Station Log Mid Shift Friday, April 09, 2004 OM 1.1 04108 21:59 Matson. Pat Assumed DSS Position from Matson, Pat, DSS. (Matson, Pat - DSS) 04108 21:59 Beltz, Boyd Assumed DOS (Fire Brigade) Position from Beltz, Boyd, DOS (Fire Brigade). (Beltz, Boyd - DOS (Fire Brigade))

04/08 22:00 Wisniewski. Norb Assumed OS (Fire Brigade) Position from Wisniewski, Norb, OS (Fire Brigade).

(Wisniewski, Norb - OS (Fire Brigade))

04108 22:00 Schleif. James Assumed STA Position from Schleif, James, STA. (Schleif, James - STA) 04108 22:29 SG1A isotopic activity was less than detectable. No permit need for draining/overflow. (Grossheim. Rob -

Chem Tech) 04/08 22:39 Grossheim, Rob Assumed Chem Tech Position from Beyer, Corrine, Chem Tech. (Grossheim, Rob - Chem Tech) 04108 23:45 Inman, Rick Assumed 4th License Position from Bressler. Mike, 4th License. (Inman. Rick - 4th License) 04/08 23:46 Pond, Dan Assumed 3rd License Position from Jurss. Dave, 3rd License. (Pond. Dan - 3rd License) 04108 23:46 Baumann. Steve Assumed U2 TurbHall (FireBrigade) Position from Wolf, Bob, U2 TurbHall (FireBrigade).

(Baumann, Steve - U2 TurbHall (FireBrigade))

04108 23:47 Purvis, Dale Assumed PAB (FireBrigade) Position from Sheehan, Joe, PAB (FireBrigade). (Purvis. Dale -

PAB (FireBrigade))

04108 23:47 Schwoerer, Eric Assumed WtrTreatment(FireBrigade) Position from Burish. John, WtrTreatment(FireBrigade). (Schwoerer.Eric-WtrTreatment(FireBrigade))

04108 23:48 Fischer. Terry Assumed Ul TurbHall (FireBrigade) Position from Denneau, Scott, Ul TurbHall (FireBrigade).

(Fischer. Terry - Ul TurbHall (FireBrigade))

04/08 23:49 Herman, Bill Assumed Unit 1 CO Position from Stock, Lee, Unit 1 CO. (Herman, Bill - Unit 1 CO) 04/08 23:53 Welch, John Assumed Trainee-AOT 1 Position from Dvorak, Douglas J., Trainee-AOT 1. (Welch. John -

Trainee-AOT 1) 04108 23:55 Hammill, Pete Assumed Unit 2 CO Position from Phillips, Scott, Unit 2 CO. (Hammill. Pete - Unit 2 CO) 04/09 00:00 Unit 1 in Mode 5 RCS temp 110 degrees F RCS is in reduced inventory Reactor Vessel Level 24%. Unit 2 in MODE I at full power. 2RC-508 Is COS. Unit 2 TSAC 3.6.3.A.2 to verify isolation once per 31 days.

Equipment OOS and Fire Rounds are per the OOS.doc (Matson. Pat - DSS) 04/09 00:14 Common. T-6A Boric Acid Storage Tank has been recirculated and sampled per O-SOP-BS-01 with SAT results. T.6A BAST is retumed to service. (Beltz. Boyd - DOS (Fire Brigade))

04)09 00:14 A-BAST sampled and analyzed, returned to service. No longer needs to be on recirc for Chemistry sampling. (Grossheim, Rob - Chem Tech) 04109 00:45 Started discharge of MT A 97%, per 01-140 permit # 04-00030L (Purvis, Dale - PAB (FireBrigade))

04/09 00:47 Common: Secured recirculation ofC" HUT IAW 01-10A (Kuchera, Brian - MISC) 04/09 00:48 Unit 1: Commenced 01 100A Depressurization of Si Accumulators to Containment Purge Exhaust System.

(Pond. Dan - 3rd License)

Page 1 of 3

Station Log Mid Shift Friday, April 09. 2004 OM 1.1 04109 01:27 RHR-1 total Isotopic activity is < 5.00e-2 uCilcc (Grossheim, Rob - Chem Tech) 04109 02:30 Unit 1 recieved unexpected repeat alarms for 1C04 1A 1-3. Source Range High Flux level at Shutdown.

Appears N-31 is spiking. (Wisniewski. Norb - OS (Fire Brigade))

04109 02:30 Started 01-32F (maintaining main generator H2 pressure and purity) to raise pressure and purity.

(Baumann, Steve - U2 TurbHall (FireBrigade))

04109 03:01 Unit 1 enters MODE 6, REFUELING. Started de-tesioning the reactor vessel head per 1 RMP 9096.

(Wisniewski. Norb - OS (Fire Brigade))

04109 03:09 NRC plant status and phone check completed SAT. (Beltz. Boyd - DOS (Fire Brigade))

04/09 03:15 Common, D-305 Swing Station Battery returned to service after successful completion of RMP 9046-1 (92 day/ 12 month surveillence ). (Beltz. Boyd - DOS (Fire Brigade))

04/09 03:20 Completed 01-32F 2 times SAT. (Baumann, Steve - U2 TurbHall (FireBrigade))

04/09 04:11 Common: Placed C" HUT on recirculation lAW 0-10A. (Kuchera. Brian-MISC) 04/09 04:18 Took a sample of unit 2 facade sump per 01-66 (Purvis, Dale - PAB (FireBrigade))

04/09 04:23 Completed TS-10A U2 Containment Air Lock Door Seal Test satisfactorily. WO 0216030 (Fischer. Terry -

Ul TurbHall (FireBrigade))

04/09 04:30 Commence Installation of Unit 1 B S/G Cold Leg Nozzle Dam (Mohr. Mike - MISC) 04109 04:41 Made a 4 bag batch of acid for the BABT per 0-SOP-BS-02 (Purvis. Dale - PAB (FireBrigade))

04109 04:52 Commence installation of Unit-1 A SIG Cold Leg Nozzle Dam. (Mohr, Mike - MISC) 04/09 04:52 Common, Notified by Chemistry that at 2229 on 4/8/04 A Steam Generator sample was satisfactory for IT-300A performance, and at 0127 419104 Co-58 for unit 1 is 4.32E-2 less than the 5.00 E-2 limit to allow flood up for refueling. (Beltz, Boyd - DOS (Fire Brigade))

04109 05:37 Installation of Unit I A and B SIG Cold Leg Nozzle Dams are complete and verified installed.

Commence installation of Unit 1A SIG Hot Leg Nozzle Dam. (Mohr. Mike - MISC) 04/09 05:43 U-2 facade sump contaminated (Berglin, Karl - MISC) 04/09 05:45 Gifford, Steve Assumed Chem Tech Position from Grossheim, Rob (Gifford, Steve - Chem Tech) 04/09 05:51 PAB Vent Stack Isokinetic sampler OOS for filter change. (Schleif, James - STA) 04/09 05:58 PAB Vent Stack Isokinetic sampler RTS. (Schleif, James - STA) 04/09 06:06 Pumped unit 2 facade sump to WHUT per 01-66,500gal (Purvis, Dale - PAB (FireBrigade))

04/09 06:15 Completed discharge od MT A per 01-140 (Purvis, Dale - PAB (FireBrigade))

Page 2 of 3

Station Log Mid Shift Friday. April 09, 2004 OM 1.1 04/09 06:32 BABT 3.68% boron. Good to drop to C-BAST (Rynish. Vince - MISC) 04/09 07:03 Started transfer of BABT to BAST C per 0-SOP-BS-02 (Purvis. Dale - PAB (FireBrigade))

04/09 07:31 Unit 1 ICP 4.001F RP and Safeguards Analog Racks Steam Flow Instruments Outage Calibration completed sat. (Jessessky. Tom - MISC) 04109 07:33 Completed transfer of BABT to BAST C per 0-SOP-BS-02 (Purvis, Dale - PAB (FireBrigade))

04/09 07:42 Unit 2 - 21CP 2.007 Nuclear Instrumentation Power Range Channels 92 Day Channel Operational Test completed satisfactorily. (Jessessky. Tom - MISC) 04/09 08:17 Log turned over by Fouse, Jim (Fouse, Jim - MISC) 04/09 08:17 Log approved by Fouse, Jim (Fouse, Jim - MISC)

Page 3 of 3

Station Log Day Shift Friday. April 09, 2004 OM 1.1 04109 05:45 Gifford, Steve Assumed Chem Tech Position from Gifford, Steve, Chem Tech. (Gifford, Steve - Chem Tech) 04109 06:16 Merkes. Rick Assumed DSS Position from Matson, Pat, DSS. (Merkes, Rick - DSS) 04109 06:23 Rittich, Dave Assumed DOS (Fire Brigade) Position from Beltz. Boyd, DOS (Fire Brigade). (Rittich.

Dave - DOS (Fire Brigade))

04109 06:24 Fouse. Jim Assumed STA Position from Schleif. James, STA. (Fouse. Jim - STA) 04109 06:34 Jessessky, Tom Assumed OS (Fire Brigade) Position from Wisniewski, Norb, OS (Fire Brigade).

(Jessessky, Tom - OS (Fire Brigade))

04109 07:25 Kupsch. Loren Assumed 4th License Position from Inman. Rick. 4th License. (Kupsch, Loren - 4th License) 04109 07:26 Steuer. Will Assumed PAB (FireBrigade) Position from Purvis. Dale. PAB (FireBrigade). (Steuer, Will - PAB (FireBrigade))

04109 07:26 Alexander, Joe Assumed Extra Auxiliary Operator Position. (Alexander. Joe - Extra Auxiliary Operator) 04/09 07:27 VanDyke, Doug Assumed Ul TurbHall (FireBrigade) Position from Fischer. Terry. Ul TurbHall (FireBrigade).

(VanDyke. Doug - Ul TurbHall (FireBrigade))

04/09 07:27 Post, Bob Assumed Unit 1 CO Position from Herman, Bill. Unit 1 CO. (Post, Bob - Unit 1 CO) 04/09 07:27 Phelps, Mike Assumed U2 TurbHall (FireBrigade) Position from Baumann, Steve, U2 TurbHall (FireBrigade).

(Phelps, Mike - U2 TurbHall (FireBrigade))

04/09 07:28 Meaney. Doug Assumed Unit 2 CO Position from Hammill, Pete. Unit 2 CO. (Meaney, Doug - Unit 2 CO) 04109 07:28 Wells. Jason Assumed Trainee-AOT 1 Position from Welch, John, Trainee-AOT 1. (Wells, Jason -

Trainee-AOT 1) 04/09 07:28 Herman, Bill Assumed 3rd License Position from Pond, Dan, 3rd License. (Herman. Bill - 3rd License) 04/09 07:30 Tompson, Richard Assumed WtrTreatment(FireBrigade) Position from Schwoerer, Eric.

WtrTreatment(FireBrigade). (Tompson, Richard - WtrTreatment(FireBrigade))

04/09 07:41 Commenced depressurizing the Unit 1-B- Si Accumulator IAW Cl-100A. (Dueno, Dan - MISC) 04/09 07:42 Unit 2, 21CP 2.007, NI Power Range Channel 92 day Channel Operational Test, completed. Sat. (Meaney, Doug - Unit 2 CO) 04109 07:43 Opened 2CW-35A &2CW-33A, #3 & #4 waterbox nash float bypasses to 2 turns open in response lo repeated low waterbox level alarms. (Phelps, Mike - U2 TurbHall (FireBrigade))

04/09 08:13 Placed '8' BAST (T-6B level = 93.3 % locally) on recirc for chemistry per 0-SOP-BS-01. (Steuer. Will - PAB (FireBrigade))

04109 08:15 O'Connor. Dennis Assumed 3rd License Position from Herman. Bill (O'Connor, Dennis - 3rd License) 04109 08:22 Opened 2CW-49A Condenser 18 tailpipe nash float bypass 1/2 turn in responce to repeated waterbox low level alarms. (Phelps, Mike - U2 TurbHall (FireBrigade))

Page 1 of 3

Station Log Day Shift Friday, April 09, 2004 OM 1.1 04109 08:24 Placed 'B' MT (T-10B) on recirc per 01-140. Chemistry informed. (Alexander. Joe- Extra Auxiliary Operator) 04109 08:40 Unit 2 - Received an expected Vacuum Control Tank Level High Alarm (2C03 2F 2-6). This alarm also brought In the D-08 Battery Charger Trouble Alarm (2C20 2B 1-9), which was caused by a DC Ground Fault on D-08. The D-08 DC Ground Alarm was cleared when the alarms on 2C03 were tested and reset. (Post.

Bob - Unit 1 CO) 04109 08:49 RWST-2 3069 ppm boron. RWST-2 can be taken off recirc. (Rynish, Vince - MISC) 04/09 08:55 Closed 2CW-49A Condenser 1B tailpipe nash float bypass in responce to vacuum control tank level high alarm.

Drained vacuum control tank level to within normal band. (Phelps, Mike - U2 TurbHall (FireBrigade))

04/09 09:10 Opened 2CW-35A #3 waterbox nash float bypass to 5 turns and opened 2CW-33A #4 waterbox nash float bypass to 6 turns in responce to continued low waterbox alarms. (Phelps, Mike - U2 TurbHall (FireBrigade))

04/09 09:25 Start Processing 'C' CVCS HUT (T-10C start level = 79%) to A' Monitor Tank (T-1OA start level = 11%) per Ol-10A. (Steuer, Will - PAB (FireBrigade))

04/09 09:27 Unit 2 - Received a repeat (3X) Waterbox Level Low Alarm (2C03 2F 3-6). This alarm also brought in the D-08 Battery Charger Trouble Alarm (2C20 28 1-9), which was caused by a DC Ground Fault on D-08. The D-08 DC Ground Alarm was cleared when the alarms on C02 were tested and reset. (Post, Bob - Unit 1 CO) 04/09 09:27 Completed 0-TS-RE-001 Power Level Determination, Sat, on Unit 2. (Meaney, Doug - Unit 2 CO) 04/09 09:35 SPING 23. Auxiliary Building Exhaust Stack OOS for filter change (Jessessky. Tom - OS (Fire Brigade))

04/09 09:36 A-CST sampled @ 0840 gamma scan and tritium < mda (Berglin, Karl - MISC) 04/09 09:45 Changed 'A' RO unit cartridge filters IAW 01-73 attachment M (Tompson, Richard -

WtrTreatment(FireBrigade))

04/09 09:46 SPING 23 returned to service (Rittich, Dave - DOS (Fire Brigade))

04/09 10:11 BABT 3.68% boron. Good to drop to C-BAST. (Rynish, Vince - MISC) 04/09 10:30 Opened 2CW-49A Condenser tailpipe nash float bypass to 1/4 turn open in responce to continued waterbox level low alarms. (Phelps, Mike - U2 TurbHall (FireBrigade))

04/09 10:30 Sampled Blowdown Evaporator Reboiler Condensate for Chemistry, and 01-16. (Steuer. Will - PAB (FireBrigade))

04/09 10:31 B-BAST sampled at 10:25, 3.72% boron (Rynish, Vince - MISC) 04/09 10:37 Unit 2 - From 07:28 to 10:37 am. Received 37 repeated Waterbox Level Low Alarms, (2C03 2F 3-6). due to current CW Pump alignment, (2P-30B running), for diver inspection. The AO made several adjustments on Nash Float Bypass valves on #2.3, & 4 water boxes, and 'B" tail Pipe per ARB, and are being tracked on the OOS Document. During the acknowledgment on - half, (20), of the Waterbox Level Low Alarms, when pushing the flasher reset push button, also brought in the D-08 Battery Charger Trouble Alarm (2C20 28 1-9), which was caused by a DC Ground Fault on D-08, (WO'd # 202133). This was also recorded in the D-08 Ground Fault Detection Log book. (Meaney. Doug - Unit 2 CO)

Page 2 of 3

Station Log Day Shift Friday, April 09. 2004 OM 1.1 04109 10:56 Jurss, Dave Assumed 3rd License Position from O'Connor, Dennis (Jurss. Dave - 3rd License) 04109 11:35 U1. Multiple spikes from N-31 Source Range NI caused the 'High Flux at Shutdown' alarm (104 1-3) to momentarily come In. Placed the High Flux at Sutdown on N-31 in 'block', N-32 SRNI High Flux at Shutdown alarm remains operable. All other functions of N-31 remain operable and LCO 3.9.3 remains met with N-40 and N-32 operable. (Rittich. Dave - DOS (Fire Brigade))

04109 12:20 Closed 2CW-49A to 1/4 turn open to maintain vacuum control tank level within normal band. (Phelps, Mike -

U2 TurbHall (FireBrigade))

04109 12:42 Common - D-106, station battery, individual cell voltages taken per RMP 9046-1 (SAT) (Bowe, Steve -

MISC) 04109 15:08 Unit 1: Commenced raising reactor vessel level with a target of 70% vessel level per OP SA Reactor Coolant Volume Control. (Fouse, Jim - STA) 04109 15:53 Unit 1: Unit 1 exits reduced inventory, vessel level greater than 55%. continuing to fill Unit 1 reactor vessel with a target of 70% per OP-5A (Fouse, Jim - STA) 04/09 16:10 Secure processing of the C HUT at 68% to A MT at 94%. B MT full at 94% also. C HUT still on recirc. per 01-10A. (Burish, John - MISC) 04/09 16:11 Unit 1: Stabilized reactor vessel level at 70% per OP-5A (Fouse. Jim - STA) 04109 16:25 Log turned over by Rittich. Dave (Rittich. Dave - DOS (Fire Brigade))

04109 16:25 Log approved by Rittich. Dave (Rittich. Dave - DOS (Fire Brigade))