|
---|
Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARML23241A0022023-08-25025 August 2023 Paragon Final Part 21 Report on Defect with Eaton/Cutler Hammer Size 4 and 5 Freedom Series Contactors Modified by Paragon with Special Coils And/Or with RTV to Improve the Securing of Shading Coils ML23221A3702023-08-0303 August 2023 Paragon Energy Solutions, 10CFR Part 21 Initial Notification: P21-08032023-IN, Rev. 0 ML19347A4262019-12-10010 December 2019 General Atomics - Reportable Occurrence Under 10CFR21: Reported Failure in Analog High Range Radiation Monitor (RP-2C) ML19317D0932019-10-25025 October 2019 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing ML19087A2522019-03-21021 March 2019 Engine Systems, Inc. - 10 CFR 21 Reportable Notification on Excitation Transformers for Vickers Voltage Regulator System ML19091A0502019-03-21021 March 2019 Engine Systems, Inc. 10 CFR 21 Reporting of Defects and Non-Compliance Report No. 10CFR21-0124, Rev. 0, Excitation Transformers for Vickers Voltage Regulator System ML19042A0802019-01-25025 January 2019 Part 21 Report No. 10CFR21-0124-INT; Rev. 0 - Saturable Reactor (Magnetic Amplifier) for Vickers Voltage Regulator System, P/N 8408218-ESI ML19002A2042018-12-21021 December 2018 to Engine Systems, Inc., Part 21 Report Re Emd Fuel and Soakback Pumps - Potentially Undertorqued Cover Bolts ML18353A4282018-11-30030 November 2018 Engine Systems, Inc., 10CFR21-0123, Rev. 0, for a 10CFR21 Reportable Condition on Emd Fuel and Soakback Pumps ML17114A0702017-04-13013 April 2017 Part 21 Notification - Identified Fisher 546S Electro-Pneumatic Transducers Standard Mounting Brackets Failed Seismic Testing Standards ML17104A2882017-04-13013 April 2017 Emerson Process Management, LLC - Fisher Information Notice, (FIN) 2017-02 ML16278A4712016-09-22022 September 2016 Notification of 10 CFR Part 21 Condition, Masterpact Breaker Fail to Close ML16281A2702016-09-22022 September 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16209A0502016-07-13013 July 2016 Part 21 - Furmanite Nuclear Grade Leak Seal Material FSC-N-1B ML16196A0642016-07-10010 July 2016 Part 21 Report - Materials Not Properly Dedicated ML16188A3762016-06-21021 June 2016 Part 21 Interim Evaluation of Deviation - Contractor Failure ML16154A2052016-05-20020 May 2016 Part 21 Interim Evaluation of a Deviation - Contactor Failure ML16139A8322016-05-13013 May 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16139A8332016-05-13013 May 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16061A0112016-02-27027 February 2016 Nuclear Logistics, Inc. - Part 21 Contactor Making Noise, Per Turkey Point ML16061A0102016-02-19019 February 2016 Nuclear Logistics, Inc. - Part 21 - Contractor Making Noise ML15345A3902015-12-0808 December 2015 Part 21 Report - 2 Motors Were Not Properly Prepared Before Small Steel Shot Blasting ML15089A4372015-03-20020 March 2015 Part 21 - Dual Alarm Modules That May Contain Faulty Diodes in Single State Relays ML14217A3472014-07-31031 July 2014 Part 21 Interim Report - Temperature Switch Set Points Out of Calibration ML14101A3422014-04-10010 April 2014 Notification of Part 21 - Potential Defect in General Electric SB1 Switches and Hea Relays ML14069A4672014-02-26026 February 2014 Part 21 Report Involving a Potential Manufacturing Defect in Replacement Masterpact Cradles ML14071A4772014-02-26026 February 2014 Report of Potential Defect Per 1OCFR Part 21 Primary Disconnect Assembly ML14042A2022014-02-0505 February 2014 Part 21 Report Regarding Unqualified Material Used in Electrical Penetration Assemblies ML13277A0102013-09-23023 September 2013 Interim Report Update for Component ASME Material Supplied by Mirion Technologies (Conax Nuclear), Inc. (Mtcn), as Part of Containment Electric Penetration Assemblies (EPA) ML13246A0842013-08-23023 August 2013 Notification of Potential Defect & Interim Report Regarding a Potential Defect of Materials Supplied to Operating Us Nuclear Power Plants by Mirion Technologies (Conax Nuclear) Inc. (Mtcn) with Containment Electric Penetration Assemblies ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13095A0112013-03-25025 March 2013 Update to Event Number 48798: 10 CFR Part 21 Notification, Dual Alarm Modules and Single Alarm Modules ML13063A4432013-03-0101 March 2013 10 CFR Part 21 Report Notification, Dual Alarm Modules and Single Alarm Modules ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12318A0402012-11-0808 November 2012 Part 21 - Report of Potential Grounding Pathway Between Heat Sink and Chassis of Control Modules ML12094A3712012-04-0202 April 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12058A1412012-02-23023 February 2012 Part 21 Report - Rosemount Nuclear Instruments, Inc., Pressure Transmitter with Nonzero Based Calibrations ML0925902422009-09-11011 September 2009 Notification of Potential Part 21 Problem with Seismic Soil Structure Analysis Software ML0907611882009-03-11011 March 2009 Part 21 Notification - Defective Hk and K-Line Circuit Breaker Tension Springs ML0904007482009-02-0505 February 2009 Update to Part 21 Report Notification, Texas Instruments Operational Amplifier, P/N: OPA 2111 ML0833301872008-11-21021 November 2008 Notification of Potential Part 21 Re Tyco Electronics, Transfer of Information - CII-012 ML0831900172008-11-12012 November 2008 Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28 ML0823901062008-08-25025 August 2008 Notification of Potential Part 21 on Failure of F and G Switches ML0818305232008-06-27027 June 2008 Part 21 Notification - Performance Affected on 3 CL150 Fisher V150 Valve Assemblies ML0809906342008-04-0404 April 2008 Part 21 Notification Regarding Failure to Comply with the Requirements for Dedication of Commercial Grade Items ML0734402112007-12-0707 December 2007 Deficiency Report Part 21 Potential Insufficient Thread Engagement for Certain Pressure Transmitters ML0713703092007-03-0707 March 2007 Velan, Inc., Piston Check Cv Information ML0627702242006-09-27027 September 2006 Part 21 Report from Tyco Valves & Controls LP, Improper Valve Springs in Pressure Relief Valves ML0608301142006-03-21021 March 2006 10 CFR Part 21 Notification Ref: FP&L Tpn Supplied Ingersall Rand Auxiliary Feed Pump No. 0601 001 FP&L Po No. 67845 2023-08-03
[Table view] Category:Letter
MONTHYEARL-2024-184, Radiological Emergency Plan Revision 772024-11-0505 November 2024 Radiological Emergency Plan Revision 77 L-2024-173, Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-31031 October 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-175, Cycle 34 Core Operating Report2024-10-24024 October 2024 Cycle 34 Core Operating Report ML24291A2882024-10-24024 October 2024 Westinghouse Topical Report - Request for Withholding Information from Public Disclosure L-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24276A2302024-10-16016 October 2024 Westinghouse Topical Report – Request for Withholding Information from Public Disclosure L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes ML24289A2372024-10-15015 October 2024 Transmittal of Revision 1 Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles IR 05000250/20243012024-10-0303 October 2024 NRC Operator License Examination Report 05000250/2024301 and 05000251/2024301 L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24269A1292024-09-24024 September 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24260A2262024-09-18018 September 2024 NRC Examination Results Summary - Examination Reports: 05000250/2024301 and 05000251/2024301 ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24158A0052024-09-17017 September 2024 Completion of Subsequent License Renewal Site Specific Environmental Review and Modification to Subsequent Renewed Facility Operating Licenses L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24207A0342024-09-13013 September 2024 – Exemption from Certain Requirements of 10 CFR 50.46 for Use of Axiom Fuel Rod Cladding – Letter ML24256A1132024-09-13013 September 2024 Regulatory Audit Summary Related to the Review of Regarding the Updated Spent Fuel Pool Criticality Safety Analysis License Amendment Request IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 ML24234A0062024-08-22022 August 2024 Project Manager Assignment L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan 05000250/LER-2024-002-01, Condition Prohibited by Technical Specifications2024-07-10010 July 2024 Condition Prohibited by Technical Specifications L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal ML24173A1902024-06-28028 June 2024 Withdrawal of an Amendment Request ML24159A2652024-06-26026 June 2024 Correction of Safety Evaluation for Issuance of Amendment Nos. 298 & 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter IR 05000250/20244012024-06-0505 June 2024 – Security Baseline Inspection Report 05000250-2024401, 05000251-2024401 and 07200062-2024401 L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000250/20240012024-05-10010 May 2024 Integrated Inspection Report 05000250/2024001 and 05000251/2024001 ML24135A0942024-05-0909 May 2024 Periodic Update to the Updated Final Safety Analysis Report ML24127A1862024-05-0909 May 2024 Request for Withholding Information from Public Disclosure L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-069, Radiological Emergency Plan Revision 762024-04-22022 April 2024 Radiological Emergency Plan Revision 76 L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-022024-04-17017 April 2024 Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 2024-09-25
[Table view] |
Text
SULZER Sulzer Pumps Sulzer Pumps (US) Inc.
Karl Strand Quality & Environmental Manager 2800 NW Front Ave.
Portland, Oregon Phone 503.721.5792 Fax 503.226.5283 karl.strand@sulzer.com U.S. Nuclear Regulatory Commission Date 21 March 2006 Document Control Desk Washington, D.C. 20555 ATT14: Brendan Moroney
Subject:
10 CFR Part 21 Notification Ref: FP&L TPN supplied Ingersall Rand Auxiliary Feed Pump #0601 001 FP&L PO# 67845
Dear Sir or Madam,
Per the requirements of I OCFR Part 21, this letter has been written to inform you of a reportable condition in regards to a pump repaired for Florida Power & Light in use at the Turkey Point Nuclear Facility.
While repairing a pump at the Sulzer Pumps (US) Inc. Shreveport Service Center, the drive end bearing assembly was installed incorrectly which resulted in an internal oil passage blockage and the possibility of premature bearing failure.
An inlernal investigation committee was convened 20 March, 2006 per the requirements of I OCFR Part 21 and the evaluation and results of the investigation as well as corrective action are attached.
This notification isalso being sent to Florida Power & Light.
Sincerely, Karl Strand Quality & Environmental Manager Sulzer Pumps (US) Inc.
i .9
SULZER PUTPS (US) iNC. FORKA14-001-2 10 CFR, PART 21 LNTERNAL EVALUATION FORM PURPOSE:
The purpose ofthiis form is to support the requirements of I OCFR, Part 21 and SPUSA's EvaluationProcedure A142. The documentation should be via this form with all necessary backup documentation attached andmaintained in the 10CFR, Part 21 file under the direction of the Corporate Quality & Environmental Manager.
SCOPE:
This form shall be used in all conditions which have been brought to the attention of the IOCFR, Part 21 Committee.
RESPOINSIBILITY:
The responsibility for assurance of completion of this form and the subsequent actions and fiing will be that of the Corporate Quality & Environmental Manager.
PUMP SEREAL NUMBER(S) FP&L IPN supplied 1-R CNTA Aux. Feed Pump #0601001 PARTS ORDER NUMBER(S) Sulzer Order No. 08701898, FP&L PO # 67845, REPORTABLE YES m NO LI TO: NRC [_J] LICENSEES [
IPN Only (A) IDENTIFICATION OF ITEM OR PROCESS AFFECTED:
The TurkeyPoint Nuclear Plant Aux. Feed Pump drive end journal beaing was installed incor-reotly (radial orientation) which resulted in internal oil passage blockage aid the possibility of mnature beating failure due to lack of lubrication.
(B) DESCRIPTION OF THE CONDITION:
Theplant reported to Sulzex on 11/8/05 that the DE journal bearing in one of the repaired pumps hadi been installed incorrectly so that the oil passage between the housing and journal obstructed the fee flow oflube oil to the bearingjournal. It was postulated the premature beating failure was due to the lack of lubrication as a direct iesult of improper assembly of the I)Ejournal bearing.
Sulzer had generated an assembly procedure based on input from an FP&L supplied procedure, and enhanced the assembly procedure; however, neither the FP&L nor Sulzer procedure included a verification of bearing radial orientation. Regardless, the installation of the journal beating should have been performed properly. The improper installation of the bearing (radial orientation) was due to human error. Sulzef had repaired two other identical TPN Aux Feed pumps using the same' procedure, and subsequent inspections confirmed the DEjournal bearing had been correctly installed in the other pumps Sulzer had repaired. This was an isolated case ofhuman errorcoupled with a procedure that, viewed in hindsight, can be updated to include a verification of beating orientation (barrier). Given the obvious oil passage design configuration coupled with the proper assembly of the other two pumps, we do not believe this is a generic issue.
.I r-
Page 2 of 2 (C) WHO REPORTED THE CONDITION:
NAME: A. Washburn TITLE: Engineering Manager DATE: 11/9105 (D) EVALUATED BY 10 CFR, PART 21 COMMITTEE:
Chairperson:
-NAME: K. Strand TITLE: Manager, Corp Quality & DAME: 3/20/06 Environmental Members:
NAME: A. Washburn TITLE: Engineering Manager DATE: 3/20/06 NAME: J. Bohhman TITLE: Si. Project Engineer DATE: 3t20/06 NAME: J. Wood TITLE: Prqject Mgr, Quality DATE: 3/20/06 NAME: D. Spencer TITLE: Mgt, Nuclear Sernices DATE: 3/20/06 NAME: . TITLE: DATE:
NAME: TITLE: DATE: __ __.
(E) REVIEW OF LIKE CONDITIONS:
Suizer is not aware of the existence of a like condition. The TE bearing assembly is not subject to a similar assembly error due to its configuration difference. As previously mentioned Sulzer and other manufacturer's pump,designs incorporate features and instructions to preclude incorrect assembly. The only other pump component where similar improper assembly is possible is ball beating installation. In designs that incorporate duplex pairs of ball bearings the assembly instructions specifyc proper orientation ( i.e. face-to-face or back-to-back).
(NOTE: IF NO LIKE CONDITION OR POTENTIAL FOR ASIVMIAR CONDITION ISl NOTED, MAKE SURE ALL ASPECTS .OF THE CONDITION IS REVIEWED AND NOT
,LIMIT THE EVALUATION TO A SPECIFIC PUMP OR APPLICATION.)
(F) RESULTS OF THE EVALUATION The improper assembly of the subject pump resulted in the potential for premature bearing*
failure. However; Sulzer believes this was an isolated case involving human erioi for failing to detect the oil passage would be obstructed. An inspection verification (barrier) to confirm correct beating assembly orientation would prevent fiuture occurrences.
I It is our opinion the issue meets the ciiteria for defect reporting per the requirements of 10CFR Part 21, Since the incident was isolated and non-generic only the NRC and the utility willI be notified. L
h;
PAGE 02 03/20/20086 13:08 9368532581 POLLOK-I SULZER PUMPS (IJS) INC NC N 4.150051 NON-CONFORMANCE REPORT (NCR)
SFaiM 146I. Ref Procedwie QNS-O1 Nl!Al osoMnuciik. 1 hL ii sheet.... I L-of ~-
PartDsc on I AsAMb(Item)No. ISeral No. a ! gh est A 2OdN.
I !C"eIV Iboo4 Drawf1Numb67 Rev Product Materia V sos Pattern No.
o0.aL c toz
_9 _
k 1 OC'b709tbi Spicr Name I
MD11-Jc
. n r- -~t I k. U. No.
x _,'
I J,9 Ir o - I OVIA I , Sar'4rf r tk A# H= AI if)io0 WlIw-r y on Order I Rejected I Part Status Coepl.I Incompl. QC. Orderp m.C.
O Order 0 poteniA No.
ICo O Am o Las Oper. Camp, Sur Material Code (Q/QS) NO _
unU Qtr I HEPORTaHEAEQ mEtICoNDlTJONANDOTFACTUW1.(ONM1)II'ONOFrHE.NN-CON(ICI IA, E 74 __T Pr r --
I.
I RIdByniftINeWIC i,7 (54>/A or, Dept.f C-; Date: (Z/4/C7i QU t ROOT CAU3E STATEMENT aY RESPONSIBLE DEPT.-PERSON ASSIGNED TO:
ZV7-i- wV. t#A MA&W-C- 4t~~fE-44t17* A447 PTO7'*ThJ IM(tr4Q,&
, lC~t I
r fflcr Rom sC Dbtpam b s ec-,;
Appmcd By. mafy Det. QZ DaIe:
LiNE ACTIONIToCORREC(Ceckonec OUSEASIS Q REP& ORQWORK ED RETLr TOSuPpLIER 0 SC31 nsPovslTIoN ID _ AtIrHORI7ATION, XEE PRO(-EDURE QNS-OI, DISSTTON AND APPROVtL BEQUJR F:Nir TABLE I.
II I.
I.
o ~ ~ ~-ucaig- - ___ ____
i Disposition y:Iiu Nam!i U,4 4, twDae APpROVIl. ,-%NDfORt:OctjCRRENCE. .5EIP(lOCEDURE QN.4-OJUP)ISFO~SJfl0N AND APPROVA',LRSEO(IM tQ(.lIDY DcpmlimnI .'hsII chri2k 111eboxe. bd!ow f~twm.-Whjv-JjrQi4 fl S . II I.
D.W 1. p Signature Date I~Design Engbiecr vue. 4A(2Qdi. [Jaother(C
__ _ulityp A .
O Checkc box if I OCPR Pant 21 is rnp0ablo NonConfatuzamc Closed WYy Qjual1y Decpt. lj)
Reported By:
CORRECTZV ACrION Date: Closed By:
UIRED? TMS NOD U ' yoc I..
CORRECr_ ACTION TO PREVENT ROOT CAUSE __CURRENCE.
R isponded By: Dare: TImplementia Paat Corrective Actlon Closed Byr'.i: tickt p)p I Date:_________
QUAWlY DEPARTMENTWHEN COMPLE7ED I
F.
- i. 83/20/2085 13:08 9368532581 POLLOK PAGE 01 III siULZER
- SULZER SULZER NUCLEAR PUMPS (US) INC.
SERVICE CENTER rorNo_ So199-0 J CORRECTIVE ACTION REPORT (CAR)
Reference SNSC Pmncedure QSS-0.3 05-033 NIA 150051 Al Baggett QA : 12/10/05 CAJR No. AUDIT No. NCR No Issued By Departnei U Date Art Washburn SNSC Manager of Engineering I12/2 0§ Issued To Department/Company REQUIR RESPON D DATE NON!-CONFORNMNG CONDITION OR PROBLEM:
See attached NCR 150051 for detailed description of Nonconforming Conditio IMMEDIATE ACMION TO CORRECT NONCONFORMIG CONDInION OR PROBD i FPL 'urkey PointNPS repiaced inboard journal bearing on pump S/N 0601001. Sulzer Engin inresponed to FPL Iiftial questions and started evaluation of nonconformance.
ROOT CAUSE OF NON-CONFORMANCE OR PROBLEM:
ia~fwne-l 6Avi1% 4SSst" Wovs Lloc;;'n3 oil ;ttA pa~Scktt)
P~b-~ ; wsv& rvsw.rvto i-' 46. Jold iISt~r 'i e t.E.
PLANNED CORRECTIW AND pREvENTVE ACTION TO PREVJNT RE:
>;"io. d SuJ<- FroIar- "'Kss-bg ChtrA wsmbtj Pocei' +u Cr b48 >
-D1C v'"AA4 4rV'r~mn.4, f S o Ok 9 ;r8j covorlrs 4* rn s e
^ 4 ov
- t;Sji A4i;( k 4IiovloA &b1 pOh;4ia-t;. °otret @Ijf 312ID 128 /o6 &
esponders NasneaeAction _eted =Date to be Cor A CompIeted FOR SULZER PUPS (US) INC. QUALMfY DEPARTMENT ONLY
. Corective and Preventive Action FollIow-up Required? Yes/No C~losed Bk Signature 8 1. J ate.
I