Cover Letter Transmitting Draft SEs of CLIIP TSTF-580, RHR Shutdown Cooling System - Hot Shutdown
ML21054A251
Person / Time
Site: Technical Specifications Task Force
Issue date: 05/26/2021
From: Victor Cusumano
NRC/NRR/DSS/STSB
To:
Technical Specifications Task Force
Honcharik, M., NRR/DSS, 301-415-1774
Shared Package
ML21054A281 List:
References
EPID L-2020-PMP-0012
Download: ML21054A251 (3)


Text

Technical Specifications Task Force 11921 Rockville Pike, Suite 100 Rockville, MD 20852

SUBJECT:

DRAFT SAFETY EVALUATIONS OF TECHNICAL SPECIFICATIONS TASK FORCE TRAVELER TSTF-580, REVISION 1, PROVIDE EXCEPTION FROM ENTERING MODE 4 WITH NO OPERABLE RHR SHUTDOWN COOLING (EPID L-2020-PMP-0012)

Dear Members of the Technical Specifications Task Force:

By letter dated January 26, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21025A232), the Technical Specifications Task Force (TSTF) submitted to the U.S. Nuclear Regulatory Commission (NRC) for review and approval Traveler TSTF-580, Revision 1, Provide Exception from Entering Mode 4 With No Operable RHR

[Residual Heat Removal] Shutdown Cooling. The NRC staffs draft safety evaluation (SE) of the traveler and draft model SE are enclosed.

Thirty calendar days are provided for you to comment on any factual errors or clarity concerns contained in the enclosed draft SEs. The final SEs will be issued after making any necessary changes. To facilitate the NRC staff's review of your comments, please provide a marked-up copy of the draft SEs showing proposed changes and provide a summary table of the proposed changes.

If you have any questions, please contact Michelle Honcharik at 301-415-1774 or via e-mail at Michelle.Honcharik@nrc.gov.

Sincerely, Victor G. Cusumano, Chief Technical Specifications Branch Division of Safety Systems Office of Nuclear Reactor Regulation Project No. 753

Enclosure:

1.

Draft Traveler SE 2.

Draft Model SE cc: See next page May 26, 2021 Signed by Cusumano, Victor on 05/26/21

Technical Specifications Task Force Project No. 753 cc:

Technical Specifications Task Force c/o EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Attention: Brian D. Mann E-mail: brian.mann@excelservices.com James P. Miksa Entergy Nuclear Operations, Inc.

Palisades Nuclear Power Plant 27780 Blue Star Memorial Highway Covert, MI 49043 E-mail: jmiksa@entergy.com Jordan L. Vaughan Duke Energy EC07C / P.O. Box 1006 Charlotte, NC 28202 E-mail: jordan.vaughan@duke-energy.com Ryan M. Joyce Southern Nuclear Operating Company 3535 Colonnade Parkway / Bin N-274-EC Birmingham, AL 35243 E-mail: rmjoyce@southernco.com David M. Gullott Exelon Generation 4300 Winfield Road Warrenville IL 60555 E-mail: David.Gullott@exeloncorp.com Wesley Sparkman Southern Nuclear Operating Company 3535 Colonnade Parkway / Bin N-226-EC Birmingham, AL 35242 E-mail: wasparkm@southernco.com

Package: ML21054A281, Cover letter: ML21054A251, Draft traveler SE: ML21053A388; Draft Model SE: ML21053A396

  • concurred via e-mail NRR-106 OFFICE NRR/DORL/LPL3/LA DSS/SNSB/BC NRR/DORL/LPL3/BC*

NAME JBurkhardt SKrepel NSalgado DATE 3/2/2021 3/8/2021 4/8/2021 OFFICE OGC/NLO*

NRR/DSS/STSB/PM NRR/DSS/STSB/BC NAME MHoncharik VCusumano DATE 5/21/2021 5/24/2021 5/26/2021