Technical Requirements Manual Update to the NRC for Period Dated January 17, 2006
ML060190680
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 01/17/2006
From: Bottemiller C
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GNRO-2006/00003
Download: ML060190680 (5)


Text

___ ~ ~~

GNRO-2006/00003 January 17,2006 US. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Document Control Desk

Subject:

Technical Requirements Manual Update to the NRC for Period Dated January 17,2006 Grand Gulf Nuclear Station Docket No. 50-416 License No. NPF-29

Dear Sir and Madam:

Pursuant to Grand Gulf Nuclear Station (GGNS) Technical Requirements Manual Section 1.04, Entergy Operations, Inc. hereby submits an update of all changes made to GGNS Technical Specification TRM since the last submittal (GNRO-2005/00070) letter dated December 8, 2005 to the NRC from GGNS). This update is consistent with update frequency listed in 10CFR50.71(e).

Should you have any questions, please contact Michael Larson at (601) 437-6685.

Yours truly,

/c CABIMJL attachment: Technical Requirement Manual Pages cc: nextpage

GNRO-2006/00003 PAGE 2 cc:

Compton J. N. (w/o)

Levanvvay D. E. (Wise Carter) (wlo)

Reynolds N. S. (wlo)

Smith L. J. (Wise Carter) (wlo)

NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150 U.S. Nuclear Regulatory Commission ALL LETTERS ATTN: Dr. Bruce S. Mallett (w/2) 611 Rvan Plaza Drive, Suite 400 Arlingion, TX 76011-4005 U.S.Nuclear Regulatory Commission ALL LETTERS -

ATTN: Mr. , NRR/DORL (w/2)

COURIER DELIVERY (FEDEX, ETC.)

ATTN: ADDRESSEE ONLY ADDRESS ONLY -

ATTN: Courier Delivery Only Mail Stop OWFN/7D-l 11555 Rockville Pike Rockville, MD 20852-2378

ATTACHMENT to GNRO-2006100003 ulf Technical ~ e ~ u i r e ~ ean^

nt es dated

SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR TR3.8.3.6 For each fuel oil storage tank: 10 years

a. Drain the fuel oil;
b. Remove the sediment; and
c. Clean the tank.

Draining of the fuel oil stored in the supply tanks, removal of accumulated sediment, and tank cleaning are required at 10 year intervals by Regulatory Guide 1.137, paragraph 2.f. This SR is typically performed in conjunction with the ASME Boiler and Pressure Vessel Code,Section XI, examinations of the tanks. To preclude the introduction of surfactants in the fuel oil system, the cleaning should be accomplished using sodium hypochlorite solutions, or their equivalent, rather than soap or detergents. This SR is for preventive maintenance. The presence of sediment does not necessarily represent a failure of this SR provided that accumulated sediment is removed during performance of the Surveillance.

An extension to the surveillance is granted by ER 2003-0234-001. Div I1 may be inspected as late as March 2006.

This does not apply to the ASME Section XI pressure test.

TRM 3 .%-24-1 LDC 05082

6.3 INSTRUMENTATION 6.3.8 TURBINE OVERSPEED PROTECTION SYSTEM LCO 6.3.8 One turbine overspeed protection system shall be OPERABLE.

APPLICABILITY: MODES 1 and 2.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One stop valve or control A.1 Enter LCO 6.0.1. Immediately 1 valve per steam line inoperable.

B. Required turbine overspeed B.l Isolate the turbine from 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> I protection system the steam supply.

inoperable for reasons other than Condition A.

I 6.3-17 LDC 06002