED 6.3-1 6.3.11 DELETED 6.3-1 6.3.12 DELETED 6.3-1 6.3.13 DEMINERALIZED SERVICE WATER SYSTEM 6.3-1 6.3.14 DELETED 6.3-2 6.3.15 NUCLEAR SERVICES RIVER WATER SYSTEM 6.3-2 6.3.16 REACTOR BUILDING NORMAL COOLING WATER 6.3-2 SYSTEM 6.3.17 REACTOR BUILDING PENETRATIONS FORCED AIR 6.3-2 COOLING SYSTEM 6.3.18 DELETED 6.3-2 6.3.19 CIRCULATING WATER SYSTEM 6.3-2 6.3.20 DELETED 6.3-2 6.3.21 ENVIRONMENTAL BARRIER SYSTEM 6.3-2 ix UPDATI 2 - AUGUST 1997
CHAPTER 6 TABLE OF CONTENTS (Cont'd)
SECTION TITLE PAGE 6.3.22 PENETRATION PRESSURIZATION SYSTEM 6.3-3 6.3.23 GLAND STEAM SYSTEM 6.3-3 6.3.24 DELETED 6.3-3 6.3.25 DELETED 6.3-3 6.3.26 DELETED 6.3-3 6.3.27 DELETED 6.3-3 6.3.28 DELETED 6.3-3 6.3.29 DELETED 6.3-3 6.3.30 DELETED 6.3-3 6.3.31 DELETED 6.3-3 6.3.32 DELETED 6.3-3 6.3.33 DELETED 6.3-3 6.3.34 DELETED 6.3-3 6.3.35 DELETED 6.3-3 6.3.36 DELETED 6.3-3 6.3.37 DELETED 6.3-3 6.3.38 DELETED 6.3-3 6.3.39 DELETED 6.3-3 6.3.40 TEMPORARY NUCLEAR SERVICES CLOSED 6.3-3 COOLING SYSTEM 6.3.41 DELETED 6.3-3 6.3.42 DELETED 6.3-4 X UPDATE 2 - AUGUST 1997
CHAPTER 6 TABLE OF CONTENTS (Cont'd)
SECTION TITLE PAGE 6.3.43 DELETED 6.3-4 6.3.44 DELETED 6.3-4 6.3.45 DELETED 6.3-4 6.3.46 DELETED 6.3-4 6.3.47 DELETED 6.3-4 6.3.48 DELETED 6.3-4 6.3.49 DELETED 6.3-4 6.3.50 EARTHQUAKE DETECTION SYSTEM 6.3-4 6.3.51 REACTOR COOLANT PUMPS MOTOR OIL DRAIN 6.3-4 SYSTEM 6.3.52 DELETED 6.3-45 6.3.53 DELETED 6.3-5 6.3.54 DELETED 6.3-5 6.3.55 DELETED 6.3-5 6.3.56 POLAR CRANE 6.3-5 6.4 DELETED 6.4- 1 6.5 SYSTEM REFERENCES 6.5-1 xi UPDATE 2 - AUGUST 1997
CHAPTER 6 TABLE OF CONTENTS (Cont'd)
LIST OF TABLES TABLE NO. TITLE PAGE 6.1-1 DEACTIVATED FACILITIES 6.1-4 6.2-1 DEACTIVATED PASSIVE SYSTEMS 6.2-20 6.3-1 DEACTIVATED SYSTEMS 6.3-6 6.5 SYSTEM REFERENCES 6.5-1 xii UPDATE 2 - AUGUST 1997
CHAPTER 6 DEACTIVATED SYSTEMS AND FACILITIES
6.0 INTRODUCTION
This chapter describes those systems and facilities which have been deactivated for PDMS. There are two categories of deactivated systems and facilities: 1) deactivated systems and facilities with passive PDMS functions and 2) deactivated systems and facilities.
The first category consists of those systems or facilities which have been deactivated but provide the passive function(s) during PDMS of contamination control and/or containment isolation. No effort will be expended to maintain the design functional capability of these systems and facilities.
However, the passive function(s) of the affected systems or facilities will be maintained throughout PDMS to provide reasonable assurance that TMI-2 can be maintained in the PDMS condition with no risk to the health and safety of the public. The passive function of containment isolation will be maintained as required in the PDMS technical specifications section 3.1.1.1, primary containment isolation. The passive function of contamination control will be maintained by adherence to the requirements of the TMI Radiation Protection Program and 1000-PLN-7200.04 (PDMS Quality Assurance Plan).
The second category consists of those systems and facilities which are deactivated because they serve no active or passive function during PDMS. No maintenance is required and no attempts will be made to preserve or maintain these systems and facilities.
Tables 6.1-1, 6.2-1, and 6.3-1 provide a listing of those facilities and systems which will be deactivated during PDMS. These tables also provide other relevant status information for the listed facilities and systems.
Equipment, components, and parts may be removed from systems and facilities designated as deactivated, and used for other purposes, provided their removal does not adversely affect the PDMS function of the system(s) or facilities involved. This may include complete system dismantlement, component removal for use elsewhere, and possible conversion of portions of systems for other uses.
Similarly, equipment, components, and parts may be removed from systems and facilities designated as deactivated with PDMS passive functions provided, the passive function is not compromised or provided, decontamination activities have negated the need for the passive function of contamination control.
A detailed original design description of deactivated facilities and systems may be found in the TMI-2 FSAR and/or system operating description books.
6.0-1 UPDATE 5 - AUGUST 2003
6.1 DEACTIVATED FACILITIES Table 6. 1-1 provides a listing of deactivated facilities for TMI-2. Also listed are the status of internal contamination and relevant remarks regarding the final layup of the facility. The following sections address the facility description and the PDMS function of the facility.
6.1.1 DELETED 6.1.2 DELETED 6.1.3 CONTAINMENT AIR CONTROL ENVELOPE The CACE was installed during the cleanup period and provided space to mobilize equipment and materials needed to support the in-containment activities through defueling. Location of the CACE at the equipment hatch allows equipment and materials to be moved into and out of the Containment Building with a minimum of difficulty through the equipment hatch airlock doors. The CACE served as an aid in the control of the spread of contamination and airborne radioactivity during those times when the airlock doors were opened.
During PDMS, this facility serves no active function and as such is designated deactivated. Certain types of RB entries require the CACE to be in a closed condition; thus, the CACE serves a passive function.
6.1.4 CIRCULATING WATER PUMP HOUSE The Circulating Water Pump House contained the six circulating water pumps and their controls which provide, a flowpath from the circulating water flume to the main condenser.
This facility has had its contents dismantled, the pump bay filled in and is being utilized by the site transportation department. Final Decommissioning release surveys were completed on the pump basin prior to filling it with crushed stone. Since this constituted final release surveys, the area is posted with warning signs against the admittance of radioactive material into the building.
Reference 6.5-129.
6.1.5 CIRCULATING WATER CHLORINATOR HOUSE The Circulating Water Chlorinator House contained the chlorine evaporator, chlorinator and ejector and storage tanks in addition to the sulfuric acid storage tank. This facility supported the chemical treatment of the Circulating Water System. All equipment and hazardous materials (chlorine, sulfuric acid) have been removed.
During PDMS, this facility serves no active or passive function and as such is designated deactivated.
6.1-1 UPDATE3- AUGUST 1999
6.1.6 NATURAL DRAFT COOLING TOWERS Two cooling towers were provided as a heat sink for the plant circulating water system.
During PDMS, these towers serve no active or passive function and as such are designated deactivated.
Therefore, the combustible material from this facility has been removed. The aircraft warning lights will remain operational.
6.1.7 MECHANICAL DRAFT COOLING TOWER The original design of the Mechanical Draft Cooling Tower was to remove the heat added by the Service Cooling Water Systems before it was returned to the river.
This facility has been dismantled and the combustible material has been removed, only the concrete basin and pump house remain.
6.1.8 DELETED 6.1.9 TENDON ACCESS GALLERY The Tendon Access Gallery provided access for initial positioning and tightening of the Tendon Post-Tensioning System during construction. The Tendon Post-Tensioning System is grouted and as such does not require periodic torquing.
During PDMS, this facility serves the passive function of contamination control and housing an operational sump pump 6.1.10 RIVER WATER PUMP HOUSE The River Water Pump House provided a structure for intake water supplied to the various nuclear and service water systems and the Unit 2 diesel fire pump (FS-P-1) in the adjacent Fire Pump House structure.
During PDMS, these facilities and the systems within these facilities serve no active or passive function and as such are designated deactivated. The contents of this facility are being dismantled and the combustivle material removed.
Following this dismantllement, the 312' elevation of the River Water Pump House is being converted to serve as a facility for the storage and testing of various non-radiological robotic equipment and mock-ups. Use of this area for this purpose has no effect on the deactivated status of this facility as related to PDMS.
6.1-2 UPDATE 2- AUGUST 1997
6.1.11 BWST PIPE CHASE The Borated Water Storage Tank (BWST) Pipe Chase is an underground tunnel extending from the BWST into the Auxiliary Building on the east side. It enclosed piping for the Decay Heat Removal and Building Spray Systems. During PDMS, this area serves the passive function of contamination control.
6.1.12 CONTROL BUILDING (M-20) AREA EAST The Control Building Area is the plant area below elevation 305' between the Turbine, Reactor, and Service Buildings. The east portion is separated from the west by a barrier wall. This area provides access to the Tendon Access Gallery on the east side and the Control and Service Buildings from the Turbine Building.
During PDMS, this area serves the passive functions of housing containment isolations and contamination control. It also contains a portion of the cork seam monitoring system.
6.1.13 CONTROL BUILDING (M-20) AREA WEST The Control Building Area west portion houses the turbine-driven Emergency Steam Generator Feed Pump, Main Steam Isolations, Relief and Atmospheric Vent Valves, the Control Building Area Sump, and Unit Substations 2-34 and 2-44. This area also provides access to the Tendon Access Gallery on the west side.
During PDMS, this area serves the passive functions of housing containment isolations and contamination control. However, one sump pump and a portion of the cork seam monitoring system will remain operational.
6.1.14 DELETED 6.1-3 UPDATE 3 - AUGUST 1999
TABLE 6. 1-1 DEACTIVATED FACILITIES PDMS INTERNAL FACILITY DESCRIPTION FUNCTION CONTAMINATION ISOLATION REMARKS DELETED CACE PASSIVE YES YES Residual fixed contamination in some floor areas Circulating Water Pump House NONE NO NO In use by Transportation Dept.
Reference 6.5-129 Circulating Water Chlorinator NONE NO NO House Natural Draft Cooling Towers NONE NO NO Aircraft warning lights are operational.
Mechanical Draft Cooling Tower NONE N/A N/A Dismantled.
DELETED Tendon Access Gallery Sump PASSIVE YES YES Residual contamination in sump; one pump operational.
DELETED 6.1-4 UPDATE 3 - AUGUST 1999
TABLE 6.1-1 (Cont'd)
DEACTIVATED FACILITIES PDMS INTERNAL CONTAINMENT FACILITY DESCRIPTION FUNCTION CONTAMINATION ISOLATION REMARKS BWST Pipe Chase PASSIVE YES NO Residual contamination in pipe chase and Decay Heat Removal piping.
Control Building (M-20) Area East PASSIVE YES YES Residual contamination in access trunk to tendon access gallery. Cork Seam Monitoring System Control Building (M-20) Area West PASSIVE YES YES Residual contamination in main steam lines and control building area sump; one sump pump operational. Cork Seam Monitoring System DELETED 6.1-5 UPDATE 2 - AUGUST 1997
6.2 - DEACTIVATED PASSIVE SYSTEMS This section describes those systems which have been deactivated but provide some passive function during PDMS._No effort will be expended to maintain the design function of these systems. The identified passive function or functions of the affected systems will be maintained through the PDMS configuration of the TMIý2 facility. Equipment, components, and parts may be removed from these systems provided the passive function is not compromised or provided decontamination and dismantlement activities have negated the need for the passive function. Removal may involve dismantlement, scrap recovery or conversion of components or systems to other uses in support of dismantlement or in support of Unit 1 activities.
Table 6.2-1 provides a listing of deactivated passive systems for the TMI-2 facility. Also listed are the system code, status of containment isolation, whether the system has internal contamination, and relevant remarks regarding the final layup of the system. Each of the following sections addresses the original design function of the system and its PDMS passive function or functions. Additional reference information is listed in Section 6.5.
6.2.1 MAIN AND REHEAT STEAM SYSTEM 6.2.1.1 System Design The main steam piping was originally designed to deliver main steam from the steam generators to the high pressure turbine. It was also designed to provide main steam to the steam generator feed pump turbines, emergency steam generator feed pump turbine, second stage reheaters of the moisture separator-reheaters, turbine bypass valves, and the turbine gland seal system.
The primary function of the Reheat Steam Piping System was to deliver reheat steam from upstream of the high pressure turbine to the moisture separator-reheaters to reheat the high pressure turbine exhaust steam. It also provided reheat steam to the steam generator feed pump turbines.
6.2.1.2 PDMS Function This Main and Reheat Steam System provides no active function during PDMS. The passive functions provided by this system during PDMS are Containment isolation and contamination control. The Containment isolation function is provided by maintaining valves MS-V I A/B, MS-V2A/B, MS-V4A/B, MS-V11 A/B, MS-V7A/B, MS-VI 5A/B, MS-V50A/B, MS-V5 I A/B, MS-V224, MS-V225, MS-V226, and MS-V227 in the closed position. Also MS-R-21A/B, MS-R-22A/B, MS-R-23A/B, MS-R-24A/B, MS-R-25A/B, MS-R-26A/B, MS-R-27A/B, MS-R-28A/B, MS-R-29A/B AND MS-R-30MB are in the closed position.
6.2.2 PRIMARY NUCLEAR PLANT HYDROGEN SUPPLY SYSTEM 6.2.2.1 System Design The Nuclear Plant Hydrogen Supply System was designed to store nuclear grade hydrogen and supply it at a reduced pressure to the make-up tank in the Auxiliary Building. Hydrogen was used in the priniar%
coolant to reduce the concentration of free oxygen.
6.2- 1 UPDATE 3 - AUGUST 19'9)
6.2.2.2 PDMS Function This system provides no active function during PDMS. The passive function provided by this 'system during PDMS is contamination control. All hydrogen bottles have been removed.
6.2.3 FUEL HANDLING AND STORAGE SYSTEM 6.2.3.1 System Design The Fuel Handling and Storage System was designed to provide the capability of receiving new fuel assemblies, storing new and spent fuel assemblies, delivering new fuel to the reactor core, removing spent fuel from the reactor core, rearranging fuel within the core and transferring spent fuel from the site.
This system was modified and utilized during the cleanup period to receive fuel canisters and transfer them from the Reactor Vessel to the Spent Fuel Pool for eventual transfer off-site.
6.2.3.2 PDMS Function This system provides no active function during PDMS. The passive functions provided by this system during PDMS are Containment isolation and contamination control. The Containment isolation function is provided by blind flanges installed downstream of valves FH-VIA/B with test valves FH-VIC/D on the flanges in the closed position. Contamination within Spent Fuel Pools (SFP) "A" and "B" is controlled by a sheet metal cover installed above each SFP. The covers consist of steel roof decking supported by structural steel beams strung across each SFP. Included in each cover is a filter to contain the spread of contamination from the SFP and an access port to allow personnel access to the inside of the SFP.
6.2.4 STANDBY REACTOR COOLANT PRESSURE CONTROL SYSTEM 6.2.4.1 System Design The Standby Reactor Coolant Pressure Control System was designed and installed during the TMI-2 cleanup period for maintaining RCS volume and pressure control.
6.2.4.2 PDMS Function This system provides no active function during PDMS., The passive function provided by this system during PDMS is contamination control.
6.2- 2 UPDATE 2 - AUGUST 1997
6.2.5 MINI-DECAY HEAT REMOVAL SYSTEM 6.2.5.1 System Design The Mini-Decay Heat Removal (MDHR) System was designed and installed during the TMI-2 cleanup period. The MDHR system was designed to remove heat from the Reactor Coolant System by forced circulation through the core, provide a means for sampling the Reactor coolant System and control ambient temperature and airborne contamination levels in the pump and heat exchanger vault.
6.2.5.2 PDMS Function This system provides no active function during PDMS. The passive function provided by this system during PDMS is contamination control. This system was never actually used during the cleanup period.
6.2.6 SPENT FUEL COOLING SYSTEM 6.2.6.1 System Design The Spent Fuel Cooling System was designed to remove the decay heat generated by the spent fuel stored within the fuel pools and purify the water in the Fuel Transfer Canal and the fuel storage pools.
Other functions of the system were as follows:
- a. Filled and drained the Fuel Transfer Canal.
- b. Purified the water in the Fuel Transfer Canal during refueling operations.
- c. Purified the water in the Borated Water Storage Tank after a refueling.
- d. Drained and filled the storage pools when required.
- e. Purified the water in the RCS while in the decay heat removal mode of operation.
- f. Recovery flow path for DWCS-FTC "A" SFP Clean-Up System.
6.2.6.2 PDMS Function This system provides no active function during PDMS. The passive functions provided by this system during PDMS are Containment isolation and contamination control. The Containment isolation function is provided by maintaining valve SF-V105 in the closed position.
6.2- 3 UPDATE 2 - AUGUST 1997
6.2.7 REACTOR COOLANT MAKEUP AND PURIFICATION SYSTEM 6.2.7.1 System Design The Makeup and Purification System was designed to provide a means for controlling the reactor coolant inventory during reactor power operations as well as maintaining the water quality and chemistry of the coolant within prescribed specifications. The system also served to accomplish the following:
- a. Provided seal injection water to the Reactor Coolant Pumps to establish a primary coolant pressure boundary and to supply pump cooling water.
- b. Provided a means of venting radioactive and,flammable gases from the RCS.
- c. Added makeup water to the core flooding tanks.
- d. Served a safety features function by injecting high pressure water into the RCS in the event of a LOCA.
- e. Provided an indication of failed fuel.
6.2.7.2 PDMS Function This system provides no active function during PDMS. The passive functions provided by this system during PDMS are Containment isolation and contamination control. The Containment isolation function is provided by maintaining valves MU-V16A/B/C/D, MU-V366, MU-V368, MU-V376, MU-V377, MU-V18, MU-V379, MU-V315, MU-V316, MU-V380, MU-V381, MU-V382, MU-V383A/B/C/D, and MU-V384A/B/C/D in the closed position.
6.2- 4 UPDATE 2 - AUGUST 1997
6.2.8 DECAY HEAT REMOVAL SYSTEM 6.2.8.1 System Design The Decay Heat Removal system was designed to provide the following functions:
- a. Remove core decay heat after the reactor coolant had reached the minimum temperature possible with condensate and feedwater cooling (2500F). Heat was removed from both the core and pressurizer.
- b. Fill, recirculate, purify (via the spent fuel system), and drain the Fuel Transfer Canal for refueling.
- c. Minimize the consequences of a loss of coolant accident in the following manner:
- 1. By injecting borated water and sodium hydroxide solutions into the core at a low reactor pressure.
- 2. By providing long term cooling after a LOCA by recirculating water from the Reactor Building sump to the core.
- 3. By supplying the suction of the high pressure injection makeup pumps for long-term cooling after a LOCA.
- 4. By supplying the building spray pumps with water from the BWST, the sodium hydroxide tanks, or from the Reactor Building sump.
- d. Circulating the contents of the BWST tank for mixing and sampling.
- e. Serve as a Recovery flow path for borated water to the defueling water clean-up system.
6.2.8.2 PDMS Function This system provides no active function during PDMS. The passive functions provided by this system during PDMS are Containment isolation, contamination control, and RB sump level and pumpdown flow path. The Containment isolation function is provided by maintaining valves DH-V3, DH-V4A/B, DH-V6A/B, DH-V187, DH-V205, and DH-V225 in the closed position.
6.2.9 REACTOR BUILDING LEAK RATE TEST SYSTEM 6.2.9.1 System Design The Reactor Building leak rate test system was designed to verify the leak tightness of the Containment.
6.2-5 UPDATE 2 - AUGUST 1997
6.2.9.2 PDMS Function This system serves no active function during PDMS. The passive function provided by this system during PDMS is Containment isolation which is ensured by installed blind flanges on penetrations R-571A and R-571D and a welded cap on R-571B.
6.2.10 SERVICE AIR SYSTEM 6.2.16.1 System Design The Service Air was piped to quick-disconnect hose connections throughout the plant and was used by the demineralizer systems for resin mixing and transport and other pneumatic equipment. Air for these purposes was oil-free, but not specially dried. Breathing air could be taken from the Service Air System at any of the outlets if the proper adapters were used.
6.2.10.2 PDMS Function This system provides no active function during PDMS. However, portions of the Service Air System are utilized by the Compressed Air System (see section 7.2.6.4). The passive function provided by this system during PDMS is Containment isolation. The Containment isolation function is provided by maintaining valve SA-V20 in the closed position.
6.2.11 CHEMICAL ADDITION SYSTEM 6.2.11.1 System design The Chemical Addition System was designed to perform the following functions:
- a. Dissolve chemicals in demineralized water.
- b. Store dissolved chemicals.
- c. Provide positive manual control of the transfer of chemicals to the appropriate system in the required quantity and concentration.
- d. Provide a means of sampling all chemical concentrations.
6.2.11.2 PDMS Function This system provides no active function during PDMS. The passive function provided by this system during PDMS is contamination control.
6.2.12 REACTOR BUILDING EMERGENCY SPRAY SYSTEM 6.2.12.1 System Design The Reactor Building Emergency Spray was designed to cool the Reactor Building atmosphere following a RCS piping rupture, thereby effecting a pressure reduction within the building, and consequently, minimizing the potential leakage of radioactivity from the building to the site and surrounding areas.
The spray system also functioned to remove radioiodine from the Reactor Building atmosphere by chemical reaction and to wash suspended particulate radioactivity out of the Reactor Building atmosphere.
6.2- 6 UPDATE 2- AUGUST 1997
6.2.12.2 PDMS Function This system provides no active function during PDMS. However, RB pressure monitoring is provided via BS-V 146 and 149 for RB pressure indication and a 0.5 psig Hi RB pressure alarm. A portion of the R.B. spray system piping will be utilized as a flow path for R.B. sump draining if required. The passive functions provided by this system during PDMS are Containment isolation and contamination control. The Containment isolation function is provided by maintaining valves BS-V148, BS-V147, BS-VIA/B BS-Vl30A/B in the closed position.
6.2.13 NUCLEAR SAMPLING SYSTEM 6.2.13.1 System Design The Nuclear Sampling System was designed to provide the capability to obtain representative liquid and gas samples from nuclear systems.
6.2.13.2 PDMS Function This system provides no active function during PDMS. The passive functions provided by this system during PDMS are Containment isolation and contamination control. The Containment isolation function is provided by maintaining valves CA-V8, CA-V9, and CA-V10 in the closed position.
6.2.14 NUCLEAR PLANT AND RADWASTE NITROGEN SYSTEMS 6.2.14.1 System Design The Nuclear Plant and Radwaste Nitrogen System was designed to store and supply nuclear grade nitrogen at various pressures to several systems in the Reactor and Auxiliary Buildings and storage tanks in the yard.
6.2.14.2 PDMS Function This system provides no active function during PDMS. The passive functions provided by this system during PDMS are Containment isolation and contamination control. The Containment isolation function is provided by maintaining valve NM-V52 in the closed position. All nitrogen bottles have been removed.
6.2-7 UPDATE 3 - AUGUST 14094)
6.2.15 DECAY HEAT CLOSED COOLING WATER SYSTEM 6.2.15.1 System Design The Decay Heat Closed Cooling Water System (DHCCW) was designed to cool the Decay Heat Removal Coolers, the Reactor Coolant Drain Tank Leakage Coolers, Decay Heat Removal Pump and Motors, and the Decay Heat Closed Cooling Water Pump Motor. The DHCCW system provided a barrier between the reactor coolant and the Nuclear Services River Water System to prevent the release of radioactivity to the environment. During the recovery period a portion was used as a return flow path for the DWCS FTCP'A" S.F. Pool Clean-Up System.
6.2.15.2 PDMS Function This system provides no active function during PDMS. The passive functions provided by this system during PDMS are Containment isolation and contamination control. The Containment isolation function is provided by maintaining valves DC-V103, DC-V1 15, and DC-V137 in the closed position.
6.2,16 RADWASTE DISPOSAL, WASTE DISPOSAL GAS SYSTEM 6.2,16.1 System Design The Radwaste Disposal, Waste Disposal Gas System was designed to provide a means to collect potentially radioactive gas from components and tanks in the plant, compress and deliver this gas to the waste gas decay tanks, store the gas for decay, and recycle or release the gas through the unit vent at a controlled rate within the limits of 10 CFR 20.
During the recovery period a portion of the system was utilized as a flow path for the DWCS Reactor Vessel Clean-Up System.
6.2.16.2 PDMS Function This system provides no active function during PDMS. The passive functions provided by this system during PDMS are containment isolation and contamination control. The containment isolation function is provided by maintaining WDG-V-199 in the closed position. Contamination within the system is controlled by the installed air filters for the contaminated portions of the system.
6.2.17 REACTOR BUILDING EMERGENCY COOLING WATER SYSTEM 6.2.17.1 System Design The Reactor Building Emergency Cooling Water System was designed to provide cooling water to the Reactor Building cooling units in the event of a LOCA.
6.2- 8 UPDATE 2 - AUGUST 1997
6.2.17.2 PDMS Function This system provides no active function during PDMS. The passive function provided by this system during PDMS is Containment isolation. The Containment isolation function is provided by maintaining valves RR-V5A/B/C, RR-V6C/D/E, RR-V1 1A/B/C/D/E, RR-V25 A/B/C/D/E, RR-V28 A/B/C/D/E, RR-V75 A/B/C/D/E, RR-V86, RR-V88, RR-V90, RR-V92, RR-V94, RR-V96, and RR-V98 in the closed position.
6.2.18 INTERMEDIATE CLOSED COOLING WATER SYSTEM 6.2.18.1 System Design The Intermediate Closed Cooling Water System was designed to provide cooling water to the following equipment located inside the Reactor Building.
- a. The Makeup and Purification System Letdown Coolers, MU-C-IA and lB.
- b. The mechanical seal area and cooling jacket for each of the four Reactor Coolant Pumps.
- c. The stator coil cooler for each of the 69 control rod drive mechanisms.
- d. The Steam Generators Hot Drain Cooler.
6.2.18.2 PDMS Function This system provides no active function during PDMS. The passive functions provided by this system during PDMS are Containment isolation and contamination control. The Containment isolation function is provided by maintaining valves IC-V3, IC-V4, IC-V5, and IC-V207 in the closed position.
6.2.19 FUEL POOL WASTE STORAGE SYSTEM 6.2.19.1 System Design This system was designed and installed during the TM1-2 cleanup period. It provided a temporary storage facility for radioactive liquid wastes from the Reactor Building Sump and the Miscellaneous Waste Holdup Tank without contaminating the Fuel Storage Pool. It also provided the capability to transfer liquid wastes from one set of storage tanks to another or to the Auxiliary Building Emergency Cleanup System. Most of this system has been removed. The only remaining portion is WG-P-1 (flow path from RB sump) and its associated piping. This portion was never used during the cleanup period.
6.2- 9 UPDATE 2 - AUGUST 1997
6.2.19.2 PDMS Function This system provides no active function during PDMS. The passive function provided by this system during PDMS are containment isolation and contamination control. The containment isolation function is provided by maintaining SWS-FV-1 in the closed position with the penetration blind flange installed.
6.2.20 TEMPORARY NUCLEAR SAMPLING SYSTEM 6.2.20.1 System Design This system was designed and installed during the TMI-2 cleanup period. The temporary nuclear sampling system provided representative liquid and gas samples from selected points containing post-accident waste.
6.2.20.2 PDMS Function This system provides no active function during PDMS. The passive function provided by this system during PDMS is contamination control.
6.2.21 OTSG CHEMICAL CLEANING SYSTEM 6.2.21.1 System Design The OTSG Chemical Cleaning System was designed to chemically remove corrosion products and contaminants from selected portions of the Condensate, Feedwater, Emergency Feedwater and Main Steam Systems prior to operation, and from the Steam Generators as needed during the life of the plant.
The Feedwater, Condensate, and Main Steam Chemical Cleaning System used temporary piping and equipment connected to the existing system piping.
During the recovery period a portion of the chemical cleaning piping was utilized for support systems; Decon Service Air, Temporary Decon Water and the Fuel Transfer Canal Fill and Drains System.
6.2.21.2 PDMS Function This system provides no active function during PDMS. The passive functions provided by this system during PDMS are Containment isolation and contamination control. The Containment isolation function is provided by maintaining valves in the Decon Service Air System, the fuel transfer canal fill and drains system and the Temporary Decon Water System DSA-V-004, DSA-V-006, PW-V-069, PW-V-099, TDW-V-001 and TDW-V-003 in the closed position.
6.2-10 UPDATE 2 - AUGUST 1997
6.2.22 CORE FLOODING SYSTEM 6.2.22.1 System Design The Core Flooding System was designed to flood the Reactor Vessel core with borated water mithe event of a major loss of coolant accident.
During the recovery period a portion of the Core Flooding System was utilized as a sampling flow path for the DWCS-Reactor Vessel Clean-up System.
6.2.22.2 PDMS Function This system provides no active function during PDMS. The passive functions provided by this system during PDMS are Containment isolation and contamination control. The Containment isolation function is provided by maintaining valves CF-V1 14A/B, CF-V144, CF-V145, CF-V146, and CF-V129A/B in the closed position.
CFT-1A is being used for storage of LCSA pieces that were cut up and removed from the Reactor Vessel; this tank is vented to the atmosphere via an installed filter.
6.2.23 FEEDWATER SYSTEM 6.2.23.1 System Design The Feedwater System was designed to supply feedwater to the steam generators. In addition. the system raised the temperature of the feedwater before entry into the steam generators.
p 6.2.23.2 PDMS Function This system provides no active function during PDMS. The passive functions provided by this system during PDMS are Containment isolation and contamination control. The Containment isolation function is provided by maintaining valves FW-Vl7A/B, FW-Vl9A/B, FW-V35A/B, and FW-V68A/B, in the closed position.
6.2.24 NUCLEAR SERVICES CLOSED COOLING WATER SYSTEM 6.2.24.1 System Design This system was designed to supply normal and emergency cooling water through various plant equipment and system heat exchangers to remove heat generated by operation. The heat was subsequently transferred to the Nuclear Services River Water System.
6.2- 11 UPDATE 2- AUGUST 1997
6.2.24.2 PDMS Function This system provides no active function during PDMS. The passive function provided by this system during PDMS is Containment isolation. The Containment isolation function is provided by maintaining valves NS-V72, NS-V81, and NS-V210 in the closed position.
6.2.25 HYDROGEN RECOMBINER 6.2.25.1 System Design Hydrogen accumulation in the Containment following a LOCA was controlled by the post-LOCA hydrogen recombiner with a purge to atmosphere through an appropriate filter train provided as a backup.
After the accident, the two post-LOCA hydrogen recombiners were transferred to TMI Unit 1. Only portions of the piping system presently remain.
6.2.25.2 PDMS Function This system provides no active function during PDMS. The passive function provided by this system during PDMS is Containment isolation. The Containment isolation function is provided by maintaining valves AH-V90A/B, AH-V120A/B, AH-V149, and AH-V151 in the closed position.
6.2.26 EMERGENCY FEEDWATER SYSTEM 6.2.26.1 System Design The Emergency Feedwater System was designed to provide a limited amount of feedwater to the steam generators on loss of all reactor coolant pumps or feedwater pumps.
6.2.26.2 PDMS Function This system provides no active function during PDMS. The passive functions provided by this system during PDMS are Containment isolation and contamination control. The Containment isolation function is provided by maintaining valves EF-V12A/B, EF-V33A/B, and EF-V36 in the closed position.
6.2.27 REACTOR COOLANT SYSTEM 6.2.27.1 System Design The RCS consists of the Reactor Vessel, two vertical Once-Through Steam Generators, four shaft-sealed reactor coolant pumps, an electrically heated pressurizer and interconnecting piping. The system, located entirely within the Containment, is arranged in two heat transport loops, each with two reactor coolant pumps and one steam generator. The reactor coolant was transported through piping connecting the Reactor Vessel to the steam generators and flowed downward through the steam generator tubes, transferring heat to the steam and water on the shell side of the steam generator. The reactor coolant was returned to the reactor through two lines, each containing a reactor coolant pump.
6.2 -12 UPDATE 2 - AUGUST 1997
6.2.27.2 PDMS Function This system provides no active function during PDMS. The passive function provided by this system during PDMS is contamination control. Contamination within the system is controlled by the installation of a contamination barrier over the open Reactor Vessel. This barrier consists of lead shielding installed above the shielded work platform to reduce radiation levels emanating from the Reactor Vessel and a moisture/ contamination barrier. In addition, the RCS has been drained to the extent practical; less than 10 gallons of water remain in the Reactor Vessel and less than 100 gallons remain in each OTSG (including J-legs). Boron impregnated glass shards were also added to the Reactor Vessel (Ref. Section 4.3.5).
6.2.28 SOLID RADWASTE DISPOSAL SYSTEM 6.2.28.1 System Design The Solid Radwaste Disposal System was designed to store and transfer resin, radioactive liquid wastes, and concentrated boric acid for processing, packaging, and subsequent transportation to a disposal site.
During the recovery period portions of the Solid Radwaste Disposal System were used in the sludge transfer and processing system. Refer to Section 6.2.
6.2.28.2 PDMS Function This system provides no active function during PDMS. The passive function provided by this system during PDMS is contamination control.
6.2.29 REACTOR FEEDWATER HEAT SYSTEM 6.2.29.1 System Design The Reactor Feedwater Heat System was designed and installed to provide a method to heat and add chemicals to the RCS water. The system was rendered obsolete before its construction was completed.
The pump, heaters, and chemical addition equipment for the system have been removed. Only miscellaneous piping and valves remain.
6.2.29.2 PDMS Function This system provides no active function during PDMS. The passive function provided by this system during PDMS is contamination control.
6.2- 13 UPDATE 2 - AUGUST 1997
6.2.30 STEAM GENERATOR SECONDARY VENTS & DRAINS SYSTEM 6.2.30.1 System Design The Steam Generator Secondary Side Vents and Drains System was designed to drain the water from the secondary side of the steam generators. In addition, it provided a flow path for nitrogen to purge all non-condensable gases from the OTSGs. It also provided the flow paths for sampling and chemical cleaning of the OTSGs.
6.2.30.2 PDMS Function This system provides no active function during PDMS. The passive function provided by this system during PDMS is Containment isolation. The Containment isolation function is provided by maintaining valves SV-VI8 and SV-V55 in the closed position.
6.2.31 DEWATERING SYSTEM 6.2.31.1 System Design The Dewatering System was designed and installed during the TMI-2 cleanup period. This system removed and filtered the water from submerged defueling canisters and provided a transfer path to the Defueling Water Cleanup System for processing. The Dewatering System also provided the cover gas for canister shipping.
The water was removed from the defueling canisters to reduce the weight of the canisters for shipping and prevent the precious metal catalysts from being submerged. A cover of argon was provided to reduce water intrusion when the canister was in the water, reduce air intrusion when the canister was out of the water, and reduce the pyrophoricity potential of the debris within the canister.
6.2.31.2 PDMS Function This system provides no active function during PDMS. The passive function provided by this system during PDMS is contamination control. Contamination within the system is controlled by a cover over the "A" spent fuel pool.
6.2.32. FUEL TRANSFER CANAL FILL AND DRAIN SYSTEM 6.2.32.1 System Design This system was designed and installed during the TMI-2 cleanup period. It provided a means of supplying borated water to the Reactor Building from the borated water storage tank through a spent fuel cooling pump (for high flow) or a sandpiper pump (for low flow) for filling the Fuel Transfer Canal and the Internals Indexing Fixture. In addition, this system was used to distribute processed water in the Reactor Building. This system was installed, in part, because the normal Fuel Transfer Canal fill capability had been lost due to an inaccessible closed valve in the Reactor Building.
6.2 -14 UPDATE 2 - AUGUST 1997
6.2.32.2 PDMS Function This system proviales no active function during PDMS. The passive functions provided by this system during PDMS are Containment isolation and contamination control. The Containment isolation function is provided by maintaining valves PW-V069 and PW-V099 in the closed position. These same valves provide the isolation function for the processed water storage and distribution system.
6.2.33 DELETED 6.2.33.1 DELETED 6.2.33.2 DELETED 6.2.34 DELETED 6.2.35 DELETED 6.2.36 SUBMERGED DEMINERALIZER SYSTEM 6.2.36.1 System Design The SDS was a temporary liquid radwaste processing system designed to reconcentrate the fission products contained in the waters in the Reactor Building sump, the RCS and liquid waste systems and reduce the fission products to levels acceptable for final treatment through the EPICOR II system. The SDS was installed during the TMI-2 cleanup period.
6.2.36.2 PDMS Function This system provides no active function during PDMS. The passive function provided by this system during PDMS is contamination control. The SDS system and "B" spent fuel pool were drained of water and the "B" spent fuel pool was covered.
6.2.37 DELETED 6.2.38 OTSG RECIRCULATING SYSTEM 6.2.38.1 System Design The OTSG Recirculating System was designed and installed during the TMI-2 cleanup period. The primary function was to:
- 1. Remove radioactivity from steam generator RC-H-IB (OTSG "B," due to a tube leak),
and
- 2. Chemically treat water in both steam generators (RC-H-1A, IB) for wet-layup condition.
6.2- 15 UPDATE 2 - AUGUST 1997
6.2.38.2 PDMS Function This system provides no active function during PDMS. The passive functions provided by this system are Containment isolation and contamination control. The Containment isolation function is provided by maintaining valves GR-V1A, lB, GR-V7A and 7B in the closed position.
6.2.39 DECONTAMINATION SERVICE AIR SYSTEM 6.2.39.1 System Design The function of the Decontamination Service Air System was to supply a source of air during the clean-up period (in addition to the existing service air system) to:
- a. The Unit 2 Reactor Building for support of work activities.
- b. The Unit 2 AFHB for operation of decontamination equipment.
6.2.39.2 PDMS Function This system provides no active function during PDMS. The passive function provided by this system is Containment isolation which is provided by maintaining valves DSA-V004 and DSA-V006 in the closed position.
6.2.40 DECON PROCESSED WATER SYSTEM 6.2.40.1 System Design The Decon Processed Water System was designed during the cleanup period to provide a sufficient source of flush water for the sludge transfer and processing systems and for decontamination in the AFHB and RB. The NLB pump, piping, and valves and the Elliott pump were included in this system.
Two centrifugal pumps, DPW-P-12A and 12B, a distribution header, and a valve manifold supplied the previously installed hose network.
6.2.40.2 PDMS Function This system provides no active function during PDMS. The passive functions provided by this system are Containment isolation and contamination control. Containment isolation is provided by maintaining valves DW-V28, TDW-VOO1, and TDW-V003 in the closed position. The NLB pump, the Elliott pump and hose distribution system have been removed. -
6.2.41 SLUDGE TRANSFER AND PROCESSING SYSTEM 6.2.41.1 System Design The Sludge Transfer and Processing System was designed during the cleanup period to provide for removal, processing, and solidification of sediment in the Reactor Building basement, Auxiliary Building Sump, and selected AFHB tanks. The system modified the Spent Resin Storage Tanks and portions of the Waste Disposal Solid system piping.
6.2 -16 UPDATE 2 - AUGUST 1997
6.2.41.2 PDMS Function This system provides no active function during PDMS. The passive functions provided by this system are Containment isolation and contamination control. Containment isolation is provided by maintaining valves WDS-FV612 and WDS-FV614 in the closed position.
6.2.42 DEFUELING WATER CLEANUP SYSTEM 6.2.42.1 System Design The DWCS is a system which was designed during the cleanup period and installed to clean two bodies of water.
- 1) The Fuel Transfer Canal/Spent Fuel Pool Cleanup. System was a temporary liquid processing system which was designed to process water contained in the SFP and/or the FTC.
- 2) The Reactor Vessel Cleanup System was a temporary liquid processing system which was designed to process water contained in the Reactor Vessel.
6.2.42.2 PDMS Function This system provides no active function during PDMS. The passive functions provided by this system are Containment isolation and contamination control. The Containment isolation function is provided by maintaining valves SF-V105, CF-V145, CF-V1 14B, CF-V129B, DC-V137, DC-V103, DH-V205, DH-V187, DWC-V038, DWC-V040B, DWC-V037, DWC-V040A, WDG-V199, WDL-V1092, DWC-V316, and DWC-V318 in the closed position. The above valves include other system designators considered as part of the DWCS.
6.2.43 PLASMA ARC NITROGEN SYSTEM 6.2.43.1 System Design The Plasma Arc Nitrogen System was designed during the defueling period to provide a source of quenching gas during plasma arc cutting operations of the Reactor Vessel internals.
6.2.43.2 PDMS Function This system provides no active function during PDMS. The passive function provided by this system is Containment Isolation which is provided by maintaining valves PAN-V-005, 017 and 019 in the closed position.
6.2.44 REACTOR BUILDING SUMP (LEVEL MEASUREMENT) 6.2.44.1 System Design The Reactor Building Sump Level System was designed and installed during the clean-up period to measure the 8' of water which accumulated in the Reactor Building Basement. It utilized an instrument air purge (bubbler) and measured the back pressure of the air which corresponded to a height of water in the R.B. Basement.
6.2 -17 UPDATE 2 - AUGUST 1997
6.2.44.2 PDMS Function This system provides no active function during PDMS. The passive functions provided by this system are contamination control and Containment Isolation which is provided by maintaining valves RBS-IV-1009, 1011, 1013 and 1014 inthe closed position.
6.2.45 REACTOR BUILDING AIR SAMPLING SYSTEM 6.2.45.1 System Design The Reactor Building Air Sampling System was designed to provide the capability of obtaining representative RB. air samples during normal and emergency conditions and Radiation monitoring of the ventilation exhaust air during purge operations.
6.2.45.2 PDMS Function This system provides no active function during PDMS. The passive function provided by this system are contamination control and Containment Isolation which is provided by maintaining valves AH-V-143, 145, 168, 169, 170, 171, 227 and 230 in the closed position.
For PDMS a new R.B. air sampling system was designed and installed through R.B. personnel airlock
- 2.
6.2.46 WASTE DISPOSAL LIQUID, REACTOR COOLANT 6.2.46.1 System Design The Waste Disposal Liquid, Reactor Coolant System was designed to receive and transfer reactor coolant from inside the Reactor Building to locations outside the R.B. for storage and/or processing for reuse or disposal.
6.2.46.2 PDMS Function The system provides no active function during PDMS. The passive functions provided by this system are Containment Isolation and Contamination Control. The Containment Isolation function is provided by maintaining valves WDL-V-1092 and WDL-V-1 125 in the closed position.
6.2.47 SECONDARY PLANT SAMPLING SYSTEM 6.2.47.1 System Design The Secondary Plant Sampling System monitored the concentration of impurities and chemical additives in the water and steam which recirculated in systems in the secondary plant. During the clean-up period the sampling system was used to monitor OTSG levels and provide a flow path for draining the OTSG's.
6.2.47.2 PDMS Function This system provided no active function for PDMS. The passive function provided by this system is contamination control.
6.2- 18 UPDATE 2- AUGUST 1997
6.2.48 MAKEUP WATER TREATMENT AND CONDENSATE POLISHING SYSTEM 6.2.48.1 System Design The makeup water treatment system processed Susquehanna River water and provided high purity demineralized water to the Dernineralized Service Water System. It also supplied the condensate polishing system which reduced the level of suspended and dissolved impurities in the condensate and feedwater systems to acceptable levels. This system is dismantled.
6.2.48.2 PDMS Function This system provides no active function for PDMS. The passive function provided by this system is contamination control.
6.2-19 UPDATE 3 - AUGUST 1999
TABLE 6.2-1 DEACTIVATED PASSIVE SYSTEMS SYSTEM CONTAINMENT INTERNAL SYSTEM DESCRIPTION CODE ISOLATION CONTAMINATION REMARKS Main and Reheat Steam MS YES YES Primary Nuclear Plant Hydrogen Supply HY NO YES All bottles of gas removed from plant.
Fuel Handling and Storage FH YES YES Standby Pressure Control System SPC NO YES Mini Decay Heat MDH NO YES Spent Fuel Cooling SF YES YES RC Makeup & Purification MU YES YES Decay Heat Removal DH YES YES See Defuelinj Water Clean-up System RB Leak Rate Test LR YES NO Service Air SA YES NO Portions utili zed by compressed air system.
Chemical Addition CA NO YES See nuclear sampling system.
6.2-20 UPDATE 2 - AUGUST 1997
TABLE 6.2-1 (Cont'd)
DEACTIVATED PASSIVE SYSTEMS SYSTEM CONTAINMENT INTERNAL SYSTEM DESCRIPTION CODE ISOLATION CONTAMINATION REMARKS Reactor Building Emergency Spray BS YES YES RB pressure signals are provided for RB pressure indication and Alarm.
Nuclear Sampling System SN YES YES CA-V8, CA-V9, CA-V 10 are considered part of nuclear sampling system.
Nuclear Plant and Radwaste Nitrogen NM YES YES Decay Heat Closed Cooling DC YES YES See Defueling Water Clean-up System Waste Disposal Gas WDG NO YES See Defueling Water Clean-up System Reactor Bldg. Emergency Cooling Wtr RR YES NO Intennediate Closed Cooling IC YES YES Fuel Pool Waste Storage WG YES YES SWS-FV-1 Containment Isolation Temporary Nuclear Sampling System SNS NO YES OTSG Chemical Cleaning SGC YES YES Core Flooding CF YES YES See Defueling Water Clean-up System Feedwater FW YES YES Nuclear Services Closed Cooling Water NS YES NO 6.2-21 UPDATE 3 - AUGUST 1999
TABLE 6.2-1 (Cont'd)
DEACTIVATED PASSIVE SYSTEMS SYSTEM CONTAINMENT INTERNAL SYSTEM DESCRIPTION CODE ISOLATION CONTAMINATION REMARKS HR YES ' YES Hydrogen Recombiner EF YES YES Emergency Feedwater Reactor Coolant System RC NO YES Waste Disposal - Solid WDS NO YES WDS-FV-612 and 614 are considered part of Sludge Transfer System.
RC Feedwater Heat RCF NO YES SGSecondarv Vent & Drain. SV YES YES Dewatering System DS NO YES Fuel Transfer Canal Fill & Dram FCC YES YES DELETED Submerged Demineralizer System SDS NO YES 6.2-22 UDATE 3 - AUGUST 1999
TABLE 6.2-1 (Cont'd)
DEACTIVATED PASSIVE SYSTEMS SYSTEM CONTAINMENT INTERNAL SYSTEM DESCRIPTION CODE ISOLATION CONTAMINATION REMARKS DELETED OTSG Recirculation GR YES YES Decon Service Air DSA YES NO Decon Process Water DPW YES YES DW-V28 is considered part of decon processed water system.
Sludge Transfer and Processing System STS YES YES Modified SRST and WDS piping.
Defueling Water Cleanup System DWC YES YES Plasma Arc Nitrogen PAN YES NO Reactor Building Sump (Level) RBS YES YES Reactor Building Air Sampling System AH YES YES Waste Disposal Liquid, Reactor Coolant WDL YES YES See Defueling Water Clean-up System Secondary Plant Sampling SS NO YES Water Treatment and Condensate WT NO YES Polishing 6.2-23 UPDATE 2 - AUGUST 1997
6.3 DEACTIVATED SYSTEMS The section provides a description of those systems which are deactivated because they serve no active or passive function during PDMS. Table 6.3-1 lists the deactivated systems for the TMI-2 facility and their PDMS status. All deactivated systems require no maintenance and no attempts will be made to preserve nor maintain these systems. Equipment, components, and parts may be removed from these systems and facilities, and used for other purposes provided their removal does not adversely affect any PDMS function.
Each of these systems is described in the following sections.
6.3.1 AUXILIARY STEAM SYSTEM The Auxiliary Steam System was designed to supply process steam to the following equipment:
- a. Reactor Coolant Evaporator
- b. DELETED
- c. Turbine Gland Seal Steam System
- d. Turbine Driven Emergency Steam Generator Feed Pump
- e. DELETED
- f. Unit I/Unit 2 Aux Steam Cross-Connect Piping.
6.3.2 DELETED 6.3.3 DELETED 6.3.4 DELETED 6.3.5 DELETED 6.3.6 DELETED 6.3.7 DELETED 6.3.8 INSTRUMENT AIR SYSTEM The Instrument Air System was used throughout the plant for nuclear and non-nuclear instrumentation and controls, and for pneumatic devices where oil and moisture-free air was required. Portions of the instrument air system are incorporated within the compressed air supply system. For additional information see Section 7.2.6.4.
6.3.9 DELETED 6.3.10 DELETED 6.3.11 DELETED 6.3.12 DELETED 6.3.13 DEMINERALIZED SERVICE WATER SYSTEM The Demineralized Service Water System was designed to receive demnineralized water from the Demineralizing System. The water was processed for oxygen removal, stored under a nitrogen blanket, and distributed to service as needed. The distribution headers supplied the Reactor Building, Turbine Building, 6.3-1 UPDATE 2 - AUGUST 1997
Control and Service Building, the Auxiliary and Fuel Handling Building, and the Diesel Generator Building. During the clean-up period, a portion of the D.W. System was utilized in the Decon Processed Water System (See Section 6.2.40).
The Radwaste Pumps Seal Water System, a subsystem of the Demineralized Service Water System, provided seal water to pumps that handled contaminated fluid in either normal or abnormal operations.
During PDMS, this water is supplied by the Domestic Water System.
6.3.14 DELETED 6.3.15 NUCLEAR SERVICES RIVER WATER SYSTEM The Nuclear Services River Water System (NSRW) supplied cooling water for all nuclear related and fuel handling requirements and various HVAC services. The system took suction from river water and returned the water to the river via the Mechanical Draft Cooling Tower. The NSRW equipment in the Screenhouse has been removed.
6.3.16 REACTOR BUILDING NORMAL COOLING WATER SYSTEM The Reactor Building Normal Cooling Water System was designed to circulate treated water through the Reactor Building air cooling units and to remove the heat thus transferred to the water by passing it through an evaporative cooler.
6.3.17 REACTOR BUILDING PENETRATIONS FORCED AIR COOLING SYSTEM The Reactor Building Penetrations Forced Air Cooling System provided cool air to the feedwater and mai-steam penetrations in the Reactor Building to maintain the temperature of the concrete surrounding the penetrations within allowable limits. U 6.3.18 DELETED 6.3.19 CIRCULATING WATER SYSTEM The Circulating Water System was designed to provide the cooling water requirement for the main condenser.
In addition, the system provided cooling water to the condenser vacuum pump coolers, deicing water supply to the River Water Pump House, and water to the chlorine ejector.
6.3.20 DELETED 6.3.21 ENVIRONMENTAL BARRIER SYSTEM The Environmental Barrier System was designed to provide added assurance that containment atmosphere leakage to the environment, through the isolation valves of selected process lines, would be as low as practical. This system provided a barrier to environmental leakage in addition to the two barriers which were normally supplied by means of the inside and outside Containment isolation valves.
6.3-2 UPDATE 2 - AUGUST 1997
6.3.22 PENETRATION PRESSURIZATION SYSTEM The Penetration Pressurization System was designed to reduce any leakage of containment atmosphere through penetration sleeve cavities by means of a positive nitrogen gas pressure in the enclosed air spaces incorporated in the penetration design.
6.3.23 GLAND STEAM SYSTEM The Turbine Gland Sealing System sealed the turbine shaft and rotor to ensure that steam was contained within the turbine casings and to prevent air inleakage. The system provided these functions automatically by controlling the gland steam pressure to an adequate sealing pressure under all conditions of turbine operation.
6.3.24 DELETED 6.3.25 DELETED 6.3.26 DELETED 6.3.27 DELETED 6.3.28 DELETED 6.3.29 DELETED 6.3.30 DELETED 6.3.31 DELETED 6.3.32 DELETED 6.3.33 DELETED 6.3.34 DELETED 6.3.35 DELETED 6.3.36 DELETED 6.3.37 DELETED 6.3.38 DELETED 6.3.39 DELETED 6.3.40 TEMPORARY NUCLEAR SERVICES CLOSED COOLING SYSTEM This system was designed and installed during the TMI-2 cleanup period. It provided cooling for the mini-decay heat removal heat exchangers. A blank plate was installed in the inlet to spent fuel pool heat exchanger IA to divert sufficient flow through the Temporary Nuclear Services Closed Cooling System.
6.3.41 DELETED 6.3-3 UPDATE 2 - AUGUST 1997
6.3.42 DELETED 6.3.43 DELETED W 6.3.44 DELETED 6.3.45 DELETED 6.3.46 DELETED 6.3.47 DELETED 6.3.48 DELETED 6.3.49 DELETED 6.3.50 EARTHQUAKE DETECTION SYSTEM The SMA-3 Strong Motion Accelerograph System manufactured by Kinemetrics, Inc. was installed mithe basement of the Reactor Building annulus to measure the strength of seismic events. The SMA-3 was a multi-channel strong motion accelerograph. It featured central recording on magnetic tape cassettes with remote accelerometer and starter packages. The system remained in standby condition and would only activate if an earthquake caused the starter to actuate the recording circuits and tape transports.
6.3.51 REACTOR COOLANT PUMPS MOTOR OIL DRAIN SYSTEM This system was used to drain oil leakage from the RCP motors. Oil was diverted from the upper beahn*
oil splash shielding and lower bearing oil splash shielding to oil shield drain tanks located in the Reactor Building basement. Each of the four (4) reactor coolant pumps has the capacity to contain as much as 138 gallons of oil. More than 40% of that oil was removed prior to PDMS. Not all of the oil was removed because the dose rates severely limit access to the area of the pumps and oil collection/drain systems.
However, the oil collection tanks meet NFPA-30 requirements and are equipped with flame arrestors.
Therefore, the residual oil in the tanks does not present a fire hazard.
6.3-4 UPDATE 2 - AUGUST 1997
6.3.52 DELETED 6.3.53 DELETED 6.3.54 DELE17ED 6.3.55 DELETED 6.3.56 POLAR CRANE The Reactor Building Polar Crane is an electr-ically powered, pendant operated rotary bridge crane with a single trolley. The crane was originally designed and constructed with a capacity of 500 tons and an auxiliary hoist capacity of 25 tons. During the post accident clean-up period, the crane was extensively refurbished with the refurbishment including deactivation of the cab controls and installation of pendant operating controls and a new festoon cable. It was subjected to a load test to recertifyr it to a main hoist capacity of 170 tons and an auxiliary hoist capacity of 25 tons in support of reactor vessel head service platform removal.
In October of 1990, the crane manufacturer notified owners that structural defects had been found in a simnilar crane and recommended certain modifications to preclude failures in all cranes of this type. In lieu of performing the modifications, GPLJN elected, with the manufacturer's approval, to downgrade the crane to a main hoist capacity of 88 tons and an auxiliary hoist capacity of 9 tons. This was sufficient capacity to satisfy' the lifting and handling needs for the remainder of the defueling program.
In March of 1994, the crane manufacturer again notified owners of additional defects identified in a similar crane and recommended further remedial modifications. GPUN deactivated the polar crane. During the PDMS period repairs and modifications will be evaluated and the crane may be refurbished to restore it to a lifting capability sufficient to support PDMS related work and future dismantlement and decommissioning needs.
6.3-5 6.3-5UPDATE 2 - AUGUST 1997
TABLE 6.3-1 DEACTIVATED SYSTEMS SYSTEM PDMS CONTAINMENT INTERNAL SYSTEM DESCRIPTION CODE FUNCTI ON ISOLATION CONTAMINATION REMARKS Auxiliary Steam AS NONE NO NO Instrument Air IA NONE NO NO Portions of the Inst. Air System will be used in the Compressed Air System Demin Water DW NONE NO NO DW-V28 transferred to decon processed water (DPW) system.
Nuclear Services River Water NR NONE NO NO Reactor Building Normal Cooling RB NONE NO NO Penetration Cooling PC NONE NO NO Circ. Water CW NONE NO NO Environmental Barrier EB NONE NO NO Penetration Pressurization PP NONE NO NO Gland Steam GS NONE NO NO 6.3-6 UPDATE 20 1ST 1997
TABLE 6.3-1 (cont'd)
DEACTIVATED SYSTEMS SYSTEM PDMS CONTAINMENT INTERNAL SYSTEM DESCRIPTION CODE FUNCTION ISOLATION CONTAMINATION REMARKS Temp. Nuc. Svc. Closed TNS NONE NO NO Cooling Earthquake Detection ED NONE NO N/A RC Pump Motor Oil Drains RO NONE NO NO Polar Crane N/A NONE NO YES 6.3-7 UPDATE 2 - AUGUST 1997
6.4 DELETED 6.4-1I -UPDATE 2 - AUGUST 1997
6.5 - SYSTEM REFERENCES Provided below is a list of reference documents that provide additional information. Unless otherwise specified, drawing numbers refer to Burns and Roe Flow Diagrams.
REFERENCE DOCUMENT NO. DOCUMENT DESCRIPTION
'6.5-1 GPU Dwg. 302-2700, Reactor Building Isolation Sheets 1,2 & 3 Flow Diagram, Unit 2 6.5-2 DELETED 6.5-3 Doc. No. 15737-2-J16-001 Bechtel hIstr. Index 6.5-4 Work Orders 2555 and 3475 Bums & Roe Instr. List 6.5-5 Dwg No 302-2219 Radiation Monitoring, Station Vent 6.5-6 DELETED 6.5-7 DELETED 6.5-8 Bechtel Dwg. Demineralized Service Water No. 15737-2-M74-DWO1 P&ID 6.5-9 DELETED 6.5-10 DELETED 6.5- 1 UPDATE 2- AUGUST 1997
SYSTEM REFERENCES (Cont'd)
REFERENCE DOCUMENT NO. DOCUMENT DESCRIPTION 6.5-11 Bechtel Dwg.
No. 2-M74-CDWO1 P&ID Containment Air Control I Envelope HVAC System 6.5-12 Bechtel Dwg. Piping and Instrument, Diagram No. 2-M74-DW01 (P&ID). Dernineralized Service Water System 6.5-13 Bechtel Dwg. No. 2-M74-DWCOl Defueling Water Clean-Up Reactor Vessel Clean-Up System 6.5-14 Bechtel Dwg. No. 2-M74-DWC02 Defueling Water Clean-Up Fuel Transfer Canal/Spent Fuel Pool Clean-Up System 6.5-15 Bechtel Dwg. No. 2-M74-DWC03 Defueling Water Clean-Up Auxiliary Systems 6.5-16 Bechtel Dwg. No. 2-M74-PWO1 Processed Water Storage and Recycle System 6.5-17 Bechtel Dwg. No. 2-M74-RBCOI Reactor Building Chilled Water System 6.5-18 Bechtel Dwg. No. 2-M74-SDS01 Piping and Instrument Diagram (P&ID'
- SDS Feed and Monitor Tank Systemx 6.5-19 Bechtel Dwg. No. 2-M75-FCCO0 Schematic Flow Diagram - Fuel TransfN Canal Fill System 6.5-20 Bechtel Dwg. No. 2-POA-1303 General Arrangement Plenum Removal Reactor Building 6.5-21 Bechtel Dwg. No. 2-POA-6401 General Arrangement Fuel Handling Building Plan El. 347'-6" 6.5-22 Dwg. No. 2002 Main & Reheat Steam and Gland Seal Steam Systems 6.5-23 Dwg. No. 2003 Bleed Steam System 6.5 -2 UPDATE 2- AUGUST 1997
SYSTEM REFERENCES (Cont'd)
REFERENCE DOCUMENT NO. DOCUMENT DESCRIPTION 6.5-24 Dwg. No. 2004 Auxiliary Steam System 6.5-25 Dwg. No. 2005 Feedwater and Condensate System 6.5-26 Dwg. No. 2006 Make-Up Water Treatment and Condensate Polishing 6.5-27 Dwvg. No. 2007 Demineralized Service Water System 6.5-28 Dwg. No. 2008 Feedwater Heater Vents, Reliefs and Misc. Drains System 6.5-29 Dwg. No. 2009 Feedwater Heater Drains System 6.5-30 D~vg. No. 2010 Condenser Air Extraction System 6.5-31 Dwg. No. 2011 Turbine Lube Oil Purification and Transfer System 6.5-32 Dwg. No. 2012 Instrument and Service Air System 6.5-33 Dwg. No. 2013 Domestic Water 6.5-34 Dwg. No. 2014 Service Air System 6.5-35 Dwg. No. 2015 Turbine Plant Sampling System -
Secondary Plant 6.5-36 Dwg. No. 2018 Secondary Services Closed Cooling Water 6.5-37 Dwg. No. 2021 Circ. Water & River Water Chemical Treatment 6.5-38 Dwvg. No. 2023 Circulating and Secondary Services River Water System 6.5-3 UPDATE 3- AL(;(I sr 1999
SYSTEM REFERENCES (Cont'd)
REFERENCE DOCUMENT NO. DOCUMENT DESCRIPTION 6.5-39 Dwg. No. 2024 Reactor Coolant, Make-Up and Purification System 6.5-40 Dwg. No. 2025 Chemical Addition 6.5-41 Dwg. No. 2026 Spent Fuel Cooling and Decay Heat System 6.5-42 Dwg. No. 2027 Radwaste Disposal Reactor Coolant Liquid 6.5-43 Dwg. No. 2028 Radwaste Disposal Gas 6.5-44 Dwg. No. 2029 Intermediate Closed Cooling Water System 6.5-45 Dwg. No. 2030 Nuclear Services Closed Cooling Water System 6.5-46 Dwg. No. 2031 Nuclear Sampling System 6.5-47 Dwg. No. 2033 Nuclear Services River Water System 6.5-48 Dwg. No. 2034 Reactor Building Emergency Spray and Core Flooding 6.5-49 Dwvg. No. 2035 Decay Heat Closed Cooling Water System 6.5-50 Dwg. No. 2036 Nitrogen for Nuclear and Radwaste Systems 6.5-51 Dwg. No. 2037 Fire Protection System 6.5-52 Dwg. No. 2038 Diesel Fuel Emergency Diesel Generator 6.5-53 Dwg. No. 2039 Radwaste Disposal - Solid 6.5-4 UPDATE 3- At (;I 'rF 1999
SYSTEM REFERENCES (Cont'd)
REFERENCE DOCUMENT DOCUMENT DESCRIPTION 6.5-54 Dwg. No. 2040 Heat and Ventilation, Turbine and Control Building Areas 6.5-55 Dwg. No. 2041 Reactor Building Ventilation, and Purge System 6.5-56 Dwg. No. 2042 Auxiliary Building Heating & Ventilation System 6.5-57 Dwg. No. 2044 Heating Ventilation and Air Condition (Control Building, Cable, Battery and Switchgear Rooms 6.5-58 Dwg. No. 2045 Radwaste Disposal Miscellaneous Liquid 6.5-59 Dwg. No. 2046 Reactor Building Normal Cooling Water 6.5-60 Dwg. No. 2047 Heating and Ventilation, Circulating and River Water Pump House and Fire Pump House 6.5-61 Dwg. No. 2049 Heating and Ventilation, Emergency Diesel Generator Building 6.5-62 Dwg. No. 2076 Piping Specialty List 6.5-63 Dwg. No. 2219 Heating and Ventilation, Building Air Intake and Exhaust 6.5-64 Dwg. No. 2343 Fuel Handling Building Heating &
Ventilation System 6.5-65 Dwg. No. 2385 Service Building Heating & Ventilation System 6.5-66 Dwg. No. 2391 Service & Control Building - Domestic Water. Sanitary Waste & Contamination Drains 6.5 -5 UPDATE 2 - AUGUST 1997
SYSTEM REFERENCES (Cont'd)
REFERENCE DOCUMENT DOCUMENT DESCRIPTION 6.5.67 Dwg. No. 2397 Reactor Building Penetrations Isolation*
Valve Seal Water System 6.5-68 Dwg. No. 2414 Steam Generator Secondary Side Vent and Drains 6.5-69 Dwg. No. 2440 Main, Bleed & Auxiliary Steam System &
Traps 6.5-70 Dwg. No. 2475 Heating and Ventilation, Coagulator Building, Circulating Water Chlorinator House, and Mechanical Draft Cooling Tower Pump House 6.5-71 Dwg. No. 2492 Radwaste Pumps Seal Water 6.5-72 Dwg. No. 2496 Sump Pump Discharge 6.5-73 Dwg. No. 2497 Reactor Building Penetration Forced Air Cooling System 6.5-74 Dwg. No. 2517 Reactor Building Leak Rate Test 6.5-75 Dwg. No. 2524 Feedwater Heater Nitrogen Blanketing 0 6.5-76 Dwg. No. 2532 H 2 and C02 Supply Systems (Secondary Plant) 6.5-77 Dwg. No. 2551 Lube Oil System - Emergency Diesel Generator 6.5-78 Dwg. No. .2552 Starting Air System, Emergency Diesel Generator 6.5-79 Dwg. No. 2596 Flow Diagram, Hydraulic and Pneumatic Fuel Transfer System 6.5-80 Dwg. No. 2601 Reactor Coolant Pumps Seals 6.5- 6 UPDATE 2 - AUGUST 1997
SYSTEM REFERENCES (Cont'd)
REFERENCE DOCUMENT DOCUMENT DESCRIPTION 6.5-81 Dwg. No. 2606 OTSG Chemical Cleaning System 6.5-82 Dwg. No. 2626 Lab & Penetration Pressurization Gas Systems and Hydrogen for Make-Up Tank 6.5-83 Dwg. No. 2632 Radwaste Disposal Reactor Coolant Leakage Recovery 6.5-84 Dwg. No. 2633 Flow Diagram Oil Splash Shield Drain Piping for R. C. Pump Motors Gland Steam Seal System Turbine 6.5-85 Dwg. No. 2634 Building 6.5-86 Dwg. No. 2636 Environmental Barrier System 6.5-87 Dwg. No. 2668 SSCCW and Secondary Plant Sampling System, TB & CBA 6.5-88 GPUN Dwg. No. 2E-3510-1024 P&ID, Reactor Building Sump Recirculation System 6.5-89 GPLUN Dwg. No. 2E-950-02-001 SDS Plan View 6.5-90 GPUN Dwg. No. 2R-950-21-001 P&ID Composite Submerged Demineralizer System 6.5-91 Dwg. No. 3004, Sheet I 4160V Switchgear One Line Diagram 6.5-92 Dwg. No. 3005, Sheet 3 480V Unit Substations One Line Diagram 6.5-93 Dwg. No. 3011 Safety Features Actuation System Block Diagram 6.5-94 Dwg. No. 3024-106 Block Diagram Misc. Seismic Monitoring System 6.5- 7 UPDATE 2 - AUGUST 1997
SYSTEM REFERENCES (Cont'd)
REFERENCE DOCUMENT DOCUMENT DESCRIPTION 6.5-95 Dwg. No. 3073 Diesel Generators Sheets .57, 59, and 60 6.5-96 Dwvg. No. 3091 Safety Features Actuation System Index 6.5-97 Dwvg. No. 4148 Reactor Building Containment Wall Penetrations Schedule 6.5-98 Dwg. No. 4479037 Steam Turbine Piping-Steam Drain &
Gland Diagram 6.5-99 Dwg. No. 614F177-5 (B&R File No. 01-00-0504) Seal Oil Diagram - Turbine Generator 6.5-100 Dwg. No. 614F177-6 Seal Oil System (B&R File No. 1 0504) 6.5-101 Dwg. No. 721J843 (B&R File No. 01-00-02 10)
E. H. Fluid STS & Lube Diagram 6.5-102 Bechtel Dwg. Piping and Instrument No. 15737-2-M74-DSOI Diagram - Dewatering System 6.5-103 TMI-I Dwvg. No. C-302-052 Unit I Auxiliary Steam System 6.5-104 TMI-1 Dwg. No. C-302-051 Auxiliary Steam System of TMI Unit No.
1 Auxiliary Boilers 6.5-105 TMI-1 Dwg. No. C-302-162 TMI-I Plant Filtered H20 to and from TMI 42 Plant 6.5-106 TMI- I Dwg. No. C-302-163 The 1,000,000 Gallon Demineralized Water Storage Tank 6.5-107 TMI-I Dwg. No. C-302-301 The Unit I Plant Generator Gas & Vents 6.5-8 UPDATE 3 - AUGUST 1999
SYSTEM REFERENCES (Cont'd)
REFERENCE DOCUMEN r DOCUMENT DESCRIPTION 6.5-108 TMI-1 Dwg. No. C-302-671 Unit I - Sampling; Liquid and Gas 6.5-109 TMI- 1 Dwg. No. C-302-692 Liquid Waste Disposal System for Unit 2 6.5-110 TMI-1 Dwg. No. C-302-840 Unit 1 -,Auxiliary Building Heating &
Ventilation 6.5-111 TMI- 1 Dwg. No. D-60372 Gland Seal & Ejector System 6.5-112 Dwg. No. E-(032 Misc. Power Panel Schedules, SDS 6.5-113 Dwg. No. E-3302-191 Unit No. 1 OTSG Chemical Cleaning System No. E-302-196 Unit No. I OTSG Chemical Cleaning 6.5-114 TMI-1 Dwg.
System 6.5-115 TMI-1 Dwg. No. E-302-231 Fire Service Water 6.5-116 Dwg. No. MC)06 Auxiliary Building Emergency Liquid Clean-Up 6.5-117 Dwg. No. M( 011 Flow Diagram Condenser Air Extraction Filtration System 6.5-118 Dwg. No. M( 12 Alternate Condensate System 6.5-1 19 Dwvg. No. M( 13 HVAC Chemical Cleaning and Health Physics Building 6.5-120 Dwg. No. M( 14 Fuel Pool Waste Storage System 6.5-121 Dwg. No. MC 15 Auxiliary Building Emergency Liquid Clean-Up System Sampling 6.5-122 Dwg. No. M( 16 Flow Diagram, Temporary Auxiliary &
Fuel Handling Building HVAC 6.5-9 UPDATE 3 - AUGUST 1999
SYSTEM REFERENCES (Cont'd)
REFERENCE DOCUMENT DOCUMENT DESCRIPTION 6.5-123 Dwg. No. M021 Long Term OTSG "B" Cooling 6.5-124 Dwg. No. M022 Standby Reactor Coolant System Pressure Control System, 6.5-125 Dwg. No. M041 "Temporary" Nuclear Services Closed Cooling Water System 6.5-126 Dwg. No. M043 Mini Decay Heat Removal System 6.5-127 Dwg. No. M044 & M045 Temporary Nuclear Sampling System, SNS 6.5-128 Dwg. No. M208 Chemical Cleaning & Health Physics Building Fire Protection 6.5-129 GPUN REPORT Post Dismantlement Radiological No. 990-2548 and Environmental Survey of the Three Mile Island Unit 2 Circulating Water Pump House Pump Bay 6'.5-10 UPDATE 3- AUGUST 1999
CHAPTER 7 OPERATIONAL SYSTEMS AND FACILITIES
CHAPTER 7 OPERATIONAL SYSTEMS AND FACILITIES TABLE OF CONTENTS SECTION TITLE PAGE NO.
7.0 INTRODUCTION
7.0-1 7.1 OPERATIONAL FACILITIES 7.1-1 7.1.1 CONTAINMENT (REACTOR BUILDING) 7.1-1 7.1.1.1 PDMS Function 7.1-1 7.1.1.2 Containment Structure 7.1-1 7.1.1.3 Containment Functional Design 7.1-2 7.1.1.4 Facility Description 7.1-2 7.1.1.5 Evaluation 7.1-2 7.1.2 AUXILIARY BUILDING 7.1-3 7.1.2.1 PDMS Function 7.1-3 7.1.2.2 Facility Description 7.1-3 7.1.2.3 Evaluation 7.1-3 7.1.3 FUEL HANDLING BUILDING 7.1-3 7.1.3.1 PDMS Function 7.1-3 7.1.3.2 Facility Description 7.1-3 7.1.3.3 Evaluation 7.1-4 7.1.4 FLOOD PROTECTION 7.1-4 7.1.4.1 PDMS Function 7.1-4 7.1.4.2 Facility Description 7.1-4 7.1.4.3 Evaluation 7.1-5 i UPDATE 2 - AUGUST 1997
CHAPTER 7 TABLE OF CONTENTS (Cont'd)
SECTION TITLE PAGE NO.
7.1.5 AIR INTAKE TUNNEL 7.1-5 7.1.5.1 PDMS Function 7.1-5 7.1.5.2 Facility Description 7.1-6 7.1.5.3 Evaluation 7.1-6 7.1.6 UNIT I/UNIT 2 CORRIDOR 7.1-6 7.1.6.1 PDMS Function 7.1-6 7.1.6.2 Facility Description 7.1-6 7.1.6.3 Evaluation 7.1-7 7.1.7 CONTROL AND SERVICE BUILDINGS 7.1-7 7.1.7.1 PDMS Function 7.1-7 7.1.7.2 Facility Description 7.1-7 7.1.7.3 Evaluation 7.1-7 7.1.8 Turbine Building 7.1-8 7.1.8.1 PDMS Function 7.1-8 7.1.8.2 Facility Description 7.1-8 7.1.8.3 Evaluation 7.1-8 7.2 OPERATIONAL SYSTEMS 7.2-1 7.2.1 CONTAINMENT SYSTEMS 7.2-1 7.2.1.1 Containment Isolation 7.2-1 7.2.1.2 Containment Atmospheric Breather 7.2-2 7.2.1.2.1 PDMS Function 7.2-2 7.2.1.2.2 System Description 7.2-2 7.2.1.2.3 Evaluation 7.2-3 7.2.1.3 Containment Ventilation and Purge 7.2-6 7.2.1.3.1 PDMS Function 7.2-6 7.2.1.3.2 System Description 7.2-6 7.2.1.3.3 Evaluation 7.2-6 7.2.1.4 Containment Airlocks and Equipment Hatch 7.2-6 ii UPDATE 2 - AUGUST 1997
CHAPTER 7 TABLE OF CONTENTS (Cont'd)
SECTION TITLE PAGE NO.
7.2.1:4.1 PDMS Function 7.2-6 7.2.1.4.2 System Description 7.2-7 7.2.1.4.3 Evaluation 7.2-7 7.2.2 FIRE PROTECTION, SERVICE, AND SUPPRESSION 7.2-7 7.2.2.1 PDMS Function 7.2-8 7.2.2.2 System Description 7.2-8 7.2.2.3 Evaluation 7.2-10 7.2.3 RADIOACTIVE WASTE MANAGEMENT 7.2-11 7.2.3.1 Radioactive Waste - Miscellaneous Liquids 7.2-11 7.2.3.1.1 PDMS Function 7.2-11 7.2.3.1.2 System Description 7.2-11 7.2.3.1.3 Evaluation 7.2-12 7.2.3.2 Sump Pump Discharge and Miscellaneous Sumps System 7.2-13 7.2.3.2.1 PDMS Function 7.2-13 7.2.3.2.2 System Description -7.2-13 7.2.3.2.3 Evaluation 7.2-13 7.2.4 RADIATION MONITORING 7.2-14 7.2.4.1 PDMS Function 7.2-14 7.2.4.2 Radiological Surveys 7.2-14 7.2.4.2.1 AFHB Radiological Surveys 7.2-14 7.2.4.2.2 Containment Radiological Surveys 7.2-14 7.2.4.3 Effluent Monitoring 7.2-15 7.2.4.3.1 AFI-B Airborne Evaluation 7.2-16 7.2.4.4 General Radiological Monitoring 7.2-17 7.2.4.5 Evaluation 7.2-17 7.2.5 ELECTRICAL SYSTEMS 7.2-17 7.2.5.1 PDMS Electrical Distribution System 7.2-17 7.2.5.1.1 PDMS Function 7.2-17 f°° UPDATE 2 - AUGUST 1997
CHAPTER 7 TABLE OF CONTENTS (Cont'd)
SECTION TITLE PAGE NO.
7.2.5.1.2 System Description 7.2-17 7.2.5.1.3 Evaluation 7.2-18 7.2.5.2 Normal and Emergency Lighting 7.2-19 7.2.5.2.1 PDMS Function 7.2-19 7.2.5.2.2 System Description 7.2-19 7.2.5.2.3 Evaluation 7.2-20 7.2.5.3 Communications System 7.2-20 7.2.5.3.1 PDMS Function 7.2-20 7.2.5.3.2 System Description 7.2-20 7.2.5.3.3 Evaluation 7.2-21 7.2.6 PDMS SUPPORT SYSTEMS 7.2-21 7.2.6.1 Auxiliary Building Ventilation System 7.2-21 7.2.6.1.1 PDMS Function 7.2-21 7.2.6.1.2 System Description 7.2-21 7.2.6.1.3 Evaluation 7.2-22 7.2.6.2 Fuel Handling Building Ventilation System 7.2-22 7.2.6.2.1 PDMS Function 7.2-22 7.2.6.2.2 System Description 7.2-22 7.2.6.2.3 Evaluation 7.2-22 7.2.6.3 Air Intake Tunnel Ventilation System 7.2-23 7.2.6.4 Compressed Air Supply System 7.2-23 7.2.6.4.1 PDMS Function 7.2-23 7.2.6.4.2 System Description 7.2-23 7.2.6.4.3 Evaluation 7.2-24 7.2.6.5 Building Inleakage Waterproofing System 7.2-24 7.2.6.5.1 PDMS Function 7.2-24 7.2.6.5.2 System Description 7.2-24 iv UPDATE 2 - AUGUST 1997
CHAPTER 7 TABLE OF CONTENTS (Cont'd)
SECTION TITLE PAGE NO.
7.2.6.5.3 Evaluation 7.2-25 7.2.6.6 Sewers 7.2-25 7.2.6.6.1 PDMS Function 7.2-25 7.2.6.6.2 System Description 7.2-25 7.2.6.6.3 Evaluation 7.2-25 7.2.6.7 Domestic Water System 7.2-25 7.2.6.7.1 PDMS Function 7.2-25 7.2.6.7.2 System Description 7.2-25 7.2.6.7.3 Evaluation 7.2-26 7.2.6.8 Control Room Ventilation System 7.2-26 7.2.6.8.1 PDMS Function 7.2-26 7.2.6.8.2 System Description 7.2-26 7.2.6.8.3 Evaluation 7.2-26 7.2.6.9 Cable Room Ventilation System 7.2-27 7.2.6.9.1 PDMS Function 7.2-27 V UPDATE 2 - AUGUST 1997
CHAPTER 7 TABLE OF CONTENTS (Cont'd)
SECTION TITLE PAGE NO.
7,2.6.9.2 System Description 7.2-27 7.2.6.9.3 Evaluation 7.2-27 7.2.6.10 Service Building Ventilation System 7.2-27 7.2.6.10.1 PDMS Function 7.2-27 7.2.6.10.2 System Description 7.2-27 7.2.6.10.3 Evaluation 7.2-28 7.2.6.11 PDMS Alarm Monitoring System 7.2-28 7.2.6.11.1 PDMS Function 7.2-28 7.2.6.11.2 System Description ,7.2-28 7.2.6.11.3 Evaluation 7.2-29 7.2.6.12 Control Building - Mechanical Equipment Room 7.2-29 Ventilation System 7.2.6.12.1 PDMS Function 7.2-29 7.2.6.12.2 System Description 7.2-29 7.2.6.12.3 Evaluation 7.2-29 7.2.6.13 Control Building Area Ventilation System 7.2-30 7.2.6.13.1 PDMS Function 7.2-30 7.2.6.13.2 System Description 7.2-30 7.2.6.13.3 Evaluation 7.2-30 7.3 SYSTEM REFERENCES 7.3-1 vi JUPDATE 2 - AUGUST 1997
CHAPTER 7 TABLE OF CONTENTS (Cont'd)
LIST OF TABLES TABLE TITLE PAGE 7.1-1 OPERATIONAL FACILITIES 7.1-9 7.2-1 OPERATIONAL SYSTEMS 7.2-31 7.2-2 CONTAINMENT ISOLATION TABLE 7.2-34 7.2-3 OPERATIONAL SUMP SYSTEMS FOR PDMS 7.2-47 7.2-4 DELETED vii UPDATE 2 - AUGUST 1997
CHAPTER 7 TABLE OF CONTENTS (Cont'd)
LIST OF FIGURES FIGURE TITLE PAGE NO.
7.2-1 CONTAINMENT ATMOSPHERIC BREATHER "MOST 7.2-51 PORTABLE" PATHWAY MODEL 7.2-2 RADIATION SURVEY LOCATIONS; R.B. ELEVATION 347' 7.2-52 7.2-3 RADIATION SURVEY LOCATIONS; R.B. ELEVATION 305' 7.2-53
°°°i UPDATE 2 - AUGUST 1997
CHAPTER 7 OPERATIONAL SYSTEMS AND FACILITIES
7.0 INTRODUCTION
This chapter describes those systems and facilities which will be maintained in an operational condition during PDMS. Generally, those facilities which are maintained operational are those buildings or areas that contain operational systems or partially operational systems. An operational facility may include both operational systems (see Section 7.2) and deactivated systems (see Chapter 6).
Operational facilities and systems serve several functions within the scope of PDMS activities, including support of site operations, maintenance activities, and surveillance activities. Tables 7.1-1 and 7.2-1 provide a listing of those facilities and systems which will be maintained in an operational condition during the PDMS period. These tables also provide other relevant information concerning the status of the listed facilities and systems.
The following'systems and facilities discussed in Chapter 7 provide reasonable assurance that TMI-2 can be maintained in the PDMS condition with no risk to the health and safety of the public: 1) the Containment structure; 2) the Containment Ventilation and Purge System; 3) the Containment Atmospheric Breather; 4) the Fire Detection, Service, and Suppression System; 5) the Auxiliary Building Ventilation System; 6) the Fuel Handling Building Ventilation System; 7) the associated support and monitoring systems; and 8) the unit's flood protection capabilities.
7.0- 1 UPDATE 2 - AUGUST 1997
7.1 OPERATIONAL FACILITIES TMI-2 facilities required to be operational during PDMS are described in this section. Facilities are required to be operational to support operational systems within those facilities and/or to isolate internal contamination from the environment. Table 7.1-1 provides a listing of operational facilities for TMI-2 during PDMS. Each internally contaminated facility is identified along with any relevant remarks regarding the final layup of the facility.
Each of the following sections addresses the PDMS function of the facility, the facility descriptidn, and applicable evaluations. Additional reference information is listed in Section 7.3.
7.1.1 CONTAINMENT (REACTOR BUILDING) 7.1.1.1 PDMS Function The primary function of the Containment during PDMS is as a contamination barrier. The Containment provides shielding of the environment from the contained radiation. It also provides the means to assure that any effluents from the Containment will be controlled, filtered, and monitored.
The Containment was designed to withstand approximately 60 psi of internal pressure, airplane crashes, a safe-shutdown-earthquake, tornados, floods and other natural phenomena. The Containment was also designed with the capability to isolate any radioactive materials produced as a result of accidents or other unplanned events.
Although modifications were made to several of the Containment penetrations, (See Table 3.7-1) the structural capabilities of the Containment were not significantly diminished by the accident or any of the cleanup activities and are expected to be retained through the PDMS period. The Containment design and isolation capabilities relied upon during PDMS are described in the following sections.
7.1.1.2 Containment Structure The Containment is a reinforced concrete structure composed of cylindrical walls with a flat foundation mat and a dome roof and lined with a carbon steel liner. The structure provides biological shielding for normal and unanticipated conditions. The steel liner encloses the equipment and systems which remain inside the Containment and ensures that an acceptable upper limit of leakage of radioactive material will not be exceeded under the worst unanticipated event.
The foundation slab is reinforced with conventional carbon steel reinforcing. The cylindrical walls are prestressed with a grouted tendon post-tensioning system in the vertical and horizontal directions. The dome roof is prestressed utilizing a three-way grouted tendon post-tensioning system. The inside surface of the Reactor Building is lined with carbon steel to ensure a high degree of leak tightness. The thickness of the liner plate is 3/8 in. for the cylinder, 1/2 in. for the dome and 1/4 in. for the base.
7.1-1 UPDATE 2 - AUGUST 1997
The foundation mat bears on the bedrock and is I11 feet 6 inches thick with an additional 2 foot thick concrete slab above the liner plate. The cylindrical portion has an inside diameter of 13 0 feet, wall thickness of 4 feet, and a height of 15 7 feet from the top of the foundation slab to the spring line. -The roof is a shallow dome which has a large radius of 110 feet and a transition radius of 20 feet 6 inches.
7.1.1.3 Containment Functional Design During PDMS, the Containment serves primarily as a contamination barrier and provides shielding from the radiation due to contained contamination. All effluents will be controlled, filtered, and monitored. The fuinctional requirements for the Reactor Building during PDMS are listed below:
- a. The Containment pressure will be maintained at equilibrium with atmospheric pressure by utilizing a passive ventilation system (see Containment Atmospheric Breather, Section 7.2.1.2) via the Auxiliary Building.
- b. Containment isolation will be maintained by a single passive barrier either 'inside or outside of Containment on each Containment penetration. Active isolation capability is not required for PDMS except for the Containment Atmospheric Breather and the RB Purge Containment valves. Various passive means, or their equivalent, are acceptable for piping systems and include locked closed valves, closed and deactivated remote manual valves, closed and deactivated automatic valves, and blind flanges.
- c. Monitoring of effluent releases will be provided by existing and/or additional monitoring equipment as designated in Section 7.2.4.
7.1.1.4 Facility Description Systems within the Containment not required to be maintained in an operational condition during PDMS have been deactivated. The electric power circuits in the Containment have been deenergized except for those necessary for PDMS monitoring, inspection, and surveillance equipment, and other PDMS support requirements. Prior to each inspection inside the Containment, circuits will be energized to provide lighting and power for required equipment.
7.1.1.5 Evaluation The Containment was originally designed to withstand airplane crashes, seismic events, tornados, floods, and other natural phenomena. Although there were modifications made during the cleanup period to several of the piping penetrations, these modifications were perforned so that the structural integrity of the Containment has been maintained. Neither the accident nor any activity during the cleanup period has significantly degraded any of the structural capabilities of the Containment.
Therefore, the Containment is structurally capable of withstanding the original design basis events (except internal pressurization) during the PDMS period without further analysis.
The internal pressure of the Containment during PDMS is controlled by a passive breather system (see Section 7.2.1.2). This system will maintain the Reactor Building in equilibrium with atmospheric pressure (via the Auxiliary Building) at all times during its use. In addition, a range of postulated events has been investigated (see Chapter 8) and none of these events could result in any significant pressurization of the Containment. Therefore, even with the reduced pressure capabilities due to the 7.1-2 7.1-2UPDATE 2 - AUGUST 1997
existence of modified penetrations, the Containment is capable of performing its intended function of contamination isolation throughout the range of normal and postulated unanticipated events.
The Containment will remain isolated during PDMS. The Containment Atmospheric Breather and the RB Purge isolation valves will close on a High RB pressure, if in operation.
7.1.2 AUXILIARY BUILDING 7.1.2.1 PDMS Function The Auxiliary Building will serve primarily to support operation of the liquid radwaste, Auxiliary Building sump, ventilation, and effluent monitoring systems required for PDMS activities.
7.1.2.2 Facility Description The Auxiliary Building shares a common wall with the Fuel Handling Building on the west side and has a vertical air intake shaft attached to the east wall. The Auxiliary Building is rectangular in plan with three main floors of slab-beam and flat slab construction. At the east exterior wall, a large door opening is located at grade level. This door opening is not protected from an aircraft impact loading or external missiles (see Section 3.5). The Auxiliary Building is accessible from the Service Building, the Fuel Handling Building, and the Unit 1 - Unit 2 corridor.
During PDMS, the Auxiliary Building Ventilation System and filters will be maintained in an operational condition and operated as required. The auxiliary sump, auxiliary sump tank, and associated level indication will remain operational as well as the 480/277 VAC power to lighting, and sump level indication circuits. Most loads of 480 VAC and above have been deenergized at the switchgear and/or motor control centers. However, selected loads (e.g., welding receptacles, heaters, pump motors, and fan motors) will remain energized and available for use, as needed. The Auxiliary Building will be accessible for periodic surveillance entries and other limited activities.
7.1.2.3 Evaluation System operations and activities in the Auxiliary Building during PDMS are at a reduced level, thereby substantially reducing the potential for spread of contamination. Auxiliary Building sump and liquid radwaste systems are operational to collect and process any liquids in the building to minimize uncontrolled accumulation of liquids during PDMS.
7.1.3 FUEL HANDLING BUILDING 7.1.3.1 PDMS Function During PDMS, the Fuel Handling Building is not required for storage of new or spent fuel. However, it may be utilized for the temporary staging of site-generated radwaste or other appropriate uses.
7.1.3.2 Facility Description The. Fuel Handling Building shares a common wall on the east side with the Auxiliary Building and a common truck bay with the Unit 1 Fuel Handling Building on the north end. One bridge crane, common 7.1-3 UPDATE 2 - AUGUST 1997
to both buildings, was provided for fuel handling; no separating wall exists above the operating floor, i.e.,
elevation 347'-6". The Containment is located on the south side of this building Two stainless steel lined, reinforced concrete fuel storage pools are located in the building.
During PDMS, the Fuel Handling Building Ventilation System and filters will be maintained in an operational condition and will be operated as required for elevations below 347'-6". The operating floor (el. 347'-6") area is ventilated by the TMI-1 ventilation system.
Electric distribution will remain configured to power low voltage (120/208 VAC) lighting loads and fire detectors.
All fuel canisters have been removed from the spent fuel pools and shipped off-site. Both fuel pool structures will remain intact. The SDS has been deactivated. The Fuel Transfer Tubes have been isolated.
Access to the fuel pool area from TMI-2 will be appropriately controlled to prevent unauthorized access to the TMI- I fuel pool area which is classified as a vital area of TMI- 1. The FHB truck bay will be accessible from and under operational control of TMI-1.
7.1.3.3 Evaluation The Fuel Handling Building configuration for PDMS minimizes sources of contamination; therefore, the potential for spread of contamination is very low.
7.1.4 FLOOD PROTECTION 7.1.4.1 PDMS Function The existing unit flood protection capabilities will be maintained for PDMS and are based on a maximum water elevation of 311 ft. under flood conditions. The probable maximum flood (PMF) for the Susquehanna River at Harrisburg was established by the Army Corps of Engineers as 1,600,000 cfs. The water surface profiles routed downstream to the site results in a PMF of 1,625,000 cfs, which corresponds to a site elevation of 308.7 ft. The water surface elevation at the tip of Three Mile Island is 304 ft. and 303 ft. at the intake structure for the design flood. At these locations for the PMF, the calculated surface elevations are 310 ft. and 309 ft., respectively. See Section 2.4.3.
7.1.4.2 Facility Description Although station grade, at 304 ft., is above the water surface profile, dikes are provided around the site to protect the station from wave action for the design flood. The top elevation of the protective dike at the tip of Three Mile Island is 310 ft., which provides a freeboard of 7.1-4 UPDATE 4 - AUGUST 2001 0
approximately six feet above the design flood at that location. The dikes along both, sides of the island descend uniformly from elevation 310 ft. to elevation 305 ft., which is sufficient to protect the entire site for the design flood: A dike with a top elevation of 304 ft. extends across the southern end of the site.
Structures are provided with complete protection at the exterior faces rather than attempting to protect individual equipment or systems. The waterstops between adjacent building walls and mats were designed to be capable of withstanding a maximum water head of 45 ft. which is in excess of the maximum head associated with the flood level. The exterior sliding doors and flood panels are provided with watertight seals. Specific design features of these structures are:
- a. Containment - There are no external openings in the Containment below the 305 ft. elevation.
- b. Fuel Handling Building - There are no external openings in the Unit 2 Fuel Handling Building that require flood protection. The railroad door in the Unit 1 portion of the Fuel Handling Building utilizes an inflatable rubber seal to minimize water intrusion.
- c. Control Building - Flood panels are provided for all ground level exterior entrances.
- d. Auxiliary Building - A flood panel is provided for the east roll-up door entrance.
- e. Control Building Area - Access to the tendon gallery is protected by watertight enclosures and flood panels at ground level.
- f. Air intake - The openings in the Air Intake Tunnel are located higher than the probable maximum flood level except for a water tight hatch located at ground level, southeast of the BWST.
- g. General - Doors and entrances (not flood protected) to the Concrete Power Block Buildings are either watertight or are provided with flood panels. All openings that are potential leak paths (e.g., ducts, pipes, conduits, cable trays) are configured to minimize water intrusion.
7.1.4.3 Evaluation In addition to specific building flood protection provisions, the entire site is protected by an early warning system provided by the Federal-State River Forecast Center and a dike with a top elevation of 310.0 ft. The probable maximum flood is calculated to reach a site elevation of 308.7 ft. (often rounded to 309 ft.).
Therefore, systems and facilities required to support PDMS activities are protected from flooding.
7.1.5 AIR INTAKE TUNNEL 7.1.5.1 PDMS Function During PDMS, the Air Intake Tunnel provides a pathway for screened air to the following operational plant ventilating systems:
- b. Auxiliary Building Ventilation
- c. Fuel Handling Building Ventilation 7.1-5 UPDATE 4 - AUGUST 2001
- d. Control Building Ventilation.
- e. Service Building Ventilation
- f. Control Building Area Ventilation The Air Intake Tunnel protects these plant ventilating systems from airborne debris, flood water, and fire.
7.1.5.2 Facility Description The Air Intake Tunnel consists of a cylindrical intake tower with screens and baffles, a 100,000 gallon sump, and an underground tunnel leading to the plant ventilating systems. The tunnel floor drains to the sump. The tunnel leads to a vertical air intake shaft which branches out into the individual supply ducts for the plant ventilating systems. The sump will be pumped out via a temporary pump, when required.
7.1.5.3 Evaluation The Air Intake Tunnel is maintained during PDMS to provide an air supply pathway for operational plant ventilating systems. The structure is designed to protect the Air Intake System against projectiles and flooding. The openings in the tower are above the probable maximum flood level, and the baffled intake and screen prevent projectiles from entering the intake.
The Air Intake Tunnel, by design, also helps prevent the spread of fire into plant ventilating systems.
Combustible material has been removed from the Air Intake Tunnel.
7.1.6 UNIT I/UNIT 2 CORRIDOR 7.1.6.1 PDMS Function During PDMS, the Unit I/Unit 2 corridor serves as an operational facility to provide:
- a. Heated weather enclosure for various operational system piping such as domestic water, Unit 1 discharge to IWTS and the Unit 1 Processed Water Storage Transfer System.
- b. Access to the Auxiliary Building from the east outside yard through rollup security door 10.
- c. Interconnecting corridor between Unit 1 and Unit 2.
7.1.6.2 Facility Description The Unit 1/Unit 2 corridor is a heated passageway running north to south adjacent to the east side of the Turbine, Service and Control, and Auxiliary Buildings. It is a steel frame structure with metal siding over a concrete base floor, with a partial block wall up to the windows to the outside east yard. The roof consists of built up layers of felt and asphalt.
7.1-6 UPDATE 2 - AUGUST 1997
7.1.6.3 Evaluation The Unit I/Unit 2 corridor provides sufficient heating during PDMS to prevent freezing of the enclosed operational system piping. All contaminated equipment has been removed or adequately isolated to minimize the spread of contamination.
7.1.7 CONTROL AND SERVICE BUILDINGS 7.1.7.1 PDMS Function The Control Building houses the Unit 2 Control Room, a relay room, two deactivated inverter battery rooms, a cable spreading room, and a mechanical equipment room. Although the PDMS Alarm Monitoring System directs instrument alarm outputs to the Unit 1 Control Room, the Unit 2 Control Room annunciators/panel indications will be relied upon to provide specific information should the need.
arise.
The Service Building houses the operational Compressed Air System compressors, receiver tanks, and associated piping. In addition, the Service Building provides access to the Reactor Building, the Auxiliary Building, the Control Building and the air intake tunnel. The Control/Service Building sump with one sump pump will remain in service.
7.1.7.2 Facility Description The Control and Service Buildings are separated by a common wall. The Control and Service Buildings are rectangular buildings with a common foundation mat. The floors of the Control Building are supported by interior walls. A peripheral gap of 4 in. between edges of the floors and the inside face of the exterior walls has been provided to create a structural separation between the exterior structure and the interior structure. The purpose of this separation was to protect vital and sensitive Control Room equipment from dynamic aircraft impact loading to which the exterior walls and the roof could be subjected. Door openings and other penetrations in exterior walls of the Control Building that are susceptible to aircraft loading have been shielded by reinforced concrete shield walls.
During PDMS, the Control Building Ventilation Systems (i.e., Control Room HVAC, Mechanical Equipment Room HVAC, and Cable Room HVAC) and the Service Building Ventilation System will be maintained in an operational condition and will be operated as required.
Additionally, electrical distribution will remain configured to power low voltage (120/208 VAC) lighting loads, fire detectors, communications and panel annunciators.
7.1.7.3 Evaluation The Control and Service Buildings configuration for PDMS minimizes sources of contamination;,
therefore, the potential for spread of contamination is very low.
7.1-7 UPDATE 2 - AUGUST 1997
7.1.8 TURBINE BUILDING 7.1.8.1 PDMS Function The Turbine Building will be utilized to house operational support systems and deactivated passive systems during PDMS. Operational systems located in the Turbine Building include:
- a. The main 13.2KV power feed disconnects, 480/120VAC distribution systems and a 125VDC distribution. system.
- c. DELETED
- d. DELETED
- e. Sewage system for the temporary personnel access facility.
f Domestic water and heat trace.
- g. Turbine Building crane and elevator.
Deactivated passive functions in the Turbine Building are Reactor Building containment isolations and contamination isolations.
7.1.8.2 Facility Description The Turbine Building is rectangular in plan with three main floors of slab-beam construction. It houses the main turbine and condenser, a portion of the steam supply system and the condensate and feedwater systems.
During PDMS, the Turbine auxiliary and support systems will remain deactivated. The Turbine Building does not have flood protection.
Equipment, components and parts may be removed from deactivated systems provided their removal does not adversely affect the PDMS function of the system(s) involved in the Turbine Building.
7.1.8.3 Evaluation The Turbine Building Configuration for PDMS minimizes sources of contamination; therefore the potential of spread of contamination is very low.
7.1-8 UPDATE 2 - AUGUST 1997
)
TABLE 7.1-1 OPERATIONAL FACILITIES CONTAINMENT INTERNAL FACILITY DESCRIPTION ISOLATION CONTAMINATION REMARKS CONTAINMENT YES' YES OPERATIONAL ONLY TO THE EXTENT NECESSARY TO (REACTOR BUILDING) SUPPORT OPERATING SYSTEMS.
AUXILIARY BUILDING YES YES OPERATIONAL ONLY TO THE EXTENT NECESSARY TO SUPPORT OPERATING SYSTEMS.
FUEL HANDLING BUILDING YES YES OPERATIONAL ONLY TO THE EXTENT NECESSARY TO SUPPORT OPERATING SYSTEMS.
FLOOD PROTECTION NO NO MANUALLY INSTALLED FLOOD PROTECTION DOORS WILL BE AVAILABLE FOR WATER INGRESS PROTECTION.
AIR INTAKE TUNNEL NO NO OPERATIONAL ONLY TO THE EXTENT NECESSARY TO SUPPORT OPERATING SYSTEMS.
UNIT 1/UNIT 2 CORRIDOR NO YES OPERATIONAL ONLY TO THE EXTENT NECESSARY TO SUPPORT OPERATING SYSTEMS.
CONTROL AND SERVICE NO YES OPERATIONAL ONLY TO THE EXTENT NECESSARY TO BUILDINGS SUPPORT OPERATING SYSTEMS.
TURBINE BUILDING YES YES OPERATIONAL ONLY TO THE EXTENT NECESSARY TO SUPPORT OPERATING SYSTEMS.
7.1- 9 7.1 - 9UPDATE 2 - AUGUST 1997
7.2 OPERATIONAL SYSTEMS The following sections describe the systems that will be maintained in an operational condition during PDMS. Table 7.2-1 provides a listing of those systems. Also listed are the system code, status of containment isolation function, internal contamination, and any relevant remarks regarding operation in the PDMS configuration.
Each of the following sections addresses the PDMS function of the specific system, system description, and an evaluation. A list of references providing more detailed information is included in Section 7.3.
As required by the PDMS Quality Assurance Plan, procedures are in-place to control the operations, surveillance, testing, modifications, and maintenance of the operational systems.
7.2.1 CONTAINMENT SYSTEMS The following systems or portions of systems provide the necessary measures to ensure that the Containment maintains its primary function as a contamination barrier throughout PDMS:
- a. Portions of systems consisting of Containment penetration isolations
- b. Containment Ventilation and Purge System
- c. Containment Atmospheric Breather
- d. Containment Airlocks and Equipment Hatch.
7.2.1.1 Containment Isolation An operating nuclear power plant requires double barrier isolation capabilities so that no single, credible failure or malfunction of an active component can result in leakage due to loss of Containment isolation.
The installed double barriers in piping systems usually include various types of valves located inside and outside of the Reactor Building penetration. Due to the non-operating and defueled condition of TMI-2 during PDMS, there are no piping systems which penetrate the Containment that require double barrier active isolation capability. Therefore, except for the Containment Atmospheric Breather and RB pressure indicating piping, all piping penetrations will be isolated by a single, passive barrier either inside or outside of Containment. Locked closed valves, closed and deactivated remote manual valves, closed and deactivated automatic valves, and blind flanges are examples of acceptable means of Containment isolation during PDMS.
Table 7.2-2 describes the means of isolation for each Containment penetration. Any system required to be operated during PDMS which necessitates the opening of a Containment isolation feature shall be controlled by procedures which delineate the requirements for opening and reestablishing isolation of the penetration.
Several Containment penetrations were modified during the cleanup period to provide capabilities necessary for cleanup operations. The piping penetration modifications installed during the cleanup period were designed to withstand a maximum of 5 psig of pressure, (Reference 7.3-12). All other piping penetrations that have not been modified are presumed to have a retained capability at or near their original design pressure.
Although Table 7.2-2 provides a listing of specific means of Containment isolation, any equivalent 7.2- 1 UPDATE 2 - AUGUST 1997
means of isolation is acceptable and will not constitute a change to the Containment isolation capability.
For example, a valve may be removed and replaced by a blind flange and result in no change in the Containment isolation capability.
7.2.1.2 Containment Atmospheric Breather 7.2.1.2.1 PDMS Function The Containment Atmospheric Breather has been added to the Containment to provide passive pressure control of the Containment relative to ambient atmospheric pressure via the Auxiliary Building and to establish a "most probable pathway" through which the Containment will "breathe." The Containment Atmospheric Breather is designed to provide a specific pathway through which the Containment atmosphere can aspirate to maintain pressure equilibrium with the environment external to the Containment. The Breather is designed so that the Containment atmosphere will preferentially aspirate through it to the Auxiliary Building rather than through other potential Containment leak paths. In addition to assuring that the Containment structure will not experience significant pressure differential, positive or negative, which could threaten the structural capability of the contamination boundaries provided by the Containment, the pathway assures that effluents from the Containment to the environment will pass through the filtered Breather pathway.
The Breather is a passive system which requires only periodic inspection of the HEPA filter and maintenance of the system isolation valve. Besides the isolation valve, there are no active parts which can fail and cause the Breather to become inoperative. The Containment Atmospheric Breather model is shown on Figure 7.2-1.
The Breather is assured to be the "most probable" pathway because the size of the Breather is very large compared to other potential leak paths. The analysis which demonstrates that the Containment Atmospheric Breather is the most probable pathway is given in Section 7.2.1.2.3. Finally, the unfiltered leak rate test required by PDMS Technical Specifications 3/4.1.1.2 ensures that the flow through the breather remains greater than 100 times the flow through the other unfiltered leak paths.
7.2.1.2.2 System Description The Breather is a passive system consisting of a 6 in. diameter duct with A HEPA filter and a welded plate installed downstream of the HEPA that holds four sample filter paper frames. Each frame holds a set of two sample filter papers that can be removed for radionuclide analysis. The PDMS configuration is shown on GPUN Drawing 302-2041 The Hydrogen Control System line is used as the Containment Atmospheric Breather. Filter position AH-F-33 contains a 24" x 24" x 11 '"HEPA. There is an isolation valve between 7.2-2 UPDATE 2 - AUGUST 1997
Containment and the Breather HEPA filter that will automatically close upon receipt of a Containment pressure increase of 4psi. The purpose of this isolation is to protect the Breather HEPA filter in the event of a significant fire in the Reactor Building.
The Breather is operated in the following modes:
Passive Breathing - AH-V-3A, AH-V-52, AH-V-153, AH-V-154 and AH-V-25 are open and AH-V-4A and AH-V-120A are closed. A filter housing door downstream of AH-F-33 is opened. In this configuration, the Reactor Building is allowed to naturally aspirate via a HEPA-filtered pathway to the Auxiliary Building which, in turn, either naturally aspirates or is ventilated to the environment through yet another set of -EPA filters. In the event of loss of air or loss of power, AH-V-52 will fail closed.
DOP Testing - DOP testing of the HEPA filter is performed without the sample filter paper frames in place. ANSI N510-1980, Testing of Nuclear Air-Cleaning Systems will provide guidance in the performance of DOP testing of the HEPA filter.
Prior to operation of the RB Purge System, the RB Breather will be isolated. In this configuration, valve AH-V-120A, AH-V153, AH-V154, AH-V-25 and AH-V-52 will be closed and valves AH-V-3A and AH-V-4A will be open.
Provisions have been made to allow semi-annual. sample filter paper removal and assay and reinstallation or replacement of the HEPA filter.
7.2.1.2.3 Evaluation This section demonstrates that the Containment Atmospheric Breather is the "most probable pathway" by which the Containment can discharge air to (or intake air from) the environment. It is presumed that the Containment Atmospheric Breather can be deemed the "most probable pathway" if the mass flowrate through the breather system in response to an atmospheric pressure change is orders of magnitude larger than the mass flowrates through all other pathways in response to the same pressure changes.
The mass flowrate through the Breather in response to a pressure differential can be calculated from its flow resistance. Similarly, the mass flowrate through "all other paths" can be calculated from the flow resistance for "all other paths." The flow resistance for "all other paths" can be calculated from the rate at which the pressure in the Containment attempted to achieve atmospheric equilibrium when the Containment was sealed and pressurized.
For the purpose of calculating the flowrates, the Containment is visualized as shown in Figure 7.2-1.
The various known or potential leaks have been lumped together as an "equivalent" leak. The Containment Atmospheric Breather has been modeled as a 30 ft. straight length of 6-inch diameter pipe with one HEPA filter.
'The maximum overpressure in Containment from the postulated worst case fire is estimated to be approximately 5 psig.
7.2-3 UPDATE 2 - AUGUST 1997
The flow through the Breather vent and the "equivalent" leak will be calculated using the extended Bernoulli equation. For the Breather:
2 2 (Pdp) + (Vd2g.) (Pa/p) + [f(l/d)] (Vv/2gc) + (DP/p) (1) where:
Pe = the pressure in the Containment p = density of Containment air Vc = the (negligible) velocity in the Containment gc = gravitational constant = 32.17 Lbm-ft/Lbf-sec2 Pa = the ambient pressure 1 = pipe length d = pipe diameter f = friction factor for flow through the 30 ft. pipe V, = velocity in the Breather vent pipe DPf = pressure drop. across the HEPA filter Since the breather system is designed to allow the Containment to respond to small changes in atmospheric pressure, the pressure differences will be small and the flow in the 6 inch diameter pipe will be assumed to be laminar. In that case, f= 64/Re = 64/(dVvp/lt), where p.is the absolute viscosity of air.
The velocity in the pipe can be written in terms of the mass flowrate in the pipe:
0 V,= ( 4 m,/(p Rid 2)) (2) where:
mv = the mass flow rate in the Breather vent pipe d = the diameter of the Breather vent pipe The pressure drop across the HEPA filter can also be written in terms of the mass flowrate in the pipe:
0 (DPdp) = (Km/p) (3) where:
K is the rated pressure drop across the filter of I-inch of water at 1000 CFM which equals 0.312 Lbf-sec/ft5 . (Note that this assumes the HEPA filter pressure drop is linear with flow.
This is conservative since the actual pressure drop will be less at the expected lower than 1000 CFM flow rate which in turn would allow more flow through the Breather.)
7.2-4 UPDATE 2 - AUGUST 1997
Substituting into equation (1):
0 m= (P, - P.) /[(128p(7c p g.))(11d) + (K/p)] (4)
For the "equivalent" leak, the result is the same except that the term for the HEPA filter is absent.
0 MI = (P, - Pa) / [( 12 8 p/(7t p gc))(I/d4)] (5)
In this case, the quantity (l/d 4) must be determined. To find an equivalent value of (l/d4) for the leaks, data from the leak test of the Containment were used. In the test, the proportional leak rate was calculated as 0.0852% per day when the Containment was held at 70.6 psia. Since the pressure in the Containment is proportional to the air mass in the Containment, the proportional leak rate is the leak path mass flowrate, mi, divided by the air mass in the Containment at the time of the measurement.
0 0
.0852%/olday = mu/M = mu/(pV) where:
M = the Containment air mass V = the Containment free volume = 2. 1E6 ft3 Converting the leak rate from % per day to inverse seconds, and combining with equation (5):
(0.000852/(24 x 3600)) = (Pc - Pa) / [(p V)(128p/(p 7rgc))(l/d4)] (6)
As a result:
(1/d4)ieai = (Pc - Pa) / [(128V1 /thgc) (0.000852 / (24 x 3600))]
Which, in turn, leads to the determination that the equivalent value of (l/d4) for the leak paths is:
(l/d4)*k = 2.61E10 ft3
[If the length of the leak path is on the order of the Containment wall thickness (i.e., 4 ft), the total leak diameter would be 0.042 inches.]
The ratio of leak flow to Breather vent flow can then be written as:
o a
[(l28a/grtg.)(L/d4 + K] / [(128p/hrg.)(l/d4),u] (7) with:
(1/d4)t = 480 ie3 K = 0.312 lbf-sec/ft5 This gives the ratio of mass flow rates as:
(mu / r*) = (0.00717 + 0.312) / 3.89E5 = .000001 Therefore, the Containment Atmospheric Breather clearly is "the most probable pathway".
7.2-5 UPDATE 2 - AUGUST 1997
As stated in Section 7.2.1.2.2, there is a welded plate installed downstream of the HEPA filter that holds four sample filter paper frames; each frame holds a set of two filter papers. The air flow into and out of the containment via the Breather also passes through each set of two sample filters. (For the purposes of this discussion, the sample filter papers closest to the Breather HEPA will be referred to as the No. 1 Filters and the sample filter papers farthest from the Breather HEPA and closest to the Auxiliary Building atmosphere as the No. 2 Filters.) The Breather HEPA filters the air leaving the Containment into the Auxiliary Building. Filter No. 1 collects the material that may pass through the HEPA filter.
Filter No. 2 filters and samples the air coming back into the Containment from the Auxiliary Building.
All four of the No. I Filters are removed semi-annually and one is assayed for radioactivity. If any activity is found on the filter, it will be assumed that, for the sampling time period, a like amount of activity was released from the Containment into the Auxiliary Building (i.e., an assumed efficiency of 50%). This is a very conservative approach since the sample filter papers used have a collection efficiency of greater than 90%. Using this methodology, any activity assumed to be released is captured on the filter and will be assumed to have been released over the six month time period. Since the filter deposition is cumulative, this method provides determinative (but not real time) monitoring to verify that effluents through the Breather are within the calculated values in Chapter 8. Due to the extremely low releases calculated for PDMS, the sample filter paper is deemed adequate for determining the releases anticipated during PDMS.
7.2.1.3 Containment Ventilation and Purge 7.2.1.3.1 PDMS Function During PDMS, the Containment Ventilation and Purge System ensures that uncontrolled atmospheric migration of radioactive contamination will not create a hazard to either the public or site personnel.
7.2.1.3.2 System Description The Containment Ventilation and Purge System will be maintained in an operational condition to support activities in the Containment (e.g., surveillance entries, maintenance) during PDMS. Testing to ensure operability of the Containment Ventilation and Purge includes HEPA filter pressure drop, exhaust flow rate, DOP testing (guidance provided by ANSI N510-1980), and visual inspection of the filter train. The Containment Ventilation and Purge System consists of a single operational Containment purge exhaust unit, make-up air supply associated ductwork, dampers, and filters. The purge exhaust unit (maximum flow 25,000 cfln) draws air from the D-rings through HEPA filters, and discharges to the station vent. The PDMS configuration is shown on GPUN Drawing 302-2041.
7.2.1.3.3 Evaluation Operation of the Containment Vent and Purge System provides fresh air to the Containment while providing a filtered, monitored exhaust path. Atmospheric radiation monitoring, as described in Section 7.2.4, provides for monitoring of airborne releases from the system by using monitors located in the exhaust duct and in the station vent. This ensures that releases from the Containment to the environment are minimal.
7.2.1.4 Containment Airlocks and Equipment Hatch 7.2.1.4.1 PDMS Function 7.2-6 UPDATE 2 - AUGUST 1997
The airlock doors will be used during PDMS for Containment ingress and egress. The airlocks are designed as a double-door system with one of the doors always closed during routine entry into the Containment. Under these conditions, the Containment remains isolated (an enclosed volume) at all times and the amount of Containment air which could be released to or from the Containment is limited to the volume inside of an airlock assembly.
7.2.1.4.2 System Description The Equipment Hatch is located in the southwest quadrant of the Containment. It is a 24 ft. 8 inch diameter, 20.5 ton cover for a 23 ft. diameter penetration in the Containment wall. Its design purpose is to accommodate the movement of large objects into and out of the Containment.
A removable personnel airlock assembly (airlock 1) is incorporated into the Equipment Hatch. The airlock has a 9 ft. outside diameter, a 12 ft. 6 in. length, and weighs approximately 15 tons. Both the Equipment Hatch and the airlock are double gasketed with the Equipment Hatch bolted to a steel flange on the Containment wall.
A separate personnel airlock assembly (airlock 2) is located in the southeast quadrant of the Containment. Its use is intended primarily for personnel access and is permanently mounted in the Containment wall. Both personnel airlock assemblies are manually operated and require no electric power to open or close.
7.2.1.4.3 Evaluation There are situations when it is necessary to open both doors of an airlock assembly simultaneously, as is the case of movement of a long piece of equipment into or out of the Containment. The relevant issues associated with opening both airlock doors simultaneously during PDMS include:
- a. Release of radioactivity during maintenance or surveillance activities, transient conditions, or other natural or man-made events.
- b. Assurance that the airlock doors can be closed.
Typically, both airlock doors would be open only for the period of time necessary to complete the relevant activity and the Reactor Building -Purge System would be operating, thereby minimizing any effluent.
Natural phenomena, such as floods and high winds, are not considered to pose a safety concern because there is adequate warning to ensure that the airlock doors could be closed prior to a..
significant release. From a seismic standpoint, the airlocks serve no structural function, and therefore, will not affect the seismic integrity of the Containment.
7.2.2 FIRE PROTECTION, SERVICE, AND SUPPRESSION Fire Protection is provided during PDMS to minimize the potential for a release of radioactive material due to a fire in a contaminated area, protect systems maintained operational during PDMS, minimize the liability and property risk from potential fires, and minimize any potential risk to the operating unit on the same site.
7.2-7 UPDATE 2 - AUGUST 1997
These objectives are achieved by minimizing the potential for a fire by strict control of combustible materials and ignition sources and by providing a system of detection and suppression suitable to deal with any potential fire.3 7.2.2.1 PDMS Function
- The overall fire protection objectives are achieved by providing a system of fire protection features designed to ensure the following primary functional requirements:
- a. Fire detection shall be provided to the extent that any credible fire will be detected.
- b. Portable fire extinguishers shall be provided in areas of the facility, as necessary, to provide adequate fire suppression capability.
C. Presence of flammable and/or combustible liquids and materials shall be minimized to the maximum extent practical.
7.2.2.2 System Description The original TMI-2 system of fire protection has been modified to address the functional requirements for fire protection for PDMS. The Fire Service, and Suppression System as configured for PDMS are-shown on Drawings 3 02-23 1,. Shit. 1 and 302-2.34, The measures required to provide the necessaryI degree of fire protection are described below..
- a. The yard fire main will be maintained pressurized using the station fire pumps in Unit 1 with the altitude tank as a backup water source.
- b. A heat sensitve wire fire detection system has been installed which provides detection capability in the Reactor, Auxiliary, Fuel Handling, Control, Service and Turbine Buildings. The detectors are divided into six (6) zones with the fire and trouble alarms transmitted to the control panel on the TMII Unit 1 Turbine Deck that alarms in the TMI- I Processing Center. The detector will actuate when its temperature reaches 150 to 165 degrees Fahrenheit. The installation of this system supports the plan to remove the original plant high voltage detection system.
C. Equipment-related fire detectors, installed on various components within the plant to monitor a specific hazard and automatically trip the associated fire suppression system, have been deactivated along with the related fire suppression system.
7.2-8 UPDATE 4 - AUGUST 2001
- d. The Halon systems 2 protecting the Air Intake Tunnel have been deactivated by removing the-Halon cylinders and deenergizing the ultraviolet and pressure detectors. The Halon system protecting the relay room has been deactivated by removing the cylinders. The heat sensitive wire fire detection system, will remain operational to monitor these areas.
- e. Portable fire extinguishers and self-contained breathing apparatus are staged with emergency response crew equipment. Additional portable fire extinguishers are located throughout the plant as needed to support work activities.
- f. Transient combustibles inside the Containment and the AFHB have been removed to the maximum extent practical.
- g. The oil has been drained from the main turbine and lube oil reservoir, feedwater pump turbines, emergency feedwater pump turbine, emergency feedwater pumps, condensate pumps, condensate booster pumps, and the hydrogen seal oil unit.
- h. The charcoal filters have been removed from all HVAC systems in Unit 2.
- i. The 12 in. fire service loop, which runs through the Diesel Generator Building, AFHB, Control Building area and Turbine Building (east and west), has been cut and capped off. The Diesel Generator Building has been turned over to TMI-1. Fire Service Water System standpipes have been configured to the East and West side of the Turbine Building which permits connection of the local fire hydrants to the 331' elevation of the Turbine Deck by way of staged fire hoses. This will allow responsive action by the Station Fire Brigade and or local Fire Departments.
- j. DELETED
- k. The station fire brigade is fully trained to assure that the personnel are familiar with system configurations, plant layout, and the procedures in Unit 2.
- 1. The Fire Protection Program and housekeeping inspections and their frequency are addressed in plant procedures.
2The air intake tunnel halon system was removed because the probability of an airplane crash in the vicinity of the air intake tunnel was estimated to be less than 2E-7/year and because of the presence of heat activated detectors.
7.2-9 UPDATE 4 - AUGUST 2001
7.2.2.3 Evaluation The scope of fire protection has been reduced for areas in which systems have been deactivated and combustibles have been significantly reduced, so that the corresponding fire hazards have been minimrized.
Deluge systems in the air/intake tunnel, the Auxiliary, the Turbine, and Control Buildings have been deactivated for PDMS. There are no deluge systems in the Containment.
Detection devices provide contacts for supervisory indication that each device is operational and, in the event of detector actuation, indicates the location where the wire detector actuated the alarm.
The station fire brigade is under the supervisory control of Unit 1. Upon detection of a fire in Unit 2, the station fire brigade will respond to the specific location in Unit 2. This response in accordance with ongoing station fire brigade training and procedures will ensure mitigation of a fire in Unit 2 during PDMS. The fire protection and suppression systems are configured to provide adequate capability to extinguish any potential fire during PDMS.
7.2-10 UPDATE 2 - AUGUST 1997 4
7.2.3 RADIOACTIVE WASTE MANAGEMENT Liquid radwaste management systems that are operational during PDMS are the Radioactive Waste - Miscellaneous Liquids System and the Sump Pump Discharge and Miscellaneous Sumps System. Major portions of these two systems are operational during PDMS to prevent localized flooding and to provide proper disposal of effluents.
7.2.3.1 Radioactive Waste - Miscellaneous Liquids 7.2.3.1.1 PDMS Function During the PDMS period, portions of the WDL system remain operational. This status provides assurance that significant quantities of liquid wastes will not accumulate in an uncontrolled manner in the Auxiliary and Containment Buildings. Liquid radwaste in these buildings may result from either rainwater inleakage or PDMS activities. The WDL system achieves its objective by meeting the following criteria.
- a. Existing sumps in the Auxiliary and Containment Buildings will be monitored and pumped, as required.
- b. Liquid storage capabilities have been provided for accumulation until sufficient quantities are available for batch processing, as necessary.
- c. Existing Unit 1 and Unit 2 WDL system tie-ins have been restored to provide capability to process Unit 2 low-level liquid radwastes.
7.2.3.1.2 System Description The WDL system is designed to receive liquids from the Auxiliary and Fuel Handling Buildings, assorted equipment in these buildings, and from the Containment sump. This system has the capability to retain waste liquids for radioactive decay, sampling, filtering, or transferring liquids to TMI-1 for processing and/or disposal. The PDMS configuration is shown on GPUN Drawing 302-2045.
Liquid waste sources from the AFHB and Containment include tank drains, vents, filter drains, flush line drains, and floor drains. Rain water inleakage into the AF-B also accumulates in the Auxiliary Building sump.
Some floor drains have the potential of spreading contamination from their drain lines back into the room. Selected drains may have a ball float valve device or plug installed to preclude the spread of contamination.
The WDL components that will be utilized during PDMS include:
- a. MWHT (WDL-T-2) - A 19,518 gallon capacity, stainless steel, horizontal tank provides the waste water feed for transfer/processing. It collects water from the operable sumps, which are preferentially lined up to it. The tank has redundant inlet filters (WDL-F-8A & B) to partially clean up the influent.
7.2-11 UPDATE 2 - AUGUST 1997
- b. Sumps - The Containment Basement and Auxiliary Building sumps are lined with stainless steel. Level indication will be maintained for the Auxiliary Building Sump and Containment Basement sumps.
- c. Sump pumps - The Auxiliary Building sump has dual pumps that operate manually as needed. The Reactor Building Spray and DHR sumps (four total) have a single pump that operates manually as needed. Capacities of the pumps are as follows: Auxiliary Building sump pumps - 100 gpm; Reactor Building Spray and DHR sump pumps - 50 gpm. These pumps will be maintained operational and placed in a manual control mode.
- d. ABST (WDL-T-5) - A 3,085 gallon capacity, stainless steel, horizontal tank and its associated equipment will be maintained operational as a backup in case the MWHT is not available for extended periods.
Selected WDL tanks (e.g., the MWHT and ABST) have cartridge type HEPA filters installed on selected opening(s) to protect against airborne releases from these tanks. Deactivated WDL tanks are vented to the waste gas disposal header which has a cartridge type HEPA filter installed to protect against airborne releases.
During PDMS, the Auxiliary Building Ventilation System is not required for waste water transfer operations in the Auxiliary Building. These transfer operations do not pose an airborne problem since any airborne contaminants would be released from the water prior to entering the MWHT or the ABST. Contaminants stirred up in the MWHT or ABST will be contained by the HEPA filters installed on these WDL tanks.
The Containment Sump and Sump Pumps are in an undetermined condition. Because the existing plant sump pumps WDL-P-2A and 2B have not been refurbished, an alternate flow path will be utilized to drain down the RB basement sump. A tie-in to the WDL system has been provided outside of penetration R-593. This tie-in runs from the decay heat removal and building spray pump suction header isolation valves to the "A" RB spray pump room sump via BS-P-lA drain valves.
7.2.3.1.3 Evaluation Because a majority of plant systems are deactivated, have been drained, and placed in a layup condition, there are a limited number of activities that can generate liquid waste during PDMS.
Liquid waste in the remaining systems and accumulated water inleakage will be adequately handled by periodic batch processing to TMI-1 using the operational portions of the WDL system with TMI-1 cross-ties and discharged via approved pathways. This ensures minimum exposure to plant personnel and minimizes releases to the environment in accordance with 10CFR20 and 50.
7.2-12 UPDATE 2 - AUGUST 1997
7.2.3.2 Sump Pump Discharge and Miscellaneous Sumps System
.7.2.3.2.1 PDMS Function There are a number of sumps in TMI-2 that will be maintained in an operational condition during PDMS. The various sumps and their locations are listed in Table 7.2-3.
Maintaining the various building sumps operational assures that water buildup does not cause adverse localized flooding. These sumps will contain water that is either clean or slightly radioactive. Clean water is presently routed to the Industrial Waste Treatment System (IWTS). Radioactive water will be processed and discharged via approved pathways; slightly radioactive water will be pumped to the IWTS and released in accordance with 10 CFR 20, 10 CFR 50 and NPDES regulations. The discharge from the IWTS is monitored for radiation in accordance with the ODCM.
7.2.3.2.2 System Description The designs of the various sumps are delineated in the applicable documents referenced in Section 7.3. The PDMS configuration is shown on GPUN Drawing 302-2496. The sumps have the capability of being pumped automatically with the pumps controlled by float switches; however, they will normally be operated in the manual mode with a high level alarm that annunciates in the control room and the PDMS Alarm Monitoring System. Sump level is monitored by level detectors located in the respective sumps. The exceptions are the Circulating Water Chlorinator Building, Circulating Water Pump House, and the Air Intake Tunnel Normal Sumps which will employ portable sump pumps to pump down the sumps as necessary.
Water from the floor drains that enters these sumps is generally not contaminated, although sumps within the Turbine Building, Control Building Area, Control and Service Building, and Tendon Access Gallery have recirculation and grab sample lines to permit sampling for radioactivity.
7.2.3.2.3 Evaluation In general, the functional requirements of each sump and sump pump have been determined on an individual basis.
Monitoring of level in the various sumps by remote means and/or visual inspections ensures that accumulated leakage is transferred for processing in a timely manner. Sampling will be used to quantify radioactive content and ensure proper waste stream processing.
Therefore, operation of the sump pump discharge system ensures liquid waste streams generated during PDMS are adequately transferred for ultimate processing and do not adversely affect the PDMS plant conditions.
7.2-13 UPDATE 2 - AUGUST 1997
7.2.4 RADIATION MONITORING, 7.2.4.1 PDMS Function During PDMS, the radiation monitoring requir ements for the facility are primarily those associated.
with assuring the stability of the radiological conditions in the facility and effluent monitoring. The off-site dose calculations for normal time periods and unanticipated events (see Chapter 8) are based on assumed and measured radiological conditions associated with the various areas of the facility. In order to assure that the off-site dose calculations for the various events remain bounding, the radiological conditions must be periodically monitored to assure they remain within acceptable bounds. In addition, all effluents must be monitored to assure all off-site releases are within acceptable bounds, as well as to meet regulatory requirements for effluent reporting.
Broader radiological conditions monitoring will be conducted throughout the facility to assure compliance with good radiological conditions practices and 10 CFR 20. These radiological monitoring activities are required to support other PDMS activities such as visual inspections, preventive maintenance or other routine tasks.
7.2.4.2 Radiological Surveys 7.14.2.1 AFHB Radiological Surveys Radiological surveys will be conducted on a periodic basis to monitor radiological conditions in the Auxiliary and Fuel Handling Buildings. These radiological surveys will be conducted quarterly and will consist of air sampling, loose surface contamination, and radiation does, rate surveys. In addition, ThI~s may be placed in fixed locations and changed out periodically to monitor dose rates over a long-term period. Radiological survey results will be reviewed and evaluated for trends to provide early detection of deteriorating radiological conditions.
7.2.4.2.2 Containment Radiological Surveys Periodic Containment radiological surveys are required to provide information regarding the stability of the radiological conditions inside the Containment. As stated in Section 7.2.4.1, this information is necessary to periodically validate the off-site releases as calculated in Chapter 8. Radiological surveys just outside the containment airlock doors will be conducted quarterly, as expressed in Regulatory Guide 1.86 Position 3 .C. Radiological surveys inside containment will be conducted annually, as a minimum, at the approximate locations shown on Figures 7.2-11 and 7.2-12. Monthly radiological surveys in the Containment were performed after the RB was placed in its PDMS condition in order to develop an adequate data base. These surveys consisted of loose surface contamination and radiation dose rates at all survey locations and at least one air sample inside the containment.
The annual surveys will collect data from the same locatio ns. In addition, TLDs may be placed in fixed locations and changed out periodically to monitor dose rates over a long-term period. -These surveys will be reviewed and evaluated for any indicated trends. This will either provide assurance that contamination conditions inside the Containment are stable or will provide early indication of any changing conditions which may require corrective action.
7.2-14 UPDATE 4 - AUGUST 2001
7.2.4.3 Effluent Monitoring Airborne effluents will be monitored during active and passive ventilation of the Containment.
Periodic operation of the Reactor Building Purge may be necessary during personnel entries.
During Reactor Building Ventilation System operation, the station ventilation stack monitor, HP-R-219 or HP-R-219A, will provide real time monitoring of releases. The Reactor Building effluent monitoring system is shown on GPUN Drawing 302-2219. During periods when the Containment ventilation systems are not operating, airborne effluents from the Containment will continue to be monitored as discussed in Section 7.2.1.2.3.
The Containment is passively vented to the Auxiliary Building through a breather pathway which will be filtered using a HEPA filtration system. During periods of Reactor Building Purge operation the breather pathway will be isolated. During passive ventilation the purge exhaust will be isolated and the. Containment will be vented through the breather HEPA filter. On a semi-annual basis, a sample filter paper installed downstream of the HEPA filter will be assayed for its radioactivity content to evaluate' any release to the environment during periods of inactivity.
The Containment Atmospheric Breather System allows pressure equalization between the Containment and the environment via the Auxiliary Building. For this reason there is no motive force to cause contamination to leak out other than through the Containment Atmospheric Breather. Therefore, it is not anticipated that releases .to the environment will occur through pathways other than the breather. Operating procedures for Containment isolation and operation of airlock doors will be used during PDMS to ensure isolation is maintained.
In the AFHB, negligible airborne effluent discharges are anticipated during normal events. This conclusion is based on three factors: 1) de facto isolation of the AFHB, 2) prevention of airborne events within the AFHB, and 3) the/periodic monitoring of radiological conditions. Access to the AFHB is limited and controlled by site procedures. The ventilation system exhaust, as shown in GPUN Drawings 302-2042 houses a prefilter for large particulates, and two banks of DOP-tested HEPA filters in series. With the AFHB essentially isolated, there is no motive force togenerate significant airborne contamination levels, and any airborne contamination that might develop is filtered by the ventilation system exhaust pathway prior to release to the Station Vent.
Prevention of airborne contamination within the AFHB results, in part, from the lessened level and frequency of plant system operations and reduced access and activities of plant personnel. In addition, internally contaminated systems inside the AFHB are drained of liquids, and isolated by closing the respective boundary valves. Spent fuel pool "A/B" were sealed since they contained loose contamination sufficient to pose a contamination spreading concern.
7.2-15 UPDATE 2 - AUGUST 1997
Throughout PDMS, an ongoing radiological surveillance program will monitor radiological conditions within the AFHB. By means of various surveys, as described in Section 7.2.4.2, potential degradation of radiological conditions will be identified in order for appropriate remedial actions to be taken. A special monitoring program of AF-B airborne levels, see Section 7.2.4.3.1, was conducted for a one year period prior to PDMS, and was continued for a minimum of one year after implementation of PDMS. The information gathered during these evaluations constitutes an extensive data base that provides additional assurance that AFHB airborne effluent releases will be insignificant in nature. In addition to the special monitoring program, whenever the AFHB ventilation systems are operated during PDMS, the HEPA filtered exhaust is also monitored by the real time sampling of the Station Vent Monitor, thus assuring a controlled, monitored effluent release.
Considering that the AFHB has orders of magnitude less contamination than the Containment, the airborne effluent controls described above are sufficient for assuring airborne effluent releases from the AFHB during normal events will be insignificant.
A certain amount of inleakage into sumps is anticipated during PDMS and periodic discharges will be necessary. Initial samples will be taken and analyzed to quantify radioactive effluents. All radioactive liquid discharges will be via an approved pathway which will provide dilution and monitoring capabilities.
7.2.4.3.1 AFHB Airborne Evaluation A special monitoring program was designed to evaluate particulate airborne concentrations in the AFHB prior to, and after, entry into PDMS. The purpose of the evaluation was to determine the airborne levels in the AFHB during steady state conditions.
The most representative sample point of unfiltered AFHB airborne particulates was directly upstream of the plant ventilation system HEPA filter banks. Installed plant monitoring capabilities existed at both of these locations, i.e., HP-R-221A for the Fuel Handling Building and HP-R-222 for the Auxiliary Building. The moving filter paper mechanisms of these plant monitors was disabled, creating fixed filter sample points. The filter papers at these plant monitors were periodically changed out, and air sample results were reported quarterly.
The special monitoring program was temporarily suspended whenever plant activities in the AFHB were expected to generate significant airborne levels.
The special AFHB airborne evaluation concluded that the average particulate airborne generation rates of the Auxiliary and Fuel Handling Buildings were significantly below the 2.4 E-4 uci/sec acceptance criterion. The acceptance criterion was less than 1% of the TMI-2 Recovery Technical Specification for release of rate particulates with half lives greater than eight days. This corresponds to less than 1% of 0.024 uci/sec when averaged over any calendar quarter..
7.2-16 UPDATE 2 - AUGUST 1997
7.2.4.4 General Radiological Monitoring dt is anticipated that the routine radiological surveys will only be performed in areas requiring access for visual inspection, preventive maintenance, or other routine tasks. "High radiation," "high contamination," and sealed areas will not normally be accessed for routine surveys unless access is required for some other purpose. Radiological support of work during PDMS will be conducted in accordance with Radiological Controls procedures and good radiological work practices.
7.2.4.5 Evaluation The radiological effluent and monitoring programs described above address the principal radiological concerns for PDMS. These programs assure the radiological conditions in the facility are monitored and any significant deteriorating conditions will be identified in a timely period and appropriate correction action taken. Also, both liquid and gaseous effluents are monitored to assure all radioactive releases are within acceptable bounds. These monitoring programs, in conjunction with general radiological controls activities, assure that the radiological aspects of PDMS are appropriately addressed.
7.2.5 ELECTRICAL SYSTEMS During PDMS, various plant systems will be required to remain operational to support the monitoring, protection, and surveillance activities associated with PDMS. Some systems require continuous operation while others require only intermittent operation. Due to the need for electrical power support for these activities the PDMS Electrical Distribution System will be maintained operational and remain energized during PDMS.
7.2.5.1 PDMS Electrical Distribution System 7.2.5.1.1 PDMS Function During PDMS, the TMI-2 Electrical Distribution System will be maintained operational and energized to provide reliable power sources for the PDMS support systems and their associated controls and instrumentation. Power will also be available for area lighting, receptacles, heating and ventilation to support PDMS surveillance activities. In some instances, systems utilized for PDMS surveillance activities may require energization from local control stations prior to commencing the surveillance activity.
7.2.5.1.2 System Description The TMI-2 Electrical Distribution System is powered from a 13.2 KV offsite power source. The 13.2 KV/480 VAC transformers, in Unit Substations 2-31, 2-32, 2-35, 2-45 and 2-37, provide 480 VAC power to locations in the Turbine, Service and Auxiliary Buildings. Unit Substation 2-31 provides 480 VAC to bus Unit Substation 2-22E in the Control Building. All of the PDMS electrical loads are consolidated on these six buses.
7.2-17 UPDATE 2 - AUGUST 1997
Unit Substations 2-31 and 2-32 provide 480 VAC to five (5) Motor Control Centers (MCCs), MCC 2-3 1H, MCC-2-33A, MCC 2-3 IA, MCC 2-32A and MCC 2-42C. These contain combination motor starters using molded case circuit breakers and magnetic contactors.
The low voltage 120/208-volt AC distribution system supplies control, instrumentation, and power loads requiring unregulated 120/208-volt AC power. It consists of distribution panelboards, branch breakers, and transformers located in and powered from 480-volt MCCs through 480/120-volt dry-type transformers.
A 125-volt rectifier provides DC power to a single distribution panel. The rectifier is normally fed from Unit Substation 2-22E. In the event of a power loss, an automatic transfer switch will provide backup power from the Unit 1 Station Blackout bus. All PDMS DC control have been consolidated on this panel.
The vital 120-volt AC system consists of distribution panels, 2-12R and 2-22R, fed from regulated transformers. They receive power from Unit Substation 2-22E through 480/120-volt step-down-transformers. An automatic transfer switch provides backup power to panel 2-12R from the Unit 1 Station Blackout bus in the event primary power is lost. The regulated 120-volt AC power system supplies control and instrumentation loads as well as power for communication and annunciators.
Single line diagrams of the Unit 2 AC distribution system are shown on GPUN Drawings 206-201, 206-202, 206-203, 206-204, 3009, 3010, 3010, 3016, 3017 Shts. 1,2 and 3, E021, E025, El 16, 2E21-011 and 2E21-012.
7.2.5.1.3 Evaluation The Electrical Distribution System has been modified to meet the requirements of PDMS. Due to the deactivation of the reactor and its associated support systems, Class IE emergency diesel backed power systems are no longer required. In support of this, the emergency diesel generators have been I
turned over to TMI-1 and the Engineered Safety Feature buses no longer have connection capability to the emergency diesel generator buses 2DG-1 and 2DG-2. The Engineered Safety Feature buses will no longer be considered Class IE. As a result of an effort to isolate non-PDMS support systems and components from the TMI-2 electrical distribution system, nearly all such loads have been de-activated. Administrative controls have been developed and are in place to govern the I
use of PDMS support systems and prevent unauthorized use of deactivated systems. Load consolidation has been performed in order to reduce the number of energized circuits, which reduces plant maintenance and surveillance activities, thereby enhancing overall plant safety. DC power required during PDMS is supplied through a rectifier.
The Electrical Distribution System, as modified for PDMS, will provide sufficient reliable electrical power to support all PDMS activities with enhanced overall plant and personnel safety. In the event that all electrical power is lost, actions will be taken expeditiously to restore power. In the unlikely event that power cannot be restored within 14 days, a report will be submitted to the NRC within 30 days detailing the plans and schedule to restore power.
7.2-18 -
UPDATE 4 - AUGUST 2001
7.2.5.2 Normal and Emergency Lighting 7.2.5.2.1 PDMS Function TMJ Unit 2 is provided with normal lighting systems using mercury-vapor, fluorescent and incande nt luminaries. These systems provide illumination for PDMS support activities and for personnel safety. All lighting not required for security and monitoring activities will be turned off.
Lighting will be energized as needed for maintenance activities.
Installed emergency lighting will be maintained during PDMS. One-half of the normal lighting originally designed and installed is available throughout TMI-2 except in the RB. Normal lighting within the RB is provided by strings of lights installed on the 305' and 347' elevations. The lighting is adequate to support PDMS inspectim and test activities without additional illumination from permanently installed building lighting. Eight-hour portable emergency lighting will be carried by emergency personnel crews entering the buildings. This lighting will be staged with emergency response crew equipment. Routine entry crews will carry flashlights.
7.2.5.2.2 System Description The PDMS lighting system is powered from normal AC power sources; an exception to this is the RB lighting system discussed below. This system utilizes three types of luminaries:
mercury-vapor, fluorescent and incandescent. The mercury-vapor luminaries are powered from 480/277-volt systems directly from the 480-volt unit substations or from 480-volt motor control centers. The fluorescent and incandescent luminaries are powered from 208/120-volt systems utilizing 30 KVA step-down transformers which are supplied from the 480-volt sources. In general, the mercury-vapor luminaries are used in high ceiling areas, the fluorescent luminaries in almost all other areas, and the incandescent luminaries where environmental conditions require their use. Exit signs are powered from the normal lighting system; with backup battery for these signs from the emergency lights.
Emergency lighting consists of sealed beam lamps powered by batteries which initiate operation upon loss of the normal lighting system. This lighting is provided to ensure safe egress for personnel. Additional exit information will be provided by postings.
The RB normal lighting system consists of lights on the 305' and 347' elevations fed from Portable Power Distribution Centers (PPDC) or "power buggies." These power supplies were originally installed in the RB to support defueling activities. Two power buggies are located on the 305' elevation and two are located on the 347' elevation. The power feed is from either USS 2-35 or USS 2-45 and is configured such that the two power buggies on each elevation are energized from different sources, i.e., on each elevation, one-half of the lighting is fed from one source and the other half is fed from the other source. In the event one source of power is lost during an entry, adequate lighting would remain to assist in the safe evacuation of personnel.
7.2-19 UPDATE 2 - AUGUST 1997
7.2.5.2.3 Evaluation The majority of the existing'lighting systems remains operational during PDMS. Sufficient lighting,,
capability is provided for anticipated support activities. If further needs arise, temporary lighting will be added for specific PDMS activities.
7.2.5.3 Communications System 7.2.5.3.1 PDMS Function The TMI-2 Communications System during PDMS will provide normal communication channels throughout Unit I and Unit 2.
In addition, the Communications System will provide the capability to announce alarms and alert personnel to radiation and fire hazards.
7.2.5.3.2 System Description Portions of the original system have been retained for PDMS as follows:
- a. Normal Pane - Party System This system is powered from a separate 120-volt, single-phase AC power bus. The system is compatible with TMI Unit 1 and was merged with the TMII Unit I system through a merge-isolate switching arrangement in the control room to provide normal communication channels throughout TMI Units I and 2 (excluding Unit 2 RB) during PDMS.
The reactor building paging system is currently disabled. This was accomplished by disonnecting five cables and removing the handsets inside both air locks. The cables can be re-landed and the handsets reinstalled to allow the reactor building paging system to be returned to service.
The system consists of handsets, amplifiers, loudspeakers, evacuation tone generator, isolating transformer, and the necessary special equipment to provide a paging channel and three party line channels.
- b. Radio-Antenna System This system consists of antennas located at strategic points within the TMI-2 PDMS Buildings to ensure full coverage for radio communications. This system is the back-up system for a loss of the normal page-party system.
- c. Commercial Telephone System This system's trunk lines are leased from the Telephone Company. The handsets and switching equipment are maintained by TMI-1 personnel. This system provides links with all on site as well as off-site locations.
I 7.2-20 UPDATE 4 - AUGUST 2001
7.2.5.3.3 Evaluation The communication system will remain in an operational condition during PDMS to provide the following capabilities:
- a. Communications throughout Unit 1 and Unit 2.
- b. Communication for identification of fire, injury, and flood. Alarms are generated from the TMfI-1 Control Room.
- c. Communication for evacuation of normally unoccupied areas. Some of the areas identified may be used for storage of equipment and thus require occasional ingress and egress.
7.2.6 PDMS SUPPORT SYSTEMS The operational systems discussed in this section provide the necessary measures to support PDMS activities. Although they do not directly ensure protective functions, their operation is necessary to carry out anticipated operation, inspection, surveillance, and maintenance activities through PDMS.
7.2.6.1 Auxiliary Building Ventilation System 7.2.6.1.1 PDMS Function The Auxiliary Building Ventilation System will be maintained in an operational condition to support PDMS activities. When in operation, this system performs the following functions:
- a. Provides fresh, filtered, heated air in sufficient quantity to maintain room temperatures compatible for personnel and equipment.
- b. Minimizes the spread of contamination by providing air flow from clean areas to potentially contaminated areas and to the exhaust.
- c. Filters exhaust air.
The system will also operate to provide freeze protection, as necessary, for liquid systems inside the Auxiliary Building.
7.2.6.1.2 System Description The Auxiliary Building Ventilation System is a forced-flow heating and ventilating system consisting of supply and exhaust subsystems, with exhaust HEPA filter train, which provides 3A local differential pressure indicator is installed across each I-EPA filter. These indicators are routinely checked on a monthly surveillance when the ventilation system is in service. During PDMS, the ventilation system may be out of service for extended periods of time. No checks will be performed on the HEPA filters when the ventilation system is shutdown. The surveillance of the HEPA filters will be resumed when the system is returned to service.
7.2-21 7UPDATE 2 - AUGUST 1997
once-through ventilation with no recirculation. The discharge dampers of the supply and exhaust fans are closed when the ventilation system is not operating. The PDMS configuration is shown on GPUN Drawing 302-2042.
7.2.6.1.3 Evaluation During PDMS, Auxiliary Building ventilation and air handling equipment provide a filtered pathway during system operation to meet industrial and radiological requirements. Sources of contamination have been minimized (e.g., fuel removed, fuel pool drained, layup of deactivated systems); therefore, spread of potential contamination during PDMS has been greatly reduced.
7.2.6.2 Fuel Handling Building Ventilation System 7.2.6.2.1 PDMS Function Fuel Handling Building Ventilation System will be maintained in an operational condition to support PDMS activities. When in operation, this system performs the following functions:
- a. Provides, fresh, filtered, heated air in sufficient quantity to maintain room temperatures suitable for personnel and equipment.
- b. Minimizes the spread of contamination by providing air flow from clean areas to potentially contaminated areas, and then to the exhaust.
- c. Filters exhaust air.
- d. Maintains the lower elevations (328', 305', and 281') of the Fuel Handling Building separate from the operating deck, which is maintained at a slightly negative pressure by the Unit I ventilation system.
The system will also operate to provide freeze protection, as necessary, for liquid systems inside the Fuel Handling Building.
7.2.6.2.2 System Description The Fuel Handling Building Ventilation System is a forced flow heating and ventilating system consisting of supply and exhaust subsystems, with exhaust HEPA filter train3 , which provide once-through ventilation with no recirculation. The operating deck and Fuel Handling Building truck bay are separated from the remainder of the Fuel Handling Building and are ventilated by the Unit I ventilation system. The PDMS configuration is shown on GPUN Drawing 302-2343.
7.2.6.2.3 Evaluation During PDMS, FHB ventilation and air handling equipment provide a filtered pathway during system operation to meet industrial and radiological requirements. Sources of contamination have been minimized (e.g., fuel removed, fuel pool drained, layup of deactivated systems, covers installed on spent fuel pools); therefore, spread of potential contamination during PDMS has been 7.2-22 UPDATE 5 - AUGUST 2003
greatly reduced.
7.2.6.3 Air Intake Tunnel Ventilation System The Air Intake Tunnel will be maintained only as a supply pathway for screened air to plant ventilating systems during operation. It consists of a cylindrical intake tower with screens and baffles, a 100,000 gallon sump, and an underground tunnel leading to the plant ventilation systems. The PDMS configuration is shown on GPUN Drawing 302-2219.
During PDMS, the Air Intake Tunnel provides a supply pathway for ventilation systems operation to meet industrial and radiological requirements.
7.2.6.4 Compressed Air Supply System 7.2.6.4.1 PDMS Function Portions of the original plant Instrument and Service Air Systems will be utilized during PDMS to provide compressed air to operational pneumatic devices in the following systems:
- a. Waste Disposal - Liquid
- b. Auxiliary Building Ventilation System
- c. Fuel Handling Building Ventilation System
- d. Control Building Ventilation System
- e. Service Building Ventilation System
- f. RB Purge System
- g. RB Breather System 7.2.6.4.2 System Description The Compressed Air Supply System consists of two air-cooled air compressors, air dryer, receivers, and the piping and valves required to distribute compressed air to operational pneumatic devices. The major components, piping, and valves of the original plant Instrument/Service Air Systems have been incorporated as part of the Compressed Air Supply System. Two 7.2-23 UPDATE 5 - AUGUST 2003
air-cooled air compressors and associated air dryer are used to supply air to the modified systems in I place of the original water-cooled compressors. The Compressed Air System will be operated continuously to support operations.
7.2.6.4.3 Evaluation The Compressed Air Supply System primarily utilizes the portions of the original plant Instrument/Service Air System, which are required to store and distribute air to pneumatic devices supporting PDMS. Since cooling water will not be available during PDMS to cool air compressors, air-cooled air compressors have been used.
7.2.6.5 Building Inleakage Waterproofing System 7.2.6.5.1 PDMS Function During PDMS, the TMI-2 building waterproofing systems serve to direct roof rainwater into the site stormwater drainage system and prevent groundwater from entering buildings through joints, penetrations, and cracks.
7.2.6.5.2 System Description The plant waterproofing systems consist of:
- a. Building roofing systems
- b. Basement waterproofing from groundwater.
- c. A cork seam monitoring system (see Section 1.1.2.2.4).
The building roofs, except for the Auxiliary and Reactor Buildings, are a built-up system of asphalt, felts, and insulation on both c6ncrete and steel decks. Rainwater is directed via roof slope to roof drains which carry the rainwater to the site stormwater drainage piping. All runoff is collected in a retention basin which can be monitored prior to discharge into the Susquehanna River.
All basement walls are poured concrete. To prevent groundwater inleakage, the following were performed:
- a. All penetrations through basement walls were sealed.
- b. Expansion joints between building foundations were sealed with waterstops, cork filler, and epoxy sealant.
- c. Construction joints were keyed to deter water seepage through them.
7.2-24 UPDATE 5 - AUGUST 2003
7.2.6.5.3 Evaluation In preparation for PDMS, various building seams, link seals, and major cracks have been repaired to the extent practical to minimize expected inleakage from storms and high groundwater levels. The inleakage rates and flowpaths experienced to date do not affect plant equipment required for PDMS.
Additionally, the Sump Pump Discharge and WDL system are operational to transfer accumulated water to minimize potential spread of contamination due to localized flooding.
7.2.6.6 Sewers 7.2.6.6.1 PDMS Function The basic function of the sewage collection system is to transport sewage from TMI-2 structures to the Sewage Treatment Plant. The PDMS configuration is shown on GPUN Drawing 302-151.
7.2.6.6.2 System Description Sewage from the temporary personnel access facility (TPAF) in the Turbine Building is routed to the Sewage Treatment Plant (STP) which serves both TMI- I and TMI-2. The major operational portion of the Sewer System is underground gravity flow piping that provides for the transport of sewage from the Unit 2 support facilities to the STP.
7.2.6.6.3 Evaluation The Sewage Treatment Plant will process sewage from the TPAF. The majority of TMI-2 sewage piping is underground below the frost line. The original plant sanitary waste/sewage system is deactivated.
7.2.6.7 Domestic Water System 7.2.6.7.1 PDMS Function During PDMS, portions of the existing domestic water system will remain operational to provide domestic water services required during PDMS.
7.2.6.7.2 System Description The domestic water system is maintained as a modified operational system. Unit 2 is supplied with domestic water from Unit 1 which is then distributed to Unit 2 support facilities. Domestic water is provided to the radwaste seal water unit in the Auxiliary Building, to the TPAF in the Turbine Building, and to several outbuildings. The PDMS configuration is shown on GPUN Drawings 302-158 Sht. 4.
7.2-25 UPDATE 4 - AUGUST 2001
7.2.6.7.3 Evaluation Since personnel access into the plant will be infrequent, only one source of domestic water is required in the Turbine Building. The Auxiliary Building header supplies domestic water to the seal water unit. Unit 1 and Unit 2 support facilities will remain operational; therefore, domestic water will continue to be supplied.
7.2.6.8 Control Room Ventilation System 7.2.6.8.1 PDMS Function The Control Room Ventilation System will be maintained in an operational condition to support PDMS activities. This system provides fresh, filtered, heated or cooled air in sufficient quantity to support personnel occupancy and equipment protection.
7.2.6.8.2 System Description The Control Room Ventilation System consists of one supply fan (AH-C- 16B) running in a forced ventilation mode during normal year round conditions. The supply fan will primarily recirculate the control room air as it is heated/cooled. A small amount of fresh air (outside air) will be force supplied by bypass booster fan (AH-C-16X). Exhaust fan (AH-E-35) will return control room air to the suction of supply fan (AH-C-16B). A small amount of the control room air will be "exhausted" out of this recirc mode, primarily by exfiltration dampers in the control room and via the kitchen and toilet fans. This provides for a small amount of air change per day.
Control Room air temperature is monitored by a sensing bulb located in the Control Room return air duct. The sensing bulb provides signals to a local temperature controller which controls beating or cooling as conditions dictate. Two steps of heating are available for freeze protection and two stages of cooling are available from the 10 ton air conditioner which also reduces Control Room humidity.
Neither cooling or heating functions will operate unless supply fan (AH-C-16B) is running and satisfying a flow switch in the supply air duct.
Additional outside air can be provided by performing special operations if the chiller malfunctions and/or additional cool outside air is desired.
7.2.6.8.3 Evaluation During PDMS, Control Room ventilation and air handling equipment provides a filtered pathway for active operation to meet industrial and radiological requirements. The Control Room Ventilation System is maintained operational for the maintenance and surveillance entries into the TMI-2 Control Room and in response to off-normal conditions.
7.2-26 UPDATE 5 - AUGUST 2003
7.2.6.9 Cable Room Ventilation System
- , 7.2.6.9.1 PDMS Function The Cable Room Ventilation System will be maintained in an operational condition to support PDMS activities. When in operation, this system provides fresh, filtered, heated air in sufficient quantity to maintain room temperatures suitable for personnel and equipment.
7.2.6.9.2 System Description The Cable Room Ventilation System is a forced flow heating and ventilation system consisting of a supply and exhaust-return subsystem which provides ventilation with partial recirculation.
When the ventilation system is not operating, a damper in the bypass duct will open, allowing free passage of air in the exhaust-return duct system.
7.2.6.9.3 Evaluation During PDMS, Cable Room ventilation and air handling equipment provide a filtered pathway during system operation to meet industrial requirements and provide the appropriate environment for instrumentation and annunciator equipment.
7.2.6.10 Service Building Ventilation System 7.2.6.10.1 PDMS Function The Service Building Ventilation System will be maintained in an operational condition to support PDMS activities. When in operation, this system performs the following functions:
- a. Provides fresh, filtered, heated air in sufficient quantity to maintain room temperatures suitable for personnel and equipment.
- b. Minimizes the spread of contamination by providing air flow from clean areas to potentially contaminated areas, and then to the exhaust.
- c. Filters exhaust air.
7.2.6.10.2 System Description The Service Building Ventilation System is a forced flow heating and ventilation system consisting of supply and exhaust subsystems. Exhaust HEPA filter trains, which provide once-through ventilation with partial recirculation of clean areas.
7.2-27 UPDATE 2 - AUGUST 1997
7.2.6.10.3 Evaluation During PDMS, Service Building ventilation and air handling equipment provide a filtered pathway W during system operation to meet industrial and radiological requirements. This system is maintained operational for personnel ingress and egress to the Reactor Building, Auxiliary Building, and Unit 2 Control Room, for maintenance and surveillance entries into the Service Building, and provides ventilation for the CAS backup compressor.
7.2.6.11 PDMS Alarm Monitoring System 7.2.6.11.1 PDMS Function The function of the plant computer alarm system is to notify plant operations personnel of an abnormal plant condition which requires operator action to. correct or which represents a threat to plant, personnel or equipment safety. The PDMS Alarm Monitoring System provides the means to remotely monitor select TMI-2 alarms and TMI-2 station vent monitor signals in the TMI-1 Control Room via the TMI-1 plant computer. As required by the TIVI Emergency Plan, the PDMS Alarm j Monitoring System is designed such that if the remote monitoring of the alarms in Unit 1 becomes inoperable, the TMI-2 Control Room alarms and station vent monitor signals can be monitored from the annunciators and other recorders/equipment in the TMI-2 Control Room. The alarms and functions to be monitored are listed in Operating Procedure 1105-22, Response To PDMS alarms.
(Ref. 7.3-13).
7.2.6.11.2 System Description The plant computer uses four types of alarm information display systems - alarm CRTs, alarm displays on a Utility CRT, alarm summaries on a Utility CRT and an alarm printer. The modifications that were necessary to facilitate installation/operation of the PDMS Alarm Monitoring System were as S
follows:
- 1. A fiber optics cable link was installed between the TMII-1 computer system in the OSF Building and the TMI-2 multiplexer unit located in the TMI-2 Control Room.
- 2. A multiplexer unit was installed in the Unit 2 Control Room to interface with all required signals from the field (i.e., sensors or annunciators) or the Unit 2 Control Room annunciators.
The multiplexer performs the necessary signal processing to convert the digital and analog signals to a light signal which is transmitted back to the TMI- 1 computer via the fiber optics cable link.
- 3. The required digital alarm inputs and analog signals were interconnected to the multiplexer unit.
- 4. The multiplexer receives 120VAC power from a 480/120VAC regulated transformer. This transformer receives 480VAC power from one of two sources. Normally it will be fed from the TMI-2 480VAC system or, as a backup, it can be fed from one of TMI-l's 480VAC B.O.P. power systems.
- 5. A Mini-Uninterruptible Power Supply (UPS) provides backup power to the multiplexer in 7.2-28 UPDATE 4 - AUGUST 2001
case of failure of the normal 120 VAC power source. The UPS will provide this backup power for a minimum of one hour.
- 6. Computer software was developed and tested to generate the required audible annunciator signals and the displays on the existing CRTs in the TMI-1 Control Room.
7.2.6.11.3 Evaluation The PDMS Alarm Monitoring System does not meet NFPA requirements with respect to supervised circuits. However, the intent of the NFPA standards is met by the use of a multiplexer/communication link trouble alarm, which notifies the Unit 1 computer and operators of a failure in the multiplexer or fiber optics cable. In addition, in the event of a communications problem, the system software will suppress all other TMJ-2 alarm conditions to avoid overloading the Unit 1 operators with spurious alarms that normally would result from such a failure.
7.2.6.12 Control Building-Mechanical Equipment Room Ventilation System 7.2.6.12.1 PDMS Function Part of the Control Building-Mechanical Equipment Room Ventilation System will be maintained in an operational condition to support PDMS. The modified system provides fresh, filtered, heated air in sufficient quantity to maintain room temperatures suitable for personnel and equipment.
7.2.6.12.2 System Description The-Control Building-Mechanical Equipment Room Ventilation System is a forced flow heating ventilation system consisting of a supply and exhaust subsystem which provides once-through ventilation with no recirculation.
7.2.6.12.3 Evaluation During PDMS, the Control Building-Mechanical Equipment Room Ventilation and air handling equipment provides a filtered pathway during system operation to meet industrial and radiological requirements. The Control Building-Mechanical Equipment Room Ventilation System is maintained operational for maintenance and surveillance entries into the mechanical equipment room and in response to off-normal conditions. During the winter it provides pipe freeze protection.
7.2-29 UPDATE 2 - AUGUST 1997
7.2.6.13 7.2.6.13 Control Building Area Ventilation System 7.2.6.13.1 PDMS Function The Control Building Area Ventilation System will be maintained in an operational condition to support PDMS. When in operation, the system provides fresh, filtered, heated air 'insufficient quantity to maintain room temperatures suitable for personnel and equipment.
7.2.6.13.2 System Description The Control Building Area Ventilation System is a forced flow heating and ventilation system consisting of a supply fan, air filter, and duct heater unit, which provides heated (when required) fresh air into the Control Building Area and Tendon Access Gallery.
7.2.6.13.3 Evaluation During PDMS, the Control Building Area Ventilation and air handling equipment provides an active filtered pathway that meets industrial requirements. The Control Building Area Ventilation System is maintained operational for maintenance and surveillance entries into the Control Building Area/Tendon Access Gallery and to provide pipe freeze protection.
7.2-30 7.2-30UPDATE 2 -AUGUST 1997
TABLE 7.2-1 OPERATIONAL SYSTEMS SYSTEM CONTAINMENT INTERNAL DESCRIPTION SYS. CODE ISOLATION CONTAMINATION REMARKS CONTAINMENT All YES YES PASSIVE SYSTEM; PERIODIC INSPECTION OF HEPA FILTERS ATMOSPHERIC & ASSAY OF SAMPLE FILTER PAPERS
- BREATHER, CONTAINMENT AH YES YES OPERATED IN PURGE MODE TO SUPPORT CONTAINMENT VENTILATION & ENTRIES PURGE CONTAINMENT AIRLOCKS RBA YES N/A AIRLOCKS FOR PERSONNEL/EQUIPMENT ACCESS;
& EQUIPMENT EQUIPMENT HATCH WILL REMAIN IN PLACE HATCH FIRE PROTECTION FP N/A N/A ZONE FIRE DETECTION SHALL BE OPERATIONAL THROUGHOUT OPERATIONAL PLANT AREAS FIRE SERVICE FS YES N/A PROVISIONS HAVE BEEN MADE AND EQUIPMENT HAS BEEN STAGED TO UTILIZE LOOP HYDRANTS FIRE SUPPRESSION FS N/A N/A PORTABLE FIRE SUPPRESSION EQUIPMENT ARE STAGED EQUIPMENT WITH EMERGENCY RESPONSE CREW EQUIPMENT WASTE DISPOSAL WDL YES YES NECESSARY EQUIPMENT/TANKS TO PROCESS WATER WILL BE MAIN-
- LIQUID (MISC) TAINED OPERATIONAL. ONLY THE BUILDING SUMP PUMPS, THE MISC.
WASTE HOLDUP TANK (WDL-T-2), THE ABST (WDL-T-5) AND INTERCONNECTING PIPE SHALL REMAIN OPERATIONAL FOR WATER REMOVAL FUNCTIONS.
SUMN PUMP SD N/A YES FACILITIES ARE SEALED TO LIMIT EXTERIOR WATER INGRESS.
DISCHARGE & PERIODIC SUMP PUMP OPERATIONS WILL PREVENT SUMP ACCUMU-MISCELLANEOUS LATION OF DRAINAGE AND INADVERTENT INLEAKAGE.
7,2-31 UPDATE 2 - AUGUST 1997
TABLE 7.2-1 (Cont'd)
OPERATIONAL SYSTEMS YSTEM CONTAINMENT INTERNAL DESCRIPTION SYS. CODE ISOLATION CONTAMINATION REMARKS RADIATION HP N/A YES RADIATION MONITORS AND ALARMS REMAIN IN OPERATION MONITORING AS DEEMED NECESSARY BY RADCON. SELECTED HP MONITORING AND SURVEY PROGRAMS ARE ALSO CONTINUED ELECTRIC EE N/A N/A ELECTRICAL EQUIPMENT WHICH SUPPORTS OPERABLE SYSTEMS DISTRIBUTION AND FACILITIES SHALL REMAIN OPERATIONAL. AREA LIGHTING SHALL BE AVAILABLE THROUGHOUT THE PLANT LIGHTING & EL N/A N/A EMERGENCY LIGHTING COMMUNICATIONS COM N/A N/A COMMUNICATIONS WILL BE OPERATIONAL TO THE EXTENT NECESSARY FOR PDMS ACTIVITIES AUXILIARY BUILDING AH N/A YES VENTILATION WILL BE OPERATIONAL TO THE EXTENT VENTILATION NECESSARY FOR PDMS ACTIVITIES FUEL HANDLING AH N/A YES VENTILATION WILL BE OPERATIONAL TO THE EXTENT BUILDING VENTILATION NECESSARY FOR PDMS ACTIVITIES AIR INTAKE TUNNEL AH NO NO MAINTAINED ONLY AS A SUPPLY PATHWAY VENTILATION COMPRESSED AIR NO IA/SA NO AIR-COOLED AIR COMPRESSORS USE PORTIONS OF SUPPLY INSTRUMENT AND SERVICE AIR SYSTEMS.
BUILDING INLEAKAGE CS NO YES WATERPROOFING WILL MINIMIZE IN-LEAKAGE TO THE EXTENT THAT ANY INLEAKAGE CAN BE ADEQUATELY HANDLED BY PERIODIC TRANSFER TO BUILDING SUMPS 7.2-32 T 7U22 PDATE2- 1 ST 1997
TABLE 7.2-1 (Cont'd)
OPERATIONAL SYSTEMS SYSTEM CONTAINMENT INTERNAL DESCRIPTION SYS. CODE ISOLATION CONTAMINATION REMARKS SEWERS SE N/A NO OPERATIONAL FOR OUTBUILDINGS AND TEMPORARY PERSONNEL ACCESS FACILITY ONLY. DEACTIVATED FOR IN-PLANT PORTIONS DOMESTIC WATER DO N/A NO OPERATIONAL ONLY TO THE EXTENT REQUIRED TO SUPPORT PDMS ACTIVITIES CONTROL BUILDING AH N/A NO VENTILATION WILL BE OPERATIONAL TO THE EXTENT VENTILATION NECESSARY FOR PDMS ACTIVITIES. CONSISTS OF THREE OPERATIONAL SUBSYSTEMS; CONTROL ROOM, CABLE ROOM AND MECHANICAL EQUIPMENT ROOM VENTILATION SYSTEMS SERVICE BUILDING AH N/A YES VENTILATION WILL BE OPERATIONAL TO THE EXTENT VENTILATION NECESSARY FOR PDMS ACTIVITIES; INCLUDES, CONTROL BUILDING AREA VENT PDMS ALARM N/A N/A MONITORING SYSTEM 7.2-33 UPDATE 2 - AUGUST 1997
TABLE 7.2-2 CONTAINMENT ISOLATION TABLE Line Operational Size Isolation Penetration Service System System (inches Valves Status R-524 Fuel Transfer Canal SF NO 10 SF-V105 Manual-Locked Fill Line Closed (L.C.)
R-525 Decay Heat Coolant DH NO 12 DH-V3 De-energized Letdown 1/2 DH-V225 Manual-L.C.
R-526 Steam Generator "A" CA NO 1/2 CA-V8 De-energized-L.C.
Sample Line R-527 Core Flood Tank CF NO I CF-V144 De-energized-L.C.
Bleed & Sample R-528 Steam Generator "B" CA NO 1/2 CA-V9 De-energized-L.C.
Sample Line R-529 Reactor Coolant WDL NO 4 WDL-V125 De-energized-L.C.
Drain Pump Discharge R-530 Steam Generator SV NO 2 SV-V55 De-energized-L.C.
Side Vent & Drain R-531 Decay Heat CCW for DC NO 8 DC-V115 De-energized-L.C.
RC Leak Recovery System R-532 Fuel Transfer Tube FH NO 1 FH-VID Manual-L.C.
39 Blind Flange Installed
. ) 7.2-34 UPDO AUGUST 1997
TABLE 7.2-2 (Cont'd)
CONTAINMENT ISOLATION TABLE Line Operational Size Isolation Penetration Service System System (inches Valves Status R-533 Fuel Transfer Tube FH NO 1 FH-VIC Manual-L.C.
39 Blind Flange Installed R-535 Demincralized Water DW NO 3 DW-V28 Manual-L.C.
R-536 Plasma Arc Nitrogen PAN NO 2 PAN-V5 Manual-L.C.
3/4 PAN-V17 Manual-L.C.
1 PAN-V19 Manual-L.C.
R-537 Nitrogen & Fill CF NO 1 CF-V145 Manual-L.C.
to Core Flood Tank 1 CF-VI 14B Manual-L.C.
1/2 CF-V 129B Manual-L.C.
R-538 Pressurizer Steam SN NO 1/2 CA-V 10 De-energized-L.C.
& Water Space Sample Line 8
R-539 DWCS DC NO DC-V103 De-energized-L.C.
Isolation 1/2 DC-Vt37 Manual-L.C.
R-541 Letdown Line to MU NO 2 1/2 MU-V376 De-energized-L.C.
Purification Demin.
R-542 DWCS Borated DR NO 3 DH-V187 Manual-L.C.
Water Flush DH-V205 Manual-L.C.
I R-543 Reactor Building NM NO NM-V52 Air Disabled-L.C.
Nitrogen Header 7.2-35 UPDATE 2 - AUGUST 1997
TABLE 7.2-2 (Cont'd)
CONTAINMENT ISOLATION TABLE Line Operational Size Isolation Penetration Service System System (inches Valves Status R-544 Nitrogen & Fill to CF NO 1 CF-V146 Manual-L.C.
Core Flood Tank 1/2 CF-V129A Manual-L.C.
1 CF-Vt 14A Manual-L.C.
R-545-A Building Spray BS NO I BS-V146 Operational - open for RB pressure indication Pressure Sensing R-545-B DWCS Sample DWC NO 3/4 DWC-V038 Manual-L.C.
Isolation 3/4 DWC-V040B Manual-L.C.
R-545-C DWCS Sample DWC NO 3/4 DWC-V037 Manual-L.C.
Isolation 3/4 DWC-V040A Manual-L.C.
R-545-D Reactor MU NO 2 MU-V377 .De-energized-L.C.
Coolant Pump Seal Water Return R-546 Pressurizer, RC, WDG NO 4 WDG-V199 De-energized-L.C.
OTSG & Core Flood Tank Vents R-547 Reactor WDL NO 4 WDL-V 1126 Dec-nergized-L.C.
Building Sump Pump (DEACTIVATED Discharge PORTION)
R-548 Fire Protection FS YES 4 FS-V639 Manual-L.C.
R-549 Reactor Building AH YES 36 AH-VIB Operational Inlet Purge 4 AH-V90B Manual-L.C.
Line 1/2 AH-V149 Manual-L.C.
7.2-36 UPDA AUGUST 1997
TABLE 7.2-2 (Cont'd)
CONTAINMENT ISOLATION TABLE Line Operational Size Isolation Penetration Service System System (inches Valves Status R-550 Reactor Building AH YES 36 AR-VIA Operational Inlet Purge Line 4 AH-V90A Manual-L.C.
1/2 AH-V151 Manual-L.C.
R-551 Reactor Building AH YES 36 AH-V4A Operational Outlet Purge Line 10 AH-V52 Operational 4 AH-V120A Manual-L.C.
1/2 AH-VI53 Operational R-552 Reactor Building AH YES 36 AH-V4B Operational Outlet Purge Line 10 AH-V7 Air Disabled-L.C.
10 AH-V81 Air Disabled-L.C.
4 AH-V120B Manual-L.C.
R-553 DWCS to RB DWC NO 2 WDL-V 1092 De-energized-L.C.
Isolation R-554-A Instrument Air, Purge IA NO 1/2 AH-V2!3 Manual-L.C.
1/2 AH-V214 Manual-L.C.
1/2 AH-V221 Manual-L.C.
R-554-B Air Sample Supply AH NO 1/2 AH-V169 Manual-L.C.
(Radiation Detection) 1/2 AH-V230 Manual-L.C.
R-554-C Building Spray BS NO 1 BS-V147 Manual-L.C.
Pressure Sensing R-554-D Instrument Air DWC NO 3/4 DWC-V316 Manual-L.C.
to DWCS 3/4 DWC-V318 Manual-L.C.
1/2 Pipe Cap Installed 7.2-37 UPDATE 3 - AUGUST'1999
TABLE 7.2-2 (Cont'd)
CONTAINMENT ISOLATION TABLE Line Operational Size Isolation Penetration Service System System (inches) Valves Status R-555-A Air Sample Supply AH NO 1 AH-V143 Manual-L.C.
(Radiation Detection) 1/2 AH-V168 Manual-L.C.
R-555-B Air Sample Return AH NO 1 AH-V145 Manual-L.C.
(Radiation Detection) 1/2 AH-V171 Manual-L.C.
R-555-C PCI Isolated Ground PCI NO I Blind Flange Installed Cable R-555-D Air Sample Return All NO 1/2 AH-V 170 Manual-L.C.
(Radiation Detection) 1/2 AH-V227 Manual-L.C.
R-557 To RC Pump Oil NS NO 8 NS-V72 Air Disabled-L.C.
& Motor Coolers 1/2 NS-V210 Manual-L.C.
R-558 From RC Pump NS NO 8 NS-V81 Air Disabled-L.C.
Oil & Motor Coolers R-559 Intermediate IC NO 3 IC-V5 Air Disabled-L.C.
Cooling to Control Rod Drive Mechanisms R-561 High Pressure TDW NO TDW-V001 Manual-L.C.
Water TDW-V003 Manual-L.C.
10 Blind Flange Installed R-561 Decon Service DSA NO 'I DSA-V004 Manual-L.C.
Air 3/4 DSA-V006 Manual-L.C.
7.2-38 UPDO AUGUST 1997
TABLE 7.2-2 (Cont'd)
CONTAINMENT ISOLATION TABLE Line Operational Size Isolation Penetration Service System System (inches) Valves Status R-562-A Instrument Air IA NO 1/2 AH-V215 Manual-L.C.
Supply 1/2 AH-V216 Manual-L.C.
1/2 AH-V223 Manual-L.C.
R-562-B Pressure AH NO 1/2 AH-V147 Manual-L.C.
Transfer Fans 1 Pipe Cap Installed R-562-C Building Spray BS NO 1 BS-V148 Manual-L.C.
Pressure Sensing R-562-D RB Sludge WDS NO WDS-FV612 Manual-L.C.
Transfer NO WDJS-FV614 Manual-L.C.
R-563 Intermediate IC NO 6 IC-V4 Air Disabled-L.C.
Cooling System 1/2 IC-V207 Manual-L.C.
R-565 Processed Water PW NO 3 PW-V69 Manual-L.C.
Supply PW to Reactor 1 PW-V99 Manual-L.C.
Building 4 Flange Installed R-566 Service Air SA NO 2 1/2 SA-V20 Air Disabled-L.C.
R-567 Intermediate IC NO 6 IC-V3 Air Disabled-L.C.
Cooling System R-569 Sec. System SV NO 3 SV-V 18 L.C.
Flush & Drain R-570 High Pressure MU NO 2 1/2 MU-VI6A De-energized-L.C.
Injection Line 1/2 MU-V315 Manual-L.C.
7.2-39 UPDATE 2 - AUGUST 1997
TABLE 7.2-2 (Cont'd)
CONTAINMENT ISOLATION TABLE Line Operational Size Isolation Penetration Service System System (inches) Valves Status R-571-A Integrated Leak LR NO 1 Blind-Flange Installed Rate Test R-571-B Integrated Leak LR NO Welded Cap Installed Rate Test 1 R-571-C Building Spray BS NO BS-V149 Operational - open for RB high pressure alarm signal Pressure Sensing R-571-D Integrated Leak LR NO I Blind-Flange Installed Rate Test R-572 High Pressure MU NO 1/2 MU-V316 Manual-L.C.
Injection Line 2 1/2 MU-V16B De-energized-L.C.
& Makeup 2 1/2 MUU-V18 Air Disabled-L.C.
R-573 Reactor Coolant MU NO 3/4 MU-V379 Manual-L.C.
Pump Seal Water Supply 3/4 MU-V383A Manual-L.C.
3/4 MU-V384A Manual-L.C.
R-574 Reactor Coolant MU NO 3/4 MU-380 Manual-L.C.
Pump Seal Water 3/4 MU-V383B Manual-L.C.
Supply 3/4 MU-V384B Manual-L.C.
R-575 Reactor Coolant MU NO 3/4 MU-V381 Manual-L.C.
Pump Seal Water 3/4 MU-V383C Manual-L.C.
Supply 3/4 MU-V384C Manual-L.C.
R-576 Reactor Coolant MU NO 3/4 MU-V382 Manual-L.C.
Pump Seal Water 3/4 MU-V383D Manual-L.C.
Supply 3/4 MU-V384D Manual-L.C.
7.2-40 UPDO AUGUST 1997
TABLE 7.2-2 (Cont'd)
CONTAINMENT ISOLATION TABLE Line Operational Size Isolation Penetration Service System System (inches) Valves Status R-577 Reactor Building Air RR NO 8 RR-V5A De-energized-L.C.
Coolers 1 RR-V28A Manual-L.C.
1/2 RR-V86 Manual-L.C.
R-578 Reactor Building Air RR NO 6 RR-V1I A Air Disabled-L.C.
Coolers 1/2 RR-V75A Manual-L.C.
6 RR-V25A Air Disabled-L.C.
R-579 Reactor Building Air RR NO 8 RR-V5B De-energized-L.C.
Coolers 1 RR-V28B Manual-L.C.
1/2 RR-V88 Manual-L.C.
R-580 Reactor Building Air RR NO 8 RR-V5C De-energized-L.C.
Coolers 8 RR-V6C De-energized-L.C.
1 RR-V28C Manual-L.C.
1/2 RR-V90 Manual-L.C.
1/2 RR-V92 Manual-L.C.
R-581 Reactor Building Air RR NO 6 RR-VIlC Air Disabled-L.C.
Coolers 1/2 RR-V75C Manual-L.C.
6 RR-V25C Air Disabled-L.C.
R-582 Reactor Building RR NO 6 RR-VIIB Air Disabled-L.C.
Air Coolers 1/2 RR-V75B Manual-L.C.
6 RR-V25B Air Disabled-L.C.
R-583 Reactor Building BS NO 8 BS-V IB De-energized-L.C.
Spray Inlet Line 3 BS-V130B Manual-L.C.
7.2-41 UPDATE 2 - AUGUST 1997
TABLE 7.2-2 (Cont'd)
CONTAINMENT ISOLATION TABLE Line Operational Size Isolation Penetration Service System System , (inches Valves Status R-584 Reactor Building RR NO 8 RR-V6D De-energized-L.C.
Air Coolers 1 RR-V28D Manual-L.C.
1/2 RR-V94 Manual-L.C.
1 RR-V98 Manual-L.C.
R-585 Reactor Building RR NO 6 RR-V11D Air Disabled-L.C.
Air Coolers 1/2 RR-V75D Manual-L.C.
6 RR-V25D Air Disabled-L.C.
R-586 Reactor Building BS NO 8 BS-VIA De-energized-L.C.
Spray Inlet Line 3 BS-V130A Manual-L.C.
R-587 Reactor Building RR NO 8 RR-V6E De-energized-L.C.
Air Coolers 1 RR-V28E Manual-L.C.
1/2 RR-V96 Manual-L.C.
R-588 Reactor Building RR NO 6 RR-VI IE Air Disablcd-L.C.
Air Coolers 1/2 RR-V75E Manual-L.C.
6 RR-V25E Air Disabled-L.C.
R-589 Decay Heat DH NO 10 DH-V4A De-energized-L.C.
Coolant Supply R-590 Decay Heat DH NO 10 DH-V4B. Deenergized-L.C.
Coolant Supply R-591 High Pressure MU NO 2 1/2 MU-VI6C De-energized-L.C.
Injection Line NO 1/2 MU-V366 Manual-L.C.
R-592 High Pressure MU NO 2 1/2 MU-V16D De-energized-L.C.
Injection Line 1/2 MU-V368 Manual-L.C.
7.2-42 UP AUGUST 1997
TABLE 7.2-2 (Cont'd)
CONTAINMENT ISOLATION TABLE Line Operational Size Isolation Penetration Service System System (inches Valves Status R-593 Sump Pene- DH YES 18 DH-V6A Operational tration Sleeve
& Drain Line R-594 Sump Pene- DH YES 18 DH-V6B Operational tration Sleeve
& Drain Line R-616 Emergency EF NO 6 EF-VI2B De-energized-L.C.
Feedwater to 4 EF-V33B De-energized-L.C.
OTSG "B" 3/4 EF-V36 Manual-L.C.
6 Blind Flange Installed 6 Blind Flange Installed R-617 Feedwater FW NO 20 FW-VI7B De-energized-L.C.
to OTSG "B" 6 FW-V 19B De-energized-L.C.
3/4 FW-V68B Manual-L.C.
3/4 FW-V35B Manual-L.C.
2 GR-V7B Manual-L.C.
10 Blind Flange Installed 7.2-43 UPDATE 2 - AUGUST 1997
TABLE 7.2-2 (Cont'd)
CONTAINMENT ISOLATION TABLE Line Operational Size Isolation Penetration Service System System (inches Valves Status R-618 Feedwater to FW NO 20 FW-VI7A De-energized-L.C.
OTSG "A" 6 FW-VI9A De-energized-L.C.
3/4 FW-V68A Manual-L.C.
3/4 FW-V35A Manual-L.C.
2 GR-V7A Manual-L.C.
10 Blind Flange Installed R-619 Main Steam MS NO 24 MS-V7B De-energized-L.C.
to Turbine 10 MS-VI5B De-energized-L.C.
3/4 MS-V224 Manual-L.C.
1 MS-V51B Manual-L.C.
R-620 Main Steam MS NO 24 MS-V4B De-energized-L.C.
to Turbine 6 MS-VIB Manual-L.C.
3/4 MS-V2B Manual-L.C.
4 MS-VIlB De-energized-L.C.
1 MS-V5OB Manual-L.C.
3/4 MS-V225 Manual-L.C.
2 GR-V IB Manual-L.C.
R-621 Main Steam MS NO 24 MS-V7A De-energized-L.C.
to Turbine 10 MS-VI5A De-energized-L.C.
1 MS-V5 IA Manual-L.C.
4 MS-V1IA De-energized-L.C.
3/4 MS-V227 Manual-L.C.
7.2-44 UPD AUGUST 1997
TABLE 7.2-2 (Cont'd)
CONTAINMENT ISOLATION TABLE Line Operational Size Isolation Penetration Service System System (inches) Valves Status R-622 Main Steam to MS NO 24 MS-V4A De-energized-L.C.
Turbine 6 MS-VIA Manual-L.C.
3/4 MS-V2A Manual-L.C.
1 MS-V50A Manual-L.C.
3/4 MS-V226 Manual-L.C.
2 GR-VIA Manual-L.C.
R-623 Emergency Feedwater EF NO 6 EF-V12A De-energized-L.C.
to OTSG "A" 4 EF-V33A De-energized-L.C.
6 Blind Flange 6 Blind Flange R-626 Spare N/A NO 2 SWS-FV-1 Manual-L.C.
12 Flange Installed R-401 RB Basement RBS NO 1/2 RBS-IV-1009 Manual-L.C.
Level Indication 1/2 RBS-IV-1011 Manual-L.C.
1/2 RBS-IV-1013 Manual-L.C.
- 1/2 RBS-IV-1014 Manual-L.C.
12 Flange Installed R-508 Electrical Pene- N/A NO 11 Flange Installed tration ROSAICCTV Coax Cables 7.2-45 UPDATE 2 - AUGUST 1997
TABLE 7.2-2 (Cont'd)
CONTAINMENT ISOLATION TABLE Line Operational Size Isolation Penetration Service System System (inches Valves Status N/A RB Personnel RBA YES 1/2 RBA-V-2 Operational (Air Sampling) 1/2 RBA-V-3 Operational N/A RB Personnel Hatch N/A YES N/A Personnel Operational (Airlock #2) Door N/A RB Equipment Hatch N/A NO 31'6" N/A Bolted Flange N/A RB Equipment Hatch N/A YES N/A Personnel Operational (Airlock #1) Door 7.2-46 UPDA@ , AUGUST 1997
TABLE 7.2-3 OPERATIONAL SUMP SYSTEMS FOR PDMS Sumis Associated With SD System SUMP Location Turbine Building Sump Turbine Building Control Building Area Sump M-20 Area West Control & Service Building Service Building Sump Tendon Access Gallery Tendon Access Gallery Sump Air Intake Tunnel Normal Air Intake Tunnel Sump Sumps Associated With WDL System SumI Location Containment Basement Sumnp Containment Building Auxiliary Building Sump Auxiliary Building Decay Heat Removal Auxiliary Building Pump Room Sumps (2)
Reactor Building Spray Auxiliary Building Pump Room Sumps (2)
Contaminated Drain Service Building Tank Room Sump 7.2-47 UPDATE 2 - AUGUST 1997
Table 7.2-4 DELETED 7.2.-48 UPDATE 2 - AUGUST 1997
EQUIVALENT LEAK ' 0-"
ASSUMPTIONS:
- 1. LAMINAR FLOW IN VENT AND LEAK.
- 2. NEGLIGIBLE TURNING, ENTRANCE LOSSES.
- 3. NO LOSSES IN VALVES.
UPDATE 2- AUGUST 1997 CONTAINMENT ATMOSPHERIC BREATHER "MOST PROBABLE" PATHWAY MODEL FIGURE 7.2-1 PAGE 7.2-49
I r~Z 0m OH I
A-INSIDE AIRLOCK h7 imsrDE AImLOC
7.3 REFERENCES
Provided below is a list of reference documents that provide further information. Relevant additional information can be found in these documents (e.g.;
drawings numbers, procedure numbers, etc).
REF DOCUMENT if TITLE 7.3-1 OPM Section R-4 Unit-2 PDMS Ventilation System 7.3-2 OPM Section R-3 Unit-2 Sump Pump and Discharge System 7.3-3 OPM Section R-9 PDMS Compressed Air Supply System 7.3-4 OPM Section R-6 PDMS Electrical 7.3-5 OPM Section M-6 Flood Protection 7.3-6 OPM Section M-8 Plant Communications System Systems 7,3-7 OPM Section R-1 PDMS Alarm Monitoring 7.3-8 OPM Section R-8 Radiation Monitoring in PDMS 7.3-9 OPM Section R-5 Reactor Building Ventilation/Breather 7.3-10 OPM Section R-2 Unit-2 Liquid Radwaste Disposal in PDMS 7.3-11 OPM Section R-10 PDMS Miscellaneous 7.3-12 GPU Nuclear Letter, LL2-81-0191 "Design Pressure for Containment and Future Mechanical And Electrical Penetration Modifications," dated December 04, 1981.
7.3-13 TMI Operating Procedure Number 1105-22," Response to PDMS Alarms (SAR 7.2.6.11)."
7.3-14 GPU Nuclear SDD T2-680A, "TMI-2 Heat Sensitive Wire Fire Detection System.
7.2- 52 UPDATE 2 - AUGUST 1997
CHAPTER 8 ROUTINE AND UNANTICIPATED RELEASES
CHAPTER 8 ROUTINE AND UNANTICIPATED RELEASES, TABLE OF CONTENTS SECTION TITLE PAGE 8.1 GENERAL 8.1-1 8.1.1 ROUTINE RELEASES 8.1-1 8.1.2 SOURCE TERMS 8.1-2 8.1.2.1 Airborne Releases 8.1-3 8.1.2.2 Liquid Releases 8.1-3 8.1.2.3 Airborne Source Terms During PDMS for 8.1-3 Routine Releases 8.1.3 OFF-SHrE DOSE ESTIMATES 8.1-5 8.1.3.1 Routine Releases 8.1-6 8.1.3.2 Unanticipated Releases 8.1-6 8.2 UNANTICIPATED EVENTS ANALYSIS 8.2-1 8.2.1 VACUUM CANISTER FAILURE 8.2-1 8.2.2 ACCIDENTAL SPRAYING OF CONCENTRATED 8.2-3 CONTAMINATION WITH H1IGH PRESSURE SPRAY 8.2.3 ACCIDENTAL CUTTING OF CONTAMINATED PIPE 8.2-6 8.2.4 ACCIDENTAL BREAK OF CONTAMINATED PIPING 8.2-8 8.2.5 FIRE INSIDE THE CONTAINMENT 8.2-8 8.2.6 OPEN PENETRATION 8.2.10 i 1UPDATE 1 -JUNE 1995
CHAPTER 8 TABLE OF CONTENTS (Cont'd)
LIST OF TABLES TABLE TITLE PAGE 8.1-1
SUMMARY
OF SOURCE TERMS 8.1-9 8.1-2 ESTIMATES OF Cs AND Sr INVENTORY OF 8.1-10 SELECTED REACTOR BUILDING LOCATIONS 8.1-3 Ci FRACTIONS IN RESIDUAL FUEL 8.1-11 8.1-4 MAXIMUM POTENTIAL DOSES ESTIMATED 8.1-12 FROM ROUTINE EFFLUENT RELEASES 8.1-5 ESTIMATED DOSE COMMITMENTS RESULTING 8.1-13 FROM ROUTINE AND UNANTICIPATED EVENTS DURING PDMS ii UPDATE 1 - JUNE 1995
CHAPTER 8 ROUTINE AND UNANTICIPATED RELEASES 8.1 GENERAL The primary objective of the TMI-2 Cleanup Program was the elimination of the radiological hazards to the public resulting from the March 28, 1979 accident and minimization of on-site worker exposure. The program progressed from the initial efforts to stabilize the plant conditions through the final major cleanup efforts, including the removal and shipment of fuel and decontamination of major portions of the AFHB and the Reactor Building. The cleanup efforts have progressed to the point where the plant is in a stable and benign condition suitable for passive storage with minimum active maintenance.
The potential for release of significant quantities of radionuclides during PDMS is substantially reduced from that during normal power plant operation, or any of the post-accident cleanup phases. This results from the reduced radionuclide inventory (see Tables 5.3-4 and 5.3-5) and the absence of inherent driving forces for transport processes. The assessment of any radionuclide release during PDMS, therefore, hinges on the identification of processes or events that could either alter the potential for transport of the remaining radionuclide inventory or provide unanticipated transport mechanisms to the environment. A range of potential unanticipated events has been postulated to establish the bounding conditions of potential off-site releases. The radiological consequences associated with routine releases as well as the bounding conditions are then estimated in subsequent sections.
In addition to the evaluation of routine releases, evaluations, of the environmental effects are presented for each unanticipated event which results in off-site radiation exposures in excess of those which result from routine releases.
8.1.1 ROUTINE RELEASES Atmnospheric releases to the environment during routine PDMS operations will be limited to airborne contamination released as a result of operating the Reactor Building ventilation systems or through the Passive Breather System via the Auxiliary Building. Ventilation discharges will be through controlled, HEPA-filtered, and monitored paths. The source terms for these routine releases are tabulated on Table 8. 1-1.
Liquid systems, except for systems needed to occasionally process batches of contaminated liquids, were drained to the extent practical and deactivated for PDMS. The major sources of contaminated liquids requiring processing during PDMS are expected to be groundwater inleakage, collected precipitation, and occasional small quantities of fluids used for local decontamination.
Rainwater and groundwater inleakage are anticipated. Such inleakage will be collected and analyzed for any contamination. The capability of processing this liquid will be available to ensure that discharges are well within regulatory requirements. The source terms for routine liquid releases are tabulated on Table 8.1-1.
8.1-1 UPDATE 2 - AUGUST 1997
8.1.2 SOURCE TERMS The inventory of radionuclides remaining on-site during PDMS is greatly reduced from that existing prior to the accident or during any of the phases of the recovery operations. This results primarily from (1) removal of the fuel, which represents the largest concentration of radionuclides, (2) processing and shipping radioactive waste, and (3) natural decay. The remaining radioactivity can be characterized as residual contamination located primarily in either closed piping systems that were drained, but not aggressively decontaminated, or surface films tightly adherent to equipment or structural surfaces. An exception is the Reactor Building basement (elevation 282').
The largest source of radioactivity in the Reactor Building basement is the block wall enclosing the stairwell and elevator. Radionuclides (primarily cesium and strontium) have been absorbed into the concrete structure of the blocks during the period when the wall was partially submerged in the highly-contaminated water which collected in the Reactor Building basement during and following the accident. Since the radioactive material is embedded in the concrete, it is not readily available as a source for airborne release in the near term. However, over longer periods of time, mechanisms related to diffusion and leaching by cyclic changes in moisture content may transport a fraction of the radionuclides in the block wall to the surface where it can become available for suspension. Even though this fraction is expected to be small, the large inventory of the block wall (i.e., an estimated 19,000 Ci of Cs and 750 Ci of Sr) could make any suspension of radionuclides reaching the surface a significant airborne source term.
Other major sources of radioactivity in the Reactor Building, which could make a significant contribution to the airborne source term, include the remaining wall and floor areas that were submerged in the highly-contaminated water located in the Reactor Building basement following the accident, the interior of the D-rings, and the sediment remaining in the Reactor Building basement subsequent to the completion of the sediment removal activities. The current estimates of the inventory of Cs and Sr activity in these areas are listed on Table 8.1-2.
Since these potential sources, as well as other less-significant potential sources of airborne radioactivity, have existed for a number of years, their effect on Reactor Building atmospheric particulate concentrations can be deduced from existing measurements. The derivation of a maximum airborne particulate level for use as a source term for routine releases during PDMS is given in Section 8.1.2.3.
Another important factor in the consideration of residual contamination is the transuranic content.
Although the quantity of fuel remaining after completion-of defueling is insufficient to be of concern with respect to criticality, it is necessary to examine the potential contribution it could make to radiological source terms..
The relative fractions of the significant transuranic elements remaining in the residual fuel are given in Table 8.1-3. The Ci fractions for the residual fuel were calculated based on the original core inventory corrected for 8 years decay. On the basis of the samples analyzed to date, as well as the analyses of the course of the accident, the transuranic elements can be assumed to be associated with residual fuel. Most of the residual fuel remaining during PDMS will be fixed in the form of fine and granular debris that is inaccessible to defueling, tightly adherent surface deposits not readily removable by available dynamic defueling techniques, and resolidified material 8.1-2 UPDATE 2 - AUGUST 1997
that is either tightly adherent to the RV components or inaccessible to defueling. Approximately 1.3 kg of residual fuel fines remain in the Reactor Building basement sediment that could conceivably become airborne. In addition, there is residual fuel in other areas open to the RB atmosphere that could also become airborne and residual fuel in areas that is essentially contained (e.g., the RCS), covered (e.g., the RV), or bagged (i.e., the defueling tools) that was also considered to some degree. As a reference point for the calculations of potential off-site dose consequences, it is conservatively assumed that 2.8 kg of fuel remains as a suspendable airborne source during PDMS.
8.1.2.1 Airborne Releases The method of suspension and hence the fraction of the inventory contributing to the source term is a function of the scenario postulated. For routine releases, the airborne concentration was estimated from the most applicable observations of Reactor Building airborne concentrations to date (see Section 8.1.2.3). It was assumed that the Reactor Building airborne concentrations will reach equilibrium between intermittent operations of the Reactor Building purge system. Each purge operation is assumed to result in the discharge of the entire contents of the Reactor Building atmosphere. A total of fifty discharges of Reactor Building atmosphere particulate content per year was conservatively assumed for the routine release calculations. For the postulated unanticipated events inventory, experimentally determined suspension fractions were used as described in Section 8.2.
8.1.2.2 Liquid Releases Inleakage of groundwater and precipitation is anticipated to be the major source of liquids during PDMS. Such inleakage, which has occurred in the past, is kept under control by periodic maintenance. Based on the experience to date, an annual inleakage of 5000 gallons is conservatively estimated. To the extent that such inleakage becomes contaminated by any residual contamination on floors and sumps, it will be processed before discharge. Experience to date has shown that typical release concentrations of Cs-137 and Sr-90 are 4E-6 ptCi/ml and 1E-5 ýiCi/ml, respectively. The liquid effluent source term, therefore, is based on the assumption of a discharge of 5000 gallons annually at the above mentioned radionuclide concentrations. The source terms resulting from these considerations, as well as several of the controlling parameters, are summarized in Table 8.1-1.
8.1.2.3 Airborne Source Terms During PDMS for Routine Releases The largest sources of radioactive material which could cause significant off-site releases were removed prior to entering PDMS. The remaining radioactivity can be characterized as residual contamination which is either deeply embedded in solid materials (e.g., activation products in the reactor vessel and structural materials), or distributed in thin films adherent to surfaces which have been flushed, but not aggressively decontaminated (e.g., by chemical solutions or mechanical surface removal). This remaining inventory of radionuclides, therefore, is mostly fixed and does not represent a potential airborne source term in the near future.
Over the longer term, however, a small fraction of this inventory may become available for suspension as a result of the aging of surface conditions (e.g., rusting of steel surfaces, chalking of 8.1-3 UPDATE 2 - AUGUST 1997
paints, or flaking of concrete surfaces). The mechanisms of suspension of surface contamination resulting from these aging processes are diffusion, air motion and evaporation. In addition to these sources of radioactive material, the sediment remaining in the Reactor Building basement following cleanup activities and the residual fuel in other areas open to the RB atmosphere provide a source of loose activity available for suspension. While it is not practical to attempt quantification of each of the processes described above, the upper bound of their combined effect can be determined empirically from the observation of airborne contamination levels in the Reactor Building.
The Reactor Building atmosphere has experienced conditions spanning a broad range of the variables affecting the formation of airborne contamination (e.g., temperature, humidity and concentration gradients and changes in air flow) which readily encompasses the conditions envisioned for PDMS. The most important factors affecting airborne contamination levels today are human activities associated with decontamination, plant modification, and defueling activities (e.g., foot traffic, vibrations from machinery, cutting, grinding and welding). Since such activities will not routinely occur during PDMS, the Reactor Building air samples from the period prior to routine Reactor Building entries are likely to be more representative of PDMS conditions than the current Reactor Building atmospheric concentrations. Since Reactor Building entries commenced in late July of 1980, a review of Reactor Building air sample results from June and early July, 1980 was performed. The maximum airborne concentrations of Cs-137 and Sr-90 were 3.8E-10 and 1.3E-10 uCi/cc, respectively.
The rate of build-up of activity following purging can be estimated by the first-order rate equation:
dCfdt = (S') - lyiCi - [(Q/V)Ci]
Where ISi is the net sum of all sources (gCi/day) of radionuclide i, Iyi is the sum of all concentration-dependent removal rate constants and Q is the net exhaust flow of the ventilation (purge) system from the Reactor Building free volume (V).
For the initial conditions of interest (i.e., negligibly small concentrations at the beginning and no purge flow during this period), this equation has the simple solution:
Ci(t) --(Y-sAryI)(-e- it)
Where si = SJv The source and depletion parameters in this equation which approximate the observed behavior following the krypton purge are:
s= 5.0 E-11 (RtCi/cc/day) for Cs-137 Ys = 1.5 E- 1 (tCi/cc/day) for Sr-90, and Zy = .005 (day) for both isotopes If the Reactor Building atmosphere was allowed to reach equilibrium (i.e., previously prevented by personnel entries, associated "mini-purges," and other activities) the equilibrium concentration would be:
8.1-4 UPDATE 2 - AUGUST 1997
Ci = (ZSi/Zy i )
The above source and sink estimates would predict equilibria at 1.OE-8 and 3.OE-9 ýLCi/cc, respectively, for Cs-137 and Sr-90.
These values are considered conservative as they exceed the actually observed levels at any time after initial accident conditions. The removal of many of the potential sources of Cs-137 and Sr-90 in the Reactor Building resulting from the decontamination of large surfaces areas, removal of the basement water and sediment, and flushing and sealing of contaminated systems prior to PDMS, has resulted in further reductions in airborne concentrations during PDMS.
8.1.3 OFF-SITE DOSE ESTIMATES Environmental doses from postulated releases were quantified with the SEEDS code. This is the model used to estimate routine doses for annual reports to the NRC. The accuracy of the SEEDS code was documented in Reference 8.1-1.
This model calculates the dispersion of radionuclides in three ways: normal airborne dispersion (X/Q), depleted dispersion (i.e., which accounts for various removal processes like settling out),
and deposition (D/Q).
The SEEDS calculations use the "delta T", or the difference in temperature between sensors at 33 feet and 150 feet, of the on-site meteorological tower to determine the atmospheric (Pasquill) stability class. The model then uses the stability class with other meteorological parameters such as wind speed and direction along with plant parameters including stack height, stack diameter, and stack flow rate to determine the atmospheric dispersion.
The meteorological data used by SEEDS are automatically collected from the on-site tower and stored electronically for future use. Each meteorological tower sensor (there are about 20) is polled by a computer every 10 seconds. The ten-second results are averaged into a 15 minute average. The fifteen minute averages centered on the hour are used as hourly values. The hourly values are used for routine dose calculations.
To calculate the dose to the public, SEEDS employs numerous data files which describe the area around TMI in terms of population distribution and foodstuffs production. The area around TMI is subdivided into sixteen equal meteorological sectors (N, NNE, NE, ENE, E, ESE, etc.). Each sector is then represented in each set of data files and dispersion is calculated for each sector separately. Data files include such information as the distance from the station vent to the site boundary in each sector, the population groupings, and the location of milk cows, milk goats, gardens of more than 500 square feet and meat animals.
SEEDS also contains dose conversion factors for 75 radionuclides for each of four age groups (adults, teenagers, children and infants), seven pathways (inhalation, ground deposition, plume direct dose, and ingestion of cow milk, goat milk, vegetables, and meats), and eight organs (total body, thyroid, liver, skin, kidney, lung, bone, and GI). The pathways, organs and age groups are those specified in Regulatory Guide 1.109.
8.1-5 UPDATE 2 - AUGUST 1997
The atmospheric dispersion is combined with the dose conversion factors and applied to each organ, age group, and pathway to estimate the dose to an individual by integrating by sector, distance, and time (meteorology changes) to determine the dose, distance and direction to the maximally-exposed individual.
8.1.3.1 Routine Releases The off-site doses resulting from routine releases of gaseous fission products and transuranics were estimated by combining the annual release source term discussed in Section 8.1.2.3 and summarized in Table 8.1-1, averaged over the year, with the hourly 1985 meteorological data from the TMI tower. The calculation, therefore, is based on about 8600 different sets of meteorological conditions.
Liquid pathway doses were evaluated using MIDAS (a precursor to SEEDS), based on the 94 year average Susquehanna River flow. MIDAS liquid dose calculations consider three pathways: fish ingestion, water ingestion, and shoreline exposure. The eight organs and four age groups of Regulatory Guide 1.109 also were used.
For comparison, the largest potential doses which could be postulated on the basis of the actual effluent measurements for TMI Units 1 and 2 are shown in Table 8.1-4 for several recent years. It should be noted that the calculated values on this table are hypothetical doses which could be accrued to a maximally-exposed individual on the basis of the measured effluents from TMI-2.
The comparison of these calculated doses with the estimated PDMS doses on Table 8.1-4 shows that actual airborne releases from TMI-2 during recent cleanup activities were generally smaller than the projections made for PDMS. It is concluded, therefore, that the estimated values of Table 8.1-5 are conservative estimates of the likely impact of PDMS on the environment. Nevertheless, the estimated doses for PDMS are such small fractions of the normal background doses that they can be considered insignificant.
8.1.3.2 Unanticipated Releases The off-site doses from unanticipated events have been calculated using SEEDS and other Regulatory Guide 1.109 based calculation methods (e.g., MIDAS). Off-site doses from releases which are described as instantaneous puffs in Section 8.2 were calculated for acute inhalation exposure only. The calculation is based on the actual expected station ventilation flowrate and assumes a very stable G class stability to maximize the off-site concentration estimates. The actual calculated X/Q for these conditions of 7.67E-4 sec/cubic meter was used. Due to the short duration, the other pathways included in the Regulatory Guide 1.109 Appendix I calculation are not considered for instantaneous releases.
The off-site doses from other than puff releases (i.e., 80 minute or longer unanticipated airborne releases) have been evaluated using SEEDS. A 14-hour period of very stable conditions was selected at random from the 1985 TMINS meteorological data. The selection of this data maximized off-site concentration estimates and allows the inclusion of the ingestion pathways into the total dose estimate. The release source terms given in Section 8.2 were averaged over the 14-hour period.
i Finally, the long-term (i.e., 3 month) release for the open penetration event was also evaluated 8.1-6 UPDATE 2 - AUGUST 1997
using SEEDS. In this case, 1986 meteorological data from the TMI tower (July 1 to September
- 30) was used. The selection of this data provides a best estimate of the expected dose from a calendar quarter while maximizing some effects such as animal grazing periods. The release source terms given in Section 8.2 were averaged over the 3 month period.
8.1-7 UPDATE 2 - AUGUST 1997
REFERENCES 8.1-1 GPU Nuclear memorandum 6650-90-143, from D. W. Ballengee to T. D. Murphy, "Safety/Environmental Determination and Review of SEEDS," dated August 10, 1990.
8.1-8 UPDATE 2 - AUGUST 1997
TABLE 8.1-1
SUMMARY
OF SOURCE TERMS ROUTINE RELEASES:
Airborne Concentration Cs-137 Sr-90 ==31xx10.9 10.8 RCi/mI Ci/ml Reactor Building Atmosphere 50 Containment volumes Particulate Content per year Filter efficiency 99%
Particulate source term Cs-137 = 2.8 x 10-4 Ci/year Sr-90 = 8.5 x 10. 5 Ci/year Transuranic source term 3.2x 10.8 Ci/year (See Table 8.1-3 for isotopic composition)
LIQUID RELEASES:
Quantity 5000 gal/year Cs source term 7.6 x 10.' Ci/year Sr source term 1.9 x 10' Ci/year 8.1-9 UPDATE 2 - AUGUST 1997
TABLE 8.1-2 ESTIMATES OF Cs AND Sr INVENTORY OF SELECTED REACTOR BUILDING LOCATIONS Cs-137 ACTIVITY Sr-90 ACTIVITY LOCATION (CURIES) (CURIES)
"B" D-ring 15,000 750 "A"D-ring 1,660 80 Previously Submerged 7,000 300 Floors and Walls Sediment 460 450 Operations Deck 29,000 8,200 (305' and 347')
NOTE: These numbers are pre-decontammation, are considered conservative, and have error bands of up to 50%.
8.1-10 UPDATE 2 - AUGUST 1997
TABLE 8.1-3 Ci FRACTIONS IN RESIDUAL FUEL ISOTOPE Ci FRACTION Pu-238 1.12 E-2 Pu-239 6.81 E-2 Pu-240 3.32 E-2 Pu-241 7.73 E-1 Am-241 1.15 E-1 TOTAL 1.00 8.1-11 UPDATE 2 - AUGUST 1997
TABLE 8.1-4 MAXIMUM POTENTIAL DOSES ESTIMATED FROM ROUTINE EFFLUENT RELEASES (mrem/year)
PDMS PDMS Administrative 1983 1984 1985 1986 (ESTIMATED) Limit*.
Liquid Releases Critical Organ Dose 2E-3 1.4E-2 4. 1E-3 3.2E-3 5.OE-3 10 Critical Organ Liver Liver Bone Bone Bone Total Body Dose IE-3 6.8E-3 1.4E-3 1.3E-3 2.OE-3 3 Gaseous Releases Skin Dose 9E-3 1.IE-2 1.3E-5 5.OE-5 ------ 15 Total Body Dose 8.5E-2 9.3E-5 4.5E-6 4.2E-7 ------ 5 Airborne Particulate/Iodine Critical Organ Dose 1.1E-2 1.8E-3 2.2E-3 1.7E-2 2.2E-2 15 Critical Organ Liver Total Body Total Body Bone Bone
- NOTE: The PDMS dose limits were derived from applicable dose limits established in 10 CFR 50 Appendix 1.
8.1-12 UPDATE 2 - AUGUST 1997
TABLE 8.1-5 ESTIMATED DOSE COMMITMENTS RESULTING FROM ROUTINE AND UNANTICIPATED EVENTS DURING PDMS POPULATION DOSES Person-rem/year Population doses from routine releases via airborne pathway:
Bone Dose 0.12 Total Body Dose 0.03 Population doses from routine releases via liquid pathway:
Bone Dose 0.67 Total Body Dose 0.24 Total population dose:
Bone Dose 0.21 Total Body Dose 0.05 II. DOSES TO MAXIMALLY-EXPOSED INDIVIDUAL mremlyear Dose from routine releases via airborne pathway:
Bone Dose 0.02 Total Body Dose 0.01 Dose from routine releases via liquid pathway.
Bone Dose 1.18 Total Body Dose 0.78 III. MAXIMUM UNANTICIPATED RELEASE Dose to maximally-exposed individual from unanticipated event release 13.5 mrem (bone dose limiting - inhalation only) 8.1 -13 UPDATE 2 - AUGUST 1997
8.2 UNANTICIPATED EVENTS ANALYSIS or Unanticipated radiological releases could occur from unanticipated occurrences arising from the conditions or activities postulated during PDMS. Since there are no major activities planned for PDMS, an accidental event involving a major fraction of the remaining inventory of radionuclides is not likely. However, a number of unanticipated events have been postulated, based on the types of activities considered within the scope of PDMS. These events were reviewed to identify the bounding event.
Minor radiological events were postulated, including leaks during vacuum operations, mishaps during local decontamination operations, accidental cutting of contaminated piping and a fire in a contaminated area.
Events of these types were postulated and analyzed in a generic study of a PWR decommissioning following an accident (NUREG/CR-260 1). This generic study was used as a basis for the initial selection of events to be postulated during PDMS. These events were reviewed and events were added, modified, or deleted as appropriate based on applicability to TMI-2 during PDMS1 .
8.2.1 VACUUM CANISTER FAILURE It is anticipated that floor areas may be contaminated during PDMS by personnel tracking contamination from one area to another or through the settling of airborne contamination on the horizontal floor surfaces.
It may be necessary during PDMS to control the spread of contamination in the various plant areas. One method of controlling this contamination is by the use of a HEPA vacuum to remove and trap the contamination in a vacuum bag.
It can be postulated that the vacuum canister could fail due to a defect in the hardware or an operator error.
In either case, an event could occur involving a canister loaded with a substantial amount of contamination which could be expelled into the local area. The event could occur with the purge system operating, the building at negative pressure and isolated, or with the building under passive ventilation.
The vacuum canister has a volume of about 2. 1E+5 cm' of contamination with the following isotopic distribution.
ISOTOPE CURIES Pu-238 1.1E-3 Pu-239 1.3E-2 Pu-240 3.4E-3 Pu-241 1.4E-1 Am-241 2.1E-2 Sr-90 3.8E+O Cs-137 6.OE-1 Upon failure of the vacuum canister, a portion of the contamination becomes airborne. The airbori'e release fraction is assumed to be 1E-2. This is a higher release fraction than normally postulated due to the potentially high elevation release and the slightly pressurized expulsion of the contamination.
Using the above source term, the following three cases have been analyzed.
'In response to an NRC question generated during the review of the PDMS SAR an evaluation of the potential impact of radiolytic generation of nitric acid and hydrogen in the Reactor Vessel was performed.
The evaluation concluded the impact was negligible.
8.2 -1 UPDATE 2 - AUGUST 1997
Case I - Reactor Building Purge system operating For this case, it is assumed that the Reactor Building Purge is operating at the nominal flow rate and all effluents will be filtered through the Reactor Building Purge HEPA filters with a 99% filter efficiency. It is postulated that the vacuum canister fails and the total source term release fraction is exhausted into the Reactor Building Purge, filtered through the HEPA filters, and exhausted to the environment. That portion of the source term which is exhausted to the environment is treated as a puff release. This results in a release to the environment of:
ISOTOPE CURIES Pu-238 1.1E-7 Pu-239 1.3E-6 Pu-240 3.4E-7 Pu-241 1.4E-5 Am-241 2.1E-6 Sr-90 3.8E-4 Cs-137 6.6E-5 This postulated release results in a calculated bone dose to the maximally exposed individual of 6.9 mrem.
This dose includes the inhalation pathway only.
Case 2 - Reactor Building at negative pressure For this case, it is assumed that the Reactor Building is isolated and is being held at a slightly negative pressure. As in Case 1, it is assumed that the vacuum bag ruptures and the contamination contained in the vacuum canister is then expelled to the Reactor Building atmosphere. A portion of the contamination is suspended and diffused in the Reactor Building atmosphere. It is then assumed that the Reactor Building Purge is actuated and the source term release fraction is exhausted over a period of time through the Reactor Building Purge HEPA filters assuming a 99% filter efficiency. It is assumed that no settling of the suspended contamination occurs and the total release fraction of the vacuum canister source term is exhausted through the Reactor Building Purge during the first Reactor Building air change subsequent to the actuation of the purge system. In addition to the contamination released from the vacuum canister, the source term attributable to one normal Reactor Building volume must be included in the effluent release calculations. This results in a release slightly higher than Case 1 over an 80 minute time period. This results in a release to the environment of 8.2- 2 UPDATE 2 - AUGUST 1997
ISOTOPE CURIES Pu-238 1.LE-7 Pu-239 1.3E-6 Pu-240 3.4E-7 Pu-241 1.4E-5 Am-241 2.1E-6 Sr-90 3.8E-4 Cs-137 6.6E-5 This postulated release results in a calculated dose to the maximally-exposed individual of 1.1 mrem. This dose includes all applicable Appendix I pathways.
Case 3 - Reactor Building under passive ventilation Although it is not anticipated that personnel will be performing vacuuming operations in the Reactor Building with the building under passive ventilation, this case is considered in the event the situation should Occur.
For this case, the assumptions for the source term from the failure of the vacuum canister are the same as for Cases 1 and 2. This case is very similar to Case 2, in that there will be no specific transport mechanism to exhaust the source term from the containment. However, it can be assumed that subsequent to the failure of the vacuum canister, the containment is isolated and the Reactor building Purge is activated. This then would be the same as Case 2, assuming the purge is actuated within a reasonable time after the failure of the vacuum canister. However, the longer the delay after vacuum canister failure before actuation of the Reactor Building Purge, the less the quantity of contamination available for off-site release. The elapsed time would allow a portion of the source term to settle and redeposit on the horizontal surfaces. Thus, the longer the time the greater the amount of source term redeposited and the less the amount of source term available for transport to the environment.
Therefore, Case 3 results in a maximum release no greater than that calculated for Case 2. Since the maximum release for Case 3 can be no greater than that calculated for Case 2, no further analysis of Case 3 is required.
8.2.2 ACCIDENTAL SPRAYING OF CONCENTRATED CONTAMINATION WITH HIGH PRESSURE SPRAY It is not anticipated that there will be major decontamination efforts during PDMS; however, it may be necessary to undertake some decontamination activities. This could arise from the necessity to undertake activities in areas that are contaminated to levels greater than desired for the planned activities. High pressure spray and low pressure flush are two primary methods of surface decontamination. With either high pressure spray or low pressure flush it is possible to direct the spray fluid to an area with a level of contamination much higher than anticipated. In either case, some contamination may become airborne and be released to the environment. However, due to the higher pressures and velocities associated with the high pressure spray, the amount of 8.2- 3 UPDATE 2 - AUGUST 1997
contaminated material which may become airborne is greater with the high pressure spray than with the low pressure flush. Therefore, the high pressure spray case is analyzed.
It is assumed that a 25 gpm spray at 10,000 psi is directed at a representative area of basement contamination for a period of 10 minutes. This results in the following initial airborne source term.
ISOTOPE CURIES Pu-238 1.OE-5 Pu-239 2.6E-4 Pu-240 6.9E-5 Pu-241 9.2E-3 Am-241 1.1E-4 Sr-90 1.5E+0 Cs-137 9.6E-1 The amount of contamination that remains airborne for this event is a function of the initial airborne fraction and plate out. It is assumed that a 90% plateout will occur from an initial airborne fraction.
Using the above source term, it is possible to examine three different cases. These are that the postulated event occurs: (1) with the Reactor Building Purge operating; (2) with the Reactor Building isolated and at negative pressure with the Reactor Building Purge secured; and (3) with the Reactor Building under passive ventilation.
Case 1 - Reactor Building Purge system operatin, For this case, it is assumed that the Reactor Building Purge is operating at the nominal flow rate and all effluents will be filtered through the Reactor Building Purge HEPA filters with a 99% filter efficiency. It is postulated that the high pressure spray redistributes the contamination and a portion is released to the Reactor Building atmosphere. It is assumed that this source term release fraction is then exhausted into the Reactor Building Purge, filtered through the HEPA filters, and exhausted to the environment. That portion of the source term which is exhausted to the environment is treated as puff release. This results in a release to the environment of-ISOTOPE CURIES Pu-238 1.OE-8 Pu-239 2.6E-7 Pu-240 6.9E-8 Pu-241 9.2E-6 Am-241 1.1E-7 Sr-90 1.5E-3 Cs-137 9.6E-4 This postulated release results in a calculated bone dose to the maximally-exposed individual of 3.5 mrem.
This dose includes the inhalation pathway only.
8.2-4 UPDATE 2 - AUGUST 1997 0
Case 2 - Reactor Building at negative pressure For this case, it is assumed that the Reactor Building is isolated at a slightly negative pressure. As in Case 1, it is assumed that the high pressure spray redistributes a portion of the contamination to the Reactor Building atmosphere. However, in this case, the Reactor Building is isolated and the source term release fraction is contained within the Reactor Building and diffused within the Reactor Building atmosphere. It is then assumed that the Reactor Building Purge is actuated and the source term release fraction is exhausted over a period of time through the Reactor Building Purge HEPA filters assuming a 99% filter efficiency. It is also assumed that no settling of the redistributed contamination occurs and the total source term release fraction is exhausted to the environment in the first Reactor Building air change subsequent to the actuation of the Reactor Building Purge. In addition to the source term from the high pressure spray event, the source term attributable to one normal Reactor Building volume must also be included in the total release. This results in a release of the environment of:
ISOTOPE CURIES Pu-238 L.OE-8 Pu-239 2.6E-7 Pu-240 6.9E Pu-241 9.2E-6 Am-241 1.1E-7 Sr-90 1.5E-3 Cs-137 9.6E4 This postulated release results in a calculated dose to the maximally exposed individual of 4.0 mrem. This dose includes all applicable Appendix I pathways.'
Case 3 - Reactor Building under passive ventilation Although it is not anticipated that personnel will be performing high pressure spray decontamination operations in the Reactor Building with the building under passive ventilation, this case is considered in the event the situation should occur.
For this case, the assumptions for the source term resulting from the high pressure spray event, are the same as for Cases 1 and 2. Case 3 is very similar to Case 2. The Reactor Building is under passive ventilation and there will be no specific transport mechanism to exhaust the source term from the Containment.
However, it can be assumed that subsequent to the distribution of contamination by the high pressure spray, the Containment is isolated and the Reactor Building Purge is actuated. This would be the same as Case 2 assuming the purge is actuated within a reasonable time after the high pressure spray event. However, the longer the delay until actuation of the Reactor Building Purge, the less the severity of the event. The elapsed time would allow a portion of the contamination to settle and redeposit on the horizontal surfaces. Thus, the longer the time, the greater the amount of contamination redeposited and the less the amount of source term available for transport to the environment.
8.2- 5 UPDATE 2 - AUGUST 1997
Therefore, Case 3 results in a maximum release no greater than that calculated for Case 2. Since the maximum release for Case 3 is no greater than that calculated for Case 2, no further analysis of Case 3 is required.
8.2.3 ACCIDENTAL CU ING OF CONTAMINATED PIPE Although there are no such specific activities planned during PDMS, it may be necessary to cut into system piping. The piping systems are contaminated to various degrees, with many systems containing no contamination at all. Although each activity which involves the cutting of piping will be planned and controlled by procedures, it is possible that the degree of contamination in the planned cutting area may be underestimated or the individual performing the operation simply cut the wrong pipe. In either case, it is possible to release an unplanned source term to the Containment.
It can be postulated that an activity is being conducted which involves the cutting of a contaminated pipe.
This cutting may be done by mechanical means, such as metal sawing, or by nonmechanical means, such as a gas cutting torch. Regardless of the means, it can be postulated that the cutting is done in a area of higher than anticipated contamination or in an area with significant contamination where none was expected. In either scenario, it is assumed that a source term will be released to the containment. The quantities and distribution of the principal isotopes are given below.
ISOTOPE CURIES Sr-90 1.3E-3 Cs-137 4.2E-4 Pu-238 1.5E-8 Pu-239 1.6E-7 Pu-240 4.4E-8 Pu-241 2.OE-6 Am-241 3.2E-8 For this case, the source term is not pressurized and is not a loose particulate medium. Rather, it is a film associated with the surface of the pipe. Therefore, the release fraction for this event is assumed to be L.OE-4.
Using the above source term release fraction, it is possible to examine three different cases. The postulated event occurs: (1) with the Reactor Building Purge operating; (2) with the Reactor Building isolated at a negative pressure and the Reactor Building Purge secured; and (3) with the Reactor Building under passive ventilation.
Case 1 - Reactor Building Purae system operating For this case, it is assumed that the Reactor Building Purge is operating at the nominal flow rate and all effluents will be filtered through the Reactor Building Purge HEPA filters with a 99% filter efficiency. It is postulated that the process of cutting the pipe releases the contamination and it is assumed that the source term release fraction is distributed into the Reactor Building atmosphere and exhausted into the Reactor Building Purge, filtered through the HEPA filters, and released to the environment. That portion of the source term which is exhausted to the environment is treated as puff release. This results in a release to the environment of.
8.2- 6 UPDATE 2 - AUGUST 1997
ISOTOPE CURIES Sr-90 1.3E-9 Cs-137 4.2E-10 Pu-238 1.5E-14 Pu-239. 1.6E-13 Pu-240 4.4E-14 Pu-241 2.OE-12 Am-241 3.2E-14 This postulated release results in a calculated bone dose to the maximally exposed individual of 2.6E-6 torem. This dose includes the inhalation pathway only.
Case 2 - Reactor Building at negative pressure For this case, it is assumed that the Reactor Building is isolated at a slightly negative pressure. As in Case 1, it is assumed that the process of cutting the pipe releases the contamination and a portion of the contamination is then released to the Reactor Building atmosphere. However, in this case, the Reactor Building is isolated and the source term release fraction is contained within the Reactor Building and diffused within the Reactor Building atmosphere. It is then assumed that the Reactor Building Purge is actuated and the source term release fraction is exhausted over a period of time through the Reactor Building Purge HEPA filters, assuming a 99% filter efficiency. It is assumed that no settling of the redistributed contamination occurs and the source term release fraction is exhausted through the purge system to the environment in the first Reactor Building air change subsequent to the actuation of the Reactor Building Purge. In addition to the source term resulting from the high pressure spray event, the source term attributable to one normal Reactor Building volume must also be included in the total release. This results in a release to the environment of:
ISOTOPE CURIES Cs-137 5.7E-6 Sr-90 1.7E-6 Pu-238 3.2E-12 Pu-239 3.6E-11 Pu-240 9.6E-12 Pu-241 4.4E-10 Am-241 7.OE-12 This postulated release results in a calculated dose to the maximally exposed individual of 4.8E-3 mrem.
This dose includes all applicable Appendix I pathways.
8.2- 7 UPDATE 2 - AUGUST 1997
Case 3 - Reactor Building under passive ventilation Although it is not anticipated that personnel will be performing pipe cutting operations with the Reactor Building under passive ventilation, this case is considered in the event the situation should occur.
For this case, the assumptions for the source term resulting from the process of cutting the pipe are the same as for Cases 1 and 2. Case 3 is very similar to Case 2. Since the Reactor Building is under passive ventilation, there will be no specific transport mechanism to exhaust the source term from the containment.
However, it can be assumed that subsequent to the redistribution of contamination by the cutting operation, the containment is isolated and the Reactor building Purge is activated. This would be the same as Case 2 assuming the purge is actuated within a reasonable time after the pipe cutting event. However, the longer the delay until actuation of the Reactor Building Purge, the less the severity of the event. The elapsed time allows a portion of the source term to settle and deposit on horizontal surfaces. The longer the time, the greater the amount of source term deposited and the less the amount of source term available for transport to the environment.
Therefore, Case 3 results in a maximum release no greater than that calculated for Case 2. Since the maximum release for Case 3 is no greater than that calculated for Case 2, no further analysis of Case 3 is required.
8.2.4 ACCIDENTAL BREAK OF CONTAMINATED PIPING It may be necessary during PDMS to separate a piping system to remove or install a component, inspect a component, or to decontaminate internal portions of a piping system or component. It can be postulated that the piping system may be broken at a point that contains a higher level of contamination than expected or is contaminated in an area expected to be not contaminated. In either case, an unanticipated source term may be released to the containment.
This sequence of events is very similar to those postulated by the accidental cutting of a contaminated pipe and it can be assumed that the source term will be the same. The consequence of a break in a contaminated pipe will be less than that for the accidental cutting of a contaminated pipe because the driving mechanism for the source term (i.e., the velocity of the gas from a gas cutting torch) will not be present. Therefore, it can be assumed that the off-site consequences of accidental breaking of a contaminated pipe will be no greater than that for the accidental cutting of a contaminated pipe and no further analysis is required.
8.2.5 FIRE INSIDE THE CONTAINMENT The risk of a fire in the Containment will be greatly reduced during PDMS. Prior to entering PDMS, all unnecessary and removable combustibles will be removed from the Containment and ignition sources will be reduced. For example, all unnecessary electric power sources will be deactivated at locations outside Containment. In addition, personnel population of the Containment will be at a minimum during PDMS.
Although the risk of a fire in the Containment during PDMS is very small, there is the possibility that some personnel error or electrical short could lead to a limited fire.
Case 1 - Reactor Building Purge Operating For Case 1, it is assumed that the fire occurs while the Reactor Building Purge is operating. Therefore, the Reactor Building Purge is assumed to continue to operate at the nominal flowrate through the entire duration 8.2- 8 UPDATE 2 - AUGUST 1997
of the fire. All fire zones in the Containment were analyzed with respect to resultant off-site dose. The analysis of a fire on the operations deck (El. 305' and 347') produced the highest critical organ dose to the maximally exposed individual, i.e., a 13.5 mrem bone dose. It was assumed that the operations deck contained 29,000 Ci of Cs-137 and 8200 Ci of Sr-90 primarily on the stored RV head assembly. One hundred percent (100%) of the contamination was assumed to be loose, surface activity available to become airborne in a fire. An airborne suspension factor of 1E-3 was used for both the contamination and fuel. Any plateout of the airborne source term was conservatively ignored. A 99% efficiency is assumed for the HEPA filters in the Reactor Building Purge. This results in a release to the environment of ISOTOPE CURIES Sr-90 9.1E-4 Cs-137 3.OE-3 Pu-238 3.5E-7 Pu-239 2.2E-6 Pu-240 1.IE-6 Pu-241 2.5E-5 Am-241 3.6E-6 This postulated release results in a calculated bone dose to the maximally-exposed individual of 13.5 mrem (Reference 8.2-1). This dose includes the inhalation pathway only.
Case 2 - Reactor Building at negative pressure For this case, it is assumed that the Reactor Building is isolated and is being held at a slightly negative pressure. It is assumed that the postulated fire distributes a portion of the contamination to the Reactor Building atmosphere. However, in this case, the Reactor Building is isolated and the source term release fraction is contained within the Reactor Building and diffused within the Reactor Building atmosphere. It is then assumed that the Reactor Building Purge is actuated and the source term release fraction is exhausted over a period of time through the Reactor Building Purge HEPA filters assuming a 99% filter efficiency. It is also assumed that no settling of the distributed contamination occurs and the total source term release fraction is exhausted to the environment in the first Reactor Building air change subsequent to the actuation of the Reactor Building Purge. In addition to the source term from the postulated fire, the source term attributable to one normal Reactor Building volume must also be included in the total release. All fire zones in the Containment were analyzed with respect to resultant off-site dose. For this case, the analysis of a postulated fire on the operations deck produced the highest dose to the maximally exposed individual. The postulated release to the environment is as follows:
8.2- 9 UPDATE 2 - AUGUST 1997
ISOTOPE CURIES Sr-90 9.1E-4 Cs-137 3.OE-3 Pu-238 3.5E-7 Pu-239 2.2E-6 Pu-240 1.IE-6 Pu-241 2.5E-5 Am-241 3.6E-6 This postulated release results in a calculated bone dose to the maxirnally-exposed individual of 3.0 mrem (Reference 8.2-2). This dose includes all applicable Appendix I pathways.
Case 3 - Reactor Building under passive ventilation For this case, it is assumed that the postulated fire occurs during a time when the Reactor Building is under passive ventilation. The postulated fire could either be small or large. In the event of a small fire, it is.
assumed that there is a slight Reactor Building pressurization (i.e., less than that necessary to initiate automatic closure of the Breather isolation valve) and some airborne contamination is expelled through the filtered breather. With the RB under passive ventilation, the most significant motive force available to expel the airborne contamination would be the pressure differential created by the fire itself. However, the quantity of expelled contamination would be less than that expelled in Case 1 through the RB Purge HEPA filters because of the sizeand number of the ventilation pathways. In addition, the Breather HEPA filter is assumed to be the same efficiency as the RB Purge HEPA filters, i.e., 99%. Therefore, the off-site dose consequences for the Case 3 small fire are bounded by the off-site dose consequences of Case 1.
In the event of a significant fire, the Breather isolation valve would close and effectively seal off the Reactor Building. Although the RB is not airtight, the amount of unfiltered leakage, as shown in Section 7.2.1.2.3, would be much less than 1/100 of the amount released through the 99% efficient HEPA filter in the above small fire analysis. Therefore, less contamination would be expelled during the time when the isolation valve is shut than when it is open. The Breather isolation valve could subsequently be reopened when RB pressure reached 1/4 psi. The remainder of the event scenario for this large fire case would then follow the above small fire analysis. Therefore, the off-site dose consequences for the Case 3 large fire are also bounded by the off-site dose consequences of Case 1.
8.2.6 OPEN PENETRATION It can be postulated that during PDMS surveillance or maintenance activities, a penetration isolation mechanism is inadvertently removed or left open. This would result in a potential unfiltered pathway to the environment for the Containment atmosphere. It also can be postulated that the mechanical failure of a piping penetration or failure of the HEPA filter in the passive breather system could result in an unfiltered pathway. The result of any one of the above postulated events can be characterized as an unfiltered path to the environment. Therefore, instead of analyzing each of the events separately, a representative event is analyzed.
8.2-10 UPDATE 2 - AUGUST 1997
For the purposes of this analysis, the following conditions are assumed:
- 1. The containment is under passive ventilation
- 2. There is a 6-inch diameter unfiltered pathway to the environment
- 3. The unfiltered pathway is open for one quarter of a year (i.e., one surveillance interval)
- 4. 2.5 Reactor Building air changes with the environment
- 5. 100% of the total release is through the unfiltered pathway
- 6. "Normal" Reactor Building source term This results in a release to the environment of:
ISOTOPE CURIES Sr-90 4.2E-4 Cs-137 1.4E-3 Pu-238 1.8E-9 Pu-239 1.1E-8 Pu-240 5.3E-9 Pu-241 1.2E-7 Am-241 1.8E-8 This postulated release results in a calculated bone dose to the maximally-exposed individual of 4.6E-1 mrem (Reference 8.2-3). This dose includes all applicable Appendix I pathways.
8.2- 11 UPDATE 2 - AUGUST 1997
REFERENCES 8.2-1 GPU Nuclear memorandum 6615-92-0160 from S. Acker to E. Schrull, "Dose Calculation Results per memo C312-92-:1045, PDMS SAR Rev. 16," dated October 27, 1992 8.2-2 GPU Nuclear memorandum 6615-92-0162, from S. Acker to E. Schrull, "Additional Dose Calculations per memo C312-92-1045, PDMS SAR Rev. 16," dated October 30, 1992 8.2-3 GPU Nuclear memorandum 6510-93-0077, from S. Acker to E. Schrull, "Dose Calculation Results per memo C312-93-1019, PDMS SAR Rev. 17," dated May 21, 1993.
8.2-4 GPUN memorandum 4240-92-093 from R. Freeman to E. Schrull, "Radiolytic Hydrogen & Nitric Acid Generation in RV," dated June 29, 1992.
8.2-5 GPU Nuclear calculation 4240-3220-91-029, "Volume of Water Remaining in RV After Final Pumpdown," dated December, 1991.
8.2-6 GPU Nuclear calculation, 4440-9390-90002, "Condensation in RV during PDMS,"
dated February, 1990.
8.2- 12 UPDATE 2 - AUGUST 1997
CHAPTER 10 ADMINISTRATIVE FUNCTIONS
CHAPTER 10 ADMINISTRATIVE FUNCTIONS
. TABLE OF CONTENTS SECTION TITLE PAGE
10.0 INTRODUCTION
10.0-1 10.1 QUALITY ASSURANCE PLAN 10.1-1 10.2 SECURITY PLAN 10.2-1 10.3 EMERGENCY PLAN 10.3-1 10.4 RADIATION PROTECTION PROGRAM 10.4-1 I
10.5 ORGANIZATION 10.5-1 10.5.1 GPU Nuclear Cognizant Officer 10.5-1 10.5.2 GPU Nuclear Ombudsman 10.5-2 10.5.3 TMI-2/SNEC Oversight Committee 10.5-2 10.5.4 Manager, PDMS 10.5-2 10.5.5 Organizational Commitments 10.5-2 FIGURE NO. TITLE PAGE 10.5-1 GPU NUCLEAR ORGANIZATIONAL CHART 10.5-4 10-i UPDATE 5 - AUGUST 2003
CHAPTER 10 TABLE OF CONTENTS (Cont'd)
DELETED 10-ii UPDATE 4 - AUGUST 2001
F, CHAPTER 10 ADMINISTRATIVE FUNCTIONS
10.0 INTRODUCTION
The primary administrative functions necessary for the management of TMI-2 during PDMS are referenced in this chapter.
10.0- 1 UPDATE 2 - AUGUST 1997
10.1 QUALITY ASSURANCE PLAN Upon completing the TMI-2 Cleanup Program, the plant is in a safe, stable condition that can be maintained efficiently and poses no risk to the health and safety of the public.
Until GPU Nuclear determines a final disposition for TMI-2, it is intended that the plant remain in this condition. This phase of plant life has been termed Post-Defueling Monitored Storage.
During the PDMS period, GPU Nuclear is licensed under 10 CFR 50 to "possess but not to operate" the TMI-2 facility. Since the plant is in a non-operating and defueled status, there are no structures, systems, or components that perform a safety function. Therefore, the quality assurance requirements of 10 CFR 50 Appendix B do not specifically apply.
However, this Plan has been developed to provide TMI-2 with a limited scope PDMS QA Program based upon the guidance of Appendix B requirements. The specific requirements for QA-during PDMS are documented in the "TMI-2 PDMS Quality Assurance Plan."
10.1 -1 UPDATE 2 - AUGUST 1997
10.2 SECURITY PLAN The Code of Federal Regulations 10 CFR 50 and 10 CFR 73 define the security requirements for nuclear power plants. Due to the defueled and non-operating condition of TMI-2 during PDMS, the security requirements applicable to the facility are less than those that are applicable to an operating nuclear power plant. TMI-2 complies with all applicable security requirements. TMI-2 utilizes site physical security, guard training and qualification, and safeguards contingency plans maintained by TMI-1.
These plans are administered and are under the authority of AmerGen, the TMI-1 License holder. The specific security provisions for TMI-2 are in the "TMI Modified Amended Physical Security Plan."
10.2-1 UPDATE 4 - AUGUST 2001
10.3 EMERGENCY PLAN 10 CFR 50.47 establishes requirements forthe content and criteria for acceptance of emergency plans. Emergency planning requirements are based on the assumption of the potential necessity to notify the public of the existence of, orpotential for significant off-site releases. 10 CFR 50 Appendix E recognizes that emergency planning needs are different for facilities that present less risk to the public. Due to the non-operating and defueled status of TMI-2 during PDMS, there is no potential for any significant off-site radioactive releases and, due to the existence of TMI- I on the same site, emergency planning requirements for the site are dominated by TMI- 1. Therefore, the limited emergency planning necessary to accommodate the existence of TMH-2 on the same site as TMI- 1 has been incorporated into one integrated emergency plan. There exists only one Emergency Preparedness Plan for the TMA station. The Plan encompasses both TMI-1 and TMI-2 and is under the authority of AmerGen, the TMI-1 License holder.
The emergency plan for the TMI site incorporates all of the essential emergency planning requirements established by 10 CFR 50 Appendix E and other regulatory guidance. Since there are no events associated with TMI-2 which could result in a release approaching the levels established in the Protection Action Guide, the site emergency action levels are based on potential events which could occur at TMI- 1. The site emergency facilities, such as the Emergency Control Center, the Technical Support Center, and the Operations Support Center are located in or in convenient proximity to TMI- 1. All site personnel are trained and drilled to respond to any declared site emergency event 10.3-1 UPDATE 4 - AUGUST 2001
10.4 RADIATION PROTECTION PROGRAM TMI- 1 maintains a Radiation Protection Program which meets or exceeds standards for protection against exposures to radiation and radioactivity at the TMI site. There exists only one Radiation Protection Program for the TMI station. The Program encompasses both TMII- I and TMI-2 and is under the authority of AmerGen, the TMI- 1 License holder. The implementation of the Radiation Protection Program ensures that the facility will be managed and maintained during PDMS in a manner which minimizes risks to employees, contractors, visitors, and the public, from exposure to radiation and radioactivity at the facility. The implementation of the program also ensures a radiologically safe working environment for employees and visitors at TMI-2.
10.4-1 UPDATE 5 - AUGUST 2003
lAS ORCAWT7ATION The organizational elements responsible for the PDMS phase of TMI-2 are shown on Figure 10.5-1. The specific responsibilities are discussed below. Additionally, the PDMS Technical Specifications prescribe specific requirements for staff qualifications, training, and the review and audit of TMI-2 activities.
As part of the sale of TMI-1, GPU Nuclear entered into an agreement with AmerGen for TMI-2 services. Under this agreement and as a contractor subject to GPU Nuclear's ultimate direction and control, AmerGen will provide all services, materials and equipment required to maintain TMI-2 in Post-Defueling Monitored Storage (PDMS). Services provided by AmerGen will meet all the requirements of the Safety Analysis Report, Technical Specifications and Quality Assurance Program. Services include:
" Management services;
- Operations, maintenance and testing;
" Radwaste operations;
- Quality Assurance;
- Radiation controls and health physics;
- Environmental controls;
- Security;
- Safety;
- Administrative services, including logistical support, information technology support and procurement services;
" Engineering and Licensing;
- Warehousing and housekeeping;
" Support services required in connection with the performance of routine corrective and preventative maintenance;
- Interface with the NRC as necessary in connection with inspections, audits, site visits or meetings;
- Maintain required NRC licensing documents for TMI-2; and
- Prepare regulatory correspondence for GPU Nuclear signature or file on behalf of GPU Nuclear, to the extent permitted under applicable NRC regulations, all documents required in connection with PDMS of TMI-2.
Figure 10.5-1 also shows the AmerGen organization which will provide the above services.
10.5.1. GPU Nuclear Cognizant Officer The GPU Nuclear Cognizant Officer has the overall responsibility for the management of TMI-2 during PDMS.
10.5-1 UPDATE 4 - AUGUST 2001
10.5..2 GPU Nuclear Ombudsman An Ombudsman is provided by GPU Nuclear as part of the company's employee concern program. The Ombudsman reports to the Vice President GPU Nuclear Oversight, and if necessary has access to the GPU Nuclear Board of Directors.
This individual is accessible on a confidential basis, if desired, to anyone in the company or its contracted employees having a nuclear or radiation safety concern he or she considers is not being adequately addressed. The Ombudsman is empowered to investigate such matters, identify any needed action and seek its resolution. The Ombudsman will reply to the individual who raised the matter.
10.5..3 TMI-2/SNEC Oversight Committee Independent oversight is provided by the TMI-2/SNEC Oversight Committee which serves to independently assure that the TMI-2 structures, systems and components are maintained so as to protect the health and safety of the workers, the public and the environment and to enable effective and efficient dismantlement and decommissioning in the future. The committee is sponsored by the Vice President GPU Nuclear Oversight.
10.5..4 Manager, PDMS The Manager, PDMS has the first-level management responsibility for maintaining the TMI-2 PDMS condition. The Manager, PDMS is directly responsible for the operations and maintenance activities associated with the TMI-2 PDMS.
10.5.5 Organizational Commitments TMI-2 License Amendment and Technical Specification Change Request No. 78, submitted to the NRC on April 6, 2000, requested organizational and administrative changes that will exist following the sale of the Oyster Creek Nuclear Generating Station to AmerGen. Attachment 3 to that submittal listed a number of commitments for TMI-2 and a general commitment to list the commitments in the PDMS SAR. The listing, as issued in TMI-2 Technical Specification Amendment No. 54, is as follows:
- 1. The GPU Nuclear Cognizant Officer will have overall responsibility for TMI-2. A description of responsibilities and qualifications for this position will be addressed in the PDMS Quality Assurance (QA) Plan.
- 2. A GPU Nuclear employee or third party contractor will be permanently assigned at the TMI site.
10.5-2 UPDATE 5 - AUGUST 2003
- 3. The Ombudsman will have access, if necessary, to the GPU Nuclear Board of Directors. The Ombudsman function will be described in the PDMS Quality Assurance Plan.
- 4. GPU Nuclear will periodically assess AmerGen performance with support from other GPU (owners group) organizations as needed (e.g.
GPU Internal Audits, Contracts, Legal, etc.).
- 5. GPU Nuclear will establish a TMI-2/Saxton Nuclear Experimental Corporation (SNEC) Oversight Committee that will advise the GPU Nuclear Cognizant Officer. A description of responsibilities and qualifications will be addressed in the PDMS Quality Assurance Plan.
- 6. All Quality Assurance audit reports prepared by AmerGen for TMI-2 will be provided to the GPU Nuclear Cognizant Officer.
- 7. GPU Nuclear will conduct a periodic QA Plan audit of AmerGen. The audit and frequency will be specified in the GPU Nuclear PDMS Quality Assurance Plan.
- 8. A GPU Nuclear employee or third party contractor (ultimately responsible to GPU Nuclear) will review and approve all 10 CFR 50.59 evaluations unique to TMI-2 and all evaluations involving a TMI-2 facility change. This will be incorporated in the TMI Review and Approval Matrix.
- 9. A GPU Nuclear employee or third party contractor (ultimately responsible to GPU Nuclear) will review and approve proposed changes to the emergency preparedness program that are unique to TMI-2.
10.5-3 UPDATE 4 - AUGUST 2001
GPU NUCLEAR CORP.
ORGANIZATIONAL CHART GPU Nuclear Organization I I AmerGen Organization I I Director Nuclear Oversight MAROG I TMI Nuclear Oversight S (TMI-2 matters)
NUCLEIAR TMI-2 GPU NUCLEAR CORP.
ORGANIZATIONAL CHART CAD FILE: S1A.SKO,O0,1000.O01-,0202 THIS IS A COMPUTER GENERATED DRAWING, PDMS SAR UPDATE 5 - AUG. 2003 DO NOT REVISE MANUALLY FIGURE: 10.5-1 PAGE 10.5-4