PBNP PLANT U1 STATUS REPORT N Report Run Date: 5/2712004 6:07:47 AM Committed to Nuclear Excellence PLANT SAFETY LOST TIME ACCIDENT' 0 DOSE PREVIOUS 24 brs (mR) 0 SITE EVENT FREE 24 DAYS SINCE LAST LTA 614 TOTAL FOR YEAR (mR) l 6850 DAYS OSHA RECORDABLES 2  % of TO DATE GOAL 212% OVERALL Ul PLAN' 4J -Ycllo'vwT FIRST AID CASES 2 PcrCon EVENTS l I1 RISK T J ;s PLANT CONDITIONS V. Power 0% MWE Gross 0 DAYS SINCE LAST SCRAM FROM POWEP 315 tode 5 MWE NeLt 0 DAYS ONLINE 0 Unit Capability F 0% Forced Loss Rat 0% Days Until Next Refueling Outage 485 K EY CONTACTS - 7' 7 '

SHIFT MANAGER I DAYS: Rob Harrsch I SWINGS: INIGHTS: Jim Schicif WORK WEEK COORD/MGR Rob Geicr WORK CONTROL CENTER Mike Millen EP MANAGER Monica Ray PLANT MANAGER Jim Shaw OPERATIONS COMAIENTS (24 hotir Summary)

RCS vessel level at 70°h. Unit I RPV head tensioned at 0222.

> _ ~UNIT SIIUTDOWVN OTHfER LCOs_

~~ OPERATIONAL CONCERNS & PLANT PRIORITIES <

EQUIPMENT WO/CAP PROBLEM OWNER ECD ICV-IIO0A, BA to WO 0408329 / Valve Leaks by, causes 2 loss ofBAST levcl during J. Brander 11103104 IZ-1 BA Blcndcr CAP056696 BAST recirculation, current Status 23. Parts issue.

Inlet Flow Control PLANT HOUSEKEEPING CONCERNS OPERATOR BURDENS OPERATOR CHALLENGES OPERATOR WORKAROUNDS LIT ANNUNCIATORS COORD ID ALARMvf DESCRIPTION REASON WOCAP DAYS IN IC-20A 2-3 Site boundary control center. Troubleshooting why the alarm is in WO 0407388 62 DEGRADED INSTRUMENTS EQUIPMENT WO/CAP PROBLEM OWNER ECD IC-39, Turbine EH WO 0307938 Intermittent kilowatt transducer failure. APR 9/14/04 Control Panel INR46, NI WO 0210874 Recorder replacement via MR 01-057. IC 03/28/05 Overpower Recordet ITE-29. Incore WO 0309455 TC G4 reads low. EM 05/09/05 Thermometer at 0-ITG-01-VARM, WO 0306911 Varmeter reading high. EM 5/31/04 ITG-01 Turbine Generator Output Varmeter Thursday, ilay 27,2004 Page I of4 IfalDabon fthrecord was d*eted inl aoFb wdit doft fton ormabo\, of Act emxom --

_ V-

INR-47,NI WO 0210874 Recordcr failcd low. IC 03/28/05 Overpower Recordei:

TEMPORARY MODIFICATION J PLANT PERFORMANCE Plant Perrormnance Sunnrvary Printary System Secondary System Generator Gross 0 Mwe Total RCS LKRT 0 gpm Forcbay Temp 49 F Generator Net 0 NMwe RCS Identified LKRT 0 gpm Lake Temp 54 F Reactor Power 0 NlWth RCS Unidcntificd LKRT 0 gpm GrossHeatRate 0 BTU/kW Primary to Secondary LKRT (Rad Gas)

LP "A" LP 'B-0 gpd 0 gpd Primary Chemistry Secondary Clhemistry LP 'A' LP"B-RCS Boron 3018 ppm Sodium (ppb) 6 7 RCS H2 cclkg Chloride (ppb) 12.0 4.3 Gross Activity uClIgm SulfateLPA 12.7 15.3 DE-131 uCl/gm INPO CPI T uarsday a 27, 2004 - . Page 2- o 4 Thlursday, Alny 27, 2004 Pa.-e2of4

O-y 0t U l PBNP U2 PLANT STATUS REPORT Nc Committed to Nucler &ce~ll Ce Report Run Date: 512712004 6:07:52 AM PLANT SAFETY LOST TIME ACCIDENTE 0 DOSE PREVIOUS 24 hrs (mR) 0 SITE EVENT FREE 24 DAYS SINCE LAST LTA 614 TOTAL FOR YEAR (mR) 6850 DAYS OSHA RECORDABLES 2  % or TO DATE GOAL 112[ OVERALL U2 PLAN. 1tbre'en'G "'-

FIRST AID CASES 2 PerCon EVENTS RISK r PLANT CONDITIONS '_:

% Power 100%/0 MWE Gross 1 543 JDAYS SINCE LAST SCRAM FROM POWEF 12 Mode I 1 MWE Net 521 lDAYS ONLINE l_7 Unit Capability Facto I Forced Loss Rat 1Days Until Next Refueling Outage 310 KEY CONTACTS ' .

SHIFT MANAGER I DAYS: Rob Harrscb SWINGS: NIGHTS: Jim Schleif WORK WEEK COORD/MGR Rob Gcier WORK CONTROL CENTER Mike Millen EP MANAGER Monica Ray PLANT MANAGER Jim Shaw 7C~

OPERATIONS COMMENTS (24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Sumrnariy)

Normal full power operations.

UNIT SHUTDOWNI OTHER LCOs EQUIPMENT WO/CAP ENTRY DATE LCO DAYS OWNER ECD 2RC-508. U2C WO 0203446 11/9/2003 31 day TSAC 3.6.3.? M. Rosseau 5/2812004 Reactor Makeup

>-,upp y::-

OPERATIONAL CONCERNS & PLANT PRIORITIES C EQUIPMENT WO/CAP PROBLEM OWNER ECD 2RC-508. U2C WO 0203446 Valvc comes ofishut seat when reactor makeup wate M. MillenI J. 5/28104 Reactor Makeup pump starts. Marean Supply Unit 2. Excess WO 0310231 Inadequate excess letdown flow, scheduled for Work N. Stuart 7/09/04 Letdown Flow Week C03.

2RE-215, 2HX-46 Elevated indication, temperature related. Procedure B. Carberry 6/30104 Air Ejector Gas change request submitted. (OTH013404). Eberline Monitor Representative to assist with leak rate calculation anc temperature sensitivity.

  • PLANT HOUSEKEEPING CONCERNS -'

OPERATOR BURDENS

OPERATOR CHALLENGES OPERATOR WORKAROUNDS EQUIPMENT WO/CAP PROBLEM OWNER ECD Condenser Water N/A Unit 2 is receiving excessive condenser water box T. VandcnBosch Scheduling PHC, Box Alarms alarms. next PHC should be in June.

LIT ANNUNCIATORS l DEGRADED INSTRUMENTS Thursday, Mlay 27,2004 Page 3 of 4

EQUIPMENT WO/CAP PROBLEM OWNER ECD I

2AF-4000, 2P-29 AFW Discharge WO 0307788 Control room indication does not match local indication.

EM 05/09/05 i

MOV control room indication I 2AI-5430A, Hydrogen Purity on WO 0310574 Hydrogen purity reads low in the Control Room. FIN 05/09/05 I 2C03 2F1-412, RC Loop .A WO 0400282 Flow indicator reads high. IC 04/18/05 Flow Indicator 2FR-465, Loop A WO 0405750 Flow indicator reads high. IC 06/08/04 FW Stm/Flow Indicatior 2NR-47, NI Overpower Rccordet WO 0210875 Recorder failed low. IC 05/09/05 I TEMPORARY MODIFICATION l I PLANT PERFORMANCE Plant Performance Summnry Printary System Secondarv Svstem I

Generator Gross 543 Mwe Total RCS LKRT 0.14 gpm Forebay Temp 49 F 71 Generator Net 521 NIwe RCS ldentified LKRT 0.1 gpm Lake Temp 54 F Reactor Power 1538 1%2Wth RCS Unidentified LKRT 0.04 gpm GrossileatRate 0 BTU/kW Primary to Secondary LKRT (Rad Gas) I LP"A' LP"B' 0 gpd 0 gpd Primary Ch/emistr; Secondary Chemistry LP A LP"B' RCS Boron 1167 ppm Sodium (ppb) 0.4 0.4 RCS 112 35.8 cc/kg Chloride (ppb) 0.8 0.7 Gross Activity 1.08E+0 uClIgm SulfateLPA 1.9 1.9 DE-131 3.48E-5 uCl/gm INPO CPI 1.02 Page 4 of 4 Thursday, Alay Tbtursday, 2004 27, 2004 May 27, Page 4 of 4