|
---|
Category:Letter
MONTHYEARML24032A1082024-02-0101 February 2024 GEH Notification of GE Company Stock Beneficial Ownership Filing ML23345A1222023-12-21021 December 2023 Request for Additional Information Regarding the Direct Transfer of Control of Vallecitos Nuclear Center Licenses and Conforming License Amendments ML23338A1312023-12-0404 December 2023 GE-Hitachi Nuclear Energy Americas, LLC, Additional Information to Geha and GNF-A Application for Order Consenting to Indirect Transfer of Control (Reference 1) ML23334A2222023-11-30030 November 2023 GE Hitachi Nuclear Energy - NRC Notice Before Actions Necessary to Accomplish the Indirect Transfers of Control Are Completed ML23283A3292023-11-30030 November 2023 NRC Issuance of Order Consenting to Indirect Transfer of Control of Ge/Geha/Gnfa Licenses ML23279A1322023-11-13013 November 2023 GE Hitachi Nuclear Energy - Vallecitos Nuclear Center, Getr Decommissioning Plan (License Number TR-1, Docket Number 50-70) ML23310A1132023-11-0909 November 2023 FRN-Notice of Consideration of Approval of Direct Transfer of Control of Vallecitos Nuclear Center Licenses Conforming License Amendments Opportunity for a Hearing Transmittal Letter ML23305A0522023-11-0101 November 2023 GE Hitachi Nuclear Energy Additional Supplemental Information - Revised Exhibit H ML23275A1742023-10-26026 October 2023 Acceptance Review of Application for Consent to Direct Transfer of Control of Vallecitos Nuclear Center Licenses and Conforming License Amendments ML23292A3362023-10-19019 October 2023 Northstar Vallecitos, LLC, Supplemental Information - Financial Qualifications ML23276B3952023-10-13013 October 2023 the U.S. Nuclear Regulatory Commission Staff Assessment of Ge/Geha/Gnfa Reponses to Acceptance Observations Application for the U.S. Nuclear Regulatory Commission Consent to Indirect Transfer of Licenses ML23269A1062023-09-26026 September 2023 GEH Description of Process for Decommissioning the Vallecitos Nuclear Center (Vnc) Shutdown Reactors - Getr Decommissioning Plan ML23261A5922023-09-15015 September 2023 GE-Hitachi Nuclear Energy Americas, LLC, License Termination Plan for the Vallecitos Boiling Water Reactor License DPR-1 ML23257A2492023-09-14014 September 2023 Cultural Resources Report ML23248A2322023-09-0505 September 2023 GE Hitachi Nuclear Energy - Supplemental Information - Proposed Conforming Amendments & License Conditions ML23244A2472023-09-0101 September 2023 GE-Hitachi Nuclear Energy Americas, LLC and Northstar Vallecitos, LLC, Application for Consent to Direct Transfers of Control of Licenses and Related Conforming License Amendments ML23229A5122023-08-17017 August 2023 GE-Hitachi Nuclear Energy Americas, LLC, Response to NRC Staff Observations Enclosed with NRC Acceptance Letter (Reference 2) Related to GE, Geha and GNF-A Application (Reference 1) ML23191A8592023-07-27027 July 2023 Acceptance Letter GE GNFA and Geha Application for NRC Consent to Indirect Transfer of Licenses ML23150A0962023-05-30030 May 2023 GE Hitachi Nuclear Energy, Nuclear Center (Vnc) Organization Change ML23152A1162023-05-30030 May 2023 Application for Order Consenting to Indirect Transfer of Control with Respect to Reactor Licenses, Materials Licenses, and Export Licenses, and Notification Regarding Other Approvals IR 05000018/20230012023-05-0505 May 2023 GE Hitachi Nuclear Energy - NRC Inspection Report 05000018/2023001, 05000070/2023001, and 05000183/2023001 ML23123A0752023-04-12012 April 2023 Response to NRC Request for Inspection Documents ML23104A4172023-03-31031 March 2023 GNF-AGEH Financial Assurance of Decommissioning Funds - Surety Bond Riders Cover Letter and Affidavit ML23090A1802023-03-31031 March 2023 GEH - Financial Assurance Status Reports ML23083B3402023-03-24024 March 2023 GEH Annual Shutdown Reactor Reports for the Year 2022 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23054A3332023-02-23023 February 2023 GEH Notification of GE Company Stock Beneficial Ownership Filing ML23018A2832023-01-19019 January 2023 GE-Hitachi Nuclear Energy Americas, LLC Response to NRC Inspection Report 050-00018/2022-002; 050-00070/2022-002; 050-00183/2022-002 and Notice of Violation ML22339A1742022-12-13013 December 2022 GE Hitachi Nuclear Energy NRC Inspection Report 05000018/2022002 05000070/2022002 and 05000183/2022002 IR 05000018/20220022022-12-13013 December 2022 GE Hitachi Nuclear Energy NRC Inspection Report 05000018/2022002 05000070/2022002 and 05000183/2022002 ML22335A5262022-12-0101 December 2022 (Vnc) Organization Change ML22326A3522022-11-22022 November 2022 Limited Post Shutdown Decommissioning Activities Report Update ML22300A2102022-10-27027 October 2022 GE-Hitachi Nuclear Energy Americas, LLC, Nuclear Center (Vnc) Submittal of Radiological Emergency Plan (REP) Revision 2 ML22265A0442022-09-26026 September 2022 GE Hitachi Vallecitos Nuclear Center, U.S. Nuclear Regulatory Commission'S Analysis of GE Hitachi'S Decommissioning Funding Status Reports for the Shutdown Power Reactors Vallecitos Boiling Water Reactor (License No. DPR-1, Docket No. 50-18 ML22264A3252022-09-21021 September 2022 Decommissioning Limited Post Shutdown Decommissioning Activities Report ML22249A3652022-09-0606 September 2022 GEH Notification of GE Company Stock Beneficial Ownership Filing ML22104A1852022-04-14014 April 2022 GE-Hitachi Nuclear Energy Americas, LLC, Vallecitos Nuclear Center (Vnc) Organization Change IR 05000018/20220012022-04-12012 April 2022 GE Hitachi Nuclear Energy - NRC Inspection Report 050 00018/2022-001, 050 00070/2022 001, and 050-00183/2022-001 ML22066A5692022-04-0808 April 2022 GEH Vallecitos Nuclear Center, NRCs Response to the GEH Description of Process for Decommissioning the Shutdown Reactors ML22089A0842022-03-30030 March 2022 GE Hitachi Nuclear Energy - Financial Assurance Status Reports ML22089A2232022-03-25025 March 2022 GEH Annual Shutdown Reactor Reports for the Year 2021 ML22084A5782022-03-23023 March 2022 GNF-A/GEH Financial Assurance of Decommissioning Funds - Surety Bond Riders Cover Letter and Affidavit ML22080A1322022-03-21021 March 2022 GE-Hitachi Nuclear Energy Americas, LLC, NRC Request for Inspection Documents 2024-02-01
[Table view] Category:Organization Chart
MONTHYEARML15334A4402015-11-30030 November 2015 (Vnc) Organization Change 2015-11-30
[Table view] |
Text
GE Infrastructure Energy, Nuclear David W. Turner Manager, Vallecitos Nuclear Center 6705 Vallecitos Rd Sunol, CA 94586 USA ATTN: Document Control Desk T925 862 4344 U.S. Nuclear Regulatory Commission F910 3412577 Washington, DC 20555-0001 davidw.turner@ge.com Wednesday, December 20th, 2006 Subj: R-33 (NTR) Organization Changes Ref: (1) License R-33, Docket 50-73 (2) NEDO-32765 Technical Specifications for Ref (1)
(3) NEDO-32740 GE Nuclear Test Reactor Safety Analysis Report Encl: (1) Current Implementation of Fig 6-1 of Ref (2)
(2) D.M.Thomas Education and Experience Summary In accordance with License R-33, Technical Specification requirement 6.6.2, "Special Reports" this letter is submitted as notification of a permanent facility organizational change for the Level 2 Manager for the GE Nuclear Test Reactor (NTR). On November 30th, 2006 Daniel M.Thomas replaced Edward Ehrilich as the Level 2 Facility Manager for License R-33, GE Nuclear Test Reactor.
These positions are detailed in section 6 of Reference (2). Enclosure (1)details the current implementation of Figure 6-1 in Ref 2. Enclosure (2)summarizes the qualifications and experience of Mr. Daniel Thomas. Mr. Thomas meets the qualification requirements for the NTR Manager as described in the GE NTR Safety Analysis Report (Ref. 3).
Ifyou have any questions in the above matters, please contact me at the address above, davidw.turner@ge.com, by phone at 925.862.4344 or Tanya Martin at latonya.martin@ge.com or 925.862.4360.
Sincerely yours, Digitally signed by David W. ,-.T Date: 2006.12.20 13:25:52
'-08'00 David W. Turner Manager, Vallecitos Nuclear Center cc: Marvin Mendonca, Project Manger GeneralElectricCompany DWT-2006-29OrganizationalChangesfor R-33doc o" p
Enclosure 1 Current Implementation of Fig 6-1 of NEDO-32765 Technical Specifications for R-33 Chuck Bassett Vallecitos Technological Safety Council Chairman to R-33 Organization Changes Page 1 of 1
Enclosure 2 D.M. Thomas Education and Experience Summary Daniel M. Thomas has over 31 years of nuclear experience in the areas of engineering and operations and is currently qualified as a Senior Reactor Operator (SRO) for the General Electric (GE) Nuclear Test Reactor (NTR). Mr. Thomas has eight years of Nuclear Navy experience beginning in 1976. He held various positions in the Navy, including Engineering Watch Supervisor. He began working for GE in 1984 as a BWR Specialist. From 1984 to 1989 he was a Reactor Service Supervisor leading teams performing refueling and services work at BWR commercial facilities. In 1989, Mr. Thomas was promoted to a Field Engineer where he was responsible for oversight of shift engineering work ranging from routine refueling activities to complex reactor internal modifications. In 1993, he became certified as a Level III Non-destructive Testing (NDT) Inspector for In Vessel Visual Inspection (IVVI) and continued his work as a field engineer. As a Level III inspector, he assumed programmatic responsibilities for site implementation of code required visual reactor internal inspections. In 2002, his responsibilities were expanded to include project management of IWI projects for commercial reactors in Japan and Switzerland. He accepted a position at Vallecitos in March 2003 as an Operations Specialist for NTR and subsequently qualified as a SRO in April 2004.
Mr. Thomas has attended advanced training courses in BWR Outage training, in-vessel visual inspections, neutron radiography, fuel sipping, fuel handling, PWR fundamentals and instructor certification.
Mr. Thomas is currently pursuing a Bachelors of Science in Technical Management (BSTM) with a Project Management concentration from DeVry University in Freemont, CA. He expects to complete his degree in March 2007.
Enclosure 2 to R-33 Organization Changes Page 1 of I