Text

.Entergy Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

James A. Fitzpatrick NPP RO. Box 110 Lycoming, NY 13093 Tel 315 349 6024 Fax 315 349 6480 T.A. Sullivan Site Vice President - JAF November 7, 2003 JAFP-03-0154 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station O-P I-17 Washington, D. C. 20555

SUBJECT:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Monthlv Operating Report

Dear Sir:

Enclosed is the Operating Status Report for the James A. FitzPatrick Nuclear Power Plant for the month of October 2003. This month we changed Maximum Dependable Capacity to report net MWE instead of gross MWE.

If there are any questions concerning this report, please contact Mick Baker, Thermal Performance Engineer, (315) 349-6181.

TAS:BO:SB:SA:tmb Enclosure

-is;; *

-9,

cc:

Regional Administrator U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Resident Inspector James A. FitzPatrick Nuclear Power Plant U.S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 Mr. Guy Vissing, Project Manager Project Directorate I Division of Licensing Project Management U.S. Nuclear Regulatory Commission Mail stop OWFN 8C2 Washington, DC 20555 Mr. R. Toole ENN BWR SRC Operations Subcommittee Chairman 605 West Homer Street Ebensburg, PA 15931 Mr. Paul Eddy Public Service Commission Office of Electricity and the Environment 3 Empire Plaza Albany, NY 12223 JENG JAFP Files RMS (JAF)

ENTERGY NUCLEAR NORTHEAST JAMES A. FITZPATRICK NUCLEAR POWER PLANT OPERATING DATA REPORT REPORTING PERIOD: OCTOBER 2003 Docket No.:

Unit Name:

Date:

Completed By:

Telephone:

APENDIX A - OPERATING DATA REPORT I1.

Design electrical rating (net MWE): 816

2.

Maximum dependable capacity (net MWE): 813 50-333 FitzPatrick November 2, 2003

M. Baker (315) 349-6181 NO.

DATA REQUESTED THIS YR-TO-DATE CUMULATIVE MONTH 3

Number of hours reactor was critical:

745.0 7110.0 188440.5 4

Hours generator on-line:

745.0 6972.9 183107.2 5

Unit reserve shutdown hours:

0.0 0.0 0.0 6

Net electrical energy generated (MWH):

628339.0 5733790.0 136673585.0 APPENDIX B - UNIT SHUTDOWNS NO.

DATE TYPE DURATION REASON METHOD OF SHUTTING CAUSE

(*)

HOURS (1)

DOWN THE REACTOR CORRECTIVE ACTIONS /

___(2)

COM M ENTS N/A

(*) TYPE:

F. FORCED S. SCHEDULED (1) REASON:

A. Equipment failure (explain)

B. Maintenance or Test C. Refueling D. Regulatory Restriction E. Operator training/license examination F. Administrative G. Operational error (explain)

H. Other (explain)

(2) METHOD:

1. Manual
2. Manual Trip/Scram
3. Automatic Trip/Scram
4. Continuation
5. Other

REPORTING PERIOD: OCTOBER 2003 Dc Ur cDa Cc Te APPENDIX B - OPERATIONAL

SUMMARY

ocket No.:

50-333 nit Name:

FitzPatrick ate:

November 2, 2003 impleted By: M. Baker lephone:

(315) 349-6181 The FitzPatrick plant operated at or near rated power for the duration of the month of October 2003 with the exception of the following:

Note: This list does not include minor derates for rod pattern adjustments. (<20% reduction in average power level for the preceding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />)

There were no major derates or downpowers for the month of October