Letter Sequence Approval |
---|
|
|
MONTHYEARTSTF-17-16, Technical Specifications Task Force - Transmittal of TSTF-568, Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.22017-12-19019 December 2017 Technical Specifications Task Force - Transmittal of TSTF-568, Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 Project stage: Request ML18057A1632018-03-0808 March 2018 Acceptance for Review Regarding Traveler TSTF-568, Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 Project stage: Acceptance Review ML18204A0242019-08-15015 August 2019 NRC Staff Feedback Draft TSTF-568, Revision 1, Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 Project stage: Draft Other ML19248C8702019-11-12012 November 2019 Cover Letter Transmitting Draft SEs of Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 Project stage: Draft Approval ML19276G0312019-11-12012 November 2019 Draft Model SE of TSTF-568, Rev 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 Project stage: Draft Other ML19262E1072019-11-12012 November 2019 Draft SE of Traveler TSTF-568, Rev 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 Project stage: Draft Approval ML19325C4362019-12-17017 December 2019 Cover Letter Transmitting Final SEs of Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 Project stage: Approval ML19325C4342019-12-17017 December 2019 Final Safety Evaluation of Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 Project stage: Approval ML19325C4352019-12-17017 December 2019 Final Model Safety Evaluation of TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 Project stage: Approval 2019-11-12
[Table View] |
|
---|
Category:Letter
MONTHYEARML24362A0552024-12-30030 December 2024 TSTF-596 Cover Letter for Final Traveler SE ML24358A2262024-12-26026 December 2024 TSTF-597 Cover Letter for Final Traveler SE ML24309A2162024-11-0404 November 2024 RAIs TSTF-601, Extend Shield Building Completion Time After Refueling ML24264A0232024-09-20020 September 2024 RAI TSTF-600, Rev. 0, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency ML24249A1482024-09-11011 September 2024 Cover Letter for Final Traveler SE of TSTF 576, Revision 3, Revise Safety/Relief Valve Requirements ML24247A3162024-09-0606 September 2024 Cover Letter for Final Model SE of Traveler TSTF 592, Rev 2, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24222A4002024-08-14014 August 2024 TSTF-602, Revise the Ventilation Filter Testing Program to Permit Alternate Challenge Agents, Acceptance Review Letter ML24106A2762024-08-0101 August 2024 Draft Safety Evaluation of Technical Specifications Task Force Traveler TSTF-576, Revision 3, Revise Safety/Relief Valve Requirements (EPID L -2019-PMP-0207) ML24207A1822024-07-25025 July 2024 TSTF-601, Extend Shield Building Completion Time After Refueling, Acceptance Review Letter ML24114A2572024-04-24024 April 2024 TSTF-599 Acceptance Review Letter ML24114A2652024-04-24024 April 2024 TSTF-597 Acceptance Review Letter ML23325A2132023-12-18018 December 2023 Cover Letter for Final Model SE of TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML23262B2292023-09-21021 September 2023 Cover Letter Transmitting Final SE of TSTF-591, Revision 0, Revise Risk-Informed Completion Time (RICT) Program ML23124A2212023-09-11011 September 2023 Cover Letter for Final SEs of TSTF-589, Eliminate Automatic Diesel Generator (DG) Start During Shutdown ML23206A1242023-07-31031 July 2023 TSTF-584 Cover Letter for Final SE ML23205A2342023-07-0606 July 2023 Draft TSTF-601, Extend Shield Building Completion Time After Refueling ML23012A2812023-03-13013 March 2023 Draft SEs of TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation ML23059A3342023-02-28028 February 2023 TSTF-576 Open Issues Letter ML23010A2592023-01-11011 January 2023 Request for Additional Information Traveler TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML22272A5542022-10-0707 October 2022 Request for Additional Information Traveler TSTF-591, Revise Risk Informed Completion Time (RICT) Program TSTF-22-07, Transmittal of TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2022-07-19019 July 2022 Transmittal of TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML22193A2372022-07-12012 July 2022 Request for Additional Information TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown TSTF-22-06, Technical Specifications Task Force - Request for a Workshop to Discuss the Interaction of Natural Phenomena Protection Design Features and Operability2022-07-0808 July 2022 Technical Specifications Task Force - Request for a Workshop to Discuss the Interaction of Natural Phenomena Protection Design Features and Operability ML22110A1712022-04-26026 April 2022 Acceptance for Review Regarding Traveler Tstf-584, Rev 0, Eliminate Automatic RWCU System Isolation on SLC Initiation TSTF-22-04, Technical Specifications Task Force - Transmittal of TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) Program2022-03-22022 March 2022 Technical Specifications Task Force - Transmittal of TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) Program ML21188A2782021-07-11011 July 2021 Cover Letter Transmitting Final SEs of CLIIP TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR (Residual Heat Removal) Shutdown Cooling TSTF-21-03, TSTF Response to NRC Questions on TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements and Submittal of Revision 12021-06-23023 June 2021 TSTF Response to NRC Questions on TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements and Submittal of Revision 1 ML21054A2512021-05-26026 May 2021 Cover Letter Transmitting Draft SEs of CLIIP TSTF-580, RHR Shutdown Cooling System - Hot Shutdown ML21106A2452021-04-20020 April 2021 Cover Letter Transmitting Final Model SE of TSTF 554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21098A2422021-04-14014 April 2021 Cover Letter for Final SEs of TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML21068A4012021-03-24024 March 2021 Cover Letter for Draft SEs TSTF 577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections TSTF-21-01, Transmittal of TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2021-01-26026 January 2021 Transmittal of TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML20322A3612020-12-18018 December 2020 TSTF-554 Cover Letter for Final SE ML20308A6562020-11-0606 November 2020 Request for Additional Information Traveler TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections ML20168A3962020-10-30030 October 2020 Cover Letter Transmitting Draft SE of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML20265A1152020-10-0909 October 2020 Cover Letter Transmitting Model SE of TSTF-582 and TSTF-583-T ML20133J8832020-07-29029 July 2020 Letter Transmitting Draft SE of Traveler TSTF-582, Revision 0, RPV WIC Enhancements TSTF-20-04, Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections2020-06-0808 June 2020 Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections ML20133J8152020-05-13013 May 2020 Letter Transmitting Revised Final SE of Traveler TSTF-564, Revision 2, Safety Limit MCPR, Using the Consolidated Line Item Improvement Process ML20132A1832020-05-11011 May 2020 Request for Additional Information TSTF-576, Revision 0, Revised Safety/Relief Valve Requirement TSTF-20-01, Transmittal of TSTF-IG-20-02, Guidance on Evaluating One-Time Surveillance Frequency Changes Under the Surveillance Frequency Control Program (TSTF-425M SFCP)2020-04-0909 April 2020 Transmittal of TSTF-IG-20-02, Guidance on Evaluating One-Time Surveillance Frequency Changes Under the Surveillance Frequency Control Program (TSTF-425M SFCP) ML19260E1212020-02-25025 February 2020 Letter Transmitting Revised Final Model Safety Evaluation of Technical Specifications Task Force Traveler TSTF-564, Revision 2, Safety Limit MCPR TSTF-19-14, Technical Specifications Task Force - TSTF Response to NRC Questions on TSTF-582, RPV WIC Enhancements2020-02-12012 February 2020 Technical Specifications Task Force - TSTF Response to NRC Questions on TSTF-582, RPV WIC Enhancements TSTF-19-11, TSTF Response to NRC Questions on TSTF-554, Revise Reactor Coolant Leakage Requirements2020-01-16016 January 2020 TSTF Response to NRC Questions on TSTF-554, Revise Reactor Coolant Leakage Requirements ML19325C4362019-12-17017 December 2019 Cover Letter Transmitting Final SEs of Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML19351D7832019-12-17017 December 2019 Request for Additional Information Traveler TST-582, Revision 0, RPV WIC Enhancements TSTF-19-09, Technical Specifications Task Force - Transmittal of TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements2019-12-13013 December 2019 Technical Specifications Task Force - Transmittal of TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements ML19323E9282019-12-10010 December 2019 Cover Letter Transmitting Final SEs of Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position TSTF-19-13, Technical Specifications Task Force - Updated TSTF Membership and Distribution2019-12-0303 December 2019 Technical Specifications Task Force - Updated TSTF Membership and Distribution ML19248C8702019-11-12012 November 2019 Cover Letter Transmitting Draft SEs of Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 2024-09-06
[Table view] |
Text
December 17, 2019 Technical Specifications Task Force 11921 Rockville Pike, Suite 100 Rockville, MD 20852
SUBJECT:
FINAL SAFETY EVALUATIONS OF TECHNICAL SPECIFICATIONS TASK FORCE TRAVELER TSTF-568, REVISION 2, REVISE APPLICABILITY OF BWR/4 TS 3.6.2.5 AND TS 3.6.3.2, USING THE CONSOLIDATED LINE ITEM IMPROVEMENT PROCESS (EPID L-2017-PMP-0024)
Dear Members of the Technical Specifications Task Force:
By letter dated May 21, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19141A122), the Technical Specifications Task Force (TSTF) submitted to the U.S. Nuclear Regulatory Commission (NRC) for review and approval Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2. The traveler was submitted as part of the consolidated line item improvement process (CLIIP). Traveler TSTF-568, Revision 2, is approved as a CLIIP traveler.
By letter dated November 12, 2019 (ADAMS Package Accession No. ML19262E115), an NRC draft safety evaluation (SE) and draft model SE of Traveler TSTF-568, Revision 2, were provided for your review and comments. You had no comments to the draft SEs. The NRC staffs final traveler SE and final model SE are provided in Enclosures 1 and 2, respectively, to this letter.
Traveler TSTF-568, Revision 2, is applicable to General Electric BWR/4 plant designs. The proposed change revises Revision 4 of the Standard Technical Specifications, Volumes 1 and 2 of NUREG-1433.1 The NRC staffs SEs apply only to material provided in the subject traveler. When a licensee submits a license amendment request (LAR) to adopt the traveler, the NRC staffs review will ensure that the material presented applies to the specific plant involved. The NRC staff does not intend to repeat a technical review of the material provided in the traveler. Licensees are responsible for reviewing the NRC staffs SEs and the applicable technical justifications, providing any necessary plant-specific information, and assessing the completeness and accuracy of their LARs. The NRC will process each LAR to adopt this traveler according to applicable NRC rules and procedures.
Traveler TSTF-568, Revision 2, does not prevent licensees from requesting an alternate approach or proposing changes other than those in the traveler. However, significant changes from the approach recommended or the inclusion of additional changes in the LAR will require additional NRC staff review, increase the time and resources needed for the review, and/or result in removal of the LAR from the CLIIP. Licensees requesting significant or additional 1 U.S. Nuclear Regulatory Commission, Standard Technical Specifications, General Electric, BWR/4 Plants, NUREG-1433, Volume 1, Specifications, and Volume 2, Bases, Revision 4.0, April 2012 (ADAMS Accession Nos. ML12104A192 and ML12104A193, respectively).
Technical Specifications Task Force changes should instead submit an LAR that does not claim to adopt traveler TSTF-568, Revision 2.
If you have any questions, please contact Michelle Honcharik at 301-415-1774 or via e-mail at Michelle.Honcharik@nrc.gov.
Sincerely,
/RA/
Victor G. Cusumano, Chief Technical Specifications Branch Division of Safety Systems Office of Nuclear Reactor Regulation Project No. 753
Enclosures:
- 1. Final Traveler SE
- 2. Final Model SE cc: See next page
Technical Specifications Task Force Project No. 753 cc:
Technical Specifications Task Force c/o EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Attention: Brian D. Mann E-mail: brian.mann@excelservices.com James P. Miksa Entergy Nuclear Operations, Inc.
Palisades Nuclear Power Plant 27780 Blue Star Memorial Highway Covert, MI 49043 E-mail: jmiksa@entergy.com Jordan L. Vaughan Duke Energy EC07C / P.O. Box 1006 Charlotte, NC 28202 E-mail: jordan.vaughan@duke-energy.com Ryan M. Joyce Southern Nuclear Operating Company 3535 Colonnade Parkway / Bin N-274-EC Birmingham, AL 35243 E-mail: rmjoyce@southernco.com Putri Kusumawati Murray Exelon Generation 4300 Winfield Road Warrenville IL 60555 E-mail: Putri.Kusumawatimurray@exeloncorp.com Wesley Sparkman Southern Nuclear Operating Company 3535 Colonnade Parkway / Bin N-226-EC Birmingham, AL 35242 E-mail: wasparkm@southernco.com
Package: ML19325C444, Cover letter: ML19325C436, Final traveler SE: ML19325C434, Final model SE: ML19325C435
- no substantive changes since draft SE NRR-106 OFFICE NRR/DORL/LPL3/LA*
NRR/DORL/LPL3/BC*
NRR/DSS/SCPB/BC**
NRR/DSS/SRXB/BC(A)**
NAME JBurkhardt NSalgado SAnderson JBorromeo DATE 12/5/2019 12/9/2019 8/23/2019 8/23/2019 OFFICE OGC/NLO**
NRR/DSS/STSB/PM NRR/DSS/STSB/BC NAME MYoung MHoncharik VCusumano DATE 11/8/2019 12/17/2019 12/17/2019