Letter Sequence Other |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
|
MONTHYEARML0630602512003-10-15015 October 2003 WB1-DWD-015A, Containment Debris Walkdown Package Watts Bar N. P. Unit 1. Project stage: Other ML0629105222003-11-0505 November 2003 WB1-DWD-024A, Containment Debris Walkdown Package Watts Bar N. P. Unit 1. Project stage: Other ML0629105132004-08-24024 August 2004 TVAW001-RPT-001, Rev. 0, Report on Watts Bar, Unit 1 Containment Building Walkdowns for Emergency Sump Strainer Issues. Project stage: Other ML0515205802005-06-0303 June 2005 Request for Additional Information Related to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-water Reactors Project stage: RAI ML0603800822006-02-10010 February 2006 RAI, Response to GL-2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-water Reactors Project stage: RAI ML0610402192006-04-11011 April 2006 Generic Letter 2004-02 - Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized Water Reactors - Response to Request for Additional Information Project stage: Response to RAI ML0610101802006-05-10010 May 2006 Request for Additional Info the Nuclear Regulatory Commission Staff Audit on the Containment Sump Modification Project stage: Acceptance Review ML0629105082006-07-0303 July 2006 Generic Letter 2004-02 - Request for Additional Information Regarding NRC Staff Audit on Containment Sump Modifications Project stage: Request ML0621204722006-07-0303 July 2006 Watts Bar Nuclear Plant (WBN) Unit 1 - Generic Letter 2004-02 - Request for Additional Information Regarding the Nuclear Regulatory Commission Staff Audit on the Containment Sump Modifications Project stage: Request ML0621800772006-08-11011 August 2006 Proprietary Letter, Request for Withholding Information from Public Disclosure, Containment Sump Modifications Project stage: Withholding Request Acceptance ML0721501092007-08-0101 August 2007 Generic Letter 2004-02 - Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized Water Reactors - Request for Extension of Completion Date for Corrective Actions Project stage: Request ML0727604492007-10-0202 October 2007 Watts Bar Nuclear Plant (WBN) Unit 1, Generic Letter 2004-02, Recirculation During Design-Basis Accidents at Pressurized Water Reactors - Request for Extension of Completion Date for Corrective Actions Project stage: Request ML0733801522007-12-0606 December 2007 Generic Letter 2004-02 Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Extension Request Evaluation Project stage: Other ML0810905032008-03-31031 March 2008 Enclosure 1, Supplemental Response Addressing GL-04-002 Actions, Calculation No. PCI-5464-S01, Rev. 2, Attachments a and B, Page 384 of 680 Project stage: Supplement ML0810905012008-03-31031 March 2008 Enclosure 1, Supplemental Response Addressing GL-04-002 Actions, Pages E1-1 Through Figure 4.24 - Case 3 Project stage: Supplement ML0810905002008-03-31031 March 2008 Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors - Notice of Completion Project stage: Supplement ML0811201592008-03-31031 March 2008 Enclosure 1, Supplemental Response Addressing GL-04-002 Actions, Calculation No. PCI-5343-S01, Rev. 0, Attachment D, Page 374 of 575 Through Calculation No. PCI-5343-S02, Rev 0, Attachment B, Page 100 of 631 Project stage: Supplement ML0810905022008-03-31031 March 2008 Enclosure 1, Supplemental Response Addressing GL-04-002 Actions, Figure 4.25 - Case 3 Through Calculation PCI-5464-S01, Page 107 Project stage: Supplement ML0810905052008-03-31031 March 2008 Enclosure 1, Supplemental Response Addressing GL-04-002 Actions, Calculation No. PCI-5464-S01, Rev. 2, Attachment B, Page 385 Through 680 Project stage: Supplement ML0810905082008-03-31031 March 2008 Enclosure 1, Supplemental Response Addressing GL-04-002 Actions, Calculation No. PCI-5464-S02, Rev. 0, Attachment B Page 101 Through End Project stage: Supplement ML0833700332008-12-0303 December 2008 Request for Additional Information Regarding Generic Letter 2004-02. Potential Impact of Debris Blockage During Design Basis Accidents at Pressurized-Water Reactors (Tac No. MC4730) Project stage: RAI ML0907208692009-02-25025 February 2009 Calculation, ALION-CAL-TVA-2739-03, Rev. 4, Watts Bar Reactor Building GSI-191 Debris Generation Calculation. Project stage: Other ML0907208682009-03-0303 March 2009 Response to Request for Additional Information Regarding Generic Letter 2004-02,.Potential Impact of Debris Blockage During Design Basis Accidents at Pressurized-Water Reactors. Project stage: Response to RAI ML0926502602009-09-29029 September 2009 RAI, Regarding Generic Letter 2004-02, Potential Impact of Debris Blockage During Design Basis Accidents at Pressurized-Water Reactors Project stage: RAI ML0936502182009-12-23023 December 2009 GL 2004-02 Final RAI Responses Due Date Project stage: RAI ML1000601162010-01-0707 January 2010 Change of Response Date Regarding Request for Additional Information for Generic Letter 2004-02 Potential Impact of Debris Blockage During Design-Basis Accidents at Pressurized Project stage: RAI ML1015905562010-06-0909 June 2010 Request for Withholding Proprietary Information from Public Disclosure Related to Generic Letter 2004-02 Project stage: Other ML1016600442010-06-17017 June 2010 Summary of Conference Call with TVA on Proposed Response to Request for Additional Information on Generic Letter 2004-02 Project stage: RAI ML1107000312011-04-15015 April 2011 Notice of Meeting with Tennessee Valley Authority to Discuss Responses to NRC Requests for Additional Information for Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accident at Pre Project stage: RAI ML11152A1702011-05-12012 May 2011 05/12/2011-Meeting Slides from Meeting with TVA on Their Proposed Response to a Request for Additional Information on Generic Letter 2004-02 Project stage: Response to RAI ML11152A1632011-06-28028 June 2011 Summary of Meeting with TVA on Their Proposed Response to a Request for Additional Information on Generic Letter 2004-02 Project stage: RAI ML11230B2502011-11-0303 November 2011 Request for Withholding Proprietary Information from Public Disclosure Related to Generic Letter 2004-02 Project stage: Other CNL-15-009, Resolution of Generic Safety Issue 1912015-04-17017 April 2015 Resolution of Generic Safety Issue 191 Project stage: Request ML15191A1832015-09-17017 September 2015 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Other CNL-15-252, License Amendment Request and Request for Deviation from 10 CFR 50, Appendix R in Support of Closure of Generic Safety Issue 191 (WBN-TS-16-01)2016-02-23023 February 2016 License Amendment Request and Request for Deviation from 10 CFR 50, Appendix R in Support of Closure of Generic Safety Issue 191 (WBN-TS-16-01) Project stage: Request 2008-03-31
[Table View] |
|
---|
Category:Letter
MONTHYEARML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML24008A2462024-01-18018 January 2024 Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability2024-01-0909 January 2024 Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)2024-01-0808 January 2024 Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) ML23346A1382024-01-0303 January 2024 Regulatory Audit Summary Related to Request to Increase the Number of Tritium Producing Burnable Absorber Rods CNL-23-069, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000390/20234412023-12-21021 December 2023 Plantfinal Significance Determination for a Security-Related Greater than Green Finding, Nov, and Assessment Follow-up, 05000390-2023441 and 05000391-2023441-Public CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) IR 05000390/20234042023-12-14014 December 2023 Security Baseline Inspection Report 05000390/2023404 and 05000391/2023404 CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)2023-12-13013 December 2023 Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) ML23293A0572023-12-0606 December 2023 Issuance of Amendment Nos. 163 and 70 Regarding Adoption of TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control IR 05000390/20230102023-11-30030 November 2023 RE-Issue Watts Bar Nuclear Plant - Biennial Problem Identification and Resolution Inspection Report 050000390/2023010 and 05000391/2023010 and Apparent Violation CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20230032023-11-13013 November 2023 Integrated Inspection Report 05000390/2023003 and 05000391/2023003 and Apparent Violation ML23312A1432023-11-0808 November 2023 Submittal of Dual Unit Updated Final Safety Analysis Report (UFSAR) Amendment 5 CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23251A2002023-09-11011 September 2023 Request for Withholding Information from Public Disclosure for Watts Bar Nuclear Plant, Units 1 and 2 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000390/20230052023-08-30030 August 2023 Updated Inspection Plan for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2023005 and 05000391/2023005 ML23233A0042023-08-28028 August 2023 Proposed Alternative to the Requirements of the ASME Boiler and Pressure Vessel Code for Upper Head Injection Dissimilar Metal Butt Welds IR 05000390/20230022023-08-16016 August 2023 Reissue - Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2023002 and 05000391/2023002 ML23220A1582023-08-0909 August 2023 Integrated Inspection Report 05000390/2023002 and 05000391/2023002 CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)2023-08-0707 August 2023 License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills IR 05000390/20230112023-07-24024 July 2023 Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000390 2023011 and 05000391 2023011 CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . ML23122A2322023-06-0707 June 2023 Issuance of Amendment Nos. 162 and 69 Regarding Change to Date in Footnotes for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System (Creatcs) CNL-23-044, Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out2023-06-0101 June 2023 Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out IR 05000390/20234032023-05-30030 May 2023 Cyber Security Inspection Report 05000390/2023403 and 05000391/2023403 ML23131A1812023-05-23023 May 2023 Correction to Amendment No. 161 to Facility Operating License No. NPF-90 CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20220032023-05-0909 May 2023 Reissue Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2022003 and 05000391/2022003 ML23125A2202023-05-0505 May 2023 Issuance of Amendment No. 161 Regarding a Change to Footnotes for Technical Specification Table 1.1-1 Modes (Emergency Circumstances) IR 05000390/20230012023-05-0404 May 2023 Integrated Inspection Report 05000390/2023001 and 05000391/2023001 CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)2023-05-0404 May 2023 Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23072A0652023-04-0505 April 2023 Units 1 and 2 Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12 ML23073A2762023-04-0303 April 2023 Individual Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing (EPID L-2023-LLA-0029) (Letter) CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report 2024-01-09
[Table view] Category:Safety Evaluation
MONTHYEARML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML23293A0572023-12-0606 December 2023 Issuance of Amendment Nos. 163 and 70 Regarding Adoption of TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML23233A0042023-08-28028 August 2023 Proposed Alternative to the Requirements of the ASME Boiler and Pressure Vessel Code for Upper Head Injection Dissimilar Metal Butt Welds ML23125A2202023-05-0505 May 2023 Issuance of Amendment No. 161 Regarding a Change to Footnotes for Technical Specification Table 1.1-1 Modes (Emergency Circumstances) ML23072A0652023-04-0505 April 2023 Units 1 and 2 Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12 ML23048A3042023-03-0808 March 2023 Tennessee Valley Authority - Request for Relief from Requirements of ASME Boiler and Pressure Vessel Code Regarding Weld Examination Coverage (EPID L-2022-LLR-0045,-0046,-0047) ML22348A0052023-01-25025 January 2023 Issuance of Amendment Nos. 326, 349, and 309; 363 and 35; 159 and 67 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements ML22349A6472023-01-20020 January 2023 Issuance of Amendment Nos. 325, 348, and 308; 362 and 356; and 158 and 66 Regarding Adoption of TSTF-529, Rev. 4, Clarify Use and Application Rules ML22271A9142022-12-0707 December 2022 Issuance of Amendment Nos. 324, 347, and 307; 360 and 354; 157 and 65 Regarding a Revision to the Emergency Action Level Scheme ML22293A4082022-11-14014 November 2022 Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML22257A0512022-11-0404 November 2022 Issuance of Amendment Nos. 156 and 64 Regarding Adoption of TSTF-205-A, Revision 3, and TSTF-563-A ML22276A1612022-10-24024 October 2022 Issuance of Amendment Nos. 359, 353, 155, & 63 Regarding Adoption of TSTF Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22272A5682022-10-12012 October 2022 Authorization of Alternatives to Certain Inservice Testing Requirements in the American Society of Mechanical Engineers Operating and Maintenance Code ML22187A0192022-09-20020 September 2022 Issuance of Amendment No. 154 Regarding Revision to Technical Specification 3.3.2 to Revise Allowable Value for Trip of Turbine-Driven Main Feedwater Pumps ML22187A1812022-09-20020 September 2022 Issuance of Amendment Nos. 153 and 62 Regarding Extension of Completion Time for Technical Specification 3.7.8 for Inoperable Essential Raw Cooling Water Train ML22014A2062022-05-0404 May 2022 Issuance of Amendment Nos. 152 and 61 Regarding Revision to Technical Specifications to Delete a Redundant Unit of Measure for Certain Radiation Monitors ML22084A0012022-04-0505 April 2022 Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Units 1 and 2, Review of Quality Assurance Plan Changes ML22070A0022022-03-28028 March 2022 Review of the Fall 2021 Mid Cycle Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Report ML21306A2872022-01-25025 January 2022 Issuance of Amendment No. 60 Regarding Revision of Technical Specification Requirements Specific to the Model D3 Steam Generators That Will No Longer Apply Following Steam Generator Replacement ML21334A2952022-01-18018 January 2022 Issuance of Amendment No. 151 Regarding Revision to TS 3.7.12 for One-Time Exception to Permit Continuous Opening of Auxiliary Building Secondary Containment Enclosure During Unit 2 Steam Generator Replacement ML21334A3892022-01-12012 January 2022 Issuance of Amendment No. 59 Regarding Revision to Steam Generator Tube Rupture Dose Analysis ML21271A1372021-12-16016 December 2021 Issuance of Amendment Nos. 150 and 58 Regarding Modification of Technical Specification Surveillance Requirement 3.6.15.4, Shield Building ML21260A2102021-11-22022 November 2021 Issuance of Amendment No. 57 to Revise Technical Specifications to Change the Steam Generator Secondary Side Water Level ML21189A3072021-11-0303 November 2021 Issuance of Amendment Nos. 149 and 56 Regarding Modification of Technical Specification 5.7.2.19, Containment Leakage Rate Testing Program ML21158A2842021-09-17017 September 2021 Issuance of Amendment Nos. 148 and 55 to Revise Technical Specifications for Function 6.E of Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation ML21153A0492021-07-26026 July 2021 Issuance of Amendment No. 147 Regarding Change to Steam Generator Tube Inspection Frequency and Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-510 ML21161A2392021-06-24024 June 2021 Issuance of Amendment No. 54 Regarding Use of Temperature Adjustment to Voltage Growth Rate for the Generic Letter 95-05 Steam Generator Tube Repair Criteria ML21148A1002021-06-17017 June 2021 Issuance of Amendment No. 53 Regarding Neutron Fluence Calculation Methodology ML21099A2462021-05-14014 May 2021 Issuance of Amendment Nos. 146 and 52 to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec ML21130A6012021-05-13013 May 2021 Correction of Proposed Alternative IST-RR-8 to the Requirements of the ASME OM Code for the Residual Heat Removal Pump 1B-B ML21078A4842021-05-0505 May 2021 Issuance of Amendment Nos. 145 and 51 for One-Time Change to Technical Specification 3.7.11 to Extend the Completion Time for Main Control Room Chiller Modifications ML21110A0372021-04-29029 April 2021 Proposed Alternative IST-RR-8 to the Requirements of the ASME OM Code for the Residual Heat Removal Pump 1B-B ML21064A4082021-03-10010 March 2021 Correction of Safety Evaluation for License Amendment Nos. 143 and 50 (EPID L-2020-LLA-0005) (Non-Proprietary) ML21015A0342021-03-0909 March 2021 Issuance of Amendment No. 144 Regarding Post Accident Monitoring Instrumentation ML21034A1692021-02-26026 February 2021 Issuance of Amendment Nos. 143 and 50 Regarding Implementation of Full Spectrumtm Loss-of-Coolant Accident Analysis (LOCA) and New LOCA-Specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology ML20232C6222021-02-11011 February 2021 Issuance of Amendment Nos. 142 and 49 Regarding Revision to Technical Specifications to Implement WCAP-17661-P-A, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications (EPID L-2020-LLA-0037 ML21027A1672021-02-0909 February 2021 Issuance of Amendment No. 48 Regarding Use of Alternate Probability of Detection Values for Beginning of Cycle in Support of Operational Assessment ML20350B4932021-01-25025 January 2021 Issuance of Amendment Nos. 352, 346, 141, and 47 Regarding the Adoption of Technical Specification Task Force Traveler, TSTF-569, Revision 2, Revise Response Time Testing Definition ML20268A0822021-01-12012 January 2021 Issuance of Amendment Nos. 314, 337, and 297; 351 and 345; 140 and 46 Regarding Changes to the Technical Specifications ML20245E4132020-12-0808 December 2020 Issuance of Amendment Nos. 139 and 45 Regarding Revisions to Technical Specification 3.6.15, Shield Building ML20282A3452020-11-19019 November 2020 Issuance of Amendment Nos. 313, 336, 296, 350, 344, 138, and 44 Revise Emergency Plan On-Shift Emergency Medical Technician & Onsite Ambulance Requirements ML20239A7912020-10-28028 October 2020 Issuance of Amendment Nos. 137 and 43 Regarding Revision to Technical Specifications to Adopt Technical Specification Task Force Traveler 541, Revision 2 ML20226A4442020-10-21021 October 2020 Issuance of Amendment No. 42 Regarding Measurement Uncertainty Recapture Power Uprate ML20167A1482020-08-19019 August 2020 Issuance of Amendment Nos. 136 and 41 Regarding the Automatic Transfer from a Unit Service Station Transformer to a Common Station Service Transformer ML20156A0182020-08-10010 August 2020 Issuance of Amendment No. 40 Regarding Technical Specifications for Steam Generator Tube Repair Sleeve ML20076A1942020-04-30030 April 2020 Issuance of Amendment Nos. 134 and 38 Regarding Adopting the Title 10 CFR Section 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Plants ML20057E2422020-03-30030 March 2020 Issuance of Amendment Nos. 133 and 37 Regarding Changes to Technical Specifications Pertaining to Diesel Generator Start Instrumentation (EPID-L-2020-LLA-0003) ML20028F7332020-02-28028 February 2020 Issuance of Amendment Nos. 132 and 36 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-425, Revision 3 ML20024F8352020-02-24024 February 2020 Issuance of Amendment No. 35 Regarding One-Time Extension of Completion Time for Technical Specification 3.7.8 for Inoperable Essential Raw Cooling Water Train ML19336C5192019-12-10010 December 2019 Issuance of Amendment Nos. 131 and 34 Regarding Correction to Unbalanced Voltage Relay Instrumentation Values 2024-01-29
[Table view] |
Text
December 6, 2007 Mr. William R. Campbell, Jr.
Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
WATTS BAR NUCLEAR PLANT, UNIT 1 - GENERIC LETTER 2004-02, POTENTIAL IMPACT OF DEBRIS BLOCKAGE ON EMERGENCY RECIRCULATION DURING DESIGN-BASIS ACCIDENTS AT PRESSURIZED WATER REACTORS, EXTENSION REQUEST EVALUATION (TAC NO. MC4730)
Dear Mr. Campbell:
By letter dated August 1, 2007, revised by letter dated October 2, 2007, Tennessee Valley Authority (TVA, the licensee) submitted a request for an extension of the completion date for Generic Letter (GL) 2004-02 corrective actions at the Watts Bar Nuclear Plant, Unit 1 (WBN-1).
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the licensees request and concludes that it is acceptable to extend the due date for completion of thermal insulation modifications until the completion of the WBN-1 spring 2008 refueling outage, scheduled to begin February 10, 2008. Should the licensee elect to begin the outage more than 30 days after February 10, 2008, TVA will need to provide the NRC additional justification for further delay in completing corrective actions for GL 2004-02.
Further details on the bases for the NRC staffs conclusions are contained in the enclosed evaluation. If you have any questions regarding this issue, please feel free to contact the WBN-1 Project Manager, Brendan Moroney, at (301) 415-3974.
Sincerely,
/RA/
Thomas H. Boyce, Chief Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-390
Enclosure:
Evaluation cc w/enclosure: See next page
ML073380152 NRR-106 OFFICE LPL2-2/PM LPL2-2/PM LPL2-2/LA SSIB/BC LPL2-2/BC NAME JBowen BMoroney RSola MScott by TBoyce memo dated DATE 12/05/07 12/05/07 12/05/07 11/21/07 12/06/07 William R. Campbell, Jr.
Tennessee Valley Authority WATTS BAR NUCLEAR PLANT cc:
Mr. Gordon P. Arent Ms. Beth A. Wetzel, Manager New Generation Licensing Manager Corporate Nuclear Licensing and Tennessee Valley Authority Industry Affairs 5A Lookout Place Tennessee Valley Authority 1101 Market Street 4X Blue Ridge Chattanooga, TN 37402-2801 1101 Market Street Chattanooga, TN 37402-2801 Mr. Ashok S. Bhatnagar Senior Vice President Mr. Masoud Bajestani, Vice President Nuclear Generation Development Watts Bar Unit 2 and Construction Watts Bar Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority 6A Lookout Place P.O. Box 2000, EQB 1B 1101 Market Street Spring City, TN 37381 Chattanooga, TN 37402-2801 Mr. Michael K. Brandon, Manager Mr. James R. Douet Licensing and Industry Affairs Vice President Watts Bar Nuclear Plant Nuclear Support Tennessee Valley Authority Tennessee Valley Authority P.O. Box 2000 3R Lookout Place Spring City, TN 37381 1101 Market Street Chattanooga, TN 37402-2801 Mr. Michael J. Lorek, Plant Manager Watts Bar Nuclear Plant Mr. H. Rick Rogers Tennessee Valley Authority Vice President P.O. Box 2000 Nuclear Engineering & Technical Services Spring City, TN 37381 Tennessee Valley Authority 3R Lookout Place Senior Resident Inspector 1101 Market Street Watts Bar Nuclear Plant Chattanooga, TN 37402-2801 U.S. Nuclear Regulatory Commission 1260 Nuclear Plant Road Mr. Michael D. Skaggs, Site Vice President Spring City, TN 37381 Watts Bar Nuclear Plant Tennessee Valley Authority County Executive P.O. Box 2000 375 Church Street Spring City, TN 37381 Suite 215 Dayton, TN 37321 General Counsel Tennessee Valley Authority County Mayor 6A West Tower P. O. Box 156 400 West Summit Hill Drive Decatur, TN 37322 Knoxville, TN 37902 Mr. Lawrence E. Nanney, Director Mr. John C. Fornicola, Manager Division of Radiological Health Nuclear Assurance Dept. of Environment & Conservation Tennessee Valley Authority Third Floor, L and C Annex 3R Lookout Place 401 Church Street 1101 Market Street Nashville, TN 37243-1532 Chattanooga, TN 37402-2801 Mr. Larry E. Nicholson, General Manager Performance Improvement Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801
EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION GSI-191/GL2004-02 EXTENSION REQUEST TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT, UNIT 1 DOCKET NO. 50-390 In a letter dated August 1, 2007, revised by letter dated October 2, 2007, Tennessee Valley Authority (TVA) requested an extension to the corrective action due date of December 31, 2007, stated in NRC Generic Letter 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized Water Reactors" (GL 2004-02), for the Watts Bar Nuclear Plant, Unit 1 (WBN-1). In the letter, TVA stated that it had partially completed the corrective actions associated with GL 2004-02 during the WBN-1 fall 2006 refueling outage. However, as a result of a revised debris generation analysis, the inventory of fiber Min-K insulation and 3M fire-wrap had increased with respect to the quantity represented in the WBN-1 strainer head loss testing program. Therefore, TVA has determined that Min-K insulation on certain components needs to be replaced with reflective metal insulation (RMI), and that some Min-K needs to be secured with additional bands to prevent damage. TVA plans to perform this work during the refueling outage scheduled to start February 10, 2008.
As stated in SECY-06-0078, proposed extensions to permit changes at the next outage of opportunity after December 2007 may be granted if, based on the licensees request, the staff determines that:
- 1. The licensee has a plant-specific technical/experimental plan with milestones and schedules to address outstanding technical issues with enough margin to account for uncertainties, and
- 2. The licensee identifies mitigative measures to be put in place prior to December 31, 2007, and adequately describes how these mitigative measures will minimize the risk of degraded emergency core cooling system (ECCS) and containment spray system (CSS) functions during the extension period.
SECY-06-0078 also states that for proposed extensions beyond several months, a licensees request will more likely be accepted if the proposed mitigative measures include temporary physical improvements to the ECCS sump or materials inside containment to better ensure a high level of ECCS sump performance.
In regard to the first criterion for approving an extension, WBN-1 has a plant-specific plan, with milestones and schedules, to complete the GL 2004-02 required corrective actions and modifications by February 2008. Specifically, during the refueling outage scheduled to start on February 10, 2008, TVA plans to replace some Min-K insulation with RMI insulation and add restraint bands to Min-K insulation that cannot be replaced.
Enclosure
In regard to the second criterion for approving an extension, TVA has stated that the following modifications, mitigating measures, compensatory measures, and/or favorable conditions are in effect at WBN-1, minimizing the risk of degraded ECCS and CSS functions during the extension period:
- 1. All planned modifications (except for the modifications to the Min-K insulation described herein) required to comply with the requirements of GL 2004-02 have been completed.
The major modifications are as follows:
- A new strainer with smaller opening size and larger flow area has been installed to accommodate the loss-of-coolant accident (LOCA) generated debris load. The new strainer has 0.085-inch diameter perforations and a flow area of approximately 4600 square feet (ft2) whereas the original screen had 1/4-inch rectangular mesh and 200 ft2 flow area. The small size selected for the perforations in the new strainer is to prevent large material with a potential to block [coolant flow paths through the] fuel, ECCS injection pathways, or the containment spray nozzles from bypassing the strainer.
- The size of each orifice in the high head injection flow paths has been reduced to allow for increased seat openings in the throttle valves. As a result, the potential for throttle valve clogging is reduced. The orifice sizes and valve openings are, at minimum, 50 percent larger than the openings in the sump strainer.
- The LOCA-generated coatings debris source term has been reduced as a result of the installation of uncoated replacement steam generators.
- 2. An emergency operating procedure has been prepared to manage ECCS sump performance during a LOCA. The procedure provides guidance to the operators for monitoring the containment sump and ECCS and CSS pumps for sump blockage and for the ability to deliver the necessary flow. To reduce the rate of debris transport to the sump strainer, the procedure provides guidance on reducing containment spray and ECCS flow to single-train operation. The reduction in flow and accumulated debris results in a reduced pressure drop across the sump strainer. The procedure also provides for refill of the refueling water storage tank to make additional water available for core cooling in the event of sump blockage.
- 3. A formal program for inspecting and cleaning areas inside containment has been implemented to control the quantity of latent debris. To ensure that no loose debris is left in containment, containment access and housekeeping procedures provide guidelines for entering/exiting containment and specify acceptance criteria for cleanliness.
- 4. Design features that help minimize the possibility of sump strainer and fuel channel blockage have been incorporated into WBN-1. Specifically:
- The containment sump is located in the containment floor below the refueling canal, shielded from high-energy pipe failures.
- The lower containment is an open, one-level area, with features that channel recirculation flow in a manner that minimizes the transport of debris to the ECCS sump strainer. The only drains which are used to route water to the sump from upper containment are the two large refueling cavity drains and the twenty ice condenser floor drains. These drains route water away from the sump strainers, thereby enhancing the settling of debris.
- The new ECCS sump strainers are located in the annular space between the reactor biological shield wall and the divider wall located beneath the refueling canal. There are only two water entry points in lower containment leading to the sump strainers, one on each side of the strainer. Therefore, if a break were to occur near one of the sump entry points, water would have to travel around in this annulus area to the opposite entry point, allowing the bulk of the debris to settle and not reach the strainer.
- The high containment pool water level in this ice condenser containment provides large margins in available net positive suction head (NPSH). This feature, coupled with the low head losses established during strainer testing, indicates that the ECCS pumps have a large safety margin.
- Sodium tetraborate is used as the buffering agent, sump water temperature is relatively low, and a relatively neutral sump pH is maintained throughout the accident period. These attributes limit the corrosion of light metals and, therefore, limit chemical effects. Testing performed to date supports the conclusion that chemical effects are not a significant issue at WBN-1.
- Surveillance Instruction 1-SI-304-2, 18 Month ECCS Containment Sump Inspection, is performed during each refueling outage to ensure that the containment sump suction pit is free of debris and that the sump components, including strainers, show no evidence of degradation.
- Surveillance Instruction 1-SI-72-3, Containment Refueling Canal Drains, is performed every 92 days to ensure that the refueling canal drains that direct the flow of containment spray water from the upper compartment to the lower compartment (accessible during plant operation) are not blocked.
- Surveillance Instruction 1-SI-61-9, 18 Months Ice Condenser Floor Drains Visual Inspection, is performed during each refueling outage to ensure that the twenty ice-condenser floor drains to lower containment and associated piping and valves are free of ice, frost, or debris and that each valve seat is free of corrosion, pitting or cracking.
- Procedure 1-TRI-40-901, Accumulator Rooms 3 and 4 Open Ended Crane Wall Drains ASME Section XI Unimpaired Flow Test, is performed every other outage to verify that the two floor drains located in accumulator Rooms 3 and 4 are clear and free-flowing. These two floor drains return water to the area inside the polar-crane wall.
Also, Surveillance Instruction 1-SI-304-2, 18 Month ECCS Containment Sump Inspection, in conjunction with the sump screen inspection, requires inspection of these drains for no blockage each refueling outage.
TVA performed a risk evaluation and concluded that the probability of a Large Break LOCA (LBLOCA) resulting in core damage during a two-month extension is less than 1E-06. The risk evaluation conservatively assumed that fibrous material, released from the existing Min-K insulation inside containment, resulted in a debris layer on the containment sump screen sufficient to cause the loss of NPSH to the ECCS pumps, and subsequent core damage.
Because an LBLOCA is assumed to result in core damage, the probability of core damage is assumed to be equal to the probability of an LBLOCA -- 2.67E-06 per year (calculated in the WBN-1 PRA model) times the fraction of a year the extension is in effect (planned for less than two months). Therefore, the probability of core damage during the extension period is less than 1E-06.
TVA stated that the assumption that the LBLOCA results in sump blockage and core damage is conservative because mitigative measures to deal with sump blockage were not credited. The staff also notes that the presence of additional insulation in the debris inventory does not necessarily mean that the WBN-1 strainer will not perform acceptably during an LBLOCA. Rather, the licensee has not tested the strainers performance with this inventory. The licensees decision to remove or remediate the unrepresented quantity of insulation, rather than retesting, is an acceptable (and conservative over the long term) method for addressing the discrepancy between the quantity of fiber represented in the strainer head-loss test and the quantity of debris estimated to be generated during a LOCA.
The NRC has confidence that TVAs plan, as described herein, will result in the installation of final GSI-191 modifications that provide acceptable strainer function with adequate margin for uncertainties. Further, the NRC has concluded that TVA has put mitigation measures in place to adequately reduce risk for the approximate 2-month extension period, Therefore, it is acceptable to extend the completion date for the corrective actions for certain issues discussed in GL 2004-02 (specifically, replacement of some Min-K insulation with RMI and the installation of additional restraint banding to some Min-K insulation) until the completion of the WBN-1 spring 2008 refueling outage, currently scheduled to begin February 10, 2008. Should TVA elect to begin the outage more than 30 days after February 10, 2008, TVA will need to provide the NRC additional justification for further delay in completing corrective actions for GL 2004-02.