ML081830523

From kanterella
Jump to navigation Jump to search
Part 21 Notification - Performance Affected on 3 CL150 Fisher V150 Valve Assemblies
ML081830523
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/27/2008
From: Fitzgerald B
Fisher Controls International
To:
Office of Nuclear Reactor Regulation
References
Download: ML081830523 (4)


Text

0612712008 U.S. Nuclear Regulatory Commission Operations Center Event Report Page I General Information or Other (PAR) Event# 44322 Rep Org: FISHER CONTROLS INTERNATIONAL, LLC - Notification Date / Time: 06/27/2008 16:51 (EDT)

Supplier: FISHER CONTROLS INTERNATIONAL, LLC Event Date I Time: 06/27/2008 (CDT)

Last Modification: 06/27/2008 Region: 3 Docket #:

City: MARSHALLTOWN Agreement State: Yes County: License #:

State: IA NRC Notified by: BILL FITZGERALD Notifications: CHRISTINE LIPA R3 HQ Ops Officer: JOHN KNOKE KATHLEEN O'DONOHUE R2 Emergency Class: NON EMERGENCY VERN HODGE NRR 10 CFR Section: OMID TABATABAI NRO 21.21 UNSPECIFIED PARAGRAPH MARK CUNNINGHAM NRR PART 21 NOTIFICATION - PERFORMANCE AFFECTED ON 3" CL150 FISHER V150 VALVE ASSEMBLIES "Purpose:

The purpose of this Fisher Information Notice (FIN) is to alert FPL that as of 20 June, 2008, Fisher Controls International LLC became aware of the possibility of a situation which may affect the performance of the applicable equipment.

"Equipment Affected by This Information Notice:

Items provided to FPL - Turkey Point per Fisher Order Number 010-A001017058,Item 0001, (FPL Order 00108848, Rev. 3). This equipment included 3" CL150 Fisher V1 50 valve assemblies (quantity 2). The equipment is identified by Fisher Serial Numbers 18497294 and 18497295 (FPL Tag Number 04224971).

"Applicability:

This notice applies only to the subject equipment supplied by Fisher Controls International LLC, identified above, that was provided to FPL-Turkey Point. Fisher Controls has determined that the subject items did not meet the material requirements specified by the FPL Order 00108848, Rev. 3. Specifically the discrepancies are:

  • TFE packing was provided instead of graphite packing.
  • TCM seal rings were provided instead of HD metal seal rings.

The difference in these parts will also require that a different seal protector ring be provided."

t,'Rec:E~ed at: 06/27/2008 15:44 Jun. 27, 2008 2:46PM EMR Process - PROCUREMENT No, 0929 P. I EMERSON. [FISHER]ý Facsimile 301 South Flrst Avet Marshalltown, IA50158 T 641-754-2688 F 641-754-2645 NRC To: Vern Hodge Fax: 301-816-5151 Trish Crosser (754-2688)

From: Executive Assistant for Quality Date: 6/27/2008 Pages: 1 (incl cover)

Attached is notification of a recent FIN Notice:

FIN 200B-01 Fisher Order 0 10-A00 1017058 For questions contact:

Matthew Farrell GA Manager Codes & Standards Fisher Valve Division Matthew.farrell@emerson.com Phone: (64!) 754-3342

Jun, 27, 2008 2:46PM EMR Process - PROCUREMENT No. 0929 P. 2 4

EMERSON. Fisher Controls International LLC 301 South First Ave.

P.O. Box 190 Marshalltown, Iowa 50153-0190 USA T (641) 754-3011 F (641] 754-2630 Fisher Information Notice: FIN 2008-01 June 26, 2008

Subject:

Fisher Order 010-A001017058 for FPL-Turkey Point From:

Bill Fitzgerald Nuclear Business Unit Director and General Manager Fisher Controls International LLC 205 South Center Street Marsha[ltown, IA 50158 Fax: (641) 754-2854 Euuipment Affected By This Information Notice:

Items providedto FPL - Turkey Pointper FisherOrderNumber 010-A001017058, Item 0001, (FPL Order00108848, Rev. 3). This equipment included 3" CL150 FisherVISO valve assemblies (quantity2). The equipment is identifiedby Fisher Serial Numbers 18497294 and 18497295 (FPL Tag Number 0422497 1).

Purpose:

The purpose of this Fisher Information Notice (FIN) is to alert FPL that as of 20 June, 2008, Fisher Controls International LLC became aware of the possibility of a situation which may affect the performance of the applicable equipment.

We are informing you of this circumstance in accordance with Section 21.21 (b) of 10CFR21.

Applicability:.

This notice applies only to the subject equipment supplied by Fisher Controls International LLC, identified above, that was provided to FPL-Turkey Point.

FISHER] Page 1 of 2

Jun, 2ý, 2008 2:46PM EMR Process - PROCUREMENT No. 0929 P, 3 Fisher Information Notice: FIN 2008-01 Discussion Fisher Controls has determined that the subject items did not meet the material requirements specified by the FPL Order 00108848, Rev. 3.

Specifically the discrepancies are:

  • TFE packing was provided instead of graphite packing.
  • TCM seal rings were provided instead of HD metal seal rings. The difference in these parts will also require that a different seal protector ring be provided.

We are reviewing the situation and will pursue a corrective action investigation to prevent problems like this in the future.

Action Required

  • Contact our Fisher Controls Local Business Partner to arrange for modification or replacement of these constructions.
  • Contact Information is:

Jim Fesl or Kevin Miller Key Controls Corporation Suite I Lakeland, FL 33811 863-583-0071 (Office) 863-583-0273 (Fax) 10CFR21 Implications:

Fisher Controls requests that the recipient of this notice review it and take appropriate action in accordance with IOCFR2I.

Ifthere are any technical questions or concerns, please contact:

Michael Wedemeyer Manager, Quality Fisher Controls International LLC 205 South Center Street Marshalltown, IA 50158 Fax: (641) 754-2854 (FISHER]

Page 2 of 2