ML081090508
From kanterella
Jump to navigation
Jump to search
Letter Sequence Supplement | |
---|---|
TAC:MC4730, (Approved, Closed) | |
Initiation
Administration Questions
Answers Results Other: ML052490347, ML052500298, ML052850352, ML061010180, ML062910513, ML062910522, ML063060251, ML073370317, ML073380152, ML090720869, ML101590556, ML11154A093, ML11230B250, ML14283A526, ML15191A183 | |
MONTHYEARML0630602512003-10-15015 October 2003
[Table View]WB1-DWD-015A, Containment Debris Walkdown Package Watts Bar N. P. Unit 1 Project stage: Other ML0629105222003-11-0505 November 2003 WB1-DWD-024A, Containment Debris Walkdown Package Watts Bar N. P. Unit 1 Project stage: Other ML0629105132004-08-24024 August 2004 TVAW001-RPT-001, Rev. 0, Report on Watts Bar, Unit 1 Containment Building Walkdowns for Emergency Sump Strainer Issues Project stage: Other ML0506804622005-03-0707 March 2005 Request Biocide/Corrosion Treatment Plan Approval, NPDES Permit No. TN0026450 Project stage: Request ML0515205802005-06-0303 June 2005 Request for Additional Information Related to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-water Reactors Project stage: RAI ML0520800652005-07-21021 July 2005 And Watts Bar Nuclear Plant - NRC Generic Letter 2004-02: Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors - RAI, Supplemental Information Project stage: Supplement ML0525002982005-09-0101 September 2005 NRC Generic Ltr (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (PWR) - Second Response Project stage: Other ML0524903472005-09-0101 September 2005 NRC Generic Letter 2004-02; Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors - Second Response Project stage: Other ML0528503522005-09-30030 September 2005 Outage Start Date Change Related to Nuclear Regulatory Commission (NRC) Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (PWR) Project stage: Other ML0603800822006-02-10010 February 2006 RAI, Response to GL-2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-water Reactors Project stage: RAI ML0603704802006-02-10010 February 2006 Request for Additional Information Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-basis Accidents at Pressurized-water Reactors Project stage: RAI ML0610402192006-04-11011 April 2006 Generic Letter 2004-02 - Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized Water Reactors - Response to Request for Additional Information Project stage: Response to RAI ML0610203132006-04-11011 April 2006 Generic Letter 2004-02 - Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized Water Reactors - Response to Request for Additional Information Project stage: Response to RAI ML0610101802006-05-10010 May 2006 Request for Additional Info the Nuclear Regulatory Commission Staff Audit on the Containment Sump Modification Project stage: Other ML0621204722006-07-0303 July 2006 Generic Letter 2004-02 - Request for Additional Information Regarding the Nuclear Regulatory Commission Staff Audit on the Containment Sump Modifications Project stage: Request ML0629105082006-07-0303 July 2006 Generic Letter 2004-02 - Request for Additional Information Regarding NRC Staff Audit on Containment Sump Modifications Project stage: Request ML0621800772006-08-11011 August 2006 Proprietary Letter, Request for Withholding Information from Public Disclosure, Containment Sump Modifications Project stage: Withholding Request Acceptance ML0636204112006-12-21021 December 2006 Nuclear Regulatory Commission (NRC) Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Supplemental Response Project stage: Supplement ML0721501092007-08-0101 August 2007 Generic Letter 2004-02 - Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized Water Reactors - Request for Extension of Completion Date for Corrective Actions Project stage: Request ML0727604492007-10-0202 October 2007 Generic Letter 2004-02, Recirculation During Design-Basis Accidents at Pressurized Water Reactors - Request for Extension of Completion Date for Corrective Actions Project stage: Request ML0733703172007-11-28028 November 2007 Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (PWR) - Notice of Completion Project stage: Other ML0733801522007-12-0606 December 2007 Generic Letter 2004-02 Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Extension Request Evaluation Project stage: Other ML0806402052008-02-29029 February 2008 Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accident at Pressurized-Water Reactors (PWR) - Notice of Completion Project stage: Supplement ML0810905012008-03-31031 March 2008 Enclosure 1, Supplemental Response Addressing GL-04-002 Actions, Pages E1-1 Through Figure 4.24 - Case 3 Project stage: Supplement ML0810905002008-03-31031 March 2008 Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors - Notice of Completion Project stage: Supplement ML0810905082008-03-31031 March 2008 Enclosure 1, Supplemental Response Addressing GL-04-002 Actions, Calculation No. PCI-5464-S02, Rev. 0, Attachment B Page 101 Through End Project stage: Supplement ML0810905052008-03-31031 March 2008 Enclosure 1, Supplemental Response Addressing GL-04-002 Actions, Calculation No. PCI-5464-S01, Rev. 2, Attachment B, Page 385 Through 680 Project stage: Supplement ML0810905022008-03-31031 March 2008 Enclosure 1, Supplemental Response Addressing GL-04-002 Actions, Figure 4.25 - Case 3 Through Calculation PCI-5464-S01, Page 107 Project stage: Supplement ML0811201592008-03-31031 March 2008 Enclosure 1, Supplemental Response Addressing GL-04-002 Actions, Calculation No. PCI-5343-S01, Rev. 0, Attachment D, Page 374 of 575 Through Calculation No. PCI-5343-S02, Rev 0, Attachment B, Page 100 of 631 Project stage: Supplement ML0810905032008-03-31031 March 2008 Enclosure 1, Supplemental Response Addressing GL-04-002 Actions, Calculation No. PCI-5464-S01, Rev. 2, Attachments a and B, Page 384 of 680 Project stage: Supplement ML0832308232008-11-25025 November 2008 Request for Additional Information Regarding Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors (Tac Nos. MC4717 and MC4718) Project stage: RAI ML0833700332008-12-0303 December 2008 Request for Additional Information Regarding Generic Letter 2004-02. Potential Impact of Debris Blockage During Design Basis Accidents at Pressurized-Water Reactors (Tac No. MC4730) Project stage: RAI ML0905408572009-02-23023 February 2009 Generic Letter 2004-02 - Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized Water Reactors - Response to Request for Additional Information Project stage: Response to RAI ML0907208692009-02-25025 February 2009 Calculation, ALION-CAL-TVA-2739-03, Rev. 4, Watts Bar Reactor Building GSI-191 Debris Generation Calculation Project stage: Other ML0907208682009-03-0303 March 2009 Response to Request for Additional Information Regarding Generic Letter 2004-02,.Potential Impact of Debris Blockage During Design Basis Accidents at Pressurized-Water Reactors Project stage: Response to RAI ML0926502602009-09-29029 September 2009 RAI, Regarding Generic Letter 2004-02, Potential Impact of Debris Blockage During Design Basis Accidents at Pressurized-Water Reactors Project stage: RAI ML0936502182009-12-23023 December 2009 GL 2004-02 Final RAI Responses Due Date Project stage: RAI ML1000601162010-01-0707 January 2010 Change of Response Date Regarding Request for Additional Information for Generic Letter 2004-02 Potential Impact of Debris Blockage During Design-Basis Accidents at Pressurized Project stage: RAI ML1015905562010-06-0909 June 2010 Request for Withholding Proprietary Information from Public Disclosure Related to Generic Letter 2004-02 Project stage: Other ML1016600442010-06-17017 June 2010 Summary of Conference Call with TVA on Proposed Response to Request for Additional Information on Generic Letter 2004-02 Project stage: RAI ML11152A1702011-05-12012 May 2011 Meeting Slides from Meeting with TVA on Their Proposed Response to a Request for Additional Information on Generic Letter 2004-02 Project stage: Response to RAI ML1115303282011-06-0202 June 2011 Completion of Temporary Instruction (Ti) 184, Availability and Readiness Inspection of Severe Accident Mitigation Guidelines (Samgs) at Region II Facilities - Revision Project stage: Request ML11152A1632011-06-28028 June 2011 Summary of Meeting with TVA on Their Proposed Response to a Request for Additional Information on Generic Letter 2004-02 Project stage: RAI ML11154A0932011-06-28028 June 2011 Request for Withholding Proprietary Information from Public Disclosure Related to Generic Letter 2004-02 Project stage: Other ML11227A1342011-08-15015 August 2011 Nineteenth Update to Disclosures Pursuant to 10 CFR Section 2.336; Tennessee Valley Authority Project stage: Request ML11230B2502011-11-0303 November 2011 Request for Withholding Proprietary Information from Public Disclosure Related to Generic Letter 2004-02 Project stage: Other ML13276A0502013-09-30030 September 2013 Second Quarterly Status Report to the Flooding Hazard Reevaluation Report Extension Request and Response to the Request for Additional Information Related to the Review of Potential Breaches of Hesco Flood Barriers and Earthen Embankments a Project stage: Request CNL-14-109, Submittal Extension to the Fifth Quarterly Status Report to the Flooding Hazard Reevaluation Report Extension Request2014-06-27027 June 2014 Submittal Extension to the Fifth Quarterly Status Report to the Flooding Hazard Reevaluation Report Extension Request Project stage: Request CNL-14-114, Resolution of Generic Safety Issue (GSI)-1912014-06-27027 June 2014 Resolution of Generic Safety Issue (GSI)-191 Project stage: Request ML14283A5132014-11-17017 November 2014 NRC Staff Review Documentation Provided by TVA for the Sequoyah Nuclear Plant, Units 1 and 2 Concerning Resolution of GL2004-02 Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurizer-Wate Project stage: Approval 2008-11-25 |
ML081090508 | |
Person / Time | |
---|---|
Site: | Watts Bar ![]() |
Issue date: | 03/31/2008 |
From: | Brandon M Tennessee Valley Authority |
To: | Office of Nuclear Reactor Regulation |
References | |
GL-04-002, TAC MC4730 PCI-5464-S02, Rev 0, PCI-5464-S02, Rev 2 | |
Download: ML081090508 (589) | |
Similar Documents at Watts Bar | |
---|---|
Category:Calculation
MONTHYEARCNL-15-071, Two-Unit Offsite Dose Calculation Manual, Revision 02015-04-24024 April 2015
[Table view]Two-Unit Offsite Dose Calculation Manual, Revision 0 ML14177A1672014-06-25025 June 2014 Probabilistic Risk Assessment (PRA) Summary Report - Information Previously Committed to Provide (TAC ME3334). Part 4 of 4 ML14177A7262014-06-25025 June 2014 Probabilistic Risk Assessment (PRA) Summary Report - Information Previously Committed to Provide (TAC ME3334). Part 2 of 4 ML14177A7252014-06-25025 June 2014 Probabilistic Risk Assessment (PRA) Summary Report - Information Previously Committed to Provide (TAC ME3334). Part 1 of 4 ML14177A1662014-06-25025 June 2014 Probabilistic Risk Assessment (PRA) Summary Report - Information Previously Committed to Provide (TAC ME3334). Part 3 of 4 ML12311A1512012-10-31031 October 2012 Draft Two-Unit Offsite Dose Calculation Manual (ODCM) ML12073A2252012-02-28028 February 2012 Attachment 6, TVA Calculation WBPEVAR8807025, Revision 8, Bypassed and Inoperable Status Indication Logic Input Indications (Letter Item 4) ML12069A3312012-01-19019 January 2012 Attachment 11 - TVA Calculation WCGACQ0766, Required Response Spectra for Evaluation of Radiation Monitoring Equipment, Revision 1 (Letter Item 2, Sser Appendix Hh Item Number TVA21) ML12073A2262012-01-0606 January 2012 Attachment 9, Redacted TVA Calculation WCGACQ0766, Revision 1, Required Response Spectra for Evaluation of Radiation Monitoring Equipment. (Letter Item 6) ML12018A2142011-12-22022 December 2011 Attachment 3 - TVA Calculation EPM-MCP-071689, Cooling/Heating Load & Equipment/Component Performance Analysis for the Control Building Electrical Board Room Areas (El. 692.0 & 708.0), Revision 21. (Letter Item 4, Sser 23 Appendix Hh Item N ML11341A1372011-11-30030 November 2011 Attachments 23 Through 24, WNA-DS-01667-WBT-NP, Revision 5 and CAW-11-3301, Post Accident Monitoring System - System Design Specification ML11341A1582011-11-30030 November 2011 Attachments 11 Through 12, CN-EQT-10-44-NP, Revision 1 and CAW-11-3278, Dynamic Similarity Analysis for the Post Accident Monitoring System ML11341A1572011-11-30030 November 2011 Attachments 7 Through 9, WNA-CN-00157-WBT-NP, Revision 1, CAW-11-3316, and WBT-D-3566 Np, Incore Instrument System Signal Processing System Isolation Requirement ML11341A1352011-11-30030 November 2011 Attachments 17 Through 18, EQLR-171-NP, Revision 1 and CAW-11-3299, Environmental and Seismic Test Report Analog Input AI687 and AI688 Modules and Supporting Components for Use in Common Qualified Post Accident Monitoring System ML12171A3202011-09-19019 September 2011 Calculation WBNTSR-009, Control Room Operator and Offsite Doses from a Fuel Handling Accident, Revision 14 (Enclosure 2) ML11257A0492011-09-0101 September 2011 Attachment 3, Calculation, WNA-CN-00157-WBT-NP, Revision 0, Watts Bar 2 Incore Instrument System (Iis) Signal Processing System (SPS) Isolation Requirements ML12018A2152011-08-14014 August 2011 Attachment 4 - TVA Calculation EPM-LCP-072489, Cooling and Heating Load Analysis, Main Control Room HVAC, Revision 14 (Letter Item 4, Sser 23 Appendix Hh Item Number 108) ML11222A1142011-06-0808 June 2011 Enclosure 1, TVA Calculation WBNAPS3127, EQ Dose in the Control Building, Revision 0, Attachment 1 ML11154A1412011-04-14014 April 2011 Enclosure 3, Calculation RSOGENROGCDX00033320110002, Seismic Evaluation of Hesco Baskets ML1032001502010-11-0909 November 2010 Summary of Contingency Events and the Cases/Scenario Run ML1022403842010-08-0202 August 2010 Nuclear Power Group Calculation Titled Segmentation Analysis for Watts Bar Unit 2 DCS (Distributed Control System), Dated August 2, 2010, Revision 0, Enclosure 2 ML1016005022010-06-0303 June 2010 Chapter 12 - Question 8 - Calculation ML1016004902010-06-0303 June 2010 Chapter 12 - Question 6 - Calculations ML1013901022010-05-13013 May 2010 EEB-TI-28, Branch Technical Instruction, Setpoint Calculations ML13123A2072010-01-26026 January 2010 2012 Watts Bar Nuclear Plant, Unit 1, Effluent and Waste Disposal Annual Report; Offsite Dose Calculation Manual Revision 23 (No Revisions in 2012) ML11126A1812010-01-26026 January 2010 Offsite Dose Calculation Manual, Effluent and Waste Disposal Annual Report - 2010, Attachment 3 ML12124A2172010-01-26026 January 2010 Attachment 3, Offsite Dose Calculation Manual Revision 23 (No Revisions in 2011) ML11157A0422009-11-0202 November 2009 Enclosure 2, Calculation RSOFLHROGCDX00033320090003, PMF Temporary Modification Analysis ML0907208692009-02-25025 February 2009 Calculation, ALION-CAL-TVA-2739-03, Rev. 4, Watts Bar Reactor Building GSI-191 Debris Generation Calculation ML0810905022008-03-31031 March 2008 Enclosure 1, Supplemental Response Addressing GL-04-002 Actions, Figure 4.25 - Case 3 Through Calculation PCI-5464-S01, Page 107 ML0811201592008-03-31031 March 2008 Enclosure 1, Supplemental Response Addressing GL-04-002 Actions, Calculation No. PCI-5343-S01, Rev. 0, Attachment D, Page 374 of 575 Through Calculation No. PCI-5343-S02, Rev 0, Attachment B, Page 100 of 631 ML0810905082008-03-31031 March 2008 Enclosure 1, Supplemental Response Addressing GL-04-002 Actions, Calculation No. PCI-5464-S02, Rev. 0, Attachment B Page 101 Through End ML0810905052008-03-31031 March 2008 Enclosure 1, Supplemental Response Addressing GL-04-002 Actions, Calculation No. PCI-5464-S01, Rev. 2, Attachment B, Page 385 Through 680 ML0810905032008-03-31031 March 2008 Enclosure 1, Supplemental Response Addressing GL-04-002 Actions, Calculation No. PCI-5464-S01, Rev. 2, Attachments a and B, Page 384 of 680 ML0912603742008-01-15015 January 2008 Effluent and Waste Disposal Annual Report, Offsite Dose Calculation Manual ML0712300842006-08-18018 August 2006 2006 Effluent and Waste Disposal Annual Report, Attachment 3.0 Offsite Dose Calculation Manual, Rev 18 ML0612202592005-08-19019 August 2005 2005 Watts Bar Nuclear Plant Effluent and Waste Disposal Annual Report, Attachment 3 to Enclosure 1 Offsite Dose Calculation Manual ML0512506262004-10-19019 October 2004 Attachment 3.0, Watts Bar, Offsite Dose Calculation Manual, Revision 13 ML0413902182004-05-14014 May 2004 Annual Radiological Environmental Operating Report - 2003 ML0405006562001-12-20020 December 2001 Excerpts from Revision 9 of Calculation WBN-OSG4-091, Maximum Containment Water Level 2015-04-24 Category:Letter MONTHYEARML25052A0882025-02-27027 February 2025
[Table view]Regulatory Audit Plan in Support of License Amendment Request to Use Online Monitoring Methodology ML25051A1762025-02-26026 February 2025 Regulatory Audit Plan in Support of License Amendment Request to Adopt Risk-Informed Completion Times CNL-25-010, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Response to Request for Additional Information - TVA Request for Approval of Revision 43 to TVA Fleet Quality Assurance Program Description2025-02-26026 February 2025 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Response to Request for Additional Information - TVA Request for Approval of Revision 43 to TVA Fleet Quality Assurance Program Description ML25050A0422025-02-14014 February 2025 57484-EN 57484 - Final Report Notification Pursuant to 10 CFR 21.21 Regarding Limitorque SMB-00 Torque Switch Assemblies IR 05000390/20240042025-02-13013 February 2025 Integrated Inspection Report 05000390/2024004 and 05000391/2024004 and Apparent Violation CNL-25-026, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2025-02-12012 February 2025 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-25-028, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for (SQN-TS-23-02 & WBN-TS-23-08) (EPID L-2023-LLA-01752025-02-12012 February 2025 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for (SQN-TS-23-02 & WBN-TS-23-08) (EPID L-2023-LLA-0175 IR 05000390/20244032025-01-31031 January 2025 Watts Barr Nuclear Plant - Material Control and Accounting Program Inspection Report 05000390/2024403 and 05000391/2024403 (Public) CNL-25-009, And Watts Bar Nuclear Plant, Units 1 and 2 - Organization Topical Report, TVA-NPOD89-A, Revision 262025-01-29029 January 2025 And Watts Bar Nuclear Plant, Units 1 and 2 - Organization Topical Report, TVA-NPOD89-A, Revision 26 05000391/LER-2025-001, Loss of the Control Room Emergency Air Temperature Control System Due to Chiller Valve Malfunction2025-01-21021 January 2025 Loss of the Control Room Emergency Air Temperature Control System Due to Chiller Valve Malfunction IR 05000390/20254022025-01-17017 January 2025 Information Request for the Cybersecurity Baseline Inspection Notification to Perform Inspection 05000390/2025402 05000391/2025402 CNL-25-012, Supplement to License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources - Operating to Clarify Requirements for Diesel Generator .2025-01-16016 January 2025 Supplement to License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources - Operating to Clarify Requirements for Diesel Generator . IR 05000391/20240402025-01-16016 January 2025 95001 Supplemental Inspection Report 05000391/2024040 and Follow-Up Assessment Letter CNL-24-076, Response to Request for Additional Information Regarding Application to Modify the Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13)2025-01-16016 January 2025 Response to Request for Additional Information Regarding Application to Modify the Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13) ML25006A1172025-01-10010 January 2025 – Review of the Fall 2023 Steam Generator Tube Inspection Report (EPID-L-2024-LRO-0022) ML24354A1582025-01-0303 January 2025 Reissue Technical Specification Pages for Amendment No. 170 to Facility Operating License No. NPF-90 CNL-25-001, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-12-27027 December 2024 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24312A3222024-12-23023 December 2024 Issuance of Amendment Nos. 334, 357, & 317; 368 & 362; 172 & 77 Regarding Revision to TS 5.4 & 5.7.1 ML24312A0052024-12-23023 December 2024 Issuance of Amendment No. 171 Regarding Extension of Facility Operating License Expiration Date to Recapture Low-Power Operating License Testing Time ML24285A2072024-12-17017 December 2024 Amendment Nos. 170 and 76 Regarding the Revision of Technical Specifications 2.0, 3.0, 3.1, 3.2, 3.3, 3.4, and 5.9.5 by Adopting Various Technical Specifications Task Force Travelers CNL-24-009, Brown Ferry Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2 and Watts Bar Plant, Units 1 & 2 - Triennial Decommission Funding Plans for Independent Spent Fuel Storage Installations2024-12-17017 December 2024 Brown Ferry Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2 and Watts Bar Plant, Units 1 & 2 - Triennial Decommission Funding Plans for Independent Spent Fuel Storage Installations CNL-24-082, Central Emergency Control Center Emergency Plan Implementing Procedure Revision2024-12-17017 December 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML24352A0092024-12-16016 December 2024 Investigation Summary, Office of Investigations Case Number 2-2023-007 IR 05000390/20243012024-12-16016 December 2024 NRC Operator License Examination Report 05000390/2024301 and 05000391/2024301 ML24346A3982024-12-16016 December 2024 NRC Examination Results Summary Examination Report 05000390/2024301 and 05000391/2024301 CNL-24-072, Request for Alternative to Extend First Containment Inservice Inspection Interval2024-12-12012 December 2024 Request for Alternative to Extend First Containment Inservice Inspection Interval CNL-24-075, Response to Request for Additional Information for Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah and Watts Bar (SQN-TSTS-23-02 and W2024-11-27027 November 2024 Response to Request for Additional Information for Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah and Watts Bar (SQN-TSTS-23-02 and WBN ML24297A4632024-11-21021 November 2024 – Environmental Assessment and Finding of No Significant Impact Related to Recapture of Low-Power Testing Time CNL-24-080, Response to Request for Additional Information Regarding Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis (WBN-19-011)2024-11-20020 November 2024 Response to Request for Additional Information Regarding Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis (WBN-19-011) IR 05000390/20240032024-11-13013 November 2024 Integrated Inspection Report 05000390/2024003, 05000391/2024003 & 07201048/2024001 CNL-24-021, Application to Revise Technical Specification Limiting Condition of Operation 3.5.2, ECCS – Operating, Note 1 to Include Residual Heat Removal Pump Flow Paths (SQN-TS-23-04 and WBN-TS-23-020)2024-11-12012 November 2024 Application to Revise Technical Specification Limiting Condition of Operation 3.5.2, ECCS – Operating, Note 1 to Include Residual Heat Removal Pump Flow Paths (SQN-TS-23-04 and WBN-TS-23-020) IR 05000390/20250102024-11-0404 November 2024 Notification of an NRC (FPTI) (NRC Inspection Report 05000390/2025010 0500039/ 2025010) (RFI) CNL-24-014, License Amendment Request to Revise the Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 Technical Specifications to Use Online Monitoring Methodology (SQN-TS-24-02 and WBN-TS-23-22)2024-11-0404 November 2024 License Amendment Request to Revise the Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 Technical Specifications to Use Online Monitoring Methodology (SQN-TS-24-02 and WBN-TS-23-22) CNL-24-064, Response to Request for Additional Information Regarding the Watts Bar Nuclear Plant, Unit 2 Steam Generator Tube Inspection Report for U2R52024-11-0404 November 2024 Response to Request for Additional Information Regarding the Watts Bar Nuclear Plant, Unit 2 Steam Generator Tube Inspection Report for U2R5 CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24290A1202024-10-17017 October 2024 Operator Licensing Examination Approval 05000390/2024301 and 05000391/2024301 ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24261C0062024-10-0404 October 2024 Correction to Amendment No. 134 to Facility Operating License No. NPF-90 and Amendment No. 38 to Facility Operating License No. NPF-96 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000390/LER-2024-002, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-09-0505 September 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation IR 05000390/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390-2024005 and 05000391-2024005 ML24218A1442024-08-27027 August 2024 Issuance of Amendment Nos. 169 and 75 Regarding Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate IR 05000390/20244022024-08-20020 August 2024 – Security Baseline Inspection Report 05000390-2024402 and 05000391/2024402 - Public CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), ML24219A0262024-08-12012 August 2024 Request for Withholding Information from Public Disclosure 2025-02-27 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML081090508&oldid=5332227"