Core Operating Limits Report, Cycle 21, Revision 17
ML021050026
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 04/01/2002
From: Mccollum W
Duke Energy Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ONEI-0400-50, Revision 17
Download: ML021050026 (35)


Text

VkDuke Duke Energy WEnergy. Oconee Nuclear Station 7800 Rochester Highway Seneca, SC 29672 (864)885-3107 OFFICE W. R. McCollum, Jr. (864)885-3564 FAx Vice President April 1, 2002 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Subject:

Oconee Nuclear Site Docket No. 50-269 Core Operating Limits Report (COLR)

Gentlemen:

Attached, pursuant to Oconee Technical Specifications 5.6.5, is an information copy of a revision to the Core Operating Limits Report for Oconee Unit 1, Cycle 21, Rev. 17.

Very truly yours, W. R. McCollum, Site ice President Oconee Nuclear Site Attachment 7 CXor

NRC Document Control Desk April 1, 2002 Page 2 xc w/att: Mr. L. A. Reyes, Regional Administrator U. S. Nuclear Regulatory Commission, Region II Mr. L. N. Olshan, Project Manager Office of Nuclear Reactor Regulation Mr. Scott Freeman Acting Senior Resident Inspector Oconee Nuclear Site

DISPOSITION OF THE ORIGINAL DOCUMENT WILL BE TO Date: 03112/02 THE TRANSMITTAL SIGNATURE UNLESS RECIPIENT IS PRIOR)TY SuperRush OTHERWISE IDENTIFIED BELOW Document Transmittal #: DUK020710040

1) 00813 DOC MGMT EC03C ORIGINAL QA CONDITION N Yes [ No
2) 06358 ONS REGUL COMPLIANCE ON03RC Duke Power Company OTHER ACKNOWLEDGEMENT REQUIRED [] Yes
3) 06700 ONS MANUAL MASTER FILE ON03DM DOCUMENT TRANSMITTAL FORM IFCA OR OTHER ACKNOWLEDGEMENT REQUIRED, PLEASE ACKNOWLEDGE RECEIPT BY RETURNING THIS FORM TO:

REFERENCE NUCLEAR GENERAL OFFICE Duke Power Company P.O. Box 1006 OCONEE NUCLEAR STATION Energy Center EXEMPTION CODE: M-5 EC03C Charlotte, N,C RESP GROUP: N/E CORE OPERATING LIMITS REPORT Rec'd By Page 1 of 1 Date TOTAL DISTR CODE 2 3 4 5 6 7 8 9 10 11 TOTAL QA CONC REV #/ DATE DOCUMENT NO Vi 2 017 03/12102 NOMD-27 X VI 1

ONEI-0400-050 FOR ýNFORMAý1O O4L I _____ J..L1..J.-.----J _____ L......+/- _____ J.........2.1 _____ _____ - ___________

DUKE K S CANADY REMARKS: MANAGER DOCUMENT RELEASE EXEMPT FROM (NUCLEAR) MODIFICATIONS PROGRAM NUCLEAR ENGINEERING BY:

J W SIMMONS JWS/AYB EC08H S'I(1_

ONEI-0400-50 Rev 17 Page 1 of 32 Duke Power Company Oconee 1 Cycle 21 FOR INFORMATION ONLY Core Operating Limits Report RV!VEWEDAD APPROVED A BCFAM 3.13 RMEVIWE, AND APPROVED BY CFAM 3.13 QA Condition 1 No R agia ;A~r~

op .-- FAr. 3.1-3 Prepared By J. D. Forster ,9\(_-t A 4 f, -*J x Date: flf .* t' U0YC Checked By: L. D.McClain 5 C tizýv IfT1Q(Vc Date: 12/1a," 260/-9 CDR By: R. Q. Huynh "' Date: fs- kA &, -,_

Approved By: R. R. St. Clair Date:

Date: /"? Ha-r

  • 6) 2--

ONEI-0400-50 Rev 17 Page 2 of 32 Oconee 1 Cycle 21 Core Operating Limits Report Insertion Sheet for Revision 17 This revision is not valid until the end of operation for Oconee I Cycle 20.

Insert these revision 17 pages Remove these revision 15 and 16 pages 1 - 32 1 - 31 Revision Log Effective Pages Pages Pages Total Effective Date Revised Added Deleted Pages Revision Oconee 1 Cycle 21 revisions below 32 - 32 17 Mar-02 1-31 Oconee 1 Cycle 20 revisions below 16 May-01 1-4 - 31 15 Nov-00 1-31 - - 31 Oconee 1 Cycle 19 revisions below 14 Oct-00 1,2,3,5 - - 31 13 Feb-00 1,2,3,4 - - 31 12 Jul-99 1,2,3,58, - - 31 10, 13, 31 11 May-99 1-3 - 31 _1 Oconee I Cycle 18 revisions below 10 Mar-99 1 -31 38 31 9 Feb-98 1,2,3,5,13, - 38 16,17,32,36 8 Nov-97 1,2,3,5,10, 37 -38 32 7 Aug-97 1-38 - - 38

ONEI-0400-50 Rev 17 Page 3 of 32 Oconee 1 Cycle 21 1.0 Error Adjusted Core Operating Limits The Core Operating Limits Report for 01C21 has been prepared in accordance with the requirements of ITS 5.6.5. The core operating limits within this report have been developed using NRC approved methodology identified in references 1 through 10. The RPS protective limits and maximum allowable setpoints are documented in references 11 through 13. These limits are validated for use in 01 C21 by references 14 through 16. The OC21 analyses assume a design flow of 107.5% of 88,000 gpm per RCS pump, radial local peaking (FAh) of 1.714, and axial peaking factor (Fz) of 1.5, and an EOC (< 100 ppmB) Tavg reduction of up to 10 OF provided 4 RCPs are in operation and Tavg does not decrease below 569 OF.

The error adjusted core operating limits included in section 1 of the report incorporate all necessary uncertainties and margins required for operation of the 01C21 reload core.

1.1 References

1. Nuclear Design Methodology Using CASMO-3 / SIMULATE-3P, DPC-NE-1004P-A, Revision 0, SER dated November 23, 1992.
2. Oconee Nuclear Station Reload Design Methodology II, DPC-NE-1002A, Revision 1, SER dated October 1, 1985.
3. Oconee Nuclear Station Reload Design Methodology, NFS-1001A, Revision 4, SER dated July 29, 1981.
4. ONS Core Thermal Hydraulic Methodology Using VIPRE-01, DPC-NE-2003P-A, SER dated July 19, 1989.
5. Thermal Hydraulic Statistical Core Design Methodology, DPC-NE-2005P-A, Revision 2, SER dated June 8, 1999.
6. Fuel Mechanical Reload Analysis Methodology Using TACO3, DPC-NE-2008P-A, SER dated April 3, 1995.
7. UFSAR Chapter 15 Transient Analysis Methodology, DPC-NE-3005-PA, Revision 1, SER dated May 25, 1999.
8. DPC-NE-3000P-A, Thermal Hydraulic Transient Analysis Methodology, Rev. 2, SER dated October 14, 1998.
9. BAW-10192-PA, BWNT LOCA - BWNT Loss of Coolant Accident Evaluation Model for Once-Through Steam Generator Plants, SER dated February 18, 1997.
10. BAW-1 0227-PA, Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel, SER dated February 4, 2000.
11. Variable Low Pressure Safety Limit, OSC4048, Revision 3, July 1998.
12. Power Imbalance Safety Limits and Tech Spec Setpoints Using Error Adjusted Flux-Flow Ratio of 1.094, OSC-5604, Revision 1, November 1998.
13. ATc and EOC Reduced Tavg Operation, OSC-7265, Rev. 0, Duke Power Co., April 2001.
14. 01C21 Maneuvering Analysis, OSC-7940, Revision 1, March 2002.
15. 01C21 Specific DNB Analysis, OSC-7945, Revision 0, October 2001.
16. 01C21 Reload Safety Evaluation, OSC-8046, Revision 0, March 2002.

ONEI-0400-50 Rev 17 Page 4 of 32 Oconee 1 Cycle 21 Miscellaneous Setpoints BWST boron concentration shall be greater than 2220 ppm and less than 3000 ppm.

Referred to by ITS 3.5.4.

Spent fuel pool boron concentration shall be greater than 2220 ppm and less than 3000 ppm.

Referred to by ITS 3.7.12.

The equivalent of at least 1100 cubic feet of 11,000 ppm boron shall be maintained in the CBAST.

Referred to by ITS SLC 16.5.13.

CFT boron concentration shall be greater than 1835 ppm. The average boron concentration in the CFT's shall be less than 4000 ppm. Referred to by ITS 3.5.1.

RCS and Refueling canal boron concentration shall be greater than 2220 ppm.

Referred to by ITS 3.9.1.

Shutdown Margin (SDM) shall be greater than 1% Ak/k.

Referred to by ITS 3.1.1.

Moderator Temperature Coefficient (MTC) shall be less than: MTC x 10-4 Ap / *F  % FP Linear interpolation is valid within the table provided. +0.70 0 Referred to by ITS 3.1.3. +0.40 15 0.00 80

-0.125 100

-0.25 120 Departure from Nucleate Boiling (DNB) parameter for RCS loop pressure shall be Referred to by ITS 3.4.1. 4 RCP: measured hot leg pressure > 2125 psig 3 RCP: measured hot leg pressure > 2125 psig DNB parameter for RCS loop average temperature shall be: Max Loop Tavg (Incl 2°F unc)

ATc, *F 4 RCP Op 3 RCP Op Referred to by ITS 3.4.1. 581.0 0 581.0 1 581.4 581.2 The measured Tavg must be less than COLR limits minus 581.4 2 581.8 instrument uncertainty. ATc is the setpoint value selected by 581.7 3 582.1 the operators. Values are expanded by linear interpolation on 582.5 581.9 4

page 32 of this document without instrument uncertainty. 582.1 5 582.9

  • This limit is applied to the loop with the lowest loop average temperature consistent with the NOTE in SR 3.4.1.2. All other temperature limits apply to the maximum loop Tavg.

DNB parameter for RCS loop total flow shall be: 4 RCP: Measured > 107.5 %df 3 RCP: Measured > 74.7 % of 4 RCP min flow Referred to by ITS 3.4.1.

Regulating rod groups shall be withdrawn in sequence starting with group 5, group 6, and finally group 7.

Referred to by ITS 3.2.1.

Regulating rod group overlap shall be 25% +/- 5% between two sequential groups.

Referred to by ITS 3.2.1.

ONEI-0400-50 Rev 17 Page 5 of 32 Oconee 1 Cycle 21 Steady State Operating Band Rod Index APSR %WD EFPD Min Max Min Max 0 to 440 292+/- 5 300 30 40 440 to EOC 292 +/- 5 300 100 100 Quandrant Power Tilt Setpoints Steady State Transient Maximum 30-100 0-30 30-100 0-30 0 - 100 Core Power Level, %FP 3.50 7.72 7.22 9.51 16.66 Full Incore 2.25 6.09 5.63 7.72 14.22 Out of Core 2.22 3.87 3.63 4.81 10.07 Backup Incore Referred to by ITS 3.2.3.

ONEI-0400-50 Rev 17 Page 6 of 32 Oconee 1 Cycle 21 Variable Low RCS Pressure RPS Setpoints Referred to by ITS 3.3.1 2400 P = 2355 psiq T 618' 0F 2300 2200 (9

U Acceptable 0n Operation g 2100 P = 11.14 *Tout - 4706 0

0 2000 1900 Unacceptable Operation 1800 P = 1800 psig T = 584 °F 1700 I I 540 560 580 600 620 640 Reactor Coolant Outlet Temperature, OF

ONEI-0400-50 Rev 17 Page 7 of 32 Oconee 1 Cycle 21 RPS Power Imbalance Setpoints

% FP  % Imbalance 4 Pumps 0 -33.0 90.4 -33.0 107.9 -14.4 107.9 14.4 90.4 33.0 0 33.0 3 Pumps 0 -33.0 63.1 -33.0 80.6 -14.4 80.6 14.4 63.1 33.0 0 33.0 Maximum Allowable RPS Power Imbalance Setpoints

%FP  % Imbalance 4 Pumps 0 -35.0 90 -35.0 109.4 -14.4 109.4 14.4 90 35.0 0 35.0 3 Pumps 0 -35.0 62.3 -35.0 81.7 -14.4 81.7 14.4 62.3 35.0 0 35.0

ONEI-0400-50 Rev 17 Page 8 of 32 Oconee 1 Cycle 21 Operational Power Imbalance Setpoints Full Backup Out of

%FP Incore Incore Core 4 Pumps 0 -28.9 -28.4 -28.9 80 -28.9 -28.4 -28.9 90 -25.7 -25.4 -25.7 100 -17.3 -17.0 -17.3 102 -15.6 -15.3 -15.6 102 17.0 17.0 17.0 100 19.1 18.9 19.1 90 27.0 26.7 27.0 80 29.4 29.0 29.4 0 29.4 29.0 29.4 3 Pumps 0.0 -28.9 -28.4 -28.9 65.76 -28.9 -28.9 66.23 -28.4 77.0 -15.6 -15.3 -15.6 77.0 17.0 17.0 17.0 65.66 29.0 65.28 29.4 29.4 0.0 29.4 29.0 29.4

ONEI-0400-50 Rev 17 Page 9 of 32 Oconee 1 Cycle 21 Operational Power Imbalance Setpoints Operation with 4 RCS Pumps, BOC to EOC

% FP 1 RPS Trip Full Incore Alarm Out of Core Alarm 107.9 -14.40 14.40 107 -15.36 15.36 106 -16.42 16.42 105 -17.48 17.48 104 -18.55 18.55 103 -19.61 19.61 102 -20.67 20.67 -15.60 17.00 -15.60 17.00 101 -21.73 21.73 -16.45 18.05 -16.45 18.05 100 -22.80 22.80 -17.30 19.10 -17.30 19.10 99 -23.86 23.86 -18.14 19.89 -18.14 19.89 98 -24.92 24.92 -18.98 20.68 -18.98 20.68 97 -25.99 25.99 -19.82 21.47 -19.82 21.47 96 -27.05 27.05 -20.66 22.26 -20.66 22.26 95 -28.11 28.11 -21.50 23.05 -21.50 23.05 94 -29.17 29.17 -22.34 23.84 -22.34 23.84 93 -30.24 30.24 -23.18 24.63 -23.18 24.63 92 -31.30 31.30 -24.02 25.42 -24.02 25.42 91 -32.36 32.36 -24.86 26.21 -24.86 26.21 90.4 -33.00 33.00 -25.36 26.68 -25.36 26.68 90 -33.00 33.00 -25.70 27.00 -25.70 27.00 89 -33.00 33.00 -26.02 27.24 -26.02 27.24 88 -33.00 33.00 -26.34 27.48 -26.34 27.48 87 -33.00 33.00 -26.66 27.72 -26.66 27.72 86 -33.00 33.00 -26.98 27.96 -26.98 27.96 85 -33.00 33.00 -27.30 28.20 -27.30 28.20 84 -33.00 33.00 -27.62 28.44 -27.62 28.44 83 -33.00 33.00 -27.94 28.68 -27.94 28.68 82 -33.00 33.00 -28.26 28.92 -28.26 28.92 81 -33.00 33.00 -28.58 29.16 -28.58 29.16 80 -33.00 33.00 -28.90 29.40 -28.90 29.40 0 -33.00 33.00 -28.90 29.40 -28.90 29.40

% FP j RPS Trip j Full Incore Alarm I Out of Core Alarm ONEI-0400-50 Rev 17 Page 10 of 32 Oconee 1 Cycle 21 Operational Power Imbalance Setpoints Operation with 3 RCS Pumps, BOC to EOC

% FP RPS Trip Full Incore Alarm Out of Core Alarm 80.6 -14.40 14.40 80 -15.04 15.04 79 -16.10 16.10 78 -17.16 17.16 77.0 -18.23 18.23 -15.60 17.00 -15.60 17.00 19.29 -16.78 18.06 -16.78 18.06 76 -19.29

-20.35 20.35 -17.97 19.12 -17.97 19.12 75

-21.41 21.41 -19.15 20.18 -19.15 20.18 74

-22.48 22.48 -20.33 21.23 -20.33 21.23 73

-23.54 23.54 -21.51 22.29 -21.51 22.29 72

-24.60 24.60 -22.70 23.35 -22.70 23.35 71

-25.67 25.67 -23.88 24.41 -23.88 24.41 70

-26.73 26.73 -25.06 25.47 -25.06 25.47 69

-27.79 27.79 -26.25 26.53 -26.25 26.53 68

-28.85 28.85 -27.43 27.58 -27.43 27.58 67 29.92 -28.61 28.64 -28.61 28.64 66 -29.92

-30.18 30.18 -28.90 28.90 -28.90 28.90 65.8 30.68 -28.90 29.40 -28.90 29.40 65.3 -30.68

-30.98 30.98 -28.90 29.40 -28.90 29.40 65 32.04 -28.90 29.40 -28.90 29.40 64 -32.04

-33.00 33.00 -28.90 29.40 -28.90 29.40 63.1

-33.00 33.00 -28.90 29.40 -28.90 29.40 63

-33.00 33.00 -28.90 29.40 -28.90 29.40 62

-33.00 33.00 -28.90 29.40 -28.90 29.40 61

-33.00 33.00 -28.90 29.40 -28.90 29.40 60

-33.00 33.00 -28.90 29.40 -28.90 29.40 0

%FP RPS Trip Full Incore Alarm Out of Core Alarm ONEI-0400-50 Rev 17 Page 11 of 32 Oconee 1 Cycle 21 RPS Power Imbalance Setpoints Referred to by ITS 3.3.1 Thermal Power Level, %FP 120

(-14.4,107.9) (14.4,107.9) 100 M2 = -0.941 M1 = 0.941 Acc eptable 4 Put i Operation (33,90.4)

(-33,90.4)

(-14.4,80.6) (14.4,80.6)

(-33,63.1) 60 (33,63.1)

Acceptable 3 or 4 Pump Operation 40 20 A

ILI t n s'. I I

l I

I I

l

= I I I I

  • 40

-30 -20 -10 0 10 20 30 40

-40 Percent Power Imbalance

ONEI-0,, J0 Rev 17 Page 12 of 32 Oconee I Cycle 21 Imbalance Setpoints for 4 Pump Operation, BOC to EOC 110 RPSTrpSeto PS Trip Setpoint 100 _

_-_:+/- Incore & Outcore Alarm RR S T 90 * - -- -

80 T7:7II_-<

70 fri M-.  !

0 4,6, O_60 U

0

~50 i .

C, on V 40 r'-

30 i-v i 20 I- 4 - :Thni4 I

! 1. -1 10 I I --L 4----l i --

I I' I I ýý-- !

A3 v 30 35 40

-25 -20 -15 -10 -5 0 5 10 15 20 25

-40 -35 -30 Percent Axial Imbalance

ONEI-0400-o0 Rev 17 Page 13 of 32 Oconee 1 Cycle 21 Imbalance Setpoints for 3 Pump Operation, BOC to EOC 110 100 90 80 70 0

CLI 60 LL 4ý 0

50 1..

a-40 30 20 10 0

20 -15 -10 -5 0 5 10 15 20 25 30 35 40 35 -30 Percent Axial Imbalance

ONEI-0400-50 Rev 17 Page 14 of 32 Oconee 1 Cycle 21 Operational Rod Index Setpoints RI Insertion Setpoint RI Withdrawal

%FP No Inop Rod 1 Inop Rod Setpoint 263.5 283.4 300 4 Pumps 102.0 261.5 281.5 300 100.0 251.5 271.9 300 90.0 241.5 262.3 300 80.0 201.5 233.4 300 50.0 195.2 231.5 300 48.0 91.5 165.5 300 15.0 161.5 300 13.0 76.5 16.5 93.5 300 5.0 1.5 76.5 300 3.0 0.0 74.8 300 2.8 0.0 51.0 300 0.0 300 3 Pumps 77.0 237.5 285.2 75.0 234.8 281.5 300 50.0 201.5 235.2 300 48.0 195.2 231.5 300 15.0 91.5 165.5 300 13.0 76.5 161.5 300 5.0 16.5 93.5 300 3.0 1.5 76.5 300 2.8 0.0 74.8 300 0.0 0.0 51.0 300

ONEI-0400-50 Rev 17 Page 15 of 32 Oconee 1 Cycle 21 Shutdown Margin Rod Index Setpoints RI Insertion Setpoint RI Withdrawal

%FP No nop Rod 1 Inop Rod Setpoint 4 Pumps 102.0 224.6 283.4 300 100.0 221.5 281.5 300 48.0 141.5 231.5 300 13.0 76.5 161.5 300 3.0 1.5 76.5 300 2.8 0.0 74.8 300 0.0 0.0 51.0 300 3 Pumps 77.0 227.4 285.2 300 75.0 221.5 281.5 300 48.0 141.5 231.5 300 13.0 76.5 161.5 300 3.0 1.5 76.5 300 2.8 0.0 74.8 300 0.0 0.0 51.0 300

Oconee 1 Cycle 21 ONEI-0400-50 Rev 17 Rod Index Setpoints Page 16 of 32 4 Pump Operation, No Inoperable Rods, BOC to EOC Shutdown Margin Setpoint Operational Alarm Setpoint

% FP CRGP 5 CRGP 6 CRGP7 CRGP 5 CRGP6 CRGP 7 102 100 99.8 24.8 100 100 63.5 100 99.0 24.0 100 100 62.5 101 100 98.2 23.2 100 100 61.5 100 100 97.5_ 22.5 100 100 60.5 99 100 96.7 21.7 100 100 59.5 98 97 100 95.9 20.9 100 58.5 100 57.5 96 95.2 20.2 100 100 100 100 56.5 95 94.4 19.4 100 94 93.6 18.6 100 100 55.5 100 92.9 17.9 100 100 54.5 93 100 92.1 17.1 100 100 53.5 92 100 91 100 91.3 16.3 100 100 52.5 100 90.6 15.6 100 100 51.5 90 - - -- ----------

A 90 100 100 50.5 89 100 89.8 14.8 100 89.0 14.0 100 100 49.5 88 87 100 88_2

88. I 13.2 13.2__ I 100 100 48.5 86 100 87.5 12.5 100 100 47.5 100 86.7 11.7 100 100 46.5 85 4- II I 100 45.5 84 100 85.9 10.9 100 100 10.2 100 100 44.5 83 85.2 100 84.4 9.4 100 100 43.5 82 100 83.6 8.6 100 100 42.5 81 80 100 82.9 7.9 100 100 41.5 100 82.1 7.1 100 100 40.2 79 100 100 38.8 78 100 81.3 6.3 100 80.6 5.6 100 100 37.5 77 100 79.8 4.8 100 100 36.2 76 79.0 4.0 100 100 34.8 75 100 100 78.2 3.2 100 100 33.5 74 100 100 32.2 73 100 77.5 2.5 76.7 1.7 100 100 30.8 72 100 75.9 0.9 100 100 29.5 71 100 100 75.2 0.2 100 28.2 70 100 100 75.0 0 100 27.9 69.8 100 100 73.8 0 100 26.8 69 100 100 100 72.3 0 100 25.5 68 100 100 71.7 0 100 25.0 67.6 67 100 70.7 0 100 99.6 24.6 69.2 0 100 98.9 23.9 66 100 67.7 0 100 98.2 23.2 65 100 100 66.1 0 100 97.6 22.6 64 64.6 0 100 96.9 21.9 63 100 63.0 0 100 96.2 21.2 62 100 100 _

61.5 0 100 95.6 20.6 61 60.0 0 100 94.9 19.9 60 100 58.4 0 100 94.2 19.2 59 100 100 93.6 18.6 58 100 56.9 0 100 55.3 0 100 92.9 17.9 57 0 100 92.2 17.2 56 100 53.8 100 52.3 0-- 100 91.6 16.6 55 50.7 0 100 90.9 15.9 54 100 49.2 0 100 90.2 15.2 53 100-__

47.7 0 100 89.6 14.6 52 100 100 46.1 0 100 88.9 13.9 51 100__ 44.6 0 100 88.2 13.2 50

% FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 I CRGP 7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels. Continued on next page.

Oconee 1 Cycle 21 ONEI-0400-50 Rev 17 Page 17 of 32 Rod Index Setpoints 4 Pump Operation, No Inoperable Rods, BOC to EOC Shutdown Margin Setpoint Operational Alarm Setpoint

% FP CRGP5 CRGP6 CRGP7 CRGP5 I CRGP6 CRGP7 49 100 43.0 0 6 100 --86.7 100 41.5 0 100 85.1 10.1 48 39.6 0 100 83.5 8.5

-47. 100 0 100 82.0 7.0 46 100 37.8 35.9 0 100 80.4 5.4 45 100 34.1 0 100 78.8 3.8 44 100 100 77.2 2.2 43 100 32.2 0 30.4 0 100 75.7 0.7 42 100 100 29.6 0 100 75.0 0 41.6 41 100 28.5 0 100 73.2 _0 26.6 0 100 70.1 0 40 100 100 25.0 0 100 67.3 0 39.1 39 99.9 24.9 0 100 66.9 0 38 99.0 24.0 0 100 63.8 0 98.0 23.0 0 100 60.6 0 37 36 97.1 22.1 0 100 57.5 0 35 96.2 21.2 0 100 54.3 0 34 95.2 20.2 0 100 51.2 0 33 94.3 19.3 0 100 48.1 0 32 93.4 18.4 0 100 44.9 0 31 92.5 17.5 0 100 41.8 0 30 91.5 16.5 0 100 38.6 0 29 90.6 15.6 0 100 35.5 0 4 II -1 1 28 89.7 14.7 0 100 32.4 0 13.8 100 -I-29.2 0 27 88.8 0 12.8 0 100 26.1 0 26 87.8 _

12.5 0 100 25.0 0 25.7 87.5 11.9 0 99.0 24.0 0 25 86.9 11.0 0 97.4 22.4 0 24 86.0 10.0 0 95.8 20.8 0 23 85.0 9.1 0 94.2 19.2 0 22 84.1 21 8.2 0 92.7 17.7 0 83.2 7.2 0 91.1 16.1 0 20 82.2 6.3 H-14.5 0 19 81.3 0 89.5 5.4 0 88.0 13.0 0 18 80.4 4.5 0 86.4 11.4 0 17 79.5 3.5 0 84.8 9.8 0 16 78.5 2.6 0 83.2 8.2 0 15 77.6 1.7 0 79.5 4.5 0 14 76.7 0.8

-- ---il i -------------

75.8 0.8 0 13 75.8 0 0 0 75.0 0 0 12.8 75.0 0 0 69.0 0 0 12 69.0 11 61.5 0 0 61.5 0 54.0 0-6 54.0 0 0 10 0 0 46.5 0 0 9 46.5 0 0 39.0 0 0 8 39.0 31.5 0 0 31.5 0 0 7

0 0 24.0 0 0 6 24.0 5 16.5 0 0 16.5 0 0 00 0 9.0 0 0 4 9.0 0 1.5 0 0 3 1.5 0 0 0 0 0 0 2.8 0 0 0 0 0 2 0 0 0 0 0 0 1 0 0 0 ----

--- 0 0~~_ 0 0

%FP iCRGP 5 CRGP 6 CRGP 7 CRGP5 CRGP6 E CRGP 7 Shutdown Margin Setpoint N , Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.

Oconee 1 Cycle 21 ONEI-0400-50 Rev 17 Rod Index Setpoints Page 18 of 32 3 Pump Operation, No Inoperable Rods, BOC to EOC Shutdown Margin Setpoint Operational Alarm Setpoint

% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 77 100 100 100 37.5 100 36.4 76.2 100 25.0 100 100 99:7 24.7 100 100 36.1 76 100 100 98.2 23.2 100 100 34.8 75 100 96.8 21.8 100 100 33.5 74 73 100 95.3 20.3 i00 100 32.1 93.8 18.8 100 100 30.8 72 100 71 100 92.3 .17.3 100 100 29.5 90.8 15.8 100 100 28.1 100 69 100 89.4 14.4 100 100 26.8 100 87.9 12.9 100 25.5 68 100 100 87.4 12.4 100 25.0 67.6 100 67 100 86.4 11.4 100 99.6 24.6 66 100 84.9 9.9 98.9 23.9 100 100 83.4 8.4 100 98.2 23.2 65 I 64 100 82.0 7.0 100 97.6 22.6 100 80.5 5.5 100 96.9 21.9 63 100 79.0 4.0 100 96.2 21.2 62 100 77.5 2.5 100 95.6 20.6 61 100 76.0 1.0 100 94.9 19.9 60 100 75.0 0 100 94.4 19.4 59.3 100 74.1 0 100 94.2 19.2 59 71.1 0 100 93.6 18.6 58 100 100 68.2 0 100 92.9 17.9 57 56 100 65.2 0 100 92.2 17.2 100 62.2 0 100 91.6 16.6 55 100 59.3 0 100 90.9 15.9 54 56.3 0 100 90.2 15.2 53 100 53.4 0 100 89.6 14.6 52 100 51 100 50.4 0 100 88.9 13.9 47.4 0 100 88.2 13.2 50 100 44.5 0 100 86.7 11.7 49 100 100 41.5 0 100 85.1 10.1 48 100 39.6 0 100 83.5 8.5 47 100 37.8 0 100 82.0 7.0 46 100 35.9 0 100 80.4 5.4 45 100 34.1 0 100 78.8 3.8 44 100 32.2 0 100 77.2 2.2 43 100 30.4 0 100 75.7 0.7 42 100-_ 75.0 0 41.6 100 29.6 0-100 28.5 0 100 73.2 0 41 40 100 26.6 0 100 70.1 0 25.0 0 100 67.3 0 39.1 24.9 0 100 66.9 0 39 99.9 24.0 0 100 63.8 0 38 99 98 23.0 0 100 60.6 0 37 36 97.1 22.1 0 11 100 i

57.5 0 35 96.2 21.2 0 100 54.3 0 34 95.2 20.2 0 100 51.2 0 19.3 0 100 48.1 0 33 94.3 18.4 0 100 44.9 0 32 93.4 17.5 0 100 41.8 0 31 92.5 16.5 0 100 38.6 0 30 91.5 90.6 15.6 0 100 35.5 0 29 89.7 14.7 0 100 32.4 0 28

%FPI CRGP 5 CRGP 6 CRGP 7 CRGP5 J CRGP6 j CRGP7 I Shutdown Margin Setpoint F-Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels. Continued on next page.

Oconee 1 Cycle 21 ONEI-0400-50 Rev 17 Page 19 of 32 Rod Index Setpoints 3 Pump Operation, No Inoperable Rods, BOC to EOC nal Alarm CRGP 6 29.2 26.1 25.0 24.0 22.4 20.8 19.2 17.7 16.1 14.5 13.0 11.4 9.8 8.2 4.5 0.8 0

0 0

0 0

0 RI = 300 is withdrawal limit at all power levels.

Oconee 1 Cycle 21 ONEI-0400-50 Rev 17 Rod Index Setpoints Page 20 of 32 4 Pump Operation, 1 Inoperable Rod, BOC to EOC Shutdown Margin Setpoint Operational Alarm Setpoint

% FP I CRGP 5 CRGP 6 1 CRGPC7 [ CRGP PCRGP5 CRGP 7 102 100 100 83.4 100 101 100 100 82.5 100 100 82.5 100 100 100 100 81.5 100 100 81.5 99 100 100 80.5 100 80.5 100 98 100 100 79.6 100 79.6 100 97 100 100 78.6 100 78.6 100i 96 100 100 77.7 100 77.7 95 100 100 76.7 100 100 76.7 94 100 100 75.7 100 75.7 100 93 100 100 74.8 100 100 74.8 92 100 100 73.8 100 100 73.8 91 100 100 72.8 100 100 72.9 90 100 100 71.9 100 100 71.9 89 100 100 70.9 100 100 70.9 88 100 100 70.0 100 100 70.0 87 100 100 69.0 100 100 69.0 86 100 100 68.0 100 100 68.1 85 100 100 67.1 100 100 67.1 84 100 100 66.1 100 100 66.1 83 100 100 65.2 100 100 65.2 82 100 100 64.2 100 100 64.2 81 100 100 63.2 100 100 63.3 80 100 62.3 100 100 62.3 79 100 100 61.3 100 100 61.3 78 100 100 60.3 100 100 60.4 77 100 100 59.4 100 100 59.4 76 100 100 58.4 100 100 58.4 75 100 100 57.5 100 100 57.5 74 100 100 56.5 100 100 56.5 73 100 100 55.5 100 100 55.6 72 100 100 54.6 100 100 54.6 71 100 100 53.6 100 100 53.6 70 100 100 52.7 100 100 52.7 69 100 100 51.7 100 100 51.7 68 100 100 50.7 100 100 50.7 100 100 49.8 100 100 49.8 67 100 100 48.8 100 100 48.8 66 65 100 100 47.8 100 100 47.8 64 100 100 46.9 100 100 46.9 63 100 100 45.9 100 100 45.9 62 100 100 45.0 100 100 45.0 61 100 100 44.0 100 100 44.0 60 100 100 43.0 100 100 43.0 59 100 100 42.1 100 100 42.1 58 100 100 41.1 100 100 41.1 57 100 100 40.2 100 100 40.2 II I -- I 56 100 100 39.2 100 100 39.2 55 100 100 38.2 100 100 38.2 54 100 100 37.3 100 100 37.3 53 100 100 36.3 100 100 36.3 52 100 100 35.3 100 100 35.3 100 100 34.4 100 100 34.4 51 50 100 100 33.4 100 100 33.4 49 100 32.5 100 100 32.5 100 31.5 48 100 100 31.5 100 100 _

%IFP CRGP5 CRGP6 CRGP7 CRGP5 1 CRGP6 3 CRGP7 Shutdown Margin Setpoint I Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels. Continued on next page.

Oconee 1 Cycle 21 ONEI-0400-50 Rev 17 Rod Index Setpoints Page 21 of 32 4 Pump Operation, 1 Inoperable Rod, BOC to EOC Shutdown Margin Setpoint Operational Alarm Setpoint

% FP CRGP 5 1 CRGP 6 CRGP7 CRGP 5 CRGP 6 CRGP 7 47 100 100 29.5 100 100 29.5 46 100 100 27.5 100 100 27.5 45 100 100 25.5 100 100 25.5 44.8 100 100 25.0 100 100 25.0 44 99.2 24.2 100 99.2 24.2 100 43 100 98.2 23.2 100 98.2 23.2 42 100 97.2 22.2 100 97.2 22.2 41 100 96.2 21.2 100 96.2 21.2 40 100 95.2 20.2 100 95.2 20.2 39 100 94.2 19.2 100 94.2 19.2 38 100 93.2 18.2 100 93.2 18.2 37 100 92.2 17.2 100 92.2 17.2 36 100 91.2 16.2 100 91.2 16.2 35 100 90.2 15.2 100 90.2 15.2

-ii. + 1-34 100 89.2 14.2 100 89.2 14.2 4 -t 33 100 88.2 13.2 100 88.2 13.2 32 100 87.2 12.2 100 87.2 12.2 31 100 86.2 11.2 100 86.2 11.2 100____ 86.-2II 30 100 85.2 10.2 100 85.2 10.2 29 100_____ 85.

84.2 9.2 100 84.2 9.2 100 28 100 83.2 8.2 100 83.2 8.2 27 100 82.2 7.2 100 82.2 7.2 26 100 81.2 6.2 100 81.2 6.2 25 100 80.2 5.2 100 80.2 5.2 24 100 79.2 4.2 100 79.2 4.2 23 100 78.2 3.2 100 78.2 3.2 22 100 77.2 2.2 100 77.2 2.2 21 100 76.2 1.2 100 76.2 1.2 20 100 75.2 0.2 100 75.2 0.2 19.8 100 75.0 0 100 75.0 0 19 100 73.5 0 100 73.5 0 18 100 71.5 0 100 71.5 0 17 100 69.5 0 100 69.5 0 16 100 67.5 0 100 67.5 0 15 100 65.5 0 100 65.5 0 14 100 63.5 0 100 63.5 0 13 100 61.5 0 100 61.5 0 12 100 53.0 0 100 53.0 0 11 100 44.5 0 100 44.5 0 10 100 36.0 0 100 36.0 0 9 100 27.5 0 100 27.5 0 8.7 100 25.0 0 100 25.0 0 8 97.0 22.0 0 97.0 22.0 0 7 92.8 17.8 0 92.8 17.8 0 6 88.5 13.5 0 88.5 13.5 0 5 84.2 9.2 0 84.2 9.2 0 4 80.0 5.0 0 80.0 5.0 0 3 75.8 0.8 0 75.8 0.8 0 2.8 75.0 0 0 75.0 0 0 2 68.0 0 _0 68.0 0 0 1 59.5 0 0 59.5 0 0 0 51.0 0 0 51.0 0 0

%FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.

Oconee 1 Cycle 21 ONEI-0400-50 Rev 17 Page 22 of 32 Rod Index Setpoints 3 Pump Operation, 1 Inoperable Rod, BOC to EOC Shutdown Margin Setpoint Operational Alarm Setpoint

% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 77 100 100 85.2 100 8ý5.2 100 83.4 100 100 83.4 76 100 81.5 75 100 100 81.5 100 79.6 100 100 79.6 74 100 100 100 100 100 77.8 100 100 77.8 73 100 100 75.9 100 75.9 72 100 100 74.1 100 100 74.1 71

-100 100 72.2 72.2 70 100 100 70.4 100 100 70.4 69 100 100 68.5 100 100 68.5 68 100 100 66.7 100 100 66.7 67 100 100 100 64.8 100 100 64.8 66 100 100 63.0 100 100 63.0 65 61.1 100 100 61.1 64 100 100 100 100 59.3 100 100 59.3 63 Inn£ 100 57.4 62 100 57.4 57.4 I 10 61 1______

100___ 100 55.6 100 100 55.6

___ I

_I.F 100 100 53.7 60 100 100 53.7 100 100 51.9 100 100 51.9 59 100 100 50.0 100 100 50.0 58 100 100 48.2 100 100 48.2 57 100 100 46.3 100 100 46.3 56 55 100 100 44.5 100 100 44.5 100 100 42.6 100 100 42.6 54 100 100 40.8 100 100 40.8 53 52 100 100 38.9 100 100 38.9 100 100 37.1 100 100 37.1 51 100 100 35.2 100 100 35.2 50 100 100 33.4 100 100 33.4 49 100 100 31.5 48 100 100 31.5 47 100 100 29.5 100 100 29.5 100 27.5 100 100 27.5 46 100 100 25.5 100 100 25.5 45 100 44.8 100 100 25.0 100 100 25.0 100 99.2 24.2 100 99.2 24.2 44 43 100 98.2 23.2 100 98.2 23.2 100 97.2 22.2 100 97.2 22.2 42 _ 96.2 21.2 41 100 96.2 21.2 100 100 95.2 20.2 100 95.2 20.2 40 100 94.2 19.2 100 94.2 19.2 39 I I 4

II II ..... II- 18.2 38 Inn I g3_2 18.2 100 10 0 93.2 100 932 18.2 92.2 17.2 37 100 92.2 17.2 100 100 91.2 16.2 100 91.2 16.2 36 90.2 15.2 100 90.2 15.2 35 100 89.2 14.2 100 89.2 14.2 34 100 100 88.2 13.2 100 88.2 13.2 33 100 87.2 12.2 100 87.2 12.2 32 31 100 86.2 11.2 100 86.2 11.2 10.2 100 85.2 10.2 30 100 85.2 9.2__ 9.2 29 100 84.2 100 84.2 100 83.2 8.2 100 83.2 8.2 28 _

27 100 82.2 7.2 100 82.2 7.2

-t -II- I -- 6.2 26 100 81.2 6.2 100 81.2 25 100 80.2 5.2 100 80.2 5.2 79.2 4.2 100 79.2 4.2 24 100

%FP CRGP5 CRGP6 CRGP CRGP5 CRGP6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels. Continued on next page.

Oconee 1 Cycle 21 ONEI-0400-50 Rev 17 Rod Index Setpoints Page 23 of 32 3 Pump Operation, 1 Inoperable Rod, BOG to EOC

)oint CRGP 7 3.2 2.2 1.2 0.2 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

RI = 300 is withdrawal limit at all power levels.

ONEI-0400. Rev 17 105Oconee 1 Cycle 2Page 24 of 32 105

..... 105 Control Rod Position Setpoints HHHHHH Hil HH......

100 - +++ 100 100 No Inoperable Rods, 4 Pump Flow 95* ### MIMI II Restricted 95 Operation *

. ItIIIIIIII 90 90

  • 85 80 -- *"* N+**80 80 -**

1444M HHH I"19 #-H!iS ..... . ..... 8 60S 735 35 Operation -  !. ,1, ii ll i

. HHU.. 65 1

65 ..

..H.....

: : =; ; ; ; ; . .. .... I ....r

.....I 5 5 *145.55.65575585 95 144 M ilII44--+-I- 44-[l I FR+

50. ( I

...... HIIII

...... Accep)table"""""" 50 30 30 .. .50.....

40 - 40 35 - 111.11--"

50 5

-r - * +Ht *5 0F*

. .. HI *2 .. ...

305 2 ........ .. "...... ........ G roup.6.. I: .,, ..... 30 I H I I I Il l lil H I H a lH Control Rod Position, % WD

ONEI-0400 Rev 17 Page 25 of 32 Oconee I Cycle 21 L 105 105 Control Rod Position Setpoints 100 100 No Inoperable Rods, 3 Pump Flow 95 95 90 90 85 85 80 80 75 75 70 70 65 65 CL 60 LL 60

-0 55 55 01 50 (L. 50 45 0

45 40 40 35 35 30 30 25 25 20 20 15 15 10 10 5

5 0

Control Rod Position, % WD

ONEI-040t. ,Rev 17 Page 26 of 32 I Oconee 1 Cycle 21 105 105 Control Rod Position Setpoints 100 100 1 Inoperable Rod, 4 Pump Flow 95 95 90 90 85 85 80 80 75 75 70 70 65 65 60 a

60 O-. 55 55 50 a," 50 0~

0 45 M-45 40 40 35 35 30 30 25 25 20 20 15 15 10 10 5

5 0

Control Rod Position, % WD

ONEI-04C Rev 17 l Page 27 of 32 Oconee I Cycle 21 _.. . . ... .. 10 5

,,mk,

ii ii Ii iF IINIni 105 ,,,.p *rIrrr,*

(I IIlll Control Rod Position Setpoints II JI 100 100 1 Inoperable Rod, 3 Pump Flow i FI:h i

95 I

i; I 95 F 90 90 TTII 85 HHHHH1 N mkdm¢ 4-+++-+

44 444

+

JJ 85 80 80 * . ft n-IllI 75 75 II

--..1.

111

$1~ Unacceptable

.LL LL LL 444 70 70 . Operation i;;1;ii;i;;i m 65 fl i fl 65 I1

-+4-+

-1+4

(. 444 60 LL 4++m 60 +

.+H +

.+.

55 !4 mdWmm mira ft 55 47, .+ 11 D.. 50 50 Wil 45 45m +1lH.

Acceptable tt Operation 40 40 i 14 35 35 30 -*

"[

-HI-H I4 14111 30 I-I 25 uiwL I 25 20 R4 20 15 )) 15 10 5

iii ii It tl IIIli I!ill IIIII ii ili

ý6 W1 66l III ii:

ii U!

Group 61 ii II

,*ii

'"ii Itl "

t*l

  • tlll L4I iI1l1 l1

!1!l1 4F:l' lllll 1t111 Ittll lllll titl!

10 5

i!lll L14 Ii1 Wt 5 15 25 35 45 55 65 75 85 95 U! -++a I 1 0 0 LL I I m *I 0 10 20 30 40 50 60 70 80 90 100 10 10 20 30 40 50 60 70 80 90 100 I Group 5 Group 7 Control Rod Position, % WD

ONEI-0400-50 Rev Page 28 of 17 32 Oconee 1 Cycle 21 2.0 Core Operating Limits -- Not Error Adjusted The data provided on the following pages satisfies a licensing commitment to identify specific parameters before instrumentation uncertainties are incorporated.

References provided in section 1 of this COLR identify the sources for the data which follows.

()uadrant Power Tilt Limits Referred to by ITS 3.2.3.

Steady State Transient Maximum 30 -100 0-30 30-10'0 0-30 0- 100 Core Power Level, %FP 5.28 10.00 9.44 12.00 20.00 Quadrant Power Ti ilt, %

Variable Low RCS Pressure Protective Limits Referred to by ITS 2.1.1.

Core Out let Pressure Reactor Coolant Outlet Temperature, OF sia 3 RCS Pumps 4 RCS Pumps 1800 581.0 578.3 900 590.0 587.3 2_000 598.9 596.3 2 100 607.9 605.2

'200 616.9 614.2 2300 625.9 623.2

ONEI-0400-50 Rev 17 Page 29 of 32 Oconee 1 Cycle 21 Axial Power Imbalance Protective Limits Referred to by ITS 2.1.1

%FP RPS Operational 4 Pumps 0 -48.0 -40.6 80 -40.6 90 -37.4 100 -48.0 -27.8 112 -31.1 112 31.1 100 48.0 30.0 90 39.0 80 41.2 0 48.0 41.2 3 Pumps 0 -48.0 -40.6 74.6 -48.0 77.0 -40.6 86.6 -31.1 86.6 31.1 77.0 41.2 74.6 48.0 0 48.0 41.2

ONEI-0400-50 Rev 17 Page 30 of 32 Oconee 1 Cycle 21 Rod Index Limits Referred to by ITS 3.2.1 Operational RI Shutdown Margin RI Insertion Limit RI Withdrawal

%FP Insertion Limit No Inop Rod 1 Inop Rod Limit 4 Pumps 102 262 220 280 300 100 260 300 90 250 300 80 240 300 50 200 140 230 300 15 90 75 160 300 5 0 0 75 300 3 Pumps 77 236 220 280 300 50 200 140 230 300 15 90 75 160 300 5 0 0 75 300

ONEI-0400-50 Rev 17 Page 31 of 32 Oconee 1 Cycle 21 LOCA Limits Core Elevation Feet LOCA LHR kw/ft Limit Versus Burnup Mk-B1OF and 0 GWd/mtU 30 GWd/mtU 62 GWd/mtU Mk-B1OL Fuel 0.000 15.6 15.6 11.6 2.506 16.5 16.5 11.6 4.264 16.8 16.8 11.6 6.021 17.0 17.0 11.6 7.779 17.0 17.0 11.6 9.536 16.7 16.7 11.6 12.00 15.8 15.8 11.6 Mk-B11 Fuel 0 GWd/mtU 40 GWd/mtU 62 GWd/mtU 0.000 15.5 15.5 12.6 2.506 16.3 16.3 12.6 4.264 16.5 16.5 12.6 6.021 16.8 16.8 12.6 7.779 16.5 16.5 12.6 9.536 16.2 16.2 12.6 12.00 15.4 15.4 12.6

ONEI-0400-50 Rev 17 Page 32 of 32 Oconee 1 Cycle 21 IF 4 RCP Operation - Loop Average Temp., TF 3 RCP Operation - Loop Average Temp., °F ATcold, TF Tavg (Analytical) Tavg (Analytical)

O.0 <bb1.0 <581 .O 0.1 <581.0 <581.0 0.2 <581.1 <581.0 0.3 <581.1 <581.1 0.4 <581.2 <581.1 0.5 <581.2 <581.1 0.6 <581.2 <581.1 0.7 <581.3 <581.2 0.8 <581.3 <581.2 0.9 <581.3 <581.2 1.0 <581.4 <581.2 1.1 <581.4 <581.2 1.2 <581.5 <581.3 1.3 <581.5 <581.3 1.4 <581.5 <581.3 1.5 <581.6 <581.3 1.6 <581.6 <581.4 1.7 <581.6 <581.4 1.8 <581.7 <581.4 1.9 <581.7 <581.4 2.0 <581.8 <581.4 2.1 <581.8 <581.5 2.2 <581.8 <581.5 2.3 <581.9 <581.5 2.4 <581.9 <581.5 2.5 <582.0 <581.6 2.6 <582.0 <581.6 2.7 <582.0 <581.6 2.8 <582.1 <581.6 2.9 <582.1 <581.6 3.0 <582.1 <581.7 3.1 <582.2 <581.7 3.2 <582.2 <581.7 3.3 <582.3 <581.7 3.4 <582.3 <581.7 3.5 <582.3 <581.8 3.6 <582.4 <581-8 3.7 <582.4 <581.8 3.8 <582.4 <581.8 3.9 <582.5 <581.9 4.0 <582.5 <581.9 4.1 <582.6 <581.9 4.2 <582.6 <581.9 4.3 <582.6 <581.9 4.4 <582.7 <582.0 4.5 <582.7 <582.0 4.6 <582.7 <582.0 4.7 <582.8 <582.0 4.8 <582.8 <582.1 4.9 <582.9 <582.1 5.0 <582.9 <582.1