Letter Sequence Supplement |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: ML052490347, ML052500298, ML052850352, ML061010180, ML062910513, ML062910522, ML063060251, ML073370317, ML073380152, ML090720869, ML101590556, ML11154A093, ML11230B250, ML14283A526, ML15191A183
|
MONTHYEARML0630602512003-10-15015 October 2003 WB1-DWD-015A, Containment Debris Walkdown Package Watts Bar N. P. Unit 1 Project stage: Other ML0629105222003-11-0505 November 2003 WB1-DWD-024A, Containment Debris Walkdown Package Watts Bar N. P. Unit 1 Project stage: Other ML0629105132004-08-24024 August 2004 TVAW001-RPT-001, Rev. 0, Report on Watts Bar, Unit 1 Containment Building Walkdowns for Emergency Sump Strainer Issues Project stage: Other ML0506804622005-03-0707 March 2005 Request Biocide/Corrosion Treatment Plan Approval, NPDES Permit No. TN0026450 Project stage: Request ML0515205802005-06-0303 June 2005 Request for Additional Information Related to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-water Reactors Project stage: RAI ML0520800652005-07-21021 July 2005 And Watts Bar Nuclear Plant - NRC Generic Letter 2004-02: Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors - RAI, Supplemental Information Project stage: Supplement ML0524903472005-09-0101 September 2005 NRC Generic Letter 2004-02; Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors - Second Response Project stage: Other ML0525002982005-09-0101 September 2005 NRC Generic Ltr (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (PWR) - Second Response Project stage: Other ML0528503522005-09-30030 September 2005 Outage Start Date Change Related to Nuclear Regulatory Commission (NRC) Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (PWR) Project stage: Other ML0603800822006-02-10010 February 2006 RAI, Response to GL-2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-water Reactors Project stage: RAI ML0603704802006-02-10010 February 2006 Request for Additional Information Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-basis Accidents at Pressurized-water Reactors Project stage: RAI ML0610203132006-04-11011 April 2006 Generic Letter 2004-02 - Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized Water Reactors - Response to Request for Additional Information Project stage: Response to RAI ML0610402192006-04-11011 April 2006 Generic Letter 2004-02 - Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized Water Reactors - Response to Request for Additional Information Project stage: Response to RAI ML0610101802006-05-10010 May 2006 Request for Additional Info the Nuclear Regulatory Commission Staff Audit on the Containment Sump Modification Project stage: Other ML0629105082006-07-0303 July 2006 Generic Letter 2004-02 - Request for Additional Information Regarding NRC Staff Audit on Containment Sump Modifications Project stage: Request ML0621204722006-07-0303 July 2006 Generic Letter 2004-02 - Request for Additional Information Regarding the Nuclear Regulatory Commission Staff Audit on the Containment Sump Modifications Project stage: Request ML0621800772006-08-11011 August 2006 Proprietary Letter, Request for Withholding Information from Public Disclosure, Containment Sump Modifications Project stage: Withholding Request Acceptance ML0636204112006-12-21021 December 2006 Nuclear Regulatory Commission (NRC) Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Supplemental Response Project stage: Supplement ML0721501092007-08-0101 August 2007 Generic Letter 2004-02 - Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized Water Reactors - Request for Extension of Completion Date for Corrective Actions Project stage: Request ML0727604492007-10-0202 October 2007 Generic Letter 2004-02, Recirculation During Design-Basis Accidents at Pressurized Water Reactors - Request for Extension of Completion Date for Corrective Actions Project stage: Request ML0733703172007-11-28028 November 2007 Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (PWR) - Notice of Completion Project stage: Other ML0733801522007-12-0606 December 2007 Generic Letter 2004-02 Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Extension Request Evaluation Project stage: Other ML0806402052008-02-29029 February 2008 Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accident at Pressurized-Water Reactors (PWR) - Notice of Completion Project stage: Supplement ML0811201592008-03-31031 March 2008 Enclosure 1, Supplemental Response Addressing GL-04-002 Actions, Calculation No. PCI-5343-S01, Rev. 0, Attachment D, Page 374 of 575 Through Calculation No. PCI-5343-S02, Rev 0, Attachment B, Page 100 of 631 Project stage: Supplement ML0810905002008-03-31031 March 2008 Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors - Notice of Completion Project stage: Supplement ML0810905032008-03-31031 March 2008 Enclosure 1, Supplemental Response Addressing GL-04-002 Actions, Calculation No. PCI-5464-S01, Rev. 2, Attachments a and B, Page 384 of 680 Project stage: Supplement ML0810905082008-03-31031 March 2008 Enclosure 1, Supplemental Response Addressing GL-04-002 Actions, Calculation No. PCI-5464-S02, Rev. 0, Attachment B Page 101 Through End Project stage: Supplement ML0810905052008-03-31031 March 2008 Enclosure 1, Supplemental Response Addressing GL-04-002 Actions, Calculation No. PCI-5464-S01, Rev. 2, Attachment B, Page 385 Through 680 Project stage: Supplement ML0810905012008-03-31031 March 2008 Enclosure 1, Supplemental Response Addressing GL-04-002 Actions, Pages E1-1 Through Figure 4.24 - Case 3 Project stage: Supplement ML0810905022008-03-31031 March 2008 Enclosure 1, Supplemental Response Addressing GL-04-002 Actions, Figure 4.25 - Case 3 Through Calculation PCI-5464-S01, Page 107 Project stage: Supplement ML0832308232008-11-25025 November 2008 Request for Additional Information Regarding Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors (Tac Nos. MC4717 and MC4718) Project stage: RAI ML0833700332008-12-0303 December 2008 Request for Additional Information Regarding Generic Letter 2004-02. Potential Impact of Debris Blockage During Design Basis Accidents at Pressurized-Water Reactors (Tac No. MC4730) Project stage: RAI ML0905408572009-02-23023 February 2009 Generic Letter 2004-02 - Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized Water Reactors - Response to Request for Additional Information Project stage: Response to RAI ML0907208692009-02-25025 February 2009 Calculation, ALION-CAL-TVA-2739-03, Rev. 4, Watts Bar Reactor Building GSI-191 Debris Generation Calculation Project stage: Other ML0907208682009-03-0303 March 2009 Response to Request for Additional Information Regarding Generic Letter 2004-02,.Potential Impact of Debris Blockage During Design Basis Accidents at Pressurized-Water Reactors Project stage: Response to RAI ML0926502602009-09-29029 September 2009 RAI, Regarding Generic Letter 2004-02, Potential Impact of Debris Blockage During Design Basis Accidents at Pressurized-Water Reactors Project stage: RAI ML0936502182009-12-23023 December 2009 GL 2004-02 Final RAI Responses Due Date Project stage: RAI ML1000601162010-01-0707 January 2010 Change of Response Date Regarding Request for Additional Information for Generic Letter 2004-02 Potential Impact of Debris Blockage During Design-Basis Accidents at Pressurized Project stage: RAI ML1015905562010-06-0909 June 2010 Request for Withholding Proprietary Information from Public Disclosure Related to Generic Letter 2004-02 Project stage: Other ML1016600442010-06-17017 June 2010 Summary of Conference Call with TVA on Proposed Response to Request for Additional Information on Generic Letter 2004-02 Project stage: RAI ML1104003842011-02-0707 February 2011 Enclosure 1, Hydrothermal Effects on the Ichthyoplankton from Watts Bar Nuclear Plant Supplemental Condenser Cooling Water Outfall in Upper Chickamauga Reservoir Project stage: Request ML1104003832011-02-0707 February 2011 Submittal of Hydrothermal Effects on Ichthyoplankton from Watts Bar Nuclear Plant Supplemental Condenser Cooling Water Outfall in Upper Chickamauge Reservoir, Report Project stage: Request ML11152A1702011-05-12012 May 2011 Meeting Slides from Meeting with TVA on Their Proposed Response to a Request for Additional Information on Generic Letter 2004-02 Project stage: Response to RAI ML11137A1222011-05-13013 May 2011 Annual Radiological Environmental Operating Report - 2010 Project stage: Request ML11143A0832011-05-19019 May 2011 Response to Request for Additional Information on Intake Pumping Station Water Velocity Project stage: Response to RAI ML11152A1602011-05-26026 May 2011 Response to Request for Information from Public Meeting on May 11, 2011 Project stage: Request ML1115303282011-06-0202 June 2011 Completion of Temporary Instruction (Ti) 184, Availability and Readiness Inspection of Severe Accident Mitigation Guidelines (Samgs) at Region II Facilities - Revision Project stage: Request ML11152A1632011-06-28028 June 2011 Summary of Meeting with TVA on Their Proposed Response to a Request for Additional Information on Generic Letter 2004-02 Project stage: RAI ML11154A0932011-06-28028 June 2011 Request for Withholding Proprietary Information from Public Disclosure Related to Generic Letter 2004-02 Project stage: Other ML11215A0992011-07-28028 July 2011 NPDES Permit No. TN0020168, TVA - Watts Bar Nuclear Plant, Spring City, Rhea County, Tennessee Project stage: Request 2008-11-25
[Table View] |
Text
Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 MAR 3 1 2008 10 CFR 50.54(f)
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Gentlemen:
In the Matter of
)
Docket No. 50-390 Tennessee Valley Authority (TVA)
WATTS BAR NUCLEAR PLANT (WBN) UNIT 1 - SUPPLEMENTAL RESPONSE TO NUCLEAR REGULATORY COMMISSION (NRC) GENERIC LETTER (GL) 2004-02, POTENTIAL IMPACT OF DEBRIS BLOCKAGE ON EMERGENCY RECIRCULATION DURING DESIGN BASIS ACCIDENTS AT PRESSURIZED-WATER REACTORS (PWR) -
NOTICE OF COMPLETION (TAC NO. MC4730)
References:
- 1) TVA letter to NRC dated August 8, 2003, 'Watts Bar Nuclear Plant (WBN)
Unit 1 - Response to Bulletin 2003 Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized Water Reactors"
- 2) TVA Letter to NRC dated September 1, 2005, 'Watts Bar Nuclear Plant (WBN)
Unit 1 - NRC Generic Letter (GL) 2004-02: Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors (PWR) - Second Response (TAC No. MC4730)"
- 3) TVA Letter to NRC dated April 11, 2006, 'Watts Bar Nuclear Plant (WBN)
Unit 1 - Generic Letter 2004-02 Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents.at Pressurized Water Reactors (PWR) - Response to Request for Additional Information (TAC No.
MC4730)"
- 4) TVA letter to NRC dated July 3, 2006, 'Watts Bar Nuclear Plant (WBN) Unit 1 -
Generic Letter 2004 Request for Additional Information Regarding the Nuclear Regulatory Commission Staff Audit on the Containment Sump Modifications (TAC No. MC4730)"
- 5) NRC Letter to TVA dated February 7, 2007, 'Watts Bar Nuclear Plant, Unit 1 -
Audit Report of New Strainer Design in Response to Generic Letter 2004-02 and Generic Safety Issue - 191" printed on recycled paper
U.S. Nuclear Regulatory Commission Page 2 MAR 3 1 2OOý ) TVA Letter to NRC dated August 1, 2007, 'Watts Bar Nuclear Plant (WBN)
Unit 1 - Generic Letter 2004 Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors - Request for Extension of Completion Date for Corrective Actions (TAC No. MC4730)"
- 7) TVA Letter to NRC dated October 2, 2007, 'Watts Bar Nuclear Plant (WBN)
Unit 1 - Generic Letter 2004 Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors - Request for Extension of Completion Date for Corrective Actions (TAC No. MC4730) Revised"
- 8) NRC letter to Nuclear Energy Institute (NEI) date November 21, 2007, "Revised Content Guide for Generic Letter 2004-02 Supplemental Responses"
- 9) NRC Letter to TVA dated December 6, 2007, 'Watts Bar Nuclear Plant, Unit 1
- Generic Letter 2004-02, 'Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized Water Reactors,'
Extension Request Evaluation (TAC No. MC4730)"
The purpose of this letter is to provide the remaining information to support NRC verification that the completed corrective actions to address GL 2004-02 for WBN are adequate. This response was prepared using the guidelines set forth in Reference 8. provides the necessary supplemental response addressing GL actions at WBN Unit 1, using the guidelines set forth in Reference 8. Enclosure 2 addresses the 11 remaining open audit items described in Reference 5.
In References 6 and 7, TVA notified the NRC that final corrective actions to reduce fiber insulation quantities would be completed during the Unit 1 Cycle 8 Outage. Reference 9 approved TVA's request to extend completion of the GL 2004-02 corrective actions until the Cycle 8 Outage. In discussion with the NRR Project Manager, the generic industry supplemental response due date of February 29 was extended for WBN to the end of March to allow for 'completion of the GL 2004-02 actions that were being implemented in the Spring 2008 Cycle 8 Outage. This extension eliminated the need for preparation and review of two separate submittals for status and completion. The Cycle 8 Outage actions have now been completed.
TVA previously completed the design and installation of the sump strainers during the Unit 1, Cycle 7 refueling outage as committed in Reference 1. TVA corrective actions for GL 2004-02 are now complete.
There are no new commitments made in this letter. If you have any questions concerning this matter, please contact me at (423) 365-1824.
U.S. Nuclear Regulatory Commission Page 3 N
daecl9are r penalty of perjury that the foregoing is true and correct. Executed on the 31st day of March'2008.
Sincerely, Michael K. Brandon Manager, Site Licensing and Industry Affairs MKB:baw Enclosures cc (Enclosures):
NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 ATTN: Patrick D. Milano, Project Manager U.S. Nuclear Regulatory Commission Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation MS 8 C2 Washington, DC 20555-0001 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303
U.S. Nuclear Regulatory Commission Page 4 MAR 3 12008 MKB:baw Enclosures cc (Enclosures):
G. Arent, EQB 1B-WBN W. R. Campbell, LP 6A-C T. J. Carter, EQB 2A-WBN D. F. Helms, EQB 2A-WBN M. J. Lorek, MOB 2R-WBN M. T. McFadden, ADM 1Q-WBN M. A. Purcell, BR 4X-C NSRB Support, BR 4X-C (including Advisors)
J. E. Semelsberger, EQB 2W-WBN M. D. Skaggs, ADM 1V-WBN E. J. Vigluicci, WT 6A-K D. J. Voeller, ADM 1B-WBN B. A. Wetzel, BR 4X-C K. W. Whittenburg, SP2B-C Sequoyah Licensing Files, OPS 4C-SQN EDMS, WT 3B-K M:\\SUBMIT\\GL 2004-02 Supp Response.doc