Letter Sequence Other |
---|
EPID:L-2019-LLR-0054, Proposed Alternative Request for Reactor Vessel Inspections to Meet Code Requirements for Two ISI Intervals (Open) |
|
|
Similar Documents at Cook |
---|
Category:Code Relief or Alternative
MONTHYEARML22363A5622023-01-0404 January 2023 Relief Request ISIR-5-06 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles ML21295A0092021-11-0303 November 2021 Relief Request ISIR-4-11 Limited Coverage Examinations During the Fourth 10 Year Inservice Inspection Interval ML21141A2612021-06-0202 June 2021 Alternative Request REL-PP2 Related to Fifth 10-Year Inservice Testing Program Interval ML21130A0082021-05-12012 May 2021 Relief Request ISIR-5-05 Related to ASME Code Case N 729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles (EPID L-2021-LLR-0033 (COVID-19)) ML21034A1552021-02-12012 February 2021 Relief Request ISIR-5-04 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles ML20290A4252020-10-15015 October 2020 Verbal Authorization of Relief Request ISIR-5-04 Regarding Alternative to N-729-6 for RPV Head Visual Examination AEP-NRC-2020-65, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-042020-10-0505 October 2020 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-04 ML20247J6562020-09-10010 September 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML19196A0642019-08-23023 August 2019 Relied Request ISIR-4-10 Regarding Fourth Inservice Inspection Program Interval ML18284A3102018-10-26026 October 2018 Approval of Alternative to the ASME Code Regarding Reactor Vessel Weld Examination - Relief Request ISIR-4-08 AEP-NRC-2018-33, Proposed Alternative Request for Elimination of the Reactor Pressure Vessel Threads in Flange Examination2018-06-14014 June 2018 Proposed Alternative Request for Elimination of the Reactor Pressure Vessel Threads in Flange Examination AEP-NRC-2018-20, Request for Alternative from Volumetric/Surface Examination Frequency Requirement of ASME Code Case N-729-4, Request Number Isir 04-5, Revision 12018-03-14014 March 2018 Request for Alternative from Volumetric/Surface Examination Frequency Requirement of ASME Code Case N-729-4, Request Number Isir 04-5, Revision 1 ML17096A6272017-04-12012 April 2017 Proposed Alternative to Use ASME OM Code Case OMN-20 ML16054A5722016-03-0404 March 2016 Relief Request REL-002 Associated with Valve Seat Leakage Testing ML15299A0482015-10-29029 October 2015 Alternative Isir 4-06 to the Requirements of the ASME Code AEP-NRC-2015-31, Submittal of 10 Cer 50.55a Requests Associated with the Fifth Ten-Year Inservice Testing Interval2015-07-31031 July 2015 Submittal of 10 Cer 50.55a Requests Associated with the Fifth Ten-Year Inservice Testing Interval ML15156A9062015-06-11011 June 2015 Request for Use of Alternative Isir 04-02 Associated with Reactor Vessel Closure Head Volumetric/Surface Examination Frequency Requirements for the Inservice Inspection Program AEP-NRC-2011-23, Relief Requests for Limited Coverage Examinations Performed in the Third 10-Year Inspection Interval2011-04-0808 April 2011 Relief Requests for Limited Coverage Examinations Performed in the Third 10-Year Inspection Interval AEP-NRC-2009-52, Third and Fourth Ten-Year Interval Inservice Inspection Program Relief Request ISIR-312009-08-21021 August 2009 Third and Fourth Ten-Year Interval Inservice Inspection Program Relief Request ISIR-31 AEP-NRC-2009-26, Request to Extend the Inservice Inspection Interval for Reactor Vessel Weld Examination - Relief Request ISIR-302009-02-27027 February 2009 Request to Extend the Inservice Inspection Interval for Reactor Vessel Weld Examination - Relief Request ISIR-30 ML0903300652009-02-18018 February 2009 Relief Requests ISIR-23, ISIR-24 and ISIR-25 on End-of-Interval System Pressure Testing of Class 1 Components ML0830102372008-10-0707 October 2008 Relief Requests for Reactor Vessel Shell-to-Flange, and Nozzle to Safe-end Weld Examination AEP-NRC-2008-25, Use of Weld Inlays as an Alternative Repair Technique for Reactor Vessel Safe End-to-Primary Nozzle Alloy 82/182 Welds2008-10-0707 October 2008 Use of Weld Inlays as an Alternative Repair Technique for Reactor Vessel Safe End-to-Primary Nozzle Alloy 82/182 Welds ML0634200332006-12-29029 December 2006 Correction of Safety Evaluation Associated with Authorization of an Alternative ML0617301752006-06-28028 June 2006 D.C. Cook, Relief, Relief Requests for the Fourth 10-Year Pump and Valve Inservice Testing Program Interval ML0616403122006-06-0202 June 2006 Fourth 10-Year Interval Pump and Valve Inservice Testing Program - Request for Additional Information ML0607606732006-04-0303 April 2006 Relief Request REL-PP6 Regarding the West Essential Service Water Pump Test Frequency ML0603206912006-02-16016 February 2006 Alternatives Regarding Requirements for Examination of Dissimilar Metal Piping Welds ML0526503262005-09-13013 September 2005 Proposed Alternative to the American Society of Mechanical Engineers Code, Section XI Repair Requirements ML0517200062005-06-27027 June 2005 6/27/05, D.C. Cook, Unit 1, Alternative to Repair Requirements of Section XI of the American Society of Mechanical Engineers Code ML0307708822003-04-0202 April 2003 DC Cook, Units 1 & 2, Relief, Use of Alternatives to Pressure Retaining Bolting Inspection Requirements of American Society of Mechanical Engineers Boiler and Pressure Vessel Code Relief Isir 11 Thru 13, MB6352, MB6353, MB6354, MB6355, MB63 2023-01-04
[Table view] Category:Letter
MONTHYEARIR 05000315/20240032024-10-31031 October 2024 Integrated Inspection Report 05000315/2024003 05000316/2024003 07200072/2024001 and Exercise of Enforcement Discretion AEP-NRC-2024-77, U2C28 Steam Generator Tube Inspection Report2024-10-21021 October 2024 U2C28 Steam Generator Tube Inspection Report AEP-NRC-2024-80, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2024-10-15015 October 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-79, Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask2024-09-26026 September 2024 Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask AEP-NRC-2024-78, Reply to a Notice of Violation: EA-24-0472024-09-23023 September 2024 Reply to a Notice of Violation: EA-24-047 05000316/LER-2024-002-01, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-09-12012 September 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak IR 05000315/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000315/2024402 and 05000316/2024402, Independent Spent Fuel Storage Installation Security Inspection Report 07200072/2024401 AEP-NRC-2024-69, Core Operating Limits Report2024-09-0909 September 2024 Core Operating Limits Report IR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24225A0022024-09-0303 September 2024 Issuance of Amendment Nos. 363 and 344 Revising Technical Specifications Section 3.8.1, AC Sources-Operating, for a One-Time Extension of a Completion Time IR 05000315/20240112024-08-30030 August 2024 NRC Inspection Report 05000315/2024011 and 05000316/2024011 and Notice of Violation AEP-NRC-2024-76, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-08-28028 August 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-51, Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes2024-08-28028 August 2024 Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes 05000316/LER-2024-003, Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage2024-08-22022 August 2024 Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage IR 05000315/20240052024-08-21021 August 2024 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2024005 and 05000316/2024005) AEP-NRC-2024-61, Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request2024-08-15015 August 2024 Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request ML24221A2702024-08-0808 August 2024 Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-62, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-08-0707 August 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask ML24256A1482024-08-0202 August 2024 2024 Post Examination Submittal Letter AEP-NRC-2024-47, Form OAR-1, Owners Activity Report2024-07-30030 July 2024 Form OAR-1, Owners Activity Report ML24183A0162024-07-25025 July 2024 Review of Reactor Vessel Material Surveillance Program Capsule W Technical Report ML24169A2142024-07-25025 July 2024 Issuance of Amendment No. 362 Regarding Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System IR 05000315/20240022024-07-24024 July 2024 Integrated Inspection Report 05000315/2024002 and 05000316/2024002 05000316/LER-2024-002, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-07-15015 July 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak ML24197A1262024-07-15015 July 2024 Unit 2 - Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 AEP-NRC-2024-56, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-07-0808 July 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-48, Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-07-0202 July 2024 Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24176A1012024-06-21021 June 2024 57143-EN 57143 - Paragon Energy Solutions - Update 1 (Final) - 10CFR Part 21 Final Notification: P21-05242024-FN, Rev. 0 AEP-NRC-2024-45, Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring2024-06-13013 June 2024 Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring ML24163A0132024-06-12012 June 2024 Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000315/2024012 and 05000316/2024012 ML24159A2522024-05-30030 May 2024 10 CFR 50.71(e) Update and Related Site Change Reports AEP-NRC-2024-23, Core Operating Limits Report2024-05-23023 May 2024 Core Operating Limits Report ML24141A2162024-05-20020 May 2024 —Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection 05000316/LER-2024-001, Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip2024-05-20020 May 2024 Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip AEP-NRC-2024-40, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-05-16016 May 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-41, Annual Radiological Environmental Operating Report2024-05-15015 May 2024 Annual Radiological Environmental Operating Report AEP-NRC-2024-26, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 492024-05-14014 May 2024 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 49 IR 05000315/20244012024-05-14014 May 2024 – Security Baseline Inspection Report 05000315/2024401 and 05000316/2024401 AEP-NRC-2024-07, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2024-05-14014 May 2024 Unit 2 - Transmittal of Report of Changes to the Emergency Plan IR 05000315/20240012024-05-14014 May 2024 Integrated Inspection Report 05000315/2024001 and 05000316/2024001 ML24115A2152024-05-0707 May 2024 LTR: CNP Non-Acceptance with Opportunity TS 3-8-1 AEP-NRC-2024-24, Form OAR-1, Owners Activity Report2024-05-0707 May 2024 Form OAR-1, Owners Activity Report ML24256A1472024-05-0606 May 2024 DC Cook 2024 NRC Examination Submittal Letter: Submittal ML24116A0002024-05-0202 May 2024 – Regulatory Audit in Support of Review of the Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors AEP-NRC-2024-35, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-30030 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2024-28, 2023 Annual Radioactive Effluent Release Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report AEP-NRC-2024-31, Annual Report of Individual Monitoring2024-04-24024 April 2024 Annual Report of Individual Monitoring AEP-NRC-2024-29, (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-072024-04-0303 April 2024 (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-07 AEP-NRC-2024-02, Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-04-0303 April 2024 Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating 2024-09-09
[Table view] Category:Safety Evaluation
MONTHYEARML24225A0022024-09-0303 September 2024 Issuance of Amendment Nos. 363 and 344 Revising Technical Specifications Section 3.8.1, AC Sources-Operating, for a One-Time Extension of a Completion Time ML24169A2142024-07-25025 July 2024 Issuance of Amendment No. 362 Regarding Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System ML24107B1202024-04-18018 April 2024 Authorization and Safety Evaluation for Alternative Request No. ISIR-5-07 ML22363A5622023-01-0404 January 2023 Relief Request ISIR-5-06 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles ML22214A0012022-10-0707 October 2022 Issuance of Amendment Nos. 361 and 343 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements ML22166A3302022-07-26026 July 2022 Review of Quality Assurance Program Changes ML22046A2332022-06-21021 June 2022 Issuance of Amendment Nos. 360 and 342 Regarding Change to the Technical Specification Requirement for Containment Water Level Instrumentation ML22055A0012022-06-0808 June 2022 Issuance of Amendment No. 341 Updating the Reactor Coolant System Pressure Temperature Limits ML22102A0122022-05-0202 May 2022 Issuance of Amendment Nos. 359 and 340 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21295A0092021-11-0303 November 2021 Relief Request ISIR-4-11 Limited Coverage Examinations During the Fourth 10 Year Inservice Inspection Interval ML21141A2612021-06-0202 June 2021 Alternative Request REL-PP2 Related to Fifth 10-Year Inservice Testing Program Interval ML21130A0082021-05-12012 May 2021 Relief Request ISIR-5-05 Related to ASME Code Case N 729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles (EPID L-2021-LLR-0033 (COVID-19)) ML21062A1882021-03-23023 March 2021 Issuance of Amendment No. 339 One Cycle Extension of Appendix J, Type a, Integrated Leakage Rate Test Interval (EPID L-2020-LLA-0280 (COVID-19)) ML21041A0862021-03-0303 March 2021 Issuance of Amendment No. 338 Regarding One-Time Deferral of the Steam Generator Tube Inspections ML21034A1552021-02-12012 February 2021 Relief Request ISIR-5-04 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles ML21006A4582021-02-0202 February 2021 Issuance of Amendments Nos. 358 and 337 Regarding Revision to Technical Specifications to Adopt Technical Specifications Task Force Traveler 541, Revision 2 ML20366A1552021-01-15015 January 2021 Issuance of Amendments Nos. 357 and 336 Regarding Revision to Technical Specifications Bases Control Program ML20366A1342021-01-13013 January 2021 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML20329A0012021-01-12012 January 2021 Issuance of Amendment No. 356 Regarding Updating the Reactor Coolant System Pressure-Temperature Limits ML20322A4282021-01-0606 January 2021 Issuance of Amendment Nos. 355 and 335, Revision to Technical Specifications to Adopt Technical Specification Task Force Traveler 567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML20315A4832020-12-30030 December 2020 Issuance of Amendment Nos. 354 and 334 Adopt Technical Specification Task Force Traveler TSTF-412, Revision 3, Provide Actions for One Steam Supply to the Turbine Driven Afw/Efw Pump Inoperable ML20247J6562020-09-10010 September 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20213C7042020-09-0303 September 2020 Issuance of Amendment No. 353 One Cycle Extension of Appendix J, Type a, Integrated Leakage Rate Test Interval ML19347B3762020-01-31031 January 2020 Issuance of Amendment Nos. 350 and 331, Revise Technical Specification 5.5.5, Reactor Coolant Pump Flywheel Inspection Program, in Accordance with Technical Specification Task Force TSTF-421 ML19329A0112020-01-23023 January 2020 Issuance of Amendment Numbers 349 and 330 to Apply Leak Before-Break Methodology to Reactor Coolant System Branch Lines and Deletion of Containment Humidity Monitor ML19304B6722019-12-31031 December 2019 Issuance of Amendment Numbers 348 and 329 to Revise Operating Licenses DPR-58 and DPR-74, to Address Issues Identified in Westinghouse Document NSAL-15-1 ML19259A0542019-10-15015 October 2019 Issuance of Amendment to Revise Operating Licenses DPR-58 and DPR-74, Appendix B, Environmental Technical Specifications, Part II, Non-Radiological Environment Protection Plan ML19196A0642019-08-23023 August 2019 Relied Request ISIR-4-10 Regarding Fourth Inservice Inspection Program Interval ML19170A3622019-08-0101 August 2019 Issuance of Amendment Approval of Application of Proprietary Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping ML19134A3552019-07-11011 July 2019 Issuance of Amendments Technical Specification Task Force (TSTF) Traveler 563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML19031B9662019-04-10010 April 2019 Issuance of Amendments 344, 326 Regarding Request to Adopt TSTF-529, Revision 4, Clarify Use and Application Rules ML18346A3582019-02-0505 February 2019 Issuance of Amendments 343 and 325 Regarding the Battery Monitoring and Maintenance Program ML18348A4182019-01-0909 January 2019 Units and 2 Approval of Request for Alternative from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N 729-4 ML18337A3942018-12-11011 December 2018 Proposed Alternative Request for Elimination of the Reactor Pressure Vessel Threads in Flange Examination ML18284A2542018-11-16016 November 2018 Issuance of Amendments Request for Deviation from National Fire Protection Association 805 Requirements ML18249A0192018-11-13013 November 2018 Issuance of Amendment Nos. 341 and 323 Technical Support Center Relocation ML18284A3102018-10-26026 October 2018 Approval of Alternative to the ASME Code Regarding Reactor Vessel Weld Examination - Relief Request ISIR-4-08 ML18131A2532018-07-0606 July 2018 Issuance of Amendments Request for Deviation from National Fire Protection Association 805 Requirements ML18103A0592018-04-19019 April 2018 Request for Use of Alternative Isir 04-05, Revision 1, Associated with Reactor Vessel Closure Head Volumetric/Surface Examination Frequency Requirements for the Inservice Inspection Program ML17312B0302017-12-19019 December 2017 Issuance of Amendments License Amendment Request to Revise Technical Specifications Section 3.7.2, Steam Generator Stop Valves (CAC Nos. MF9539 and MF9540; EPID L-2017-LLA-0198) ML17214A5502017-09-21021 September 2017 Issuance of Amendments License Amendment Request Regarding Technical Specification 3.9.3, Containment Penetrations ML17131A2772017-06-0707 June 2017 Issuance of Amendments License Amendment Request Regarding Containment Leakage Rate Testing Program ML17103A1062017-05-24024 May 2017 Issuance of Amendments Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML17096A6272017-04-12012 April 2017 Proposed Alternative to Use ASME OM Code Case OMN-20 ML17045A1502017-03-31031 March 2017 Issuance of Amendments Adopting of TSTF0425-A, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B ML16327A1102016-12-28028 December 2016 Cover Letter for Revised Safety Evaluation for Amendment Nos. 332 and 314 Adoption of TSTF-490, Rev. 0, and Implementation of Full-Scope Alternative Source Term ML16242A1112016-10-20020 October 2016 DC Cook, Units 1 and 2 - Issuance of Amendments Adoption of TSTF-490,REV.0,Deletion of E-Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specification and Implementation of Full-Scope Alternative Source Ter ML16216A1812016-08-19019 August 2016 Issuance of Amendment to Revise Technical Specification 3.3.2, Engineered Safety Feature Actuation System Instrumentation ML16195A0042016-08-0404 August 2016 Issuance of Amendments to Revise Technical Specifications to Adopt Technical Specifications Task Force - 523, Generic Letter 2008 01, Managing Gas Accumulation ML16032A0312016-02-0404 February 2016 Request for Use of Alternative REL-PP1 Associated with Pump Inservice Testing (CAC Nos. MF6548 and MF6549) 2024-09-03
[Table view] |
Text
August 23, 2019 Mr. Joel P. Gebbie Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106
SUBJECT:
DONALD C. COOK NUCLEAR PLANT, UNIT NO. 2 - PROPOSED ALTERNATIVE ISIR-4-10 REGARDING FOURTH INSERVICE INSPECTION PROGRAM INTERVAL (EPID L-2019-LLR-0054)
Dear Mr. Gebbie:
By letter dated May 30, 2019 (Agencywide Document Access and Management System (ADAMS) Accession No. ML19155A074), Indiana Michigan Power Company (I&M or the licensee) proposed an alternative to the requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV) Code,Section XI, Table IWB-2500-1, for Categories B-A, B-D, B-N-2, and B-N-3, examinations for Donald C. Cook Nuclear Plant (CNP),
Unit 2, reactor pressure vessel welds, nozzle welds, interior attachments, and core support structure, respectively.
Specifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(z)(1), the licensee proposed an alternative to credit the subject examinations to be performed before February 29, 2020, for both the extended third and successive fourth inservice inspection (ISI) intervals at CNP, Unit 2, on the basis that the alternative provides an acceptable level of quality and safety.
The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the proposed alternative and determined, as set forth in the enclosed safety evaluation, that the proposed alternative provides an acceptable level of quality and safety. Accordingly, the NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(z)(1). Therefore, the NRC staff authorizes the use of ISIR-4-10 at CNP, Unit 2, for the remainder of the fourth lSI interval with an ending date of February 29, 2020, for ASME BPV Code, Categories B-A, B-D, B-N-2, and B-N-3, items.
All other requirements of the ASME BPV Code,Section XI, for which an alternative has not been specifically requested remain applicable, including third-party review by the Authorized Nuclear Inservice Inspector.
J. Gebbie If you have any questions, please contact Robert Kuntz at 301-415-3733 or via e-mail at Robert.Kuntz@nrc.gov Sincerely,
/RA by Michael Ortenak for/
Lisa M. Regner, Acting Branch Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-316
Enclosure:
Safety Evaluation cc: Listserv
SUBJECT:
DONALD C. COOK NUCLEAR PLANT, UNIT NO. 2 - PROPOSED ALTERNATIVE ISIR-4-10 REGARDING FOURTH INSERVICE INSPECTION PROGRAM INTERVAL (EPID L-2019-LLR-0054) DATED AUGUST 23, 2019 DISTRIBUTION:
PUBLIC PM File Copy RidsACRS_MailCTR Resource RidsNrrDorlLpl3 Resource RidsNrrPMDCCook Resource RidsNrrDmlrMibv Resource RidsRgn3MailCenter Resource RidsNrrLASRohrer Resource SSheng, NRR ADAMS Accession No. ML19196A064
- via e-mail OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NRR/DMLR/MVIB/BC NRR/DORL/LPL3/BC(A)
NAME RKuntz SRohrer DAlley* LRegner (MOrenak for)
DATE 8/22/19 7/15/19 8/23/19 8/23/19
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION PROPOSED ALTERNATIVE ISIR-4-10 REGARDING FOURTH INSERVICE INSPECTION PROGRAM INTERVAL INDIANA MICHIGAN POWER COMPANY DONALD C. COOK NUCLEAR PLANT, UNIT 2 DOCKET NO. 50-316
1.0 INTRODUCTION
By letter dated May 30, 2019 (Agencywide Document Access and Management System (ADAMS) Accession No. ML19155A074), Indiana Michigan Power Company (I&M or the licensee) proposed an alternative from the requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV) Code,Section XI, Table IWB-2500-1, for Categories B-A, B-D, B-N-2, and B-N-3, examinations for Donald C. Cook Nuclear Plant (CNP),
Unit 2, reactor pressure vessel (RPV) welds, nozzle welds, interior attachments, and core support structure, respectively.
Specifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(z)(1), the licensee proposed an alternative to credit the subject examinations to be performed before February 29, 2020, for both the extended third and successive fourth inservice inspection (ISI) intervals at CNP, Unit 2, on the basis that the alternative provides an acceptable level of quality and safety.
2.0 REGULATORY EVALUATION
Adherence to Section XI of the ASME BPV Code is mandated by 10 CFR 50.55a(g)(4), which states, in part, that ASME Code Class 1, 2, and 3 components will meet the requirements, except the design and access provisions and the pre-service examination requirements, set forth in Section XI of the ASME BPV Code.
The regulation in 10 CFR 50.55a(z) states that alternatives to the requirements of paragraphs (b) through (h) of 10 CFR 50.55a, or portions thereof, may be used when authorized by the Director, Office of Nuclear Reactor Regulation. A proposed alternative must be submitted and authorized prior to implementation. The licensee must demonstrate that the proposed alternatives provide an acceptable level of quality and safety, or compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Enclosure
Based on the above, and subject to the following technical evaluation, the U.S. Nuclear Regulatory Commission (NRC) staff finds that the licensee may request the use of an alternative and the NRC has the regulatory authority to authorize the proposed alternative.
3.0 TECHNICAL EVALUATION
3.1 ASME BPV Code Component Affected The affected components are the subject plant RPV welds, full penetration nozzle welds, interior attachments, and core support structure. The following examination categories and item numbers from IWB-2500 and Table IWB-2500-1 of the ASME BPV Code,Section XI, are listed in ISIR-4-10:
Exam Category Item No. Description B-A B1.11 Circumferential Shell Welds B-A B1.12 Longitudinal Shell Welds B-A B1.21 Circumferential Head Welds B-A B1.22 Meridional Head Welds B-A B1.30 Shell-to-Flange Weld B-D B3.90 Nozzle-to-Vessel Welds B-D B3.100 Nozzle Inner Radius Section B-N-2 B13.60 Interior Attachments Beyond Beltline Region B-N-3 B13.70 Core Support Structure 3.2 Applicable Code Edition and Addenda For the fourth 10-year ISI interval at CNP, Unit 2, the code of record for the inspection of ASME Code Class 1, 2, and 3 components is the 2004 Edition of the ASME BPV Code,Section XI.
3.3 Applicable Code Requirements ASME BPV Code,Section XI, paragraph IWB-2412, Inspection Program B, requires volumetric examination of essentially 100 percent of the total number of RPV pressure-retaining welds and visual examinations of RPV components identified in Table IWB-2500-1, once each 10-year interval.
ASME BPV Code,Section XI, IWA-2430(d)(2) requires that an examination performed to satisfy requirements of either the extended interval or the successive interval shall not be credited for both intervals.
3.4 Licensees Proposed Alternative In ISIR-4-10, the licensee proposes to use an alternative to the requirement of ASME BPV Code, IWA-2430(d)(2), to permit the use of an examination to satisfy the requirements of both the third extended interval and the current fourth interval.
3.5 Licensees Basis for Alternative In ISIR-4-10, the licensee states that the alternatives approved in the safety evaluations (SEs) for the RPV welds and full penetration nozzle welds (ADAMS Accession No. ML091260163) and for interior attachments and core support structure (ADAMS Accession No. ML091320549)
permit the extension of the examination interval for the respective components from 10 to 20 years. The basis for these approvals is that the alternatives provide an acceptable level of quality and safety pursuant to 10 CFR 50.55a(z)(1). Therefore, performing the subject examinations at the approved time and crediting the examinations for both the extended third ISI interval and the regular fourth ISI interval (with the same ISI end date) will not create any unnecessary risk.
3.6 Duration of Alternative The proposed alternative is for the remainder of the fourth lSI interval, which is scheduled to end on February 29, 2020.
4.0 NRC STAFF EVALUATION The NRC authorized alternatives to the examination requirements of the ASME BPV Code,Section XI, for Category B-A (RPV welds), B-D (RPV nozzle welds), B-N-2 (interior attachments), and B-N-3 (core support structure) for pressurized-water reactors to extend the ISI interval of the subject components from 10 years to 20 years. These NRC authorizations allow licensees to complete the ASME BPV Code required examination for certain categories for a 10-year ISI interval in 20 years. The technical basis for the alternative is documented in WCAP-16168-NP-A, Revision 3, Risk-Informed Extension of the Reactor Vessel In-Service Inspection Interval (ADAMS Accession No. ML11306A084).
WCAP-16168 provides a basis for the acceptability of 20-year inspection interval for ASME BPV Code Categories B-A and B-D components of pressurized water reactors designed by Westinghouse, Combustion Engineering, and Babcock and Wilcox (B&W) through the use of risk-informed analyses and probabilistic fracture mechanics for a pilot plant of each design. The NRC staffs SE for WCAP-16168 finds the alternative acceptable for use based on consistency with the principles contained in Regulatory Guide 1.174, Revision 1, An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis (ADAMS Accession No. ML17317A256). Regarding plant-specific application of WCAP-16168, the associated SE states, a relief for an alternative, in accordance with 10 CFR 50.55a(a)(3)(i) [now 10 CFR 50.55a(z)(1)], must be submitted and approved by the NRC to extend the ISI interval. The SE further discusses conditions upon its use to provide plant-specific information to demonstrate the applicability of the WCAP. The following condition is related to future inspections:
The 20-year inspection interval is a maximum interval and will be granted on an interval-by-interval basis. In its request for an alternative, each licensee shall identify the years in which future inspection will be performed. The dates provided must be within plus or minus one refueling cycle of the dates identified in the implementation plan provided to the NRC in PWROG [Pressurized Water Reactor Owners Group]
letter OG-10-238 [ADAMS Accession No. ML11153A033].
While the SE allows an ISI interval be extended from 10 years to 20 years, the SE is silent on the inspection requirements on the subsequent ISI interval which overlaps with the last 10 years of the extended ISI interval and ends at the same date of the extended ISI interval.
NRC Assessment of the Licensees Request In ISIR-4-10, I&M has determined that the fourth 10-year ISI interval coexists with the extended third ISI interval. Since IWA-2430(d)(2) requires that an examination performed to satisfy requirements of either the extended interval or the successive interval shall not be credited for both intervals, the licensee proposed an alternative to IWA-2430(d)(2) to permit use of one examination to satisfy the requirements of both the third extended interval and the fourth interval.
Based on the technical justification provided in WCAP-16168, and the licensees conformance to the requirements of WCAP-16168, the NRC staff finds that simultaneously conducting the examiniation required by the ASME Code twice, once for the third interval and once for the fourth, provides no benefit to the safety of the plant when compared with the licensees proposal to conduct the examination only once. As such, the NRC finds that the licensees proposed alternative provides an acceptable level of quality and safety.
5.0 CONCLUSION
As set forth above, the NRC staff determined that the licensee demonstrated that the proposed alternative provides an acceptable level of quality and safety. Accordingly, the NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(z)(1). Therefore, the NRC staff authorizes the use of ISIR-4-10 at CNP, Unit 2, for the remainder of the fourth lSI interval with an ending date of February 29, 2020, for ASME BPV Code, Categories B-A, B-D, B-N-2, and B-N-3, items.
All other requirements of the ASME BPV Code,Section XI, for which an alternative has not been specifically requested remain applicable, including third-party review by the Authorized Nuclear Inservice Inspector.
Principal Contributor: Simon Sheng, NRR Date of issuance: August 23, 2019