Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML22363A562 | 4 January 2023 | Relief Request ISIR-5-06 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles | |
ML22214A001 | 7 October 2022 | Issuance of Amendment Nos. 361 and 343 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements | Pressure Boundary Leakage Fire Protection Program |
ML22166A330 | 26 July 2022 | Review of Quality Assurance Program Changes | Process Control Program Grace period |
ML22046A233 | 21 June 2022 | Issuance of Amendment Nos. 360 and 342 Regarding Change to the Technical Specification Requirement for Containment Water Level Instrumentation | Safe Shutdown Anticipated operational occurrence Post Accident Monitoring Probabilistic Risk Assessment Fire Protection Program |
ML22055A001 | 8 June 2022 | Issuance of Amendment No. 341 Updating the Reactor Coolant System Pressure Temperature Limits | Shutdown Margin Hydrostatic Surveillance Frequency Control Program |
ML22102A012 | 2 May 2022 | Issuance of Amendment Nos. 359 and 340 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections | Post Accident Monitoring Nondestructive Examination Surveillance Frequency Control Program Fire Protection Program |
ML21295A009 | 3 November 2021 | Relief Request ISIR-4-11 Limited Coverage Examinations During the Fourth 10 Year Inservice Inspection Interval | Probabilistic Risk Assessment Nondestructive Examination VT-2 Incorporated by reference Large early release frequency Pressure Boundary Leakage |
ML21141A261 | 2 June 2021 | Alternative Request REL-PP2 Related to Fifth 10-Year Inservice Testing Program Interval | Incorporated by reference |
ML21130A008 | 12 May 2021 | Relief Request ISIR-5-05 Related to ASME Code Case N 729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles (EPID L-2021-LLR-0033 (COVID-19)) | Pandemic Coronavirus COVID-19 |
ML21062A188 | 23 March 2021 | Issuance of Amendment No. 339 One Cycle Extension of Appendix J, Type a, Integrated Leakage Rate Test Interval (EPID L-2020-LLA-0280 (COVID-19)) | Internal Flooding Probabilistic Risk Assessment Coatings Large early release frequency Earthquake Pandemic Coronavirus COVID-19 Grace period |
ML21041A086 | 3 March 2021 | Issuance of Amendment No. 338 Regarding One-Time Deferral of the Steam Generator Tube Inspections | Nondestructive Examination Foreign Material Exclusion Pandemic Coronavirus |
ML21034A155 | 12 February 2021 | Relief Request ISIR-5-04 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles | High Radiation Area Pandemic Coronavirus COVID-19 Pressure Boundary Leakage |
ML21006A458 | 2 February 2021 | Issuance of Amendments Nos. 358 and 337 Regarding Revision to Technical Specifications to Adopt Technical Specifications Task Force Traveler 541, Revision 2 | Surveillance Frequency Control Program Fire Protection Program |
ML20366A155 | 15 January 2021 | Issuance of Amendments Nos. 357 and 336 Regarding Revision to Technical Specifications Bases Control Program | Fire Protection Program |
ML20366A134 | 13 January 2021 | Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques | |
ML20329A001 | 12 January 2021 | Issuance of Amendment No. 356 Regarding Updating the Reactor Coolant System Pressure-Temperature Limits | Shutdown Margin Hydrostatic Surveillance Frequency Control Program Fire Protection Program |
ML20322A428 | 6 January 2021 | Issuance of Amendment Nos. 355 and 335, Revision to Technical Specifications to Adopt Technical Specification Task Force Traveler 567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues | Surveillance Frequency Control Program Fire Protection Program |
ML20315A483 | 30 December 2020 | Issuance of Amendment Nos. 354 and 334 Adopt Technical Specification Task Force Traveler TSTF-412, Revision 3, Provide Actions for One Steam Supply to the Turbine Driven Afw/Efw Pump Inoperable | Surveillance Frequency Control Program Fire Protection Program |
ML20247J656 | 10 September 2020 | Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI | Incorporated by reference |
ML20213C704 | 3 September 2020 | Issuance of Amendment No. 353 One Cycle Extension of Appendix J, Type a, Integrated Leakage Rate Test Interval | Internal Flooding Probabilistic Risk Assessment Coatings Large early release frequency Earthquake Pandemic COVID-19 Fire Protection Program Grace period |
ML19347B376 | 31 January 2020 | Issuance of Amendment Nos. 350 and 331, Revise Technical Specification 5.5.5, Reactor Coolant Pump Flywheel Inspection Program, in Accordance with Technical Specification Task Force TSTF-421 | Probabilistic Risk Assessment Liquid penetrant Fire Protection Program |
ML19329A011 | 23 January 2020 | Issuance of Amendment Numbers 349 and 330 to Apply Leak Before-Break Methodology to Reactor Coolant System Branch Lines and Deletion of Containment Humidity Monitor | Grab sample Safe Shutdown Earthquake Probabilistic Risk Assessment Surveillance Frequency Control Program Earthquake Fuel cladding Pressure Boundary Leakage Fire Protection Program |
ML19304B672 | 31 December 2019 | Issuance of Amendment Numbers 348 and 329 to Revise Operating Licenses DPR-58 and DPR-74, to Address Issues Identified in Westinghouse Document NSAL-15-1 | Surveillance Frequency Control Program Fire Protection Program |
ML19259A054 | 15 October 2019 | Issuance of Amendment to Revise Operating Licenses DPR-58 and DPR-74, Appendix B, Environmental Technical Specifications, Part II, Non-Radiological Environment Protection Plan | Fire Protection Program |
ML19196A064 | 23 August 2019 | Relied Request ISIR-4-10 Regarding Fourth Inservice Inspection Program Interval | Probabilistic Risk Assessment |
ML19170A362 | 1 August 2019 | Issuance of Amendment Approval of Application of Proprietary Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping | Grab sample Safe Shutdown Earthquake Earthquake Pressure Boundary Leakage Pressure boundary leak Fire Protection Program |
ML19134A355 | 11 July 2019 | Issuance of Amendments Technical Specification Task Force (TSTF) Traveler 563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program | Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency Pressure Boundary Leakage Fire Protection Program |
ML19031B966 | 10 April 2019 | Issuance of Amendments 344, 326 Regarding Request to Adopt TSTF-529, Revision 4, Clarify Use and Application Rules | Time of Discovery Missed surveillance Fire Protection Program |
ML18346A358 | 5 February 2019 | Issuance of Amendments 343 and 325 Regarding the Battery Monitoring and Maintenance Program | Emergency Lighting Surveillance Frequency Control Program Fire Protection Program |
ML18348A418 | 9 January 2019 | Units and 2 Approval of Request for Alternative from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N 729-4 | Incorporated by reference |
ML18337A394 | 11 December 2018 | Proposed Alternative Request for Elimination of the Reactor Pressure Vessel Threads in Flange Examination | |
ML18284A254 | 16 November 2018 | Issuance of Amendments Request for Deviation from National Fire Protection Association 805 Requirements | Safe Shutdown Probabilistic Risk Assessment Fire Protection Program |
ML18249A019 | 13 November 2018 | Issuance of Amendment Nos. 341 and 323 Technical Support Center Relocation | Health Physics Network High winds Earthquake |
ML18284A310 | 26 October 2018 | Approval of Alternative to the ASME Code Regarding Reactor Vessel Weld Examination - Relief Request ISIR-4-08 | Probabilistic Risk Assessment |
ML18131A253 | 6 July 2018 | Issuance of Amendments Request for Deviation from National Fire Protection Association 805 Requirements | Safe Shutdown Mission time Fire Barrier Probabilistic Risk Assessment Fire Protection Program |
ML18103A059 | 19 April 2018 | Request for Use of Alternative Isir 04-05, Revision 1, Associated with Reactor Vessel Closure Head Volumetric/Surface Examination Frequency Requirements for the Inservice Inspection Program | Boric Acid VT-2 |
ML17312B030 | 19 December 2017 | Issuance of Amendments License Amendment Request to Revise Technical Specifications Section 3.7.2, Steam Generator Stop Valves (CAC Nos. MF9539 and MF9540; EPID L-2017-LLA-0198) | Surveillance Frequency Control Program Fire Protection Program |
ML17214A550 | 21 September 2017 | Issuance of Amendments License Amendment Request Regarding Technical Specification 3.9.3, Containment Penetrations | Fire Protection Program |
ML17131A277 | 7 June 2017 | Issuance of Amendments License Amendment Request Regarding Containment Leakage Rate Testing Program | Fire Protection Program |
ML17103A106 | 24 May 2017 | Issuance of Amendments Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing | Incorporated by reference Missed surveillance Surveillance Frequency Control Program Pressure Boundary Leakage Fire Protection Program |
ML17096A627 | 12 April 2017 | Proposed Alternative to Use ASME OM Code Case OMN-20 | |
ML17045A150 | 31 March 2017 | Issuance of Amendments Adopting of TSTF0425-A, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B | High winds Shutdown Margin High Radiation Area Ultimate heat sink Internal Flooding Hydrostatic Probabilistic Risk Assessment Cyber Security Surveillance Frequency Control Program Large early release frequency Pressure Boundary Leakage Offsite Circuit Fire Protection Program Backfit Power change |
ML16327A110 | 28 December 2016 | Cover Letter for Revised Safety Evaluation for Amendment Nos. 332 and 314 Adoption of TSTF-490, Rev. 0, and Implementation of Full-Scope Alternative Source Term | Safe Shutdown Unanalyzed Condition Boric Acid Fuel cladding Coast down GOTHIC Power Uprate Measurement Uncertainty Recapture |
ML16242A111 | 20 October 2016 | DC Cook, Units 1 and 2 - Issuance of Amendments Adoption of TSTF-490,REV.0,Deletion of E-Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specification and Implementation of Full-Scope Alternative Source Ter | Safe Shutdown Unanalyzed Condition Boric Acid Fuel cladding Fire Protection Program Power change Coast down GOTHIC Power Uprate Measurement Uncertainty Recapture |
ML16216A181 | 19 August 2016 | Issuance of Amendment to Revise Technical Specification 3.3.2, Engineered Safety Feature Actuation System Instrumentation | Probabilistic Risk Assessment |
ML16195A004 | 4 August 2016 | Issuance of Amendments to Revise Technical Specifications to Adopt Technical Specifications Task Force - 523, Generic Letter 2008 01, Managing Gas Accumulation | Fire Protection Program |
ML16032A031 | 4 February 2016 | Request for Use of Alternative REL-PP1 Associated with Pump Inservice Testing (CAC Nos. MF6548 and MF6549) | Boric Acid Incorporated by reference |
ML15327A217 | 11 December 2015 | Issuance of Amendments Technical Specifications Surveillance Requirements 3.8.1.10, 3.8.1.11, and 3.8.1.15 | Safe Shutdown Offsite Circuit Fire Protection Program |
ML14197A097 | 30 November 2015 | Issuance of Amendment Regarding Restoration of Normal Reactor Coolant System Pressure and Temperature Consistent with Previously Licensed Conditions | Boric Acid Shutdown Margin Loop seal Anticipated operational occurrence Hydrostatic Fuel cladding Fire Protection Program |
ML15264A851 | 9 November 2015 | Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 | Boric Acid High winds Shutdown Margin Loop seal High Radiation Area Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Emergency Lighting Locked High Radiation Area Finite Element Analysis FLEX Tornado-Generated Missile Fukushima Dai-Ichi Design basis earthquake Spent Fuel Pool Instrumentation Severe Accident Management Guideline Frazil ice Earthquake Fire Protection Program Coast down GOTHIC |