Letter Sequence RAI |
---|
|
|
MONTHYEARML0411006672004-04-13013 April 2004 Steam Generator Tube Integrity Assessment from the 2003 Refueling Outage Project stage: Request ML0423704502004-09-0202 September 2004 Request for Additional Information Steam Generator Tube Assessment Report, 2003 Outage Project stage: RAI ML0434304462004-12-0101 December 2004 Day Response to Request for Additional Information Steam Generator Tube Integrity Assessment from the 2003 Refueling Outage Project stage: Response to RAI ML0505600102005-03-0101 March 2005 Attachments 1-4, Palisades - Tube Inspection Report Project stage: Other ML0505405642005-03-0101 March 2005 Palisades - Review of Palisades Steam Generator Tube Inspection Reports for the Spring 2003 Outage Project stage: Approval 2004-04-13
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000255/20244022024-09-0606 September 2024 Public: Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2024402 PNP 2024-029, Notice of Payroll Transition at Palisades Nuclear Plant2024-08-15015 August 2024 Notice of Payroll Transition at Palisades Nuclear Plant PNP 2024-032, Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-07-31031 July 2024 Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations ML24206A0572024-07-25025 July 2024 PRM-50-125 - Letter to Alan Blind; Docketing of Petition for Rulemaking and Sufficiency Review Status (10 CFR Part 50) PNP 2024-033, Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-07-24024 July 2024 Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations PNP 2024-031, Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-07-18018 July 2024 Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000255/20240112024-07-15015 July 2024 Nuclear Plant - Restart Inspection Report 05000255/2024011 PNP 2024-027, Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2024-07-0909 July 2024 Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML24183A1382024-07-0202 July 2024 Tribal Letter - Lac Du Flambeau Band of Lake Superior Chippewa Indians ML24137A0142024-07-0202 July 2024 OEDO-24-00011 - 2.206 Petition for Misuse of Palisades Decommissioning Trust Fund (EPID L-2023-CRS-0008) - Letter ML24183A1392024-07-0101 July 2024 Tribal Letter-Lac Vieux Desert Band of Lake Superior Chippewa Indians ML24155A0032024-07-0101 July 2024 Kathy Kowal, Us EPA Region 5-Palisades-NOI to Cibdyct Scoping Process and Prepare an EA EPID L-2024-LNE-0003 ML24183A1502024-07-0101 July 2024 Tribal Letter - Prarie Band Potawatomi Nation ML24183A1442024-07-0101 July 2024 Tribal Letter - Menominee Indian Tribe of Wisconsin ML24183A1312024-07-0101 July 2024 Tribal Letter-Citizen Potawatomi Nation ML24183A1302024-07-0101 July 2024 Tribal Letter-Chippewa Cree Indians of the Rocky Boys Reservation ML24183A1452024-07-0101 July 2024 Tribal Letter - Miami Tribe of Oklahoma ML24163A2602024-07-0101 July 2024 Randy Claramunt, Michigan DNR-Palisades-NOI to Conduct Scoping Process and Prepare an EA EPID L-2024-LNE-0003, Docket No.50-0255 ML24183A1592024-07-0101 July 2024 Tribal letter-Sokaogon Chippewa Community ML24152A1952024-07-0101 July 2024 Carin Speidel, Acting Division Director, Environmental Health - Palisades - Noi to Conduct Scoping Process and Prepare an EA EPID No. L-2024-LNE-0003, Docket No. 50-0255 ML24152A1992024-07-0101 July 2024 Richie Garcia, Water Filtration Supervisor-Palisades-NOI to Conduct Scoping Process and Prepare an EA EPID No. L-2024-LNE-0003 Docket No. 50-0255 ML24183A1602024-07-0101 July 2024 Tribal Letter - Turtle Mountain Band of Chippewa Indians ML24183A1322024-07-0101 July 2024 Tribal Letter-Fond Du Lac Band of Lake Superior Chippewa ML24156A0222024-07-0101 July 2024 Initiation of Scoping Process to Prepare an Environmental Assessment for the Environmental Review of Holtec Decommissioning International, Llc’S Licensing and Regulatory Requests for Reauthorization of Power Operations at Palisades EPID L-2 ML24155A0102024-07-0101 July 2024 Quentin L. Messer Jr., Michigan Econ-Palisades-NOI to Conduct Scoping Process and Prep an EA-EPID No. L-2024-LNE-0003 Docket No.50-0255P ML24163A2392024-07-0101 July 2024 Sara Thompson, Michigan DNR-Palisades-NOI to Conduct Scoping Process and Prepare an EPID No. L-2024-LNE-0003-Docket No. 50-0255 ML24163A0832024-07-0101 July 2024 Ltr to R Schumaker Shpo Re Initiation of Scoping Process, Section 106 Consult for Env Rev of HDI, LLC Request for Reauth of Power Operations at Palisades Nuclear Plant ML24183A1572024-07-0101 July 2024 Tribal Letter - Saint Croix Chippewa Indians of Wisconsin ML24183A1532024-07-0101 July 2024 Tribal Letter Quechan Tribe of the Fort Yuma Indian Reservation ML24183A1432024-07-0101 July 2024 Tribal Letter- Match-e-be-Nash-She-Wish Band of Pottawatomi Indians ML24183A1492024-07-0101 July 2024 Tribal Letter - Pokagon Band of Potawatomi Indians ML24163A0822024-07-0101 July 2024 Ltr to J Loichinger Achp Re Initiation of Scoping Process, Section 106 Consult for Env Rev of HDI, LLC Request for Reauth of Power Operations at Palisades Nuclear Plant ML24152A1972024-07-0101 July 2024 Mayor Annie Brown, South Haven-Palisades-NOI to Conduct Scoping and Develop an Environmental Assessment for the Palisades Nuclear Plant Reauthorization of Power Operation ML24163A0552024-07-0101 July 2024 Rebecca Held Knoche NOAA-Palisades-NOI to Conduct Scoping Process and Prepare an EA - EPID No. L-2024-LNE-0003-Docket No. 50-0255 ML24183A1342024-07-0101 July 2024 Tribal Letter-Grand Portage Band of Lake Superior Chippewa ML24183A1262024-07-0101 July 2024 Letter to R. Yob, Grand River Bands of Ottawa Indians-Initiation of Scoping Process for Env Review of Holtec Decommissioning Intl, LLC Request for Reauth of Power Ops at Palisades ML24183A1582024-07-0101 July 2024 Tribal Letter Sault Ste. Marie Tribe of Chippewa Indians ML24183A1292024-07-0101 July 2024 Tribal Letter-Bois Forte Band ML24183A1242024-07-0101 July 2024 Letter to B. Hamlin, Burt Lake Band Re Initiation of Scoping Process for the Env Review of Holtec Decommissioning Intl, LLC Request for Reauth of Power Ops at Palisades ML24183A1362024-07-0101 July 2024 Tribal Letter - Keweenaw Bay Indian Community ML24183A1412024-07-0101 July 2024 Tribal Letter-Little River Band of Ottawa Indians ML24183A1512024-07-0101 July 2024 Tribal Letter-Prairie Island Indian Community ML24183A1462024-07-0101 July 2024 Tribal letter-Mille Lacs Band of Ojibwe ML24183A1282024-07-0101 July 2024 Tribal letter-Bay Mills Indian Community ML24183A1352024-07-0101 July 2024 Tribal Letter-Hannahville Indian Community ML24183A1252024-07-0101 July 2024 Letter to G. Gould, Swan Creek Black River Confederated Ojibwa-Init of Scoping Process for the Env Rev of Holtec Decommissioning Intl, LLC Request for Reauth of Power Ops at Palisades ML24183A1542024-07-0101 July 2024 Tribal Letter Red Cliff Band of Lake Superior Chippewa Indians ML24183A1272024-07-0101 July 2024 Tribal Letter-Bad River Band of the Lake Superior Tribe of Chippewa ML24183A1472024-07-0101 July 2024 Tribal Letter - Nottawaseppi Huron Band of the Potawatomi ML24183A1422024-07-0101 July 2024 Tribal Letter-Little Traverse Bay Bands of Odawa Indians 2024-09-06
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24192A0012024-07-0606 July 2024 (E-Mail) Palisades Nuclear Plant - Plant - Draft Request for Additional Information: Palisades Operating TS License Amendment Request - June 6, 2024 ML24192A1672024-06-28028 June 2024 Restart - NRC Request for Additional Information - EP ORO Coordination - June 28, 2024 ML24192A1472024-06-28028 June 2024 Email - Palisades Nuclear Plant - Draft Request for Additional Information: Palisades Administrative TS License Amendment Request - June 28, 2024 ML23354A2602023-12-21021 December 2023 Reference Simulator Inspection Request for Information ML23055A1542023-02-24024 February 2023 Attachment: Request for Additional Information on the Palisades PSDAR ML22292A2582022-10-31031 October 2022 PDEP-EAL Amendment RAI ML22102A2482022-04-14014 April 2022 Request for Additional Information Regarding License Amendment Request for Permanently Defueled Technical Specifications ML21274A4172021-10-0505 October 2021 Request for Information for an NRC Triennial Heat Exchanger/Sink Performance Inspection and Request for Information Inspection Report 05000255/2021004 ML21028A0552021-01-27027 January 2021 NRR E-mail Capture - Palisades Nuclear Plant - Acceptance of License Transfer Application ML21028A4092021-01-27027 January 2021 NRR E-mail Capture - Palisades Nuclear Plant - Acceptance of Holtec Exemption Request from 10CFR50.82(a)(8)(i)(A) and 10CFR50.75(h)(1)(iv) ML20272A0112020-09-26026 September 2020 Request for Additional Information - Palisades Relief Request RR 5-8 (Proposed Alternative) for Reactor Pressure Vessel Head Penetration Repairs ML20133K0562020-05-14014 May 2020 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML19357A2752019-12-23023 December 2019 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000255/2020011 ML19226A2932019-08-14014 August 2019 NRR E-mail Capture - Request for Additional Information Re License Amendment Request to Adopt TSTF-425, Revision 3 for the Palisades Nuclear Plant ML19226A2922019-08-0505 August 2019 NRR E-mail Capture - Draft Request for Additional Information for Palisades License Amendment Request to Adopt TSTF-425 ML19122A4852019-04-29029 April 2019 NRR E-mail Capture - Request for Additional Information for Palisades License Amendment Request to Revise License Conditions Related to NFPA 805 Modifications ML19009A5392019-01-0909 January 2019 NRR E-mail Capture - Request for Additional Information for Palisades License Amendment Request to Revise Emergency Diesel Generator Degraded Voltage Surveillance Requirement 3.3.5.2a ML19009A5382018-12-12012 December 2018 NRR E-mail Capture - Draft Request for Additional Information for Palisades License Amendment Request to Revise Emergency Diesel Generator Degraded Voltage Surveillance Requirement 3.3.5.2a ML18337A1382018-11-30030 November 2018 NRR E-mail Capture - Request for Additional Information Related to Palisades Relief Request Number RR 5-7 ML18337A1402018-11-29029 November 2018 NRR E-mail Capture - Draft Request for Additional Information Related to Palisades Relief Request 5-7 ML18309A1342018-11-0808 November 2018 Supplemental Information Needed for Acceptance or Requested Licensing Action Amendment Request to Revise Technical Specifications to Adopt TSTF-425, Revision 3 ML18094B0922018-04-0505 April 2018 Enclosurequest for Additional Information (Letter to B. S. Ford RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for ISFSI Docket Nos.: 72-43, 72-51, 72-1044, 72-07, 72-12, and 72-59) ML18081A2962018-03-22022 March 2018 NRR E-mail Capture - Palisades Nuclear Plant - Request for Additional Information Regarding Proposed Changes to Site Emergency Plan for Permanently Defueled Condition (CAC MG0198: EPID L-2017-LLA-0305) ML18059A8202018-02-28028 February 2018 NRR E-mail Capture - Palisades Nuclear Plant - Request for Additional Information Regarding Proposed Alternative for Relevant Condition ML17335A1042017-11-30030 November 2017 NRR E-mail Capture - Palisades Nuclear Plant - RAI Regarding Proposed Changes to Administrative Controls Section of the Technical Specifications for Permanently Defueled Condition (CAC MG0021; EPID L-2017-LLA-0266) ML17118A3342017-04-18018 April 2017 E-Mailed Request for Information Dated 04/18/2017 for Palisades Nuclear Power Station, Unit 1, Inservice Inspection - Part B Items (Exf) ML17118A3312017-04-18018 April 2017 E-Mailed Request for Information Dated 04/18/17 for Palisades Nuclear Power Station, Unit 1, Inservice Inspection - Part a Items ML17072A2752017-03-10010 March 2017 NRR E-mail Capture - Palisades Nuclear Plant - Final Request for Additional Information Regarding Relief Request No. RR 4-25 ML16238A0302016-08-29029 August 2016 Supplemental Information Needed for Acceptance of Requested Licensing Action Control Rod Drive Exercise Surveillance ML16130A0762016-05-11011 May 2016 Request for Additional Information Regarding the License Amendment Request for Implementation of an Alternative Repair Criterion on the Steam Generator Tubes ML16013A0642016-01-13013 January 2016 NRR E-mail Capture - Request for Additional Information Entergy CNRO-2015-00023 - Revision to Entergy Quality Assurance Program Manual (Fleet Submittal CAC Nos. MF7086-MF7097) ML15341A1662015-12-0707 December 2015 NRR E-mail Capture - Entergy Fleet RR-EN-15-1, Request for Additional Information (CACs MF6341-MF6349) ML15258A2432015-09-0101 September 2015 NRC Supplement to NRC Letter - Notification of NRC Inspection and Request for Information Dated May 1, 2015 - Palisades Nuclear Plant ML15149A2462015-05-28028 May 2015 Information Request to Support NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Mxg) ML15072A2542015-03-19019 March 2015 Request for Additional Information Regarding the License Amendment Request to Implement 10 CFR 50.61a CNRO-2015-00008, Responses to NRC Request for Additional Information Regarding Change in Corporate Form of Entergy Nuclear Holding Company2015-02-18018 February 2015 Responses to NRC Request for Additional Information Regarding Change in Corporate Form of Entergy Nuclear Holding Company ML15022A1382015-01-22022 January 2015 E-Mail - Palisades Request for Information ML15016A1842015-01-20020 January 2015 Request for Additional Information Regarding the License Amendment Request to Implement 10 CFR 50.61a ML15012A3052015-01-15015 January 2015 Request for Additional Information Regarding the License Amendment Request for an Equivalent Margin Analysis Completed in Accordance with 10 CFR 50, Appendix G ML14318A4002014-12-17017 December 2014 Vermont Yankee Nuclear and Big Rock Point - Request for Additional Information Regarding Change in Corporate Form of Entergy Nuclear Holding Company (Tac Nos. MF3218 - MF3221) ML14157A3642014-06-0505 June 2014 CDBI Request for Information ML13353A0422013-12-16016 December 2013 NRR E-mail Capture - Request for Additional Information - Palisades - Proposed Revision to Palisades Site Emergency Plan (SEP) Emergency Response Organization (ERO) MF2321 ML13312A4232013-11-26026 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13179A4622013-07-0505 July 2013 Entergy Nuclear Operations, Inc., Decommissioning Funding Status Report Request for Additional Information Regarding the Decommissioning Funding Status Report ML13051A7772013-02-19019 February 2013 Request for Additional Information, 2012 SG Inspection Report ML12314A4222012-11-0808 November 2012 ME8074 - Request for Additional Information Regarding Replacement of Spent Fuel Pool Region I Storage Racks ML12278A3862012-10-0404 October 2012 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2, and 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford, Request for Additional Information, Round 2, Amendment Request to Revise QA Program Manual and Staff Qualification TSs ML12206A4042012-07-24024 July 2012 Request for Additional Information (Revised) - Palisades - SFP Rerack LAR - ME8074 ML12206A3322012-07-19019 July 2012 E-mail Combined Request for Additional Information for Several Branches of NRR for the Submittal on Palisades re-sack LAR ML12121A7032012-04-27027 April 2012 Relief Request - Proposed Alternative - Use of Alternate ASME Code Case N-770-1 Baseline Examination - ME8492 2024-07-06
[Table view] |
Text
September 2, 2004 Daniel J. Malone Site Vice President Palisades Nuclear Plant Nuclear Management Company, LLC 27780 Blue Star Memorial Highway Covert, MI 49043
SUBJECT:
PALISADES NUCLEAR POWER PLANT, REQUEST FOR ADDITIONAL INFORMATION RE: STEAM GENERATOR TUBE INTEGRITY ASSESSMENT FROM THE 2003 REFUELING OUTAGE (TAC NO. MC2747)
Dear Mr. Malone:
By letter to the Nuclear Regulatory Commission (NRC), dated April 13, 2004, supplemented by letter dated June 28, 2004, the licensee submitted a report that summarizes the steam generator tube integrity assessment performed at Palisades Nuclear Power Plant during the 2003 refueling outage.
NRC staff is reviewing your request and has determined that the information identified in the enclosure to this letter is needed to complete its evaluation. The enclosed request was discussed with Ms. Amy Hazelhoff during a conference call on August 17, 2004. Your response to this request for additional information is requested within 90 days from the date of this letter.
Ms. Hazelhoff has agreed to this request.
If you have any questions, please contact me at (301)415-1345 or email jfs2@nrc.gov.
Sincerely,
/RA/
John F. Stang, Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-255
Enclosure:
Request for Additional Information cc w/encls: See next page
ML042370450 OFFICE PDIII-1/PM PDIII-1/PM PDIII-1/LA PDIII-1/SC NAME JStang MCall THarris LRaghavan DATE 8/31/04 8/30/04 08/26/04 8/31/04 Palisades Plant cc:
Robert A. Fenech, Senior Vice President Michigan Department of Attorney General Nuclear, Fossil, and Hydro Operations Special Litigation Division Consumers Energy Company 525 West Ottawa St.
1945 Parnall Rd. Sixth Floor, G. Mennen Williams Building Jackson, MI 49201 Lansing, MI 48913 Arunas T. Udrys, Esquire Manager, Regulatory Affairs Consumers Energy Company Nuclear Management Company, LLC 1 Energy Plaza 27780 Blue Star Memorial Highway Jackson, MI 49201 Covert, MI 49043 Regional Administrator, Region III Director of Nuclear Assets U.S. Nuclear Regulatory Commission Consumers Energy Company 801 Warrenville Road Palisades Nuclear Plant Lisle, IL 60532-4351 27780 Blue Star Memorial Highway Covert, MI 49043 Supervisor Covert Township John Paul Cowan P. O. Box 35 Executive Vice President & Chief Nuclear Covert, MI 49043 Officer Nuclear Management Company, LLC Office of the Governor 700 First Street P. O. Box 30013 Hudson, WI 54016 Lansing, MI 48909 Jonathan Rogoff, Esquire U.S. Nuclear Regulatory Commission Vice President, Counsel & Secretary Resident Inspectors Office Nuclear Management Company, LLC Palisades Plant 700 First Street 27782 Blue Star Memorial Highway Hudson, WI 54016 Covert, MI 49043 Douglas E. Cooper Michigan Department of Environmental Quality Senior Vice President - Group Operations Waste and Hazardous Materials Division Palisades Nuclear Plant Hazardous Waste and Radiological Nuclear Management Company, LLC Protection Section 27780 Blue Star Memorial Highway Nuclear Facilities Unit Covert, MI 49043 Constitution Hall, Lower-Level North 525 West Allegan Street P.O. Box 30241 Lansing, MI 48909-7741
REQUEST FOR ADDITIONAL INFORMATION FOR NUCLEAR MANAGEMENT COMPANY PALISADES STEAM GENERATOR TUBE INSPECTION REPORT FOR THE 2003 OUTAGE DOCKET NO. 50-255 By letter dated April 13, 2004 (ML041100667), supplemented by letter dated June 28, 2004 (ML041890415), Nuclear Management Company, LLC, the licensee for Palisades, submitted a report that summarizes the steam generator (SG) tube integrity assessment performed during the 2003 refueling outage. In reviewing these two letters and their attachments, the Nuclear Regulatory Commission (NRC) staff determined that the responses to the following questions are required to complete the evaluation.
- 1. Provide a general description of the replacement SGs, Include in this general description the total number of tubes, tube diameter, tube wall thickness, tube pitch, tube support thickness and any other noteworthy design characteristics from a SG tube integrity standpoint (e.g., full length stress relieved of the row 1 through 10 tubes). In addition, provide sketches of the steam generators that depict the tube support naming conventions and tubesheet maps that depict the rows and columns of the tubes.
- 2. On page 7 of your in-service inspection report, you indicated that 100 percent of rows 1, 2 and 3 U-bends were inspected in SG E-50A. You also indicated that only 25 percent of rows 1 and 2 U-bends were inspected in SG E-50B and that no expansion of this sample was required. Given that you identified primary water stress corrosion cracking (PWSCC) in the U-bend region of a row 2 tube in SG E-50A and the potential for PWSCC to develop in the U-bend of other low row tubes, discuss the technical basis for not expanding the U-bend inspection to include 100 percent of the tubes in rows 1, 2, and 3 in SG E-50B. Discuss how this was accounted for in your operational assessment.
- 3. On page 8 of your in-service inspection report, you indicated that one tube (R135C100) was plugged due to a restriction to the passage of a +PointTM rotating pancake coil (RPC). Describe the nature and location of the restriction. Include in your response a discussion of the extent of the restriction and whether or not it was service induced.
What was the largest size probe to be passed through the tube during this outage and previous outages? If the restriction was service induced, discuss the basis for not expanding the inspection to include 100 percent of the tubes.
- 4. On page 9 of your in-service inspection report, you indicated that after tube plugging, there were 7 tubes non-expanded in SG E-50A and 1 in SG E-50B that remained in
service. Then, on page 32, you stated that the non-expanded tube population is 6 tubes in SG E-50A and 1 in SG E-50B. On page 33 you indicated that only 7 tubes remained in service with no expansion in the tubesheet region. Clarify how many non-expanded tubes remain in service in each SG.
- 5. On pages 15, 16, and 18 of your in-service inspection report, you indicated that 25 tubes in SG E-50A and 21 tubes in SG E-50B were plugged. You then stated that after 8 cycles of operation, 57 additional tubes in SG E-50A and 51 in SG E-50B have been plugged, which brings the total number of tubes plugged to 365 and 360, respectively.
Please clarify how many tubes were plugged prior to placing the SGs in service and clarify how many tubes were plugged prior to the 2003 refueling outage.
- 6. With respect to the eggcrate wear indications, address the following:
On page 26 of your in-service inspection report, you indicated that 100 tubes in SG E-50A and 68 tubes in SG E-50B were reported as having a distorted support indication (DSI) from bobbin, were +PointTM RPC tested and reported as VOL. On the same page, you stated that the remaining DSI reported by bobbin were at supports. These included 10 DSI in SG E-50A and 45 DSI in SG E-50B, which were +PointTM RPC tested and no degradation was found. Please clarify this discussion. Is it implying that 110 DSIs were reported in SG E-50A and of these 110, 100 were attributed to wear and 10 had no degradation?
In addition, please clarify an apparent discrepancy in Table 16. Table 16 indicates that 114 tubes in SG E-50A had wear indications while the text indicates 100.
Provide the technical basis for determining when wear at eggcrates should be RPC inspected. Specifically, address in your response whether there is any data that indicates any appreciable change in the bobbin coil signal will result from an axial or circumferential flaw that is present in a wear scar.
- 7. On page 39 of your in-service inspection report, you indicated that a sodium intrusion event has introduced sodium into the crevices. Discuss this event in detail or if already provided to NRC, please provide references to documents where this is discussed.
- 8. On page 8 of your in-service inspection report, you indicated that stay rod locations are areas of high residual stress and susceptible to stress corrosion cracking. Discuss why this area is considered to be susceptible to high residual stresses and what degradation mechanisms are more prone to appear.
- 9. Regarding your disposition of the freespan differential (FSD) indications:
Discuss what constitutes a significant change in the signals when compared to baseline and your technical basis for this criteria (e.g., Is it based on test repeatability?).
Approximately 260 tube locations were inspected with an RPC probe because of a new FSD or because an existing FSD changed. Clarify whether the indications that required RPC testing were considered new or changed. If new indications, discuss the cause. If changed indications, discuss the reason for the change.
Clarify the number of tubes with FSD indications that required RPC testing.
Table 19 implies that only 1020 of the 1619 FSDs were dispositioned based on history review.
- 10. You indicated that no changes were noted in the bobbin coil examinations of dings. You further indicated that a bobbin coil review was performed for all free span dings greater than or equal to 2 volts. Clarify how many dings are present in your steam generators (e.g., x dings greater than 2 volts, y dings greater than 5 volts). Clarify that 95 percent of all dings (greater than 2 volts) are located at vertical straps. Clarify whether circumferential cracking has been observed at dings at Palisades or at other similarly designed and operated units. If it has been observed, discuss the basis for not expanding the scope of inspection to 100 percent. Based on the material provided, the staff inferred that for dings whose voltages are between 2 and 5 volts, the 2003 bobbin coil data was compared to baseline data to determine if any change occurred. If this is the case, discuss the technical basis for the approach including whether the bobbin coil signal from a ding would change significantly if a flaw (axial or circumferential) were to initiate at this location. The staff notes that many plants with mill annealed Alloy 600 tubes inspect 100 percent of all dents/dings that have bobbin voltages greater than 5 volts.
- 11. In your assessment of tube wear, discuss how you accounted for degradation in the tubes you did not inspect. In addition, clarify the discussion regarding the 67 percent through wall wear indication detected in 1999 (p. 26). Was the wear associated with this tube caused by some local support condition such that it necessitated inspection of surrounding tubes?
- 12. On page 28 of your in-service inspection report, you indicated that an axial u-bend outside diameter stress corrosion cracking (ODSCC) indication was screened. Was an axial ODSCC indication detected in the U-bend or is this a typographical error?
- 13. Discuss whether any primary to secondary leakage has been observed during the current cycle.
- 14. For all tubes with possible loose parts indications, discuss whether a visual inspection was performed at these locations. Were any loose parts left in the SG? If so, discuss whether a tube integrity evaluation was performed.