(Vnc) Organization Change
ML15334A440
Person / Time
Site: Vallecitos Nuclear Center, 07000754, Vallecitos
Issue date: 11/30/2015
From: Caine T
GE-Hitachi Nuclear Energy Americas
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
TAC 15-018
Download: ML15334A440 (2)


Text

GE Hitachi Nuclear Energy Thomas A. Caine Site Manager, Vallecitos Nuclear Center 6705 Vallecitos Rd Sunol, CA 94586 USA T 925 918 6018 TAC 15-018 Thomas.caine@ge.com November 30, 2015 US Nuclear Regulatory Commission Attn: Document Control Desk Director, Office of Nuclear Reactor Regulation Director, Office of Nuclear Material Safety and Safeguards Washington, DC 20555-0001

Subject:

Vallecitos Nuclear Center (VNC) Organization Change

References:

1 - License TR-1, Docket 50-70 (GETR) 2 - License DR-10, Docket 50-183 (EVESR) 3 - License DPR-1, Docket 50-18 (VBWR) 4 - License R-33, Docket 50-73 (NTR) 5 - SNM 960, Docket 70-754 Pursuant to the Technical Specifications requirements of References 1 and 4, this 30-day report is being provided regarding a personnel change for the Vice President Reactor Facility Safety and Security for GE-Hitachi Nuclear Energy Americas, LLC. Specifically, License TR-1 Docket 50-70 (GETR), Technical Specification (6.6.2.2.a) requires issuance of a 30 day report for permanent changes in the facility organization involving Level 1-2 personnel while License R-33 Docket 50-73 Technical Specification (6.6.2.b) requires a written report within 30 days to the NRC following permanent changes in the facility organization involving Level 2 or Level 3 management.

Effective November 12, 2015 Ms. Emily Martin was appointed Vice President Reactor Facility Safety and Security for GE-Hitachi Nuclear Energy Americas, LLC replacing Mr. Jon Ball. Ms.

Martin is a US Citizen.

References 2, 3, and 5 do not contain specific reporting requirements of this nature, but are listed here for completeness.

U.S. NRC November 30, 2015 Page 2 of2 If you have any questions in the above matters, please contact me at 925-918-6018.

Sincerely, Thomas A. Caine, Site Manager Vallecitos Nuclear Center Commitments: None cc: Jack Parrott- NRC, NMSS Project Manager Duane Hardesty- NRC, NRR Project Manager Osiris Siurano- NRC, NMSS Project Manager Ray Kellar- NRC RIV Rob Evans- NRC RIV

GE Hitachi Nuclear Energy Thomas A. Caine Site Manager, Vallecitos Nuclear Center 6705 Vallecitos Rd Sunol, CA 94586 USA T 925 918 6018 TAC 15-018 Thomas.caine@ge.com November 30, 2015 US Nuclear Regulatory Commission Attn: Document Control Desk Director, Office of Nuclear Reactor Regulation Director, Office of Nuclear Material Safety and Safeguards Washington, DC 20555-0001

Subject:

Vallecitos Nuclear Center (VNC) Organization Change

References:

1 - License TR-1, Docket 50-70 (GETR) 2 - License DR-10, Docket 50-183 (EVESR) 3 - License DPR-1, Docket 50-18 (VBWR) 4 - License R-33, Docket 50-73 (NTR) 5 - SNM 960, Docket 70-754 Pursuant to the Technical Specifications requirements of References 1 and 4, this 30-day report is being provided regarding a personnel change for the Vice President Reactor Facility Safety and Security for GE-Hitachi Nuclear Energy Americas, LLC. Specifically, License TR-1 Docket 50-70 (GETR), Technical Specification (6.6.2.2.a) requires issuance of a 30 day report for permanent changes in the facility organization involving Level 1-2 personnel while License R-33 Docket 50-73 Technical Specification (6.6.2.b) requires a written report within 30 days to the NRC following permanent changes in the facility organization involving Level 2 or Level 3 management.

Effective November 12, 2015 Ms. Emily Martin was appointed Vice President Reactor Facility Safety and Security for GE-Hitachi Nuclear Energy Americas, LLC replacing Mr. Jon Ball. Ms.

Martin is a US Citizen.

References 2, 3, and 5 do not contain specific reporting requirements of this nature, but are listed here for completeness.

U.S. NRC November 30, 2015 Page 2 of2 If you have any questions in the above matters, please contact me at 925-918-6018.

Sincerely, Thomas A. Caine, Site Manager Vallecitos Nuclear Center Commitments: None cc: Jack Parrott- NRC, NMSS Project Manager Duane Hardesty- NRC, NRR Project Manager Osiris Siurano- NRC, NMSS Project Manager Ray Kellar- NRC RIV Rob Evans- NRC RIV