ML21188A278

From kanterella
Jump to navigation Jump to search

Cover Letter Transmitting Final SEs of CLIIP TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR (Residual Heat Removal) Shutdown Cooling
ML21188A278
Person / Time
Site: Technical Specifications Task Force
Issue date: 07/11/2021
From: Natreon Jordan
NRC/NRR/DSS/STSB
To:
Technical Specifications Task Force
Honcharik M C-NRR-DSS
Shared Package
ML21188A283 List:
References
EPID L 2020-PMP-0012, TSTF-580, Rev 1
Download: ML21188A278 (3)


Text

July 11, 2021 Technical Specifications Task Force 11921 Rockville Pike, Suite 100 Rockville, MD 20852

SUBJECT:

FINAL SAFETY EVALUATIONS OF TECHNICAL SPECIFICATIONS TASK FORCE TRAVELER TSTF-580, REVISION 1, PROVIDE EXCEPTION FROM ENTERING MODE 4 WITH NO OPERABLE RHR SHUTDOWN COOLING (EPID L-2020-PMP-0012)

Dear Members of the Technical Specifications Task Force:

By letter dated January 26, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21025A232), the Technical Specifications Task Force (TSTF) submitted to the U.S. Nuclear Regulatory Commission (NRC) for review and approval Traveler TSTF-580, Revision 1, Provide Exception from Entering Mode 4 With No Operable RHR

[Residual Heat Removal] Shutdown Cooling. The traveler was submitted as part of the consolidated line item improvement process (CLIIP). Traveler TSTF-580, Revision 1, is approved as a CLIIP traveler.

By letter dated May 26, 2021 (ADAMS Package Accession No. ML21054A281), NRC draft safety evaluations (SEs) of Traveler TSTF-580, Revision 1, were provided for your review and comments. You provided comments on June 16, 2021 (ADAMS Accession No. ML21167A044).

The comments have been incorporated. The NRC staffs final traveler SE and model SE are enclosed.

If you have any questions, please contact Michelle Honcharik at 301-415-1774 or via e-mail at Michelle.Honcharik@nrc.gov.

Sincerely,

/RA/

Natreon J. Jordan, Acting Chief Technical Specifications Branch Division of Safety Systems Office of Nuclear Reactor Regulation Project No. 753

Enclosures:

1. Final Traveler SE
2. Final Model SE cc: See next page

Technical Specifications Task Force Project No. 753 cc:

Technical Specifications Task Force c/o EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Attention: Brian D. Mann E-mail: brian.mann@excelservices.com James P. Miksa Entergy Nuclear Operations, Inc.

Palisades Nuclear Power Plant 27780 Blue Star Memorial Highway Covert, MI 49043 E-mail: jmiksa@entergy.com Jordan L. Vaughan Duke Energy EC07C / P.O. Box 1006 Charlotte, NC 28202 E-mail: jordan.vaughan@duke-energy.com Ryan M. Joyce Southern Nuclear Operating Company 3535 Colonnade Parkway / Bin N-274-EC Birmingham, AL 35243 E-mail: rmjoyce@southernco.com David M. Gullott Exelon Generation 4300 Winfield Road Warrenville IL 60555 E-mail: David.Gullott@exeloncorp.com Wesley Sparkman Southern Nuclear Operating Company 3535 Colonnade Parkway / Bin N-226-EC Birmingham, AL 35242 E-mail: wasparkm@southernco.com

ML21188A283, Package ML21188A278, Cover letter ML21188A227, Final traveler SE ML21188A225, Final Model SE

  • concurred via e-mail NRR-106 OFFICE NRR/DORL/LPL3/LA*

DSS/SNSB/BC*

NRR/DORL/LPL3/BC*

NAME JBurkhardt SKrepel NSalgado DATE 3/2/2021 3/8/2021 4/8/2021 OFFICE OGC/NLO*

NRR/DSS/STSB/PM NRR/DSS/STSB/ABC NAME STurk and ANaber MHoncharik NJordan DATE 5/21/2021 07/ 9 /2021 07/11 /2021