Cover Letter Transmitting Draft SE of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements
ML20168A396
Person / Time
Site: Technical Specifications Task Force
Issue date: 10/30/2020
From: Victor Cusumano
NRC/NRR/DSS/STSB
To:
Technical Specifications Task Force
Honcharik, M., NRR/DSS, 301-415-1774
Shared Package
ML20304A138 List:
References
EPID L-2019-PMP-0181, TSTF-554, Rev 1
Download: ML20168A396 (3)


Text

October 30, 2020 Technical Specifications Task Force 11921 Rockville Pike, Suite 100 Rockville, MD 20852

SUBJECT:

DRAFT SAFETY EVALUATION OF TECHNICAL SPECIFICATIONS TASK FORCE TRAVELER TSTF-554, REVISION 1, REVISE REACTOR COOLANT LEAKAGE REQUIREMENTS (EPID L-2019-PMP-0181)

Dear Members of the Technical Specifications Task Force:

By letter dated January 16, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No ML20016A233), the Technical Specifications Task Force (TSTF) submitted to the U.S. Nuclear Regulatory Commission (NRC) for review and approval Traveler TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements. The NRC staffs draft safety evaluation (SE) of the traveler is enclosed.

Thirty calendar days are provided for you to comment on any factual errors or clarity concerns contained in the enclosed draft SEs. The final SEs will be issued by December 31, 2020, after making any necessary changes. To facilitate the NRC staff's review of your comments, please provide a marked-up copy of the draft SEs showing proposed changes and provide a summary table of the proposed changes.

If you have any questions, please contact Michelle Honcharik at 301-415-1774 or via e-mail at Michelle.Honcharik@nrc.gov.

Sincerely, Victor G. Cusumano, Chief Technical Specifications Branch Division of Safety Systems Office of Nuclear Reactor Regulation Project No. 753

Enclosure:

Draft Traveler SE cc: See next page Victor Cusumano Digitally signed by Victor Cusumano Date: 2020.10.30 16:27:25 -04'00'

Technical Specifications Task Force Project No. 753 cc:

Technical Specifications Task Force c/o EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Attention: Brian D. Mann E-mail: brian.mann@excelservices.com James P. Miksa Entergy Nuclear Operations, Inc.

Palisades Nuclear Power Plant 27780 Blue Star Memorial Highway Covert, MI 49043 E-mail: jmiksa@entergy.com Jordan L. Vaughan Duke Energy EC07C / P.O. Box 1006 Charlotte, NC 28202 E-mail: jordan.vaughan@duke-energy.com Ryan M. Joyce Southern Nuclear Operating Company 3535 Colonnade Parkway / Bin N-274-EC Birmingham, AL 35243 E-mail: rmjoyce@southernco.com David M. Gullott Exelon Generation 4300 Winfield Road Warrenville IL 60555 E-mail: David.Gullott@exeloncorp.com Wesley Sparkman Southern Nuclear Operating Company 3535 Colonnade Parkway / Bin N-226-EC Birmingham, AL 35242 E-mail: wasparkm@southernco.com

Package: ML20304A138, Cover letter: ML20168A396, Draft traveler SE: ML20154K606

  • concurred via e-mail NRR-106 OFFICE NRR/DORL/LSPB/LA*

NRR/DNLR/NPHP/BC*

NRR/DORL/LPL2-1/BC*

NAME JBurkhardt MMitchell MMarkley DATE 6/3/2020 4/6/2020 10/29/2020 OFFICE NRR/DRA/ARCB/BC*

NRR/DSS/SFNB/BC*

NRR/DSS/SCPB/BC*

NAME KHsueh RLukes BWittick DATE 6/10/2020 6/11/2020 4/3/2020 OFFICE OGC/NLO*

NRR/DSS/STSB/PM*

NRR/DSS/STSB/BC*

NAME NMertz MHoncharik VCusumano DATE 10/15/2020 10/30/2020 10/30/2020