Letter Sequence Other |
---|
|
|
MONTHYEARML16027A1582016-01-29029 January 2016 Relief Request I4R-02 from Requirements of ASME Code Section XI, Table IWF-2500-1 for 100% Visual Examination of Class 1 Supports, Fourth 10-Year Inservice Inspection Interval Project stage: Other 2016-01-29
[Table View] |
|
---|
Category:Code Relief or Alternative
MONTHYEARML20225A2922020-08-12012 August 2020 Request to Use a Portion of a Later Edition of the ASME B&PV Code, Section XI ML19079A1482019-04-0101 April 2019 Request for Alternative I4R-05 to Reactor Vessel Nozzle Weld Examination Frequency Requirements (EPID L-2018-LLR-0051 ML18313A0692018-11-26026 November 2018 Request for Relief I4R-01 Related to the Inservice Inspection Program for Class 3 Buried High Density Polyethylene Piping ULNRC-06420, Request 14R-05 for Relief from Requirements of ASME Code Case N-770-2 Regarding Inspection Intervals for Reactor Vessel Nozzle Dissimilar Metal Welds2018-04-0909 April 2018 Request 14R-05 for Relief from Requirements of ASME Code Case N-770-2 Regarding Inspection Intervals for Reactor Vessel Nozzle Dissimilar Metal Welds ML17262A7002017-10-0303 October 2017 Request for Alternative I4R-04 Applicable to the Fourth 10-Year Inspection Program Interval ML17254A1202017-09-25025 September 2017 Request for Alternative No. PR-07 from the Requirements of the ASME Code for the Fourth 10-Year Inservice Testing Interval ML17058A4432017-03-0606 March 2017 Request for Alternative I4R-03 Applicable to the Fourth 10-Year Inservice Inspection Program Interval ML16223A7122016-08-30030 August 2016 Relief Request No. 13R-08 from Code Case N-460, Alternative Examination Coverage for Class 1 and Class 2 Welds, for Piping Welds, Third 10-Year Inservice Inspection Interval ML16055A4642016-03-17017 March 2016 Relief Requests 13R-09 (Steam Generator Tubesheet Weld), 13R-11 (Pressurizer Welds) from Code Case N-460 and 13R-18 (SG Weld), from Appendix Viii Requirements, Third 10-Year Inservice Inspection Interval (CAC MF6735-MF6737) ML16027A1582016-01-29029 January 2016 Relief Request I4R-02 from Requirements of ASME Code Section XI, Table IWF-2500-1 for 100% Visual Examination of Class 1 Supports, Fourth 10-Year Inservice Inspection Interval ML15064A1252015-05-12012 May 2015 Request for Relief I4R-01 from ASME Code Requirements for Replacement of Class 3 Essential Service Water Buried Piping with High Density Polyethylene Piping, for the Fourth 10-year Inservice Testing Interval ML15035A1482015-02-10010 February 2015 Relief Request 13R-17, Proposed Alternative to ASME Code, Section XI Requirements, Which Extends Reactor Vessel Inservice Inspection Frequency from 10 to 20 Years, Third 10-Year Interval ML14239A0972014-09-0404 September 2014 Request for Relief I3R-15, ASME Code Class 1 Pressure-Retaining Piping/Components Leakage Testing at Full Pressure, Third 10-Year Inservice Inspection Interval ML14234A4512014-09-0404 September 2014 Relief Request I3R-16, Temporary Non-Code Repair of the Train a Component Cooling Water Heat Exchanger to Control ESW Leakage, Third 10-Year Inservice Inspection Interval ML14178A7692014-07-15015 July 2014 Requests for Relief PR-01, PR-02, PR-03, PR-04, and PR-06 (PR-05 Withdrawn), ASME OM Code Cases for Group a and B Pumps for Fourth 10-Year Inservice Testing Interval ML14027A0572014-01-29029 January 2014 Relief Request PR-07, Testing Frequency for Pumps and Valves, Third 10-year Inservice Testing Interval ML13246A3042013-08-30030 August 2013 Verbal Authorization Email, Relief Request PR-07, Testing Frequency for Pumps and Valves, Third 10-year Inservice Testing Interval ML13126A3202013-05-0707 May 2013 Summary of Telephone Conference, Verbal Authorization of Relief Request I3R-14. Proposed Alternative to ASME Code Requirements for Leakage Testing of RPV Head Flange Leakoff Lines, Third 10-Year ISI Interval. ML12258A0452012-09-18018 September 2012 Relief Request VR-01 from Requirements of ASME OM Code, Mandatory Appendix I, One-time Extension for 5-Year Replacement Interval, from 4/11/12 to 6/2013, Main Steam Isolation Valve Actuator Rupture Disks ML1211502472012-05-0303 May 2012 Memo to File, Verbal Authorization, Relief Request VR-01 from Requirements of ASME OM Code Mandatory Appendix I, One-time Extension Replacement of Main Steam Isolation Valve Actuator Rupture Disks ML1201907482012-02-16016 February 2012 Relief Request 13R-13, Alternative to ASME Code Section XI Requirements for Performance of Second Successive Exam of C Cold Leg Safe-End to Elbow Weld, Third 10-Year Inservice Inspection ML0831002882008-11-0707 November 2008 Relief Request 13R-10 Approved on October 31, 2008, for Third 10-Year Inservice Inspection Interval for Use of Polyethylene Pipe in Lieu of Carbon Steel Pipe in Buried Essential Service Water Piping System ML0818406062008-07-0303 July 2008 Approval of Second Extension Request for Corrective Actions GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors. ML0731114422007-12-10010 December 2007 Correction to Authorization of Relief Request ISI-39 for the Second 10-Year Inservice Inspection Interval ML0729803972007-10-30030 October 2007 Relief Request ISI-38, Reactor Pressure Vessel Inlet Safe-End to-Elbow Welds Proposed Alternative Examination for Second 10-Year Inservice Inspection Interval ML0724000922007-09-17017 September 2007 Issuance of Relief Requests (Rrs) ISI-36, ISI-37, and ISI-38 for Second Year Inservice Inspection (ISI) Interval ML0725504882007-08-30030 August 2007 10 CFR 50.55a Request: Proposed Alternative to ASME Section Xi Requirements for Replacement of Class 3 Buried Piping ML0715203292007-07-10010 July 2007 Request for Alternatives for Application of Structural Weld Overlays to Pressurizer Dissimilar Metal Nozzle Welds for Third 10-Year Inservice Inspection Program Interval ML0705803332007-03-15015 March 2007 Authorization of Relief Request No. ISI-33 for Second 10-Year and Third 10-Year ISI Interval ML0635203182007-01-18018 January 2007 Request for Relief No. ISI-35 for Second 10-year Inservice Inspection Interval ML0700303362007-01-18018 January 2007 Relief Request ISI-41 for the Second 10-year Inservice Inspection Interval ML0630604782006-12-0707 December 2006 Relief Request 13R-04 for the Third 10-Year Interval Inservice Inspection ML0629302822006-11-17017 November 2006 Relief Requests I3R-05 and I3R-06 for the Third Inservice Inspection Interval ULNRC-05183, Requests for Relief from ASME Section XI Code Inservice Examination Requirements2006-10-25025 October 2006 Requests for Relief from ASME Section XI Code Inservice Examination Requirements ML0614301312006-06-15015 June 2006 Relief, Third 10-Year Interval Inservice Inspection Program Relief Request I3R-02 ML0520802152005-08-18018 August 2005 Relief, Use a Subsequent Edition of ASME Code Examinations for the Third Inservice Inspection Interval ML0515302072005-06-22022 June 2005 6/22/05 Callaway, Unit 1 - Relief Requests ISI-24,ISI-25 and ISI-26 of the Second 10-Year Inservice Inspection (ISI) Interval (Tacs. MC4435 and MC4436) ML0507601292005-05-19019 May 2005 Relief, Request for Relief from Certain ASME Code Examinations for the Second Inservice Inspection Interval ULNRC-05092, Revision to Approve Request for Relief from ASME Section III Requirements Regarding Non-destructive Examination of Welds Performed Under Site Repair/Replacement Program2004-11-18018 November 2004 Revision to Approve Request for Relief from ASME Section III Requirements Regarding Non-destructive Examination of Welds Performed Under Site Repair/Replacement Program ULNRC-05049, Union Electric Company Callaway Plant Request for Relief from ASME Section XI Code Inservice Examination Requirements2004-09-0303 September 2004 Union Electric Company Callaway Plant Request for Relief from ASME Section XI Code Inservice Examination Requirements ML0414100712004-05-19019 May 2004 Relief, ASME Code Requirements on the Use of Weld Overlay Reinforcement to Restore Wall Thickness of ASME Class 2 Carbon Steel Main Feedwater Piping. ML0414100352004-05-19019 May 2004 Relief, Second Ten-Year Interval Inservice Inspection Program Relief Request to Use an Alternative Examination Method ULNRC-04993, Revision of Request for Relief from ASME Section XI Requirements in Order to Temporarily Restore Wall Thickness of ASME Class 2 Carbon Steel Main Feedwater Piping by Weld Overlay Reinforcement2004-05-0707 May 2004 Revision of Request for Relief from ASME Section XI Requirements in Order to Temporarily Restore Wall Thickness of ASME Class 2 Carbon Steel Main Feedwater Piping by Weld Overlay Reinforcement ML0409806642004-04-0707 April 2004 4/7/04 Callaway Plant - Request for Relief from ASME Code Requirements on the Use of Weld Overlay Reinforcement to Restore Wall Thickness of ASME Class 2 Carbon Steel Main Feedwater Piping ULNRC-04879, Requests for Relief Regarding Implementation of ASME Section XI Appendix VII Requirements2003-08-14014 August 2003 Requests for Relief Regarding Implementation of ASME Section XI Appendix VII Requirements ML0318305352003-07-0101 July 2003 Second Ten-Year Interval Inservice Inspection Program Relief Request to Use an Alternative Examination Method (Tac. MB6534) ML0134602652002-01-30030 January 2002 Relief, Application of Risk-Informed Inservice Inspection Program for the American Society of Mechanical Engineers Boilers and Pressure Vessel Code Class 1 and 2 TAC No MB1205) 2020-08-12
[Table view] Category:Letter
MONTHYEARULNRC-06853, Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.7172024-01-29029 January 2024 Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.717 IR 05000483/20230042024-01-19019 January 2024 Integrated Inspection Report 05000483/2023004 ML24008A0552024-01-19019 January 2024 Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code (EPID L-2023-LLR- 0061) ML23353A1712024-01-18018 January 2024 Issuance of Amendment No. 237 to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23317A0012024-01-12012 January 2024 Audit Summary Regarding LAR to Clarify Support System Requirements for the Residual Heat Removal and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23347A1212024-01-11011 January 2024 Issuance of Amendment No. 236 to Adopt TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Volume Values to Licensee Control EPID L-2023-LLA-0046) ML24011A1492024-01-11011 January 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information (05000483/2024011) ULNRC-06847, Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01)2023-12-21021 December 2023 Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01) ULNRC-06849, License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds2023-12-20020 December 2023 License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds ML23346A0392023-12-14014 December 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Request for Relief from Requirements of ASME Code, Section Xl, Examination and Testing Unbonded Post-Tensioning System ULNRC-06844, Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification2023-12-0707 December 2023 Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification 05000483/LER-2023-001, Submittal of LER 2023-001-00 for Callaway, Unit 1, Inoperable Instrument Tunnel Sump Level Indication Resulted in Condition Prohibited by Technical Specifications2023-11-29029 November 2023 Submittal of LER 2023-001-00 for Callaway, Unit 1, Inoperable Instrument Tunnel Sump Level Indication Resulted in Condition Prohibited by Technical Specifications ULNRC-06827, Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029)2023-11-20020 November 2023 Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029) IR 05000483/20230102023-11-15015 November 2023 NRC License Renewal Phase 1 Inspection Report 05000483 2023010 IR 05000483/20233012023-11-0909 November 2023 NRC Examination Report 05000483-2023301 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23297A2502023-11-0606 November 2023 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination and Opportunity for a Hearing (EPID L-2022-LLA-0176) - Letter IR 05000483/20240122023-10-24024 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (05000483/2024012) ML23293A2652023-10-24024 October 2023 3rd Quarter 2023 Integrated Inspection Report ML23240A3692023-10-0505 October 2023 Issuance of Amendment No. 235 to Revise Technical Specifications to Use of Framatome Gaia Fuel (EPID L-2022-LLA-0150) (Non-Proprietary) ML23234A1522023-10-0505 October 2023 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2022-LLE-0030) (Letter) ML23305A0942023-10-0202 October 2023 10-CW-2023-09 Post-Exam Submittal ML23270B9662023-09-27027 September 2023 10 CFR 50.55a(z)(I) Request for Relief from ASME OM Code Pump and Valve Testing Requirements for Fifth 120-Month Inservice Testing Interval ML23228A0252023-09-25025 September 2023 Issuance of Amendment No. 234 to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23261C3852023-09-25025 September 2023 Safety Evaluation for Operating Quality Assurance Manual Revision 36A ML23166B0882023-09-20020 September 2023 Issuance of Amendment No. 233 for Adoption of Alternative Source Term and Revision of Technical Specifications ML23206A1992023-09-15015 September 2023 Regulatory Audit Summary Regarding License Amendment and Regulatory Exemptions Request for Fuel Transition to Framatome Gaia Fuel (Epids L-2022-LLA-0150 and L-2022-LLE-0030) IR 05000483/20234012023-09-13013 September 2023 NRC Security Baseline Inspection Report 05000483/2023401 ML23240A7572023-08-31031 August 2023 NRC Initial Operator Licensing Examination Approval 05000483/2023301 IR 05000483/20230052023-08-23023 August 2023 Updated Inspection Plan for Callaway Nuclear Power Plant, Unit 1 (Report 05000483/2023005) - Mid Cycle Letter 2023 ULNRC-06824, Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A2023-08-17017 August 2023 Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A ML23219A1392023-08-15015 August 2023 Request for Withholding Information from Public Disclosure ULNRC-06830, Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak2023-08-15015 August 2023 Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak ML23215A1972023-08-0303 August 2023 Supplement to License Amendment and Exemption Request Regarding Use of Framatome Gaia Fuel (LDCN 22-0002) ULNRC-06223, Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004)2023-07-25025 July 2023 Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004) ULNRC-06799, Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications2023-07-13013 July 2023 Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications IR 05000483/20230022023-07-10010 July 2023 Integrated Inspection Report 05000483/2023002 ML23174A1272023-06-23023 June 2023 Cw FFD Document Request List 2023 ML23171A9942023-06-22022 June 2023 Acceptance of Request for Approval of Operating Quality Assurance Manual Revision 36a ULNRC-06821, Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301)2023-06-21021 June 2023 Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301) IR 05000483/20230112023-06-15015 June 2023 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000483/2023011 ULNRC-06822, Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a2023-06-14014 June 2023 Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a ML23158A1462023-06-13013 June 2023 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000483/2023010) ULNRC-06815, Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a2023-06-0505 June 2023 Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a ULNRC-06818, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate .2023-06-0505 June 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate . ML23093A0952023-05-10010 May 2023 Issuance of Amendment No. 232 Regarding Technical Specification Changes for Spent Fuel Storage ULNRC-06816, Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015)2023-05-0909 May 2023 Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015) ML23129A7942023-05-0909 May 2023 Post-Audit Supplement to License Amendment Request and Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (Iepid L-2022-LLA-0150 and EPID L-2022-LLE-0030) ML23122A3172023-05-0808 May 2023 Review of the Spring 2022 Steam Generator Tube Inservice Inspections ML23118A3492023-05-0808 May 2023 Request for Withholding Information from Public Disclosure 2024-01-29
[Table view] Category:Safety Evaluation
MONTHYEARML23353A1712024-01-18018 January 2024 Issuance of Amendment No. 237 to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23347A1212024-01-11011 January 2024 Issuance of Amendment No. 236 to Adopt TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Volume Values to Licensee Control EPID L-2023-LLA-0046) ML23234A1522023-10-0505 October 2023 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2022-LLE-0030) (Letter) ML23240A3692023-10-0505 October 2023 Issuance of Amendment No. 235 to Revise Technical Specifications to Use of Framatome Gaia Fuel (EPID L-2022-LLA-0150) (Non-Proprietary) ML23228A0252023-09-25025 September 2023 Issuance of Amendment No. 234 to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23261C3852023-09-25025 September 2023 Safety Evaluation for Operating Quality Assurance Manual Revision 36A ML23166B0882023-09-20020 September 2023 Issuance of Amendment No. 233 for Adoption of Alternative Source Term and Revision of Technical Specifications ML22361A0702023-02-24024 February 2023 Issuance of Amendment No. 231 for Revision to Radiological Emergency Response Plan Regarding Response and Notification Goals ML23019A1752023-01-30030 January 2023 Issuance of Amendment No. 230 to Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML22301A0072022-12-0202 December 2022 Issuance of Amendment No. 229 to Revise Technical Specifications to Adopt TSTF-505, Revision 2, and TSTF-439, Revision 2 ML22220A1302022-10-21021 October 2022 Exemptions from the Requirements of 10 CFR 50.46 and 10 CFR Part 50 Appendix a, General Design Criteria 35, 38, and 41 (EPID L-2021-LLE-0021) (Cover Letter) ML22220A1322022-10-21021 October 2022 Issuance of Amendment No. 228 Re; Revise Technical Specifications to Address Generic Safety Isusue-191 and Respond to Generic Letter 2004-02 Using Risk-Informed Approach ML22053A2832022-04-0707 April 2022 Issuance of Amendment No. 227 Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-529, Revision 4, Clarify Use and Application Rules ML21344A0052021-12-29029 December 2021 Issuance of Amendment No. 226 Regarding Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants ML21053A1262021-03-24024 March 2021 Issuance of Amendment No. 225 to Revise Technical Specification Administrative Control 5.3.1 to Remove Details Specified for the Qualification of Certain Positions within the Unit Staff ML20218A4102020-11-0303 November 2020 Issuance of Amendment No. 224 Performance Based Method Alternative for Thermal Insulation Material ML20246G5702020-10-16016 October 2020 Issuance of Amendment No. 223 One-Time Deferral of the Steam Generator Tube Inspections ML20230A3872020-08-31031 August 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20216A6812020-08-0606 August 2020 Operating Quality Assurance Manual Change Revision 34B (EPID L-2020-LLQ-0004 (COVID-19)) ML20141L7452020-06-0808 June 2020 Operating Quality Assurance Manual Change Revision 34A ML20107H9782020-04-20020 April 2020 COVID-19 Relief Request CC-01 Containment Tendon Inspection ML19283C4812019-12-0606 December 2019 Issuance of Amendment No. 221 Main Turbine Control Slave Relay Testing ML19158A2902019-07-30030 July 2019 Issuance of Amendment No. 220 Regarding Emergency Action Level Scheme Changes ML19073A0012019-04-18018 April 2019 Issuance of Amendment No. 219 to Add New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System ML19079A1482019-04-0101 April 2019 Request for Alternative I4R-05 to Reactor Vessel Nozzle Weld Examination Frequency Requirements (EPID L-2018-LLR-0051 ML18313A0692018-11-26026 November 2018 Request for Relief I4R-01 Related to the Inservice Inspection Program for Class 3 Buried High Density Polyethylene Piping ML18124A0262018-05-30030 May 2018 Issuance of Amendment No. 218 FSAR Revision Compliance with Regulatory Guide 1.106 Regarding MOV Thermal Overload Protection ML17262A7002017-10-0303 October 2017 Request for Alternative I4R-04 Applicable to the Fourth 10-Year Inspection Program Interval ML17254A1202017-09-25025 September 2017 Request for Alternative No. PR-07 from the Requirements of the ASME Code for the Fourth 10-Year Inservice Testing Interval ML17236A0822017-09-15015 September 2017 Issuance of Amendment No. 217 Replacement of Methodology in Technical Specification 5.6.5, Core Operating Limits Report (Colr), ML17170A3202017-06-20020 June 2017 Safety Evaluation Input - for Ameren Missouri Request to Amend Callaway Plant, Unit 1, Technical Specification 5.6.5, Core Operating Limits Report - ML17058A4432017-03-0606 March 2017 Request for Alternative I4R-03 Applicable to the Fourth 10-Year Inservice Inspection Program Interval ML17010A3322017-02-0202 February 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML16223A7122016-08-30030 August 2016 Relief Request No. 13R-08 from Code Case N-460, Alternative Examination Coverage for Class 1 and Class 2 Welds, for Piping Welds, Third 10-Year Inservice Inspection Interval ML16089A1672016-04-0101 April 2016 Review and Approval of Quality Assurance Plan Change Per Nuclear Energy Institute (NEI) 14-05A, Revision 1 ML16055A4642016-03-17017 March 2016 Relief Requests 13R-09 (Steam Generator Tubesheet Weld), 13R-11 (Pressurizer Welds) from Code Case N-460 and 13R-18 (SG Weld), from Appendix Viii Requirements, Third 10-Year Inservice Inspection Interval (CAC MF6735-MF6737) ML16020A5162016-02-29029 February 2016 Issuance of Amendment No. 216, Revise Technical Specification (TS) 2.1.1.1 and TS 5.6.5, to Remove Uncertainties from Departure from Nucleate Boiling Ratio Safety Limit and Adopt WCAP-14565-P-A Methodology ML15324A1142016-02-0202 February 2016 Issuance of Amendment No. 215, Adopt Technical Specification Task Force (TSTF) Traveler TSTF-510, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection ML16027A1582016-01-29029 January 2016 Relief Request I4R-02 from Requirements of ASME Code Section XI, Table IWF-2500-1 for 100% Visual Examination of Class 1 Supports, Fourth 10-Year Inservice Inspection Interval ML15328A0592016-01-28028 January 2016 Issuance of Amendment No. 214, Request to Revise Operating License Condition Related to Cyber Security Plan Milestone 8 Full Implementation Date ML15258A5102015-10-28028 October 2015 Issuance of Amendment No. 213, Adopt Technical Specification Task Force Traveler TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation ML15251A4932015-10-0707 October 2015 Issuance of Amendment No. 212, Request to Upgrade the Emergency Action Level Scheme by Adopting Nuclear Energy Institute NEI 99-01, Revision 6 ML15064A1252015-05-12012 May 2015 Request for Relief I4R-01 from ASME Code Requirements for Replacement of Class 3 Essential Service Water Buried Piping with High Density Polyethylene Piping, for the Fourth 10-year Inservice Testing Interval ML15064A0282015-03-31031 March 2015 Issuance of Amendment No. 211, Request to Revise Final Safety Analysis Report Standard Plant Section 3.6 for High Density Polyethylene (Hdpe) Crack Exclusion ML15035A1482015-02-10010 February 2015 Relief Request 13R-17, Proposed Alternative to ASME Code, Section XI Requirements, Which Extends Reactor Vessel Inservice Inspection Frequency from 10 to 20 Years, Third 10-Year Interval ML14350B2392015-01-20020 January 2015 Issuance of Amendment No. 210, Revise Technical Specification LCO 3.4.12, Cold Overpressure Mitigation System (Coms), to Clarify No Limitation on Normal Charging Pump Use During Modes 4-6 ML14234A4512014-09-0404 September 2014 Relief Request I3R-16, Temporary Non-Code Repair of the Train a Component Cooling Water Heat Exchanger to Control ESW Leakage, Third 10-Year Inservice Inspection Interval ML14178A7692014-07-15015 July 2014 Requests for Relief PR-01, PR-02, PR-03, PR-04, and PR-06 (PR-05 Withdrawn), ASME OM Code Cases for Group a and B Pumps for Fourth 10-Year Inservice Testing Interval ML14175A3902014-07-0101 July 2014 Issuance of Amendment No. 209, Adoption of Technical Specification Task Force Change Traveler TSTF-522-A, Revision 0, Revise Ventilation System to Operate for 10 Hours Per Month, Using CLIIP ML14027A0572014-01-29029 January 2014 Relief Request PR-07, Testing Frequency for Pumps and Valves, Third 10-year Inservice Testing Interval 2024-01-18
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 29, 2016 Mr. Fadi Diya Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251
SUBJECT:
CALLAWAY PLANT UNIT 1 - RELIEF REQUEST 14R-02 FROM THE REQUIREMENTS OF THE ASME CODE, SECTION XI, TABLE IWF-2500-1 FOR 100 PERCENT VISUAL EXAMINATION OF CLASS 1 SUPPORTS (CAC NO MF5613)
Dear Mr. Diya:
By letter dated January 26, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15026A686), as supplemented by letter dated October 6, 2015 (ADAMS Accession No. ML15280A045), Union Electric Company (dba Ameren Missouri), the licensee, submitted a request to the U.S.Nuclear Regulatory Commission (NRC) for relief from American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code),
Section XI requirements at the Callaway Plant, Unit 1 (Callaway).
Specifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(z)(2), the licensee requested relief from the requirements of ASME Code,Section XI, Table IWF-2500-1, Category F-A, Item No. F1 .40. This inservice inspection requires the performance of a 100 percent visual VT-3 examination of the reactor pressure vessel Class 1 supports, other than piping supports, once every inspection interval. This relief request is being proposed for use during the fourth inspection interval that began December 19, 2014, and ends on December 18, 2024.
The request has been submitted because compliance with the above examination would result in a hardship or unusual difficulty without a compensating increase in the level of quality and safety. Additionally, the licensee included a proposed alternative to the 100 percent examination above.
The NRC staff has reviewed the subject request and concludes, as set forth in the enclosed safety evaluation, that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(z)(2). Therefore, the NRC grants relief for the subject examination of the components, as requested in the relief request RR 14R-02 for the fourth 10-year inspection interval at Callaway.
All other ASME Code,Section XI requirements for which relief was not specifically requested and approved in the subject request for relief, remain applicable including third-party review by the Authorized Nuclear lnservice Inspector.
F. Diya If you have any questions, please contact the Project Manager, John Klos at 301-415-5136 or via e-mail at john.klos@nrc.gov.
Sincerely, Robert J. Pascarelli, Chief Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-483
Enclosure:
Safety Evaluation cc w/encl: Distribution via ListServ
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELIEF REQUEST NO. 14R-02 REGARDING FOURTH 10-YEAR INSERVICE INSPECTION INTERVAL OF REACTOR PRESSURE VESSEL SUPPORTS UNION ELECTRIC COMPANY (OBA AMEREN MISSOURI)
CALLAWAY PLANT, UNIT 1 DOCKET NO. 50-483)
1.0 INTRODUCTION
By letter dated January 26, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15026A686), as supplemented by letter dated October 6, 2015 (ADAMS Accession No. ML15280A045), Union Electric Company (Ameren Missouri), the licensee, requested relief from the requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code),Section XI for Callaway Plant, Unit 1 (Callaway), reactor vessel supports.
Specifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(z)(2), the licensee requested relief on the basis that compliance with the specific requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
2.0 REGULATORY EVALUATION
The regulations in 10 CFR 50.55a(z)(2) state that alternatives to the requirements of paragraph (g) of 10 CFR 50.55a may be used, when authorized by the U.S. Nuclear Regulatory Commission (NRC), if (1) the proposed alternatives would provide an acceptable level of quality and safety or (2) compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Additionally, pursuant to 10 CFR 50.55a(g)(4), ASME Code Class 1, 2, and 3 components (including supports) shall meet the requirements, except the design and access provisions and the preservice examination requirements, set forth in the ASME Code,Section XI to the extent practical within the limitations of design, geometry, and materials of construction of the components. The regulations require that inservice examination of components and system pressure tests conducted during the first 10-year interval and subsequent intervals comply with the requirements in the latest edition and addenda of Section XI of the ASME Code, which was Enclosure
incorporated by reference in 10 CFR 50.55a(a)(1 )(ii) 12 months prior to the start of the 120-month interval, subject to the conditions listed in 10 CFR 50.55a(b)(2).
3.0 TECHNICAL EVALUATION
The information provided by the licensee in support of the request for relief from ASME Code requirements has been evaluated, and the bases for disposition are documented below.
3.1 The Licensee's Relief Request Request for Relief 14R-02, from ASME Code,Section XI, Table IWF-2500-1. Examination Category F-A Item F1.40 ASME Code Components Affected Reactor vessel supports, Component Numbers 2-RBB01-01, 2-RBB01-02, 2-RBB01-03 and 2-RBB01-04, ASME Code Class 1 component supports.
ASME Code Requirement ASME Code,Section XI, Table IWF-2500-1, Examination Category F-A, Item F1 .40 requires a visual examination (VT-3) of 100 percent of Class 1 supports, other than piping supports.
Licensee's Basis for Relief Request In its letter dated January 26, 2015, the licensee stated that:
Pursuant to [10 CFR 50.55a(z)(2)], relief is requested on the basis that compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.
Conformance with the applicable inservice inspection requirements would necessitate a design modification to the Reactor Pressure Vessel (RPV) supports and associated insulation/walk-plate to allow 100% visual examination of the subject supports.
In addition, limited accessibility and high radiation levels in the area where these supports are located further reduces the percentage of the supports available for visual examination.
The Callaway RPV is supported by two cold leg nozzles and two hot leg nozzles.
There is a support assembly at each of these nozzles that consists of a nozzle weld build-up, shoe plate, air cooled box, and steel support structure embedded in the primary shield wall. Figures 1 and 2 depict these support assemblies. As shown in the Figures, only the nozzle weld build-up and shoe plate are completely accessible for a visual VT-3 examination. Most of the air cooled box and the entire steel support structure are located beneath a steel walk-plate, and only the top of the air cooled box is directly accessible. An additional 20 to 30 percent of the air cooled box and a very small percentage of the steel support
structure would be made accessible if the steel walk plate and insulation were removed.
The RPV supports are located in a confined space below the refueling pool permanent seal ring. The area can only be accessed through seal ring hatches which are partially obstructed by the reactor vessel insulation neutron detector wells. In addition to difficult access, the radiation level in the area is between 1.5 and 2.0 man-rem per hour.
Changing the RPV supports and associated insulation/walk-plate to allow 100% visual examination of the subject supports would be an extensive and costly modification. Further, it is estimated that the removal and re-installation of the walk-plate and insulation in this confined space, combined with the performance of the visual VT-3 examination, would result in an exposure of approximately 36 man-rem. Removal of the walk plate and insulation, under these conditions, in order to increase the examination coverage of the air cooled box by approximately 20 to 30 percent and a very small percentage of the steel support structure is considered a hardship without a compensating increase in the level of quality or safety.
Licensee's Proposed Alternative Examination In its letter dated January 26, 2015, the licensee stated that:
In lieu of implementing the requirements of Table IWF-2500-1, Category F-A, Item No. F1 .40, Callaway proposes to perform a limited VT-3 visual examination, with the walk-plate and insulation installed, on the accessible NF portions of the RPV support assemblies. If conditions are discovered during this limited VT-3 examination that do not meet the acceptance standards of IWF-3400, the walk plate or insulation will, if necessary, be removed to in order to meet the requirements of IWF-3122.2 or IWF-3122.3, as applicable.
3.2 NRC Staff Evaluation The licensee has requested relief from ASME Code requirements pursuant to 10 CFR 50.55a(z)(2). The ASME Code of record for the fourth 10-year interval inservice inspection program, which began on December 19, 2014, and is scheduled to end on December 18, 2024, is the 2007 Edition through 2008 Addenda of Section XI of the ASME Code.
The ASME Code of record for Callaway in this inspection interval requires that 100 percent of Class 1 supports, other than piping supports, be subject to a visual, VT-3 examination once every inspection interval. As an alternative to the ASME Code requirements, the license proposes to perform a limited VT-3 visual examination, with the walk-plate and insulation installed, on the accessible portions of the reactor vessel support assemblies. In addition, the licensee proposed that if conditions are discovered during this limited VT-3 examination that do not meet the acceptance standards of IWF-3400, the walk-plate or insulation will, if necessary, be removed in order to meet the requirements of IWF-3122.2 or IWF-3122.3, as applicable.
As described in the licensee's submittal, limited accessibility and high-radiation levels in the area where the subject supports are located reduce the percentage of the supports available for visual examination. According to Figures 1 and 2 of the licensee's submittal, the reactor vessel is supported by two cold-leg nozzles and two hot-leg nozzles. In addition, there is a support assembly at each of these nozzles that consists of a nozzle weld build-up, shoe plate, air-cooled box, and steel support structure embedded in the primary shield wall. The air-cooled box steel support structure is located beneath a steel walk plate and only the top of the air-cooled box is accessible to perform a VT-3 visual examination. If the steel walk plate and insulation were removed, only an additional 20 to 30 percent of the air-cooled box and a small percentage of the steel support structure would be made accessible for examination.
Furthermore, the subject reactor vessel supports are located in a confined space that is below the refueling pool permanent seal ring. This area is only accessible through four seal-ring hatches and access in this area would cause the licensee's personnel to be exposed to a radiation level between 1.5 and 2.0 man-rem per hour. The licensee estimated that the removal and reinstallation of the walk plate and insulation combined with the performance of the visual VT-3 examination would result in an exposure of approximately 36 man-rem.
Based on the radiation exposure and the difficulty in obtaining access to the reactor vessel support areas, the NRC staff concludes that compliance with the ASME Code requirements would result in a hardship without a compensating increase in the level of quality and safety.
The NRC staff further concludes that the alternative provides reasonable assurance of the structural integrity of the reactor vessel support structures, based on the licensee's proposed alternative in relief request 14R-02.
4.0 CONCLUSION
The NRC staff concludes that the examinations performed to the extent practical provide reasonable assurance of structural integrity of the subject components and that compliance with the specified requirements would result in hardship without a compensating increase in the level of quality and safety. Accordingly, the NRC staff concludes that the licensee has adequately addressed the regulatory requirements set forth in 10 CFR 50.55a(z)(2). Therefore, the NRC staff grants relief for the subject examination of the components, as requested in relief request RR 14R-02 for the fourth 10-year inservice inspection interval for Callaway, which began on December 19, 2014, and is scheduled to end on December 18, 2024.
All other ASME Code,Section XI requirements for which relief was not specifically requested and approved remain applicable, including third-party review by the Authorized Nuclear lnservice Inspector.
Principal Contributor: C. Fairbanks Date: January 29, 2016