Cover Letter for Final SEs of TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections
ML21098A242
Person / Time
Site: Technical Specifications Task Force
Issue date: 04/14/2021
From: Victor Cusumano
NRC/NRR/DSS/STSB
To:
Technical Specifications Task Force
Honcharik, M., NRR/DSS, 301-415-1774
Shared Package
ML21099A086 List:
References
EPID L-2020-PMP-0005
Download: ML21098A242 (3)


Text

April 14, 2021 Technical Specifications Task Force 11921 Rockville Pike, Suite 100 Rockville, MD 20852

SUBJECT:

FINAL SAFETY EVALUATIONS OF TECHNICAL SPECIFICATIONS TASK FORCE TRAVELER TSTF-577, REVISION 1, REVISED FREQUENCIES FOR STEAM GENERATOR TUBE INSPECTIONS, USING THE CONSOLIDATED LINE ITEM IMPROVEMENT PROCESS (EPID L-2020-PMP-0005)

Dear Members of the Technical Specifications Task Force:

By letter dated March 1, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21060B434), the Technical Specifications Task Force (TSTF) submitted to the U.S. Nuclear Regulatory Commission (NRC) for review and approval Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections. The traveler was submitted as part of the consolidated line item improvement process (CLIIP).

Traveler TSTF-577, Revision 1, is approved as a CLIIP traveler.

By letter dated March 24, 2021 (ADAMS Package Accession No. ML21069A190), NRC draft safety evaluations (SEs) of Traveler TSTF-577, Revision 1, were provided for your review and comments. You provided editorial comments via e-mail on March 30, 2021 (ADAMS Accession No. ML21097A187). The comments have been incorporated. The NRC staffs final traveler SE and model SE are enclosed.

If you have any questions, please contact Michelle Honcharik at 301-415-1774 or via e-mail at Michelle.Honcharik@nrc.gov.

Sincerely, RA Victor G. Cusumano, Chief Technical Specifications Branch Division of Safety Systems Office of Nuclear Reactor Regulation Project No. 753

Enclosures:

1. Final Traveler SE
2. Final Model SE cc: See next page

Technical Specifications Task Force Project No. 753 cc:

Technical Specifications Task Force c/o EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Attention: Brian D. Mann E-mail: brian.mann@excelservices.com James P. Miksa Entergy Nuclear Operations, Inc.

Palisades Nuclear Power Plant 27780 Blue Star Memorial Highway Covert, MI 49043 E-mail: jmiksa@entergy.com Jordan L. Vaughan Duke Energy EC07C / P.O. Box 1006 Charlotte, NC 28202 E-mail: jordan.vaughan@duke-energy.com Ryan M. Joyce Southern Nuclear Operating Company 3535 Colonnade Parkway / Bin N-274-EC Birmingham, AL 35243 E-mail: rmjoyce@southernco.com David M. Gullott Exelon Generation 4300 Winfield Road Warrenville IL 60555 E-mail: David.Gullott@exeloncorp.com Wesley Sparkman Southern Nuclear Operating Company 3535 Colonnade Parkway / Bin N-226-EC Birmingham, AL 35242 E-mail: wasparkm@southernco.com

Package: ML21099A086, Cover letter: ML21098A242, Final traveler SE: ML21098A188; Final Model SE: ML21096A274

  • concurred via e-mail NRR-106 OFFICE NRR/DORL/LPL3/LA* NRR/DNLR/NGSG/BC* NRR/DORL/LPL2-2/BC*

NAME JBurkhardt SBloom UShoop DATE 4/12/2021 3/2/2021 3/15/2021 OFFICE OGC/NLO* NRR/DSS/STSB/PM* NRR/DSS/STSB/BC*

NAME MWoods/JWachutka MHoncharik VCusumano DATE 3/24/2021 4/12/2021 4/14/2021