Letter Sequence Acceptance Review |
---|
|
|
MONTHYEARML0325805152003-09-0909 September 2003 Technical Specification, Revision of TSs for Minimum Usable Volumes for the Diesel Generator Fuel Oil Storage Tanks. MB9663 Project stage: Other ML0325800652003-09-0909 September 2003 Amendment, Revision of TSs for Minimum Usable Volumes for the Diesel Generator Fuel Oil Storage Tanks. MB9663 Project stage: Acceptance Review 2003-09-09
[Table View] |
|
---|
Category:Letter
MONTHYEARULNRC-06853, Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.7172024-01-29029 January 2024 Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.717 IR 05000483/20230042024-01-19019 January 2024 Integrated Inspection Report 05000483/2023004 ML24008A0552024-01-19019 January 2024 Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code (EPID L-2023-LLR- 0061) ML23353A1712024-01-18018 January 2024 Issuance of Amendment No. 237 to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23317A0012024-01-12012 January 2024 Audit Summary Regarding LAR to Clarify Support System Requirements for the Residual Heat Removal and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23347A1212024-01-11011 January 2024 Issuance of Amendment No. 236 to Adopt TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Volume Values to Licensee Control EPID L-2023-LLA-0046) ML24011A1492024-01-11011 January 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information (05000483/2024011) ULNRC-06847, Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01)2023-12-21021 December 2023 Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01) ULNRC-06849, License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds2023-12-20020 December 2023 License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds ML23346A0392023-12-14014 December 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Request for Relief from Requirements of ASME Code, Section Xl, Examination and Testing Unbonded Post-Tensioning System ULNRC-06844, Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification2023-12-0707 December 2023 Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification 05000483/LER-2023-001, Submittal of LER 2023-001-00 for Callaway, Unit 1, Inoperable Instrument Tunnel Sump Level Indication Resulted in Condition Prohibited by Technical Specifications2023-11-29029 November 2023 Submittal of LER 2023-001-00 for Callaway, Unit 1, Inoperable Instrument Tunnel Sump Level Indication Resulted in Condition Prohibited by Technical Specifications ULNRC-06827, Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029)2023-11-20020 November 2023 Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029) IR 05000483/20230102023-11-15015 November 2023 NRC License Renewal Phase 1 Inspection Report 05000483 2023010 IR 05000483/20233012023-11-0909 November 2023 NRC Examination Report 05000483-2023301 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23297A2502023-11-0606 November 2023 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination and Opportunity for a Hearing (EPID L-2022-LLA-0176) - Letter IR 05000483/20240122023-10-24024 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (05000483/2024012) ML23293A2652023-10-24024 October 2023 3rd Quarter 2023 Integrated Inspection Report ML23240A3692023-10-0505 October 2023 Issuance of Amendment No. 235 to Revise Technical Specifications to Use of Framatome Gaia Fuel (EPID L-2022-LLA-0150) (Non-Proprietary) ML23234A1522023-10-0505 October 2023 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2022-LLE-0030) (Letter) ML23305A0942023-10-0202 October 2023 10-CW-2023-09 Post-Exam Submittal ML23270B9662023-09-27027 September 2023 10 CFR 50.55a(z)(I) Request for Relief from ASME OM Code Pump and Valve Testing Requirements for Fifth 120-Month Inservice Testing Interval ML23228A0252023-09-25025 September 2023 Issuance of Amendment No. 234 to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23261C3852023-09-25025 September 2023 Safety Evaluation for Operating Quality Assurance Manual Revision 36A ML23166B0882023-09-20020 September 2023 Issuance of Amendment No. 233 for Adoption of Alternative Source Term and Revision of Technical Specifications ML23206A1992023-09-15015 September 2023 Regulatory Audit Summary Regarding License Amendment and Regulatory Exemptions Request for Fuel Transition to Framatome Gaia Fuel (Epids L-2022-LLA-0150 and L-2022-LLE-0030) IR 05000483/20234012023-09-13013 September 2023 NRC Security Baseline Inspection Report 05000483/2023401 ML23240A7572023-08-31031 August 2023 NRC Initial Operator Licensing Examination Approval 05000483/2023301 IR 05000483/20230052023-08-23023 August 2023 Updated Inspection Plan for Callaway Nuclear Power Plant, Unit 1 (Report 05000483/2023005) - Mid Cycle Letter 2023 ULNRC-06824, Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A2023-08-17017 August 2023 Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A ML23219A1392023-08-15015 August 2023 Request for Withholding Information from Public Disclosure ULNRC-06830, Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak2023-08-15015 August 2023 Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak ML23215A1972023-08-0303 August 2023 Supplement to License Amendment and Exemption Request Regarding Use of Framatome Gaia Fuel (LDCN 22-0002) ULNRC-06223, Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004)2023-07-25025 July 2023 Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004) ULNRC-06799, Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications2023-07-13013 July 2023 Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications IR 05000483/20230022023-07-10010 July 2023 Integrated Inspection Report 05000483/2023002 ML23174A1272023-06-23023 June 2023 Cw FFD Document Request List 2023 ML23171A9942023-06-22022 June 2023 Acceptance of Request for Approval of Operating Quality Assurance Manual Revision 36a ULNRC-06821, Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301)2023-06-21021 June 2023 Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301) IR 05000483/20230112023-06-15015 June 2023 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000483/2023011 ULNRC-06822, Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a2023-06-14014 June 2023 Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a ML23158A1462023-06-13013 June 2023 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000483/2023010) ULNRC-06815, Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a2023-06-0505 June 2023 Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a ULNRC-06818, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate .2023-06-0505 June 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate . ML23093A0952023-05-10010 May 2023 Issuance of Amendment No. 232 Regarding Technical Specification Changes for Spent Fuel Storage ULNRC-06816, Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015)2023-05-0909 May 2023 Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015) ML23129A7942023-05-0909 May 2023 Post-Audit Supplement to License Amendment Request and Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (Iepid L-2022-LLA-0150 and EPID L-2022-LLE-0030) ML23122A3172023-05-0808 May 2023 Review of the Spring 2022 Steam Generator Tube Inservice Inspections ML23118A3492023-05-0808 May 2023 Request for Withholding Information from Public Disclosure 2024-01-29
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23353A1712024-01-18018 January 2024 Issuance of Amendment No. 237 to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23347A1212024-01-11011 January 2024 Issuance of Amendment No. 236 to Adopt TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Volume Values to Licensee Control EPID L-2023-LLA-0046) ML23240A3692023-10-0505 October 2023 Issuance of Amendment No. 235 to Revise Technical Specifications to Use of Framatome Gaia Fuel (EPID L-2022-LLA-0150) (Non-Proprietary) ML23228A0252023-09-25025 September 2023 Issuance of Amendment No. 234 to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23166B0882023-09-20020 September 2023 Issuance of Amendment No. 233 for Adoption of Alternative Source Term and Revision of Technical Specifications ML23093A0952023-05-10010 May 2023 Issuance of Amendment No. 232 Regarding Technical Specification Changes for Spent Fuel Storage ML22361A0702023-02-24024 February 2023 Issuance of Amendment No. 231 for Revision to Radiological Emergency Response Plan Regarding Response and Notification Goals ML23019A1752023-01-30030 January 2023 Issuance of Amendment No. 230 to Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML23067A1482022-12-29029 December 2022 Operating License, Appendix C, Revision 078, Additional Conditions ML23067A1512022-12-29029 December 2022 Facility Operating License, Table of Contents ML23067A1522022-12-29029 December 2022 67, Operating License Amendment Index ML23067A1502022-12-29029 December 2022 Renewed Facility Operating License ML22301A0072022-12-0202 December 2022 Issuance of Amendment No. 229 to Revise Technical Specifications to Adopt TSTF-505, Revision 2, and TSTF-439, Revision 2 ML22220A1322022-10-21021 October 2022 Issuance of Amendment No. 228 Re; Revise Technical Specifications to Address Generic Safety Isusue-191 and Respond to Generic Letter 2004-02 Using Risk-Informed Approach ML22220A1302022-10-21021 October 2022 Exemptions from the Requirements of 10 CFR 50.46 and 10 CFR Part 50 Appendix a, General Design Criteria 35, 38, and 41 (EPID L-2021-LLE-0021) (Cover Letter) ML22220A2812022-08-15015 August 2022 Withdrawal of Requested Licensing Action LAR for TS Change and Exemption Request Transition to Allow Use of Framatome Gaia Fuel Submitted to NRC for Acceptance Review ML22053A2832022-04-0707 April 2022 Issuance of Amendment No. 227 Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-529, Revision 4, Clarify Use and Application Rules ML21344A0052021-12-29029 December 2021 Issuance of Amendment No. 226 Regarding Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants ML21195A2942021-06-22022 June 2021 78 to Operating License Appendix B - Environmental Protection Plan ML21195A2972021-06-22022 June 2021 64 to Operating License Amendment Index ML21195A2952021-06-22022 June 2021 Renewed Operating License ML21195A2932021-06-22022 June 2021 8 to Operating License Appendix C ML21053A1262021-03-24024 March 2021 Issuance of Amendment No. 225 to Revise Technical Specification Administrative Control 5.3.1 to Remove Details Specified for the Qualification of Certain Positions within the Unit Staff ML20218A4102020-11-0303 November 2020 Issuance of Amendment No. 224 Performance Based Method Alternative for Thermal Insulation Material ML20246G5702020-10-16016 October 2020 Issuance of Amendment No. 223 One-Time Deferral of the Steam Generator Tube Inspections ML19283C4812019-12-0606 December 2019 Issuance of Amendment No. 221 Main Turbine Control Slave Relay Testing ML20209A1482019-11-13013 November 2019 Operating License Re NRC Order ML20209A1172019-11-13013 November 2019 Operating License, Appendix B, Environmental Protection Plan ML20209A1522019-11-13013 November 2019 Operating License Re EA-12-051, Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation ML20209A1262019-11-13013 November 2019 Operating License Amendment Index ML20209A1122019-11-13013 November 2019 Operating License Re Appendix C, Additional Conditions ML20209A1052019-11-13013 November 2019 Operating License, Table of Contents ML20209A1252019-11-13013 November 2019 Operating License Re EA-03-009 Errata, Issuance of Errata to Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors ML20209A1352019-11-13013 November 2019 Operating License Re EA-06-037, Issuance of Order Requiring Compliance with Updated Adversary Characteristic ML20209A1312019-11-13013 November 2019 Operating License Re EA-05-007, Issuance of Order for Additional Security Measures on the Transportation of Radioactive Material Quantities of Concern ML20209A1392019-11-13013 November 2019 Operating License Re Order Modifying Licenses (Effective Immediately), EA-02-026 ML20209A1162019-11-13013 November 2019 Operating License Regarding Issuance of First Revised NRC Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors ML20209A1072019-11-13013 November 2019 Operating License Re EA-13-237, Issuance of Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access for Callaway Plant Independent Spent Fuel Storage Installation ML20209A1132019-11-13013 November 2019 Operating License Re Renewed Facility Operating License ML20209A1412019-11-13013 November 2019 Operating License Re Issuance of Order for Compensatory Measures Related to Fitness-for-Duty Enhancements Applicable to Nuclear Facility Security Force Personnel ML20209A1432019-11-13013 November 2019 Operating License Re EA-12-049, Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events ML20209A1532019-11-13013 November 2019 Operating License Re Issuance of Order Requiring Compliance with Revised Design Basis Threat for Operating Power Reactors ML19158A2902019-07-30030 July 2019 Issuance of Amendment No. 220 Regarding Emergency Action Level Scheme Changes ML19073A0012019-04-18018 April 2019 Issuance of Amendment No. 219 to Add New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System ML18124A0262018-05-30030 May 2018 Issuance of Amendment No. 218 FSAR Revision Compliance with Regulatory Guide 1.106 Regarding MOV Thermal Overload Protection ML17236A0822017-09-15015 September 2017 Issuance of Amendment No. 217 Replacement of Methodology in Technical Specification 5.6.5, Core Operating Limits Report (Colr), ML16020A5162016-02-29029 February 2016 Issuance of Amendment No. 216, Revise Technical Specification (TS) 2.1.1.1 and TS 5.6.5, to Remove Uncertainties from Departure from Nucleate Boiling Ratio Safety Limit and Adopt WCAP-14565-P-A Methodology ML15324A1142016-02-0202 February 2016 Issuance of Amendment No. 215, Adopt Technical Specification Task Force (TSTF) Traveler TSTF-510, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection ML15328A0592016-01-28028 January 2016 Issuance of Amendment No. 214, Request to Revise Operating License Condition Related to Cyber Security Plan Milestone 8 Full Implementation Date ML15258A5102015-10-28028 October 2015 Issuance of Amendment No. 213, Adopt Technical Specification Task Force Traveler TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation 2024-01-18
[Table view] Category:Safety Evaluation
MONTHYEARML23353A1712024-01-18018 January 2024 Issuance of Amendment No. 237 to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23347A1212024-01-11011 January 2024 Issuance of Amendment No. 236 to Adopt TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Volume Values to Licensee Control EPID L-2023-LLA-0046) ML23234A1522023-10-0505 October 2023 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2022-LLE-0030) (Letter) ML23240A3692023-10-0505 October 2023 Issuance of Amendment No. 235 to Revise Technical Specifications to Use of Framatome Gaia Fuel (EPID L-2022-LLA-0150) (Non-Proprietary) ML23228A0252023-09-25025 September 2023 Issuance of Amendment No. 234 to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23261C3852023-09-25025 September 2023 Safety Evaluation for Operating Quality Assurance Manual Revision 36A ML23166B0882023-09-20020 September 2023 Issuance of Amendment No. 233 for Adoption of Alternative Source Term and Revision of Technical Specifications ML22361A0702023-02-24024 February 2023 Issuance of Amendment No. 231 for Revision to Radiological Emergency Response Plan Regarding Response and Notification Goals ML23019A1752023-01-30030 January 2023 Issuance of Amendment No. 230 to Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML22301A0072022-12-0202 December 2022 Issuance of Amendment No. 229 to Revise Technical Specifications to Adopt TSTF-505, Revision 2, and TSTF-439, Revision 2 ML22220A1302022-10-21021 October 2022 Exemptions from the Requirements of 10 CFR 50.46 and 10 CFR Part 50 Appendix a, General Design Criteria 35, 38, and 41 (EPID L-2021-LLE-0021) (Cover Letter) ML22220A1322022-10-21021 October 2022 Issuance of Amendment No. 228 Re; Revise Technical Specifications to Address Generic Safety Isusue-191 and Respond to Generic Letter 2004-02 Using Risk-Informed Approach ML22053A2832022-04-0707 April 2022 Issuance of Amendment No. 227 Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-529, Revision 4, Clarify Use and Application Rules ML21344A0052021-12-29029 December 2021 Issuance of Amendment No. 226 Regarding Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants ML21053A1262021-03-24024 March 2021 Issuance of Amendment No. 225 to Revise Technical Specification Administrative Control 5.3.1 to Remove Details Specified for the Qualification of Certain Positions within the Unit Staff ML20218A4102020-11-0303 November 2020 Issuance of Amendment No. 224 Performance Based Method Alternative for Thermal Insulation Material ML20246G5702020-10-16016 October 2020 Issuance of Amendment No. 223 One-Time Deferral of the Steam Generator Tube Inspections ML20230A3872020-08-31031 August 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20216A6812020-08-0606 August 2020 Operating Quality Assurance Manual Change Revision 34B (EPID L-2020-LLQ-0004 (COVID-19)) ML20141L7452020-06-0808 June 2020 Operating Quality Assurance Manual Change Revision 34A ML20107H9782020-04-20020 April 2020 COVID-19 Relief Request CC-01 Containment Tendon Inspection ML19283C4812019-12-0606 December 2019 Issuance of Amendment No. 221 Main Turbine Control Slave Relay Testing ML19158A2902019-07-30030 July 2019 Issuance of Amendment No. 220 Regarding Emergency Action Level Scheme Changes ML19073A0012019-04-18018 April 2019 Issuance of Amendment No. 219 to Add New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System ML19079A1482019-04-0101 April 2019 Request for Alternative I4R-05 to Reactor Vessel Nozzle Weld Examination Frequency Requirements (EPID L-2018-LLR-0051 ML18313A0692018-11-26026 November 2018 Request for Relief I4R-01 Related to the Inservice Inspection Program for Class 3 Buried High Density Polyethylene Piping ML18124A0262018-05-30030 May 2018 Issuance of Amendment No. 218 FSAR Revision Compliance with Regulatory Guide 1.106 Regarding MOV Thermal Overload Protection ML17262A7002017-10-0303 October 2017 Request for Alternative I4R-04 Applicable to the Fourth 10-Year Inspection Program Interval ML17254A1202017-09-25025 September 2017 Request for Alternative No. PR-07 from the Requirements of the ASME Code for the Fourth 10-Year Inservice Testing Interval ML17236A0822017-09-15015 September 2017 Issuance of Amendment No. 217 Replacement of Methodology in Technical Specification 5.6.5, Core Operating Limits Report (Colr), ML17170A3202017-06-20020 June 2017 Safety Evaluation Input - for Ameren Missouri Request to Amend Callaway Plant, Unit 1, Technical Specification 5.6.5, Core Operating Limits Report - ML17058A4432017-03-0606 March 2017 Request for Alternative I4R-03 Applicable to the Fourth 10-Year Inservice Inspection Program Interval ML17010A3322017-02-0202 February 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML16223A7122016-08-30030 August 2016 Relief Request No. 13R-08 from Code Case N-460, Alternative Examination Coverage for Class 1 and Class 2 Welds, for Piping Welds, Third 10-Year Inservice Inspection Interval ML16089A1672016-04-0101 April 2016 Review and Approval of Quality Assurance Plan Change Per Nuclear Energy Institute (NEI) 14-05A, Revision 1 ML16055A4642016-03-17017 March 2016 Relief Requests 13R-09 (Steam Generator Tubesheet Weld), 13R-11 (Pressurizer Welds) from Code Case N-460 and 13R-18 (SG Weld), from Appendix Viii Requirements, Third 10-Year Inservice Inspection Interval (CAC MF6735-MF6737) ML16020A5162016-02-29029 February 2016 Issuance of Amendment No. 216, Revise Technical Specification (TS) 2.1.1.1 and TS 5.6.5, to Remove Uncertainties from Departure from Nucleate Boiling Ratio Safety Limit and Adopt WCAP-14565-P-A Methodology ML15324A1142016-02-0202 February 2016 Issuance of Amendment No. 215, Adopt Technical Specification Task Force (TSTF) Traveler TSTF-510, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection ML16027A1582016-01-29029 January 2016 Relief Request I4R-02 from Requirements of ASME Code Section XI, Table IWF-2500-1 for 100% Visual Examination of Class 1 Supports, Fourth 10-Year Inservice Inspection Interval ML15328A0592016-01-28028 January 2016 Issuance of Amendment No. 214, Request to Revise Operating License Condition Related to Cyber Security Plan Milestone 8 Full Implementation Date ML15258A5102015-10-28028 October 2015 Issuance of Amendment No. 213, Adopt Technical Specification Task Force Traveler TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation ML15251A4932015-10-0707 October 2015 Issuance of Amendment No. 212, Request to Upgrade the Emergency Action Level Scheme by Adopting Nuclear Energy Institute NEI 99-01, Revision 6 ML15064A1252015-05-12012 May 2015 Request for Relief I4R-01 from ASME Code Requirements for Replacement of Class 3 Essential Service Water Buried Piping with High Density Polyethylene Piping, for the Fourth 10-year Inservice Testing Interval ML15064A0282015-03-31031 March 2015 Issuance of Amendment No. 211, Request to Revise Final Safety Analysis Report Standard Plant Section 3.6 for High Density Polyethylene (Hdpe) Crack Exclusion ML15035A1482015-02-10010 February 2015 Relief Request 13R-17, Proposed Alternative to ASME Code, Section XI Requirements, Which Extends Reactor Vessel Inservice Inspection Frequency from 10 to 20 Years, Third 10-Year Interval ML14350B2392015-01-20020 January 2015 Issuance of Amendment No. 210, Revise Technical Specification LCO 3.4.12, Cold Overpressure Mitigation System (Coms), to Clarify No Limitation on Normal Charging Pump Use During Modes 4-6 ML14234A4512014-09-0404 September 2014 Relief Request I3R-16, Temporary Non-Code Repair of the Train a Component Cooling Water Heat Exchanger to Control ESW Leakage, Third 10-Year Inservice Inspection Interval ML14178A7692014-07-15015 July 2014 Requests for Relief PR-01, PR-02, PR-03, PR-04, and PR-06 (PR-05 Withdrawn), ASME OM Code Cases for Group a and B Pumps for Fourth 10-Year Inservice Testing Interval ML14175A3902014-07-0101 July 2014 Issuance of Amendment No. 209, Adoption of Technical Specification Task Force Change Traveler TSTF-522-A, Revision 0, Revise Ventilation System to Operate for 10 Hours Per Month, Using CLIIP ML14027A0572014-01-29029 January 2014 Relief Request PR-07, Testing Frequency for Pumps and Valves, Third 10-year Inservice Testing Interval 2024-01-18
[Table view] |
Text
September 9, 2003 Mr. Garry L. Randolph Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251
SUBJECT:
CALLAWAY PLANT, UNIT 1 - ISSUANCE OF AMENDMENT RE: REVISION OF TECHNICAL SPECIFICATIONS FOR MINIMUM USABLE VOLUMES FOR THE DIESEL GENERATOR FUEL OIL STORAGE TANKS (TAC NO. MB9663)
Dear Mr. Randolph:
The Commission has issued the enclosed Amendment No. 156 to Facility Operating License No. NPF-30 for the Callaway Plant, Unit 1. The amendment consists of changes to the technical specifications (TSs) in response to your application dated June 2, 2003 (ULNRC-04854).
The amendment revises TS 3.8.3, Condition A to increase the specified minimum fuel oil inventories maintained in the fuel oil storage tanks for the diesel generators.
A copy of the related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commissions next biweekly Federal Register notice.
Sincerely,
/RA/
Brian Benney, Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-483
Enclosures:
- 1. Amendment No. 156 to NPF-30
- 2. Safety Evaluation cc w/encls: See next page
ML032580065 NRR-058 OFFICE PDIV-2/PM PDIV-2/PM PDIV-2/LA SPLB/BC NAME BBenney JDonohew EPeyton JHannon DATE 7/31/03 7/31/03 9/3/03 8/20/03 OFFICE OGC PDIV-2/SC NAME DCummings SDembek DATE 9/2/03 9/5/03 DOCUMENT NAME: C:\ORPCheckout\FileNET\ML032580065.wpd UNION ELECTRIC COMPANY CALLAWAY PLANT, UNIT 1 DOCKET NO. 50-483 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 156 License No. NPF-30
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Union Electric Company (UE, the licensee) dated June 2, 2003, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commissions regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. NPF-30 is hereby amended to read as follows:
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 156 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. This amendment is effective as of its date of issuance, and shall be implemented within 60 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Stephen Dembek, Chief, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: September 9, 2003
ATTACHMENT TO LICENSE AMENDMENT NO. 156 FACILITY OPERATING LICENSE NO. NPF-30 DOCKET NO. 50-483 Replace the following page of the Appendix A Technical Specifications with the attached revised page. The revised page is identified by amendment number and contains marginal lines indicating the areas of change.
REMOVE INSERT 3.8-19 3.8-19
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 156 TO FACILITY OPERATING LICENSE NO. NPF-30 UNION ELECTRIC COMPANY CALLAWAY PLANT, UNIT 1 DOCKET NO. 50-483
1.0 INTRODUCTION
By letter dated June 2, 2003, Union Electric Company (the licensee) requested changes to the Technical Specifications (TSs) for the Callaway Plant, Unit 1. The proposed TS change would modify the minimum fuel oil inventories maintained in the fuel oil storage tanks for the diesel generators (DGs). Currently, TS 3.8.3 requires a minimum usable fuel oil volume of 68,915 gallons to be maintained. The licensee proposed to change the minimum usable fuel oil volume to 69,300 gallons. Limiting Condition for Operation (LCO) 3.8.3, Condition A, is affected by the TS change.
2.0 REGULATORY EVALUATION
The current TS requirements on minimum fuel oil inventory are based on previous calculations that concluded a minimum volume of 68,915 gallons was needed for each of the DGs. The licensee assumed these fuel oil inventories based on limited operation of emergency core cooling system pumps during the first six days following a loss-of-coolant accident (LOCA).
Recently, the licensee re-calculated the minimum fuel oil inventories for the DG fuel oil storage tanks. The results of the calculations indicated that the required minimum usable fuel oil in the fuel oil storage tanks is greater than that required by current TSs. Accordingly, the licensee requested a change to the operating license to increase the amount of diesel fuel oil to be kept in the storage tanks. Regulatory Guide 1.137, "Fuel Oil Systems for Standby Diesel Generators," describes the method for complying with the NRC regulations. The American National Standards Institute (ANSI) N195-1976 Standard, "Fuel Oil Systems for Standby Diesel-Generators," provides a method acceptable to the staff for complying with the pertinent requirements of General Design Criterion (GDC) 17.
3.0 TECHNICAL EVALUATION
3.1 Regulatory Requirements GDC-17, "Electric Power Systems," of Appendix A to 10 CFR Part 50 requires that an onsite electric power system and an offsite electric power system be provided to permit functioning of structures, systems, and components important to safety. In addition, GDC-17 contains requirements concerning system capacity, capability, independence, redundancy, availability,
testability, and reliability. The onsite standby (alternating current [ac]) power system, powered by the DGs, supplies power to selected loads in the event of a loss of normal ac power supplies. The availability and reliability of the DGs is a major factor in ensuring acceptable plant safety.
3.2 TS Changes Proposed for Callaway At Callaway, the fuel oil storage tanks are required to supply sufficient fuel oil to the DGs for their proper operation for a duration of seven days following a LOCA. LCO Condition A provides a volume range below 80,400 gallons, but above 68,915 for a period of 48 hours2 days <br />0.286 weeks <br />0.0658 months <br /> prior to restoring the tank volume to greater than 80,400 gallons. In this condition, the seven-day fuel oil supply for a DG is not available. However, the condition is restricted to fuel oil level reductions that maintain at least a six-day supply. The proposed TS change would require additional fuel oil to be stored in the DG fuel oil storage tanks, as was determined by the licensees updated calculations. The proposed change would increase minimum fuel oil volume from 68,915 gallons to 69,300 gallons. Section 5.4, "Calculation of Fuel Oil Storage Requirements," of the ANSI N195-1976 Standard, states that fuel oil calculations shall be based on the assumption that the DG operates continuously for seven days at its rated capacity. The licensee stated that the original calculation for the LCO (6-day supply) capacity was obtained by dividing 80,400 by 7 and multiplying by 6. This does not properly account for the total unusable volume of 2840 gallons. New calculations, which account for only the usable volume of the fuel oil in the storage tank for the 6-day and 7-day supply, required a volume increase of 385 gallons in the specified 6-day supply in LCO 3.8.3, Condition A.
The staff has completed its review of the licensees submittal and finds that the TS change will ensure the capability of the DGs to perform their safety function with the revised capacities specified for usable fuel. Therefore, the staff concludes that the proposed change to the fuel volumes in the DG fuel oil storage tanks meets the intent of GDC-17, and is acceptable.
3.3 Evaluation Conclusions On the basis of its review, the staff concludes that the proposed TS change is acceptable. The basis for the staffs acceptance are that:
The proposed change is justified by the licensee on the basis of technical information reviewed by the staff.
The proposed change would improve the DG availability and capability.
The proposed change meets the intent of GDC-17.
Therefore, the staff concludes that the proposed TS change is acceptable.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Missouri State official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding (68 FR 43393). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: Brian Benney, DLPM Date: September 9, 2003
Callaway Plant, Unit 1 cc:
Professional Nuclear Consulting, Inc. Mr. Rick A. Muench 19041 Raines Drive President and Chief Executive Officer Derwood, MD 20855 Wolf Creek Nuclear Operating Corporation P.O. Box 411 John ONeill, Esq. Burlington, KA 66839 Shaw, Pittman, Potts & Trowbridge 2300 N. Street, N.W. Mr. Dan I. Bolef, President Washington, D.C. 20037 Kay Drey, Representative Board of Directors Coalition for the Mr. Mark A. Reidmeyer, Regional Environment Regulatory Affairs Supervisor 6267 Delmar Boulevard Regulatory Affairs University City, MO 63130 AmerenUE P.O. Box 620 Mr. Lee Fritz, Presiding Commissioner Fulton, MO 65251 Callaway County Court House 10 East Fifth Street U.S. Nuclear Regulatory Commission Fulton, MO 65151 Resident Inspector Office 8201 NRC Road Mr. David E. Shafer Steedman, MO 65077-1302 Superintendent, Licensing Regulatory Affairs Mr. Chris Younie AmerenUE Manager, Quality Assurance P.O. Box 66149, MC 470 AmerenUE St. Louis, MO 63166-6149 P.O. Box 620 Fulton, MO 65251 Mr. Keith D. Young Manager, Regulatory Affairs Manager - Electric Department AmerenUE Missouri Public Service Commission P.O. Box 620 301 W. High Fulton, MO 65251 P.O. Box 360 Jefferson City, MO 65102 Mr. Scott Clardy, Director Section for Environmental Public Health Regional Administrator, Region IV P.O. Box 570 U.S. Nuclear Regulatory Commission Jefferson City, MO 65102-0570 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Mr. Ronald A. Kucera Deputy Director for Public Policy Department of Natural Resources P.O. Box 176 Jefferson City, Missouri 65102