October 2002 Monthly Operating Report for FitzPatrick, Rev 1
ML030780068
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 12/12/2002
From: Ted Sullivan
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
JAFP-02-0225
Download: ML030780068 (6)


Text

oEntergy T.A. Sullivan Vice President, Operations-JAF December 12, 2002 JAFP-02-0225 U.S Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station O-P 1-17 Washington, DC 20555 Subject James A. FitzPatrick Nuclear Power Plant NRC Docket No. 50-333 Revision To October 2002 Monthly Operating Report Entergy letter, T. Sullivan to USNRC Document Control Desk (JAFP-02-021 1) dated November 12, 2002 regarding October 2002 "Monthly Operating Report"

Dear Sir:

This letter transmits a revised copy of the James A. FitzPatrick's Monthly Operating Report for October 2002. Previous submittal, dated November 12, 2002, contained a discrepancy in reported data appearing in the table of operating statistics. The revised report area is identified by a revision bar.

Should you have any questions concerning this report, please direct them to Mr. Sherard Anderson, Thermal Performance Engineer, at (315) 349-6558.

Very

urs,

.. Sullivajn~l TAS:SA:tmb Enclosure cc:

next page Entergy Nuclear Northeast Entergy Nuclear Operations, Inc James A Fitzpatrick NPP PO Box 110 Lycoming, NY 13093 Tel 315 349 6024 Fax 315 349 6480

Reference:

cc:

Regional Administrator U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Resident Inspector U.S. Nuclear Regulatory Commission James A. FitzPatrick Nuclear Power Plant P.O. Box 136 Lycoming, NY 13093 Mr. Guy Vissing, Project Manager Project Directorate I Division of Licensing Project Management U.S. Nuclear Regulatory Commission Mail stop OWFN 8C2 Washington, DC 20555 Mr. R. Toole ENN BWR SRC Operations Subcommittee Chairman 605 West Homer Street Ebensburg, PA 15931 JENG JAFP Files RMS (JAF)

RMS (WPO)

ENTERGY NUCLEAR NORTHEAST JAMES A. FITZPATRICK NUCLEAR POWER PLANT OPERATING DATA REPORT REPORT MONTH: OCTOBER 2002, REVISION 1 OPERATING STATUS

1.
2.
3.
4.
5.

6

7.
8.
9.

10.

Unit name: FitzPatrick Reporting period: 10101/2002 - 10/31/2002 Licensed thermal power (MWT): 2536 Nameplate rating (gross MWE): 883.0 Design electrical rating (net MWE): 816 Maximum dependable capacity (gross MWE): 839 Maximum dependable capacity (net MWE). 813 If changes occur in capacity ratings (Items 3-7) since last report, give reasons:

Power level to which restricted, if any (net MWE):

Reasons for restrictions, if any:

NO.

DATA REQUESTED THIS YR-TO-DATE CUMULATIVE MONTH 11 Hours in reporting period:

745 7,296 238,992 12 Number of hours reactor was critical.

192 8 6,706 4 179,866.5 13 Reactor reserve shutdown hours:

0.00 0.00 0.00 14 Hours generator on-line:

165.4 6,648.5 174,670.3 15 Unit reserve shutdown hours:

0.00 0.00 0.00 16 Gross thermal energy generated (MWH):

248,530.7 16,488,839.4 398,218,349.0 7

Gross electrical energy generated (MWH):

76,459 5,584,619 134,664,759 18 Net electrical energy generated (MIWH):

73,727 5,406,112 129,750,882 19 Unit service factor:

2221 91 13 73.09 20 Unit availability factor:

22.21 91.13 73.09 21 Unit capacity factor (using MDC net):

12.17 91.14 74.68 22 Unit capacity factor (using DER net) 12.13 90.81 66 53 23 Unit forced outage rate:

0.00 0.00 10.92

24.

Shutdowns scheduled over next 6 months (type, date, and duration of each)- None

25.

If shutdown at end of report period, estimated date of startup: N/A 26 Units in test status (prior to commercial operation):

Initial Criticality:

Initial Electricity:

Commercial Operation.

FORECAST ACHIEVED Docket No.-

50-333 Unit Name:

FitzPatrick Date:

November 8, 2002 Completed By: S. Anderson Telephone:

(315)349-6558

ENTERGY NUCLEAR NORTHEAST JAMES A. FITZPATRICK NUCLEAR POWER PLANT OPERATING DATA REPORT REPORT MONTH: OCTOBER 2002, REVISION 1 DAY NET AVERAGE DAILY DAY NET AVERAGE DAILY POWER LEVEL POWER LEVEL 1

790 17 0

2 509 18 0

3 420 19 0

4 424 20 0

5 419 21 0

6 380 22 0

7 5

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 125 16 0

Docket No:

50-333 Unit Name:

FitzPatrick Date:

November 8, 2002 Completed By: S. Anderson Telephone:

(315)349-6558

REPORT MONTH: OCTOBER 2002, REVISION 1 F: FORCED S: SCHEDULED REASON:

A. Equipment failure (explain)

B. Maintenance or Test C. Refueling D. Regulatory Restriction E. Operator training and license examination F. Administrative G. Operational error (explain)

H. Other (explain)

METHOD:

1. Manual
2. Manual Scram
3. Automatic Scram
4. Continued
5. Reduced load
9. Other EXHIBIT G: Instructions for preparation of data entry sheets for Licensee Event Report (LER) file (NUREG-0161)

Docket No.:

50-333 Unit Name:

FitzPatrick Date:

November 8, 2002 Completed By: S. Anderson Telephone:

(315)349-6558 NO.

DATE TYPE DURATION REASON METHOD OF LICENSEE SYSTEM COMPONENT CAUSE and CORRECTIVE HOURS SHUTTING EVENT CODE CODE ACTION TO PREVENT DOWN THE REPORT RECURRENCE REACTOR NO.

1 10/7/02 5

579.2 C

1 N/A N/A N/A N/A

REPORT MONTH: OCTOBER 2002, REVISION 1 OPERATIONAL

SUMMARY

The FitzPatrick plant - with the exception of minor derates for rod adjustments - operated at or near rated power for the duration of the month of October 2002.

0 October 2, 2002 - 0614 October 6, 2002 - 1950 October 30, 2002 - 0406 The plant commenced a power reduction in response to a seal leak on the

'A' feedwater pump. Power was reduced to 52% at 0642 and the 'A' feedwater pump was removed from service at 0705.

Due to plant conditions, repairs to the 'A' feedwater pump could not be made and the plant remained at 55% power for the remainder of the cycle The plant commenced shutdown for Refueling Outage 15. The main turbine was taken offline at 0119 on October 7, and the plant reached All Rods In at 0616 The plant commenced startup from the refuel outage The mode switch was taken to startup, placing the plant in mode 2. The reactor was made critical at 0530. Power ascension continued until the main turbine was placed online at 0331 on October 31. The main turbine was tripped offline at 1222 for overspeed testing and placed back online at 1408. Power ascension then continued through the end of October, concluding the month at roughly 50% power.

Docket No.:

50-333 Unit Name:

FitzPatrick Date:

November 8, 2002 Completed By: S. Anderson Telephone:

(315)349-6558