ML022380362

From kanterella
Jump to navigation Jump to search
Final - RO & SRO Written
ML022380362
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 07/29/2002
From: Pisano L
Constellation Nuclear
To: Conte R
NRC/RGN-I/DRS/OSB
Conte R
References
05000410/02-301 05000410/02-301
Download: ML022380362 (131)


Text

SUJCTV SCOR INTUCO USE ONL I t10tJ C50:

c9]

C4]

6-z IUZ Mo

'0 m0 i

Os Cb Z

U 0

r rri 50 M1__

Ca]

cA]

CA]

CA]

C:A CA]

cA]

CAn c:AD

-As CA]

CA]

C¶J]

C40:

c8D c3n (F)

CB]

CB]

CB]

CBn cBD cBn CBn CB]

CB]

cB]

cB]

cB]

CB]

CB]

CB]

CBD CB]

CB]

"CB]

"CB]

CB]

a@

CB]

CB]

CBo CB]

S=

EB.

cB]

CB]

cB]

C B]

soIIII rBD CBD CB=

EBD EB2 C580 r30D C7]

C2]

C 3]

rC]

cCC]

cCC cCC CC]

cC]

cCC]

csa C:C]

C=c CC]

cC]

cCC CC]

CC]

CC]

p "cCD "cCn CC]

CC]

rC]

cC]

cC]

CC]

CC]

rCC Cc:

cC]

rC]

CC]

CCn cC3 CCn MID cCD cCC CCD c70D c20D c6D C l CD]

CD]

CD]

cD]

CD]

CD]

CD]

cD]

CDD cD]

CDo cD]

CD D CDD won CD]

CDD WIPE cD]

CD]

CD]

CD]

r DD CD]

CDD cD]

cDD CD]

CDD CD]

soft cDn cD]

CD]

cD]

rD]

cDD C D c60n Clo]

C1 5 cO]

KEY CE]

"CE]

"CEn "CE]

"CE]

cE]

CE]

cE]

CE]

CE]

CE]

cE]

cE]

cE]

"CED "CE]

cE]

cE]

CE]

CE]

CE]

CE]

CE]

"CE]

"CE]

CE]

CED cE]

CE]

cE]

cE]

CE]

CE]

CE]

CE]

CE]

CE]

CE]

CE]

CE]

cE]

cED CEE cE]

cE]

cE]

cED TO USE SUBJECTVE U EVARTIVCO.LFSCORE FEATURE.

  • MAKE DARK MARKS
  • ON, -T -kn I.

I

,y

  • ERASE COMPLETELY IS 1

EXAMPLE OF,

-EAPL:STUDERT SCORE:

PART 1

=A-M!TRONZH FORM NO. 888-E TO REORDER CALL 1-800-722-6876, CANADA 1-800-263-3338 Maw-(T)

A%

cA]

CA]

CA]

CA]

CA]

CA]

[:An GRADE:

TITLE : U2 ACTOR OPERATOR'NRC WR=ITEN EXAM Trainees will be judged to have willfully violated the integrity of an examination if they are found to have:

a.

Utilized unauthorized documents during the examination.

b.

Secured unauthorized documents for the purpose of accessibility during an examination.

c.

Solicited examination information from other trainees or any other individuals.

d.

Provided examination information to other trainees during an examination.

e.

Reviewed or attempted to review materials that are unauthorized, including the examination prior to implementation, the examination answer key, or the answers developed by any other trainee during the examination.

I have read and understand the above.

SIGNATURE:

DATE:

48 cA]

cBI cCD 9

cE]

49 CA]

cBn cC]

01 cED 50 cA]

0 cC2 cDD cED NAME:9 o Kc-'

SS #:

COURSE: UNIT 2 LICENSE CLASS 01-01 DATE:

F ZIb4 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 17 18 19 20 CA]

CA]

CA]

CAs cA]

CA]

CA]

21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 J

CA]

CA]

CA]

cA]

cA]

CAD CA]

CA]

Proposed Question: RO 1, SRO 32 With the plant at 28% power, a Generator armature fault occurs.

Which one of the following identifies the effect this would have on the Main Turbine?

A.

Main Turbine trips B.

Turbine Load Reject occurs C.

Turbine Load is runback to 25%

D.

Main Turbine remains on-line at previous load Proposed Answer: A Justification:

A correct - Main Turbine trips/armature protected.

B incorrect - 40% imbalance cannot actuate at the power level.

C incorrect - Loss of stator water response D incorrect - reverse of RPS interlock knowledge Proposed references to be provided to applicants during examination: None Technical Reference(s):

02-OPS-001-245-2-02 (Page.39), EO-1.5 KA:

295005, Main AK 2.04, Main Generator Protection Turbine Generator Trip 10 CFR Part 55 Content:

55.41(4)

X 55.43 Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

2 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

1 1

Group #

1 1

K/A #

295006 295006 Importance Rating 4.2 4.3 Proposed Question: RO 2, SRO 2 The plant is in Mode 2 at 11% power, with the following:

"* MSIV's close due to a spurious isolation signal

"* Reactor pressure spiked to 1050 psig Reactor power spiked to 16%

"* Turbine Chest Warming is selected

"* A reactor scram occurs Which one of the following RPS signals initiated the scram?

A.

High Reactor Power B.

High Reactor Pressure C.

MSIV position switches D.

Turbine Stop Valve position switches Proposed Answer: A Justification:

A correct - in STARTUP position SCRAM occurs at 15% power. B incorrect - scram on pressure occurs at 1057 psig. C incorrect MSIV position scram bypassed in STARTUP. D incorrect - TSV/TCV scram bypassed when less than 30% power.

Proposed references to be provided to applicants during examination-None Technical Reference(s):

02-OPS-212-02-00 KA:

295006 AK2.06, Knowledge of the interrelations between SCRAM and the SCRAM following: 'Reactor power' 10 CFR Part 55 Content:

55.41 (7) X 55.43 Question Source:

Bank #

Modified Bank#

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

2 Comments: NRC: Editorial. Power and Pressure are bulleted, MSIV status is not. Cue to choice A or B as being correct. Re-formatted to remove cue.

Examination Outline Cross-reference:

Level RO SRO Tier #

1 1

Group #

1 1

K/A #

295009 295009 Importance Rating 3.9 3.9 Proposed Question: RO 3, SRO 5 The plant is operating at 100% power, with the following:

° One of the two operating Reactor Feedwater (FWS) Pumps trips.

Annunciator 603139, "REACTOR WATER LEVEL HIGH/LOW" alarms.

Narrow Range RPV water level is 175 inches and slowly lowering.

The Feedwater Level Control Valves (LV1 Os) are observed to be opening Reactor Recirculation flow has remained constant.

Which one of the following actions is required by N2-SOP-06, Feedwater Failures, to stabilize RPV water level above the scram setpoint?

A.

Place LVl0 controller for the tripped FWS Pump in "MANUAL" B.

Place the Feedwater Master Level Controller in "MANUAL" C.

Reduce power per N2-SOP-101D, Rapid Power Reduction D.

Reduce power per N2-OP-101D, Power Changes Proposed Answer: C Justification:

C is correct - Immediate Action per N2-SOP-06. A&B incorrect placing any controller in "MANUAL" will not stabilize level as FWLCS is responding properly. D incorrect not N2-SOP-06 Immediate Action and would not stabilize level before automatic scram Proposed references to be provided to applicants during examination - None Technical Reference(s):

N2-SOP-06 KA:

295009: Low AA1.01: Ability to operate/monitor the following as they apply to LOW Reactor Water REACTOR WATER LEVEL: 'Reactor feedwater' Level 10 CFR Part 55 Content:

55.41.10 X

Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

2 Comments:

None

Examination Outline Cross-reference:

Level RO SRO Tier #

1 1

Group #

1 1

K/A #

295014 295014 Importance Rating 3.7 4.2 Proposed Question: RO 4, SRO 8 The plant is operating at 100% power, with the following:

Annunciator 603443, Control Rod Drift, alarms Rod 34-23, originally at notch 14, indicates at 18, then 20 and continuing Which one of the following describes the reactivity control actions required to minimize the potential for a Thermal Limit violation?

A.

Insert rod 34-23 to position 00, only B.

Lower Recirculation (RCS) flow until power drops by 40 MWe, only C.

Lower Recirculation (RCS) flow until power drops to 89%, only D.

Lower power to 89% and insert rod 34-23 to 00 Proposed Answer: D Justification:

D is correct - Both power reduction below 90% and rod insertion are required.

A/B are incorrect - Outward rod drift will raise power so power must be reduced to below 90%. C is incorrect - In addition to power reduction below 90% the rod must be inserted.

Proposed references to be provided to applicants during examination - None Technical Reference(s):

N2-SOP-08, 3.4/4.3 KA:

295014, AK1.05, Knowledge of the operational implications of the following concepts as Inadvertent they apply to INADVERTANT REACTIVITY ADDITION: 'Fuel Thermal limits' Reactivity Addition 10 CFR Part 55 Content:

55.41.5 X

55.43 Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

2 Comments: NRC: Justification section had "B" as correct. Changed to "D".

Examination Outline Cross-reference:

Level RO SRO Tier #

1 1

Group #

1 1

K/A #

295014 295014 Importance Rating 4.0 4.1 Proposed Question: RO 5, SRO 10 The plant is operating at 95% power, with the following:

"B" 61h Point Feedwater Heater extraction steam isolation valve closes Steady state Feedwater temperature drops to 406°F Reactor power level rises to 99%.

Which one of the following is the required operator action?

A.

Perform a reactor scram.

B.

Reduce reactor power to 89%.

C.

Reduce reactor power to 95%.

D.

Maintain reactor power at 99%.

Proposed Answer: B Justification:

B is correct - Step 3.4 of N2-SOP-08 requires an initial power reduction to less than 90%. A incorrect - reactor scram is not required per N2-SOP-08. C&D incorrect - reactor power level is too high per N2-SOP-08.

Proposed references to be provided to applicants during examination - None Technical Reference(s):

N2-SOP-08 KA:

295014:

AA1.07: Ability to operate and/or monitor the following as they apply Inadvertent to INADVERTENT REACTIVITY ADDITION: 'Cold water injection' Reactivity Addition 10 CFR Part 55 Content:

55.41.10 X

55.43 1

Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

3 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier#

1 Group#

1 K/A #

295015 295015 Importance Rating 2.8 3.0 Proposed Question: RO 6, SRO 11 A reactor scram has occurred, with the following:

Reactor power is 10% on all APRMs The MODE SELECT indicated on SPDS screen is RUN mode Which one of the following indicates the color that the APRM POWER will be displayed on the SPDS screen?

A.

Green B.

Yellow C.

Red D.

Magenta Proposed Answer: A Justification:

A is correct-As long as the SPDS mode is RUN, power above 4% will be displayed as Green. B incorrect-Yellow would be correct if MODE SELECT was Shutdown. C incorrect-Red displayed if above high value limit.

D incorrect. Magenta is displayed for invalid data.

Proposed references to be provided to applicants during examination - None Technical Reference(s):

02-OPS-001-226-2-01 KA:

295015:

AK2.10 Knowledge of interrelationship between INCOMPLETE Incomplete SCRAM and the following: 'SPDS/ERIS/CRIDS/GDS' SCRAM 10 CFR Part 55 Content:

55.41.7 X

55.43 Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

3 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier#

1 1

Group#

1 1

K/A #

295024 295024 Importance Rating 3.3 3.4 Proposed Question: RO 7, SRO 16 A large break LOCA is in progress, with the following:

Suppression Pool level is 215 feet Primary Containment venting is required Which one of the following identifies the appropriate path to vent the Primary Containment?

A.

Only the Drywell vent flow path should be aligned.

B.

Only the Suppression Chamber vent flow path should be aligned.

C.

BOTH the Drywell AND Suppression Chamber vent flow paths should be aligned.

D.

NEITHER the Drywell NOR the Suppression Chamber vent flow path should be aligned.

Proposed Answer: B Justification:

B is correct - Venting is capable from both but is desired from SC for scrubbing with SPL below 217ft. A&D incorrect - The venting should occur from the SC. C is incorrect - The DW should not be vented since SPL is low enough to take advantage of scrubbing.

Proposed references to be provided to applicants during examination-N2-EOP-PC Technical Reference(s):

N2-EOP-PC & N2-EOP 6 Aft 21 K/A:

295024: High EAI. 19, Ability to operate and/or monitor the following as they apply D/W pressure.

to HIGH DRYWELL PRESSURE: Containment atmosphere control 10 CFR Part 55 Content:

55.41(10) x 55.43 Question Source:

Bank #

X Modified Bank #

New History:

Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis x

LOD 3

Comments: Question from INPO bank Oyster Creek 13071 -1996 exam

Examination Outline Cross-reference:

Level RO SRO Tier #

1 1

Group #

1 1

K/A #

295025 295025 Importance Rating 3.9 4.1 Proposed Question: RO 8, SRO 17 With the plant at 100% power a Group 1 Primary Containment Isolation and reactor scram occurs, with the following:

All rods are "FULL IN" except for one rod which is stuck at position "12" 2 SRVs are automatically controlling RPV pressure Which one of the following describes the expected status of the Alternate Rod Insertion (ARI) valves AND the status of the Redundant Reactivity Control system (RRCS) Reactor Feedwater Runback logic?

ARI VALVE STATUS A.

Open B.

Open C.

Closed D.

Closed Proposed Answer: B RRCS RUNBACK STATUS Runback occurred Runback did not occur Runback occurred Runback did not occur Justification:

B correct - SRV opening in Relief Mode indicates RPV pressure >1065 psig which opens ARI valves. RFPs remain available since power < 4% after 25 sec. A incorrect - RFPs will not runback. C&D incorrect - RRCS ARI initiation setpiont (high RPV pressure) exceeded.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

02-OPS-001-294-2-08 (RRCS), EO-1.5 KA:

295025, Reactor EK2.04, Knowledge of interrelationships between HIGH REACTOR Pressure PRESSURE and the following: 'ARI, RPT, ATWS' 10 CFR Part 55 Content:

55.41.7 X

Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

2 Comments: None

ATTACHMENT 7: QUESTIONS COMMENTS DURING NRC INITIAL WR1TTEN EXAMINATION Applicant Level:

0 RO IR SRO Applicant Name:

0 (List Names Here) 0 Question Type:

1 Common

[] RO only 0 SRO only Question #:RO IF (enter number, if SRO only enter N/A)

SRO

__7

, (enter number, if RO only enter N/A)

Question (enter verbatim):

"T<-

TLz z

L'k'C.e Se-T I-,

,e k

V Iwe-.

Response

0 Withheld additional guidance. instructed the applicant to do his best with information provided.

1 Did NOT withhold additional guidance. Provided the foilowing response (enter verbatim).

C Changes !.clarifications made to -examinatio n, E Identified an the white board

&'Called to the attention of the applicants Proctor:

7Post-Examination Comments form initiated Pra ee TAP-TQS-06 Rev 05 Page 34

Examination Outline Cross-reference:

Level RO SRO Tier #

1 1

Group#

1 1

K/A #

295025 295025 Importance Rating 3.3 3.7 Proposed Question: RO 9, SRO 18 The plant has scrammed due to an MSIV closure, with the following:

A large number of control rods have failed to fully insert Reactor power is 6% and steady 6 SRVs initially lifted Pressure is being maintained with SRVs Which one of the following describes the expected status of the Reactor Recirculation Pumps (RCS) and Standby Liquid Control Pumps (SLS) two minutes following the initial event?

RCS Pumps A.

Running B.

Running C.

Not running D.

Not running Proposed Answer: C SLS Pumps Running Not running Running Not running Justification:

C is correct-SLC pumps start with the APRM's >4% and RCS pumps trip on a RRCS reactor high press signal& pwr >4% after 25 sec.

A is incorrect-RCS pumps initially downshift but then trip if pwr >4%.

B is incorrect-this would be with power <4%. D is incorrect-NP Proposed references to be provided to applicants during examination: None Technical Reference(s):

02-OPS-001-294-2-08-Rev 3 (RRCS), EO-1.5 KA:

295025, High EA1.08, Ability to operate and/or monitor RRCS as it applies to Reactor Reactor Pressure Pressure 10 CFR Part 55 Content:

55.41.7 X

55.43 Question Source:

Bank #

Modified Bank#

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

4 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

1 1

Group #

1 1

K/A #

295031 295031 Importance Rating 3.7 4.1 Proposed Question: RO 10, SRO 23 Which one of the following system lineups must be terminated and prevented in accordance with N2-EOP-C5, Failure To Scram, when level is required to be lowered to reduce reactor power?

A.

RDS aligned to maximize injection B.

WCS aligned to inject boron solution C.

RCIC with suction aligned to the Suppression Pool D.

RHS aligned to inject through the Shutdown Cooling line Proposed Answer: D Justification:

D correct - injects outside shroud and will cause power excursion. A incorrect - used to S/D reactor. B incorrect - a boron injection system.

C incorrect - RCIC excluded per EOP bases Proposed references to be provided to applicants during examination: N2-EOP-C5 Technical Reference(s):

N2-EOP-C5 step L-7 KA:

295031, Reactor EK1.03, Knowledge of the operational implications of the following concepts Low Water Level as they apply to REACTOR LOW WATER LEVEL: 'Water level effects on reactor power' 10 CFR Part 55 Content:

55.41 (10) X 55.43 1

Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

3 Comments: None

Proposed Question: RO 11, SRO 25 A spurious reactor scram has occurred, with the following:

22 Control Rods failed to automatically insert Reactor Power is unknown Reactor Pressure is 940 psig and steady A steam leak, which cannot be isolated, has developed in the Reactor Water Cleanup (WCS) pump room WCS pump room temperature is 1450F and rising.

Which one of the following actions should be taken to lower the leak rate?

A.

Manually insert control rods and then initiate a normal cooldown.

B.

Immediately commence a cooldown at less then 100OF per hour.

C.

Terminate and prevent injection into the RPV and blowdown the reactor.

D.

Depressurize with Turbine Bypass valves regardless of cooldown rate.

Proposed Answer: A Justification:

A is correct - EOP-C5 step P-6 only allows a cooldown if the reactor is shutdown with no boron injected. B is incorrect - With reactor power unknown, a cooldown is not permitted. C is incorrect - A blowdown per EOP-SC/RR is only warranted if two or more areas exceed their Max Safe values. D is incorrect-not permitted during ATWS.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-EOP-C5; N2-EOP-SC/RR KA:

295037, Scram EK1.06, Knowledge of the operational implications of'cooldown effects on Condition Present reactor power' and Reactor Power Above 4%

or Unknown 10 CFR Part 55 Content:

55.41.10 X

55.43 Question Source:

Bank #

Modified Bank #

X SSES - 2001 Q RO-8 New History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

4 Comments: None

Proposed Question: RO 12 A LOCA is in progress, with the following:

Hydrogen (H2) has been released into the Primary Containment.

Suppression Chamber sprays have been directed in accordance with N2-EOP-PCH, Hydrogen Control.

Which one of the following identifies the bases for initiating Suppression Chamber sprays under these conditions?

To reduce.

A.

H2 concentration prior to purging.

B.

radioactive particulate prior to purging.

C.

H2 concentration to prevent deflagration.

D.

radioactive particulate to prevent deflagration.

Proposed Answer: B Justification:

B is correct - per N2-EOP-PCH Bases. B/C/D incorrect - not correct per N2-EOP-PCH.

Proposed references to be provided to applicants during examination-N2-EOP-PCH Technical Reference(s):

N2-EOP-PCH K/A:

500000, High EK3.05: Knowledge of the reasons for the following responses as Containment they apply to HIGH PRIMARY CONTAINMENT HYDROGEN Hydrogen CONCENTRATIONS: Operation of wetwell (suppression pool)

Concentration sprays' 10 CFR Part 55 Content:

55.41.10 X

Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD 2

Comments: Question from INPO bank # 905 Grand Gulf 1998

Examination Outline Cross-reference:

Level RO SRO Tier #

1 1

Group #

1 1

K/A #

500000 500000 Importance Rating 3.4 3.8 Proposed Question: RO 13, SRO 27 Which one of the following identifies the reason for securing the H 2 Recombiners when H2 concentration rises to 5% per N2-EOP-PCH, Hydrogen Control?

H2 Recombiners are required to be shutdown to prevent damage from.....

A.

excessive recombiner chamber temperatures.

B.

excessive recombiner chamber moisture.

C.

insufficient hydrogen and oxygen recombination.

D.

insufficient hydrogen and oxygen flow.

Proposed Answer: A Justification:

A is correct - per step 32 of N2-EOP-PCH, shutdown H 2 Recombiners if 02 and H 2 concentrations > 5% because recombiner damage can result from excessive temperatures at the higher recombination rate.

BICID incorrect - wrong reason.

Proposed references to be provided to applicants during examination - N2-EOP-PCH Technical Reference(s):

N2-EOP-PCH & Bases, N2-OP-62, D.7.0 K/A:

500000, High 2.1.32, Ability to explain and apply system limits and precautions.

Containment Hydrogen Conc.

10 CFR Part 55 Content:

55.41()

X 55.43 Question Source:

Bank #

Modified Bank#

New X

History:

Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD 2

Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

1 Group#

2 K/A #

295001 Importance Rating 3.1 Proposed Question: RO 14 The plant is at 100% power when a jet pump rams head failure occurs.

Which one of the following describes the expected response of reactor power AND drive flow in the Recirculation loop containing the defective jet pump?

REACTOR POWER A.

Rises B.

Rises C.

Lowers D.

Lowers Proposed Answer:

C RECIRC LOOP DRIVE FLOW Rises Lowers Rises Lowers Justification:

C is correct - less core flow results in lower reactor power. Drive flow in recirc loop with defective pump rises due to less flow resistance.

D incorrect - drive flow does not lower. A&B incorrect - reactor power does not rise.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

K/A:

295001, AA2.05: Ability to determine and interpret the following as they apply Partial/com to PARTIAL OR COMPLETE LOSS OF FORCED CORE FLOW plete loss CIRCULATION: 'Jet pump operability' of forced core circulation 10 CFR Part 55 Content:

55.41(2) 55.43 11 Question Source:

Bank #

Modified Bank#

X New History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

2 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

1 1

Group #

2 2

K/A #

295002 295002 Importance Rating 3.4 3.4 Proposed Question: RO 15, SRO 28 The plant is operating at 100% power with the following:

A Loss of NPS-SWG001 occurs.

RPV water level is lowering.

Main condenser vacuum lowers to 8.5" Hg VAC.

Which one of the following identifies the automatic action and the reason for that action?

A.

MSIVs close due to indication of a loss of the primary heat sink.

B.

MSIVs close due to indication of excessive reactor vessel inventory loss.

C.

Turbine Bypass Valves close due to indication of a loss of the primary heat sink.

D.

Turbine Bypass Valves close due to indication of excessive reactor vessel inventory loss.

Proposed Answer: A Justification:

A correct - Setpoint for MSIV closure is 8.5" Hg. vac basis per Op.

Tech. B incorrect - wrong basis. C&D incorrect - Turb. BPVs close at 7.0" hg. vac.

Proposed references to be provided to applicants during examination-none Technical Reference(s):

02-OPS-001-223-2-02, N2 OP-83 K/A:

295002, Loss of AK3.05, Knowledge of the reasons for the following responses as Main Condenser they apply to Loss of Main Condenser Vacuum: Main steam Vacuum isolation valve 10 CFR Part 55 Content:

55.41(7)

X 55.43 Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD 3

Comments: NRC: Unsat. Back half of "B" and "D" distractors didn't make sense. Nothing in stem indicates an inventory loss.

NM Response: Fixed by adding loss of NPS-SWG001 and RPV level is lowering.

Examination Outline Cross-reference:

Level RO SRO Tier #

1 1

Group #

2 2

K/A #

295002 295002 Importance Rating 4.0 4.3 Proposed Question: RO 16, SRO 29 The plant is operating at 100% power, with the following:

Annunciator 851306, "OFF GAS SYSTEM TROUBLE", alarms Main condenser vacuum is 28 inches Hg and degrading slowly Which one of the following identifies the required procedural entry for this condition?

A.

N2-OP-101C, Plant Shutdown B.

N2-OP-101D, Power Changes C.

N2-SOP-101C, Reactor Scram D.

N2-SOP-101 D, Rapid Power Reduction Proposed Answer: D Justification:

D is correct. Immediate action for loss of condenser vacuum is to reduce power per SOP-101D. A & B - incorrect. SOP-09 requires rapid power reduction or scram. C incorrect. Slow vac drop does not immediately threaten trip.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-SOP-09 KA:

295002, Loss of Main G2.4.4 Ability to recognize abnormal indications for system Condenser Vacuum operating parameters which are entry level conditions for emergency and abnormal operating procedures.

10 CFR Part 55 Content:

55.41.10 X

55. 43 Question Source:

Bank #

Modified Bank #

New X

History:

Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

2 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

1 1

Group #

2 1

K/A #

295003 295003 Importance Rating 2.9 3.2 Proposed Question: RO 17, SRO 01 The plant is operating at 100% power, with the following:

A complete loss of off-site power has occurred.

All three divisional diesels (EDGs) running and powering their respective switchgears.

Which one of the following describes the action required to be taken per N2-SOP-03, Loss of AC Power, when ready to start an additional Service Water Pump in Division I?

A.

Re-open non-essential Service Water MOVs.

B.

Verify Service Water crosstie MOVs are closed.

C.

Start RHS Pump "A" and CSL Pump.

D_

Verify RHS "A" and CSL Pumps are secured.

Proposed Answer C Justification:

C is correct - RHS and CSL pumps need to be already running due to starting current considerations. A incorrect - if non-essentials opened prior to pump start, pump runout will occur. B incorrect - Service Water crosstie MOVs are required to be open when the additional pump is started. D incorrect - wrong sequence.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-SOP-03 KA:

295003: Partial/

AK1.03: Knowledge of operational implications of the following Complete Loss of concepts as they apply to PARTIAL OR COMPLETE LOSS OF AC AC Power POWER: " Under voltage/degraded voltage effects on electrical loads' 10 CFR Part 55 Content:

55.41.5 X

55.43 Question Source:

Bank #

X Question from NM2 bank - Group 3, Question #2 Modified Bank#

New History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

3 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

2 2

Group #

1 1

K/A #

295004 295004 Importance Rating 3.2 3.4 Proposed Question: RO 18, SRO 30 The plant is operating at 75% power when a fault in the Division 11 125 VDC Battery, 2BYS*BAT2B, causes the following:

Battery Breaker to Division II DC Switchgear, 2BYS*SWG002B, trips OPEN.

Charger 2BYS*CHGR2B1, Output Breaker to Division II DC Switchgear, 2BYS*SWG002B, trips OPEN.

Which one of the following describes the effect on plant operation and conditions needed to restore power to the Division 11 125 VDC Bus or loads?

A.

Stop all activity that could result in a plant trip, DC power can NOT be restored until the battery is available.

B.

Orderly plant shutdown is required, DC power can NOT be restored until the battery is available.

C.

Orderly plant shutdown is required until DC power can be restored using the standby charger.

D.

Immediate scram is required, DC power can be restored using the standby charger.

Proposed Answer:

D Justification:

D is correct. Plant must be scrammed because both recirculation pumps tripped. Power can be restored by placing the alternate charger in service. C is incorrect. Plant must immediately be scrammed due to the trip of both recirc pumps. B is incorrect. Plant must be scrammed because both recirculation pumps tripped. Power can be restored by placing the alternate charger in service. A is incorrect. Plant must be scrammed because both recirculation pumps tripped. Power can be restored by placing the alternate charger in service.

Proposed references to be provided to applicants during examination - None Technical Reference(s):

N2-SOP-04 and N2-SOP-29 KA:

295004 Partial or AK1.02: Knowledge of the operational implications of the following Complete Loss of concepts as they apply to Partial or Complete Loss of D.C. Power:

D.C. Power Redundant D.C. power supplies: Plant-Specific 10 CFR Part 55 Content:

55.41(7)

X 55.43 11 Question Source:

Bank #

X Modified Bank#

New History Last NRC Exam 2000 Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

3 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier#

1 1

Group #

2 2

K/A #

295005 295005 Importance Rating 3.6 3.6 Proposed Question: RO 19, SRO 33 The plant is operating at 100% power, with the following:

Main Generator Lockout trip occurs Main Turbine is not tripped Which one of the following describes the Turbine Control Valve (CV) and Bypass Valve (BPV) position 10 seconds after the Main Generator Lockout trip occurs?

CV Position BPV Position A.

Open 2 open, 3 closed B.

Open All 5 open C.

Closed All 5 open D.

Closed 2 open, 3 closed Proposed Answer: C Justification:

C is correct - CVs will fast close to regulated turbine speed which rises above 1800 RPM with the loss of electrical load. All 5 turbine bypass valves open in response to the reactor pressure rise.

A/B incorrect - CV throttle closed as turbine speed rises.

D incorrect - All 5 BPVs are open in response to the reactor pressure rise.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-SOP-21 KA:

295005: Main AA1.05 Ability to operate and or monitor the following as they apply to Turbine Generator MAIN TURBINE GENERATOR TRIP: 'Reactor/turbine pressure Trip regulating system.

10 CFR Part 55 Content:

55.41.10 X

55.43 Question Source:

Bank #

Modified Bank#

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

2 Comments: NRC: Unsat. KA Mismatch.

NM Response: Wrote new question.

Examination Outline Cross-reference:

Level RO SRO Tier #

1 1

Group #

2 2

K/A #

295008 295008 Importance Rating 2.8 2.8 Proposed Question: RO 20, SRO 34 The plant is operating at 100% power, with the following:

A complete loss of Feedwater occurs.

RPV water level lowers to 100 inches.

RPV water level is automatically restored and peaks at 210 inches.

RPV water level is now 160 inches and lowering.

Which one of the following actions is required to establish High Pressure Core Spray (CSH)

System injection?

A.

Manually start the pump then place the injection valve control switch to open.

B.

Ensure the pump is running then place the injection valve control switch to open.

C.

Place the level 8 bypass test keylock switch to test and ensure injection valve opens.

D.

Depress high water level seal-in reset pushbutton and ensure injection valve opens.

Proposed Answer:

D Justification:

D correct. After L8 seals-in, only resetting the L8 or another L2 signal will open the injection Valve. A/B/C are incorrect. The pump remains running after the initial L2. Injection Valve will not reopen until <L2 with L8 seal-in.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

02-OPS-001-206-2-00 KA:

295008: Reactor AA1.06 Ability to operate and/or monitor the following as they apply to High Level HIGH REACTOR WATER LEVEL: 'HPCS' 10 CFR Part 55 Content:

55.41.7 X

55.43 Question Source:

Bank #

X Sys ID 6280 Modified Bank#

New History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

2 Comments:

NRC Comment: Setpoint Question NM Response: Replaced original with question from bank.

Examination Outline Cross-reference:

Level RO SRO Tier #

1 Group #

2 K/A #

295008 Importance Rating 3.4 Proposed Question: RO 21 The plant is operating at 50% power, with the following:

A Feedwater Level Control (FWLC) malfunction causes RPV level to rise.

Level continuing to rise after the controller is taken to manual.

Level is rising on P601 indications.

Which one of the following describes the response of the Main Turbine if the current level trend continues?

The Main Turbine will trip when the following indicator(s) reach Level 8.....

A.

both P601 PAM level indicators.

B.

either P601 PAM level indicator.

C.

any two P603 NR level indicators.

D.

the selected P603 NR level indicator.

Proposed Answer:

C Justification:

C is correct - Main turbine trip on high level comes from narrow range detectors indicated on P603, 2 of 3 needed to produce trip. A&B incorrect - PAM indicates wide range and does not input to trip logic.

D incorrect - not correct logic Proposed references to be provided to applicants during examination: None Technical Reference(s):

02-OPS-001-216-2-01 KA:

295008: High High Reactor Water Level K/A Topic: AA 1.07 Ability to Reactor Water operate/monitor the following as they apply to HIGH REACTOR Level WATER LEVEL: Main turbine 10 CFR Part 55 Content:

55.41.7 X

55.43 Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

2 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

1 1

Group#

2 1

K/A#

295013 295013 Importance Rating 3.6 3.7 Proposed Question: RO 22, SRO 22 A steam line break has occurred in the Primary Containment, several control rods failed to fully insert, with the following.

RPV Level is 167 inches RPV Pressure is 420 psig Drywell Pressure is 7.0 psig Drywell Temperature is 180°F Suppression Chamber Pressure is 2 psig Suppression Pool Temperature is 1060F Which one of the following Residual Heat Removal System lineups is required?

A.

System "A" and "B" in suppression pool cooling.

B.

System "A" in suppression pool cooling with "B" in LPCI.

C.

System "A" and "B" in drywell and suppression chamber spray.

D.

System "A" in suppression pool cooling and "B" in drywell spray.

Proposed Answer: A Justification:

A is correct - N2-EOP-PC directs starting all available suppression pool cooling. B incorrect - B loop should also be started in SP cooling, RPV makeup is NOT needed. C is incorrect - because both loops should be in suppression pool cooling. D is incorrect - because both loops should be in suppression pool cooling.

Proposed references to be provided to applicants during examination: N2-EOP-PC Technical Reference(s):

N2-EOP-PC KA:

295013: Low AK2.01: Knowledge or the interrelations between HIGH Suppression Pool SUPPRESSION POOL TEMPERATURE and Suppression Pool Level Cooling.

10 CFR Part 55 Content:

55.41.7 55.45.8 Question Source:

Bank #

X Modified Bank#

New History Last NRC Exam 2000 Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

3 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

1 1

Group #

2 1

K/A #

295016 295016 Importance Rating 3.7 3.8 Proposed Question: RO 23, SRO 12 The plant is operating at 100% power, with the following:

A fire forces an evacuation of the Control Room.

Dense smoke prevented any Control Room actions from being taken.

Which one of the following describes the method employed per N2-SOP-78, Control Room Evacuation, for tripping the Main Turbine?

A.

Confirm trip on Generator Reverse Power.

B.

Confirm trip on Generator Backup Protection.

C.

Manually trip using both trip pushbuttons.

D.

Manually trip from Front Standard.

Proposed Answer: D Justification:

D is correct, SOP-78 directs the Operator to trip the Main Turbine from the front standard after the Reactor is scrammed locally. A/B incorrect allowing automatic trip does not comply with procedural direction of SOP-78, since the reactor was not scrammed from the Control Room.

C incorrect - Trip pushbuttons are in the Control Room.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-SOP-78 KA:

295016, Control AK 3.02, Knowledge of the reasons for the following responses as they to Room CONTROL ROOM ABANDONMENT: 'turbine trip' Abandonment 10 CFR Part 55 Content:

55.41.10 X

55.43 Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

3 Comments:

NRC: Unsat. "C" is partially correct, based on stem focus.

NM Response: Modified all choices to eliminate partially correct answer.

Examination Outline Cross-reference:

Level RO SRO Tier #

1 1

Group #

2 1

K/A#

295017 295017 Importance Rating 3.3 3.5 Proposed Question: RO 24, SRO 13 A plant transient occurs with the following:

Main Steam leak is in progress Main Steam lines cannot be isolated Offsite release rates are above the Emergency Plan ALERT level Turbine Building Ventilation system is operating Which one of the following is the reason for continued operation of the Turbine Building Ventilation System per the Emergency Operating Procedures?

A.

Maintain Turbine Building at a negative pressure.

B.

Maintain Turbine Building at atmospheric pressure.

C.

Treat Turbine Building release prior to discharge.

D.

Elevate and monitor Turbine Building release.

Proposed Answer: D Justification:

D is correct - per N2-EOP-RR basis. AIBIC incorrect - not per N2-EOP-RR basis. A/B incorrect - because the TB is not airtight. C incorrect - because there is no treatment of TB exhaust.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-EOP-RR basis KA:

295017: High Off-AK3.02: Knowledge of the reasons for the following responses as Site release Rate they apply to HIGH OFF-SITE RELEASE RATE: 'Plant ventilation' 10 CFR Part 55 Content:

55.41.10 55.43 Question Source:

Bank #

X NM-2 bank. TRAIN # 15995 Modified Bank #

New History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

2 Comments: NRC: Unsat. Why are "A", "B" and "C" plausible? Still unsat after changes NM Response: Added more info to distractors and additional info to Justifications. After two attempts, replaced original KA AK3.04, with AK3.02, modified a bank question.

Examination Outline Cross-reference:

Level RO SRO Tier #

1 1

Group #

2 2

K/A #

295019 295019 Importance Rating 3.5 1

3.4 Proposed Question: RO 25, SRO 36 An Instrument Air System transient occurs, with the following:

The Instrument Air system is aligned with the Compressor Selector Switch on P851 selected to the "BCA" position.

Instrument Air header pressure drops to 98 psig.

Which one of the following identifies the compressor that will automatically start and load AND the pressure at which this compressor will then unload?

COMPRESSOR THAT STARTS A.

A B.

A C.

C D.

C UNLOAD PRESSURE 115 psig 125 psig.

115 psig 125 psig Proposed Answer:

D Justification:

D correct - Lag compressor "C" will start and load at 100 psig and unload at 125 psig. A&B incorrect - "A" will not start until 85 psig.

C incorrect-unloading pressure is always 125 psig. 115 psig is the pressure at which compressor loads.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

02-OPS-001-279-2-00 pgs. 9, 27 & 29 K/A:

295019, Partial or AK3.02, Knowledge of the reasons for the following as they apply to Total Loss of PARTIAL OR COMPLETE LOSS OF INSTRUMENT AIR: Standby Instrument Air compressor operation 10 CFR Part 55 Content:

55.41(5) 55.43 Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

2 Comments:

NRC Comment: Borderline LOD NM Response: Unloading Pressure makes the question a little more difficult. KA Match with high importance value.

Examination Outline Cross-reference:

Level RO SRO Tier #

1 1

Group#

2 2

K/A #

295020 295020 Importance Rating 3.9 4.0 Proposed Question: RO 26, SRO 37 An inadvertent Division 1 Group 8 low level isolation signal causes the Outboard CCP Containment Isolation valves to DRS to isolate, with the following:

The isolation signal can not be reset.

The CRS has directed performance of N2-SOP-60, Loss of Drywell Cooling.

Which one of the following is required per N2-SOP-60?

A.

Place DRYWELL UNIT COOLER WTR DIV I LOCA OVERRIDE in the "OVERRIDE" position only.

B.

Place both DRYWELL UNIT COOLER WTR DIV 1 (11) LOCA OVERRIDE in the "OVERRIDE" position only.

C.

Place DRYWELL UNIT COOLER WTR DIV I LOCA OVERRIDE and UNIT COOLER FANS GR 1 LOCA OVERRIDE switches in the "OVERRIDE" position only.

D.

Place both UNIT COOLER FANS GR 1(2) LOCA OVERRIDE switches in the "OVERRIDE" position only.

Proposed Answer: B Justification:

B is correct - required for restoration per SOP.

A/C incorrect - not required per SOP steps.

D incorrect - this is action if CCP cannot be restored Proposed references to be provided to applicants during examination: N2-SOP-60 Technical Reference(s):

N2-SOP 60 Step 4.4.a KA:

295020:

2.1.23 Ability to perform specific system and integrated plant Inadvertent procedures during different modes of plant operation.

Containment isolation 10 CFR Part 55 Content:

55.41.7 X

55-.4-3 Question Source:

Bank #

Modified Bank #

X Question from NM-2 Bank. #

8110/Group 6/Q61 New History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

3 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

1 1

Group #

2 2

K/A #

295022 295022 Importance Rating 3.3 3.4 Proposed Question: RO 27, SRO 39 A plant startup is in progress, with the following:

Reactor Pressure is 500 psig The operating Control Rod Drive (RDS) Pump trips No RDS Pump can be started A Control Rod at position 12 has an accumulator pressure of 900 psig Which one of the following describes when a manual scram is required to be initiated per N2-SOP-30, Control Rod Failures?

A.

Immediately B.

In 20 minutes C.

If one control rod drifts in D.

If any other control rod accumulator becomes inoperable Proposed Answer: A Justification:

A is correct-SOP-30 calls for immediate scram if reactor pressure is <900#

and CRD charging water pressure is <940# and any accumulator is inop with its associated rod withdrawn. B/CID incorrect-All conditions not met per SOP

30.

Proposed references to be provided to applicants during examination: N2-SOP-30 Attachments 1 & 2 Technical Reference(s):

N2 SOP-30, 02 OPS-001-201-2-01, EO-1.8 KA:

295022, Loss of AK1.01, 'Reactor pressure versus rod insertion capabilities'.

CRD Pumps 10 CFR Part 55 Content:

55.41.10 X

55.43 Question Source:

Bank #

X Modified Bank #

New History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

3 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

1 1

Group #

2 1

KIA #

295026 295026 Importance Rating 3.0 3.4 Proposed Question: RO 28, SRO 19 Which one of the following events would bring a running Residual Heat Removal System (RHS) pump closer to cavitation while injecting during the Low Pressure Coolant Injection (LPCI) mode of operation?

A.

Broken tailpipe on an open SRV in the Suppression Chamber airspace B.

A stuck open Suppression Chamber to Drywell vacuum breaker C.

Inadvertently opened Safety Relief Valve D.

CST leaking into the Suppression Pool Proposed Answer:

C Justification:

C is correct - warmer water will lower pump NPSH. A incorrect - no effect on NPSH, BID incorrect - improve NPSH Proposed references to be provided to applicants during examination: None Technical Reference(s):

EOP Basis Document, Calculations KA:

295026 High EK1.01: Knowledge of the operational implications of the following Suppression Pool concepts as they apply to HIGH SUPPRESSION POOL TEMP:

Temperature Pump NPSH 10 CFR Part 55 Content:

55.41.5 X

55.43 Question Source:

Bank #

Modified Bank#

X Question from NM2 bank #15925, Grp 5

New History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

2 Comments: NRC. Enhancement. Ensure that in "B" it is understood that Suppression Chamber means air space, above water line.

NM Response: Fixed by adding "airspace", then swapped A and B distractors for length.

Examination Outline Cross-reference:

Level RO SRO Tier #

1 1

Group #

2 2

K/A #

295029 295029 Importance Rating 2.9 3.0 Proposed Question: RO 29, SRO 41 The plant has experienced a LOCA, with the following:

Reactor pressure is 200 psig and slowly lowering Reactor level is 102 inches and steady Suppression Pool level is 210 feet and rising Which one of the following injection systems is allowed to be used to maintain reactor level per the Emergency Operating Procedures?

A.

RDS B.

RHS in the LPCI mode C.

Condensate D.

RCIC with suction aligned to the CST Proposed Answer: B Justification:

B is correct. With S/P level high (above 209.5 feet @ 200 psig), N2 EOP-PC, SPL-2 calls for injection sources that do not add to containment inventory. AIC/D incorrect - all inject from outside sources.

Proposed references to be provided to applicants during examination: N2-EOP-RPV, N2-EOP-PC Technical Reference(s):

N2-EOP-PC KA:

295029: High EA1.03, Ability to operate and/or monitor the following as they apply Suppression Pool to HIGH SUPPRESSION POOL LEVEL:

"RHR/LPCI" Level 10 CFR Part 55 Content:

55.41.7 X

55.43 Question Source:

Bank #

Modified Bank#

New X

History:

Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

2 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

1 1

Group #

2 1

K/A #

295030 295030 Importance Rating 3.6 3.7 Proposed Question: RO 30, SRO 21 Procedure N2-EOP-PC, Primary Containment Control, contains a caution concerning the operation of RCIC with low suppression pool water level.

Which one of the following describes the potential hazard of not complying with this caution?

A.

RCIC exhaust line pressure oscillations could potentially cause system damage.

B.

Reduced cooling water flow to the RCIC turbine bearings may cause system damage.

C.

With RCIC suction aligned from its alternate source, NPSH and vortex limits may be exceeded.

D.

RCIC steam will discharge into the Suppression Chamber air space and overpressurize containment.

Proposed Answer: C Justification:

C is correct - per EOP basis. A is incorrect - concern at low RPM. B is incorrect - low cooling water flow is not reason for caution. D is incorrect isolation prevents this if exhaust uncovers Technical Reference(s):

EOP-PC Basis, 02-OPS-006-344-2, EO-1.4 KA:

295030, Low EK3.03, Knowledge for the reasons for the following responses as they Suppression Pool apply to LOW SUPPRESSION POOL WATER LEVEL: 'RCIC operation' Water Level 10 CFR Part 55 Content:

55.41.10 X

55.43 Proposed references to be provided to applicants during examination: None Question Source:

Bank#

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

3 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

1 1

Group #

2 1

K/A #

295030 295030 Importance Rating 3.9 3.9 Proposed Question: RO 31, SRO 6 The plant has experienced a LOCA, with the following:

Reactor level -10 inches and slowly rising Suppression Pool level 196.5 feet and steady "A" RHS injecting (LPCI mode) with Service Water aligned to heat exchanger "B" RHS running (Suppression Pool Cooling mode) with Service Water aligned to heat exchanger Which one of the following describes the method per N2-EOP-PC, Primary Containment Control, that should be used for determining a valid reading for Suppression Pool temperature with the above conditions?

A.

Heat exchanger inlet temperature on "B" RHS.

B.

Heat exchanger outlet temperature on "A" RHS.

C.

Suppression Pool temperature indication on SPDS.

D.

Post Accident Monitor Suppression Pool temperature indicators.

Proposed Answer: A Justification:

A is correct-with S/P level <197 ft, one method given for determining temperature is the HTX inlet temp. for a RHS pump running in S/P cooling. B incorrect-LPCI flow not thru HTX. C/D incorrect-S/P level

< 197'.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-EOP-PC Basis K/A:

295030, Low S/P EA2.02, Knowledge of the interrelationships between LOW Water Level SUPPRESSION POOL WATER LEVEL and the following:

'Suppression pool temperature' 10 CFR Part 55 Content:

55.41(10)

X 55.43 55.45 Question Source:

Bank #

Modified Bank#

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

3 Comments:

None

Examination Outline Cross-reference:

Level RO Tier #

1 Group #

2 K/A #

295033 Importance Rating 3.8 Proposed Question: RO 32 A primary system is found to be discharging into the Reactor Building and attempts to isolate it have failed, with the following:

Area temperature on Elevation 215' is 180°F and rising Radiation levels on Elevation 353' are 1.2 x E4 mRem/hr and rising Radiation levels on Elevations 261' and 240' are 1.5 x E4 mRem/hr and rising Reactor Building ventilation exhaust radiation levels are above the alarm setpoint Which one of the following actions is required?

A.

Reactor scram only B.

Reactor scram and RPV blowdown C.

Reactor scram and RPV depressurization not to exceed 1 00°F/hr D.

Reactor scram and rapid RPV depressurization with turbine bypass valves Proposed Answer: B Justification:

B is correct - reactor scram and RPV blowdown required if 2 or more areas exceed maximum safe operating radiation levels. A incorrect RPV blowdown is also required. C&D incorrect - not actions per N2 EOP-SC.

Proposed references to be provided to applicants during examination: N2-EOP-SC Technical Reference(s):

N2-EOP-SCC KA:

295033: High EK2.01: Knowledge of interrelationships between HIGH Secondary SECONDARY CONTAINMENT RADIATION LEVELS and the Containment Area following: 'Area radiation monitoring system' Radiation Levels 10 CFR Part 55 Content:

55.41.7 X

55.43 1

Question Source:

Bank #

X From NM-2 bank # 8340 162/Grp 6 Modified Bank #

New History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

3 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

1 Group #

3 K/A #

259021 Importance Rating 3.3 Proposed Question: RO 33 During a loss of shutdown cooling direction is given in N2-SOP-31, Loss of Shutdown Cooling, to raise level if no RHR pump or Recirculation Pump can be started.

Which one of the following identifies the reason for raising RPV water level to 227 to 243 inches?

To flood the.....

A.

dryer assembly to promote natural circulation.

B.

steam separators to promote natural circulation.

C.

dryer assembly to provide long term decay heat removal.

D.

steam separators to provide long term decay heat removal.

Proposed Answer:

B Justification:

B correct, separators are flooded to connect flow from inside to outside the shroud. A&C incorrect, separator not dryer. D incorrect, does not remove heat.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-SOP-31 K/A:

295021, Loss of AK3.01, Knowledge of the reasons for the following as they apply to Shutdown Loss of Shutdown Cooling: Raising reactor water level Cooling 10 CFR Part 55 Content:

55.41(5)

X 55.43 Question Source:

Bank #

Modified Bank #

New X

History:

Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

1 Group #

3 K/A #

295023 Importance Rating 3.7 Proposed Question: RO 34 The plant is in a Refueling Outage, with the following:

Fuel loading is in progress RPS shorting links are installed Following the insertion of a fuel assembly into the core, the Reactor Operator reports that SRM count rates are steadily rising The "SRM SHORT PERIOD" annunciator alarms and does not clear Which one of the following identifies automatic actions that will occur AND operator actions that must be taken in accordance with N2-SOP-39, Refuel Floor Events?

AUTOMATIC ACTION A.

IRM scram B.

SRM scram C.

IRM scram D.

SRM scram OPERATOR ACTIONS Evacuate Refuel Floor and Drywell Evacuate Refuel Floor and Drywell Manually start both Standby Gas Treatment trains Manually start both Standby Gas Treatment trains Proposed Answer: A Justification:

A is correct - IRM scram will occur and evacuation is required per N2-SOP-39. B&D incorrect - SRM scram will not occur with shorting links installed. C incorrect - manual GTS start not required per N2-SOP-39.

Proposed references to be provided to applicants during examination: None Technical N2-SOP-39 Reference(s):

KA:

295023:

AK1.03: Knowledge of the operational implications of the following Refueling concepts as they apply to REFUELING ACCIDENTS: 'Inadvertent Accidents criticality' 10 CFR Part 55 55.41.10 Content:

55.43 Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

3 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

1 1

Group #

3 2

K/A #

295035 295035 Importance Rating 3.3 3.5 Proposed Question: RO 35, SRO 44 The plant is operating at 100% power, with the following:

A swap of the operating Reactor Building ventilation (HVR) exhaust fans is performed Reactor Building differential pressure changes from -0.6" to -0.4" WG.

Which one of the following identifies the ventilation system response to this transient?

GTS RESPONSE HVR MOD17A/B RESPONSE A.

Starts Open B.

Remains in standby Close C.

Remains in standby Open D.

Starts Close Proposed Answer:

C Justification:

C correct - MODs will modulate open to reduce intake air flow to RB and GTS will not start on building dp. A&D incorrect - GTS will not start on building dp. B incorrect - MODs will modulate open to reduce intake air flow to RB.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-OP-52 and N2-OP-61 B KA:

295035:

EK3.02 Knowledge of the reasons for the following as they apply to Secondary SECONDARY CONTAINMENT HIGH DIFFERENTIAL PRESSURE:

Containment High Secondary containment ventilation response Differential Pressure 10 CFR Part 55 Content:

55.41(5)

X 55.43 Question Source:

Bank #

Modified Bank#

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

3 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

1 Group #

3 K/A #

295036 Importance Rating 2.8 Proposed Question: RO 36 The plant is at 50% power when the Radwaste Operator calls reporting that he has received the following alarms and conditions:

RX. BLDG. FL DR. SUMP TK2B LEAK RATE HIGH RX. BLDG. FL.DR. SUMP TK2B LEVEL HIGH HIGH The associated standby sump pump has auto started Another call is received from a non-licensed operator reporting a service water leak in the "A" RHR pump room and the floor drain is handling the leak.

Which one of the following describes entry requirements to N2-EOP-SC, Secondary Containment Control AND plant shutdown requirements?

N2-EOP-SC ENTRY A.

Yes B,

No C.

No D.

Yes PLANT SHUTDOWN Yes Yes No No Proposed Answer: D Justification:

D is correct-Rx Bldg. Sump level Hi Hi alarm is entry to EOP-SC only one area is above Max Safe. A is incorrect-S/D directed if more than one area. B/C is incorrect-Rx Bldg. Sump level Hi Hi alarm is entry to EOP-SCC Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-EOP-SC & R/W ARC 2CES-PNL513 KA:

295036 High EA1.03 Ability to operate/monitor the following as they apply to Secondary SECONDARY CONTAINMENT HIGH SUMP /AREA WATER LEVEL:

Containment

'Radwaste' Sump/Area Water level 10 CFR Part 55 Content:

55.41.10 X

55.43.

1 Question Source:

Bank #

Modified Bank#

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

3 Comments: None

Examination Outline Cross-

Reference:

Level RO SRO Tier #

2 Group #

1 K/A #

201001 Importance Rating 3.5 Proposed Question: RO 37 The plant is operating at 100% power, with the following:

Annunciator 603441, "ROD DRIVE ACCUMULATOR TROUBLE", alarms.

Local accumulator pressure for control rod 30-35 is indicating 1015 psig.

Which one of the following identifies the effect this will have on normal movement of control rod 30-35 AND the action that should be directed to clear the annunciator?

EFFECT ON MOVEMENT A.

Slower rod speeds B.

Slower rod speeds C.

No effect on movement D.

No effect on movement REQUIRED ACTION Blow water out of the instrument block Charge Nitrogen side of accumulator Charge Nitrogen side of accumulator Blow water out of the instrument block Proposed Answer. C Justification C is correct - the rod speed of control rod 30-35 will not be effected. N2-OP-30 indicates that a local accumulator pressure indication of less than 1025 psig is indicative of a nitrogen leak and the required action for this condition is to recharge the Nitrogen side of the accumulator to 1100 psig. A&B are incorrect - control rod 30 35 rod speeds are not effected. D is incorrect - wrong action per N2-OP-30 Proposed references to be provided to applicants during examination: None Technical Reference(s):

02 OPS-001-201-2-01, N2-OP-30 (F.7.0), N2-ARP-01 Window 603441 KA:

201001, Control A2.10, Ability to (a) predict the impacts of the following on the CONTROL ROD Rod Drive DRIVE HYDRAULIC SYSTEM; and (b) based on those predictions, use procedures to Hydraulic System correct, control, or mitigate the consequences of those abnormal conditions or operations: Low HCU accumulator pressure/high level 10 CFR Part 55 Content:

55.41.6 X

55.43 Question Source:

Bank#

Modified Bank#

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

2 Comments: None

Examination Outline Cross-

Reference:

Level RO SRO Tier #

2 2

Group #

1 1

K/A #

215005 215005 Importance Rating 3.2 3.3 Proposed Question: RO 38, SRO 69 The plant is operating at 90% power, with the following:

Control pattern adjustment is in progress All APRM's and RBM channels indicate 90% flow initially The % flow signal for APRM # 1 fails to 125%

Which one of the following identifies the system(s), if any, required to be bypassed to allow rod movement?

APRM #1 RBM A A.

Yes Yes B.

Yes No C.

No Yes D.

No No Proposed Answer: B Justification B is correct - bypassing the APRM removes the APRM flow upscale rod block and the flow comparator signal from the RBM. A is incorrect - because bypassing the RBM is not required since bypassing APRM #1 removes the upscale flow signal from RBM A. C is incorrect - because only the 10% difference rod block is removed. D is incorrect - because none of the rod blocks are removed Proposed references to be provided to applicants during examination: None Technical Reference 02-OPS-001-215-2-07 Table 5; N2-ARP-01, Attachment 12, 603217; N2-ARP-01, 4, 603442 KA:

215005, K6.07, Knowledge of the effect that a loss or malfunction of the following will have on APRM/LPRM the Average Power Range Monitor/Local Power Range Monitor System: flow comparator.

10 CFR Part 55 Content:

55.41.6 X

55.43 Question Source:

Bank #

Modified Bank #

New X

History Original KA 201002 K3.01 was replaced with this KA 215005 K6.07 and new question developed.

Comments:

Examination Outline Cross-

Reference:

Level RO SRO Tier #

2 Group #

1 K/A #

201002 Importance Rating 3.2 Proposed Question: RO 39 A reactor startup is in progress, with the following:

Reactor power is currently on Range 3 of the Intermediate Range Monitoring system Control rod 30-31 is the next control rod to be moved AND it is currently at notch position 12 Following the selection of control rod 30-31, the "ACTIVITY CONTROLS DISAGREE" light on the Rod Select Module illuminates, and remains illuminated Based on the above condition, which one of the following describes the ability to move the control rod?

Using Reactor Manual Control System, control rod 30-31 can be.....

A.

inserted or withdrawn B.

withdrawn only C.

inserted only D.

neither inserted nor withdrawn Proposed Answer: D Justification D is correct - the RMC system inserts control rod motion inhibit signals in response to an Activity Controls Disagree condition. A/B/C incorrect - due to both insert and withdraw blocks being applied Proposed references to be provided to applicants during examination: None Technical Reference(s):

02 OPS-001-201-2-02 KA:

201002, Reactor A3.01, Ability to monitor automatic operations of the REACTOR MANUAL CONTROL Manual Control SYSTEM including: Control rod block actuation System 10 CFR Part 55 Content:

55.41.7 X

55.43 Question Source:

Bank #

Modified Bank #

New X

History Comments: None

Examination Outline Cross-

Reference:

Level RO SRO Tier #

2 2

Group #

1 1

K/A #

202002 202002 Importance Rating 3.7 3.7 Proposed Question: RO 40, SRO 45 The plant is operating at 100% power, with the following:

The "A" hydraulic power unit (HPU) subloop for Reactor Recirculation (RCS) pump PlA is in-service The "B" HPU subloop for RCS pump PlA is in the READY (standby) mode The "A" HPU subloop trips on motor overload Which one of the following identifies the status of the "B" HPU subloop AND Reactor Recirculation flow control valve (FCV) "A" one minute after the motor overload condition occurs?

"B" HPU SUBLOOP STATUS A.

Running B.

Running C.

Not running D.

Not running FCV "A" STATUS Motion inhibited Motion not inhibited Motion inhibited Motion not inhibited Proposed Answer: B Justification B is correct - standby HPU subloop ("B") will start and no motion inhibit signal will be generated. A is incorrect - FCV "A" motion will not be inhibited. B&D are incorrect standby HPU subloop ("B") will automatically start.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

02-OPS-001-202-2-02, EO-1.7e KA:

202002, K3.06, Knowledge of the effect that a loss or malfunction of the RECIRCULATION Recirculation FLOW CONTROL SYSTEM will have on the following: Recirculation flow control valve Flow Control position: Plant-Specific System 10 CFR Part 55 Content:

55.41.6 55.43 Question Source:

Bank #

X NMP2 exam bank: Group 7 Question 8 Modified Bank #

New History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

2 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

2 2

Group #

1 1

K/A #

202002 202002 Importance Rating 3.3 3.4 Proposed Question: RO 41, SRO 46 The plant is shutdown, with the following:

Startup preparations are in progress.

Recirc Pump "A" is about to be started Recirc Pump "A" Flow Control Valve is at 25% open position.

An operator gives 'A' pump a start signal.

Which one of the following describes the response of the Recirc Pump?

A.

Does not start.

B.

Starts, immediately trips off.

C.

Starts then shifts to slow speed.

D.

Starts, remains running on high speed.

Proposed Answer: A Justification:

A is correct based on the FCV position starting interlock of 17 - 19 %. B is incorrect, pump does not start, since FCV is not at the minimum interlock position.C incorrect, would be correct at present power level if FCV were in correct position. D incorrect, would be correct for high power.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-OP-29 K/A:

202002, K 4.09 Knowledge of recirculation flow control system design feature(s)

Recirculation and/or interlocks which provide for the following:

Flow Control Minimum and maximum flow control valve position setpoints: BWR-5-6 System 10 CFR Part 55 Content:

55.41.7 X

55.43 Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

2 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

2 2

Group #

1 1

K/A #

203000 203000 Importance Rating 4.2 4.3 Proposed Question: RO 42, SRO 47 The plant has experienced a LOCA, with the following:

Division I Switchgear Bus 2ENS*SWG101 is de-energized due to a bus fault An automatic ADS blowdown has occurred RPV water level is -30 " and steady RHS pump "B" is the only running ECCS pump Which one of the following identifies the effect on the ADS valves if RHS pump "B" were to trip?

A.

All ADS valves will remain open.

B.

All ADS valves will close immediately.

C.

3 ADS valves will close AND 4 ADS valves will remain open.

D.

4 ADS valves will close AND 3 ADS valves will remain open.

Proposed Answer: A Justification:

A is correct - valves remain open due to seal-in contact.

B incorrect - reset PB must be depressed.

C&D incorrect - The loss of ENS*SWG101 will interrupt nitrogen supply to Div I ADS valves. A loss of nitrogen and accumulator will cause partial ADS valve closure (3 or 4 valves). This makes C and D credible distractors.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

02-OPS-001-218-2-01 K/A:

203000, K3.03: Knowledge of the effect that a loss or malfunction of the RHR/LPCI RHR/LPCl INJECTION MODE will have on the following: 'Automatic Injection Mode depressurization logic' 10 CFR Part 55 Content:

55.41.7 X

55.43 Question Source:

Bank#

Modified Bank #

X Modified from INPO bank-LGS 1998 New History:

Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

2 Comments: NRC: Unsat. "C" and "D" are not credible distractors. NM Response: Added justification explanation as to why these are credible distractors.

Examination Outline Cross-reference:

Level RO Tier #

2 Group #

1 K/A #

203000 Importance Rating 3.4 Proposed Question: RO 43 The plant is in Mode 4, with the following:

0 RHS Loop "A" is operating in Suppression Pool Cooling.

Which one of the following describes RHS Loop "A" LPCI operability and Injection capability per N2-OP 31, Residual Heat Removal System?

LPCI OPERABLE A.

Yes B.

Yes C.

No D.

No Proposed Answer: C INJECTION CAPABILITY Yes No Yes No Justification:

C is correct. With Full Flow test Valve open, N2-OP-31 requires the LPCI mode to be declared inoperable, due closing stroke time of the test valve.

The Loop is still capable and available to inject at full flow.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-OP-31, 02-OPS-001-205-2-00 KA:

203000 RHR/LPCI 2.1.32 Ability to explain and apply system limits and precautions Injection Mode 10 CFR Part 55 Content:

55.41.10 X

55.43 Question Source:

Bank #

Modified Bank#

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

2 Comments: NRC: Unsat. KA Mismatch. NM Response: Wrote new question.

Examination Outline Cross-reference:

Level RO SRO Tier #

2 2

Group #

1 1

K/A #

209001 209001 Importance Rating 3.7 3.6 Proposed Question: RO 44, SRO 48 Following a loss of coolant accident (LOCA) the Low Pressure Core Spray System is automatically aligning for injection, with the following:

2CSL*MOV104 Injection Valve is opening Approximately 500 gpm Injection flow is passing through 2CSL*MOV104 The thermal motor overloads on 2CSL*MOV104 trip (actuate)

Which one of the following approximates the Low Pressure Core Spray Pump flow, one minute from now?

A.

6300 gpm B.

1500 gpm C.

500 gpm D.

0 gpm Proposed Answer: A Justification A is correct. Motor overload trip will not stop the valve from stroking full open on initiation and full injection flow will be achieved. B is incorrect. If valve motion stopped, this would be correct (500 + 1000 gpm min flow). C is incorrect. If injection valve stopped with no min flow, 500 gpm would be the pump flow. D is incorrect. Plausible if pump trips due to overheating.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-OP-32 F.2; N2-ARP-01, ATT 4, 601416; P&ID 32A Note 12 K/A:

209001, Low A3.04, Ability to monitor automatic operation of LOW PRESSURE CORE Pressure Core SPRAY SYSTEM including: System flow Spray 10 CFR Part 55 Content:

55.41.7 X

55.43 Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

3 Comments: NRC: Unsat. Minutia, low LOD, math problem.

NM Response: Wrote new question.

Examination Outline Cross-reference:

Level RO SRO Tier #

2 2

Group #

1 1

K/A #

209002 209002 Importance Rating 3.5 3.5 Proposed Question: RO 45, SRO 49 N2-EOP-PC, Primary Containment Control, has been entered due to high Suppression Pool level.

Which one of the following describes the current suction source for the RCIC and High Pressure Core Spray (CSH) systems?

RCIC SUCTION A.

CST B.

CST C.

Suppression Pool D.

Suppression Pool Proposed Answer: A CSH SUCTION Suppression Pool CST Suppression Pool CST Justification:

A is correct - SP high level entry to N2-EOP-PC is > HPCS swap setpoint from CST to SP. C&D incorrect - RCIC swap occurs only on low CST level. B incorrect - CSH swaps to SP Proposed references to be provided to applicants during examination: None Comments: None Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

2

Examination Outline Cross-

Reference:

Level RO SRO Tier #

2 2

Group #

1 1

K/A #

209002 209002 Importance Rating 2.8 2.8 Proposed Question: RO 46, SRO 50 The plant is operating at 100% power, with the following:

The High Pressure Core Spray (CSH) system is in standby Condensate Storage Tank (CST) 1B level is 35 feet The CSH water leg pump (WTR LEG PMP 2) trips Which one of the following identifies the operational status AND availability of the CSH system?

CSH OPERATIONAL STATUS CSH AVAILABILITY A.

OPERABLE Available for injection B.

OPERABLE Unavailable for injection C.

INOPERABLE Unavailable for injection D.

INOPERABLE Available for injection Proposed Answer: C Justification C is correct - per N2-OP-33 (H10.0), with the CSH water leg pump out of service, CSH is inoperable, but will be unavailable since CST level is less than 47 feet.

A&B are incorrect - CSH is not operable. C is incorrect - CSH is not available for injection, CST 1 B level is less than 47 feet.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-OP-33 KA:

209002, High A4.07, Ability to manually operate and/or monitor in the control room: Line fill pump:

Pressure Core BWR-5, 6 Spray System (HPCS) 10 CFR Part 55 Content:

55.41.7 X

55.43 Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

2 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

2 2

Group #

1 1

K/A#

211000 211000 Importance Rating 3.4 3.6 Proposed Question: RO 47, SRO 51 The plant has experienced a transient, with the following:

The Reactor Water Cleanup (WCS) system is operating normally The switch for Standby Liquid Control (SLS) pump P1 B is placed in the "PUMP B RUN" position The SLS pump P1B suction valve fails to open SLS pump P1 B fails to start Which one of the following identifies the response of the WCS isolation valves to the above event?

WCS Inboard Isolation Valve (2WCS*MOV102)

A.

Closes B.

Remains open C.

Remains open D.

Closes Proposed Answer: A WCS Outboard Isolation Valve (2WCS*MOV112)

Remains open Remains open Closes Closes Justification:

A is correct - it indicates that inboard WCS isolation valve 2WCS*MOV102 will close AND outboard WCS isolation valve 2WCS*MOV1 12 will remain open. B is incorrect - inboard WCS isolation valve 2WCS*MOV1 02 will close. C is incorrect - inboard WCS isolation valve 2WCS*MOV1 02 will close AND outboard WCS isolation valve 2WCS*MOV1 12 will remain open.

D is incorrect - 2WCS*MOV1 12 will remain open.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-OP-36A, 02-OPS-001-204-2-01, 02-OPS-001-211-2-00 K/A:

211000, SLC K1.05, Knowledge of the physical connections and/or cause-effect relationships between SLC and the following: RWCU 10 CFR Part 55 Content:

55.41 55.43 Question Source:

Bank #

Modified Bank #

X, NM-2 Group 5 Question 130 New History:

Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

2 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

2 Group #

1 K/A #

212000 Importance Rating 3.9 Proposed Question: RO 48 The plant is at 90% power when an automatic scram occurred as a result of a Main Generator lockout, with the following:

All control rods fully inserted RPV pressure is 960 psig and steady RPV water level dropped to 120 inches and is slowly rising Which one of the following describes the position of the EOC-RPT Breakers AND Reactor Recirculation (RCS) pump status 30 seconds later?

EOC-RPT BREAKERS A.

Closed B.

Closed C.

Open D.

Open RCS PUMP STATUS Off Slow speed Off Slow speed Proposed Answer:

D Justification:

D is correct - EOC-RPT bkrs open on Main Turbine trip & pumps shift to slow. A incorrect - NP. B incorrect - EOC RPT bkrs do not stay closed. C incorrect - Pump remains running Proposed references to be provided to applicants during examination: None Technical Reference(s):

02-OPS-001-202-2-01 KA:

212000: Reactor A4.15: Ability to manually operate and/or monitor in the control room:

Protection System

'Recirculation pump/EOC RPT' 10 CFR Part 55 Content:

55.41.7 X

55.43 1

Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

2 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

2 2

Group#

1 2

K/A#

215003 215003 Importance Rating 4.0 4.0 Proposed Question: RO 49, SRO 72 The plant is in Mode 2 with a reactor startup in progress, with the following:

All APRMs are reading 2% power "B" IRM is reading 122 on Range 6 Which one of the following describes the expected Reactor Protection System (RPS) and Reactor Manual Control System (RMCS) response?

A.

Half scram only.

B.

Full reactor scram.

C.

Rod withdraw block only.

D.

Rod withdraw block and half scram.

Proposed Answer: D Justification:

D correct - IRM upscale trip and RB would be in with mode switch in STARTUP. A - incorrect with units above trip 120/125 it is also above RB 108/125. B incorrect - this would occur if shorting links were removed. C incorrect - this would be true if units were above 108 and below 120.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

02-OPS-001-212-2-00 (RPS)

KA:

215003, K4.02, Knowledge of IRM system design features and/or interlocks which Intermediate Provide for the following: 'Reactor SCRAM signals' Range Monitors 10 CFR Part 55 Content:

55.41(7)

X Question Source:

Bank#

X LGS Bank Modified Bank #

New History from LGS 2001 Audit Exam Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

2 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

2 Group #

1 KIA #

215004 Importance Rating 3.2 Proposed Question: RO 50 The plant is in Mode 2 with a reactor start-up in progress, with the following:

The IRM's are all on Range 4 reading between 40 and 60.

The SRM's B and C are being withdrawn with the following readings:

SRM:

A B

C D

CPS:

120 80 120 110 Which one of the following describes the status of the SRM withdrawal and the Rod Out Block?

SRM Withdrawal Rod Out Block Applied A.

Continues Yes B.

Continues No C.

Terminates Yes D.

Terminates Proposed Answer: B No Justification:

B correct - SRM retract has no stop interlock & no rod block if IRM's on or above range 3. A incorrect - RB is bypassed on B SRM with IRM on R4. C incorrect - Retract permit inputs to RB circuit not drive circuit and RB is bypassed >IRM R3. D incorrect - Retract permit inputs to RB circuit not drive circuit.

Proposed references to be provided to applicants during examination: None Question Source:

Bank #

X LGS Bank Modified Bank #

New History on LGS 2000 NRC Exam Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

3 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

2 2

Group #

1 1

K/A #

217000 217000 Importance Rating Proposed Question: RO 51, SRO 53 The RCIC turbine has been manually started for level control, with the following:

"* RPV pressure is 850 psig and stable.

"* RCIC system flow indicates 0 gpm.

"* RCIC turbine speed indicates 4500 rpm.

"* RCIC pump discharge pressure indicates 700 psig

"* The injection valve indicates open.

Which one of the following is the minimum pump discharge pressure needed to establish injection and the action needed to achieve that pressure per N2-OP-35, Reactor Core Isolation Cooling System?

A.

860 psig by manually raising turbine speed.

B.

860 psig by raising flow controller setpoint.

C.

960 psig by manually raising turbine speed.

D.

960 psig by raising flow controller setpoint.

Proposed Answer: C Justification:

C is correct per N2-OP-35, F.3.9 NOTE. A/B are incorrect, because the pump discharge pressure is too low to open the injection check valve. BID are incorrect because procedurally, the controller is in manual and changing the setpoint will not affect turbine speed/pump discharge pressure.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-OP-35, F.3.9 NOTE KA:

217000 RCIC A4.08, Ability to manually operate and/or monitor in the control room; system I

flow.

10 CFR Part 55 Content:

55.41.7 55.43 Question Source:

Bank #

Modified Bank #

X Sys ID 4834 New History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

2 Comments: NRC: Unsat. Low LOD, low importance. Replace.

NM response: No acceptable question can be developed for original KA 215005 K4.08. Selected new KA 217000 A4.08 (Plant Specific Priority) and wrote new question.

Examination Outline Cross-reference:

Level RO SRO Tier #

2 2

Group#

1 1

K/A #

217000 217000 Importance Rating 2.6 2.6 Proposed Question: RO 52, SRO 55 The plant is operating at 100% power, investigating a loss of Normal 125 VDC Distribution, 2BYS SWG001 B, with the following:

A Loss of Feedwater occurs The reactor is scrammed RCIC automatic initiation conditions are met Which one of the following describes the status of the Reactor Core Isolation Cooling System (RCIC)?

A.

Failed to initiate, the logic is not actuated.

B.

Running with the Injection Valve closed C.

Running and injecting with no minimum flow protection D.

Running and injecting with no turbine seals Proposed Answer: D Justification:

D is correct - Gland Seal Compressor is powered from Normal DC distribution (2BYS-SWG001 B) and is not running. A is incorrect Logic power is from Division I Safety Related DC. BIC are incorrect Minimum Flow and Injection Valves are not powered from Normal 125VDC.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

02-OPS-001-217-2-00, EO-1.5 N2-SOP-04 KA:

217000, Reactor K2.04, Knowledge of electrical power supply to the Gland Seal Core Isolation Compressor Cooling 10 CFR Part 55 Content:

55.41.8 X

55.43 Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

3 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

2 2

Group #

1 1

KIA #

218000 218000 Importance Rating 3.8 3.8 Proposed Question: RO 53, SRO 56 A plant transient has occurred requiring entry into the EOPs, with the following:

"B" and "C" RHR pumps are the only ECCS pumps running RPV Blowdown is required Just prior to the blowdown, the following events/actions occur:

A loss of Division 11125 VDC Then, all four ADS Logic Manual Initiation pushbuttons are armed and depressed Which one of the following applies to the ADS valves?

A.

Open only after the ADS timer has timed out.

B.

Open immediately without further operator action.

C.

Still closed and should be opened using their "B" solenoids.

D.

Still closed and should be opened using their "A" solenoids.

Proposed Answer: D Justification:

D is correct - Remain closed because ADS logic Div I does not have ECCS pump run permissive since RHR A nor CSL Pumps are running AND "A" solenoid is Div I DC (2BYS*PNL201A). A is incorrect - this would be auto initiation with Div I ECCS Pumps running. B is incorrect - this would be if Div I ECCS Pumps were running. C is incorrect - "B" ADS solenoids are powered from Div II DC (2BYS*PNL201B).

Proposed references to be provided to applicants during examination: None Technical Reference(s):

02-OPS-001-218-2-01, EO-1.5 K/A:

218000, K4.01, Knowledge of the operational implications of the following concepts Automatic as they apply to THE AUTOMATIC DEPRESSURIZATION SYSTEM: 'ADS Depressurization logic operation' System 10 CFR Part 55 Content:

55.41.7 X

55.43 Question Source:

Bank#

X NM-2 Q157 Modified Bank #

New History Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

2 2

Group #

1 1

K/A #

218000 218000 Importance Rating 3.7 3.8 Proposed Question: RO 54, SRO 57 A Loss of High Pressure injection occurs, with the following:

Automatic initiation of ADS RPV Pressure lowers to 80 psig RPV level is 180 inches Which one of the following identifies the expected status of the Control Room P601 and P628/P631 red indicating lights for SRV 137 at this time?

P601 A.

On B.

On C.

Off D.

Off P6281P631 On Off On Off Proposed Answer: C Justification:

C correct - the solenoid red lights on P628/631 light and Acoustic Monitoring actuates the red P601 light but will be off because pressure is too low (330 psig) to drive acoustic mon. A incorrect - this is expected with pressure

>330 psig. B incorrect this would be if valve opened above 330 psig by relief or safety modes. D incorrect - this would be normal indication without open or ADS initiation.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

O2-OPS-001-218-02-01, EO-1.5 KA:

218000, Automatic A3.03, Ability to monitor automatic operations of the ADS including: ADS Depressurization valve acoustical monitor noise System 10 CFR Part 55 Content:

55.41(7)

X 55.43 Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

3 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

2 2

Group #

1 1

K/A #

223001 223001 Importance Rating 2.7 2.9 Proposed Question: RO 55, SRO 58 The plant is operating at 100% power when electrical power is lost to 2NNS-SWG014.

Which one of the following identifies the Drywell Unit Cooler Fans that will lose power?

A.

None B.

Only a quarter C.

Only a half D.

All Proposed Answer: C Justification:

C is correct. NNS-SWG014 supplies power to MCC01 1 through NJS-US5.

MCC01 1 supplies 5 of the 10 Drywell Unit Cooler Fan Motors.

AIBID are incorrect.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-OP-60, Attachment 2 KA:

223001, Primary K2.09, Knowledge of electrical power supplies to Drywell Cooling Fans Containment System and Auxiliaries 10 CFR Part 55 Content:

55.41.7 X

55.43 Question Source:

Bank #

Modified Bank #

X New History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

2 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

2 2

Group #

1 1

K/A #

223001 223001 Importance Rating 3.1 3.3 Proposed Question: RO 56, SRO 59 A LOCA is in progress, with the following:

0 All Drywell Vacuum Breakers fail to open, when required.

Which one of the following identifies the containment failure mechanism that can result from the vacuum breaker failure?

A.

Excessive inward pressure on Drywell wall.

B.

Excessive inward pressure on Suppression Pool wall.

C.

Excessive upward pressure on Drywell floor.

D.

Excessive downward pressure on Drywell floor.

Proposed Answer: C Justification:

C is correct - Vac breakers relieve from SC to DW to limit upward stress on DW floor. A&B incorrect - These would result from excessive negative (to outside) pressure in the Drywell. D incorrect Under LOCA conditions, a downward force exist on the floor.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

02-OPS-001-221-2-01 KA:

223001 Primary K5.01 Knowledge of the operational implications of the following Containment and concepts as they apply to the PRIMARY CONTAINMENT AND Auxiliaries AUXILIARIES: 'Vacuum breaker/relief operation' 10 CFR Part 55 Content:

55.41(5)

X 55.43 Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

2 Comments: None

Examination Outline Cross-

Reference:

Level RO SRO Tier #

2 2

Group #

1 1

K/A #

223002 223002 Importance Rating 3.7 3.7 Proposed Question: RO 57, SRO 60 The plant is in an outage, with the following:

System testing is in progress Division 1 HYDROGEN RECOMBINER Manual isolation switch on P602 is taken to PUSH TO ISOLATE and depressed Which one of the following describes the status of the HYDROGEN RECOMBINER Train "A" Isolation Valves?

Inboard Valves A.

Open B.

Closed C.

Open D.

Closed Proposed Answer: D Outboard Valves Open Open Closed Closed Justification:

D is correct - For the HCS system "A" Train (all valves) are isolated by Division 1 AIBIC are incorrect - Both Inboard and Outboard valves will close Proposed references to be provided to applicants during examination: None Technical Reference(s):

02-OPS-001-223-2-02, N2-SOP-83 KA:

223002, Primary A1.02, Ability to predict and/or monitor changes in parameters associated with Containment operating the PRIMARY CONTAINMENT ISOLATION SYSTEM/NUCLEAR STEAM Isolation SUPPLY SHUTOFF SYSTEM (PCIS/NSSSS) controls including: Valve closures System/Nuclear Steam Supply Shutoff System (PCIS/NSSSS) 10 CFR Part 55 Content:

55.41.5 X

55.43 1

Question Source:

Bank #

Modified Bank#

X New History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

2 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

2 2

Group #

1 1

KJA #

239002 239002 Importance Rating 4.1 4.2 Proposed Question: RO 58, SRO 61 The plant is operating at 100% power, with the following:

Safety Relief Valve (SRV) 2MSS*PSV120 inadvertently opens AND remains open All fuses for the SRV have been removed in accordance with N2-SOP-34, Stuck Open Safety Relief Valve Which one of the following identifies an acceptable method for confirming, by observation, that the SRV is closed following the removal of its associated fuses in accordance with N2-SOP-34?

A.

Immediate clearing of the ADS/SRV Leaking alarm B.

Closed indication on Control Room panel P601 C.

Closed indication on the ERr computer D.

Reduction in Main Generator megawatts Proposed Answer: C Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-ARP-01 Window 601537, N2-SOP-34.

KA:

239002 SRVs A2.03, Ability to (a) predict the impacts of the following on the SRVs and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Stuck open SRV 10 CFR Part 55 Content:

55.41.10 X

55.43 Question Source:

Bank #

Group 1 Question 45 Modified Bank #

New History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

3 Comments: None Justification:

A is incorrect because N2-SOP-34 does NOT specify that the clearing of this annunciator is an indication of valve closure following the removal of the fuses for the associated SRV. B is incorrect because N2-SOP-34 does NOT specify that observing a closed position indication on Main Control Room panel P601 is an indication of valve closure following the removal of the fuses for the associated SRV. C is correct because N2-SOP-34 specifies that SRV indications on the ERF computer can be used to confirm SRV closure following the removal of the fuses for the associated SRV. D is incorrect because Turbine Generator output would rise (more steam would be available to the Turbine Generator).

Examination Outline Cross-reference:

Level RO SRO Tier #

2 2

Group#

1 1

K/A #

241000 241000 Importance Rating 2.7 2.7 Proposed Question: RO 59, SRO 63 Main Turbine speed rises from 100% to 107% of rated.

Which one of the following describes the response of the Main Turbine Control Valves (CVs) AND Intercept Valves (IVs)?

A.

The CVs AND IVs start to throttle closed together B.

CVs throttle closed first followed by the IVs C.

IVs throttle closed first followed by the CVs D.

IVs throttle closed AND the CVs remain open Proposed Answer: B Proposed references to be provided to applicants during examination: None Technical Reference(s):

02-OPS-001-248-2-00 KA:

241000 A1.13 Ability to predict and/or monitor changes in parameters associated Reactor/Turbine with operating the Reactor/Turbine Pressure Regulating System controls Pressure including: Main turbine speed Regulating System 10 CFR Part 55 Content:

55.41.4 55.43 Question Source:

Bank #

X Group 1 Question 56 Modified Bank #

New History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

2 Comments: None Justification:

A is incorrect because the CVs AND IVs will NOT throttle together. The CVs will throttle closed first AND will be fully closed at 105% of rated speed.

Then the master IVs will throttle closed AND all Vs will be fully closed at 107% of rated speed. B is correct because it indicates that the CVs will throttle closed first followed by the IVs. C is incorrect because the IVs will NOT throttle closed first. The CVs will throttle closed first AND will be fully closed at 105% of rated speed. Then the master IVs will throttle closed AND all IVs will be fully closed at 107% of rated speed. D is incorrect because the CVs will NOT remain open. The CVs will throttle closed first AND will be fully closed at 105% of rated speed. Then the master IVs will throttle closed AND all IVs will be fully closed at 107% of rated speed

Examination Outline Cross-reference:

Level RO SRO Tier #

2 2

Group #

1 2

K/A #

259001 259001 Importance Rating 3.3 3.3 Proposed Question: RO 60, SRO 75 A plant startup is in progress with RPV pressure at 500 psig, with the following:

The first Reactor Feedwater Pump (FWS-PlA) has just been placed in-service on minimum flow RPV water level is being controlled by the Startup Level Control Valve (LV1 37) in automatic An electrical malfunction fails open the Feedwater Pump Bypass Valve (MOV122)

Which one of the following will terminate the RPV water level transient?

A.

Reactor Feedwater Pump (FWS-P1A) trip on Level 8.

B.

Startup Level Control Valve (LV1 37) automatic closure.

C.

RO closes the Feedwater Blocking Valves (MOV21 s).

D.

RO closes the 6th Point Heater A Inlet Valve (MOV17A).

Proposed Answer: C Justification:

C is correct - because the MOV122 bypasses the FWS pumps and LV137 allowing uncontrolled injection by Condensate Booster Pumps.

The RPV water level rise can be terminated only by closing the Feedwater Blocking Valves (MOV21s).

A/BID are incorrect - none will stop RPV water level rise.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-OP-08, N2-SOP-101C (Steps 4.2.5, 4.2.6, 4.2.7, 4.2.8, 4.2.9)

K/A:

259001, Reactor A1.01: Ability to predict and/or monitor changes to parameters Feedwater associated with operating the REACTOR FEEDWATER SYSTEM System controls including: Feedwater flow/pressure 10 CFR Part 55 Content:

55.41.5 X

55.43 Question Source:

Bank #

Modified Bank #

New X

History:

Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

3 Comments: None

Examination Outline Cross-

Reference:

Level RO SRO Tier #

2 2

Group #

1 2

K/A #

259001 259001 Importance Rating 3.0 3.0 Proposed Question: RO 61, SRO 74 The plant is operating at 100% power, with the following:

2FWS-P1A and 2FWS-P1B are running.

Instrument Air pressure is lost to 2FWS-P1A recirc valve 2FWR-FV2A.

Which one of the following identifies the response of 2FWS-P1A pump flow and feedwater flow to the RPV?

A.

Pump flow remains constant and feedwater flow to the RPV rises.

B.

Pump flow remains constant and feedwater flow to the RPV lowers C.

Pump flow rises and feedwater flow to the RPV rises.

D.

Pump flow rises and feedwater flow to the RPV lowers.

Proposed Answer: D Justification D is correct - because the recirc FV fails open on loss of IA. A/B are incorrect - FWS pump flow rises in response to the recirc FV failing open. C is incorrect - because the recirc valve failing open puts the FWS pump in run-out.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

02-OPS-001-259-2-01, N2-SOP-19, N2-OP-03 KA:

259001, Reactor K6.01, Knowledge of the effect that a loss or malfunction of the following will have on I Feedwater System the REACTOR FEEDWATER SYSTEM: Plant Air system 10 CFR Part 55 Content:

55.41.7 X

55.43 1

Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

2 Comments: NRC: LOD 1, Basic system knowledge of what is supplied by CCS and what isn't. Revised question still unacceptable.

NM Response: Randomly selected new KA (original KA K6.05 - new KA K6.01) and wrote new question.

Examination Outline Cross-reference:

Level RO SRO Tier #

2 2

Group #

1 1

K/A #

259002 259002 Importance Rating 3.1 3.1 Proposed Question: RO 62, SRO 64 The plant is operating at 100% power, with the following:

Feedwater Level Control (FWLC) is in Automatic - 3 element control Level setpoint is 183 inches One steam flow transmitter signal to FWLC fails downscale to zero flow Which one of the following identifies the effect of this signal failure on reactor water level?

A.

Lowers resulting in a reactor scram at 159 inches.

B.

Lowers and automatically stabilizes between 170 to 175 inches.

C.

Rises and automatically stabilizes between 190 to 195 inches.

D.

Rises resulting in automatic protective functions at 202 inches.

Proposed Answer: B Justification:

B is correct - Based on 12 inch drop for one steam flow transmitter downscale failure will result in a level of 173 inches. A is incorrect - this would occur for total steam flow signal failure. C/D are incorrect, but can occur upscale steam flow signal failures.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

02-OPS-001-259-2-02 KA:

259002, K6.03, Knowledge of the effect that a loss or malfunction of the following Reactor Water will have on the Reactor Water Level Control: Main steam flow input.

Level Control 10 CFR Part 55 Content:

55.41:.7 X

55.43 Question Source:

Bank #

X Modified Bank #

New History Question taken from SSES, 2001 LOT Exam, RO 59, SRO 61 Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

3 Comments: NRC: Unsat. "C" and "D" are not plausible. Change so that all choices contain "lowers".

NM Response. Did not agree, but re-wrote to include all "lower" choices.

Proposed Question: RO 63, SRO 65 The plant is operating at 60% power, with the following:

Only Reactor Feedwater (FWS) Pump "A" is in-service Both Reactor Recirc (RCS) Pumps are in Fast Speed Power is lost to 2FWS-PNL10A, the panel for 2FWS-LV1OA Reactor Recirc (RCS) Pump "A" inadvertently trips Which one of the following identifies the response of RPV water level AND the operator response necessary to stabilize RPV water level in accordance with N2-SOP-6, Feedwater Failures?

LEVEL RESPONSE A.

Rises B.

Rises C.

Lowers D.

Lowers Proposed Answer: A Justification:

OPERATOR ACTION Throttle Feedwater Blocking Valves (MOV21s)

Take manual control of Master Level Controller Throttle Feedwater Blocking Valves (MOV21s)

Take manual control of Master Level Controller A is correct - per 4.4.1.a of N2-SOP-06, loss of power to 2FWS-PNL10A will cause LV-10A lockout circuits to trip. RPV water level rise following RCS pump trip due to swell and reactor power reduction. Operator response per N2-SOP-6 is to throttle Feedwater Blocking Valves (MOV-21s). B incorrect-with valve locked up, Master Level Controller will not move valve. COD incorrect - RPV water level rises, not lowers.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-SOP-06 KA:

259002: Reactor A2.06: Ability to predict the impacts of the following on the REACTOR Water Level WATER LEVEL CONTROL and based on those predictions, use Control procedures to correct, control or mitigate the consequences of these abnormal conditions or operations: 'Loss of controller signal output' 10 CFR Part 55 Content:

55.41.7 X

55.43 Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

4 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

2 2

Group #

1 1

K/A #

259002 295002 Importance Rating 3.3 3.4 Proposed Question: RO 63.S?.O 65 The plant is operating at..,O/% power, with the following:

Only Reactor Feedwater (FWS) Pump "A" is in-service Both Reactor Recirc (RCS) Pumps are in Fast Speed Power is lost to 2FWS-PNL10A, the panel for 2FWS-LV10A Reactor Recirc (RCS) Pump "A" inadvertently trips Which one of the following identifies the response of RPV water level AND the operator response necessary to stabilize RPV water level in accordance with N2-SOP-6, Feedwater Failures?

LEVEL RESPONSE A.

Rises B.

Rises C.

Lowers D.

Lowers Proposed Answer: A OPERATOR ACTION Throttle Feedwater Blocking Valves (MOV21s)

Take manual control of Master Level Controller Throttle Feedwater Blocking Valves (MOV21s)

Take manual control of Master Level Controller Justification:

A is correct - per 4.4.1.a of N2-SOP-06, loss of power to 2FWS-PNL10A will cause LV-10A lockout circuits to trip. RPV water level rise following RCS pump trip due to swell and reactor power reduction. Operator response per N2-SOP-6 is to throttle Feedwater Blocking Valves (MOV-21s). B incorrect - with valve locked up, Master Level Controller will not move valve. CID incorrect - RPV water level rises, not lowers.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-SOP-06 KA:

259002: Reactor A2.06: Ability to predict the impacts of the following on the REACTOR Water Level WATER LEVEL CONTROL and based on those predictions, use Control procedures to correct, control or mitigate the consequences of these abnormal conditions or operations: 'Loss of controller signal output' 10 CFR Part 55 Content:

55.41.7 X

55.43 Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

4 Comments: None Ak 6 0.

? I,

Proposed Question: RO 64, SRO 67 The plant is operating at 100% power, with the following:

Emergency Diesel Generator, 2EGS*EG2 is running and loaded.

Both Battery AND Battery Charger power to Division III 125 VDC are lost.

Which one of the following describes the effect on Emergency Diesel Generator, 2EGS*EG2?

A.

Continues to operate but engine and output breaker protection are lost.

B.

Continues to operate but output breaker controls are lost.

C.

Trips and output breaker remains closed.

D.

Trips and output breaker opens.

Proposed Answer: C Justification:

C is correct - Emergency Diesel Generator trip without DC power and output breaker will remain as is. A/B incorrect - Emergency Diesel Generator will not continue to run. D incorrect - Output breaker cannot open without control power Proposed references to be provided to applicants during examination: None Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD 3

Comments: None

Proposed Question: RO 65, SRO 81 The plant is operating at 100% power, the scram inlet valve for a control rod at position 24 opens.

Which one of the following identifies the response of reactor power AND scram discharge volume (SDV) level to this event?

REACTOR POWER SDV LEVEL A.

Rises Stays the same B.

Rises Rises C.

Lowers Stays the same D.

Lowers Rises Proposed Answer: C Justification C is correct - opening of the scram inlet valve will cause the control rod to drift in, resulting in a drop in reactor power. Because the scram outlet valve did not open, SDV level remains the same. A&B are incorrect - reactor power lowers, not rises.

D is incorrect - SDV level remains the same, it does not rise.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

02-OPS-001-201-2-01 KA:

201003, Control K5.03, Knowledge of the operational implications of the following concepts as they Rod And Drive apply to CONTROL ROD AND DRIVE MECHANISM: Reactor power control Mechanism 10 CFR Part 55 Content:

55.41.6 55.43 Question Source:

Bank #

X NMP2 exam bank: Group 5 Question 148 Modified Bank #

New History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

3 Comments: None

Proposed Question: RO 66 The plant is operating at power, with the following:

Control rod 22-19 is fully withdrawn A coupling integrity check is performed on control rod 22-19 Annunciator 603444, "CONTROL ROD OVERTRAVEL", alarms Which one of the following identifies the position indication displayed on the Four Rod Display window for control rod 22-19 after movement has been completed for the coupling check?

A.

Blank B.

XX C.

48 D.

50 Proposed Answer: A I

ustilication:

A. correct because it indicates the position indication for control rod 22-19 on the Four Rod Display will be blank.

B. incorrect this is failed RPIS.

C. incorrect this is full out indication coupled.

D. incorrect this is not indicated on display.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-ARP-01 603444 KA:

201003 Control A3.01 Ability to monitor automatic operations of the CONTROL ROD AND Rod and Drive DRIVE MECHANISM including: Control rod position Mechanism 10 CFR Part 55 Content:

55.41.6 55.43 Question Source:

Bank#

Group 3 Question 185 Modified Bank #

New History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

2 Comments: None iJ

Examination Outline Cross-reference:

Level RO SRO Tier #

2 Group #

2 K/A #

202001 Importance Rating 2.6 Proposed Question: RO 67 A reactor startup is in progress with power at 15%, with the following indications for Recirculation Pump (RCS) P1B:

Seal Purge Flow 0 gpm No. 1 Seal Cavity Temperature 150OF and steady No. 2 Seal Cavity Temperature 153 0F and steady Which one of the following describes the impact on continued operation of RCS P1 B per N2-OP-29, Reactor Recirculation System?

A.

Is allowed without any restrictions.

B.

Is allowed provided CCP is available.

C.

Is not allowed and the pump must be tripped within 90 seconds.

D.

Is not allowed and the pump should be shutdown using the normal shutdown procedure.

Proposed Answer: B Justification:

B is correct - With no CRD seal purge, continued pump operation allowed per N2-OP-29 as long as CCP is available. A/C/D incorrect not correct per N2-OP-29.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-OP-29 KA:

202001 A1.0 Ability to predict and/or monitor changes in parameters Recirculation associated with operating the RECIRCULATION SYSTEM controls system including: 'Seal purge flow' 10 CFR Part 55 Content:

55.41(10)

X 55.43 Question Source:

Bank #

X Question from NM2 bank #17778 Grp 7

Modified Bank #

New r History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

3 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

2 Group #

2 K/A #

204000 Importance Rating 3.0 Proposed Question: RO 68 The plant is operating at 100% power, with the following:

A catastrophic tube rupture occurs in the Reactor Water Cleanup (WCS) System Non-Regenerative Heat Exchanger tube bundle.

The resultant leak rate is 300 gpm.

Which one of the following identifies the WCS system AND the CCP Surge Tank level responses to the tube rupture?

A.

WCS continues to operate and the CCP Surge Tank empties.

B.

WCS continues to operate and the CCP Surge Tank overflows.

C.

WCS isolates and the CCP Surge Tank empties.

D.

WCS isolates and the CCP Surge Tank overflows.

Proposed Answer: D Justification:

D is correct. For the conditions given (WCS NRHX tube leak), WCS flow will enter the CCP system because WCS system pressure is higher than CCP system pressure. As a result, the WCS system will isolate on high differential flow (after a 45 second time delay) AND CCP Surge Tank level will rise until it reaches the atmospheric vent, at which time it will overflow into the Reactor Building. A is incorrect because the WCS system will isolate AND the CCP Surge Tank level rises. B is incorrect because the WCS system will isolate. C is incorrect because the CCP Surge Tank level rises.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

02-OPS-001-204-2-00 KA:

204000, Reactor A4.06, Ability to manually operate and/or monitor in the control room:

Water Cleanup System flow System 10 CFR Part 55 Content:

55.41.7 X

55.43 Question Source:

Bank #

Modified Bank #

X New History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

3 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

2 Group #

2 K/A #

205000 Importance Rating 3.6 Proposed Question: RO 69 The plant is in Mode 3 at 2720F with 'A' RHS Pump operating in Shutdown Cooling, with the following:

'A' RHS Pump trips on a motor electrical fault The reactor coolant begins to heat up at a constant 40F per minute At a constant heat up rate, which one of the following identifies the maximum time before Shutdown Cooling isolates?

A.

15 minutes B.

17 minutes C.

20 minutes D.

24 minutes Proposed Answer: C Justification:

C correct - From steam tables: The isolation setpoint of 128 psig/142.7 psia is equal to 354.5 degrees F. A maximum time of 20 minutes (correct ans.)

would take you to 352 degrees. A incorrect - (60 degree rise) this is subtracting 14.7 instead of adding it to 128 for psia. B incorrect- (68 degree rise) this is using 128 without converting to psia. D incorrect - (96 degree rise) NP Proposed references to be provided to applicants during examination: Steam Tables Technical Reference(s):

02 OPS-001-205-2-00, EO-1.7 KA:

205000, Shutdown K1.01, Knowledge of the physical connections and/or cause effect Cooling System relationships between SHUTDOWN COOLING SYSTEM and the following:

'reactor pressure' 10 CFR Part 55 Content:

55.41.5 X

Question Source:

-Bank #

Modified Bank#

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

3 Comments: None

Examination Outline Cross-

Reference:

Level RO SRO Tier #

2 Group #

2 K/A #

214000 Importance Rating 3.0 Proposed Question: RO 70 A reactor scram has occurred, with the following:

All rods fully insert RPS has NOT been reset Which one of the following identifies the control rod position indicated in the Four Rod Display and on the Process Computer?

Four Rod Display A.

00 B.

00 C.

Blank D.

Blank Process Computer 0

-99 0

-99 Proposed Answer: D Justification:

D is correct - With RPS tripped, the rod is driven past the 00 position switch. The Process Computer (OD7) displays -99 and the Four Rod display will be blank. AIC are incorrect - The Process Computer displays -99, until the scram is reset.

B is incorrect - With RPS tripped, the rod is driven past the 00 position switch and Four Rod Display indicates Blank, until the scram is reset.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

02-OPS-001-201-2-03 KA:

214000, Rod K4.01, Knowledge of ROD POSITION INFORMATION SYSTEM design feature(s)

Position and/or interlocks which provide for the following: Reed switch locations Information System 10 CFR Part 55 Content:

55.41.7 55.43 Question Source:

Bank #

Modified Bank #

X NMP2 exam bank: Group 7 Question 73 New History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

2 Comments: NRC: Unsat. Full In green light off is not plausible.

NM Response: Changed green full in light to Process Computer Display.

Proposed Question: RO 71, SRO 70 The plant is operating at 100% power when the Instrument Air supply line to the in-service Control Rod Drive (RDS) system flow control valve (2RDS*FV6B) actuator breaks.

Which one of the following identifies the response of the Control Rods/Drive Mechanisms (CRDMs) to this Instrument Air line break?

A.

CRDM temperatures will rise B.

CRDM temperatures will lower C.

Control rods will drift in D.

Control rods will drift out Proposed Answer: A Proposed references to be provided to applicants during examination: None Question Source:

Bank #

Group 6 Question 152 Modified Bank #

New History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

2 Comments: None Justification:

A is correct because it indicates that CRDM temperatures will rise as a result of the Instrument Air line break. B is incorrect because CRDM temperatures will NOT lower as a result of the Instrument Air line break. CRDM temperatures will rise due to closure of the in-service RDS flow control valve.

C is incorrect because control rods will NOT drift in as a result of the Instrument Air line break. CRDM temperatures will rise due to closure of the in-service RDS flow control valve. D is incorrect because control rods will NOT drift out as a result of the Instrument Air line break. CRDM

_ temperatures will rise due to closure of the in-service RDS flow control valve.

Examination Outline Cross-

Reference:

Level RO SRO Tier #

2 2

Group #

2 2

KIA #

215002 215002 Importance Rating 3.3 3.5 Proposed Question: RO 72, SRO 71 A reactor startup is in progress, with the following:

Reactor power is 40%

Control rod 22-31 is selected and being withdrawn from position 24 to position 48 Annunciator 603204, "RBM UPSCALE/INOPERABLE", alarms then clears Control rod 22-31 settles at position 32 Both Rod Block Monitor (RBM) channel "A" AND "B" "ALARM SET INTM" lights are now illuminated Which one of the following identifies the procedural action required to continue control rod withdrawal?

A.

Bypass one RBM channel to continue rod withdrawal and notify the System Engineer B.

Depress the PUSH TO SET UP pushbuttons then continue control rod withdrawal C.

Stop all control rod movement and contact the Reactor Engineer for assistance D.

Place one RBM channel keylock switch to INOP Proposed Answer: B Justification B is correct - Step 2.0 of 603204, "RBM UPSCALE/ INOPERABLE", states "IF the ALM SET LO OR ALARM SET INTM light is lit, THEN depress the PUSH TO SET UP pushbutton". Annunciator clears because alarm setpoint changes. A/CID are incorrect - wrong action per procedure.

Technical Reference(s):

02-OPS-001-215-2-06, EO-1.7e, N2-ARP-01 Window 603204 KA:

215002, Rod A2.01, Ability to predict and/or monitor the impacts of the following on the ROD Block Monitor BLOCK MONITOR SYSTEM and based on those predictions, use procedures to System correct, control or mitigate the consequences of those abnormal conditions or operations: Withdrawal of control rod in a high power region of the core.

10 CFR Part 55 Content:

55.41.7 X

55.43 1

Proposed references to be provided to applicants during examination: None Question Source:

Bank #

X NMP2 exam bank: Group 7 Question 92 Modified Bank #

New History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD 2

Comments:

None

Proposed Question: RO 73 A reactor startup is in progress, with the following:

Reactor power is 25%

Total Recirculation Flow signals received by the Rod Block Monitors (RBMs) are as follows:

32%

30%

41%

38%

Which one of the following describes the capability to drive individual control rods?

A.

Can INSERT or WITHDRAW B.

Can INSERT Only C.

Can WITHDRAW Only D.

Can neither INSERT nor WITHDRAW Proposed Answer: B Justificatio B is correct-Alarm setpoint is 10%, initiates a withdraw block only and is active at any power level. A/CID are incorrect - a WITHDRAW block is initiated.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

KA:

215002, Rod Block Monitor System 10 CFR Part 55 Content:

IT 02-OPS-001-215-2-06, EO-1.7e, N2-ARP-01 Window 603217 2.4.50, Ability to verify system alarm setpoints and operate controls identified in the alarm response manual 55.41.7 55.43 Question Source:

Bank #

X NMP2 exam bank: Group 7 Question 92 Modified Bank #

New History Comments: None S

0 S

Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

2 Comments: None

Proposed Question: RO 74 The plant is operating at 85% power, with the following:

0 7 Condensate Demins are in service and 2 in standby Fourth Point Heater drain pump 'A' trips on electrical fault.

Which one of the following describes the effect on the Condensate Demineralizer differential pressure (D/P) and the required actions?

A.

D/P lowers, remove Demineralizers as necessary.

B.

D/P rises, open Condensate Demineralizer Bypass Valve.

C.

D/P lowers, verify closed Condensate Demineralizer Bypass Valve.

D.

D/P rises, place in service standby Demineralizers as necessary.

Proposed Answer: D Justification:

D is correct based on the loss of the pumping forward by one heater drain pump. Condensate System Flow rises and causes a higher demineralizer D/P and a drop in Booster Pump Suction pressure. Placing additional demineralizers in service will restore system dp. A is the inverse of the correct answer, C adds the normal power to be lowered to in N2-SOP-8 for unplanned power changes. B Condensate Demineralizer Bypass Valve is not I opened under theses conditions.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-ARP-01 (page 1327-851403), N2-SOP-8 K/A:

256000, Reactor A2.16, Ability to (a) predict the impacts of the following on the reactor Condensate condensate system and (b) based on those predictions, use procedures to System correct, control, or mitigate the consequences of those abnormal conditions or operations: High demineralizer differential pressure.

10 CFR Part 55 Content:

55.41.7 X

55.43 Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

3 Comments: None

Proposed Question: RO 75, SRO 66 The plant is operating at 100% power, with the following:

A loss of Line 6 occurs 15 seconds later, a loss of Line 5 occurs Which one of the following identifies the Control Building Special Filter Train(s), if any, that will be running after power is restored by the Emergency Diesel Generators?

A.

Neither Special Filter Train B.

Only Special Filter Train "A" C.

Only Special Filter Train "B" D.

Both Special Filter Trains "A and "B" Proposed Answer: C Justification:

C is correct - If loss of second Division occurs > 8 seconds after the first Division then the start of the second fan will be blocked. A is incorrect - this would occur if EDGs did not re-energize buses. B is incorrect - this would be if line 5 were lost followed by line 6 > 8 seconds later. D is incorrect - this is if loss occurred < 8 seconds apart Proposed references to be provided to applicants during examination: None Technical Reference(s):

02 OPS-001-288-2-02, EO-1.5, N2-SOP-03 KA:

262001, Electrical K3.01, Knowledge of the effect that a loss or malfunction of the A.C.

Distribution ELECTRICAL DISTRIBUTION will have on: 'major system loads' 10 CFR Part 55 Content:

55.41.7 X

55.43 Question Source:

Bank #

X NM-2 system final Q-57 Modified Bank #

New History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

3 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

2 Group #

2 K/A#

262002 Importance Rating 2.8 Proposed Question: RO 76 Due to an overcurrent condition, plant AC Bus NJS-US3 is lost, de-energizing the Normal AC input to 2VBB-UPS1A.

Which one of the following describes the 2VBB-UPS1A load response?

A.

Transfers to the maintenance AC source.

B.

Lost due to a loss of "synch" with the maintenance AC supply.

C.

Continuously supplied by the DC input until Bus NJS-US3 is restored.

D.

Momentarily supplied by DC and then supplied by the alternate Normal AC source.

Proposed Answer: D Justification:

D correct - on a loss of normal AC input, UPS will be supplied from DC input for about 30 seconds while VBB-TRS1 transfers the normal AC input to US-4. AIBIC incorrect - do not function as above.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

O2-OPS-001-262-2-03 KA:

262002:

A3.01: Ability to monitor automatic operations of the Uninterruptable Power UNINTERRUPTABLE POWER SUPPLY SYTEM including:

Supply

'Transfer from preferred to alternate source' 10 CFR Part 55 Content:

55.41 X

(7) 55.43 Question Source:

Bank#

X Question from NM2 bank #8100 Grp 6, ques 58 Modified Bank #

New History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

3 Comments:

None

Examination Outline Cross-reference:

Level RO SRO Tier #

2 2

Group#

2 2

K/A #

263000 263000 Importance Rating 3.1 3.4 Proposed Question: RO 77, SRO 76 The plant is operating at 100% power, when a loss of 125VDC Bus 2BYS-SWG001C occurs.

Which one of the following identifies the Uninterruptible Power Supplies (UPS's) that will lose DC power?

A.

2A and 2B B.

1D and 3B C.

1A, 1C and 1G D.

1B, 1G and 3A Proposed Answer: D Justification:

D is correct. UPS IB, 1G AND 3A receive backup dc power from 2BYS-SWG001C A incorrect-dc power from *SWG002B. B incorrect dc power from SWG001 B C incorrect-dc power from SWG001A, except 1G Proposed references to be provided to applicants during examination: None Technical Reference(s):

02-OPS-001-262-2-03 KA:

263000, D.C K2.01: Knowledge of the electrical power supplies to the following:

Electrical Major D.C. loads Distribution 10 CFR Part 55 Content:

55.41.7 X

55.43.

Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

2 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

2 2

Group #

2 2

K/A #

263000 263000 Importance Rating 2.5 2.8 Proposed Question: RO 78, SRO 77 During a period of heavy loading on the Division 1 125 VDC Bus, bus current rises to 375 amps.

Which one of the following describes the resultant condition of the Division 1 battery charger AND battery?

A.

The battery charger will supply the entire current load B.

The battery will supply the entire current load C.

The battery charger will supply 345 amps AND the battery will supply the remaining current load D.

The battery will supply 345 amps AND the battery charger will supply the remaining current load Proposed Answer: C Justification:

A is incorrect because the battery charger will NOT supply the entire current load. The battery charger will supply 345 amps AND the battery will supply the remaining current. B is incorrect because the battery will NOT supply the entire current load. The battery charger will supply 345 amps AND the battery will supply the remaining current. C is correct because it indicates that the battery charger will supply 345 amps AND the battery will supply the remaining current load. D is incorrect because the battery will NOT supply 345 amps. The battery charger will supply 345 amps AND the battery will supply the remaining current load Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-OP-74A, 02-OPS-001-263-2-01 KA:

263000 DC A1.01 Ability to predict and/or monitor changes in parameters associated Electrical with operating the DC Electrical Distribution controls including: Battery Distribution charging/discharging rate 10 CFR Part 55 Content:

55.41.10 55.43 Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

3 Comments: None

Proposed Question: RO 79 The plant is operating at 100% power when a control rod drop accident and fuel element failure occurs.

Offgas radiation levels go into alarm as follows:

At 0618, 2OFG-REI3A goes to ALERT (Yellow)

At 0621, 2OFG-RE13B goes to ALERT (Yellow)

At 0630, 2OFG-RE13B goes to HIGH (Red)

At 0635, 2OFG-RE13A goes to HIGH (Red)

Which one of the following describes the earliest time when the Offgas System Discharge Valve (2OFG-AOV103) will automatically close?

A.

0618 B.

0621 C.

0630 D.

0635 Proposed Answer: D Justification:

D is correct-Both REI3's have to be Red. AIB/C are incorrect - Both RE13's are not yet Red Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-ARP-01, 851253 KA:

271000, Offgas K6.09, Knowledge of the effect that a loss or malfunction of the following will have on System the OFFGAS SYSTEM: Fuel cladding integrity 10 CFR Part 55 Content:

55.41.10 X

55.43 Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

2 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

2 2

Group #

2 2

KIA #

286000 286000 Importance Rating 3.2 3.4 Proposed Question: RO 80, SRO 78 One zone of Computer Room Underfloor Area fire detection is inoperable and has been placed in Alarm Only. This area is protected by cross zone detection.

Which one of the following identifies the impact of this failure if an actual fire occurs in the room?

The remaining zone will.....

A.

actuate local/control room alarms, but fire suppression must be manually actuated.

B.

actuate local/control room alarms and fire suppression will be automatically actuated.

C.

not actuate local/control room alarms, but fire suppression will be automatically actuated.

D.

not actuate local/control room alarms and fire suppression must be manually actuated.

Proposed Answer: A Justification:

A correct-alarms occur off either zone, suppression requires both. B incorrect - requires one detector in both zones. C incorrect - alarms are from either zone, suppression requires both. D incorrect - alarms will still occur from the remaining zone.

Proposed references to be provided to applicants during examination: N2-OP-47 (without attachments)

Technical Reference(s):

N2-OP-47, 02-OPS-00 1-286-02-01 KA:

286000, Fire K3.01, Knowledge of the effect that a loss or malfunction of the FIRE Protection System PROTECTION SYSTEM will have on the following: 'Ability to detect fires.

10 CFR Part 55 Content:

55.41(4)

X 55.43 Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

2 Comments: None

Proposed Question: RO 81 The plant has experienced a large break LOCA inside the Drywell, with the following:

Drywell pressure is 5 psig Both Control Building Special Filter Train Booster Fans start at 1200 Which one of the following identifies the latest time that both Control Building Special Filter Train Booster Fans can remain running and why, per N2-OP-53A, Control Building Ventilation System?

A.

1220 to prevent excessive positive Control Room pressure.

B.

1220 to prevent excessive radiation exposure to personnel.

C.

2000 to prevent excessive positive Control Room pressure.

D.

2000 to prevent excessive radiation exposure to personnel.

Proposed Answer: B Justification B is correct - CAUTION in Step H 1.0 of N2-OP-53A states "BOTH Special Filter Trains start simultaneously on a valid LOCA/Hi Rad signal. Failure to shutdown one of the operating fans 2HVC*FN2A(B) within 20 minutes of Actuation CAN result in the Control Room personnel receiving Excessive Radiation Exposure". AICID are incorrect - not an action directed in either N2-EOP-6 Attachment 1 or N2-OP-53A. There is an 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> requirement to close one of the Building intake dampers under LOCA conditions.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-EOP-6 Attachment 1 (Step 3.2.2.1), N2-OP-53A (CAUTION H 1.0)

K/A 290003, K5.01 Knowledge of the operational implications of the following concepts as they apply to CONTROL ROOM HVAC: Airborne contamination (example: radiological, toxic gas, smoke) control KA:

290003, Control K5.01, Knowledge of the operational implications of the following concepts as they Room HVAC apply to CONTROL ROOM HVAC: Airborne contamination (example: radiological, toxic gas, smoke) control 10 CFR Part 55 Content:

55.41.7 X

55.43 Question Source:

Bank #

Modified Bank#

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

3 Comments:

None

Examination Outline Cross-reference:

Level RO SRO Tier #

2 Group #

2 K/A #

300000 Importance Rating 2.8 Proposed Question: RO 82 Excessive Instrument Air System loading occurs, with the following:

Instrument Air pressure as read at P851 is 80 psig.

The Lead and Lag compressors are running Which one of the following identifies the expected status of the Back-Up Compressor and Service Air Header isolation (21AS-AOV1 71) at this pressure?

BACK-UP COMPRESSOR 21AS-AOV171 A.

On Closed B.

On Open C.

Off Closed D.

Off Open Proposed Answer: A Justification:

A correct - Backup compressor starts and 21AS-AOV1 71 closes at 85 psig.

B incorrect - SA isolates at same setpoint. C incorrect - B/U Comp starts at same pressure as SA iso. D incorrect - normal conditions prior to low air pressure Proposed references to be provided to applicants during examination: None Technical Reference(s):

02-OPS-001-279-2, EO-1.4, SOP-19 KA:

300000, K4.01, Knowledge of design features and/or interlocks which provide for the Instrument Air following: 'Manual/automatic transfers of controllers' System 10 CFR Part 55 Content:

55.41.4 X

55.43 Question Source:

Bank #

X NM-2 Q8403 Modified Bank #

New History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

2 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

2 2

Group #

2 2

K/A #

400000 400000 Importance Rating 3.2 3.4 Proposed Question: RO 83, SRO 80 Piping failures resulted in a loss of Reactor Building Closed Loop Cooling (CCP) flow. Which one of the following components can still be cooled following the loss of CCP?

A.

Drywell Unit Coolers B.

RHS Pump Seal Coolers C.

RDS Pump Seal Coolers D.

Drywell Equipment Drain Coolers Proposed Answer: B Justification:

B correct - RHS Pump seal coolers can also be supplied with Service Water. A/C/D incorrect - loads cooled by CCP only.

Technical Reference(s):

N2-SOP-13 K/A:

400000, K1.02, Knowledge of the physical connections and/or cause-effect Component relationships between COMPONENT COOLING WATER SYSTEM cooling water and the following: Loads cooled by CCWS system 10 CFR Part 55 Content:

55.41.4 X

F-55.43 Proposed references to be provided to applicants during examination: None Question Source:

Bank #

Modified Bank#

X New History Last NRC Exam. Question # 12338 modified from INPO bank (LGS - 1998 Exam).

Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD 2

Comments: None

Proposed Question: RO 84 The plant is operating at 100% power, with the following:

Spent Fuel Cooling Pump (SFC) "A" is in service Fuel pool gates installed.

Then, SFC Pump "A" trips Which one of the following describes fuel pool and SFC Surge Tank "A" level response?

Fuel Pool Level SFC Surge Tank "A" Level A.

Remains the same Remains the same B.

Remains the same Rises C.

Lowers to bottom of weir Remains the same D.

Lowers to bottom of weir Rises Proposed Answer: D Justification:

D is correct - Overflow from weirs to SFC Surge Tank lowers pool level and raises Surge Tank level. AIBIC incorrect - Surge tank Level rises as Pool drains to Surge Tank Proposed references to be provided to applicants during examination: None Technical Reference(s):

02-OPS-001 -233-2-00 Spent Fuel Pool Cooling & Cleanup K/A:

233000, Fuel K4.06, Knowledge of Fuel Pool Cooling and Cleanup design feature(s) and Pool Cooling and or interlocks which provide for the following: 'Maintenance of adequate pool Clean-up level'.

10 CFR Part 55 Content:

55.41(7)

X 55.43 Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD 3

Comments: None

Proposed Question: RO 85, SRO 73 Which one of the following describes an indication of a fuel assembly that has been improperly oriented in the core?

A.

The channel fastener is adjacent to the center of the fuel cell.

B.

The identification boss on the bail handle points toward the top guide.

C.

The channel spacing buttons are adjacent to the control rod passage area.

D.

The fuel assembly identification number on the bail handle is readable from the direction of the center of the fuel cell.

Proposed Answer: B Justification:

B correct - I.D boss should point toward the center of the cell to be correctly oriented. A incorrect - number (1) per OPTECH. C incorrect - number (3) per OPTECH. D incorrect - number (4) per OPTECH.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

02-OPS-001-101-2-02, EO-1.5 KA:

234000, Fuel K5.05, Knowledge of the operational implications of the following as they Handling apply to FUEL HANDLING EQUIPMENT: 'Fuel orientation' Equipment 10 CFR Part 55 Content:

55.41(2)

X 155.43 Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

3 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

2 2

Group #

3 3

K/A #

288000 288000 Importance Rating 2.8 2.9 Proposed Question: RO 86, SRO 83 The plant is in Mode 4 and startup preparations in progress, with the following:

A Reactor Building Ventilation system startup is in progress per N2-OP-52, Reactor Building Ventilation Division 1 and 2 Low Flow Isolation switches are in "OVERRIDE".

All running Reactor Building Exhaust fans trip.

Which one of the following Reactor Building Ventilation System actions will occur?

A.

Supply fans auto trip immediately.

B.

Supply fans auto trip after a time delay.

C.

"B" Emergency Recirc fan auto starts immediately.

D.

"B" Emergency Recirc fan auto starts after a time delay.

Proposed Answer: B Justification:

B correct - 10 second TD on high dp. A incorrect - this would occur on isolation damper closure. COD incorrect - occur only if flow isolation is not bypassed.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

02-OPS-001 -288-2-03 K/A:

288000, Plant K4.03, Knowledge of PLANT VENTILATION SYSTEMS design feature(s)

Ventilation and/or interlocks which provide for the following: Automatic starting and systems stopping of fans 10 CFR Part 55 Content:

55.41(7 )

X 55.43 Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD 3

Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

2 2

Group #

3 3

K/A #

290002 290002 Importance Rating 3.6 3.9 Proposed Question: RO 87, SRO 84 The plant is operating at 100% power, with the following:

A Drywell Instrument Nitrogen line break occurs inside the Drywell resulting in a rapid loss of Nitrogen pressure AND rapid closure of the inboard MSIVs 14 Safety Relief Valves opened AND then immediately re-closed Which one of the following identifies the effect of this transient on the RPV Pressure Safety Limit AND RPV pressure control actions specified in N2-EOP-RPV, RPV Control?

SAFETY LIMIT A.

Will not be exceeded B.

Will not be exceeded C.

Will be exceeded D.

Will be exceeded Proposed Answer: A RPV PRESSURE CONTROL METHOD Use sustained SRV opening using the 'C' solenoid only Use ADS SRVs using the 'A/B' solenoids only Use sustained SRV opening using the 'C' solenoid only Use ADS SRVs using the 'A/B' solenoids only Justification:

A correct - per USAR, Safety Limit will not be exceeded following MSIV closure at rated power. Sustained SRV opening is directed.

B incorrect - operation of ADS solenoids is prohibited.

C&D incorrect - per USAR, Safety Limit will not be exceeded following MSIV closure at rated power.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-EOP-RPV K/A:

290002, Reactor A2.02, ability to (a) predict the impacts of the following on the Vessel Internals REACTOR VESSEL INTERNALS and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations:

overpressurization transient.

10 CFR Part 55 Content:

55.41.5 X

55.43 Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD 2

Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

3 Group #

K/A#

2.1.10 Importance Rating 2.7 Proposed Question: RO 88 While performing a tour on the Refuel Floor, you note that the New Fuel Storage Vault is partially open AND 15 new fuel bundles are uncovered.

Which one of the following identifies the station document that contains the requirement that is being violated?

A.

Core Operating Limits Report B.

Core Reactivity Control Book C.

Facility ALARA Program D.

Facility Operating License Proposed Answer: D Justification:

D is correct-Tech Spec Operating License Condition C.3.d I AIB/C are incorrect. No such requirement exists in these documents Proposed references to be provided to applicants during examination: None Technical Reference(s):

KA:

Generic 2.1:

2.1.10: Knowledge of conditions and limitations in the facility license.

Conduct of Operations 10 CFR Part 55 Content:

55.41.10 X

55.43.

Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

2 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

3 3

Group #

K/A#

2.1.14 2.1.14 Importance Rating 2.5 3.3 Proposed Question: RO 89, SRO 87 The plant is in an outage, with the following:

RHS pump PlA was started for Shutdown Cooling (Event 1)

RHS pump PlA is being removed from Shutdown Cooling (Event 2)

Which one of the following identifies the event(s), if any, that require a Plant Page announcement?

EVENT I EVENT 2 A.

Yes Yes B.

Yes.

No C.

No No D.

No Yes Proposed Answer: A Justification:

A is correct - starting or securing a large pump or fan requires station announcement. BIC/D incorrect - not denoted as evolutions that require Gai-Tronics announcement.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

Operations Manual 3.4 KA Generic 2.1:

2.1.14: Knowledge of system status criteria which require the Conduct of notification of plant personnel.

Operations 10 CFR Part 55 Content:

55.41.10 X

55.43.

Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

2 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

3 3

Group #

K/A#

2.1.31 2.1.31 Importance Rating 4.2 3.9 Proposed Question: RO 90, SRO 88 A loss of coolant has occurred, with the following:

A High Drywell Pressure LOCA signal is present and cannot be reset.

RCIC is injecting into the RPV.

A spurious RCIC Turbine trip occurs.

Which one of the following identifies the status of the ICS*MOV1 50 "red" position indicating light on the horizontal section of P601 AND the ability to operate ICS*MOV150 from P601?

P601 RED POSITION INDICATING LIGHT (HORIZONTAL SECTION)

A.

On B.

On C.

Off D.

Off P601 OPERATION CAPABILITY Yes No No Yes Proposed Answer: B Justification:

B is correct - horizontal indication is for motor operator, not the Trip And Throttle Valve itself. The red light is normally on when the turbine is reset and remains on following a turbine trip. A LOCA signal removes power from the ICS*MOV1 50 valve operator preventing operation from P601. Power remains available to the indicating lights. A&D incorrect - P601 operation not available with LOCA signal present. C incorrect - red light remains on because control power remains available.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-OP-35 KA:

Generic 2.1:

2.1.31: Ability to locate control room switches, controls and Conduct of indications and determine they are correctly reflecting the desired Operations plant lineup.

10 CFR Part 55 Content:

55.41.7 X

55.43.

Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

4 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

3 3

Group #

K/A#

2.2.12 2.2.12 Importance Rating 3.0 3.4 Proposed Question: RO 91, SRO 89 While performing a step in an Operation's Surveillance Procedure, it has been determined that a normally open, motor operated Primary Containment Isolation Valve will not stroke in the closed direction, as required by the procedure.

Which one of the following identifies when the Technical Specification LCO action time is started per GAP-SAT-01, Surveillance Test Program?

The LCO time would start.....

A.

when the surveillance was logged as started.

B.

as soon as the valve failure is recognized.

C.

when the surveillance is logged as complete.

D.

at the time the surveillance was last satisfactorily completed.

Proposed Answer: B Justification:

B correct - per step 3.6.3. A/C/D incorrect - not allowed by GAP-SAT.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

GAP-SAT-01 K/A:

Equipment 2.2.12, Knowledge of Surveillance Procedures I Control 10 CFR Part 55 Content:

55.41(10)

X 55.43 Question Source:

Bank #

X NM-2 Exam Bank - ID # 13086 Modified Bank #

New History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD 2

Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

3 Group #

K/A #

2.2.28 Importance Rating 2.6 Proposed Question: RO 92 The plant is in MODE 5 with the following conditions:

A Core Reload is in progress All SRM's are OPERABLE All control rods are in the core Which one of the following conditions requires the Reactor Operator to notify the Fuel Handling SRO to stop fuel movement in accordance with N2-FHP-1 3.2, Complete Core Reload?

A.

Only radio communication between control room and refuel floor is available.

B.

High radiation level alarm on either 2HVR*CAB32A or 2HVR*CAB32B.

C.

Control rod 22-31 full-in position indication is lost in the control room.

D.

SRM Channel 'A' high voltage power supply fails.

Proposed Answer: C Justification:

C is correct - FHP-13.2 requires fuel movement be stopped if any control rod (not removed from the core) full-in position indication is lost. A is incorrect TRM 3.9.3 Bases allows any mode of direct communication between the control room and refuel floor, including radio. B is incorrect - ARP for 851254 (Process Airborne Radiation Monitor Activated) requires entry into N2-SOP-39, Refuel Floor Events, if either HVR Above Refuel Floor monitor (2HVR*CAB14A/B) alarms. The CAB32's are the Below Refuel Floor monitors. D is incorrect - Stem conditions specify that all 4 SRM's are OPERABLE; an INOP condition (i.e, the HV power supply failure) on the 'A' SRM channel still leaves 3 SRM's operable. Tech Spec 3.3.1.2 (Table 3.3.1.2-1) requires only 2 operable SRMs for the stem conditions.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-FHP-13.2 (Att.4); TS 3.3.1.2, TRM 3.9.3, N2-ARP-01 (Att. 21 for window 851254)

KA:

GENERIC 2.2 2.2.28, Knowledge of new and spent fuel movement procedures 10 CFR Part 55 Content:

55.41 55.43.7 1X Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

3 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

3 3

Group #

K/A #

2.2.11 2.2.11 Importance Rating 2.5 3.4 Proposed Question: RO 93, SRO 92 Assuming any necessary approval or direction is obtained, which one of the following types of procedure changes may be prepared AND processed as a Type 1 (14 day) Procedure Change Evaluation (PCE), in accordance with NIP-PRO-04, Procedure Change Evaluations And Future Procedure Enhancements?

A change that.....

A.

swaps the location of two steps in a Special Operating Procedure.

B.

revises an acceptance criteria value in a Surveillance Test Procedure.

C.

adds a new motor-operated valve to the scope of an In-Service Test Procedure.

D.

deletes a reference from of an Administrative Procedure.

Proposed Answer: A Justification:

A is correct - such a change is not a 'Change of Intent' as defined by NIP-PRO-04, Attachment 3; therefore, a Type 1 PCE would be allowed, provided that the EOP/SOP Coordinator has directed that the SOP be changed using the PCE process (Section 3.1.1). BIC are incorrect specifically violate NIP-PRO-04, 'Change of Intent' criteria. D is incorrect - Type 1 PCE process is not allowed for changing Administrative Procedures (NIP-PRO-04, Section 3.1.2).

Proposed references to be provided to applicants during examination: None Technical Reference(s):

NIP-PRO-04 KA:

2.2, Equipment Control 2.2.11, Knowledge of the process for controlling temporary changes.

10 CFR Part 55 Content:

55.41.10 X

55.43 Question Source:

Bank #

Modified Bank #

X (PBAPS, NRC 2000)

New History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

2 Comments: NRC: Enhancement. "A" is general in nature and can be a change of intent. Make choices more specific.

Examination Outline Cross-reference:

Level RO SRO Tier #

3 Group #

K/A#

2.3.2 Importance Rating 2.5 Proposed Question: RO 94 A plant transient is in progress, with the following:

An emergency at the ALERT level has been declared You are a radiation worker who has been authorized to receive an emergency radiation exposure for the purpose of protecting valuable plant equipment Which one of the following identifies the highest (TEDE dose) emergency exposure that you may receive without exceeding the limits specified in EPIP-EPP-15, Emergency Health Physics Procedure?

A.

5 rem B.

10 rem C.

25 rem D.

50 rem Proposed Answer: B Justification:

B is correct - For protecting valuable plant equipment/property, emergency exposure limit is 10 rem (TEDE). A is incorrect - 5 rem emergency exposure is within the 10 rem limit, but is not the highest dose before exceeding the 10 rem limit. C is incorrect - 25 rem far exceeds the limit for protecting valuable plant property. 25 rem is the limit for saving lives or protecting large populations. D is incorrect 50 rem far exceeds the limit for protecting valuable plant property. 50 rem could be authorized only for individuals who volunteer to save lives or protect large populations.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

EPIP-EPP-15, Attachment1l, Section 1.0 KA:

Generic 2.3.2: Knowledge of facility ALARA program 2.3:Radiation Control 10 CFR Part 55 Content:

55.41.12 X

55.43 Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

2 Comments: None

Proposed Question: RO 95, SRO 94 Which one of the following identifies the reason for maintaining both Reactor Building and Primary Containment pressure limits during suppression chamber purge operation using the 20 inch line, per N2-OP-61A, Primary Containment Ventilation, Purge and Nitrogen System?

To prevent cross flow from the...

A.

suppression chamber to the drywell.

B.

drywell to the suppression chamber.

C.

suppression chamber to the reactor building.

D.

reactor building to the suppression chamber.

Proposed Answer: C Justification:

C is correct-Supp. Chamber reverse flow could occur if limits are exceeded. A&B incorrect-limits on SC to DW DP. D incorrect-wrong direction Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-OP-61A, pg.24 KA:

Generic 2.3:

2.3.9: Knowledge of the process for performing a containment purge.

I Radiation Control 10 CFR Part 55 Content:

55.41.13 X

55.43.

Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

2 Comments: NRC: Unsat. With values given, flow can only be from Supp Chamber to Rx Bldg, so others are non-plausible. LOD 1. May be salvageable by removing bullet conditions.

NM Response: Fixed by removing parameters.

Examination Outline Cross-reference:

Level RO SRO Tier #

3 3

Group #

K/A#

2.3.11 2.3.11 Importance Rating 2.7 3.2 Proposed Question: RO 96, SRO 96 The plant experienced a transient, with the following:

"* Reactor scram and all MSIVs closed two hours ago

"* RPV pressure is now being maintained 800 psig to 1000 psig with SRVs

"* Main Steam Line Radiation Levels are now 2.OOE+5 mR/hr and slowly rising

"* Turbine Building HVAC Radiation Level is now less thanl.00E-3 pCi/cc and rising

"* Offgas Radiation Level is now 1.00E+2 p[Ci/cc and steady

"* Both Auxiliary Boilers are placed in service Which one of the following Emergency Operating Procedure actions is required?

A.

Operate available Steam Jet Air Ejectors through Offgas System.

B.

Isolate the Main Condenser and establish seals on MSIVs and turbine.

C.

Isolate the Main Condenser and start all Circulating Water Pumps.

D.

Open seven ADS/SRVs to depressurize the reactor to at least 100 psig.

Proposed Answer: A Justification:

A is correct. Fig MSL 2 value is exceeded AND Fig MSL 3 value is also exceeded. EOP-MSL requires operation of SJAE through Offgas.

BIC is incorrect, since SJAE are available from Aux Boilers AND Fig MSL 1 is not being exceeded. C is incorrect. Non-plausible. D is incorrect. Conditions do not warrant an Emergency Blowdown.

Proposed references to be provided to applicants during examination: N2-EOP-MSL Technical Reference(s):

N2-EOP-MSL KA: I 2.3.11 2.3.11 Ability to control radiation releases.

10 CFR Part 55 Content:

55.41(O1)

X 55.43 Question Source:

Bank #

X Modified Bank #

New History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

3 Comments: Replacement question. No comment was made on original question 96, but when question 24 RO was replaced, based on NRC comment, it became a duplicate with 96.

Proposed Question: RO 97, SRO 97 A Failure To Scram (ATWS) has occurred, with the following:

Suppression Pool temperature is 112 0F and steady Reactor water level is being intentionally lowered to reduce power Which one of the following is prevented by specifying a minimum level limit per N2-EOP-C5, Failure to Scram, while lowering RPV level?

A.

Thermal hydraulic instabilities B.

Inadvertent ECCS pump starts C.

Peak cladding temperatures above 1500°F D.

Uncovering Fuel Zone instrument variable leg taps Proposed Answer: C C is correct - this is the reason for the Minimum Steam Cooling Water Level (MSCWL) limit. A is incorrect-a maximum level of 100 inches is specified in EOP-C5 step L-7 for this concern. B is incorrect - ECCS Pumps will start as level is lowered to the MSCWL, since their initiation setpoint is above MSCWL. D is incorrect-Fuel Zone Instruments are used when level is at MSCWL.

Proposed references to be provided to applicants during examination: None Question Source:

Bank #

X INPO Bank # 12276 Modified Bank #

New History LGS 1998 NRC exam Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD 3

Comments: None J ustification:

Examination Outline Cross-reference:

Level RO SRO Tier #

3 3

Group #

K/A #

2.4.27 2.4.27 Importance Rating 3.0 3.5 Proposed Question: RO 98, SRO 99 The plant is operating at 100%, with the following:

Automatic fire suppression has actuated.

Multiple fire alarms are illuminated on P849.

An Unusual Event has been declared.

Which one of the following describes the Chief Shift Operator's actions?

A.

Sound the Fire Alarm and direct the Fire Brigade to the scene.

B.

Sound the Fire Alarm and direct the Fire Brigade to the OSC.

C.

Call the Fire Brigade leader and direct them to the alarming fire panels.

D.

Call the OSC and direct the Fire Brigade leader to the alarming fire panels.

Proposed Answer: A Justification:

A is correct - automatic fire suppression has actuated so Fire Alarm/Announcement is appropriate. B is incorrect - the Fire Brigade is directed to the scene because the OSC is not staffed until ALERT classification. C is incorrect - automatic fire suppression actuation requires use of Alarm/Announce verses phone call and investigation. D is incorrect the OSC would not be manned and Alarm/Announce would be required verses phone call and investigate. C and D are plausible for a manual fire suppression system.

Proposed references to be provided to applicants during examination: EPIP-EPP-28 Technical Reference(s):

EPIP-EPP-28, Sec 3.1, Attachment 1 KA:

2.4, Emergency 2.4.27, Knowledge of fire in plant procedure Procedures/Plan 10 CFR Part 55 Content:

55.41.10 X

55.43 Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

3 Comments: NRC: Is "B" plausible with sounding Station Alarm during a fire? Are "C" and "D" plausible?

NM Response: Modified distractor B and explained plausibility of C and D. Still not acceptable after fix.

Modified stem conditions and made open reference per Chief Examiner recommendation.

Proposed Question: RO 99, SRO 100 The plant is operating at 100%, when electrical faults on various Foxboro cabinets result in a loss of all annunciator capability.

Which one of the following identifies the required actions per N2-SOP-91, Loss of Control Room Annunciators?

Assign.....

A.

a licensed operator to monitor all control room panels B.

any operator to monitor all control room panels C.

a licensed operator to perform rounds twice per shift in all buildings D.

any operator to perform rounds twice per shift in all buildings Proposed Answer: A Justification:

A is correct - N2-SOP-91 requires a licensed operator to monitor all affected panels B is incorrect - requires a licensed operator CID are incorrect - building rounds must be performed continuously Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-SOP-91 KA: I GENERIC 2.4.32, Knowledge of operator response to loss of all annunciators 10 CFR Part 55 Content:

55.41.7 1X 55.43 Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

2 Comments: None

Examination Outline Cross-

Reference:

Level RO SRO Tier #

3 3

Group #

K/A #

2.4.35 2.4.35 Importance Rating 3.3 3.5 Proposed Question: RO 100, SRO 9 The plant is at 100% power when a SCRAM occurs, with the following:

RPS is tripped All of the blue lights are illuminated on the full-core display Rods are not all in SLS fails to initiate Radiation levels make Reactor Building elevation 328' inaccessible Which one of the following methods should be used to shut down the reactor?

A.

Vent the scram air header B.

Individually scram the control rods C.

Inject boron using WCS D.

Inject boron using the SLS hydro pump Proposed Answer: D Justification D is correct - RB elevation 289' is accessible, and hydro pump boron injection would be effective. AIB are incorrect - with scram valves already open, neither would be effective. C is incorrect -

RB elevation 328' is inaccessible Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-EOP-6 KA:

GENERIC 2.4.35, Knowledge of local auxiliary operator tasks during emergency operations including system geography and system implications.

10 CFR Part 55 55.41.7 X

Content:

55.43 Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

3 Comments: None

SUJCTV SCOR INTUCO USE ONL AZ ca-I coO

<0 m M i

  • zt zOA o,

i i

i~

0 t-

-I cAm cA]

cA]

CAn cAn CB]

c Bn

" Bn "CBn cDB r Bn cBO cBO 1:Bn cBn CB]

c Bn cBn son c:Bn cBn cBn cB]

cem c Bn cBD cBn cBn cBD c~n nCo "CCn CC]

1C]

cno

" co

" Cn COC rCC CC]

EC]

-0 cCO cC]

Cc]

cC]

rCC rCC cCO cCC ECC rCn men Ec~n

" cO "cOn cCD CC]

CDO CD]

010 CD]

CDO CD]

CDO

-mo so CDO CD]

CD]

cD]

cD]

CDO cDO cDn CDO "cDO "cDO cDO cDO cD]

rcDO TA USE AUOjECTIAA SCARE FEATURE.

m-1ar

-ot -

osileubje.iv points1

'RAKE DARK MARKS

. OMly Utm; psr 'I-a key

  • ERASE COMPLETELY TO CHANAE EX LE 01

-EXAMPE:

AENT SCARE PART 1

-*="TRON* FORM NO. 888-E TO REORDER CALL 1-800-722-6876.

CANADA 1-800-263-3338 i 100 C90]

c80O c70]

c60

]

C50]

C40]

c30D C203 clO]

C9]

C8n c7n C6n C5n c4n 3 C 2n C ln COn (T)

(F)

KEY w=w wmi-c:3 n i66 1 cA]

zBn.4 cDO LEE 2

cB]

cCn CD]

CE]

3 cAn CB]

CC]

S CE]

4 CA]

cBn cC]

a CE]

5 cA]

CB]

0 CD]

cE]

6 no CB]

cC]

CD]

CE]

7 cAn CC]

C ED] CE]

8 CA]

CB]

ECC G

CE]

9 CA]

cBn rCC 0

CE]

10 cA]

m@- cC]

CD]

CE]

11 R

cBn cCn CD]

CE]

12 CA]

cBD CC]

0i0 CE]

13 CA]

cB]

cCn I00 CE]

14 cAn IB1 ECn CD]

CE]

15 cA]

cDB CC]

W41 CE]

16 cA]

ad= cC]

cD]

CE]

17 CA]

0, cCC CD]

CEE 18 cAn CB]

M CD]

CE]

19 CA]

cBD 8

cD]

CE]

20 W CBD ECC CD]

CE]

GRADE:

TITLE : U2(5ENIOR REACTOR OPERATO NRC WR=TEN EXAM Trainees will be judged to have willfully violated the integrity of an examination if they are found to have:

a.

Utilized unauthorized documents during the examination.

b.

Secured unauthorized documents for the purpose of accessibility during an examination.

c.

Solicited examination information from other trainees or any other individuals.

d.

Provided examination information to other trainees during an examination.

e.

Reviewed or attempted to review materials that are unauthorized, including the examination prior to implementation, the examination answer key, or the answers developed by any other trainee during the examination.

I have read and understand the above.

SIGNATURE:

DATE:

CEE cEn CEE CE]

c En CEE CEE "CEn "CEn "cEn "CEn CEn CEE CEn CEE "cEn "CEn "CEn "cEn "CE]

CEE CE]

CEE CEE CE]

cEn cEE "cEn "cEn "cEn "CEn NAý Ke~

SS #:

COURSE: UNIT 2LJICENSE CLASS 01-01 DATE:

A-7/

ý 21 CAn 22 s 23 CAn 24 --eA n 25 o

26 cA]

27 =*=

28 w 29 cA]

30 cA]

31 32 33 34 35 36

  • 7 38 39 40 41 42 43 44 45 46 47 48 49 50 CA]

cAn cAn cAn CA]

CAn CAn c:An

Examination Outline Cross-reference:

Level RO SRO Tier #

1 Group #

I KIA #

295006 Importance Rating 4.1 Proposed Question: SRO 3 The plant is at 100% power when surveillance testing finds that RPS Reactor Pressure trip unit (B22 N078B) trip setpoint is 1075 psig and cannot be adjusted.

Which one of the following describes the minimum required Technical Specification action?

A.

Place the Unit in Mode 2 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> B.

Place the Unit in mode 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

C.

Initiate a 'B' channel half scram within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

D.

Initiate a 'B' channel half scram within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Proposed Answer: D Justification:

D is correct. Tech Spec 3.3.1.1 Condition A Required Action A.2.

A is incorrect This is Required Action G.1, which is not entered. B is incorrect but plausible if Condition H is entered directly from Table 3.3.1.1-1 Function 3. C is incorrect. This is Required Action B.2 Proposed references to be provided to applicants during examination: Technical Specification Section 3 to be provided as reference, not just 3.3.1.1 Technical Reference(s):

Tech Spec. 3.3.1.1 KA:

295006, SCRAM AA2.04, Ability to determine and/or interpret the following as they I

apply to SCRAM: " Reactor pressure" 10 CFR Part 55 Content:

55.41 55.43(2)

X Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

2 Comments: NRC: Provide all of TS section 3 as reference during exam.

Examination Outline Cross-reference:

Level RO SRO Tier#

1 Group #

1 K/A #

295007

_ Importance Rating 3.7 Proposed Question: SRO 4 A transient has occurred resulting in entry into N2-EOP-C3, Steam Cooling, with no RPV injection sources available and the following conditions:

"* RPV pressure is 600 psig

"* Fuel Zone RPV water level indicates -60 inches At which one of the following identifies the highest indicated RPV water level that requires RPV Blowdown with RPV pressure now stabilized at 800 psig?

A.

-70 inches B.

-73 inches C.

-80 inches D.

-83 inches Proposed Answer D Justification:

D is correct - -55 at 800 psig.

B incorrect - -55 at 600 psig A incorrect - -42 at 600 psig C incorrect - -42 at 800 psig.

Proposed references to be provided to applicants during examination: N2-EOP-C3.

Technical Reference(s):

N2-EOP-C3 - Ref graph Z KA:

295007, High AA2.03: Ability to determine and interpret the following as they apply Reactor Pressure to HIGH REACTOR PRESSURE: 'Reactor water level' 10 CFR Part 55 Content:

55.41.

55.43.5 X

Question Source:

Bank #

Modified Bank #

New X

History:

Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD 3

Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

1 Group#

I K/A #

295013 Importance Rating 4.0 Proposed Question: SRO 7 The plant is in MODE 1 when the following events occur:

"* A Safety Relief Valve (SRV) inadvertently opens.

"* Five minutes later the valve re-closes and stays closed.

"* Suppression Pool Cooling is placed in service as required by plant procedures.

Suppression Pool temperature values AND times are as follows:

Time Suppression Pool Temperature 08:00 850F (initial opening of SRV) 08:03 90OF 08:05 920F (SRV closes) 08:10 940F 09:00 91 OF Which one of the following identifies the latest time that the next Technical Specification requirement will need to be completed? (assume one hour readings are being taken for Suppression Pool temperature AND normal channel check readings are being taken)

A.

Same day by 20:03 B.

Same day by 20:05 C.

Next day by 08:03 D.

Next day by 08:05 Proposed Answer: B Justification:

B is correct - TS.3.6.1.7 requires vacuum breakers to be tested within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> of an SRV opening.

A incorrect - 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> applied when above 900F.

D incorrect - 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> applied to vacuum breaker test.

C incorrect - correct, but not next action.

Proposed references to be provided to applicants during examination: Technical Specification 3.6.1.7.

Technical Reference(s):

Technical Specifications 3.6.1.7 (SR 3.6.1.7.2)

KA:

295013, High 2.1.12: Ability to apply technical specifications for a system Suppression Pool Temperature 10 CFR Part 55 Content:

55.41 55.43.2 Question Source:

Bank #

Modified Bank #

New X

History:

Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD 3

Comments: From INPO bank - Duane Arnold # 7174

Examination Outline Cross-reference:

Level RO SRO Tier #

1 Group #

1 K/A #

295023 Importance Rating 4.6 Proposed Question: SRO 14 The plant is in a Refueling Outage when the following events occur:

An irradiated spent fuel bundle is dropped in the Spent Fuel Pool 2HVR*RE14A-1 AND 2HVR*RE14B-1 gaseous radiation monitors indicate "red" on DRMS Reactor building ventilation systems respond as designed Refuel Floor ARMs 43-RMS1 11 AND 43-RMS1 12 indicate 5.3 R/hr Which one of the following Emergency Classifications should be declared given these conditions?

A.

Unusual Event B.

Alert C.

Site Area Emergency D.

General Emergency Proposed Answer: B Justification:

B is correct - EAL Category 1.4 (Alert classification). AICID incorrect - not per EAL Category 1.4.

Proposed references to be provided to applicants during examination: EAL flowchart Technical Reference(s):

EAL Action Level Matrix KA:

295023, Refueling AA2.05, Ability to determine and/or interpret the following as they apply to Accidents REFUELING ACCIDENTS: "Entry conditions of emergency plan 10 CFR Part 55 Content:

55.41 55.43.5 1X Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

3 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

1 Group #

1 K/A #

295023 Importance Rating 3.6 Proposed Question: SRO 15 The plant is in a Refueling Outage with fuel movements in progress when the following events occur:

Time Event 0830 An Unusual Event is declared due to lowering Spent Fuel Pool level 0900 Refuel Floor SRO reports irradiated spent fuel bundles in the Spent Fuel Pool have uncovered Which one of the following meets the declaration AND reporting time requirements specified in the Emergency Plan for the 'Alert' condition?

A.

Declare an Alert at 0902 AND commence State/County notifications by 0920 B.

Declare an Alert at 0900 AND commence State/County notifications by 0918 C.

Declare an Alert at 0918 AND commence State/County notifications by 0925 D.

Declare an Alert at 0914 AND commence State/County notifications by 0929 Proposed Answer: D Justification:

D is correct - Per EAL flowchart, declare within 15 minutes of discovery (EPIP-EPP-02). AND notify within 15 minutes of declaration (EPIP-EPP-20). A&B incorrect - exceed 15 minute notification. C incorrect - exceeds 15 minute declaration time.

Technical Reference(s):

EPIP-EPP-02, EPIP-EPP-20 KA:

295023 Refueling 2.4.30 Knowledge of which events related to system Accidents operations/status should be reported to outside agencies.

10 CFR Part 55 Content:

55.41 55.43.5 X

Proposed references to be provided to applicants during examination: None Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

2 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

1 Group#

1 K/A #

295026 Importance Rating 4.1 Proposed Question: SRO 20 The plant is in Mode 2 at 6% power with extended RCIC testing in progress, and the following conditions:

Suppression Pool temperature 920F Suppression Pool level 200.7 ft.

Which one of the following describes the required actions per plant procedures?

A.

Enter N2-EOP-PC only.

B.

Suspend RCIC testing only.

C.

Enter N2-EOP-PC AND 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Required Action D.

Enter 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Required Action AND suspend RCIC testing.

Proposed Answer: A Justification:

A is correct. _>90 0F is entry into EOP-PC. B&D incorrect. RCIC testing can continue until 105 0F. C incorrect. LCO not entered with testing in progress.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-EOP-PC and T.S. 3.6.2.1 KA:

295026, High 2.2.22, Knowledge of limiting conditions for operations and safety Suppression Pool limits.

Temperature 10 CFR Part 55 Content:

55.41.

55.43.5 X

Question Source:

Bank #

Modified Bank #

New X

History:

Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

2 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

1 Group#

1 K/A #

295031 Importance Rating 4.0 Proposed Question: SRO 24 The plant is at 100% power when Fuel Zone level indicator (21SC*LT1 3A) fails downscale.

Which one of the following actions is required by plant Technical Specifications?

A.

Initiate action within I hour to place the unit in Mode 2 within 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />.

B.

Restore to operable within 7 days or be in Mode 3 within the following 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

C.

Restore to operable within 30 days or be in Mode 3 within the following 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

D.

Restore to operable within 30 days or file a written report within the following 14 days.

Proposed Answer: D Justification:

D is correct, A &B actions required per TS 3.3.3.1. A incorrect, This would be for TS 3.0.3. B incorrect, This would be for 2 channels INOP. C incorrect, S/D only called for if 2 channels INOP.

Proposed references to be provided to applicants during examination: Tech Spec 3.3.3.1 and 5.6.6 Technical Reference(s):

Tech Spec 3.3.3.1 actions Al & B1 (PAM) and 5.6.6 KA:

295031, Reactor G2.1.33 Ability to recognize indications for system operating Low water level parameters which are entry-level conditions for technical specifications.

10 CFR Part 55 Content:

55.41 55.43.2 1X Question Source:

Bank #

Modified Bank #

New X

History:

Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

3 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

1 Group #

1 K/A #

500000 Importance Rating 3.3 Proposed Question: SRO 26 A LOCA is in progress AND Hydrogen (H2) has been released into the Primary Containment.

The following conditions exist:

Drywell H2 6.5%

Drywell 02 5%

Suppression Chamber H2 2.0%

Suppression Chamber 02 5%

Suppression pool level is 205 feet The Drywell Spray Initiation Limit is satisfied Which one of the following identifies the requirement for Drywell AND Suppression Chamber Spray operation for the given Containment H 2 AND 02 concentrations?

DRYWELL SPRAY OPERATION SUPPRESSION CHAMBER SPRAY OPERATION A.

Not required Required B.

Not required Not required C.

Required Required D.

Required Not required Proposed Answer: C Justification:

C is correct - DW is at deflagration and SC is deinerted and deflagration Hydrogen exists in DW. A/B incorrect - meet conditions to spray DW per N2-EOP-PCH. D incorrect - meet conditions to spray SC Proposed references to be provided to applicants during examination: N2-EOP-PCH Technical Reference(s):

N2-EOP-PCH KA:

500000 High EA1.05, Ability to operate and/or monitor the following as they apply Containment to HIGH CONTAINMENT HYDROGEN CONC.: 'Wetwell sprays' Hydrogen Concentration 10 CFR Part 55 Content:

55.41 55.43.5 X

Question Source:

Bank #

Modified Bank #

X INPO bank # 905 Grand Gulf 1998 New History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD 3

Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

1 Group #

2 K/A #

295004 Importance Rating 3.6 Proposed Question: SRO 31 The plant is in MODE 1, with the following conditions:

The in-service Division I Battery Charger trips off due to an electrical protective device actuation The standby charger is unavailable Neither charger will be available for at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Which one of the following identifies the cause of the trip and the time required to be in MODE 3?

Cause of TRIP TIME TO BE IN MODE 3 A.

Low DC output voltage 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> B.

Low DC output voltage 14 hours1.62037e-4 days <br />0.00389 hours <br />2.314815e-5 weeks <br />5.327e-6 months <br /> C.

High DC output voltage 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> D.

High DC output voltage 14 hours1.62037e-4 days <br />0.00389 hours <br />2.314815e-5 weeks <br />5.327e-6 months <br /> Proposed Answer: D Justification:

High DC output voltage is the only device that will auto trip the charger. Tech I Specs allows 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to restore Div 1 and then 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> to be in Mode 3.

Proposed references to be provided to applicants during examination: Technical Specification 3.8.4 Technical Reference(s):

02-OPS-001-263-2-1, EO-1.4 KA:

295004, Complete A2.01, Ability to operate/and or interpret the following as they apply to or partial loss of PARTIAL OR COMPLETE LOSS OF DC POWER: 'cause of partial loss of DC DC Power power' 10 CFR Part 55 Content:

55.41 55.43.2 X

Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

3 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

1 Group #

2 K/A #

295012 Importance Rating 3.7 Proposed Question: SRO 35 The plant is in MODE 1 when all Drywell Cooling is lost due to an inadvertent Division I containment isolation signal, with the following:

Drywell pressure is 0.77 psig and rising slowly Drywell absolute pressure is 15.4 psia Drywell temperature is 151°F and rising slowly Which one of the following is the maximum time allowed by Technical Specifications before the plant is required to be in MODE 3?

A.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> B.

13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br /> C.

16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> D.

20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> Proposed Answer: D Justification:

D correct, Required Action A.1 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to restore, then 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> to be in Mode 3. B is incorrect, 15.4 psia is within the allowable range of 14.2 to 15.45 psia of TS 3.6.1.4 A&C incorrect, actions associated with bypassing PCIV, which has not been done.

Proposed references to be provided to applicants during examination: Tech Spec 3.6.1.4 &

3.6.1.5 Technical Reference(s):

Tech Spec 3.6.1.5 KA:

295012, High D/W AK2.02, Knowledge of the interrelations between high Drywell Temperature temperature and the following: Drywell cooling 10 CFR Part 55 Content:

55.41.

55.43.2 X

Question Source:

Bank #

Modified Bank #

New X

History:

Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

3 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

1 Group #

2 K/A #

295021 Importance Rating 3.4 Proposed Question: SRO 38 The plant is in MODE 5, with the following:

Fuel movements in progress An equipment failure results in the inability to establish Shutdown Cooling flow Flow has been secured for two hours Which one of the following initial actions is required by plant Technical Specifications?

A.

Suspend Core Alterations immediately.

B.

Restore Secondary Containment Integrity immediately.

C.

Start the Standby Gas Treatment system within one hour.

D.

Verify an alternate method of decay heat removal available within one hour.

Proposed Answer: D Justification:

D is correct - Flow can only be secured for up to two hours, then must be declared inoperable/unavailable per TS 3.9.8 action A (high level.). A incorrect - this is follow up action if an alternate method of decay heat removal is determined to be not available within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

B&C incorrect - actions would be for TS 3.9.9 (low level - Mode 5 not moving fuel).

Proposed references to be provided to applicants during examination:Tech Specs 3.9.8 & 3.9.9 Technical Reference(s):

N2-SOP-31 and Tech Spec 3.9.8 (high level)

KA:

295021 Loss of AA2.02, Ability to determine and/or interpret the following as they S/D Cooling.

apply to LOSS OF SHUTDOWN COOLING: "S/D cooling flow" 10 CFR Part 55 Content:

55.41.

55.43.2 X

Question Source:

Bank #

Modified Bank #

New X

History:

Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

2 Comments: NRC: Unsat. "B" and "C" are not credible distractors. How would SDC loss result in GTS and Sec Containment issues? Also, KA match is weak.

NM Response: Modified stem conditions and enhanced Justification section.

Examination Outline Cross-reference:

Level RO SRO Tier #

1 Group #

2 K/A #

295029 Importance Rating 3.7 Proposed Question: SRO 40 The plant is in MODE 1 when the following events occur:

"* A transient results in a rising suppression pool level.

"* The crew is executing N2-EOP-PC, Primary Containment Control.

"* All efforts to reduce pool level below the SRV Tail Pipe Level Limit have been unsuccessful.

Which one of the following describes the implication of delaying RPV Blowdown?

A.

SRV tailpipe submergence could result in exceeding the Primary Containment design pressure.

B.

Containment downcomer submergence could result in exceeding the Primary Containment design pressure.

C.

SRV tailpipe vacuum breaker submergence could result in exceeding the Primary Containment design pressure.

D.

Suppression chamber to drywell vacuum breaker submergence could result in exceeding the Primary Containment design pressure.

Proposed Answer: A Justification:

A correct - per EOP-PC SPL-2 bases. B incorrect - downcomer submergence is not a concern in EOP-PC high level this is low level concern. C incorrect - vac. bkrs are in the drywell not a concern on high pool level. D incorrect - this is concern for spraying the chamber.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

EOP-PC Bases KA:

295029, High EK 1.01, Knowledge of the operational implications of the following concepts Suppression Pool as they apply to the HIGH SUPPRESSION POOL WATER LEVEL:

Water Level Containment integrity 10 CFR Part 55 Content:

55.41 X

Question Source:

Bank #

X Q6684 from INPO bank Modified Bank #

New History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

2 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

1 Group #

2 K/A #

295032 Importance Rating 4.0 Proposed Question: SRO 42 The plant is operating at 100% power, with the following:

RCIC Pump Room temperature is 2360F and rising Reactor Building General Area Elevation 206 temperature is 215°F and rising.

Several fire alarms are actuated in the Reactor Building DRMS indicates radiation levels in all areas of the Reactor Building are NOT rising There are no indications of system piping breaches anywhere Which one of the following action(s) are required by the EOPs?

Reactor Shutdown Blowdown A.

Yes Yes B.

Yes No C.

No Yes D.

No No Proposed Answer: B Justification:

B is correct. 2 or more areas exceeding max safe temp. requires scram. Blowdown is not required since leak is not from a primary system (based on steady radiation levels and the presence of fire alarms). The indications provided are that the cause of the high temperature is the fire. A&C incorrect. Blowdown is not required. D incorrect. Scram is required Proposed references to be provided to applicants during examination: N2-EOP-SC, EOP 6-att.28 Technical Reference(s):

N2-EOP-SC and Bases KA:

295032, High EA2.03: Ability to determine and/or interpret the following as they Secondary apply to HIGH SECONDARYCONTAINMENT AREA Containment Area TEMPERATURE: 'cause of high area temperature' temperature 10 CFR Part 55 Content:

55.41 55.43.5 X

Question Source:

Bank #

Modified Bank #

X New History:

Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

3 Comments: Question modified from INPO bank - Oyster Creek 13076

Examination Outline Cross-reference:

Level RO SRO Tier #

1 Group #

2 K/A #

295032 Importance Rating 3.7 Proposed Question: SRO 43 The Plant is at 100% power when surveillance testing finds that one of the two Reactor Building Pipe Chase Area temperature detectors for elevation 292 feet has a trip setpoint of 1490F.

Which one of the following describes the Technical Specification basis for the temperature setpoint and any Technical Specification action associated with the above instrument?

TS Basis TS Action A.

Will detect leak of

__25 GPM B.

Will detect leak of

_>25 GPM C.

Set to isolate to prevent equipment damage D.

Set to isolate to prevent equipment damage None required 24 hr. Action is required None required 24 hr. Action is required Proposed Answer: A A is correct-Basis for setpoint is to detect leaks _Ž25 gpm. No action req'd since only one detector required for this area.

B incorrect-right basis wrong to enter LCO C&D incorrect-wronq basis Proposed references to be provided to applicants during examination: Tech Specs Technical Reference(s):

Tech Spec 3.3.6.1 and Basis KA:

295032: High 2.2.25: knowledge of basis in technical specifications for limiting Secondary conditions for operation and safety limits.

Containment Area Temperature 10 CFR Part 55 Content:

55.41.

55.43.2 X

Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

4 Comments: None 7-

Examination Outline Cross-reference:

Level RO SRO Tier #

2 Group #

1 K/A #

211000 Importance Rating 3.8 Proposed Question: SRO 52 With the plant in Mode 2, which one of the following sets of parameters are needed to satisfy Standby Liquid Control System Technical Specification requirements?

Tank Volume(Gallons)

A.

4400 B.

4500 C.

4600 D.

4700 Proposed Answer: B Justification:

Sodium Pentaborate Concentration 14%

14%

13.5%

13.5%

B is correct, parameters fall within Tech Spec 3.1.7 Figure 3.1.7-1.

AICID incorrect, parameters fall outside of the figure.

Proposed references to be provided to applicants during examination: Technical Specification 3.1.7 Technical Reference(s):

KA:

211000, Standby liquid Control System 10 CFR Part 55 Content T~r4h £n*_c,.R 1 7 2.1.32, Ability to explain and apply system limits and precautions.

55.41.

1 55.43.2 1X Bank #

X INPO bank; Quad Cities #16648 Modified Bank #

New Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

3 Comments: None 55.41.

55.43.2 X

I Tat-h q incs 3 1 7 i

I

Examination Outline Cross-reference:

Level RO SRO Tier #

2 Group #

1 K/A #

215005 Importance Rating 3.8 Proposed Question: SRO 54 The plant is operating at 60% power with the OPRMs enabled. The following alarms are received:

"OPRM INOP/TRIP" received from APRM 1 "APRM TRIP SYSTEM UPSCALE/INOP" received from APRM 4 Which one of the following describes the automatic plant response?

A.

Reactor Scram B.

Rod Out Block only C.

Reactor Half Scram only D.

Reactor Half Scram and Rod Out Block Proposed Answer: B Justification B is correct - per N2-OP-92, need two OPRM and APRM trips.

AICID are incorrect - wrong response. D would be correct if two trips from same function.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-OP-92 KA:

215005:

2.1.32: Ability to explain and apply system limits and precautions.

APRM/LPRMs 10 CFR Part 55 Content:

55.41.6 X

55.43 11 Question Source:

Bank #

Modified Bank#

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

3 Comments: This question is on the SRO exam only, but is NOT one of the required 25 SRO ONLY questions.

Examination Outline Cross-reference:

Level RO SRO Tier #

2 Group #

1 K/A #

239002 Importance Rating 4.0 Proposed Question: SRO 62 A major plant transient has occurred and an RPV Blowdown is required, due to exceeding the limit for Pressure Suppression Pressure, with the following:

Reactor Pressure is 650 psig Drywell Pressure is 14 psig Suppression Chamber pressure is 11 psig Suppression Pool level is 192 feet Primary Containment Sprays are unavailable Which one of the following describes the required method of depressurizing the RPV and the maximum allowable reactor pressure following the depressurization?

DEPRESSURIZATION METHOD A.

SRVs B.

SRVs C.

Turbine BPVs D.

Turbine BPVs MAXIMUM ALLOWABLE REACTOR PRESSURE below 38 psig below 49 psig below 38 psig below 49 psig Proposed Answer: D Justification:

D is correct. Proc calls for turbine BPVs since SP level is too low to use SRVs. Rx. Pressure needs to remain within 38# of SP pressure.

A&B incorrect. SP level too low for SRV use. C incorrect. This would be if SP pressure were 0.

Proposed references to be provided to applicants during examination: N2-EOP-C2 Technical Reference(s):

N2-EOP-PC, N2-EOP-C2 KA:

239002:

Topic: G 2.4.6: Knowledge of symptom bases EOP mitigation Relief/Safety strategies.

valves 10 CFR Part 55 Content:

55.41 55.43.5 1X Question Source:

Bank #

Modified Bank #

New X

History:

Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

3 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

2 Group #

2 K/A #

201001 Importance Rating 4.3 Proposed Question: SRO 68 During a plant refueling outage and with core alterations in progress, ANN 603441, ROD DRIVE ACCUMULATOR TROUBLE alarms. The following conditions exist:

Accumulator Alarm is for rod 30-35 Rod 30-35 is fully withdrawn Accumulator pressure for rod 30-35, is 900 psig All fuel bundles around rod 30-35 are present Which one of the following identifies the actions required?

A.

Suspend CORE ALTERATIONS.

B.

Insert rod 30-35 immediately.

C.

Declare rod 30-35 inoperable and disarm hydraulically.

D.

Verify Technical Specification control rod separation criteria are met.

Proposed Answer: B Justification:

B is correct, action directed from SOP-30. A&D incorrect, not correct per procedure. C incorrect, This is an action for Mode 1 or 2 only.

Proposed references to be provided to applicants during examination: N2-SOP-30 Attachment I and 2 Technical Reference(s):

N2-SOP-30, Tech. Spec. 3.9.5 KA:

201001, Control 2.4.4, Ability to recognize abnormal indications for system operating Rod Drive parameters which are entry-level conditions for emergency and Hydraulic System abnormal operating procedures.

10 CFR Part 55 Content:

55.41.

55.43.6 1X Question Source:

Bank #

Modified Bank #

New X

History:

Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

3 Comments: NRC: Make sure "A" is not correct by other station procedures.

NM Response: Verified in N2-FHP-1 3.1, A is not correct.

Examination Outline Cross-reference:

Level RO SRO Tier #

2 Group#

2 K/A #

286000 Importance Rating 3.6 Proposed Question: SRO 79 A fire has started in the Control Building HVAC room. Thick smoke pours into the Control Room requiring a Control Room Evacuation.

Event timeline is as follows:

09:03 09:06 09:08 09:23 09:30 Fire is reported to the Control Room.

Main Control Room evacuation ordered.

Reactor is manually scrammed.

Control at Remote Shutdown Panel is established.

Fire is reported extinguished.

Which one of the following Emergency Event Classifications is required per the EALs?

A.

Unusual Event B.

Alert C.

Site Area Emergency D.

General Emergency Proposed Answer: C Justification:

C is correct-fire w/ control not established at RSP within 15 min is Site Area Emergency 7.2.4. A incorrect-this would be for fire not extinguished within 10 min.

B incorrect-would be for fire in vital area. D incorrect-NP Proposed references to be provided to applicants during examination: EAL Matrix Technical Reference(s):

EAL Site Area Emergency 7.2.4 KA:

286000, Fire 2.4.30: Knowledge of which events related to system I Protection System operation/status should be reported to outside agencies.

10 CFR Part 55 Content:

55.41.

55.43.5 1X Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

3 Comments: None S

S 0

B 0

Examination Outline Cross-reference:

Level RO SRO Tier #

2 Group #

3 K/A #

233000 Importance Rating 4.3 Proposed Question: SRO 82 The plant is in MODE 5 with the Spent Fuel Pool/Cavity Gates installed. Preparations are underway to flood the reactor cavity. The following annunciators alarm in the Main Control Room:

875111, "SPENT FUEL POOL LEVEL HIGH/LOW' 0

873317, "DIVISION I SPENT FUEL POOL LEVEL LOW' 875117, "DIVISION II SPENT FUEL POOL LEVEL LOW' Which one of the following should be utilized to keep the fuel bundles covered?

A.

High Pressure Core Spray (CSH) and Low Pressure Coolant Injection (LPCI)

B.

Low Pressure Core Spray (CSL) and Low Pressure Coolant Injection (LPCI)

C. Feedwater (FWS) and Condensate (CNM)

D. Makeup Water (MWS) and Condensate Transfer (CNS)

Proposed Answer: D Justification D is correct-cavity level is not threatened and injecting to the cavity will not add water to the pool. AIBIC are incorrect-injection to the cavity will not add water to the pool.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-SOP-39, Section 4.2 KA:

233000: Fuel Pool 2.4.4: Ability to recognize abnormal indications for system operating Cooling and Clean parameters which are entry level conditions for emergency and Up abnormal operating procedures.

10 CFR Part 55 Content:

55.41.

55.43.4 1X Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

3 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier#

3 Group #

K/A#

2.1.6 Importance Rating 4.3 Proposed Question: SRO 85 During plant transient conditions, which one of the following describes a situation where the Reactor Operator must obtain SSS or CRS approval before taking action?

A.

Initiate a manual scram when the reactor is in jeopardy.

B.

Take an immediate operator action as specified in a Special Operating Procedure.

C.

Executing an approved procedure step that directs overriding an automatic safety feature.

D.

Overriding an automatic safety feature when continued operation will produce an unsafe condition.

Proposed Answer: D Justification:

D is correct-per OM section 3.8.8(operation of control room equipment)

A/BIC incorrect-these actions specified as not requiring prior SRO approval Proposed references to be provided to applicants during examination: None Technical Reference(s):

Ops Manual Section 3.3.8 KA:

Generic 2.1, 2.1.6, Ability to supervise and assume a management role during Conduct of plant transients and upset conditions.

Operations 10 CFR Part 55 Content:

55.41.

55.43.5 1X Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

3 Comments: This question is on the SRO exam only, but is NOT one of the required 25 SRO ONLY questions.

Examination Outline Cross-reference:

Level RO SRO Tier #

3 Group #

N/A K/A #

2.4.30 Importance Rating 3.6 Proposed Question: SRO 86 The plant is operating at 100% power, with the following:

07:00 Tech Spec 3.4.5 Condition A is entered when unidentified RCS leakage rises to 6.8 gpm.

11:30 Plant shutdown is commenced per Tech Spec 3.4.5 Condition C.

13:45 RCS leakage is identified and Tech Spec 3.4.5 Conditions A and C are exited.

20:00 Plant shutdown is completed to repair RCS leakage.

Which one of the following correctly states the required reports to the NRC?

A.

No reports are required to be made to the NRC B.

Only an LER is required to notify the NRC.

C.

Only an ENS notification to the NRC is required.

D.

Both an ENS notification and an LER are required.

Proposed Answer: C Justification:

C is correct per 10CFR50.72 (b)(2)(i).

A - incorrect, because a shutdown required by TS was commenced.

BID - incorrect, because the shutdown was commenced as required by TS, but the TS did not require completion of the shutdown.

Proposed references to be provided to applicants during examination: 10CFR50 Technical Reference(s):

10CFR50.72, 10CFR50.73 and NUREG 1022, Rev2 KA:

2.4.30, 2.4.30, Knowledge of which events related to system operation/status Emergency should be reported to outside agencies Procedures/Plan 10 CFR Part 55 Content:

55.41.10 55.43.5 X

Question Source:

Bank#

Modified Bank#

New X

History:

Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

3 Comments: NRC: Unsat. NRC had issues with our NIP-SEC-01 related to this question. KA needs to be de-selected and another re-selected. Develop new question. This issue needs to be raised through Security. NRC said they would cite us, if we ever implemented this step.

NM Response: Deselected original KA 2.1.13 and randomly selected new generic KA 2.1.9 and wrote new question. Still unacceptable. Randomly selected new KA 2.4.30, and developed a new question.

Examination Outline Cross-reference:

Level RO SRO Tier #

3 Group #

K/A #

G2.2.17 Importance Rating 3.5 Proposed Question: SRO 90 With the plant at power, which one of the following maintenance activities can the CRS approve to be performed under GAP-PSH-09, Minor Maintenance?

A.

Meggar of a Chemistry Lab HVAC fan motor.

B.

Welding on an RHR system piping support bracket.

C.

A scheduled recurring preventive maintenance activity.

D.

Work on a plant lighting fixture located in an 'airborne' radiation area.

Proposed Answer: A Justification:

A is correct-activity allowed under GAP-PSH-09. BICID incorrect examples cited in GAP-PSH as not covered under Minor Maintenance.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

GAP-PSH -09 KA:

Generic: 2.2 2.2.17, Knowledge of the process for managing maintenance I Equipment Control activities during power operations.

10 CFR Part 55 Content:

55.41.

55.43.5 X

Question Source:

Bank #

Modified Bank #

New X

History:

Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

4 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

3 Group #

K/A #

G 2.2.23 Importance Rating 3.8 Proposed Question: SRO 91 The plant is operating at 100% power when the following events occur:

February 1 at 2400 "A" RHS pump is declared inoperable February 3 at 1200 "C" RHS pump is declared inoperable February 6 at 0600 "A" RHS pump is restored to operable status February 6 at 0800 CSH system is declared inoperable.

Which one of the following describes the time and date when the plant shall be in Mode 3 as required by plant Technical Specifications?

A.

February 8 at 2400.

B.

February 9 at 1200 C.

February 9 at 2000 D.

February 9 at 2400 Proposed Answer: B Justification:

B is correct. T.Spec 3.5.1, Required Action A - 7 day for one L.P ECCS sys. Inop plus 12 hrs to reach Mode 3. A incorrect-this would be if 12 hrs to be in Mode 3 was not added. C incorrect-this would be for 72 hr action plus 12 with C RHS and CHS INOP D-incorrect NP Proposed references to be provided to applicants during examination: Tech Spec 3.5.1 Technical Reference(s):

Tech Specs KA:

Generic 2.2, 2.2.23, Ability to track Limiting conditions for operations.

I Equipment control 10 CFR Part 55 Content:

55.41.

Question Source:

Bank #

X Modified Bank #

New History:

Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD 3

Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

3 Group #

K/A#

2.3.8 Importance Rating 3.2 Proposed Question: SRO 93 The plant is at 100% Power, when a loss of Drywell Cooling occurs. The following conditions exist:

Drywell Pressure is at 0.8 psig and slowly rising.

Drywell Temperature is at 140

  • and slowly rising.

The decision has been made to vent the Primary Containment.

Which one of the following identifies chemistry sampling requirement AND vent location requirement to perform this evolution?

SAMPLE REQUIRED A.

YES B.

YES C.

NO D.

NO VENT LOCATION Drywell Suppression Chamber Drywell Suppression Chamber Proposed Answer: A Justification:

A is correct, sample required (not directed by EOPs) & DW should be vented since only DW pressure should rise on loss of cooling.

B incorrect, venting SC would not correct problem. C&D incorrect, sampling is not required only if in EOPs.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-SOP-60, N2-OP-61A, H.1.0 KA:

Generic 2.3, 2.3.8, Knowledge of the process for performing a planned gaseous 6 Radiation Control radioactive release.

10 CFR Part 55 Content:

55.41.

1 55.43.41 X Question Source:

Bank #

Modified Bank #

New X

History:

Question Cognitive Level:

Memory or Fundamental Knowledge Comprehension or Analysis X

LOD:

3 Comments: None

Examination Outline Cross-reference:

Level RO SRO Tier #

3 Group #

K/A #

G2.3.10 Importance Rating 3.3 Proposed Question: SRO 95 A stuck TIP cable requires Maintenance personnel to enter the TIP room, which is posted as a Very High Radiation area.

Which one of the following identifies the plant personnel responsible for approving entry into the TIP room per GAP-RPP-08, Control Of Locked High, And Very High Radiation Areas?

The RP Supervisor and.

A.

Station Shift Supervisor B.

Plant General Manager C.

Maintenance Supervisor D.

Operations Manager Proposed Answer: A Justification:

A is correct. RP Supervisor & SSS approval needed per GAP-RRP

08. BIC/D incorrect - not per GAP-RRP-08.

Proposed references to be provided to applicants during examination: None Technical Reference(s):

GAP-RPP-08, Section 3.4 KA:

Generic 2.3.

2.3.10, Ability to perform procedures to reduce excessive levels of I Radiation Control radiation and guard against personnel exposure.

10 CFR Part 55 Content:

55.41.

55.43.4 X

Question Source:

Bank #

Modified Bank #

New X

History:

Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD 2

Comments: NRC: Enhancement. Include RP Supervisor in all choices.

NM Response: Fixed.

Examination Outline Cross-reference:

Level RO SRO Tier #

3 Group #

K/A #

2.4.22 Importance Rating 4.0 Proposed Question: SRO 98 A LOCA is in progress with the following conditions:

RPV water level is being maintained at 30 inches with Feedwater Suppression Chamber Spray is in service Drywell Sprays are available AND not in service Pressure Suppression Pressure is being exceeded by 0.5 psig Which one of the following describes the actions that are to be taken to control Primary Containment Pressure, per the EOPs?

A.

Immediately Spray the Drywell. Immediately Blowdown regardless of containment pressure response.

B.

Immediately Spray the Drywell. Blowdown only if sprays do not reduce containment pressure.

C.

Don't Spray the Drywell. Immediately Blowdown regardless of containment pressure response.

D.

Don't Spray the Drywell. Blowdown only if containment pressure cannot be maintained below design pressure limit.

Proposed Answer:

B Justification:

B is correct. N2-EOP-PC directs spraying the drywell with the current conditions.

Blowdown is not warranted, since all applicable actions have not yet been taken to reduce pressure. A is incorrect. An immediate blowdown is not required since DW Sprays have not yet been placed in service and are required to be in service.

CID is incorrect. DW Sprays have not yet been placed in service and are required to be in service.

EOP Bases for PCP-1 0 requires actions to be taken to lower pressure. PCP-1 1 to perform a blowdown assumes containment sprays have been ineffective in controlling DW pressure. Blowdown is not warranted unless DW Spray is in service AND pressure cannot be maintained below Pressure Suppression Limit Proposed references to be provided to applicants during examination: None Technical Reference(s):

N2-EOP-PC KA:

Equipment Control Knowledge of the basis for prioritizing safety functions during 1 2.4.22 abnormal/emergency operations.

10 CFR Part 55 Content:

55.41 55.43.5 X

Question Source:

Bank #

Modified Bank #

New X

History Question Cognitive Level:

Memory or Fundamental Knowledge X

Comprehension or Analysis LOD:

3 Comments: None