GE Hitachi Nuclear Energy Thomas A. Caine Site Manager, Vallecitos Nuclear Center 6705 Vallecitos Rd Sunol, CA 94586 USA T 925 918 6018 Thomas.caine@ge.com TAC 15-018 November 30, 2015 US Nuclear Regulatory Commission Attn: Document Control Desk Director, Office of Nuclear Reactor Regulation Director, Office of Nuclear Material Safety and Safeguards Washington, DC 20555-0001
Subject:
Vallecitos Nuclear Center (VNC) Organization Change
References:
1 - License TR-1, Docket 50-70 (GETR) 2 - License DR-10, Docket 50-183 (EVESR) 3 - License DPR-1, Docket 50-18 (VBWR) 4 - License R-33, Docket 50-73 (NTR) 5 - SNM 960, Docket 70-754 Pursuant to the Technical Specifications requirements of References 1 and 4, this 30-day report is being provided regarding a personnel change for the Vice President Reactor Facility Safety and Security for GE-Hitachi Nuclear Energy Americas, LLC. Specifically, License TR-1 Docket 50-70 (GETR), Technical Specification (6.6.2.2.a) requires issuance of a 30 day report for permanent changes in the facility organization involving Level 1-2 personnel while License R-33 Docket 50-73 Technical Specification (6.6.2.b) requires a written report within 30 days to the NRC following permanent changes in the facility organization involving Level 2 or Level 3 management.
Effective November 12, 2015 Ms. Emily Martin was appointed Vice President Reactor Facility Safety and Security for GE-Hitachi Nuclear Energy Americas, LLC replacing Mr. Jon Ball. Ms.
Martin is a US Citizen.
References 2, 3, and 5 do not contain specific reporting requirements of this nature, but are listed here for completeness.
U.S. NRC November 30, 2015 Page 2 of2 If you have any questions in the above matters, please contact me at 925-918-6018.
Sincerely, Thomas A. Caine, Site Manager Vallecitos Nuclear Center Commitments: None cc:
Jack Parrott-NRC, NMSS Project Manager Duane Hardesty-NRC, NRR Project Manager Osiris Siurano-NRC, NMSS Project Manager Ray Kellar-NRC RIV Rob Evans-NRC RIV
GE Hitachi Nuclear Energy Thomas A. Caine Site Manager, Vallecitos Nuclear Center 6705 Vallecitos Rd Sunol, CA 94586 USA T 925 918 6018 Thomas.caine@ge.com TAC 15-018 November 30, 2015 US Nuclear Regulatory Commission Attn: Document Control Desk Director, Office of Nuclear Reactor Regulation Director, Office of Nuclear Material Safety and Safeguards Washington, DC 20555-0001
Subject:
Vallecitos Nuclear Center (VNC) Organization Change
References:
1 - License TR-1, Docket 50-70 (GETR) 2 - License DR-10, Docket 50-183 (EVESR) 3 - License DPR-1, Docket 50-18 (VBWR) 4 - License R-33, Docket 50-73 (NTR) 5 - SNM 960, Docket 70-754 Pursuant to the Technical Specifications requirements of References 1 and 4, this 30-day report is being provided regarding a personnel change for the Vice President Reactor Facility Safety and Security for GE-Hitachi Nuclear Energy Americas, LLC. Specifically, License TR-1 Docket 50-70 (GETR), Technical Specification (6.6.2.2.a) requires issuance of a 30 day report for permanent changes in the facility organization involving Level 1-2 personnel while License R-33 Docket 50-73 Technical Specification (6.6.2.b) requires a written report within 30 days to the NRC following permanent changes in the facility organization involving Level 2 or Level 3 management.
Effective November 12, 2015 Ms. Emily Martin was appointed Vice President Reactor Facility Safety and Security for GE-Hitachi Nuclear Energy Americas, LLC replacing Mr. Jon Ball. Ms.
Martin is a US Citizen.
References 2, 3, and 5 do not contain specific reporting requirements of this nature, but are listed here for completeness.
U.S. NRC November 30, 2015 Page 2 of2 If you have any questions in the above matters, please contact me at 925-918-6018.
Sincerely, Thomas A. Caine, Site Manager Vallecitos Nuclear Center Commitments: None cc: