ML23067A148

From kanterella
Jump to navigation Jump to search
Operating License, Appendix C, Revision 078, Additional Conditions
ML23067A148
Person / Time
Site: Callaway Ameren icon.png
Issue date: 12/29/2022
From:
Union Electric Co, Ameren Missouri
To:
Office of Nuclear Reactor Regulation
Shared Package
ML23067A139 List: ... further results
References
ULNRC-06782
Download: ML23067A148 (1)


Text

Operating License Appendix C Revision 078 APPENDIX C

ADDITIONAL CONDITIONS

FACILITY OPERATING LICENSE NO. NPF-30

UE shall comply with the following conditions on the schedules noted below:

Amendment Implementation Number Additional ConditionsDate

133 This amendment authorizes the The amendment shall relocation of certain Technical be implemented by Specification requirements to April 30, 2000.

licensee-controlled documents.

Implementation of tis amendment shall include the relocation of these Technical Specification requirements to the appropriate documents, as described in Table LG of Details Relocated from Current Technical Specifications, Table R of Relocated Current Technical Specifications, and Table LS of Less Restrictive Changes to Current Technical Specifications that are attached to the NRC staffs Safety Evaluation enclosed with this amendment.

133 The schedule for the performance of new The amendment shall and revised Surveillance Requirements be implemented by (SRs) shall be as follows: April 30, 2000.

For SRs that are new in this amendment, the first performance is due at the end of the first surveillance interval that begins on the date of implementation of this amendment.

For SRs that existed prior to this amendment whose intervals of performance are being reduced, the first reduced surveillance interval begins upon completion of the first surveillance performed after implementation of this amendment.

Amendment No. 133 MAY 28 1999 Operating License Appendix C Revision 078

Amendment Implementation Number Additional ConditionsDate

133 For SRs that existed prior to this amendment that The amendment shall have modified acceptance criteria, the first be implemented by performance is due at the end of the first April 30, 2000.

surveillance interval that began on the date the surveillance was last performed prior to the implementation of this amendment.

For SRs that existed prior to this amendment whose intervals of performance are being extended, the first extended surveillance interval begins upon completion of the last surveillance performed prior to implementation of this amendment.

180 Technical Specification (TS) 3.6.7 requires the Prior to MODE 4 Recirculation Fluid pH Control System to be ascending during OPERABLE and Surveillance Requirement (SR) startup from the 3.6.7.2 requires verification that the sump pH be Refuel 15 outage.

7.1. Trisodium phosphate crystalline (TSP-C) will be used for pH control as described in TS Bases 3.6.7. NRC approval is required prior to using a different chemical for pH control.

190 Upon implementation of License Amendment, The amendment shall adopting TSTF-448, Revision 3, the determination be implemented within of control room envelope (CRE) and control 120 days from the date building envelope (CBE) boundary unfiltered air of issuance inleakage as required by SR 3.7.10.4, in accordance with TS 5.5.17.c.(i), the assessment of CRE habitability as required by Specification 5.5.17.c.(ii), and the measurement of control room pressure as required by Specification 5.5.17.d, shall be considered met. Following implementation:

a. The first performance of SR 3.7.10.4, in accordance with Specification 5.5.17.c.(i), shall be within the specified Frequency of 6 years, plus the 18-month allowance of SR 3.0.2, as measured from September 19, 2004, the date of the most recent successful tracer gas test, as stated in the December 15, 2004, letter response to Generic Letter 2003-01, or within the next 18 months if the time period since the most recent successful tracer gas test is greater than 6 years.

Amendment No. 190 Operating License Appendix C Revision 078

Amendment Implementation Number Additional ConditionsDate 190 b. The first performance of the periodic (contd) assessment of CRE habitability, Specification 5.5.17.c.(ii), shall be within 3 years, plus the 9-month allowance of SR 3.0.2, as measured from September 19, 2004, the date of the most recent successful tracer gas test, as stated in the December 15, 2004, letter response to Generic Letter 2003-01, or within the next 9 months if the time period since the most recent successful tracer gas test is greater than 3 years.

c. The first performance of the periodic measurement of control room pressure, Specification 5.5.17.d, shall be within 18 months, plus the 138 days allowed by SR 3.0.2, as measured from March 16, 2007, the date of the most recent successful pressure measurement test.

Amendment No. 190