Letter Sequence RAI |
---|
|
|
MONTHYEARML0325501462003-09-23023 September 2003 RAI, 2002 Steam Generator Inspection Results Project stage: RAI ML0331003702003-11-0303 November 2003 Request for Additional Information Regarding the 2002 Steam Generator Tube Inspections Project stage: Request ML0334210102003-12-11011 December 2003 Davis -BESSE, RAI, 2002 Steam Generator Tube Inservice Inspection Results Project stage: RAI ML0335602582003-12-17017 December 2003 Response to Questions Regarding the 2002 Steam Generator Tube Inspections Project stage: Other ML0400901892004-01-0707 January 2004 Response to Questions Regarding the 2002 Steam Generator Tube Inspections Project stage: Other 2003-12-17
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000346/20234012023-09-13013 September 2023 Security Baseline Inspection Report 05000346/2023401 (Public) L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual IR 05000346/20230112023-08-30030 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000346/2023011 ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000346/20230052023-08-24024 August 2023 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2023005) L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments IR 05000346/20230502023-08-0303 August 2023 Special Inspection Report 05000346/2023050 IR 05000346/20230902023-08-0101 August 2023 EA-23-002 Davis-Besse Nuclear Power Station - NRC Inspection Report No. 05000346/2023090 (Public) ML23178A2742023-08-0101 August 2023 Letter to the Honorable Marcy Kaptur from Chair Hanson Responds to Letter Regarding the License Transfer Application for the Davis-Besse Nuclear Power Station L-23-175, Submittal of Fifth Ten Year Inservice Testing Program2023-08-0101 August 2023 Submittal of Fifth Ten Year Inservice Testing Program IR 05000346/20230022023-07-27027 July 2023 Integrated Inspection Report 05000346/2023002 ML23193A7842023-07-13013 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000346/2023402 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III ML23160A2342023-06-13013 June 2023 Confirmation of Initial License Examination L-23-034, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-13013 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models IR 05000346/20235012023-06-13013 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000346/2023501 L-23-135, Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-31031 May 2023 Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) ML23131A2732023-05-15015 May 2023 Notification of NRC Supplemental Inspection 95001 and Request for Information L-23-101, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 20222023-05-12012 May 2023 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 2022 L-23-131, Readiness for Resumption of NRC Supplemental Inspection2023-05-12012 May 2023 Readiness for Resumption of NRC Supplemental Inspection IR 05000346/20230102023-05-0909 May 2023 Commercial Grade Dedication Inspection Report 05000346/2023010 ML23123A1272023-05-0303 May 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Davis-Besse Nuclear Power Station IR 05000346/20230012023-05-0101 May 2023 Integrated Inspection Report 05000346/2023001 and 07200014/2022001 L-23-092, Occupational Radiation Exposure Report for Year 20222023-04-27027 April 2023 Occupational Radiation Exposure Report for Year 2022 ML23111A1972023-04-26026 April 2023 Information Meeting with Question and Answer Session to Discuss NRC 2022 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Plant Station ML23114A1062023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-20020 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments CP-202300157, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-14014 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML23096A1382023-04-11011 April 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-037, and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2023-03-29029 March 2023 and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage ML23066A2892023-03-14014 March 2023 Request for Threshold Determination Under 10 CFR 50.80 and 10 CFR 72.50 for an Amendment to the Voting Agreement ML23066A2592023-03-14014 March 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2, Davis Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 2024-02-02
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 ML23193A7842023-07-13013 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000346/2023402 ML23131A2732023-05-15015 May 2023 Notification of NRC Supplemental Inspection 95001 and Request for Information ML23033A0322023-02-0101 February 2023 NRR E-mail Capture - Request for Additional Information for Davis-Besse's 2022 Steam Generator Inspection Report (L-2022-LRO-0115) ML22357A0302022-12-23023 December 2022 Request for Information for NRC Commercial Grade Dedication Inspection: Inspection Report 05000346/2023010 ML22266A1102022-09-23023 September 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding July 21, 2022, Request for Withholding Information from Public Disclosure ML22214A7042022-08-0202 August 2022 Reissue - Davis-Besse Nuclear Power Station, Unit 1 Notification of Nrc Fire Protection Team Inspection Request for Information: Inspection Report 05000346/2022011 ML22187A0992022-07-0606 July 2022 Notification of NRC Supplemental Inspection (95001) and Request for Information ML22164A8572022-06-13013 June 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan ML22118A6862022-04-28028 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML22112A1092022-04-22022 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building ML22055A0872022-02-23023 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Relief Request RP-3 IR 05000346/20210912021-12-17017 December 2021 NRC Inspection Report (05000346/2021091) Preliminary Greater than Green Finding ML21321A3792021-11-16016 November 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML21301A0992021-10-28028 October 2021 Draft Request for Additional Information: Proposed Alternate for Examination of Steam Generator Welds - Energy Harbor Nuclear Corp., Davis-Besse Nuclear Power Station, Unit No. 1 ML21203A3252021-07-28028 July 2021 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team): Inspection Report 05000346/2021011 ML21155A1952021-06-0404 June 2021 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Davis Besse Nuclear Power Station ML21041A5452021-02-10010 February 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Steam Generator Tube Inspection Reports ML21007A3732021-01-0707 January 2021 NRR E-mail Capture - (External_Sender) (External) Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, ML21004A1442020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff ML20300A5592020-10-27027 October 2020 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML20154K7642020-06-0202 June 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425 ML20133J9792020-05-14014 May 2020 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML20127H8672020-05-0606 May 2020 NRR E-mail Capture - Beaver Valley, Davis-Besse, and Perry - Request for Additional Information Regarding Request for Exemptions from Part 73 Security Requalification Requirements ML20021A3162020-01-21021 January 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request to Revise Containment Leakage Rate Testing ML19192A2222019-07-18018 July 2019 Request for Additional Information Regarding Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML19179A1382019-06-28028 June 2019 NRR E-mail Capture - Davis-Besse - Request for Additional Information Regarding the Decommissioning Quality Assurance Program ML19164A1532019-06-13013 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Post-Shutdown Emergency Plan ML19162A3922019-06-11011 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Permanently Defueled Technical Specifications ML19143A0732019-05-29029 May 2019 FENOC Fleet - Beaver Valley, Units 1 and 2; Davis-Besse, Unit 1, Perry, Unit 1 - Supplemental Information Needed for Acceptance of Requested Licensing Action; Application for Order Consenting to License Transfer and Conforming Amendments ML18305B0192018-11-0101 November 2018 18 Davis-Besse Nuclear Power Station - Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information(Rdb) ML18201A4122018-07-19019 July 2018 NRR E-mail Capture - Davis-Besse - Request for Additional Information Regarding License Amendment Request to Adopt NFPA 805 ML18190A4902018-07-0909 July 2018 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team), Inspection Report 05000346/2018011 (DRP-DXB) ML18102B0852018-04-12012 April 2018 NRR E-mail Capture - Follow-up Request for Additional Information (RAI) FENOC FLEET-- Exemption Request for a Physical Barrier Requirement for Beaver ML18043A0102018-02-0909 February 2018 NRR E-mail Capture - FENOC--MG0010-MG0011, MG-0012, MG0013-- Request for Additional Information (RAI) - Exemption Request Security Barrier in Physical Plans ML17355A3722017-12-21021 December 2017 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Adopt NFPA 805 ML17303B1582017-11-0707 November 2017 FENOC-Beaver Valley Power Station, Units 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, Perry Nuclear Power Plant Unit 1 - Generic Letter 2016-01, Request for Supplemental Information ML17257A1402017-09-14014 September 2017 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Adopt NFPA 805 ML17135A3612017-05-12012 May 2017 Information Request for NRC Triennial Evaluations of Changes, Tests, and Experiments (50.59) Baseline Inspection 05000346/2017010 (Jvb) ML17129A4112017-05-0909 May 2017 Request for Additional Information Regarding Evaluation Submitted in Response to License Renewal Commitment No. 54 ML17100A1732017-04-19019 April 2017 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Associated Standard 805 ML16364A2792017-01-23023 January 2017 Request for Additional Information Regarding License Renewal Commitment No. 42 ML16355A0352016-12-19019 December 2016 Ltr 12/19/16 Davis-Besse Nuclear Power Station, Unit 1 - Information Request for an NRC Post-Approval Site Inspection for License Renewal 05000346/2017009 (Bxj) ML16256A0662016-10-18018 October 2016 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Associated Standard 805 ML16196A0152016-07-22022 July 2016 Request for Additional Information Regarding Amendment Request to Revise Emergency Action Level Scheme L-16-122, Completion of Required Action by NRC Order EA-12-051, Reliable Spent Fuel Pool Instrumentation2016-06-24024 June 2016 Completion of Required Action by NRC Order EA-12-051, Reliable Spent Fuel Pool Instrumentation ML16060A0122016-02-29029 February 2016 FENOC - Email RAI to Licensee Regarding LAR for Changes to TS 5.3.1 CAC Nos. MF7118, MF7119, and MF7120 ML16047A1452016-02-22022 February 2016 Supplemental Information Needed for Acceptance of License Amendment Request to Adopt National Fire Protection Associated Standard 805 ML16019A3972016-01-20020 January 2016 Request for Additional Information Related to Amendment Request for Emergency Diesel Generator Minimum Voltage Surveillance Requirements ML15222A1792015-09-21021 September 2015 Request for Additional Information Related to Amendment Request for Emergency Diesel Generator Minimum Voltage Surveillance Requirements (TAC No. MF6060)(L-15-117) 2023-07-13
[Table view] |
Text
December 11, 2003 Mr. Lew W. Myers Chief Operating Officer FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION RE: 2002 STEAM GENERATOR TUBE INSERVICE INSPECTION RESULTS (TAC NO. MB9541)
Dear Mr. Myers:
By letters dated March 22, 2002, and March 31, 2003, FirstEnergy Nuclear Operating Company provided a summary of your 2002 steam generator tube inservice inspection. By letter dated September 23, 2003, the Nuclear Regulatory Commission staff requested additional information concerning the inspection. You responded to that request by letter dated November 3, 2003.
Based on the staffs review of the information provided, the staff has additional questions.
The enclosed questions were provided to your staff on December 4, 2003, and the questions were discussed with members of your staff on that date. It is our understanding that certain questions will be responded to this month with the remaining response provided to support an anticipated license amendment application. If our understanding is not correct, please contact me at (301) 415-3027 at the earliest opportunity.
Sincerely,
/RA/
Jon B. Hopkins, Sr. Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-346
Enclosure:
Request for Additional Information cc w/enclosure: See next page
Davis-Besse Nuclear Power Station, Unit 1 cc:
Mary E. OReilly Zack A. Clayton FirstEnergy Corporation DERR 76 South Main St. Ohio Environmental Protection Agency Akron, OH 44308 P.O. Box 1049 Columbus, OH 43266-0149 Manager - Regulatory Affairs FirstEnergy Nuclear Operating Company State of Ohio Davis-Besse Nuclear Power Station Public Utilities Commission 5501 North State - Route 2 180 East Broad Street Oak Harbor, OH 43449-9760 Columbus, OH 43266-0573 Director, Ohio Department of Commerce Attorney General Division of Industrial Compliance Department of Attorney General Bureau of Operations & Maintenance 30 East Broad Street 6606 Tussing Road Columbus, OH 43216 P.O. Box 4009 Reynoldsburg, OH 43068-9009 President, Board of County Commissioners of Ottawa County Regional Administrator Port Clinton, OH 43252 U.S. Nuclear Regulatory Commission 801 Warrenville Road President, Board of County Lisle, IL 60523-4351 Commissioners of Lucas County One Government Center, Suite 800 Michael A. Schoppman Toledo, OH 43604-6506 Framatome ANP 1911 N. Ft. Myer Drive David Lochbaum, Nuclear Safety Engineer Rosslyn, VA 22209 Union of Concerned Scientists 1707 H Street NW, Suite 600 Resident Inspector Washington, DC 20006 U.S. Nuclear Regulatory Commission 5503 North State Route 2 The Honorable Dennis J. Kucinich Oak Harbor, OH 43449-9760 United States House of Representatives Washington, D.C. 20515 Randel J. Fast, Plant Manager FirstEnergy Nuclear Operating Company The Honorable Dennis J. Kucinich, Member Davis-Besse Nuclear Power Station United States House of Representatives 5501 North State - Route 2 14400 Detroit Avenue Oak Harbor, OH 43449-9760 Lakewood, OH 44107 Dennis Clum Mr. James P. Riccio Radiological Assistance Section Supervisor Nuclear Policy Analyst Bureau of Radiation Protection Greenpeace Ohio Department of Health 702 H. Street, NW, Suite 300 P.O. Box 118 Washington, DC 20001 Columbus, OH 43266-0118 Paul Gunter Carol OClaire, Chief, Radiological Branch Director Nuclear Watchdog Project Ohio Emergency Management Agency Nuclear Information & Resource Service 2855 West Dublin Granville Road 1424 16th Street NW Suite 401 Columbus, OH 43235-2206 Washington, DC 20009
December 11, 2003 Mr. Lew W. Myers Chief Operating Officer FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION RE: 2002 STEAM GENERATOR TUBE INSERVICE INSPECTION RESULTS (TAC NO. MB9541)
Dear Mr. Myers:
By letters dated March 22, 2002, and March 31, 2003, FirstEnergy Nuclear Operating Company provided a summary of your 2002 steam generator tube inservice inspection. By letter dated September 23, 2003, the Nuclear Regulatory Commission staff requested additional information concerning the inspection. You responded to that request by letter dated November 3, 2003.
Based on the staffs review of the information provided, the staff has additional questions.
The enclosed questions were provided to your staff on December 4, 2003, and the questions were discussed with members of your staff on that date. It is our understanding that certain questions will be responded to this month with the remaining response provided to support an anticipated license amendment application. If our understanding is not correct, please contact me at (301) 415-3027 at the earliest opportunity.
Sincerely,
/RA/
Jon B. Hopkins, Sr. Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-346
Enclosure:
Request for Additional Information cc w/enclosure: See next page DISTRIBUTION:
PUBLIC OGC PDIII-2 r/f ACRS AMendiola CLipa, RIII THarris SReynolds, RIII JHopkins ADAMS Accession Number: ML033421010 OFFICE PM:PDIII-2 LA:PDIII-2 SC:PDIII-2 NAME JHopkins THarris AMendiola DATE 12/11/03 12/10/03 12/10/03 OFFICIAL RECORD COPY
REQUEST FOR ADDITIONAL INFORMATION DAVIS-BESSE NUCLEAR POWER STATION 2002 STEAM GENERATOR TUBE INSERVICE INSPECTION TAC NO. MB9541
- 1. Regarding the inspection of the peripheral tubes to inspect for changes in the gap between the tubes and the secured auxiliary feedwater (AFW) header to verify that the header has not moved, it was indicated that 100 percent of the inservice periphery tubes were inspected. In addition, it was indicated that gap measurements were made for several AFW header indications.
Discuss how many tubes in each steam generator were examined as part of this inspection. Please discuss when a gap measurement is made for these tubes. Discuss in detail how it was verified that the AFW header has not moved. For example, were the 2002 gap measurements compared to the gap measurements taken when the AFW header was secured? Discuss the basis for the 0.250-inch criteria mentioned in your November 3, 2003 letter. Discuss the results of the visual inspection (visual inspection required per technical specification 4.4.5.8) of the AFW header.
It was indicated that two tubes were plugged as a result of dents associated with the AFW header. Clarify when these dents were identified and whether they have changed in size with time. If they have changed with time, discuss what impact, if any, it has on your assessments that verify the AFW header has not moved in operation. Discuss the causal mechanism for the denting.
- 2. It was stated that no fatigue degradation was discovered in either steam generator during the 2002 refueling outage in the one row of unsleeved tubes bordering the sleeved portion of the lane/wedge region (i.e., the sleeve border locations).
Clarify how the determination was made that no fatigue degradation was present. For example, was it based on not detecting any degradation in these tubes or was it based on not detecting any circumferential indications in these tubes? If circumferential indications were found in these tubes, discuss how it was determined that these circumferential indications were not induced by fatigue.
- 3. It was indicated that approximately 60 percent of the roll expansions in the upper tubesheet were examined with a rotating probe (+PointTM and pancake coil) during the 2002 outage. Given that crack indications were detected in this region, it is not clear why the sample was not expanded to include 100 percent of the tubes in this region.
The staff notes that industry guidance (Electric Power Research Institute (EPRI)
Pressurized-Water Reactor (PWR) Steam Generator Inspection Guidelines) would require expansion of the initial sample to include all of the roll expansions and tube ends in the upper tubesheet upon the detection of a single crack.
ENCLOSURE
Provide the technical basis for not inspecting the upper tubesheet roll expansions and tube ends for 100 percent of the tubes. Discuss the methodology (and technical basis) for addressing the structural and leakage integrity for degradation that could be occurring in this region of the tube given that approximately 40 percent of the roll expansions and tube ends in the upper tubesheet were not inspected during the 2002 outage.
- 4. Recently, a couple of plants have detected tube end cracking in the lower tubesheet region. Address the methodology (and technical basis) for addressing the structural and leakage integrity for degradation that could be occurring in this region of the tube given that the roll expansions and tube ends of only a limited number of tubes were inspected in the lower tubesheet with a rotating probe during the 2002 outage.
- 5. A volumetric indication was located in the crevice between the tube and the upper tubesheet just below the roll transition.
Clarify the nature of this indication (e.g., initiated from the inside diameter of the tube).
Provide an assessment of whether similar indications could be located in other tubes given that this indication appears to have been detected only with a rotating probe and 100 percent of the tubes were not examined. If similar indications can not be ruled out, provide the methodology (and technical basis) for addressing the structural and leakage integrity for degradation that could be occurring in this region of the tube.
- 6. An examination of dents at or above the 14th tube support plate revealed 18 new and repeat dents in SG 2-A and 21 new and repeat dents in SG 1-B.
Clarify how many of these dents were new (reported for the first time)? If these dents are not traceable back to the preservice inspection, discuss what affect this active denting mechanism could have on tube integrity for the period of time between inspections.
- 7. One tube (A-105-1) with a dent indication below the dent reporting threshold of 2.5 volts had a non-quantifiable indication (NQI). This NQI was detected with a bobbin probe and was located at or above the 14th tube support. Further examination of this indication with a +PointTM probe revealed that the indication was a circumferential primary water stress corrosion cracking indication. If the indication was truly circumferential, it is not clear why the bobbin probe detected the indication.
Clarify whether the NQI was a result of the circumferential indication or some other anomaly (e.g., did the circumferential indication have some axial extent)? In addition, since it is very difficult to detect circumferential indications using a bobbin probe, discuss whether similar circumferential indications (which may or may not have been detected with a bobbin probe) could exist at dents that were not examined with a rotating probe.
- 8. A number of tubes with volumetric indications attributed to intergranular attack were plugged. Several of these indications were near 60 percent through-wall.
Discuss the growth rate for these indications and discuss whether an increase in growth rate has been occurring with time (if a growth rate can not be established, discuss whether the maximum and/or average depths observed during an outage has been increasing with time). If the growth rate (or maximum and average depths of the
population of indications) has been increasing, discuss the implications to your tube integrity assessments.
- 9. It was indicated that 3 of the 194 dents in SG 1-B were identified with the pancake coil.
Please discuss why these dents (presumably greater than 2.5 volts as determined by the bobbin coil) were not identified during the original bobbin screening. Also, discuss the implications of not finding these dents with the bobbin coil given that cracking has occurred at dents.
- 10. For the dents not examined during the 2002 outage, please describe the methodology used to assess the integrity of these tubes for the period of time between inspections.
Include in this response, the size distribution of the dents not inspected and an assessment of whether the bobbin would have detected axial and circumferential cracks at these locations (given the size of the dent).
- 11. It was reported that an exception was taken against one specific element of the EPRI PWR Steam Generator Examination Guidelines that requires the number of reported false calls be no more that 10 percent of the total number of unflawed grading units when grading a Qualified Data Analyst test. The licensee stated that not imposing the false call criteria assures a higher probability of detection, which should result in a more conservative position, thereby assuring a safe and reliable inspection process.
It appears to the Nuclear Regulatory Commission staff that this would be true, provided the false call rate made during analysis of the field eddy current data was the same or higher than the false call rate made during the qualification test (i.e., to avoid an analyst making numerous false calls during the qualification test simply to pass the test).
Discuss what measures, if any, were taken to verify that the false call rate in the field were consistently higher than the false call rate made during the qualification test. In other words, explain why excluding the false call criteria assures a higher probability of detection for the individual qualified data analysts.
- 12. It was indicated that the plant deviated from the portion of the EPRI guidelines dealing with chemical excursions that exceeded Action Level 3 limits.
Discuss whether this deviation was in effect prior to the 2002 outage and whether it currently is in effect. Discuss the corrective actions taken to minimize the potential to exceed the Action Level 3 limits. In addition, provide the technical basis demonstrating that the process followed when Action Level 3 limits are exceeded at Davis-Besse is the best course of action. Also, discuss why this is not recognized by the industry guidelines (i.e., is the phenomenon observed at Davis-Besse unique).
- 13. It was indicated that there were no confirmed loose part indications detected by eddy current. Clarify what is meant by confirmed. For example, is it referring to visual confirmation of the indication? Discuss whether any possible loose parts were detected during the eddy current examination.