ML23012A281
| ML23012A281 | |
| Person / Time | |
|---|---|
| Site: | Technical Specifications Task Force |
| Issue date: | 03/13/2023 |
| From: | Victor Cusumano NRC/NRR/DSS/STSB |
| To: | Technical Specifications Task Force |
| Shared Package | |
| ML23012A280 | List: |
| References | |
| EPID L-2022-PMP-0002 | |
| Download: ML23012A281 (1) | |
Text
Technical Specifications Task Force 11921 Rockville Pike, Suite 100 Rockville, MD 20852
SUBJECT:
DRAFT SAFETY EVALUATIONS OF TECHNICAL SPECIFICATIONS TASK FORCE TRAVELER TSTF-584, REVISION 0, ELIMINATE AUTOMATIC RWCU SYSTEM ISOLATION ON SLC INITIATION (EPID L-2022-PMP-0002)
Dear Members of the Technical Specifications Task Force:
By letter dated February 23, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22054A292), the Technical Specifications Task Force (TSTF) submitted to the U.S. Nuclear Regulatory Commission (NRC) for review and approval Traveler TSTF-584, Revision 0, Eliminate Automatic RWCU [Reactor Water Clean Up] System Isolation on SLC Initiation. The NRC staffs draft safety evaluation (SE) of the traveler and draft model SE are enclosed.
Thirty calendar days are provided for you to comment on any factual errors or clarity concerns contained in the enclosed draft SEs. The final SEs will be issued after making any necessary changes. To facilitate the NRC staff's review of your comments, please provide a marked-up copy of the draft SEs showing proposed changes and provide a summary table of the proposed changes.
If you have any questions, please contact Michelle Honcharik at 301-415-1774 or via email at Michelle.Honcharik@nrc.gov.
Sincerely, Victor G. Cusumano, Chief Technical Specifications Branch Division of Safety Systems Office of Nuclear Reactor Regulation Project No. 753
Enclosure:
- 1. Draft Traveler SE
- 2. Draft Model SE cc: See next page March 13, 2023 Signed by Cusumano, Victor on 03/13/23
Technical Specifications Task Force Project No. 753 cc:
Technical Specifications Task Force c/o EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Attention: Brian D. Mann email: brian.mann@excelservices.com Drew Richards STP Nuclear Operating Company 12090 FM 521 Mail Code: N5016 email: amrichards@stpegs.com Phil H. Lashley Energy Harbor 168 E. Market St.
Akron, OH 44308 email: phlashley@energyharbor.com Kevin Lueshen Constellation Energy Generation 4300 Winfield Road Warrenville IL 60555 email: kevin.lueshen@constellation.com Jordan L. Vaughan Duke Energy EC07C / P.O. Box 1006 Charlotte, NC 28202 email: jordan.vaughan@duke-energy.com Wesley Sparkman Southern Nuclear Operating Company 3535 Colonnade Parkway / Bin N-226-EC Birmingham, AL 35242 email: wasparkm@southernco.com
ML23012A280, Package ML23012A281, Cover letter ML23012A282, Draft traveler SE ML23012A284, Draft Model SE
- concurred via email NRR-106 OFFICE NRR/DORL/LPL1/LA DSS/SNSB/ABC*
NRR/DORL/LPL2/BC NAME KEntz DWoodyatt DWrona DATE 2/14/2023 9/27/2023 3/7/2023 OFFICE OGC/NLO*
NRR/DSS/STSB/PM NRR/DSS/STSB/BC NAME MHoncharik VCusumano DATE 3/13/2023 3/9/2023 3/13/2023