ML18117A406

From kanterella
Jump to navigation Jump to search
4 to Updated Final Safety Analysis Report, Chapter 10, Table of Contents
ML18117A406
Person / Time
Site: Crane Constellation icon.png
Issue date: 04/06/2018
From:
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML18117A343 List: ... further results
References
TMI-18-047
Download: ML18117A406 (4)


Text

TMI-1 UFSAR CHAPTER 10 10-i REV. 18, APRIL 2006 CHAPTER 10 - STEAM AND POWER CONVERSION SYSTEM TABLE OF CONTENTS SECTION TITLE 10.0 STEAM AND POWER CONVERSION SYSTEM 10.1

SUMMARY

DESCRIPTION 10.2 TURBINE GENERATOR 10.2.1 DESIGN BASIS 10.2.2 SYSTEM DESCRIPTION AND OPERATION 10.3 STEAM SUPPLY SYSTEMS 10.3.1 MAIN STEAM SYSTEM 10.3.1.1 DESIGN BASIS 10.3.1.2 SYSTEM DESCRIPTION AND OPERATION 10.3.2 TURBINE BYPASS SYSTEM 10.3.2.1 DESIGN BASIS 10.3.2.2 DESIGN DESCRIPTION AND OPERATION 10.3.3 EXTRACTION STEAM AND DRAINS SYSTEM 10.3.3.1 DESIGN BASIS 10.3.3.2 SYSTEM DESCRIPTION AND OPERATION 10.3.4 AUXILIARY STEAM SYSTEM 10.3.4.1 DESIGN BASIS 10.3.4.2 SYSTEM DESCRIPTION AND OPERATION 10.4 CONDENSATE SYSTEM 10.4.1 MAIN CONDENSATE SYSTEM 10.4.1.1 DESIGN BASIS 10.4.1.2 SYSTEM DESCRIPTION AND OPERATION 10.4.2 CONDENSATE POLISHING 10.4.2.1 DESIGN BASIS 10.4.

2.2 DESCRIPTION

AND OPERATION 10.4.3 CONDENSATE CHEMICAL TREATMENT SYSTEM 10.4.3.1 DESIGN BASIS 10.4.3.2 SYSTEM DESCRIPTION AND OPERATION 10.4.4 CONDENSER AIR REMOVAL SYSTEM 10.4.4.1 DESIGN BASIS 10.4.4.2 DESIGN DESCRIPTION AND OPERATION 10.4.5 CONDENSATE HOLDUP FOR RELEASE/RECYCLE 10.4.5.1 DESIGN BASIS 10.4.5.2 SYSTEM DESCRIPTION AND OPERATION 10.5 MAIN FEEDWATER SYSTEM 10.5.1 DESIGN BASIS 10.5.2 SYSTEM DESCRIPTION AND OPERATION

TMI-1 UFSAR TABLE OF CONTENTS (cont'd)

SECTION TITLE CHAPTER 10 10-ii REV. 18, APRIL 2006 10.6 EMERGENCY FEEDWATER SYSTEM 10.6.1 DESIGN BASIS 10.6.2 SYSTEM DESCRIPTION AND OPERATION 10.7 SYSTEM ANALYSIS 10.7.1 TRIPS, AUTOMATIC CONTROL ACTIONS, AND ALARMS 10.7.2 TRANSIENT CONDITIONS 10.7.3 MALFUNCTIONS 10.7.4 OVERPRESSURE PROTECTION 10.7.5 INTERACTIONS 10.8 TESTS AND INSPECTIONS 10.8.1 GENERAL 10.8.2 EMERGENCY FEEDWATER SYSTEM TESTS AND SURVEILLANCE 10.8.2.1 INITIAL RESTART TESTS

10.9 REFERENCES

TMI-1 UFSAR CHAPTER 10 10-iii REV. 18, APRIL 2006 LIST OF TABLES TABLE TITLE 10.2-1 TURBINE DATA 10.2-2 GENERATOR DATA 10.3-1 MAIN STEAM MAIN COMPONENTS 10.3-2 EXTRACTION STEAM SYSTEM MAIN COMPONENTS NOMINAL DATA 10.3-3 AUXILIARY BOILER SYSTEM 10.4-1 CONDENSATE SYSTEM MAIN COMPONENTS NOMINAL DATA 10.4-2 DELETED 10.4-3 CONDENSER AIR REMOVAL SYSTEM MAIN COMPONENTS 10.4-4 CONDENSATE HOLDUP SYSTEM 10.5-1 FEEDWATER SYSTEM MAIN COMPONENTS NOMINAL DATA 10.6-1 EMERGENCY FEEDWATER SYSTEM MAIN COMPONENTS 10.6-2 EMERGENCY FEEDWATER REQUIREMENTS

TMI-1 UFSAR CHAPTER 10 10-iv REV. 18, APRIL 2006 LIST OF FIGURES FIGURE TITLE 10.2-1 DELETED 10.2-2 DELETED 10.3-1 DELETED 10.3-2 DELETED 10.3-3 DELETED 10.4-1 DELETED 10.4-2 DELETED 10.4-3 DELETED 10.5-1 DELETED 10.6-1 DELETED