Letter Sequence RAI |
---|
TAC:MD5249, Clarify Application of Setpoint Methodology for LSSS Functions (Open) |
Results
Other: ML072050146, ML072070251, ML072070260, ML072070269, ML072070355, ML072070358, ML072120059, ML072120076, ML072120083, ML072120091, ML072120096, ML072120100, ML072120105, ML072120111, ML072120119, ML072120145, ML072120153, ML072120162, ML072120164, ML072120165, ML072120168
|
MONTHYEARML0714401832007-05-24024 May 2007 Acceptance for Review and Establishment of Milestone Schedule for TSTF Traveler 493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions. Project stage: Acceptance Review ML0721201052007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Enclosure 4i - BWR6_3.03.5.01_B for TSTF-493R2eITSB Project stage: Other ML0720702512007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Enclosure 2 - 493 R2 pp-1_12 Markup Rev. B Project stage: Other ML0720702602007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Enclosure 3a - Bwog - 3.3.01_ B for TSTF -493R23e ITSB Project stage: Other ML0720702692007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Enclosure 3b-BWOG - 3.3.05_B for TSTF-493R23e ITSB Project stage: Other ML0720703552007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Enclosure 4a - BWR4_3.03.1.01_B for TSTF-493R2eITSB Project stage: Other ML0720703582007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Enclosure 4b - BWR4_3.03.2.01_B for TSTF 493 R2eITSB Project stage: Other ML0721200592007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Enclosure 4c - BWR4_3.03.4.01_B for TSTF-493R2eITSB Project stage: Other ML0721200762007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Enclosure 4d - BWR4_3.03.5.01_B for TSTF-493R2eITSB Project stage: Other ML0721200832007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Enclosure 4e - BWR4_3.03.5.02_B for TSTF-493R2eITSB Project stage: Other ML0721200912007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Enclosure 4f - BWR6_3.03.1.01_B for TSTF-493R2eITSB Project stage: Other ML0721200962007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Enclosure 4g - BWR6_3.03.2.01_B for TSTF-493R2eITSB Project stage: Other ML0721201002007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Enclosure 4h - BWR6_3.03.4.01_ B for TSTF-493R2eITSB Project stage: Other ML0721201112007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Enclosure 4j -BWR6_3.03.5.02_B for TSTF-493R2eITSB Project stage: Other ML0721201192007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Enclosure 4k - BWR6_3.03.6.05_B for TSTF-493R2eITSB Project stage: Other ML0721201452007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Enclosure 5a - CEOG_3.3.01a_B for TSTF-493R2eITSB Project stage: Other ML0721201532007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Enclosure 5b - CEOG_3.3.01d_B for TSTF-4932eITSB Project stage: Other ML0721201622007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Enclosure 5c - CEOG_3.3.04a_B for TSTF-493R2eITSB Project stage: Other ML0721201642007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Enclosure 5d - CEOG_3.3.05d_B for TSTF-493R2eITSB Project stage: Other ML0721201652007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Enclosure 6a - WOG_3.3.01_B for TSTF-493R2eITSB Project stage: Other ML0721201682007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Enclosure 6b - WOG_3.3.02_B for TSTF-493R2eITSB Project stage: Other ML0720501462007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions Project stage: Other ML0828004842008-11-0404 November 2008 Evaluation of TSTF Responses to NRC Staff Request for Additional Information (RAI) Regarding Traveler TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions. Project stage: RAI 2007-07-25
[Table View] |
|
---|
Category:Letter
MONTHYEARML24264A0232024-09-20020 September 2024 RAI TSTF-600, Rev. 0, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency ML24249A1482024-09-11011 September 2024 Cover Letter for Final Traveler SE of TSTF 576, Revision 3, Revise Safety/Relief Valve Requirements ML24247A3162024-09-0606 September 2024 Cover Letter for Final Model SE of Traveler TSTF 592, Rev 2, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24222A4002024-08-14014 August 2024 TSTF-602, Revise the Ventilation Filter Testing Program to Permit Alternate Challenge Agents, Acceptance Review Letter ML24106A2762024-08-0101 August 2024 Draft Safety Evaluation of Technical Specifications Task Force Traveler TSTF-576, Revision 3, Revise Safety/Relief Valve Requirements (EPID L -2019-PMP-0207) ML24207A1822024-07-25025 July 2024 TSTF-601, Extend Shield Building Completion Time After Refueling, Acceptance Review Letter ML24114A2572024-04-24024 April 2024 TSTF-599 Acceptance Review Letter ML24114A2652024-04-24024 April 2024 TSTF-597 Acceptance Review Letter ML23325A2132023-12-18018 December 2023 Cover Letter for Final Model SE of TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML23262B2292023-09-21021 September 2023 Cover Letter Transmitting Final SE of TSTF-591, Revision 0, Revise Risk-Informed Completion Time (RICT) Program ML23124A2212023-09-11011 September 2023 Cover Letter for Final SEs of TSTF-589, Eliminate Automatic Diesel Generator (DG) Start During Shutdown ML23206A1242023-07-31031 July 2023 TSTF-584 Cover Letter for Final SE ML23205A2342023-07-0606 July 2023 Draft TSTF-601, 'Extend Shield Building Completion Time After Refueling' ML23012A2812023-03-13013 March 2023 Draft SEs of TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation ML23059A3342023-02-28028 February 2023 TSTF-576 Open Issues Letter ML23010A2592023-01-11011 January 2023 Request for Additional Information Traveler TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML22272A5542022-10-0707 October 2022 Request for Additional Information Traveler TSTF-591, Revise Risk Informed Completion Time (RICT) Program TSTF-22-07, Transmittal of TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2022-07-19019 July 2022 Transmittal of TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML22193A2372022-07-12012 July 2022 Request for Additional Information TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown TSTF-22-06, Technical Specifications Task Force - Request for a Workshop to Discuss the Interaction of Natural Phenomena Protection Design Features and Operability2022-07-0808 July 2022 Technical Specifications Task Force - Request for a Workshop to Discuss the Interaction of Natural Phenomena Protection Design Features and Operability ML22110A1712022-04-26026 April 2022 Acceptance for Review Regarding Traveler Tstf-584, Rev 0, Eliminate Automatic RWCU System Isolation on SLC Initiation TSTF-22-04, Technical Specifications Task Force - Transmittal of TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) Program2022-03-22022 March 2022 Technical Specifications Task Force - Transmittal of TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) Program ML21188A2782021-07-11011 July 2021 Cover Letter Transmitting Final SEs of CLIIP TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR (Residual Heat Removal) Shutdown Cooling TSTF-21-03, TSTF Response to NRC Questions on TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements and Submittal of Revision 12021-06-23023 June 2021 TSTF Response to NRC Questions on TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements and Submittal of Revision 1 ML21054A2512021-05-26026 May 2021 Cover Letter Transmitting Draft SEs of CLIIP TSTF-580, RHR Shutdown Cooling System - Hot Shutdown ML21106A2452021-04-20020 April 2021 Cover Letter Transmitting Final Model SE of TSTF 554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21098A2422021-04-14014 April 2021 Cover Letter for Final SEs of TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML21068A4012021-03-24024 March 2021 Cover Letter for Draft SEs TSTF 577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections TSTF-21-01, Transmittal of TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2021-01-26026 January 2021 Transmittal of TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML20322A3612020-12-18018 December 2020 TSTF-554 Cover Letter for Final SE ML20308A6562020-11-0606 November 2020 Request for Additional Information Traveler TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections ML20168A3962020-10-30030 October 2020 Cover Letter Transmitting Draft SE of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML20265A1152020-10-0909 October 2020 Cover Letter Transmitting Model SE of TSTF-582 and TSTF-583-T ML20133J8832020-07-29029 July 2020 Letter Transmitting Draft SE of Traveler TSTF-582, Revision 0, RPV WIC Enhancements TSTF-20-04, Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections2020-06-0808 June 2020 Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections ML20133J8152020-05-13013 May 2020 Letter Transmitting Revised Final SE of Traveler TSTF-564, Revision 2, Safety Limit MCPR, Using the Consolidated Line Item Improvement Process ML20132A1832020-05-11011 May 2020 Request for Additional Information TSTF-576, Revision 0, Revised Safety/Relief Valve Requirement TSTF-20-01, Transmittal of TSTF-IG-20-02, Guidance on Evaluating One-Time Surveillance Frequency Changes Under the Surveillance Frequency Control Program (TSTF-425M SFCP)2020-04-0909 April 2020 Transmittal of TSTF-IG-20-02, Guidance on Evaluating One-Time Surveillance Frequency Changes Under the Surveillance Frequency Control Program (TSTF-425M SFCP) TSTF-19-14, Technical Specifications Task Force - TSTF Response to NRC Questions on TSTF-582, RPV WIC Enhancements2020-02-12012 February 2020 Technical Specifications Task Force - TSTF Response to NRC Questions on TSTF-582, RPV WIC Enhancements TSTF-19-11, TSTF Response to NRC Questions on TSTF-554, Revise Reactor Coolant Leakage Requirements2020-01-16016 January 2020 TSTF Response to NRC Questions on TSTF-554, Revise Reactor Coolant Leakage Requirements ML19325C4362019-12-17017 December 2019 Cover Letter Transmitting Final SEs of Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 TSTF-19-09, Technical Specifications Task Force - Transmittal of TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements2019-12-13013 December 2019 Technical Specifications Task Force - Transmittal of TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements ML19323E9282019-12-10010 December 2019 Cover Letter Transmitting Final SEs of Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position TSTF-19-13, Technical Specifications Task Force - Updated TSTF Membership and Distribution2019-12-0303 December 2019 Technical Specifications Task Force - Updated TSTF Membership and Distribution TSTF-19-12, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position.2019-11-0505 November 2019 TSTF Comments on Draft Safety Evaluations for Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position. TSTF-19-10, Transmittal of Errata Changes to TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2019-08-28028 August 2019 Transmittal of Errata Changes to TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML19176A1892019-08-14014 August 2019 Cover Letter Transmitting Final Safety Evaluations of Traveler TSTF-569, Revision 2, Revise Response Time Testing Definition TSTF-19-03, Request for Fee Exemption for TSTF-554, Revision 0, Revise Reactor Coolant Leakage Requirements - Letter2019-07-0808 July 2019 Request for Fee Exemption for TSTF-554, Revision 0, Revise Reactor Coolant Leakage Requirements - Letter TSTF-19-08, Draft of Traveler TSTF-582, Revision 0, RPV WIC Enhancements.2019-07-0303 July 2019 Draft of Traveler TSTF-582, Revision 0, RPV WIC Enhancements. TSTF-19-06, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-569, Revision 1, Revise Response Time Testing Definition2019-06-25025 June 2019 TSTF Comments on Draft Safety Evaluations for Traveler TSTF-569, Revision 1, Revise Response Time Testing Definition 2024-09-06
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24264A0232024-09-20020 September 2024 RAI TSTF-600, Rev. 0, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency ML23222A2272023-08-10010 August 2023 Request for Additional Information Traveler TSTF-592, Revision 1, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML23010A2592023-01-11011 January 2023 Request for Additional Information Traveler TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML22272A5542022-10-0707 October 2022 Request for Additional Information Traveler TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML22235A7382022-08-19019 August 2022 NRR E-mail Capture - Draft RAIs for TSTF-591 (L-2022-PMP-0003) ML22193A2372022-07-12012 July 2022 Request for Additional Information TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown ML21109A1352021-04-12012 April 2021 TSTF-576 NRC Comments on Draft Rev 1 and Draft RAI Response ML20308A6562020-11-0606 November 2020 Request for Additional Information Traveler TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections ML20132A1832020-05-11011 May 2020 Request for Additional Information TSTF-576, Revision 0, Revised Safety/Relief Valve Requirement ML20065J9902020-03-0505 March 2020 March 5 2020 TSTF Quarterly Meeting Handout, Agenda Item Iiib - Generic RAIs for LARs to Adopt TSTF-505 Rict ML19323D5342019-11-19019 November 2019 Draft RAIs TSTF-554, Revise Reactor Coolant Leakage ML18134A0752018-05-21021 May 2018 Request for Additional Information (RAI) Technical Specifications Task Force (TSTF) Traveler TSTF-569, Revise Response Time Testing Definition ML18127A4052018-05-0707 May 2018 Draft RAI TSTF-569, Revise Response Time Testing Definition. ML18122A1662018-04-27027 April 2018 Draft RAIs TSTF-568, Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3. ML18095A2292018-04-12012 April 2018 Request for Additional Information Traveler TSTF-564, Safety Limit MCPR ML18085A0252018-03-20020 March 2018 Traveler TSTF-564, Safety Limit MCPR, Draft RAIs ML18100A0942018-01-29029 January 2018 Draft RAIs from Apla TSTF-563, Revise Instrument Testing Definitions to Incorporate SFCP ML16215A1252016-08-0202 August 2016 Request for Additional Information for Technical Specifications Task Force TSTF-553, Revision 0, Add Action for Two Inoperable Control Room Emergency Air Temperature Control System Trains, CAC No. MF7061 ML16028A4532016-02-23023 February 2016 Request for Additional Information TSTF-553, Add Action for Two Inoperable Creatcs (Control Room Emergency Air Temperature Control System) Trains. ML15322A2842016-02-0404 February 2016 Request for Additional Information TSTF-537, Revision 0, Increase CIV Completion Time; Update of TSTF-373. ML15322A2702016-01-12012 January 2016 Request for Additional Information Regarding Traveler TSTF-454, Revision 3, Extend PCIV Completion Times (NEDC-33046). ML15293A1612015-12-0808 December 2015 Request for Additional Information (RAI) TSTF 542, Rev. 1, Reactor Pressure Vessel Water Inventory Control, ML15281A2912015-11-18018 November 2015 Request for Additional Information Regarding TSTF-551, Revision 1, Revise Secondary Containment Surveillance Requirements. ML15208A2872015-08-13013 August 2015 Request for Additional Information Traveler TSTF-541, Rev 0, Add Exceptions to Surveillance Requirements When the Safety Function Is Being Performed ML15033A1082015-06-0202 June 2015 Draft Request for Additional Information Traveler TSTF-529, Revision 2, Clarify Use and Application Rules TSTF-14-17, Technical Specification Task Force - Response to NRC Request for Additional Information Regarding TSTF-454, Revision, Extend PCIV Completion Times (NEDC-33046) and Submittal of TSTF-454, Revision 32015-03-31031 March 2015 Technical Specification Task Force - Response to NRC Request for Additional Information Regarding TSTF-454, Revision, Extend PCIV Completion Times (NEDC-33046) and Submittal of TSTF-454, Revision 3 ML15057A2482015-02-26026 February 2015 Notice of Forthcoming Public Meeting Between the U.S. Nuclear Regulatory Commission and the Technical Specifications Task Force TSTF-551 ML14310A3442014-11-0606 November 2014 Draft RAI from Srxb TSTF-547, Clarification of Rod Position Requirements. ML14196A4142014-07-0707 July 2014 TSTF Handout from 7/10/14 Meeting TSTF Concerns with TSTF-505 RAIs ML13045A8602013-03-0404 March 2013 Request for Additional Information Traveler TSTF-537, Revision 0, Increase CIV (Containment Isolation Valve) Completion Time; Update of TSTF-373 ML12279A2082012-10-19019 October 2012 TSTF-531 RAIs ML12279A1342012-10-19019 October 2012 TSTF-454, Rev 2, RAIs ML12158A5472012-06-13013 June 2012 TSTF-523 Acceptance Letter and RAIs ML1108908172011-04-12012 April 2011 Request for Additional Information Regarding TSTF-508, Revision 1, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation ML1020402322010-07-27027 July 2010 Request for Additional Information Regarding TSTF-505, Revision 0, on Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML1015304012010-07-0707 July 2010 Acceptance for Review and Request for Additional Information for TSTF-432, Revision 0, Change in Technical Specifications End States (WCAP-16294). ML0914704322009-06-11011 June 2009 Request for Additional Information Regarding TSTF-514 on Reactor Coolant System Leakage Detection ML0906808132009-04-17017 April 2009 Request for Additional Information Regarding TSTF-508, Revision 0, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation ML0828004842008-11-0404 November 2008 Evaluation of TSTF Responses to NRC Staff Request for Additional Information (RAI) Regarding Traveler TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions. ML0820406052008-08-13013 August 2008 RAI for Review of TSTF-506, Rev 0 ML0812101752008-06-0404 June 2008 Request for Additional Information Regarding TSTF-500, Rev. 0, DC Electrical Rewrite - Update to TSTF-360. ML0810400032008-05-0505 May 2008 Request for Additional Information Regarding TSTF-501, Revision 0, Relocate Stored Fuel Oil and Lube Oil Values to Licensee Control ML0721206302007-10-0202 October 2007 Request for Additional Information (RAI) Regarding TSTF Traveler 425, Revision 1, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5. ML0627700892006-11-0909 November 2006 Request for Additional Information Regarding TSTF-478, Revision 0, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control 2024-09-20
[Table view] |
Text
November 4, 2008 Technical Specifications Task Force (TSTF) 11921 Rockville Pike Suite 100 Rockville, MD 20852
SUBJECT:
EVALUATION OF TSTF RESPONSES TO NRC STAFF REQUEST FOR ADDITIONAL INFORMATION (RAI) REGARDING TRAVELER TSTF-493, REVISION 2, ACLARIFY APPLICATION OF SETPOINT METHODOLOGY FOR LSSS FUNCTIONS@
DOCKET NO: PROJ0753; TAC MD5249
REFERENCE:
Letter from the Technical Specifications Task Force to the NRC, Response to NRC July 25, 2007 Request for Additional Information Regarding TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, dated January 18, 2008.
Dear Members of the TSTF:
The contents of the evaluation provided by this letter have been reviewed by and coordinated with the appropriate authorities within the Office of Nuclear Reactor Regulation. In the reference letter you replied to the NRC staff letter dated June 25, 2007 (Agencywide Document and Management Systems (ADAMS) Accession Number ML072050146), which requested information about issues that need to be resolved in order for TSTF-493, Revision 2 to be approved and made available as a consolidated line item improvement (CLIIP) TSTF traveler.
TSTF-493 is intended to provide licensees with a readily adoptable approach to ensure that plant technical specifications (TSs) conform to the requirements of 10 CFR 50.36. This letter documents the staff evaluation of the RAI responses (see enclosure) and identifies the review information the staff needs to process requests to approve the TSTF-493, Revision 3 for plant-specific license applications. The review information was discussed during the September 30, 2008, public meeting between the NRC staff and the TSTF.
In its RAI letter the NRC staff requested the TSTF Owners Group submit screening criteria used to identify instrument functions determined to be Safety Limit (SL) Limiting Safety System Settings (LSSSs). This request was made in order to account for the significant differences in the numbers and scope of SL-LSSSs instrument functions identified in the different vendor TS contained in TSTF-493, Revision 2. Furthermore, it was thought this information would help to reconcile each vendor SL-LSSSs TS position with the NRC staff position in Regulatory Issue Summary 2006-17, NRC Staff Position on the Requirements of 10 CFR 50.36, Technical Specifications, Regarding Limiting Safety System Settings during Periodic Testing and Calibration of Instrument Channels dated August 24, 2006. The RAI letter also requested information regarding the agreement criteria for non-SL LSSSs setpoint verification testing to ensure it would be addressed in the TSTF. The RAI suggested using agreement criteria modeled after the agreement concepts in the Nuclear Energy Institute (NEI) letter to Mr. James Lyons (NRC) from Alexander Marion (NEI) dated May 18, 2005. The above items address the
TSTF most significant requests for information. Other items in the letter involved changes to Bases discussion on SL-LSSSs and changes to Reviewers notes regarding surveillance testing agreement criteria for digital components. Bases editorial changes and TSTF technical justification editorial changes were also identified.
The September 30, 2008 public meeting between the NRC staff and the TSTF was held to establish a common technical solution to the scope of content issue for SL versus non-SL LSSSs instrument functions in TSTF-493, Revision 3. At the meeting the NRC staff emphasized two important concerns addressed by the RAIs.
First, to satisfy the requirement of 10 CFR 50.36(c)(1)(ii)(A), the staff guidance for the subset of variables TSTF-493 should designate as SL-LSSSs includes automatic protective devices in TSs for specified variables on which SLs have been placed that: (1) initiate a reactor trip; or (2) actuate safety systems to reasonably protect the integrity of physical barriers that guard against the uncontrolled release of radioactivity.
LCOs that contain SL-LSSSs should include the Reactor Trip System (Reactor Protection System for BWRs), Engineered Safety Feature Actuation System (Emergency Core Cooling System for BWRs) instrumentation and there may be some instrument system functions in other LCOs identified by the BWROG as being SL-LSSSs. Manual actuations, interlocks, permissives and automatic actuation logic circuits are not SL-LSSSs. The instrumentation for these LCOs will ensure acceptable fuel design limits are not exceeded, and reactor coolant pressure boundary limits have sufficient margin to ensure design conditions are not exceeded during design basis events. TS Notes for each SL-LSSSs instrument function should be included to ensure testing agreement criteria are contained in TS to verify the instruments are functioning as required and to establish TS operability criteria for the requirements of 10 CFR 50.36. This position is consistent with RIS 2006-17.
Second, for each instrument function not labeled as a SL-LSSS, the TS Bases should address the agreement concepts for testing (similar to the Notes 1 & 2 for SL-LSSS (ADAMS Accession Number ML052500004) to ensure instruments are functioning as required in accordance with safety analyses of record. This would resolve any concern with staff RAIs to request this information during individual plant-specific license amendment reviews.
The NRC staff believes that if TSTF-493, Revision 3 is revised to include the scope of the SL related LSSS discussed above, and TSTF-493, Revision 3 is revised to include the operability requirement for non-SL related LSSS in the Bases for the remainder of STS instrument functions, then any licensee can adopt the updated TSTF-493 with only one condition which is stated below. This condition is plant-specific and licensees will be required to address it in their submittal. The condition is as follows:
Setpoint Calculation Methodology: Provide documentation, including sample calculations, of the methodology used for establishing the limiting setpoint (or nominal setpoint) and the limiting acceptable values for the As-Found and As-Left setpoints as measured in periodic surveillance testing. Indicate the related Analytical Limits/design limits and other limiting design values (and the sources of these values) for each setpoint.
TSTF For licensees who adopt TSTF-493, future license amendment requests to revise setpoints would only require the licensee to address the above setpoint methodology requirement. The licensee will not be required to justify whether setpoints are SL-LSSS or not.
If you have any questions related to this issue or action please contact Carl Schulten at (301) 415-1192 or e-mail carl.schulten@nrc.gov or Hukam Garg at (301) 415-2929 or e-mail hukam.garg@nrc.gov.
Sincerely,
/RA/
Robert B. Elliott, Chief Technical Specifications Branch Division of Inspection and Regional Support Office of Nuclear Reactor Regulation cc: See next page
Enclosure:
As stated
ML082800484 Parallel Concurrence Previous Concurrence =
- OFFICE ITSB:DIRS EICB:DE EICB:DE ITSB:DIRS NRR:DPR NRR:DE NRR:DORL NRR:DIRS NAME CSchulten* HGarg* WKemper* RElliott* MCase PHiland JGiitter FBrown DATE 10/9/08 10/9/08 10/10/08 10/16/08 10/17/08 10/20/08 10/20/08 11/4/08
Technical Specifications Task Force Mailing List cc:
Technical Specifications Task Force Donald R. Hoffman 11921 Rockville Pike EXCEL Services Corporation Suite 100 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Rockville, MD 20852 E-mail: tstf@excelservices.com E-mail: donaldh@excelservices.com Brian Mann George G. (Bert) Yates EXCEL Services Corporation AmerenUE Callaway Plant 11921 Rockville Pike, Suite 100 P.O. Box 620 Rockville, MD 20852 Fulton, MO 65251 E-mail: brianm@excelservices.com E-mail: gyates@ameren.com John Messina First Energy Nuclear Operating Company 76 South Main Street Mail Stop: Akron-GO-14 Akron, OH 44308 E-mail: jmessina@firstenergycorp.com David Bice Entergy N-GSB64 1448 SR 333 Russellville, AR 72802 E-mail: dbice@entergy.com Reene' V. Gambrell Duke Energy Mailcode: ON03RC 7800 Rochester Highway Seneca, SC 29672 E-mail: RVGambrell@duke-energy.com
Evaluation of TSTF-493, Revision 2 RAI Responses Request for Additional Information
- 1. Identify the screening criteria used by the TSTF for deciding whether a BWR Technical Specifications (TS) Instrumentation Function is a Safety Limit related (SL-related) or non-Safety Limit (non-SL) related Limiting Safety System Settings (LSSS). For example, BWR/4 and BWR/6 instrument functions for Drywell Pressure High, Suppression Pool Water Level High and Reactor Vessel Water Level -Low Low Low are not denoted as SL-related LSSS and no justification is included in the TSTF for this determination.
Response: [summarized]
Based on these safety limits, a systematic process was developed to identify limiting safety system settings which are consistent with the objective of protecting one or more of the four safety limits. A key element of this systematic process is that only those instrument settings that protect the four safety limits (based on safety analysis for each specific BWR) are considered.
To determine a set of LSSSs, it was necessary to employ a consistent set of criteria that applied to the current BWR safety analysis, and considering only parameters in the improved Standard Technical Specification Tables in Section 3.3 and 3.4.
The results of applying this systematic process resulted in the list of potential SL-LSSSs identified in TSTF-493 for a limiting BWR/4 and BWR/6. This is the "limiting" list of functions because all BWRs may not have all the SL-LSSS functions identified in the TSTF due to plant specific analysis revisions or licensing basis changes.
The PWROG determined that it was not possible to generically limit the list of potential SL-LSSS functions identified in TSTF-493 other than to exclude permissives and interlocks. For the PWR plants, all possible SL-LSSS were identified in the TSTF-493 markups, and each plant specific submittal will identify whether the generic SL-LSSS apply and remove any of those identified in TSTF-493 that are not consistent with the plant specific safety analysis. The addition of a reviewers Note requiring identification of functions that are not a SL-LSSS as follows: Where a function does not directly protect a Safety Limit, add the following statement in the function discussion below. The setpoint for this function does not provide an automatic trip setpoint that protects against violating the Reactor Core Safety Limit or Reactor Coolant System Pressure Safety Limit during AOOs. This LSSS is not a SL-LSSS.
Disposition:
First, to satisfy the requirement of 10 CFR 50.36, TSTF-493 should designate each reactor trip and engineered safety feature automatic protective device instrument function as a SL-LSSS except for manual actuations, interlocks, permissives and automatic actuation logic circuits. TS Notes for each SL-LSSSs instrument function should be included to ensure testing agreement criteria are contained in TS which verify the instruments are functioning as required. Implicit in this position is that the instrument functions in these LCOs preserve the integrity of the fuel cladding and the Reactor Coolant System (RCS) because they are equipment that meet the Enclosure
LCO requirements of 10 CFR 50.36(c)(2)(ii) Criterion 3: A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.
- 2. For each instrument function not labeled as a SL-LSSS, revise the Bases for the instrument function to include the justification for the determination. For setpoint verification surveillance tests conducted on these functions, also revise these surveillance test Bases to include performance-based acceptance criteria (similar to the Notes 1 & 2 for SL-LSSS) to ensure the agreement concepts for TS non-SL LSSS safety
-related instrument setpoints and allowable values are addressed. The agreement concepts referred to are those in the Nuclear Energy Institute (NEI) letter to Mr. James Lyons (NRC) from Alexander Marion (NEI) dated May 18, 2005 and the NRC letter response to Mr. Alexander Marion (NEI) from Mr. Bruce Boger, dated August 23, 2005.
Response
A Reviewer's Note will be added which requires the identification of functions that are not a SL-LSSS. The Reviewer's Note will state: Where a function does not directly protect a Safety Limit add the following statement, in the function discussion below. The setpoint for this function does not provide an automatic trip setpoint that protects against violating the Reactor Core Safety Limit or Reactor Coolant System Pressure Safety Limit during AOOs. This LSSS is not a SL-LSSS. Each plant currently has a program that verifies Technical Specification channels are functioning as required. The addition of the Notes in this TSTF makes this verification a Technical Specification requirement for a selected set of functions (SL-LSSSs).
For all other LSSS functions in the Technical Specifications, the existing programs are consistent with the safety significance of the functions. Therefore, no changes are made to the Bases to document the verifications for functions that are not SL-LSSS.
Disposition:
By designating reactor trip and engineered safety feature automatic protective device instrument function as a SL-LSSS except for manual actuations, interlocks, permissives and automatic actuation logic circuits the need for the Reviewers Note is moot. All other instrument functions are non-SL LSSSs, therefore the TS Bases should identify the location of the requirements for the setpoint verification surveillance tests conducted on these functions including a discussion of the performance-based acceptance criteria (similar to the Notes 1 & 2 for SL-LSSS) used to ensure the agreement concepts for TS non-SL LSSS safety-related instrument setpoints and allowable values are addressed.
- 3. Correct the TSTF definition of SL-LSSS by deleting the word directly to be consistent with the requirements of 10 CFR 50.36 which specify SL-LSSS as variables on which a SL has been placed. The TSTF definition must be consistent with regulatory requirements. The TSTF justification states that Notes 1 and 2 are applied to Functions which are Safety Limit Limiting Safety System Settings (SL-LSSS), considering the following definition of SL-LSSS: Trip Setpoints for Functions which provide automatic trips that directly (emphasis added) protect against violating the Reactor core and the Reactor Coolant System (RCS) pressure boundary Safety Limits during anticipated
operational occurrences (AOOs) are Safety Limit Limiting Safety System Settings (SL-LSSS).
Response
The term directly is important to the SL-LSSS definition. There may be several different settings, permissives, or Limiting Conditions for Operation that contribute to the protection of the Safety Limit but are not part of the direct success path for accident mitigation and protection of a Safety Limit. Some of these functions may provide alternative, anticipatory, or backup protection for the Safety Limit. The SL-LSSS definition is limited to the function credited in the safety analysis as directly preventing exceeding of the Safety Limit.
Disposition:
Application of the term directly to the SL-LSSS definition is an interpretation that establishes a limitation to the requirement of 10 CFR 50.36(c)(2)(ii) Criterion 3: A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier. To satisfy the requirement of 10 CFR 50.36, TSTF-493 should designate each reactor trip and engineered safety feature automatic protective device instrument function as a SL-LSSS except for manual actuations, interlocks, permissives and automatic actuation logic circuits. By designating the above functions as SL-LSSS, the question of directly is immaterial.
- 4. Revise the TSTF Bases Reviewers Note 3 as follows:
Notes [1] and [2] may not apply to SL-LSSS Functions and Surveillances which test only digital components. For purely digital components, (such as actuation logic and associated relays) there is no expected change in result between surveillance performances other than measurement and test errors (M&TE) therefore, justification is needed to confirm that comparison of Surveillance results does not provide an indication of channel or component performance.
The NRC staff has issued license amendments that include modified versions of Notes 1 and 2 for Surveillances which test digital components. Similarly, the TSTF guidance should not categorically exclude applying the notes to digital components.
Response
The TSTF Bases Reviewers Note 3 is revised to state:
Notes [a] and [b] may not apply to SL-LSSS Functions and Surveillances which test only digital components. For purely digital components, such as actuation logic circuits, relays, and any other tests using a digital or on/off input, there is no expected change in result between surveillance performances and any test result other than the identified Technical Specification surveillance acceptance criteria would be considered inoperable. Therefore, the Notes would not apply. Where there is a separate as-left and as-found tolerance established for the SR, the
Notes may not apply if the NRC staff agrees with a licensee's conclusion that they are not required.
For digital channels or parts of channels where the analog to digital (A/D) or digital to analog (D/A) converter is not a part of the specific Surveillance Test, a digital input (without regard to M&TE tolerance) is input and a state change (trip) is generally the expected result. In this case the test only verifies that the correct values exist in the software and that the corrective action occurs when a test value greater than the setpoint is input. Drift is not a possibility in these specific circuits and the Notes provide no increased assurance in detecting degradation of the channel.
Disposition: Accept
- 5. Include a second version (Option B) to TSTF-493, Revision 2. The format and content of Option B should be modeled after the Section 3.3 Instrumentation TS in ESBWR Design Control Document, Tier 2, Chapter 16, Technical Specifications and Bases dated 12/15/2006, ADAMS Accession Numbers ML070110098 and ML070110101, respectfully.
Response
The current TSTF option is sufficient to resolve the NRC's concerns related to the control of Allowable Values, Limiting Trip Setpoints, and the performance of channels during and between calibrations. While the Option B recommendation has many merits, the Owners Group believe it to be essential to resolve the issue based on the work completed over the last 5 years without adding new options to the NRC approval activities.
Disposition: Accepted
- 6. Incorporate the comments on the TSTF Justification provided in Enclosure 2.
Response
A revision to TSTF-493 is attached which incorporates the comments with some changes based on industry comments.
Disposition: Accepted with comments.
- 7. Incorporate the comments of the TSTF Bases provided in Enclosures 3 through 6.
Response
A revision to TSTF-493 is attached which incorporates the comments with some changes based on industry comments.
Disposition: Accepted with comments.
- 8. Delete Appendix A, TSTF 493 History in its entirety. TSTF Appendix A contains references to non-NRC staff (i.e., TSTF) meeting notes and summaries related to the development of industry and NRC staff agreements that resulted in TSTF-493, Rev. 2.
Response
The Appendix has been removed from TSTF-493, Revision 3.
Disposition: Accepted