Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML24002B085 | 2 January 2024 | FY24 NMP2 Final QA Forms | |
ML23347A063 | 13 December 2023 | NMP1 Retake FY23 Examination Files | Job Performance Measure |
ML23257A173 | 14 September 2023 | Requalification Program Inspection | |
ML23220A026 | 8 August 2023 | Licensed Operator Positive Fitness-for-Duty Test | |
ML23186A164 | 6 July 2023 | Operator Licensing Retake Examination Approval | |
RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations | 16 June 2023 | Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations | |
ML23135A156 | 15 May 2023 | Final Qa/Related Forms | Job Performance Measure |
IR 05000410/2023302 | 15 May 2023 | Initial Operator Licensing Examination Report 05000410/2023302 | |
ML23123A058 | 3 May 2023 | Final Qa/Related Forms | |
ML23109A033 | 19 April 2023 | Senior Reactor and Reactor Operator Initial License Examinations | |
RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations | 25 March 2022 | Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations | |
ML21258A355 | 16 September 2021 | Requalification Program Inspection | |
ML21137A160 | 17 May 2021 | NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) | |
ML21137A240 | 17 May 2021 | NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) | |
ML21137A169 | 17 May 2021 | Final Written Examination and Operating Test Outlines (Folder 3) | Shutdown Margin Half scram Offsite Dose Calculation Manual Overtravel Fuel cladding Power change |
ML21133A147 | 13 May 2021 | Final Qa/Related Forms (Folder 1) | |
ML21133A242 | 13 May 2021 | Handouts to Applicants (Folder 3) | Surveillance Frequency Control Program Scram Discharge Volume Overtravel Offsite Circuit |
ML21131A189 | 11 May 2021 | Draft Written Examination and Operating Test Outlines (Folder 2) | Shutdown Margin Half scram Offsite Dose Calculation Manual Overtravel Fuel cladding Power change |
ML21123A189 | 3 May 2021 | Draft Written Examination (Folder 2) | Shutdown Margin Half scram Ultimate heat sink Squib Power change |
ML21123A198 | 3 May 2021 | Draft Operating Test (Section a, Section B, Section C) (Folder 2) | Loop seal Half scram Grab sample Offsite Dose Calculation Manual Water Inventory Control Reserve Station Service Transformer Locked High Radiation Area Scram Discharge Volume MELLLA Overtravel Fuel cladding Recently irradiated fuel Power change |
ML21123A224 | 19 April 2021 | Final Written Examination with Answer Key (401-5 Format) (Folder 3) | Shutdown Margin High Radiation Area Half scram Ultimate heat sink Squib Power change |
ML21123A241 | 19 April 2021 | Final Operating Test (Sections a, B, and C) (Folder 3) | Loop seal Half scram Grab sample Offsite Dose Calculation Manual Water Inventory Control Reserve Station Service Transformer Locked High Radiation Area Scram Discharge Volume MELLLA Overtravel Fuel cladding Recently irradiated fuel Power change |
ML21034A474 | 3 February 2021 | Handouts to Applicants (Folder 3) | High winds Grab sample Hydrostatic Squib Surveillance Frequency Control Program Earthquake Pressure Boundary Leakage |
ML21034A476 | 3 February 2021 | NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) | Half scram |
ML21033A796 | 2 February 2021 | NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) | |
ML21033A538 | 2 February 2021 | Final Written Examination and Operating Test Outlines (Folder 3) | High Radiation Area Half scram Fuel cladding |
ML21032A323 | 1 February 2021 | Draft Written Examination and Operating Test Outlines (Folder 2) | High Radiation Area Half scram Ultimate heat sink Fuel cladding |
ML21032A281 | 1 February 2021 | Final Qa/Related Forms (Folder 1) | |
ML21027A259 | 27 January 2021 | Draft Operating Test (Section a, Section B, Section C) (Folder 2) | High Radiation Area Half scram Ultimate heat sink Stroke time Locked High Radiation Area Overtravel Fuel cladding Power change |
ML21012A269 | 12 January 2021 | Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 | Generic Fundamentals Examination COVID-19 |
ML21008A354 | 8 January 2021 | Final Operating Test (Sections a, B, and C) (Folder 3) | High winds High Radiation Area Half scram Stroke time Locked High Radiation Area FLEX Fuel cladding Power change |
ML21008A332 | 8 January 2021 | Final Written Examination with Answer Key (401-5 Format) (Folder 3) | High winds Grab sample Offsite Dose Calculation Manual Scram Discharge Volume Earthquake Power change |
ML20350B785 | 11 December 2020 | Modified Question Source Information (Post 2020 Audit) (Folder 3) | |
ML20120A558 | 30 April 2020 | Senior Reactor and Reactor Operator Initial License Examinations | |
ML20105A176 | 15 April 2020 | March 4, 2020, NRC Generic Fundamentals Examination Results for Nine Mile Point Nuclear Station, Unit 1 (Cover Letter Publicly Available, Enclosures Withheld from Public) | Generic Fundamentals Examination |
ML20055E009 | 15 January 2020 | Final Q/A Related Form - Form ES-401-6 (Folder 1) | |
ML20055D883 | 15 January 2020 | Final Qa/Related Forms (Folder 1) | Probabilistic Risk Assessment |
ML19352D657 | 16 December 2019 | Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 | Generic Fundamentals Examination |
ML19337A534 | 29 November 2019 | Operator Licensing Examination Approval | |
ML20055E017 | 28 October 2019 | Nile Mile Point Unit 2 - Draft Written Examination (Folder 2) | Shutdown Margin High Radiation Area Half scram Fuel cladding Power change Unidentified leakage Overexposure Failure to Scram |
ML20055E015 | 28 October 2019 | Draft Written Examination and Operating Test Outlines (Folder 2) | Fuel cladding |
ML20055E012 | 28 October 2019 | NRC Comments on Draft Licensee-Developed Operating Test | |
ML19289D013 | 15 October 2019 | September 4, 2019, NRC Generic Fundamentals Examination Results for Nine Mile Point Nuclear Station, Unit 1 (Cover Letter Publicly Available, Enclosures Withheld from Public) | Generic Fundamentals Examination |
ML20055E013 | 15 October 2019 | NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) | |
NMP1L3288, Fitness-for-Duty Response to Request for Information | 1 July 2019 | Fitness-for-Duty Response to Request for Information | |
ML19154A567 | 3 June 2019 | Senior Reactor and Reactor Operator Initial License Examinations | |
ML19151A813 | 31 May 2019 | Licensed Operator Positive Fitness-For-Duty Test |