JAFP-02-0064, Revised November 2001 Monthly Operating Report for James A. FitzPatrick

From kanterella
(Redirected from ML020840054)
Jump to navigation Jump to search
Revised November 2001 Monthly Operating Report for James A. FitzPatrick
ML020840054
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/15/2002
From: Ted Sullivan
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
JAFP-02-0064
Download: ML020840054 (6)


Text

Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

James A. FitzPatrick NPP RO. Box 110 Lycoming, NY 13093 SEntergy Tel 315 349 6024 Fax 315 349 6480 T.

ViceA.President, SullivanOperations-JAF March 15, 2002 JAFP-02-0064 U.S Nuclear Regulatory Commission Attn: Document Control Desk Mail Station O-PI-17 Washington, DC 20555

Subject:

James A. FitzPatrick Nuclear Power Plant NRC Docket No. 50-333 Monthly Operating Report

References:

Entergy letter from T. Sullivan to USNRC Document Control Desk,

Subject:

November 2001 Monthly Operating Report, JAFP-01-0261, dated December 14, 2001.

Dear Sir:

This letter transmits a revised copy of the James A. FitzPatrick's Monthly Operating Report for November 2001. Previous submittal, dated December 14, 2001, contained discrepancies in reported data appearing in the table of operating statistics. Revised report areas are identified by a revision bar.

If there are any questions concerning this report, please contact Mr. Sherard Anderson at (315) 349-6558.

TAS:BO:RD:SA:tmb Enclosure

Cc: Regional Administrator U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 Mr. Guy Vissing, Project Manager Project Directorate I Division of Licensing Project Management U.S. Nuclear Regulatory Commission Mail stop OWFN 8C2 Washington, DC 20555 JENG JAFP Files RMS (AF)

RMS (WPO)

REPORT MONTH: NOVEMBER 2001, Revision 1 Docket No.: 50-333 Unit Name: FitzPatrick Date: March 6, 2002 Completed By: S. Anderson Telephone: (315)349-6558 OPERATING STATUS

1. Unit name: FitzPatrick
2. Reporting period: 11/01/2001 - 11/30/2001
3. Licensed thermal power (MWT): 2536
4. Nameplate rating (gross MWE): 883.0
5. Design electrical rating (net MWE): 816
6. Maximum dependable capacity (gross MWE): 839
7. Maximum dependable capacity (net MWE): 813
8. If changes occur in capacity ratings (Items 3-7) since last report, give reasons:
9. Power level to which restricted, if any (net MWE):
10. Reasons for restrictions, if any:

NO. DATA REQUESTED THIS YR-TO-DATE CUMULATIVE MONTH 11 Hours in reporting period: 720 8,016 230,952.0 12 Number of hours reactor was critical: 720 7,920.0 172,416.1 13 Reactor reserve shutdown hours: 0.00 0.00 0.00 14 Hours generator on-line: 720 7,895.7 167,277.9 15 Unit reserve shutdown hours: 0.00 0.00 0.00 16 Gross thermal energy generated (MWH): 1,811,259.6 19,654,898.1 379,846,858.2 17 Gross electrical energy generated (MWH): 618,940 6,693,330 128,434,240 18 Net electrical energy generated (MWH): 599,600 6,464,830 123,719,100 19 Unit service factor: 100 98.50 72.43 20 Unit availability factor: 100 98.50 72.43 21 Unit capacity factor (using MDC net): 102.43 99.20 74.00 22 Unit capacity factor (using DER net) 102.06 98.83 65.65 23 Unit forced outage rate: 0.00 0.00 11.35

24. Shutdowns scheduled over next 6 months (type, date, and duration of each): None
25. If shutdown at end of report period, estimated date of startup: N/A
26. Units in test status (prior to commercial operation): FORECAST ACHIEVED Initial Criticality:

Initial Electricity:

Commercial Operation:

ENTERGY NUCLEAR NORTHEAST JAMES A. FITZPATRICK NUCLEAR POWER PLANT OPERATING DATA REPORT REPORT MONTH: NOVEMBER 2001, Revision 1 Docket No.: 50-333 Unit Name: FitzPatrick Date: March 6, 2002 Completed By: S. Anderson Telephone: (315)349-6558 DAY NET AVERAGE DAILY DAY NET AVERAGE DAILY POWER LEVEL POWER LEVEL 17 840 1 836 18 840 2 836 836 19 840 3

836 20 840 4

836 21 841 5

22 840 6 837 838 23 840 7

837 24 841 8

838 25 840 9

26 679 10 838 837 27 839 11 28 840 12 838 29 830 13 839 30 831 14 840 15 839 16 840

REPORT MONTH: NOVEMBER 2001, Revision 1 Docket No.: 50-333 Unit Name: FitzPatrick Date: March 6, 2002 Completed By: S. Anderson Telephone: (315)349-6558 I m NO. DATE TYPE DURATION REASON METHOD OF LICENSEE SYSTEM COMPONENT CAUSE and CORRECTIE HOURS SHUTTING EVENT CODE CODE ACTION TO PREVENT DOWN THE REPORT RECURRENCE REACTOR NO.

METHOD: EXHIBIT G: Instructions for preparation of F: FORCED REASON:

1. Manual data entry sheets for Licensee Event Report S: SCHEDULED A. Equipment failure (explain)
2. Manual Scram (LER) file (NUREG-0161)

B. Maintenance or Test C. Refueling 3. Automatic Scram D. Regulatory Restriction 4. Continued E. Operator training and license examination 5. Reduced load F. Administrative 9. Other G. Operational error (explain)

H. Other (explain)

REPORT MONTH: NOVEMBER 2001, Revision 1 Docket No.: 50-333 Unit Name: FitzPatrick Date: March 6, 2002 Completed By: S. Anderson Telephone: (315)349-6558 OPERATIONAL

SUMMARY

The FitzPatrick plant - with the exception of minor derates for rod adjustments - operated at or near rated power during the month of November 2001 except for the following:

" November 26, 2001 - 0804 The plant commenced a load reduction to support a control rod sequence exchange, scram time testing of control rods, and condenser waterbox de fishing. Control rod scram time testing began at 0903, and condenser waterbox de-fishing began at 0915. Scram time testing was completed at 1240. Main turbine stop valve testing was started at 1222 and completed at 1259. De-fishing was completed at roughly 1427. Power ascension was then commenced at 1551. Main turbine control valve testing was started at 1658 and completed at 1730. The unit was returned to full power at 0323 on November 27. The total duration of this load reduction was 19 hours2.199074e-4 days <br />0.00528 hours <br />3.141534e-5 weeks <br />7.2295e-6 months <br /> and 19 minutes.

" November 29, 2001 - 0808 The plant commenced a load reduction to 98% power to support troubleshooting of the 'B' Reactor Water Recirculation (RWR) pump speed control system. Work on the troubleshooting plan began at 0811 and completed at 1826 on November 30. Power was reduced to 95% at 1840 and 'B' RWR pump response monitored. Power was then returned to 98% at 1845 and 'B' RWR pump response monitored. Power was then returned to 100% at 1900. The total duration of this load reduction was slightly greater than 11 hours1.273148e-4 days <br />0.00306 hours <br />1.818783e-5 weeks <br />4.1855e-6 months <br />.