ML21106A245

From kanterella
Jump to navigation Jump to search

Cover Letter Transmitting Final Model SE of TSTF 554, Revision 1, Revise Reactor Coolant Leakage Requirements
ML21106A245
Person / Time
Site: Technical Specifications Task Force
Issue date: 04/20/2021
From: Victor Cusumano
NRC/NRR/DSS
To:
Technical Specifications Task Force
Michelle Honcharik-NRR/DSS
Shared Package
ML21106A249 List:
References
EPID L-2019-PMP-0181
Download: ML21106A245 (3)


Text

April 20, 2021 Technical Specifications Task Force 11921 Rockville Pike, Suite 100 Rockville, MD 20852

SUBJECT:

FINAL MODEL SAFETY EVALUATION OF TECHNICAL SPECIFICATIONS TASK FORCE TRAVELER TSTF-554, REVISION 1, REVISE REACTOR COOLANT LEAKAGE REQUIREMENTS (EPID L-2019-PMP-0181)

Dear Members of the Technical Specifications Task Force:

By letter dated January 16, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No ML20016A233), the Technical Specifications Task Force (TSTF) submitted to the U.S. Nuclear Regulatory Commission (NRC) for review and approval Traveler TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements. The NRC staffs final model safety evaluation (SE) of the traveler is enclosed.

By letter dated December 21, 2020 (ADAMS Package Accession No. ML20353A074), an NRC draft safety evaluation (SE) of Traveler TSTF-554, Revision 1, was provided for your review and comments. You did not have any comments.

If you have any questions, please contact Michelle Honcharik at 301-415-1774 or via e-mail at Michelle.Honcharik@nrc.gov.

Sincerely, Digitally signed by Victor Victor Cusumano Cusumano Date: 2021.04.20 12:46:43 -04'00' Victor G. Cusumano, Chief Technical Specifications Branch Division of Safety Systems Office of Nuclear Reactor Regulation Project No. 753

Enclosure:

Draft Model SE cc: See next page

Technical Specifications Task Force Project No. 753 cc:

Technical Specifications Task Force c/o EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Attention: Brian D. Mann E-mail: brian.mann@excelservices.com James P. Miksa Entergy Nuclear Operations, Inc.

Palisades Nuclear Power Plant 27780 Blue Star Memorial Highway Covert, MI 49043 E-mail: jmiksa@entergy.com Jordan L. Vaughan Duke Energy EC07C / P.O. Box 1006 Charlotte, NC 28202 E-mail: jordan.vaughan@duke-energy.com Ryan M. Joyce Southern Nuclear Operating Company 3535 Colonnade Parkway / Bin N-274-EC Birmingham, AL 35243 E-mail: rmjoyce@southernco.com David M. Gullott Exelon Generation 4300 Winfield Road Warrenville IL 60555 E-mail: David.Gullott@exeloncorp.com Wesley Sparkman Southern Nuclear Operating Company 3535 Colonnade Parkway / Bin N-226-EC Birmingham, AL 35242 E-mail: wasparkm@southernco.com

Package: ML21106A249, Cover letter: ML21106A245, Final MODEL SE: ML21106A239 *concurred via e-mail NRR-106 OFFICE NRR/DORL/LPL3/LA* NRR/DNLR/NPHP/BC* NRR/DORL/LPL2-1/BC*

NAME JBurkhardt MMitchell MMarkley DATE 4/20/2021 12/11/2020 12/15/2020 OFFICE NRR/DRA/ARCB/BC* NRR/DSS/SFNB/BC* NRR/DSS/SCPB/BC*

NAME KHsueh RLukes BWittick DATE 6/10/2020 6/11/2020 4/3/2020 OFFICE OGC/NLO* NRR/DSS/STSB/PM* NRR/DSS/STSB/BC*

NAME MYoung MHoncharik VCusumano DATE 12/4/2020 04/20/2021 04/20/2021 OFFICE NRR/DNRL/NCSG NAME SBloom DATE 12/9/2020