FENO G IO Beaver Valley Power Station Route 168 FirstEnergy Nuclear Operating Company Shippingport, PA 15077-0004 L. William Pearce 724-682-5234 Site Vice President Fax: 724-643-8069 February 20, 2004 L-04-025 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001

Subject:

Beaver Valley Power Station (BVPS), Unit No. 1 and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50412, License No. NPF-73 Additional Information Regarding Risk-Informed ISI Program (TAC Nos. MB5687 and MB5688)

On July 24, 2002, FirstEnergy Nuclear Operating Company (FENOC) submitted a relief request to allow implementation of a Risk-Informed Inservice Inspection (RI-ISI)

Program as an alternative to the current ASME Section XI requirements for piping at BVPS Unit 1 and Unit 2. The submittal was based on the Probabilistic Risk Assessment (PRA) model in effect at that time for each Unit.

The purpose of this letter is to confirm that the incorporation of the resolution of the Facts and Observations from the July 15-19, 2002, Westinghouse Owner's Group peer review into the PRAs used to support the RI-ISI relief request is not expected to have a significant impact on the proposed RI-ISI program. This confirmation was requested by the NRC Project Manager for BVPS, so that the NRC staff may complete its review of the proposed RI-ISI program relief request.

It is our understanding that all requests for information regarding the subject relief request have now been addressed, which should enable the NRC to complete the relief request approval process.

There are no new regulatory commitments identified in this document. If there are any questions concerning this matter, please contact Mr. Larry R. Freeland, Manager, Regulatory Affairs/Performance Improvement at 724-682-5284.

Sincerely, Eiliam Pearce A7

Beaver Valley Power Station, Unit No. 1 and No. 2 Risk-Informed Inservice Inspection Program Relief Request L-04-025 Page 2 c: Mr. T. G. Colburn, NRR Senior Project Manager Mr. P. C. Cataldo, NRC Sr. Resident Inspector Mr. H. J. Miller, NRC Region I Administrator