SEntergy Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.
James A. FitzPatrick NPP RO. Box 110 Lycoming, NY 13093 Tel 315 349 6024 Fax 315 349 6480 March 15, 2002 JAFP-02-0064 U.S Nuclear Regulatory Commission Attn: Document Control Desk Mail Station O-PI-17 Washington, DC 20555
Subject:
James A. FitzPatrick Nuclear Power Plant NRC Docket No. 50-333 Monthly Operating Report
References:
Entergy letter from T. Sullivan to USNRC Document Control Desk,
Subject:
November 2001 Monthly Operating Report, JAFP-01-0261, dated December 14, 2001.
Dear Sir:
This letter transmits a revised copy of the James A. FitzPatrick's Monthly Operating Report for November 2001. Previous submittal, dated December 14, 2001, contained discrepancies in reported data appearing in the table of operating statistics. Revised report areas are identified by a revision bar.
If there are any questions concerning this report, please contact Mr. Sherard Anderson at (315) 349-6558.
TAS:BO:RD:SA:tmb Enclosure T. A. Sullivan Vice President, Operations-JAF
Cc:
Regional Administrator U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 Mr. Guy Vissing, Project Manager Project Directorate I Division of Licensing Project Management U.S. Nuclear Regulatory Commission Mail stop OWFN 8C2 Washington, DC 20555 JENG JAFP Files RMS (AF)
REPORT MONTH: NOVEMBER 2001, Revision 1 Docket No.:
50-333 Unit Name:
FitzPatrick Date:
March 6, 2002 Completed By: S. Anderson Telephone:
(315)349-6558 OPERATING STATUS
- 1.
Unit name: FitzPatrick
- 2.
Reporting period: 11/01/2001 - 11/30/2001
- 3.
Licensed thermal power (MWT): 2536
- 4.
Nameplate rating (gross MWE): 883.0
- 5.
Design electrical rating (net MWE): 816
- 6.
Maximum dependable capacity (gross MWE): 839
- 7.
Maximum dependable capacity (net MWE): 813
- 8.
If changes occur in capacity ratings (Items 3-7) since last report, give reasons:
- 9.
Power level to which restricted, if any (net MWE):
- 10.
Reasons for restrictions, if any:
NO.
DATA REQUESTED THIS YR-TO-DATE CUMULATIVE MONTH 11 Hours in reporting period:
720 8,016 230,952.0 12 Number of hours reactor was critical:
720 7,920.0 172,416.1 13 Reactor reserve shutdown hours:
0.00 0.00 0.00 14 Hours generator on-line:
720 7,895.7 167,277.9 15 Unit reserve shutdown hours:
0.00 0.00 0.00 16 Gross thermal energy generated (MWH):
1,811,259.6 19,654,898.1 379,846,858.2 17 Gross electrical energy generated (MWH):
618,940 6,693,330 128,434,240 18 Net electrical energy generated (MWH):
599,600 6,464,830 123,719,100 19 Unit service factor:
100 98.50 72.43 20 Unit availability factor:
100 98.50 72.43 21 Unit capacity factor (using MDC net):
102.43 99.20 74.00 22 Unit capacity factor (using DER net) 102.06 98.83 65.65 23 Unit forced outage rate:
0.00 0.00 11.35
- 24.
Shutdowns scheduled over next 6 months (type, date, and duration of each): None
- 25.
If shutdown at end of report period, estimated date of startup: N/A
- 26.
Units in test status (prior to commercial operation):
Initial Criticality:
Initial Electricity:
Commercial Operation:
FORECAST ACHIEVED
ENTERGY NUCLEAR NORTHEAST JAMES A. FITZPATRICK NUCLEAR POWER PLANT OPERATING DATA REPORT REPORT MONTH: NOVEMBER 2001, Revision 1 Docket No.:
50-333 Unit Name:
FitzPatrick Date:
March 6, 2002 Completed By: S. Anderson Telephone:
(315)349-6558 DAY NET AVERAGE DAILY POWER LEVEL 1
836 2
836 3
836 4
836 5
836 6
837 7
838 8
837 9
838 10 838 11 837 12 838 13 839 14 840 15 839 16 840 DAY NET AVERAGE DAILY POWER LEVEL 17 840 18 840 19 840 20 840 21 841 22 840 23 840 24 841 25 840 26 679 27 839 28 840 29 830 30 831
REPORT MONTH: NOVEMBER 2001, Revision 1 Docket No.:
50-333 Unit Name:
FitzPatrick Date:
March 6, 2002 Completed By: S. Anderson Telephone:
(315)349-6558 NO.
DATE TYPE DURATION REASON METHOD OF LICENSEE SYSTEM COMPONENT CAUSE and CORRECTIE HOURS SHUTTING EVENT CODE CODE ACTION TO PREVENT DOWN THE REPORT RECURRENCE REACTOR NO.
REASON:
A. Equipment failure (explain)
B. Maintenance or Test C. Refueling D. Regulatory Restriction E. Operator training and license examination F. Administrative G. Operational error (explain)
H. Other (explain)
METHOD:
- 1. Manual
- 2. Manual Scram
- 3. Automatic Scram
- 4. Continued
- 5. Reduced load
- 9. Other EXHIBIT G: Instructions for preparation of data entry sheets for Licensee Event Report (LER) file (NUREG-0161)
F: FORCED S: SCHEDULED I
m
REPORT MONTH: NOVEMBER 2001, Revision 1 OPERATIONAL
SUMMARY
The FitzPatrick plant - with the exception of minor derates for rod adjustments - operated at or near rated power during the month of November 2001 except for the following:
November 26, 2001 - 0804 November 29, 2001 - 0808 The plant commenced a load reduction to support a control rod sequence exchange, scram time testing of control rods, and condenser waterbox de fishing. Control rod scram time testing began at 0903, and condenser waterbox de-fishing began at 0915. Scram time testing was completed at 1240. Main turbine stop valve testing was started at 1222 and completed at 1259. De-fishing was completed at roughly 1427. Power ascension was then commenced at 1551. Main turbine control valve testing was started at 1658 and completed at 1730. The unit was returned to full power at 0323 on November 27. The total duration of this load reduction was 19 hours2.199074e-4 days <br />0.00528 hours <br />3.141534e-5 weeks <br />7.2295e-6 months <br /> and 19 minutes.
The plant commenced a load reduction to 98% power to support troubleshooting of the 'B' Reactor Water Recirculation (RWR) pump speed control system. Work on the troubleshooting plan began at 0811 and completed at 1826 on November 30. Power was reduced to 95% at 1840 and 'B' RWR pump response monitored. Power was then returned to 98% at 1845 and 'B' RWR pump response monitored. Power was then returned to 100% at 1900. The total duration of this load reduction was slightly greater than 11 hours1.273148e-4 days <br />0.00306 hours <br />1.818783e-5 weeks <br />4.1855e-6 months <br />.
Docket No.:
50-333 Unit Name:
FitzPatrick Date:
March 6, 2002 Completed By: S. Anderson Telephone:
(315)349-6558