MONTHYEARML0204501932002-02-14014 February 2002 DC Cook, Unit 1 - Page 5 of Amendment 265 Project stage: Other ML0204305292002-02-14014 February 2002 Emergency Amendment, Ice Condenser Lower Inlet Doors Project stage: Other ML0205101092002-02-19019 February 2002 Safety Evaluation of Proposed Technical Specifications Changes to Donald C. Cook Nuclear Plant, Units 1, Related to Ice Condenser Inlet Door Surveillance Testing Project stage: Approval 2002-02-14
[Table View] |
Similar Documents at Cook |
---|
Category:Memoranda
MONTHYEARML23044A3662023-02-15015 February 2023 Calendar Year 2022 Reactor Oversight Process Baseline Inspection Program Completion - Region III ML21062A2552021-04-0707 April 2021 Federal Register Notice for Environmental Assessments and Findings of No Significant Impact of Independent Spent Fuel Storage Facilities Decommissioning Funding Plans Related to Donald C. Cook Nuclear Plant; Memo to File ML20280A1812020-10-16016 October 2020 Insights Obtained from Review of D.C. Cook Seismic Probabilistic Risk Assessment ML20209A6032020-07-27027 July 2020 Summary of the July 21, 2020, Public Webinar to Discuss the NRC 2019 End-of-Cycle Plant Performance Assessment of the Donald C. Cook Nuclear Plant, Units 1 and 2 IR 05000315/20140052019-02-0505 February 2019 NRR Position on NCV 05000315/2014005-03; 05000316/2014005-03; Radiological Impact of the Removal of the Auxiliary Shield Blocks on the Containment Accident Shield Post Large-Break Loss-of-Coolant Accident ML17080A1192017-06-23023 June 2017 NRR Position on NCV 05000315/2014005-03; 05000316/2014005-003 Radiological Impact of the Removal of the Auxiliary Shield Blocks on the Containment Accident Shield Post LBLOCA ML15237A3362015-09-0202 September 2015 Summary of August 24, 2015, Telephone Call to Provide Verbal Authorization of Relief Request ISIR-4-06, Alternate Repair of Socket Weld ML15150A0352015-07-0808 July 2015 Memorandum Documenting Withdrawal and Planned Denial of Emergency License Amendment Request to Extend the Allowed Outage Time for an Emergency Diesel Generator ML15127A5692015-05-0707 May 2015 Final Task Interface Agreement-Regulatory Position on Design Life of Safety-Related Structures, Systems, & Components Related to Unresolved Items at D. C. Cook, Monticello, & Palisades (TIA 2014-01) ML14023A3872014-01-30030 January 2014 Summary of Joint Steering Committee Meeting to Discuss Activities Related to Lessons-Learned from the Fukushima Dai-Ichi Nuclear Power Plant Event ML13161A3802013-06-12012 June 2013 Meeting Notice with Indiana Michigan Power Company (I&M) Concerning Donald C. Cook Nuclear Plant, Unit 1 ML13085A1842013-04-22022 April 2013 Review and Conclusion of Indiana Michigan Power Company'S Resolution of Facts and Observations in Support of DC Cook'S Transition to NFPA 805 ML13011A3822012-12-0707 December 2012 Task Interface Agreement - Licensing Basis for Steam Generator Tube Rupture Event Coincident with Loss of Offsite Power (TIA 2012-11) ML12215A1562012-08-0303 August 2012 Memo Indian Michigan Power Company- Donald C. Cook Nuclear Plant, Unit 1 and 2 Revised Safety Evaluation Input - Cyber Security Program ML12144A3552012-05-24024 May 2012 DC Cook Physical Security Plan Review Memo for the Independent Spent Fuel Storage Installations Security and Verification of ASM Incorporation ML1211504272012-04-20020 April 2012 Memo to S. Wastler Technical Assistance Request - Review of Physical Security Plan of Donald C. Cook Nuclear Plant (TAC L24638) ML11115A0012011-04-26026 April 2011 Notice of Forthcoming Meeting with Indiana Michigan Power Company to Discuss Pre-Application Issues Related to the Future Amendment to Transition to NFPA 805, Performance-Based Fire Protection ML1016202942010-06-11011 June 2010 Project Manager Assignment ML0815606912008-07-11011 July 2008 Transmittal of Final Accident Sequence Precursor (ASP) Analyses of Operational Events That Occurred at D.C. Cook, Unit 2 on November 8, 2005 and at Brunswick, Unit 2 on November 1, 2006 ML0812802272008-05-0202 May 2008 Memorandum from Hubert T. Bell to Chairman Dale E. Klein, NRC Staff Review of License Renewal Applications ML0809200582008-04-18018 April 2008 Summary of Phone Call with Licensees Concerning Sump Strainer Head Loss Testing ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment ML0732410262007-11-21021 November 2007 Notice of Meeting with D. C. Cook to Discuss Issues Concerning Ice Fusion in Ice Condenser Baskets ML0710603252007-04-17017 April 2007 Notice of Meeting with D. C. Cook Regarding Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors ML0623705122006-09-19019 September 2006 Memo: Summary of NFPA 805 Workshop at DC Cook ML0615202802006-06-0101 June 2006 DC Cook, RAI, Shifting the Reactor Trip on Turbine Trip Interlock from P-7 to P-8 ML0611504292006-04-25025 April 2006 Forthcoming Meeting with D. C. Cook Nuclear Plant, Units 1 and 2, Regarding Implementation of Degraded Voltage Protection Backfit ML0608301672006-03-23023 March 2006 D.C. Cook DRS Input to Integrated Report 05-315/2006-003; 50-316/2006-003 ML0625401692005-09-30030 September 2005 Memo T. Boyce, NRR, to C. Carpenter, NRR, Fiscal Year 2005 Audit/Self Assessment & Evaluation of Quality of Plant Conversions ML0526305372005-09-22022 September 2005 Unit 2 - Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-water Reactors. ML0513200192005-05-17017 May 2005 Information Provided in E-Mail Dated April 20, 2005, for Donald C. Cook Nuclear Plant for the ITS Conversion Amendments ML0513201652005-05-12012 May 2005 5-12-05 - Results of the Severe Accident Mitigation Alternative (SAMA) Review for Donald C. Cook Nuclear Plant, Units 1 and 2 ML0510901352005-04-15015 April 2005 E-mail Form T. Steingass to C. Lyon Donald C. Cook Unit 1, Request for Additional Information ML0434803502005-02-28028 February 2005 Response to Task Interface Agreement (TIA 2004-02), Request for Protection ML0504901422005-02-17017 February 2005 Summary of January 13, 2005, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Nuclear Energy Institute (NEI) on Updating the License Renewal Guidance Documents ML0433403052004-11-30030 November 2004 Notice of Meeting with Indiana Michigan Power Company to Discuss the Degraded Voltage Protection Design at the Donald C. Cook Nuclear Plant ML0432105772004-11-15015 November 2004 Audit and Review Report for Plant Aging Management Reviews and Programs at the Donald C. Cook Nuclear Power Plant, Units 1 and 2 ML0427904842004-09-23023 September 2004 Summary of Telephone Conference Held on September 7, 2004, Between the Us NRC and Indiana Michigan Power Company, Concerning Unresolved Items Pertaining to the Donald C. Cook Nuclear Plant, Units 1 & 2, LRA ML0427902732004-09-22022 September 2004 Summary of Telephone Conference Held Between the U.S. Nuclear Regulatory Commission and Indiana Michigan Power Company, Concerning Follow-Up Items to Request for Additional Information Pertaining to DC Cook, Units 1 & 2, LRA ML0424406712004-08-31031 August 2004 Summary of Telephone Conference Held on August 10, 2004 Between the U.S. Nuclear Regulatory Commission (NRC) and Indiana Michigan Power Company (I&M) Representatives Concerning Requests for Additional Information on Donald C. Cook Nuclear P ML0417400862004-06-21021 June 2004 All Region III Facility Training Managers Revised NRC Form 398 - Personal Qualification Statement Licensee ML0415902732004-06-0707 June 2004 TIA 04-02 Request for Technical Assistance Re Degraded Voltage Protection at D. C. Cook ML0510300282004-02-0909 February 2004 Receipt of Proposed Differing Professional View ML0335800462003-12-23023 December 2003 Transmittal of Final ASP Analysis of August 2001 Operational Condition at D.C. Cook 1 & 2 ML0324005922003-05-24024 May 2003 May 10-11, 2000, Summary of NRC Senior Management Meeting to Review Performance of Operating Nuclear Power Plants and Materials Facilities Licensed by Nrc. Partially Withheld ML0312105392003-05-0101 May 2003 Meeting with TVA and American Electric Power Staff'S Draft Evaluation for Ice Condenser Topical Report McGuire, Catawba, Sequoyah, Watts Bar, and D.C.Cook ML0510300512003-01-13013 January 2003 Response to Task Interface Agreement (TIA 2001 -15) Regarding Evaluation of Containment Structure Conformance to Design-basis Requirements ML0232903772003-01-13013 January 2003 Task Interface Agreement (TIA 2001-15) Evaluation of Containment Structure Conformance to Design-Basis Requirement IR 05000315/20020092003-01-10010 January 2003 Memo 1/10/03, D.C. Cook, DRS Input to DRP IR 05000315-02-009 and 05000316-02-009 ML0300802552003-01-0808 January 2003 Report on Status of Open TIAs Assigned to NRR 2023-02-15
[Table view] Category:Safety Evaluation
MONTHYEARML24225A0022024-09-0303 September 2024 Issuance of Amendment Nos. 363 and 344 Revising Technical Specifications Section 3.8.1, AC Sources-Operating, for a One-Time Extension of a Completion Time ML24169A2142024-07-25025 July 2024 Issuance of Amendment No. 362 Regarding Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System ML24107B1202024-04-18018 April 2024 Authorization and Safety Evaluation for Alternative Request No. ISIR-5-07 ML22363A5622023-01-0404 January 2023 Relief Request ISIR-5-06 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles ML22214A0012022-10-0707 October 2022 Issuance of Amendment Nos. 361 and 343 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements ML22166A3302022-07-26026 July 2022 Review of Quality Assurance Program Changes ML22046A2332022-06-21021 June 2022 Issuance of Amendment Nos. 360 and 342 Regarding Change to the Technical Specification Requirement for Containment Water Level Instrumentation ML22055A0012022-06-0808 June 2022 Issuance of Amendment No. 341 Updating the Reactor Coolant System Pressure Temperature Limits ML22102A0122022-05-0202 May 2022 Issuance of Amendment Nos. 359 and 340 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21295A0092021-11-0303 November 2021 Relief Request ISIR-4-11 Limited Coverage Examinations During the Fourth 10 Year Inservice Inspection Interval ML21141A2612021-06-0202 June 2021 Alternative Request REL-PP2 Related to Fifth 10-Year Inservice Testing Program Interval ML21130A0082021-05-12012 May 2021 Relief Request ISIR-5-05 Related to ASME Code Case N 729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles (EPID L-2021-LLR-0033 (COVID-19)) ML21062A1882021-03-23023 March 2021 Issuance of Amendment No. 339 One Cycle Extension of Appendix J, Type a, Integrated Leakage Rate Test Interval (EPID L-2020-LLA-0280 (COVID-19)) ML21041A0862021-03-0303 March 2021 Issuance of Amendment No. 338 Regarding One-Time Deferral of the Steam Generator Tube Inspections ML21034A1552021-02-12012 February 2021 Relief Request ISIR-5-04 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles ML21006A4582021-02-0202 February 2021 Issuance of Amendments Nos. 358 and 337 Regarding Revision to Technical Specifications to Adopt Technical Specifications Task Force Traveler 541, Revision 2 ML20366A1552021-01-15015 January 2021 Issuance of Amendments Nos. 357 and 336 Regarding Revision to Technical Specifications Bases Control Program ML20366A1342021-01-13013 January 2021 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML20329A0012021-01-12012 January 2021 Issuance of Amendment No. 356 Regarding Updating the Reactor Coolant System Pressure-Temperature Limits ML20322A4282021-01-0606 January 2021 Issuance of Amendment Nos. 355 and 335, Revision to Technical Specifications to Adopt Technical Specification Task Force Traveler 567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML20315A4832020-12-30030 December 2020 Issuance of Amendment Nos. 354 and 334 Adopt Technical Specification Task Force Traveler TSTF-412, Revision 3, Provide Actions for One Steam Supply to the Turbine Driven Afw/Efw Pump Inoperable ML20247J6562020-09-10010 September 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20213C7042020-09-0303 September 2020 Issuance of Amendment No. 353 One Cycle Extension of Appendix J, Type a, Integrated Leakage Rate Test Interval ML19347B3762020-01-31031 January 2020 Issuance of Amendment Nos. 350 and 331, Revise Technical Specification 5.5.5, Reactor Coolant Pump Flywheel Inspection Program, in Accordance with Technical Specification Task Force TSTF-421 ML19329A0112020-01-23023 January 2020 Issuance of Amendment Numbers 349 and 330 to Apply Leak Before-Break Methodology to Reactor Coolant System Branch Lines and Deletion of Containment Humidity Monitor ML19304B6722019-12-31031 December 2019 Issuance of Amendment Numbers 348 and 329 to Revise Operating Licenses DPR-58 and DPR-74, to Address Issues Identified in Westinghouse Document NSAL-15-1 ML19259A0542019-10-15015 October 2019 Issuance of Amendment to Revise Operating Licenses DPR-58 and DPR-74, Appendix B, Environmental Technical Specifications, Part II, Non-Radiological Environment Protection Plan ML19196A0642019-08-23023 August 2019 Relied Request ISIR-4-10 Regarding Fourth Inservice Inspection Program Interval ML19170A3622019-08-0101 August 2019 Issuance of Amendment Approval of Application of Proprietary Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping ML19134A3552019-07-11011 July 2019 Issuance of Amendments Technical Specification Task Force (TSTF) Traveler 563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML19031B9662019-04-10010 April 2019 Issuance of Amendments 344, 326 Regarding Request to Adopt TSTF-529, Revision 4, Clarify Use and Application Rules ML18346A3582019-02-0505 February 2019 Issuance of Amendments 343 and 325 Regarding the Battery Monitoring and Maintenance Program ML18348A4182019-01-0909 January 2019 Units and 2 Approval of Request for Alternative from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N 729-4 ML18337A3942018-12-11011 December 2018 Proposed Alternative Request for Elimination of the Reactor Pressure Vessel Threads in Flange Examination ML18284A2542018-11-16016 November 2018 Issuance of Amendments Request for Deviation from National Fire Protection Association 805 Requirements ML18249A0192018-11-13013 November 2018 Issuance of Amendment Nos. 341 and 323 Technical Support Center Relocation ML18284A3102018-10-26026 October 2018 Approval of Alternative to the ASME Code Regarding Reactor Vessel Weld Examination - Relief Request ISIR-4-08 ML18131A2532018-07-0606 July 2018 Issuance of Amendments Request for Deviation from National Fire Protection Association 805 Requirements ML18103A0592018-04-19019 April 2018 Request for Use of Alternative Isir 04-05, Revision 1, Associated with Reactor Vessel Closure Head Volumetric/Surface Examination Frequency Requirements for the Inservice Inspection Program ML17312B0302017-12-19019 December 2017 Issuance of Amendments License Amendment Request to Revise Technical Specifications Section 3.7.2, Steam Generator Stop Valves (CAC Nos. MF9539 and MF9540; EPID L-2017-LLA-0198) ML17214A5502017-09-21021 September 2017 Issuance of Amendments License Amendment Request Regarding Technical Specification 3.9.3, Containment Penetrations ML17131A2772017-06-0707 June 2017 Issuance of Amendments License Amendment Request Regarding Containment Leakage Rate Testing Program ML17103A1062017-05-24024 May 2017 Issuance of Amendments Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML17096A6272017-04-12012 April 2017 Proposed Alternative to Use ASME OM Code Case OMN-20 ML17045A1502017-03-31031 March 2017 Issuance of Amendments Adopting of TSTF0425-A, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B ML16327A1102016-12-28028 December 2016 Cover Letter for Revised Safety Evaluation for Amendment Nos. 332 and 314 Adoption of TSTF-490, Rev. 0, and Implementation of Full-Scope Alternative Source Term ML16242A1112016-10-20020 October 2016 DC Cook, Units 1 and 2 - Issuance of Amendments Adoption of TSTF-490,REV.0,Deletion of E-Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specification and Implementation of Full-Scope Alternative Source Ter ML16216A1812016-08-19019 August 2016 Issuance of Amendment to Revise Technical Specification 3.3.2, Engineered Safety Feature Actuation System Instrumentation ML16195A0042016-08-0404 August 2016 Issuance of Amendments to Revise Technical Specifications to Adopt Technical Specifications Task Force - 523, Generic Letter 2008 01, Managing Gas Accumulation ML16032A0312016-02-0404 February 2016 Request for Use of Alternative REL-PP1 Associated with Pump Inservice Testing (CAC Nos. MF6548 and MF6549) 2024-09-03
[Table view] |
Text
February 19, 2002 MEMORANDUM TO: William D. Reckley, Chief Section 1 Project Directorate III Division of Licensing Project Management FROM: Robert C. Hagar, Acting Chief/RA/
Design Basis Review Section Plant Systems Branch Division of Systems Safety and Analysis
SUBJECT:
SAFETY EVALUATION OF PROPOSED TECHNICAL SPECIFICATIONS CHANGES TO DONALD C. COOK NUCLEAR PLANT, UNITS 1, RELATED TO ICE CONDENSER INLET DOOR SURVEILLANCE TESTING (TAC NO: MB3989)
By letter dated February 8, 2002, and supplemented by letter dated February 10, 2002, Indiana Michigan Power Company, the licensee for Donald C. Cook Nuclear Plant, Unit 1, requested changes to the Technical Specifications (TS) allowing a one-time limited duration exemption from the surveillance requirement to verify that the opening, closing, and frictional torque of the ice condenser inlet door are within the specified limits as required by Technical Specifications (TS). The exemption will be in effect until the next entry into Mode 5 of sufficient duration.
The Plant Systems Branch has reviewed the licensees proposed TS changes and finds them to be acceptable. Our evaluation is attached.
Docket No. 50-315
Attachment:
As stated
Contact:
Chang-Yang Li, SPLB/DSSA/NRR 415-2830
February 19, 2002 MEMORANDUM TO: William D. Reckley, Chief Section 1 Project Directorate III Division of Licensing Project Management FROM: Robert C. Hagar, Acting Chief/RA/
Design Basis Review Section Plant Systems Branch Division of Systems Safety and Analysis
SUBJECT:
SAFETY EVALUATION OF PROPOSED TECHNICAL SPECIFICATIONS CHANGES TO DONALD C. COOK NUCLEAR PLANT, UNITS 1, RELATED TO ICE CONDENSER INLET DOOR SURVEILLANCE TESTING (TAC NO: MB3989)
By letter dated February 8, 2002, and supplemented by letter dated February 10, 2002, Indiana Michigan Power Company, the licensee for Donald C. Cook Nuclear Plant, Unit 1, requested changes to the Technical Specifications (TS) allowing a one-time limited duration exemption from the surveillance requirement to verify that the opening, closing, and frictional torque of the ice condenser inlet door are within the specified limits as required by Technical Specifications (TS). The exemption will be in effect until the next entry into Mode 5 of sufficient duration.
The Plant Systems Branch has reviewed the licensees proposed TS changes and finds them to be acceptable. Our evaluation is attached.
Docket No. 50-315
Attachment:
As stated
Contact:
Chang-Yang Li, SPLB/DSSA/NRR 415-2830 DISTRIBUTION: ADAMS SPLB r/f JStang RHagar CLi DOCUMENT NAME: G:\SPLB\SECTION B - HAGAR\LI\DC COOK SE.WPD OFFICE SPLB:DSSA:NRR SC:SPLB:DSSA NAME CLi:bw RHagar DATE 02/14/02 02/19/02 / /02 / /02 / /02
Attachment SAFETY EVALUATION REPORT BY PLANT SYSTEMS BRANCH FOR D. C. COOK NUCLEAR PLANT, UNIT 1 RELATED TO ICE CONDENSER INLET DOOR SURVEILLANCE TESTING 1.0 Background By letter dated February 8, 2002, and supplemented by letter dated February 10, 2002, Indiana Michigan Power Company, the licensee for Donald C. Cook Nuclear Plant (CNP), Unit 1, requested changes to the TS allowing a one-time limited duration exemption from the surveillance requirement to verify that the opening, closing, and frictional torque of the ice condenser inlet door are within the specified limits as required by TS. The exemption will be in effect until the next entry into Mode 5 of sufficient duration. The licensee concluded that based on its analysis shown in Reference 1 for the average closing torque or average friction torque, the lower inlet doors would have demonstrated compliance with the Technical Specification criteria. However, for the worst case combination of maximum closing torque and maximum friction torque, the data shows that as many as five doors may not meet the TS acceptance limit for opening torque.
2.0 Staff Evaluation After the initial review of Reference 1, the staff requested additional information regarding the impact of the containment performance resulting from postulated failures of the ice condenser inlet doors. In response, the licensee performed several bounding evaluation and supplemented the initial submittal in Reference 2. In the supplemental information, the licensee discussed the effects of different postulated failures of the lower inlet doors during a SBLOCA and a LBLOCA and the effects of mal-distribution from lower inlet door failures. The impact of the containment performance of a main steam line break is bounded by that of a LOCA.
2.1 SBLOCA The significant design-basis issue for a SBLOCA is to assure that there is sufficient recirculation sump water level to preclude vortex of the emergency core cooling system pumps during the recirculation phase. Based on the discussion of CNPs current analysis-of-record for containment recirculation sump water inventory as described in References 3 and 4, the water volume needed for minimum recirculation sump water level is approximately 20% of the TS 3.6.5.1 value specified for minimum ice mass. This 20% is the amount of ice that must be melted to assure the minimum required sump water level following any LOCA. For the following two cases, the licensee postulated a worst case considering for potential impact on the minimum recirculation sump water level during the limiting SBLOCA.
First, for a single lower inlet door failing to open, the worst case for sump inventory would be no steam flow to the ice column immediately behind the affected door. This situation would reduces the available ice mass by 1/48 or about 2.1%. Comparing to the value of 20% of the TS 3.6.5.1 value for minimum ice mass that must be melted to assure the minimum required sump
2 water level, 80% of the TS required ice mass do not have to be melted. It takes approximately as many as 38 out of 48 doors being failed to reach an unacceptable sump water inventory.
The worst case of five doors being failed does not result in an unacceptable sump inventory.
Secondly, for one or more lower inlet doors being opened prematurely, the worst case for sump inventory would be all steam to flow to the ice column immediately behind the affected doors or to the upper compartment via the bypass flow area. The size of the SBLOCA would be sufficiently small that the lower inlet door pressure differential is adequate to open the other doors. The containment pressure would increase gradually to the safety injection (SI) signal, which would initiate the containment equalization (CEQ) fan. The CEQ fans provide sufficient head to open the remaining lower inlet doors and preclude containment spray (CTS) actuation.
Without CTS taking water from the sump, there would be sufficient water inventory in the sump.
2.2 LBLOCA During CNP licensing application in answering ACRS questions, the licensee analyzed that failure of two doors to open would have about 1% change in operating deck differential pressure and essentially no change on the containment pressure. The significant design-basis issue for a LBLOCA is to assure that containment pressure can be maintained. The design of the lower inlet door assembly is such that the door assembly would fail at a pressure below the design pressure of the loop subcompartment boundaries, essentially acting like a rupture disk.
The staff believes that in a LBLOCA the blowdown force is so strong that the small deviation of the door testing torque experienced in Unit 1 will not affect the peak containment pressure because the lower inlet doors will be opened rapidly and fully even with this deviation of the door testing tongue or with the rupture of the door.
The failure of one or more lower inlet doors to open would result in reduction of the vent area for the lower containment loop subcompartments. The reduction of the vent area would tend to increase the peak loop subcompartment pressures and potentially cause mal-distribution into the ice bed. To evaluate the maximum increase in the peak differential pressure of loop subcompartments, the licensee analyzed a worst case in Reference 2 that no inlet doors were providing venting relief. The doors were assumed not to provide venting even though the design configuration of the door is to fail open at differential pressures less than the peak within the loop subcompartment. The resultant differential pressure increase between the break subcompartment and adjacent loop subcompartment would be approximately 10%. The structure elements in the subcompartment have at least a 25% excess capacity and would continue to perform their function. Therefore, the structure integrity in the loop subcompartment can be maintained.
2.3 MAL-DISTRIBUTION The licensee evaluated the effects of mal-distribution from lower inlet door failures. Under the current licensing basis, Section 5.3.3.5.3 of the UFSAR stated that the inlet door are designed to distribute steam to ice condenser to limit mal-distribution to less than 150% maximum, peak to average mass flow into the ice condenser, resulting from postulated LOCA that causes the door to open. In Reference 5, there is an analysis regarding the mal-distribution effects of inlet doors. In this analysis, the maximum variation in flow area due to door parameter tolerances was used. The resulting mal-distribution characteristic is a function of break sizes. For the
3 most critical break size of 6-inches the calculated mal-distribution is less than 150% with some margin. The margin becomes larger for smaller breaks or large breaks. In Reference 6, the effects of single door failures were analyzed. Assuming door fail to open or open with improper proportioning characteristics, it could result in a 5 percent increase in the peak mal-distribution, or could cause a maximum mal-distribution of about 146%.
TS 4.6.5.3.1.b.1 ensures that the doors will initially open in response to a SBLOCA, but as a result of the indeterminate surveillance for TS 4.6.5.3.1.b.3, 4, and 5, the opening, closing, and hinge frictional torque might vary from one door to another. If we postulate that multiple doors behave erratically as a result of the indeterminate surveillance, the 150% design limit as defined in the UFSAR may or may not be met. That is, depending on the extent of malfunction of doors, one or more doors may pass more than 150% of 1/48th of the total flow. However, the licensee indicated that the important factor is the distribution of flow through the ice bed rather than the flow through the doors. Assuming conservatively that the ice bed behind each door is physically segregated from the ice bed behind the other doors, i.e., no crossflow considered, there are 48 parallel flow paths. Each flow path has several flow resistors in series: the lower inlet door, the turning vanes, the ice bed, and the intermediate and upper deck doors (or built-in bypass area). While this particular concept has not been explicitly analyzed, the pressure drop across the lower inlet door is relatively small compared to the design pressure drop through the ice condenser, so the effect of varying door resistance is tempered by its relatively small contribution to the overall pressure drop. That is, the effect on mal-distribution through the ice bed would not be significantly affected by a variation in door resistance. In reality, the flow paths are not segregated and cross flows due to both the pressure profile and the natural affinity of steam for ice will further smooth flow distribution through the ice bed. Even if the maximum mal-distribution could be slightly higher than 150%, it would not be sufficient to change the containment recirculation sump water inventory for SBLOCA or the peak containment pressure for LBLOCA.
3.0 Conclusion Based on the above, the staff finds that the insufficient door testing will not affect the peak containment pressure. The small effect of subcompartment pressure differential is within the structure design margin. There will be sufficient containment recirculation sump water inventory for SBLOCA. The design basis maximum mal-distribution of 150% could be exceeded slightly, but would be insignificant to impact the containment recirculation sump water inventory for SBLOCA or the peak containment pressure for LBLOCA. Therefore, the staff concludes that the compliance of all the containment design criteria in 10 CFR 50, Appendix A, GDC 16 and GDC 35 are not affected.
4.0 References
- 1. Letter from A.C. Bakken, III, Indiana Michigan Power Company (I&M) to U. S. Nuclear Regulatory Commission, February 8, 2002.
- 2. Letter from A.C. Bakken, III, Indiana Michigan Power Company (I&M) to U. S. Nuclear Regulatory Commission, February 10, 2002.
4
- 3. Fauske and Associates, Inc. (FAI) report, FAI/01-67, Evaluation of Proposed Change to Containment Spray Heat Exchanger Configuration in D. C. Cook, dated September, 2001.
- 4. FAI report, FAI/99-77, Rev. 2, Containment Sump Level Evaluation for the D. C. Cook Plant, dated September 1999.
- 5. WCAP-15302, Donald C. Cook Nuclear Plant Units 1 and 2 modifications to the Containment Systems Westinghouse Safety Evaluation, September, 1999.
- 6. WCAP-7689, Design and Performance Evaluation of Ice Condenser Inlet Doors, March, 1971.